RM2RC59GF–'Students at the School of Aerial Photography at Cornell University in Ithaca, NY studying first, second, and third trench systems. Photograph taken on 3/26/19 by Photographer Rico. This image is part of a series documenting the activities of the school. Tower with a graphic labeled 'TREN GRAPHY BARRAY' visible in the background. The image is numbered '235-P' and is for official use only.'
RF2J1XJR6–Aerial top view on construction site the concrete sanitary sewer pipes storm drain systems of an apartment house
RM2RCCHX4–Aerial photograph taken during World War One showing unidentified trench systems. The photograph, numbered 111-SC-7492, was taken by Signal Corps photographer WUNDER. The photograph was received on March 10, 1921 and corresponds to 1918 symbol notation. The location and specific details of the trench systems are not identified in the image.
RF2H52X45–Laying of underground storm sewer pipes and sewerage well. Construction of water main, sanitary sewer, storm drain systems. An aerial view of the conc
RM2RBYGA8–Aerial map showing the elaborate trench systems in France during World War One. The map provides a detailed overview of the network of intricately designed trenches in the war-torn region. This photograph was taken by the Signal Corps photographer Syrdol from the Wunder collection.
RF2J1XK2P–Aerial top view in preparation process of construction site on concrete sanitary sewer pipes storm drain systems
RF2H52W14–Laying of underground storm sewer pipes and sewerage well. Construction of water main, sanitary sewer, storm drain systems. An aerial view of the conc
RM2RBXY94–Aerial map of trenches in France during World War One. The photograph shows detailed trenches along with corresponding notes such as ICA-510-CARRIERES BOHERY and their precise coordinates 22.917-16. The image was taken from an aircraft at an altitude of 2000m at 8:40:37 in the morning. Its reference is F-120.
RF2J26BMK–Aerial view of excavator at construction of water main, sanitary sewer, storm drain systems
RF2H52M3C–Laying of underground storm sewer pipes and sewerage well. Construction of water main, sanitary sewer, storm drain systems. An aerial view of the conc
RM2RBX2RT–Aerial view of trenches in France during World War One. The photograph is labeled 111-SC-8788 and is part of the Signal Corps collection. The image was taken to capture an overview of the trench systems. Notes indicate the photograph is numbered 08788 and has a size of 2.7.
RF2J28B4J–Aerial view of construction site in preparation process build new home on concrete sanitary sewer pipes storm drain systems
RF2H52TYW–Laying of underground storm sewer pipes and sewerage well. Construction of water main, sanitary sewer, storm drain systems. An aerial view of the conc
RM2RBXP5J–Aerial map of trenches in France during World War One. The photograph, taken by the Signal Corps, is identified as 111-SC-8752. The map highlights the intricate network of trenches used by soldiers during the war. The photo was described and issued as AMBER 8752 and bears the notation 'TAKES H SYMBOL ADRIAL MAP 07 TRENCHES IN PRANCE EU.'
RM2RC2FK6–This photograph, labeled as 111-SC-132, shows an aerial map of trenches in France, specifically in Pont Faverger. It is a part of the Signal Corps collection and was taken by a photographer. The description mentions that it was taken during World War I and is an issued photograph. The symbol 'BU' is not further clarified.
RM2RBXKCA–'Aerial view of trenches in France, captured by the Signal Corps. The photograph, labeled 111-SC-8548, was taken by NEOD and issued by SYL KU. This image shows an aerial map of trenches in France, with a note mentioning the presence of butter when the temperature was -32.3 degrees Celsius.'
RM2RCCF60–Soldiers from the United States engaged in combat training during World War One.
RM2RCG8DG–2nd Lt. Charles E. Reiss of the Signal Corps photographed with a captured German prisoner pigeon at St. Mihiel, Fort Bonnelle, Pigeon Center in Langres, Haute Marne, France. This image was received on April 14, 1919 and is assigned the photographer number 52089. The description emphasizes Lt. Reiss' role with the captured pigeon, possibly for intelligence purposes. The date of issue for the image is not specified.
RM2RCGHF2–Pvt. W.J. Miller having his photograph taken with a Fairnault flight wing, issued model. The photograph was taken on November 10, 1918. It was later approved by the M.I.D. censor on November 19, 1918. Image number is *26253.
RM2RBYHT0–Sgt. L. P. Morper and Sgt. John L. Johnson are shown operating a Lucas lamp and projector in Saulty, France. This equipment was used by the Signal Platoon of the 320th Regiment of the 80th Division during World War One. The photograph was released by the A. E. P. Censor, but the exact date is unknown.
RM2RCN9BC–Caption: Cpl. Allan Hanson, S. C., captured this photograph on August 1, 1913, showcasing Private Albert V. Lems from the 127th Infantry, 2nd Battalion of the 32nd Division. Lems is seen fulfilling his duty in an observation post at Lock 25 on the Canal in Eglingen, Alsace, Germany. The image was approved by the A.E.F. censor on July 23, 1918.
RF2J21RD6–Construction site aerial views of concrete drainage pipe and manhole
RM2RC0K93–Sergeant Nightingale captured this image on November 5, 1918, at Camp de Fort des Romains near St. Mihiel, Meuse, France. It shows a concrete pillbox with a steel turret. The photograph was received and taken on December 27, 1918. It is part of the collection of American military activities during World War One.
RF2H52X0A–Laying of underground storm sewer pipes and sewerage well. Construction of water main, sanitary sewer, storm drain systems. An aerial view of the conc
RM2RCH2KY–Private Clyde L. Eddy, an S.C. photographer, captured this image on November 11, 1918, near Verdun, France. It shows the control winch with a reel unwinding telephonic wire. Lieutenant William Heftym, the maneuvering officer, can be seen directing the operations. This photograph was taken during World War One.
RM2RCJ0P9–American soldiers stationed in France during World War One observe the view from Cote St. Germain. This photograph, taken on November 22, 1918, shows a wooded area known as the Bois de Bun, which is located half a kilometer south of Milly in the Meuse region.
RM2WBNEMN–CAPE CANAVERAL, Fla. – An aerial view shows construction progress at Launch Pad 39B at NASA’s Kennedy Space Center in Florida. A new elevator has been constructed on the surface of the pad and the crawlerway leading up to the surface is being repaired. Repairs also are being made to the crawler track panels and catacomb roof below on either side of the flame trench. Also in view are two of the three tall lightning towers that surround the pad. Upgrades are underway at Pad B and other facilities in the Launch Complex 39 area. The Ground Systems Development and Operations, or GSDO, Program offic
RF2J21RP6–Aerial top view of construction site laying concrete pipe drainage system
RF2H532WM–Laying of underground storm sewer pipes and sewerage well. Excavator at construction of water main, sanitary sewer, storm drain systems. Aerial view o
RM2WBNFP4–CAPE CANAVERAL, Fla. – An aerial view shows construction progress at Launch Pad 39B at NASA’s Kennedy Space Center in Florida. A new elevator has been constructed on the surface of the pad and the crawlerway leading up to the surface is being repaired. Repairs also are being made to the crawler track panels and catacomb roof below on either side of the flame trench. Also in view are the water tower and two of the three tall lightning towers that surround the pad. Upgrades are underway at Pad B and other facilities in the Launch Complex 39 area. The Ground Systems Development and Operations, or
RF2J26BMG–Under construction site the concrete sanitary sewer pipes storm drain systems of an apartment house
RF2H52XAX–Laying of underground storm sewer pipes and sewerage well. Excavator at construction of water main, sanitary sewer, storm drain systems. Aerial view o
RM2WBNAB8–CAPE CANAVERAL, Fla. – An aerial view shows construction progress at Launch Pad 39B at NASA’s Kennedy Space Center in Florida. A new elevator has been constructed on the surface of the pad and the crawlerway leading up to the surface is being repaired. Repairs also are being made to the crawler track panels and catacomb roof below on either side of the flame trench. Also in view are the water tower and the three tall lightning towers that surround the pad. Upgrades are underway at Pad B and other facilities in the Launch Complex 39 area. The Ground Systems Development and Operations, or GSDO,
RF2J21RN3–Aerial top view of construction site laying concrete pipe drainage system with working industrial machines
RF2GEECNM–Aerial view with PVC pipe for building sewage drainage systems underground for new home
RF2H53908–Laying of underground storm sewer pipes and sewerage well. Excavator at construction of water main, sanitary sewer, storm drain systems. Aerial view o
RF2J1Y2GT–Aerial view of preparation process for new residential complex buildings for construction site work
RM2WBNGWH–CAPE CANAVERAL, Fla. – An aerial view shows construction progress at Launch Pad 39B at NASA’s Kennedy Space Center in Florida. A new elevator has been constructed on the surface of the pad and the crawlerway leading up to the surface is being repaired. Repairs also are being made to the crawler track panels and catacomb roof below on either side of the flame trench. Also in view are the water tower and two of the three tall lightning towers that surround the pad. Upgrades are underway at Pad B and other facilities in the Launch Complex 39 area. The Ground Systems Development and Operations, or
RF2J21RAN–Aerial view of the concrete pipe and concrete wells laying of underground storm sewer pipes and sewerage well
RF2J1XJ1Y–Aerial view under construction site concrete pipes stacking for a new home
RM2WBNCB5–CAPE CANAVERAL, Fla. – An aerial view shows construction progress at Launch Pad 39B at NASA’s Kennedy Space Center in Florida. A new elevator has been constructed on the surface of the pad and the crawlerway leading up to the surface is being repaired. Repairs also are being made to the crawler track panels and catacomb roof below on either side of the flame trench. Also in view are portions of the water tower and the three tall lightning towers that surround the pad. Upgrades are underway at Pad B and other facilities in the Launch Complex 39 area. The Ground Systems Development and Operation
RF2J1XJ6T–Preparation process for industrial building of construction site with aerial view concrete drainage pipe manhole
RM2WBNDAJ–CAPE CANAVERAL, Fla. – An aerial view shows construction progress at Launch Pad 39B at NASA’s Kennedy Space Center in Florida. A new elevator has been constructed on the surface of the pad and the crawlerway leading up to the surface is being repaired. Repairs also are being made to the crawler track panels and catacomb roof below on either side of the flame trench. To the right is one of three tall lightning towers. Upgrades are underway at Pad B and other facilities in the Launch Complex 39 area. The Ground Systems Development and Operations, or GSDO, Program office at Kennedy is leading the
RF2J1Y1J4–Digger on earthworks in excavator dig the trenche at construction site on arial view of earth moving heavy equipment
RM2WBNED3–CAPE CANAVERAL, Fla. – An aerial view shows construction progress at Launch Pad 39B at NASA’s Kennedy Space Center in Florida. A new elevator has been constructed on the surface of the pad and the crawlerway leading up to the surface is being repaired. Repairs also are being made to the crawler track panels and catacomb roof below on either side of the flame trench. Also in view are the water tower and two of the three tall lightning towers that surround the pad. Upgrades are underway at Pad B and other facilities in the Launch Complex 39 area. The Ground Systems Development and Operations, or
RF2J1Y233–Laying of underground storm sewer pipes and sewerage well on excavator at construction in preparation process for new build
RM2WBNBGY–CAPE CANAVERAL, Fla. – An aerial view shows construction progress at Launch Pad 39B at NASA’s Kennedy Space Center in Florida. A new elevator has been constructed on the surface of the pad and the crawlerway leading up to the surface is being repaired. Repairs also are being made to the crawler track panels and catacomb roof below on either side of the flame trench. Also in view are the water tower and two of the three tall lightning towers that surround the pad. Upgrades are underway at Pad B and other facilities in the Launch Complex 39 area. The Ground Systems Development and Operations, or
RF2J1Y1DD–Excavator working at backhoe digs ground for laying concrete pipes on construction site on earthworks
RM2WBNDY7–CAPE CANAVERAL, Fla. – An aerial view shows construction progress at Launch Pad 39B at NASA’s Kennedy Space Center in Florida. A new elevator has been constructed on the surface of the pad and the crawlerway leading up to the surface is being repaired. Repairs also are being made to the crawler track panels and catacomb roof below on either side of the flame trench. Also in view are the water tower and the three tall lightning towers that surround the pad. Upgrades are underway at Pad B and other facilities in the Launch Complex 39 area. The Ground Systems Development and Operations, or GSDO,
RF2J1Y2AM–Construction of storm water pits sanitary sewer system excavator working backhoe digs ground
RM2WBNCB8–CAPE CANAVERAL, Fla. – An aerial view shows construction progress at Launch Pad 39B at NASA’s Kennedy Space Center in Florida. A new elevator has been constructed on the surface of the pad and the crawlerway leading up to the surface is being repaired. Repairs also are being made to the crawler track panels and catacomb roof below on either side of the flame trench. Also in view are two of the three tall lightning towers that surround the pad. Upgrades are underway at Pad B and other facilities in the Launch Complex 39 area. The Ground Systems Development and Operations, or GSDO, Program offic
RF2J1Y21E–Excavator working backhoe digs ground of preparation process for new residential complex buildings with construction of storm water pits sanitary
RF2J21R5A–Digger on earthworks in excavator dig the trenche at construction site on arial view
RF2J1XJHJ–Concrete drainage pipe and manhole of new housing under construction site
RF2J21PMF–Reinforced concrete pipes drainage for industrial building construction
Download Confirmation
Please complete the form below. The information provided will be included in your download confirmation