10.01.2013 Views

unclassified

unclassified

unclassified

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DEPARTMENT OF THE NAVY<br />

FISCAL YEAR (FY) 2005<br />

BUDGET ESTIMATES<br />

JUSTIFICATION OF ESTIMATES<br />

FEBRUARY 2004<br />

OTHER PROCUREMENT, NAVY<br />

BUDGET ACTIVITY 2


UNCLASSIFIED<br />

Department of the Navy<br />

FY 2005 Procurement Program Exhibit P-1<br />

APPROPRIATION: 1810N Other Procurement, Navy DATE: February 2004<br />

------------------------------------------------------------------------------------------------------------------------------------<br />

TOA, $ IN MILLIONS<br />

(DOLLARS) ------------------------------------------------------ S<br />

LINE IDENT FY 2005 -----FY 2003---- -----FY 2004---- -----FY 2005---- E<br />

NO ITEM NOMENCLATURE CODE UNIT COST QUANTITY COST QUANTITY COST QUANTITY COST C<br />

---- ----------------- ----- --------- -------- ------- -------- ------- -------- ------- -<br />

BUDGET ACTIVITY 02: Communications and Electronics Equipment<br />

-------------------<br />

Ship Radars<br />

29 2026 SPQ-9B Radar - 19.3 3.6 U<br />

30 2040 Radar Support A 13.4 10.2 - U<br />

31 2043 TISS A - 4.4 - U<br />

Ship Sonars<br />

32 2136 AN/SQQ-89 Surf ASW Combat System A 13.7 15.2 - U<br />

33 2147 SSN Acoustics A 229.6 266.4 225.0 U<br />

34 2171 UUV Program - - 61.3 U<br />

35 2176 Undersea Warfare Support Equipment A 13.4 11.6 14.1 U<br />

36 2181 Sonar Switches and Transducers A 15.8 13.5 13.3 U<br />

ASW Electronic Equipment<br />

37 2210 Submarine Acoustic Warfare System A 20.5 25.9 20.9 U<br />

38 2213 SSTD A - 13.7 22.3 U<br />

39 2225 Fixed Surveillance System A 60.8 46.0 55.3 U<br />

40 2237 SURTASS A 19.9 15.1 7.2 U<br />

41 2246 Tactical Support Center A 5.1 9.4 5.1 U<br />

Electronic Warfare Equipment<br />

42 2312 AN/SLQ-32 A 1.8 22.3 18.7 U<br />

43 2340 Information Warfare Systems A 5.0 4.2 4.0 U<br />

Reconnaissance Equipment<br />

44 2360 Shipboard IW Exploit A 82.1 122.2 69.2 U<br />

* ITEMS UNDER $50,000 UNCLASSIFIED PAGE N- 4


UNCLASSIFIED<br />

Department of the Navy<br />

FY 2005 Procurement Program Exhibit P-1<br />

APPROPRIATION: 1810N Other Procurement, Navy DATE: February 2004<br />

------------------------------------------------------------------------------------------------------------------------------------<br />

TOA, $ IN MILLIONS<br />

(DOLLARS) ------------------------------------------------------ S<br />

LINE IDENT FY 2005 -----FY 2003---- -----FY 2004---- -----FY 2005---- E<br />

NO ITEM NOMENCLATURE CODE UNIT COST QUANTITY COST QUANTITY COST QUANTITY COST C<br />

---- ----------------- ----- --------- -------- ------- -------- ------- -------- ------- -<br />

Submarine Surveillance Equipment<br />

45 2560 Submarine Support Equipment Prog A 86.3 70.9 79.0 U<br />

Other Ship Electronic Equipment<br />

46 2605 Navy Tactical Data System A 7.5 12.0 - U<br />

47 2606 Cooperative Engagement Capability B 70.1 66.6 57.5 U<br />

48 2608 GCCS-M Equipment A 58.4 51.8 63.4 U<br />

49 2611 Naval Tactical Command Support System (NTCSS) A 31.6 51.3 26.2 U<br />

50 2614 ATDLS A 9.0 16.1 2.4 U<br />

51 2622 Minesweeping System Replacement A 25,985,333 .1 18.2 3 78.0 U<br />

52 2657 NAVSTAR GPS Receivers (Space) A 11.4 15.5 11.7 U<br />

53 2666 Armed Forces Radio and TV A 4.1 4.2 4.2 U<br />

54 2676 Strategic Platform Support Equip A 17.6 8.5 5.3 U<br />

Training Equipment<br />

55 2760 Other SPAWAR Training Equipment A 1.0 - - U<br />

56 2762 Other Training Equipment A 21.5 52.2 42.9 U<br />

Aviation Electronic Equipment<br />

57 2815 MATCALS A 7.6 4.1 15.6 U<br />

58 2831 Shipboard Air Traffic Control B 8.1 7.8 7.7 U<br />

59 2832 Automatic Carrier Landing System A 11.5 17.4 12.5 U<br />

60 2840 National Air Space System B 7.0 15.9 16.1 U<br />

61 2845 Air Station Support Equipment A 6.8 7.5 3.6 U<br />

62 2846 Microwave Landing System A - - 7.2 U<br />

* ITEMS UNDER $50,000 UNCLASSIFIED PAGE N- 5


UNCLASSIFIED<br />

Department of the Navy<br />

FY 2005 Procurement Program Exhibit P-1<br />

APPROPRIATION: 1810N Other Procurement, Navy DATE: February 2004<br />

------------------------------------------------------------------------------------------------------------------------------------<br />

TOA, $ IN MILLIONS<br />

(DOLLARS) ------------------------------------------------------ S<br />

LINE IDENT FY 2005 -----FY 2003---- -----FY 2004---- -----FY 2005---- E<br />

NO ITEM NOMENCLATURE CODE UNIT COST QUANTITY COST QUANTITY COST QUANTITY COST C<br />

---- ----------------- ----- --------- -------- ------- -------- ------- -------- ------- -<br />

63 2847 FACSFAC A 4.2 4.3 3.7 U<br />

64 2851 ID Systems A 29.7 21.7 18.3 U<br />

65 2876 TAC A/C Mission Planning Sys(TAMPS) A 6.8 8.6 9.1 U<br />

Other Shore Electronic Equipment<br />

66 2804 Deployable Joint Command and Control (DJC2) A - 51.7 32.5 U<br />

67 2901 Naval Space Surveillance System A 2.0 - - U<br />

68 2905 DIMHRS .* 5.7 - U<br />

69 2914 Common Imagery Ground Surface Systems 51.2 40.3 53.2 U<br />

70 2920 RADIAC A 8.2 8.5 9.1 U<br />

71 2940 GPETE A 6.5 9.9 7.0 U<br />

72 2960 Integ Combat System Test Facility A 7.7 8.7 4.7 U<br />

73 2970 EMI Control Instrumentation A 5.2 6.4 5.9 U<br />

74 2980 Items less than $5 Million 12.1 15.3 12.1 U<br />

Shipboard Communications<br />

75 3010 Shipboard Tactical Communications A - 40.0 14.1 U<br />

76 3050 Ship Communications Automation A 158.8 180.9 159.7 U<br />

77 3057 Communications Items under $5M 36.5 29.3 11.9 U<br />

Submarine Communications<br />

78 3107 Submarine Broadcast Support A 3.7 16.4 17.8 U<br />

79 3130 Submarine Communication Equipment A 121.4 109.5 94.5 U<br />

Satellite Communications<br />

80 3215 Satellite Communications Systems 158.9 234.8 130.6 U<br />

* ITEMS UNDER $50,000 UNCLASSIFIED PAGE N- 6


UNCLASSIFIED<br />

Department of the Navy<br />

FY 2005 Procurement Program Exhibit P-1<br />

APPROPRIATION: 1810N Other Procurement, Navy DATE: February 2004<br />

------------------------------------------------------------------------------------------------------------------------------------<br />

TOA, $ IN MILLIONS<br />

(DOLLARS) ------------------------------------------------------ S<br />

LINE IDENT FY 2005 -----FY 2003---- -----FY 2004---- -----FY 2005---- E<br />

NO ITEM NOMENCLATURE CODE UNIT COST QUANTITY COST QUANTITY COST QUANTITY COST C<br />

---- ----------------- ----- --------- -------- ------- -------- ------- -------- ------- -<br />

Shore Communications<br />

81 3302 JCS Communications Equipment A 4.1 3.9 3.0 U<br />

82 3303 Electrical Power Systems A 1.2 1.4 1.3 U<br />

83 3306 NSIPS A 5.3 .4 .3 U<br />

84 3311 JEDMICS A 11.7 6.4 - U<br />

85 3368 Naval Shore Communications A 97.4 76.3 57.1 U<br />

Cryptographic Equipment<br />

86 3415 Info Systems Security Program (ISSP) A 83.9 81.2 88.4 U<br />

Cryptologic Equipment<br />

87 3501 Cryptologic Communications Equip A 21.5 24.5 26.1 U<br />

Other Electronic Support<br />

88 3620 Coast Guard Equipment A - 12.5 7.6 U<br />

Drug Interdiction Support<br />

89 3820 Other Drug Interdiction Support A 14.6 - - U<br />

------- ------- -------<br />

TOTAL Communications and Electronics Equipment 1,693.4 2,018.0 1,721.1<br />

* ITEMS UNDER $50,000 UNCLASSIFIED PAGE N- 7


Fiscal Year 2005 Budget Estimates<br />

Budget Appendix Extract Language<br />

OTHER PROCUREMENT, NAVY (OPN)<br />

For procurement, production, and modernization of support equipment and materials<br />

not otherwise provided for, Navy ordnance (except ordnance for new aircraft, new ships,<br />

and ships authorized for conversion); the purchase of passenger motor vehicles for<br />

replacement [only, and the purchase of 7 vehicles required for physical security of<br />

personnel, notwithstanding price limitations applicable to passenger vehicles but not to<br />

exceed $200,000 per vehicle] only; expansion of public and private plants, including the<br />

land necessary therefor, and such lands and interests therein, may be acquired, and<br />

construction prosecuted thereon prior to approval of title; and procurement and<br />

installation of equipment, appliances, and machine tools in public and private plants;<br />

reserve plant and Government and contractor-owned equipment layaway,<br />

[$4,941,098,000] $4,834,278,000, to remain available for obligation until September 30,<br />

[2006] 2007, of which $37,373,000 shall be for the Navy Reserve and Marine Corps<br />

Reserve. (10 U.S.C. 5013, 5063; Department of Defense Appropriations Act, 2004.)<br />

[For an additional amount for ‘‘Other Procurement, Navy’’, $76,357,000, to remain<br />

available until September 30, 2006.] (Emergency Supplemental Appropriations Act for<br />

Defense and for the Reconstruction of Iraq and Afghanistan, 2004.)


CLASSIFICATION:<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

Other Procurement, Navy<br />

BA-2 COMMUNICATIONS & ELECTRONICS EQUIPMENT SPQ-9B RADAR- 202600<br />

Program Element for Code B Items: Other Related Program Elements<br />

ID To<br />

Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions) 0.0 19.3 3.6 1.7 0.0 14.5 15.2 CONT CONT<br />

SPARES COST<br />

(In Millions)<br />

EMERGENCY RESPONSE FUND<br />

(In Millions)<br />

* Funding for the SPQ 9B was budgeted in BLI 511000/05/06 prior to FY 2004<br />

DESCRIPTION: This program provides for procurement of equipment, materials and Ordnance Alterations (ORDALTS) to improve combat effectiveness of and maintain logistic supportability of Gun<br />

Fire Control Systems (GFCS) installed on 65 ships (65 MK 86) and 8 shore installations (8 MK 86).<br />

BR040 AN/SPQ-9B Radar - Procures AN/SPQ-9B Radars to add Anti-Ship Missile Defense (ASMD) capability which increases the radar's capability to detect and track low-flying, very small crosssection<br />

targets in natural and man-made clutter. Total inventory objective is 118, in the following ship classes: CG-47, DDG-51, CVN, LHD, DD-963, including Training unit, and LBTS. An FY 04<br />

Congressional Plus Up provides for the procurement of transmitters.<br />

BR042 AN/SPQ-9B Engineering Change Proposals (ECPs) - Procures product improvements generated by ECPs; corrects problems reported by fleet units; upgrades unreliable components and<br />

replaces obsolete components and parts no longer in production for AN/SPQ-9B Radar.<br />

BR830 AN/SPQ-9B Production Support - Supports AN/SPQ-9B Radar program and contractor associated areas.<br />

BR900 AN/SPQ-9B Consulting Services Support - Supports AN/SPQ-9B Radar program with contractor associated areas.<br />

BR5IN/BR6IN - Installation of Equipments - Provides funding to install ORDALTS and AN/SPQ-9B Radars, field changes and other alterations in ships (Fleet Modernization Program - FMP) and shore<br />

sites (Non-fleet Modernization Program - NON-FMP)<br />

DD Form 2454, JUN 86 ITEM NO. 29 PAGE NO. 1<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS DATE:<br />

P-5<br />

FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY<br />

Other Procurement, Navy/<br />

P-1 ITEM NOMENCLATURE/SUBHEAD<br />

BA-2 COMMUNICATIONS & ELECTRONICS EQUIPMENT SPQ-9B RADAR - 202600 A2BR<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID FY 2003 FY 2004 FY 2005<br />

CODE Code<br />

Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

EQUIPMENT<br />

BR040 AN/SPQ-9B Radar A 1 5,732 5,732 0<br />

BR040 CFE--Transmitter Tech Refresh Backfits A 8 1,213 9,700<br />

BR042 Engineering Change Proposals (ECPs) 732 249<br />

BR830 AN/SPQ-9B Production Support 957 609<br />

BR900 AN/SPQ-9B Consulting Services 0 0<br />

INSTALL<br />

BR5IN Installation of Eqmt.-- FMP (AN/SPQ-9B) 1 725 725 3 909 2,726<br />

BR6IN Installation of Eqmt -- NON FMP (AN/SPQ-9B) 2 725 1,449<br />

TOTAL 19,295 3,584<br />

DD FORM 2446, JUN 86 CLASSIFICATION:<br />

ITEM NO. 29 PAGE NO. 2<br />

UNCLASSIFIED<br />

19,295 3,584


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

FEBRUARY 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy/<br />

BA-2 COMMUNICATIONS & ELECTRONICS EQUIPMENT SPQ-9B RADAR - 202600 A2BR<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

FISCAL YEAR (04)<br />

BR040 AN/SPQ-9B Radar 1 5732 NAVSEA May-03 SS/FFP NORTHROP GRUMMAN Mar-04 Sep-05 YES<br />

NORDEN SYSTEMS, INC.<br />

MELVILLE, NY<br />

BR040 Xmtr Tech Refresh 8 1213 NAVSEA May-03 SS/FFP NORTHROP GRUMMAN Jul-04 Oct-05 YES<br />

Backfits NORDEN SYSTEMS, INC.<br />

D. REMARKS<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Classification:<br />

ITEM NO. 29 PAGE NO. 3 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION FEBRUARY 2004<br />

MODELS OF SYSTEM AFFECTED: AN/SPQ-9B Radar TYPE MODIFICATION: N/A MODIFICATION TITLE: AN/SPQ-9B Radar<br />

DESCRIPTION/JUSTIFICATION:<br />

Adds Anti-Ship Missile Defense mode: detects and tracks low-flying, extremely small radar cross-section targets in clutter.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: MS II 10/94; CA 10/94; CDR 7/95; LBTS DT 10/98; DT/OT FY03; MS III FY04<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2001 & Prior FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS - UNIT COST<br />

INSTALLATION KITS NONRECURRING<br />

2 80.0 0 0.0 0 0.0 0 1.9 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 2 81.9<br />

EQUIPMENT 6 30.6 0.0 0.0 1 5.7 0.0 0.0 0.0 2 12.9 2 13.1 11 62.3<br />

EQUIPMENT NONRECURRING 9.4 8 9.7 9.4<br />

ENGINEERING CHANGE ORDERS<br />

DATA<br />

12.8 0.0 0.0 0.7 0.2 0.0 0.0 0.6 0.4 14.9<br />

TRAINING EQUIPMENT 2 9.7 2 9.7<br />

SUPPORT EQUIPMENT 8.5 8.5<br />

OTHER (PRODUCTION SUPPORT) 7.6 1.0 0.6 0.8 0.0 1.0 0.9 11.9<br />

OTHER (CSS) 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6<br />

OTHER (non-FMP Install)<br />

INTERIM CONTRACTOR SUPPORT<br />

1.5 0.7<br />

INSTALL COST 2.4 0.0 0.0 0.7 2.7 0.9 0.0 0.0 0.8 7.6<br />

TOTAL PROCUREMENT 82.6 0.0 0.0 19.3 3.5 1.7 0.0 14.5 15.2 126.6<br />

ITEM 29 PAGE 4 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AN/SPQ-9B MODIFICATION TITLE: AN/SPQ-9B<br />

INSTALLATION INFORMATIOALTERATION INSTALLATION TEAM (AIT<br />

METHOD OF IMPLEMENTATION:<br />

ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME: 18 Months<br />

CONTRACT DATES: FY 2002: Jul 02 FY 2003: Jul 02<br />

DELIVERY DATE: FY 2002: Jan 04 FY 2003: Jan 04<br />

($ in Millions)<br />

Cost: FY2001 & Prior Years FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2002 EQUIPMENT<br />

FY 2003 EQUIPMENT<br />

4 2.4 4 2.4<br />

FY 2004 EQUIPMENT 1 0.7 1 0.7<br />

FY 2005 EQUIPMENT 3 2.7 3 2.7<br />

FY 2006 EQUIPMENT 1 0.9 1 0.9<br />

FY 2007 EQUIPMENT 0.0 0 0.0<br />

FY 2008 EQUIPMENT 0.0 0 0.0<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

1 0.8 1 0.8<br />

INSTALLATION SCHEDULE:<br />

FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 TOTAL<br />

In 4 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 1<br />

Out 4 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 1<br />

P-3A<br />

ITEM 29 PAGE 5 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY<br />

OTHER PROCUREMENT, NAVY<br />

P-1 ITEM NOMENCLATURE<br />

BA-2 Communication & Elect. Eq<br />

THERMAL IMAGING SENSOR SYSTEM (TISS) 2043<br />

Program Element for Code B Items: Other Related Program Elements<br />

Prior ID<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Total<br />

QUANTITY<br />

COST<br />

(In Millions) N/A A 0.0 4.4 0.0 0.0 0.0 0.0 0.0 4.4<br />

SPARES COST<br />

(In Millions) N/A A<br />

Description: The Thermal Imaging Sensor System is a lightweight, state-of-the-art imaging/laser system manufactured by various competing corporations. Funds are requested to<br />

acquire Electro-Optic (EO) capabilities for improvement of Integrated Ship Defense (ISD) system against air Anti-Ship Missile defense and surface (mine and small boat attack) threats<br />

in support of the Navy's Anti-terrorism/Force Protection Initiative. TISS is a Non Developmental Item (NDI) procurement which was developed in FY 95. Increased technology in the<br />

open market will allow for increased capability and reduced system cost. TISS is currently installed on twenty-one ships.<br />

Note: NO ERF,D funding received<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 31 PAGE NO. 1<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD SUBHEAD:<br />

Other Procurement, Navy THERMAL IMAGING SENSOR SYSTEM (TISS)<br />

BA-2 COMMUNICATION & ELECT. EQ. BLI # 204300 A2UT<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID FY 2003 FY 2004 FY 2005<br />

CODE Code<br />

UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

QTY COST COST QTY COST COST QTY COST COST<br />

N76 SPONSOR<br />

EQUIPMENT<br />

UT002 Logistical Engineering Change Proposal A 4.367<br />

TOTAL 0 4.367 0.000<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 31 PAGE NO. 2 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE<br />

February 2004<br />

SUBHEAD<br />

Other Procurement, Navy<br />

BA-2 COMMUNICATION & ELECT. EQ.<br />

THERMAL IMAGING SENSOR SYSTEM (TISS) 2043 A2UT<br />

CONTRACT DATE OF SPECS IF NO<br />

Cost Element/ QTY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE WHEN<br />

FISCAL YEAR COST<br />

(000)<br />

OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

FISCAL YEAR (04)<br />

UT002 NAVSEA CPFF DRS/ CA 3/04<br />

D. REMARKS<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 31 PAGE NO. 3 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: THERMAL IMAGING SENSOR SYSTEM (TISS) 2043 TYPE MODIFICATION: N/A MODIFICATION TITLE: N/A<br />

DESCRIPTION/JUSTIFICATION:<br />

The Thermal Imaging Sensor System is a lightweight, state-of-the-art imaging/laser system manufactured by various competing corporations. Funds are requested to acquire Electro-Optic (EO)<br />

capabilities for improvement of Integrated Ship Defense (ISD) system against air Anti-Ship Missile defense and surface (mine and small boat attack) threats in support of the Navy's Antiterrorism/Force<br />

Protection Initiative.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 6.0 0 6.0<br />

PROCUREMENT<br />

INSTALLATION KITS 0 0.0<br />

INSTALLATION KITS NONRECURRING 0 0.0<br />

EQUIPMENT 24 16.2 24 16.2<br />

EQUIPMENT NONRECURRING 0 0.0<br />

ENGINEERING CHANGE ORDERS 4.4 0 4.4<br />

DATA 0 0.0<br />

TRAINING EQUIPMENT 0 0.0<br />

SUPPORT EQUIPMENT 0 0.0<br />

OTHER (production engineering) 0 0.0<br />

OTHER 0 0.0<br />

OTHER 0 0.0<br />

INTERIM CONTRACTOR SUPPORT 0 0.0<br />

PROCUREMENT COST 24 16.2 0 0.0 0 4.4 24 20.6<br />

INSTALL COST 2.8 0 2.8<br />

TOTAL PROGRAM COST 24 19.0 0 0.0 0 4.4 24 23.4<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

UNCLASSIFIED<br />

ITEM NO. 31 PAGE NO. 4


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: THERMAL IMAGING SENSOR SYSTEM (TISS) 2043 MODIFICATION TITLE:<br />

INSTALLATION INFORMATION: ALTERATION INSTALLATION TEAM (AIT)<br />

METHOD OF IMPLEMENTATION:<br />

ADMINISTRATIVE LEADTIME: VAR Months PRODUCTION LEADTIME:<br />

CONTRACT DATES: FY 2005:<br />

DELIVERY DATE: FY 2006:<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Later Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 24 2.8 24 2.8<br />

FY 2003 EQUIPMENT 0 0.0<br />

FY 2004 EQUIPMENT 0 0.0<br />

FY 2005 EQUIPMENT* 0 0.0<br />

FY 2006 EQUIPMENT 0 0.0<br />

FY 2006 EQUIPMENT 0 0.0<br />

FY 2007 EQUIPMENT 0 0.0<br />

FY 2008 EQUIPMENT 0 0.0<br />

FY 2009 EQUIPMENT 0 0.0<br />

TO COMPLETE 24 2.8 24 2.8<br />

* Installation funding provided in FY05<br />

INSTALLATION SCHEDULE: SHIP AVAILABILITIES<br />

FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 24 8 24<br />

Out 24 8 24<br />

P-3A<br />

ITEM NO. 31 PAGE 5 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE/SUBHEAD<br />

OTHER PROCUREMENT, NAVY BA-02 AN/SQQ-89(V) Surface ASW Combat System/ BLI 213600/5/ A2DB<br />

Program Element for Code B Items: Other Related Program Elements<br />

Surface ASW Combat System Integration/PE 0205620N<br />

FY 2002 ID To<br />

and Prior Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions)<br />

SPARES COST<br />

(In Millions)<br />

PROGRAM OVERVIEW:<br />

$852.8 $13.7 $15.2 $0.0 $0.0 $0.0 $0.0 $32.9 CONT. CONT.<br />

The AN/SQQ-89 is a fully integrated surface ship Undersea Warfare (USW) combat system with capability to detect, classify, localize and attack submarine targets. The AN/SQQ-89(V) is the USW<br />

Combat System for new construction DDG51 class ships, backfit on DDG51 class ships, and also backfit on CG47 class ships as part of the Cruiser Modernization program. The AN/SQQ-89(V)<br />

configuration will vary based upon ship class, system production configuration, and pre-backfit configuration of each ship. This budget supports modernization of existing AN/SQQ-89(V) systems.<br />

The AN/SQQ-89A(V)15 backfit upgrade will capitalize on the AN/SQQ-89(V)15 forward fit investment and will integrate a new tactical towed array sensor (Multi Function Towed Array) to provide a<br />

Commercial-Off-The-Shelf (COTS) based USW combat system with the capability for mid-frequency bistatic and multi-static sonar operations. The AN/SQQ-89A(V)15 features a mid frequency bistatic<br />

hull/towed Sonar Echo Tracker Classifier, hull/towed Sonar with Acoustic Intercept fused data for improved torpedo defense, passive towed array processing, common Sub/Surface sensor performance<br />

and prediction, common NAVAIR/Surface LAMPS processing, portable software, and integrated supportability and on-line training.<br />

FY 2004 budget includes Congressional Add for 'AN/SQQ-89 Modernization' under DB008. Funds will be used for AN/SQQ-89(V) Build 2 upgrades under the AN/SQQ-89(V) modernization program.<br />

Specifically, funds will be used to procure, integrate and field a system for land based testing and a system on a DDG 51 class ship for at-sea demonstration, testing, fleet evaluation and assessment.<br />

FY 2004 budget includes Congressional Add for 'Surface Ship Anti-Submarine Warfare Improvements (only for procurement of surface ship Multi-Purpose Processor (MPP) Small Business Innovative<br />

Research (SBIR) Phase III improvements)' under DB010. Funds will be used to accelerate the fielding of mature ASW-related warfighting enhancements on ships currently configured with the AN/SQQ<br />

89(V)6 USW combat system. Each installation will include state-of-the-art ASW improvements hosted on modern COTS hardware.<br />

FMP Installation: Funding is for the installation of equipment by "K" ALTs through shipyards and/or Alteration Installation Teams (AIT).<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 32 PAGE NO.<br />

1 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy / BA-02<br />

AN/SQQ-89(V) Surface ASW Combat System/BLI 213600/5/A2DB<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID FY 2002 FY 2003<br />

FY 2004 FY 2005<br />

CODE Code and Prior<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

DB008 AN/SQQ-89 Modernization A 10,936<br />

(FY 2004 Congressional Add)<br />

DB010 Surface Ship ASW Improvements A 4,250<br />

(FY 2004 Congressional Add)<br />

DB600 AN/SQQ-89A(V)15 Trainer System A 1 7,119<br />

DB700 AN/SQQ-89A(V)15 Shore Site A 619<br />

System Components<br />

DB830 Production Engineering 1,738<br />

DB900 Consulting Services 763<br />

DB984 Systems Technical Support 1,733<br />

DB006 INSTALLATION FOR DB300 510<br />

(CG47 Class System Components)<br />

DB006 INSTALLATION FOR DB400 1,197<br />

(DDG51 Class System Components)<br />

0 0 13,679 15,186 0<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 32 PAGE NO. 2<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

FEBRUARY 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy / BA-02<br />

AN/SQQ-89(V) Surface ASW Combat System A2DB<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

FY 2003<br />

DB600/AN/SQQ-89A(V)15 1 7,119 NAVSEA September 01 Option FP Lockheed Martin, NY Dec 02 May 04 Yes<br />

D. REMARKS<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST PAGE NO. Classification:<br />

ITEM NO. 32 3 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED FEBRUARY 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: DDG51 Class Ships/ DB008 TYPE MODIFICATION: Added Capability MODIFICATION TITLE: AN/SQQ-89 Modernization<br />

DESCRIPTION/JUSTIFICATION:<br />

FY 2004 budget included Congressional Add for 'AN/SQQ-89 Modernization' under DB008. Funds will be used for AN/SQQ-89(V) Build 2 upgrades under the AN/SQQ-89(V) modernization program. Specifically, funds<br />

will be used to procure, integrate and field a system for land based testing and a system on a DDG 51 class ship for at-sea demonstration, testing, fleet evaluation and assessment.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: N/A<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS 0.0<br />

INSTALLATION KITS - UNIT COST 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 7.0 7.0<br />

EQUIPMENT NONRECURRING 2.8 2.8<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 0.0<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER - ECPs 0.0<br />

OTHER - ENGINEERING SUPPORT 1.1 1.1<br />

OTHER 0.0<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 0.0<br />

TOTAL PROCUREMENT 0.0 0.0 10.9 0.0 0.0 0.0 0.0 0.0 0.0 10.9<br />

ITEM PAGE CLASSIFICATION: UNCLASSIFIED<br />

32 4


CLASSIFICATION: UNCLASSIFIED FEBRUARY 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: DDG51 Class Ships/ DB010 TYPE MODIFICATION: Added Capability MODIFICATION TITLE: Surface Ship ASW Improvements<br />

DESCRIPTION/JUSTIFICATION:<br />

FY 2004 budget included Congressional Add for 'Surface Ship Anti-Submarine Warfare Improvements (only for procurement of surface ship MPP SBIR Phase III improvements)' under DB010. Funds will be used to<br />

accelerate the fielding of mature ASW-related warfighting enhancements on ships currently configured with the AN/SQQ-89(V)6 USW combat system. Each installation will include state-of-the-art ASW improvements<br />

hosted on modern COTS hardware.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: N/A<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS 0.0<br />

INSTALLATION KITS - UNIT COST 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 3.7 3.7<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 0.0<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER - ECPs 0.0<br />

OTHER - ENGINEERING SUPPORT 0.6 0.6<br />

OTHER 0.0<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 0.0<br />

TOTAL PROCUREMENT 0.0 0.0 4.3 0.0 0.0 0.0 0.0 0.0 0.0 4.3<br />

ITEM PAGE CLASSIFICATION: UNCLASSIFIED<br />

32 5


CLASSIFICATION: UNCLASSIFIED FEBRUARY 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: Trainers (DB600) & Shore Sites (DB700) TYPE MODIFICATION: Added Capability MODIFICATION TITLE: AN/SQQ-89 Surf ASW Combat Sys<br />

DESCRIPTION/JUSTIFICATION:<br />

Procurement of AN/SQQ-89 Surface ASW Combat System equipment at training centers and shore sites to match upgrades to current ship systems.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: AN/SQQ-89A(V)15 Pre-Production Prototype ordered in FY 2003 and to be installed 3Q04 (RDT&E PE 0205620N)<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS 0.0<br />

INSTALLATION KITS - UNIT COST 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 0.0<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT Var 17.6 1 7.1 24.7<br />

SUPPORT EQUIPMENT Var 43.1 Var 0.6 43.7<br />

OTHER - ECPs 0.0<br />

OTHER - ENGR SUPT (DB830/900/984) 42.1 1.4 43.5<br />

OTHER 0.0<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 0.0<br />

TOTAL PROCUREMENT 102.8 9.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 111.9<br />

ITEM PAGE CLASSIFICATION: UNCLASSIFIED<br />

32 6


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA:2 214700/SSN ACOUSTICS<br />

Program Element for Code B Items: Other Related Program Elements<br />

Prior ID To<br />

Years Code 2 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY2009 Complete Total<br />

QUANTITY N/A B 0<br />

COST<br />

(In Millions) $229.6 $266.4 $225.0 $229.0 $265.4 $296.5 $289.0 $1,918.1<br />

SPARES COST<br />

(In Millions) $13.8 $17.7 $15.6 $17.9 $18.3 $26.9 $5.3 118.4<br />

A. MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: This program procures submarine systems and equipment for installation on all classes of submarines to maintain<br />

clear acoustical, tactical and operational superiority over submarine and surface combatants in all scenarios through detection, classification, localization and contact following. All future<br />

acoustic upgrades of Acoustic-Rapid COTS Insertion (A-RCI) equipment are incorporated into this budget item. Future procurements, detailed below, are focused on supporting Littoral<br />

Warfare, Regional Sea Denial, Battle Group Support, Diesel Submarine Detection, Surveillance, and Peacetime Engagement. Acoustics Rapid COTS Insertion (A-RCI ) is a multi-phased,<br />

evolutionary development effort geared toward addressing Acoustic Superiority issues through the rapid introduction of interim products applicable to SSN 688, 688I Flight, SSN21, SSGN<br />

and SSBN 726 Class Submarines. A-RCI Phase II provides towed array processing improvements; A-RCI Phase III provides spherical array processing improvements. The AN/BSY-1 High<br />

Frequency Upgrade is a stand-alone program which is provided as A-RCI Phase IV for SSN 688I and Seawolf Class only. As part of CNO N772's plan to maintain acoustic superiority for In<br />

Service Submarines a joint cooperative effort with NAVSEA (SEA 93, ASTO) to deliver annual Advanced Processing Builds (APBs). The capabilities in the APBs will be integrated as part<br />

of A-RCI certified systems. This effort, known as the N772 Business Plan funds the APB integration efforts with the Multi-Purpose Processor as well as the AN/BQQ-10 Sonar system<br />

beginning in FY02. This budget submit also reflects the procurement of Technology Insertion kits, Submarine Tactical Decision Aids (STDA), Total Ship Monitoring System (TSMS), Active<br />

Intercept and Ranging (AI&R), Precision Bottom Mapping, Acoustic Intelligence (ACINT 21), and AN/BQS-15 upgrades to be installed with A-RCI systems/upgrades.<br />

Towed system's procurements include Towed Array Refurbishment & Upgrades, TB-16, TB-16 Next Generation and OA-9070 B kits and upgrades. Towed Systems procurements provide<br />

upgrades/support for TB-16 Series Towed Arrays, TB-23 Towed Arrays, TB-29 Series Towed Arrays, OK-276 Series Towed Array Handlers, OK-634 Towed Array Handler and OA-9070<br />

Series Handlers installed on SSN688, SSN 688I, SSN21 and SSBN726 Class Submarines. These upgrades provide increased sensor capability to maintain acoustic superiority and<br />

reliability improvements to increase the service life, reduce failures, and increase the inventory of arrays and handlers available for fleet use.<br />

DD Form 2454, JUN 86 ITEM NO. 33 PAGE NO. 1<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA: 2 214700/SSN ACOUSTICS<br />

SA101 ACOUSTICS UPGRADES:<br />

Procures A-RCI TA, SA, HA, and HF Upgrade Kits, Precision Bottom Mapping Kits, AN/BQS-15 High Frequency Upgrades, Acoustic Intercept, TSMS and ACINT-21 Lite and Heavy. This line also<br />

supports the refurbishment and installation of the upgrades.<br />

SA102 TOWED SYSTEMS:<br />

Procures TB-29 A Towed Arrays, Fiber Optic Thinline Systems, TB-16 Fatline Replacement , Advanced Hull Sensors, OA-9070B Towed Array Handler Kits, and refurbishment/upgrade material to<br />

support reliability improvements to TB-16, TB-23, TB-29 Towed Arrays and Towed Array Handling Systems. Handling System reliability improvements include: improved cables in the outboard<br />

systems, EMI improvements, roller boxes, improved hydraulic control and capstans. Towed Array reliability improvements include: improved internal connectors, hydrophones, towcables and<br />

Vibration Isolation Modules (VIMs). Towed Array improvements to increase performance include: Light Weight Tow Cables for the TB-29 A Towed Arrays and Wideband OMNI capability in TB-16<br />

Arrays.<br />

SA104 SSGN MODERIZATION:<br />

Funds provided to procure A-RCI hardware for combat systems on SSGN conversions.<br />

SA105 SONAR SUPPORT EQUIPMENT<br />

Funds provided to procure BQN-17 and associated equipment.<br />

SA201 BLOCK CHANGES:<br />

Minor ECP's and hardware changes affecting all classes of submarines are procured through this line. Funding contained In this line will be used to support non-recurring first article test efforts<br />

associated with the changing COTS environment as well as Reliability, Maintainability and Availability modifications requested by the Fleet. This line also supports the procurement of hardware<br />

necessary to implement the ECP's into the System or end item being procured.<br />

SA202 PRODUCTION/ENGINEERING SUPPORT:<br />

Funding supports the procurement of Acoustics Upgrades equipment and Towed System hardware.<br />

SA203 TOWED ARRAY UNIQUE TEST EQUIPMENT:<br />

Funding procures various towed array test equipment and handling system/stowage tube inspection test equipment.<br />

SA302 OP TRAINER UPGRADES:<br />

Funding procures hardware upgrades and production engineering for Acoustic Upgrades operational trainer sites.<br />

DD Form 2454, JUN 86 ITEM NO. 33 PAGE NO. 2<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA: 2 214700/SSN ACOUSTICS<br />

SA303 COTS SUPPORTABILITY UPGRADES:<br />

Provides for Technology Refresh/Insertion for A-RCI kits. Tech Refresh provides for Software and Hardware updates to accommodate shifts in technology to the execution procurement years'<br />

"current state-of-the-practice" hardware. A-RCI has already undergone three technology insertion phases to accommodate integrating Advanced Processing Builds (APBs). Updates are necessary for<br />

signal and display processing hardware as APBs are introduced or as commercial support for the hardware is phased out. Tech Insertion procures the hardware necessary to upgrade and backfit the<br />

A-RCI kits. When A-RCI systems are being upgraded to subsequent phases of A-RCI (e.g. from Phase II to Phase IV), upgrades to the Phase II signal processing and display hardware will be<br />

procured from this line to accommodate common technology consistent with the APB being implemented in the year of introduction. In future years, requirements will be included to fund complete<br />

system technology insertion as the COTS hardware becomes unsupportable.<br />

SA401 INITIAL TRAINING:<br />

Provides for initial training curriculum development, training management materials, exercise control group development, pilot services and services to the Fleet.<br />

SA500 AN/BQG-5 WIDE APERTURE ARRAY (WAA):<br />

Funding supports Wide Aperture Array Shore Spares for both AN/BQG-5 and AN/BSY-2 systems. Funding also supports engineering changes and support unique to the AN/BQG-5 systems.<br />

SA501 AN/BSY-2:<br />

Funding supports engineering changes and upgrade and an End of Life Parts program. This funding also supports procurement, installation and test of ARCI-HF Kits, ARCI SA Kits, ARCI (V)5 Kits.<br />

SA502 NON-PROPULSION ELECTRONIC SYSTEMS MODERIZATION:<br />

Funds provide for Subsystem C4I connectivity and interoperability in support of CNO IT21 initiatives. Supports rapid data/information transmitial on/off board the submarine.<br />

SA5IN EQUIPMENT INSTALLATION:<br />

Funds actual hardware installation during shipyard and pierside availabilities.<br />

SA900 CONSULTING SERVICES:<br />

Includes specification validation, contract deliverable monitoring, prime contractor monitoring for cost, schedule and performance slips, ILS planning and coordination of GFI. Additional support will<br />

include production planning, business case analysis, technical refresh and insertion planning and market analysis to review implementation strategies for procurement of current year "state of the<br />

practice" hardware in Acoustics programs. Consulting services will also provide production monitoring, installation planning and coordination support.<br />

DD Form 2454, JUN 86 ITEM NO. 33 PAGE NO. 3<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy B 214700/SSN ACOUSTICS/H2SA<br />

BA-2: COMMUNICATIONS AND ELECTRONICS EQUIPMENT<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID Prior FY 2003 FY 2004 FY 2005<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

SA101<br />

SPONSOR: N77<br />

ACOUSTICS UPGRADES $98,769 $98,895 $60,300<br />

INSTALL SUPPORT A 3,727 $4,200<br />

BQS-15 EC-19 (GUAM Hulls) A 3 2,850 8,550<br />

HIGH FREQUENCY ARRAY WINDOWS (HF) B 12 208 2,500<br />

A-RCI 688 PHASE II KITS (TA RCI KITS) B 1 3,200 3,200<br />

A-RCI 688 PHASE II-III KITS (TA - SA RCI KITS) B 4 7,000 28,000 3 7,133 21,400 1 7,300 7,300<br />

A-RCI 688 PHASE III KITS (SA RCI KITS) B 2 9,600 19,200 2 9,792 19,584<br />

A-RCI 688I PHASE II-IV KITS (TA - SA/HF RCI KITS) B 3 7,800 23,400 4 7,950 31,800 4 8,125 32,500<br />

A-RCI 688I PHASE IV KITS (SA-HF RCI KITS) B 1 10,812 10,812<br />

A-RCI SSBN PHASE II KITS (TA RCI KITS) B 1 3,099 3,099 1 3,200 3,200<br />

TOTAL SHIP MONITORING SYSTEM KITS A 9 799 7,191 5 800 4,000 9 811 7,300<br />

ACTIVE INTERCEPT & RANGING KITS (AI&R) A 9 689 6,201 5 800 4,000 9 667 6,000<br />

AI&R SENSORS (BACKFIT APPLICATIONS) A 2 400 800<br />

SA5IN ACOUSTICS UPGRADES INSTALLATION $18,280 $39,026 $31,400<br />

SA102 TOWED SYSTEMS $35,278 $52,409 $33,664<br />

TOWED ARRAY REFURBISHMENT & UPGRADE A 18,317 22,476 23,773<br />

TOWED ARRAY HANDLER SYSTEM UPGRADE A 4,848 7,065 4,381<br />

OA-9070 B KITS A 4 439 2,193 5 483 2,413 1 510 510<br />

TOWED ARRAY TB-29A B 3 2,907 8,720 4 2,500 10,000<br />

TB-16 ARRAY A 2 600 1,200 17 615 10,455<br />

TB-16 NEXT GENERATION A 7 680 4,760<br />

TB-16 NEXT GENERATION INTERFACE HWD A 4 60 240<br />

SA5IN TOWED SYSTEM INSTALLATION $9,613 $15,879 $4,734<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 33 PAGE NO. 4


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy 214700/SSN ACOUSTICS/H2SA<br />

BA-2: COMMUNICATIONS AND ELECTRONICS EQUIPMENT<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID Prior FY 2003 FY 2004 FY 2005<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

SA104 SSGN MODERIZATION $0 $1,000 $31,000<br />

SSGN CONVERSION B $1,000<br />

SSGN PHASE IV KITS B 2 15,500 31,000<br />

SA5IN SSGN MODERNIZATION INSTALLATION $0 $1,000 $500<br />

SA105 SONAR SUPPORT EQUIPMENT $0 $500 $4,500<br />

BQN-17 A 500 1,400<br />

BQS-15A EC-19 (P) A 100<br />

BQS-15A EC-20 (P) A 4 750 3,000<br />

SA5IN SONAR SUPT EQUIP INSTALLATION $0 $0 $500<br />

SA201 BLOCK CHANGES $3,388 $3,488 $3,573<br />

ACOUSTICS (AN/BQQ-5/AN/BSY-1) 1,701 2,050 $2,117<br />

SSEP 200 200<br />

ACOUSTIC INTERCEPT FIRST ARTICLE 472<br />

TOWED SYSTEMS ECP'S 1,215 1,238 1,256<br />

SA202 PROD/ENG'G SUPPT $6,028 $5,796 $5,764<br />

ACOUSTICS (AN/BQQ-5/AN/BSY-1) 2,741 2,695 2,446<br />

TOWED ARRAYS/HANDLING EQUIPMENT 3,287 3,101 3,318<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 33 PAGE NO. 5<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy 214700/SSN ACOUSTICS/H2SA<br />

BA-2: COMMUNICATIONS AND ELECTRONICS EQUIPMENT<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID Prior FY 2003 FY 2004 FY 2005<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

SA203 TOWED SYSTEMS UNIQUE TEST $3,193 $2,713 $1,600<br />

EQUIPMENT<br />

SA302 OP TRAINER GFE $1,800 $1,700 $1,700<br />

SA303 COTS SUPPORTABILITY UPGRADES $35,335 $36,691 $28,508<br />

COTS TECH INSERTION 22,355 21,591 21,008<br />

SONAR TACTICAL DECISION AIDS (STDA) 10,280 12,300 5,000<br />

AEMP 1,200 1,500 2,500<br />

COTS TECH REFRESH 1,500 1,300<br />

SA401 INITIAL TRAINING $1,529 $1,599 $1,696<br />

ACOUSTICS 1,100 1,119 1,200<br />

TOWED ARRAY HANDLING EQUIPMENT 429 480 496<br />

SA500 AN/BQG-5 WAA<br />

ENGINEERING CHANGES<br />

$0 $0 $0<br />

SA501 AN/BSY-2 $11,288 $0 $10,100<br />

END OF LIFE PARTS (EOL) 445<br />

ENGINEERING CHANGES/UPGRADES 445<br />

INSTALLATION & TEST SPT/INTEG 698<br />

A-RCI PHASE IV KIT 1 9,700 9,700 1 10,100 $10,100<br />

SA51N AN/BSY-2 EQUIPMENT INSTALLATION $2,500 $3,100 $3,100<br />

SA900 CONSULTING SERVICES $2,624 $2,635 $2,389<br />

ACOUSTICS 1,622 1,639 1,488<br />

TOWED SYSTEMS 1,002 996 901<br />

229,625 266,431 225,028<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 33 PAGE NO. 6<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy 214700/SSN ACOUSTICS H2SA<br />

BA-2: COMMUNICATIONS AND ELECTRONICS EQUIPMENT<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

FY 2003<br />

SA101 - A-RCI TA-SA/HF Upgrade (688I) 3 $7,800 NAVSEA SS/CPIF/Opt Lockheed Martin, VA 3/03 3/04 YES<br />

SA101 - A-RCI SA (688) 2 $9,600 NAVSEA SS/CPIF/Opt Lockheed Martin, VA 3/03 3/04 YES<br />

SA101 - A-RCI TA-SA Upgrades (688) 4 $7,000 NAVSEA SS/CPIF/Opt Lockheed Martin, VA 3/03 3/04 YES<br />

SA101 - ACOUSTIC HF WINDOWS 12 $208 NUWC, Newport RFP NUWC, Newport 1/03 1/04 YES<br />

SA101 - TSMS KITS 9 $799 NAVSEA SS/CPIF DSR,VA. 3/03 3/04 YES<br />

SA101 - BQS 15 EC-19 3 $2,850 NAVSEA SS/FFP ARL/UT 2/03 2/04 YES<br />

SA101 - ACTIVE INTERCEPT RANGING KITS 9 $689 NAVSEA C/CPIF PROGENCY 3/03 3/04 YES<br />

SA102 - TOWED ARRAY TB-29 A 3 $2,907 NAVSEA C/CPFF/Opt Lockheed Martin, VA 2/03 8/04 YES<br />

SA102 - OA-9070 B Kits 5 $439 NUWC, Newport C/FFP NUWC, Newport 2/03 10/03 YES<br />

SA102 - TB-16 ARRAY 2 $600 NAVSEA SS/CPIF CSC 8/03 8/04 YES<br />

SA501 - ARCVI-(V)5 KIT 1 $9,700 NAVSEA SS/FP/OPT Lockheed Martin, VA 2/03 2/04 YES<br />

FY 2004<br />

SA101 - A-RCI TA TO SA/HF Upgrade (688I) 4 $7,950 NAVSEA SS/CPIF/Opt Lockheed Martin, VA 12/03 3/05 YES<br />

SA101 - A-RCI SA/HF Kits(688I) 1 $10,812 NAVSEA SS/CPIF/Opt Lockheed Martin, VA 12/03 3/05 YES<br />

SA101 - A-RCI SA (688) 2 $9,792 NAVSEA SS/CPIF/Opt Lockheed Martin, VA 12/03 3/05 YES<br />

SA101 - A-RCI TA-SA Upgrades (688) 3 $7,133 NAVSEA SS/CPIF/Opt Lockheed Martin, VA 12/03 3/05 YES<br />

SA101 - ACINT-21 KITS LITE 4 $1,672 NAVSEA SS/CPIF/Opt DSR, VA 12/03 3/05 YES<br />

SA101 - TSMS KITS 5 $800 NAVSEA SS/CPIF DSR,VA. 12/03 3/05 YES<br />

SA101 - ACTIVE INTERCEPT RANGING KITS 5 $800 NAVSEA C/CPIF PROGENCY 304 3/05 YES<br />

SA101 - SSBN A-RCI PH II KITS 1 $3,099 NAVSEA SS/CPIF Lockheed Martin, VA 12/03 10/04 YES<br />

SA102 -TOWED ARRAY TB-29A 4 $2,500 NAVSEA SS/FFP Lockheed Martin, VA 5/04 3/05 YES<br />

SA102 - OA-9070B KITS 5 $483 NUWC, Newport C/FFP/Opt NUWC,Newport 1/04 7/04 YES<br />

SA102 - TB-16 ARRAY 17 $615 NAVSEA SS/CPIF/Opt CSC 2/04 10/04 YES<br />

D. REMARKS<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 33 Classification:<br />

PAGE NO. 7 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy 214700/SSN ACOUSTICS H2SA<br />

BA-2: COMMUNICATIONS AND ELECTRONICS EQUIPMENT<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

FY 2005<br />

SA101 - A-RCI 688 Phase II KITS (TA RCI) 1 $3,200 NAVSEA SS/CPIF Lockheed Martin, VA 3/05 3/06 YES<br />

SA101 - A-RCI TA TO SA/HF UPGR. KITS (688I) 4 $8,125 NAVSEA SS/CPIF Lockheed Martin, VA 3/05 3/06 YES<br />

SA101 - TSMS KITS 9 $811 NAVSEA SS/CPIF DSR,VA. 3/05 3/06 YES<br />

SA101 - ACTIVE INTERCEPT RANGING KITS 10 $660 NAVSEA C/CPIF PROGENCY 3/05 3/06 YES<br />

SA101 - A-RCI TA-SA Upgrades (688) 1 $7,300 NAVSEA SS/CPIF/Opt Lockheed Martin, VA 3/05 3/06 YES<br />

SA101 - SSBN A-RCI PH II KITS 1 $3,200 NAVSEA SS/CPIF Lockheed Martin, VA 3/05 3/06 YES<br />

SA101 - ACTIVE INTERCEPT RANGING KITS 9 $667 NAVSEA CPIF/Opt PROGENCY 3/05 3/06 YES<br />

SA 101 - AI&R SENSORS (BACKFIT) 2 $400 NAVSEA CPIF/Opt PROGENCY 3/05 3/06 YES<br />

SA102 - OA-9070B KITS 1 $510 NUWC, Newport C/FFP/Opt NUWC, Newport 1/05 7/05 YES<br />

SA102 - TB-16 ARRAY NEXT GENERATION 7 $680 NAVSEA C/FFP TBD 2/05 10/05 NO<br />

SA102 - TB-16 INTERFACE HARDWARE 4 $60 NAVSEA C/FFP TBD 2/05 10/05 NO<br />

SA104 - SSGN CONVERSION 2 $15,500 NAVSEA SS/CPIF Lockheed Martin, VA 3/05 3/06 YES<br />

SA105 - BQS-15A EC-20 (P) 4 $750 NAVSEA TBD TBD 3/05 3/06 NO<br />

SA501 - ARCI PHASE IV KITS 1 $10,100 NAVSEA SS/CPIF Lockheed Martin, VA 3/05 3/06 YES<br />

D. REMARKS<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 33 Classification:<br />

PAGE NO. 8 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: BQS-15 EC-19 KITS TYPE MODIFICATION: SHIPALT MODIFICATION TITLE: SSN ACOUSTICS<br />

(SA101)<br />

DESCRIPTION/JUSTIFICATION:<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 0.000<br />

PROCUREMENT<br />

INSTALLATION KITS 1 2.000 3 8.550 4 10.550<br />

INSTALLATION KITS - UNIT COST 2.000 2.850<br />

INSTALLATION KITS NONRECURRING 0.000<br />

EQUIPMENT 0.000<br />

EQUIPMENT NONRECURRING 0.000<br />

ENGINEERING CHANGE ORDERS 0.000<br />

DATA 0.000<br />

TRAINING EQUIPMENT 0.000<br />

SUPPORT EQUIPMENT 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

INTERIM CONTRACTOR SUPPORT 0.000<br />

INSTALL COST 1 0.500 2 1.100 1 0.500 4 2.100<br />

TOTAL PROCUREMENT 2.500 8.550 1.100 0.500 12.650<br />

ITEM 33 PAGE 9 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: BQS-15 EC-19 KITS MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIPALT<br />

ADMINISTRATIVE LEADTIME: 24 MOS PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: 3/2002 FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATE: FY 2002: 3/2003 FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 0 0.000<br />

FY 2002 EQUIPMENT 1 0.500 0 0.000<br />

FY 2003 EQUIPMENT 2 1.100 1 0.500 3 1.600<br />

FY 2004 EQUIPMENT 0 0.000<br />

FY 2005 EQUIPMENT 0 0.0<br />

FY 2006 EQUIPMENT 0 0.0<br />

FY 2007 EQUIPMENT 0 0.000<br />

FY 2008 EQUIPMENT 0 0.0<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

0 0.0<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 1 0 0 0 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4<br />

Out 1 0 0 0 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4<br />

P-3A<br />

ITEM 33 PAGE 10 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: HIGH FREQUENCY ARRAY WIND TYPE MODIFICATION: ORDALTS MODIFICATION TITLE: SSN ACOUSTICS<br />

DESCRIPTION/JUSTIFICATION:<br />

The installation funding cited on this P3A is included in BLI 214700 not 214705; REQUIRED UPGRADE WHEN ADDING PHASE IV HIGH FREQUENCY ARRAY CAPABILITY<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 0.000<br />

PROCUREMENT<br />

INSTALLATION KITS 13 2.500 12 2.500 25 5.000<br />

INSTALLATION KITS - UNIT COST 0.192 0.208<br />

INSTALLATION KITS NONRECURRING 0.000<br />

EQUIPMENT 0.000<br />

EQUIPMENT NONRECURRING 0.000<br />

ENGINEERING CHANGE ORDERS 0.000<br />

DATA 0.000<br />

TRAINING EQUIPMENT 0.000<br />

SUPPORT EQUIPMENT 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

INTERIM CONTRACTOR SUPPORT 0.000<br />

INSTALL COST 13 2.886 12 2.664 25 5.550<br />

TOTAL PROCUREMENT 2.500 5.386 2.664 10.550<br />

ITEM 33 PAGE 11 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: HF ARRAY WINDOWS MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: ORDALTS<br />

ADMINISTRATIVE LEADTIME: 24 MOS PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: 3/2002 FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATE: FY 2002: 3/2003 FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 0 0.000<br />

FY 2002 EQUIPMENT 13 2.886 13 2.886<br />

FY 2003 EQUIPMENT 12 2.664 12 2.664<br />

FY 2004 EQUIPMENT 0 0.000<br />

FY 2005 EQUIPMENT 0 0.0<br />

FY 2006 EQUIPMENT 0 0.0<br />

FY 2007 EQUIPMENT 0 0.000<br />

FY 2008 EQUIPMENT 0 0.0<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

0 0.0<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 2 4 4 3 2 4 4 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25<br />

Out 0 2 4 4 3 2 4 4 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25<br />

P-3A<br />

Item No. 33 PAGE 12 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: A-RCI 688 PHASE II KITS TYPE MODIFICATION: SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS<br />

DESCRIPTION/JUSTIFICATION:<br />

SSN688 A-RCI TOWED ARRAY KITS. PROVIDES TB-29 ARRAY CAPABILITY AND IMPROVED DETECTION<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 0 0.000<br />

PROCUREMENT<br />

INSTALLATION KITS 22 56.144 1 3.200 23 59.344<br />

INSTALLATION KITS - UNIT COST 2.552 3.200<br />

INSTALLATION KITS NONRECURRING 0.000<br />

EQUIPMENT 0.000<br />

EQUIPMENT NONRECURRING 0.000<br />

ENGINEERING CHANGE ORDERS 0.000<br />

DATA 0.000<br />

TRAINING EQUIPMENT 1 2.282 1 2.282<br />

SUPPORT EQUIPMENT 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

INTERIM CONTRACTOR SUPPORT 0.000<br />

INSTALL COST 2 3.000 1 1.500 3 4.500<br />

TOTAL PROCUREMENT 58.426 3.000 3.200 1.500 66.126<br />

ITEM 33 PAGE 13 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: A-RCI 688 PHASE II KITS MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIP ALT<br />

ADMINISTRATIVE LEADTIME: 24 MOS PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: 3/2002 FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATE: FY 2002: 3/2003 FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 20 15.455 ### 15.455<br />

FY 2002 EQUIPMENT 2 3.000 2 3.000<br />

FY 2003 EQUIPMENT 0 0.000<br />

FY 2004 EQUIPMENT 0 0.000<br />

FY 2005 EQUIPMENT 1 1.500 1 1.5<br />

FY 2006 EQUIPMENT 0 0.0<br />

FY 2007 EQUIPMENT 0 0.000<br />

FY 2008 EQUIPMENT 0 0.0<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

0 0.0<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 20 0 1 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23<br />

Out 20 0 1 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23<br />

P-3A<br />

ITEM 33 PAGE 14 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: 688 PHASE II - III KITS TYPE MODIFICATION: SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS<br />

DESCRIPTION/JUSTIFICATION:<br />

688 TA - SA KIT; PROVIDES SPHERICAL ARRAY PROCESSING CAPABILITY<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 0 0.000<br />

PROCUREMENT<br />

INSTALLATION KITS 5 25.604 4 28.000 3 21.400 1 7.300 1 7.400 3 22.800 1 7.750 1 7.750 19 128.004<br />

INSTALLATION KITS - UNIT COST 5.121 7.000 7.133 7.300 7.400 7.600 7.750 7.750<br />

INSTALLATION KITS NONRECURRING 0.000<br />

EQUIPMENT 0.000<br />

EQUIPMENT NONRECURRING 0.000<br />

ENGINEERING CHANGE ORDERS 0.000<br />

DATA 0.000<br />

TRAINING EQUIPMENT 0 0.000<br />

SUPPORT EQUIPMENT 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

INTERIM CONTRACTOR SUPPORT 0.000<br />

INSTALL COST 5 11.144 4 9.400 3 7.200 1 2.400 1 2.400 3 7.500 1 2.550 1 2.550 19 45.144<br />

TOTAL PROCUREMENT 36.748 28.000 30.800 14.500 9.800 25.200 15.250 10.300 170.598<br />

ITEM 33 PAGE 15 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: 688 PHASE II - III KITS MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIP ALT<br />

ADMINISTRATIVE LEADTIME: 24 MOS PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: 03/03 FY 2004: 03/04 FY 2005: 3/05<br />

DELIVERY DATE: FY 2002: N/A FY 2003: 03/04 FY 2004: 03/05 FY 2005: 3/06<br />

($ in Millions)<br />

Cost: Prior Years FY2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 5 #### 0 0.000 5 11.144<br />

FY 2002 EQUIPMENT 0 0.000 0 0.000<br />

FY 2003 EQUIPMENT 4 9.400 4 9.400<br />

FY 2004 EQUIPMENT 3 7.200 3 7.200<br />

FY 2005 EQUIPMENT 1 2.400 1 2.400<br />

FY 2006 EQUIPMENT 1 2.400 1 2.400<br />

FY 2007 EQUIPMENT 3 7.500 3 7.500<br />

FY 2008 EQUIPMENT 1 2.550 1 2.550<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

1 2.550 1 2.550<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 4 0 0 0 0 0 0 3 2 0 1 2 1 0 0 1 0 0 0 1 0 0 1 1 1 0 1 0 0 0 19<br />

Out 4 0 0 0 0 0 0 3 2 0 1 2 1 0 0 1 0 0 0 1 0 0 1 1 1 0 1 0 0 0 19<br />

P-3A<br />

ITEM NO. 33 PAGE 16 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: 688 PHASE III KIT TYPE MODIFICATION: SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS<br />

DESCRIPTION/JUSTIFICATION:<br />

688 A-RCI SA KITS; PROVIDES SPHERICAL ARRAY PROCESSING CAPABILITY<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 0.000<br />

PROCUREMENT<br />

INSTALLATION KITS 2 16.562 2 19.200 2 19.584 6 55.346<br />

INSTALLATION KITS - UNIT COST 8.281 9.600 9.792<br />

INSTALLATION KITS NONRECURRING 0.000<br />

EQUIPMENT 0.000<br />

EQUIPMENT NONRECURRING 0.000<br />

ENGINEERING CHANGE ORDERS 0.000<br />

DATA 0.000<br />

TRAINING EQUIPMENT 0.000<br />

SUPPORT EQUIPMENT 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

INTERIM CONTRACTOR SUPPORT 0.000<br />

INSTALL COST 1 2.234 1 2.700 2 5.100 2 5.200 6 15.234<br />

TOTAL PROCUREMENT 18.796 21.900 24.684 5.200 70.580<br />

ITEM 33 PAGE 17 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: 688 PHASE III KITS MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIP ALT<br />

ADMINISTRATIVE LEADTIME: 24 MOS PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: 3/03 FY 2004: 3/04 FY 2005: 3/05<br />

DELIVERY DATE: FY 2002: N/A FY 2003: 3/04 FY 2004: 3/05 FY 2005: 3/06<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 1 2.234 1 2.700 2 4.934<br />

FY 2002 EQUIPMENT 0 0.000<br />

FY 2003 EQUIPMENT 2 5.100 2 5.100<br />

FY 2004 EQUIPMENT 2 5.200 2 5.200<br />

FY 2005 EQUIPMENT 0 0.000<br />

FY 2006 EQUIPMENT 0 0.000<br />

FY 2007 EQUIPMENT 0 0.000<br />

FY 2008 EQUIPMENT 0 0.0<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

0 0.0<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 1 1 0 0 0 0 0 1 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6<br />

Out 1 1 0 0 0 0 0 1 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6<br />

P-3A<br />

ITEM NO. 33 PAGE 18 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: 688I PHASE II KITS TYPE MODIFICATION: SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS<br />

DESCRIPTION/JUSTIFICATION:<br />

A-RCI 688 I TA KITS; PROVIDES TB-29 ARRAY PROCESSING CAPABILITY AND IMPROVED DETECTION.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 0.000<br />

PROCUREMENT<br />

INSTALLATION KITS 13 35.473 13 35.473<br />

INSTALLATION KITS - UNIT COST 2.729<br />

INSTALLATION KITS NONRECURRING 0.000<br />

EQUIPMENT 0.000<br />

EQUIPMENT NONRECURRING 0.000<br />

ENGINEERING CHANGE ORDERS 0.000<br />

DATA 0.000<br />

TRAINING EQUIPMENT 0.000<br />

SUPPORT EQUIPMENT 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

INTERIM CONTRACTOR SUPPORT 0.000<br />

INSTALL COST 13 10.007 1 0.900 14 10.907<br />

TOTAL PROCUREMENT 45.480 0.900 46.380<br />

ITEM 33 PAGE 19 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: 688I PHASE II KITS MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIP ALT<br />

ADMINISTRATIVE LEADTIME: 24 MOS PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: 3/02 FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATE: FY 2002: 3/03 FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

($ in Millions)<br />

Cost: Prior Years FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 12 10.007 12 10.007<br />

FY 2002 EQUIPMENT 1 0.900 1 0.900<br />

FY 2003 EQUIPMENT 0 0.000<br />

FY 2004 EQUIPMENT 0 0.000<br />

FY 2005 EQUIPMENT 0 0.0<br />

FY 2006 EQUIPMENT 0 0.0<br />

FY 2007 EQUIPMENT 0 0.000<br />

FY 2008 EQUIPMENT 0 0.0<br />

FY 2009 EQUIPMENT 0 0.0<br />

TO COMPLETE<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 12 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13<br />

Out 12 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13<br />

P-3A<br />

ITEM NO. 33 PAGE 20 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: 688I PHASE II - IV KITS TYPE MODIFICATION: SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS<br />

DESCRIPTION/JUSTIFICATION:<br />

688I A-RCI TA - SA/HF KITS; PROVIDES SPHERICAL ARRAY PROCESSING AND UNDER ICE CAPABILITY.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 0.000<br />

PROCUREMENT<br />

INSTALLATION KITS/TA-SA KITS 5 36.325 3 23.400 4 31.800 4 32.500 16 124.025<br />

INSTALLATION KITS - UNIT COST 7.265 7.800 7.950 8.125<br />

INSTALLATION KITS NONRECURRING<br />

EQUIPMENT<br />

EQUIPMENT NONRECURRING 0.000<br />

ENGINEERING CHANGE ORDERS 0.000<br />

DATA 0.000<br />

TRAINING EQUIPMENT 0.000<br />

SUPPORT EQUIPMENT 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

INTERIM CONTRACTOR SUPPORT 0.000<br />

INSTALL COST 1 1.333 4 8.804 3 6.100 4 8.300 4 8.500 16 33.037<br />

TOTAL PROCUREMENT 37.658 32.204 37.900 40.800 8.500 157.062<br />

ITEM 33 PAGE 21 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: 688I PHASE II - IV KITS MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIP ALT<br />

ADMINISTRATIVE LEADTIME: 24 MOS PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: 3/03 FY 2004: 3/04 FY 2005: 3/05<br />

DELIVERY DATE: FY 2002: N/A FY 2003: 3/04 FY 2004: 3/05 FY 2005: 3/06<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 1 1.333 1 1.333<br />

FY 2002 EQUIPMENT 4 8.804 4 8.804<br />

FY 2003 EQUIPMENT 3 6.100 3 6.100<br />

FY 2004 EQUIPMENT 4 8.300 4 8.3<br />

FY 2005 EQUIPMENT 4 8.500 4 8.5<br />

FY 2006 EQUIPMENT 0 0.000<br />

FY 2007 EQUIPMENT 0 0.000<br />

FY 2008 EQUIPMENT 0 0.000<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

0 0.0<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 1 2 2 0 0 0 1 1 1 1 1 1 1 0 1 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 16<br />

Out 1 2 2 0 0 0 1 1 1 1 1 1 1 0 1 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 16<br />

P-3A<br />

ITEM 33 PAGE 22 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: 688I PHASE IV KIT TYPE MODIFICATION: SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS<br />

DESCRIPTION/JUSTIFICATION:<br />

688I A-RCI SA - HF KITS; PROVIDES SPHERICAL ARRAY PROCESSING AND UNDER ICE CAPABILITY.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: OPEVAL 4nd QTR FY02<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOT<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS/SA KITS 6 50.288 1 10.812 7<br />

INSTALLATION KITS - UNIT COST<br />

EQUIPMENT NONRECURRING<br />

EQUIPMENT<br />

EQUIPMENT NONRECURRING<br />

ENGINEERING CHANGE ORDERS<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

OTHER<br />

OTHER<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

8.381 10.812<br />

INSTALL COST 6 15.641 1 2.300 7<br />

TOTAL PROCUREMENT 65.929 10.812 2.300<br />

ITEM 33 PAGE 23 CLASSIFICATION: UNCLA


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: 688I PHASE IV KITS MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIP ALT<br />

ADMINISTRATIVE LEADTIME: 24 MOS PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: N/A FY 2004: 03/04 FY 2005: N/A<br />

DELIVERY DATE: FY 2002: N/A FY 2003: N/A FY 2004: 03/05 FY 2005: N/A<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 6 15.641 6 15.641<br />

FY 2002 EQUIPMENT 0 0.000<br />

FY 2003 EQUIPMENT 0 0.000<br />

FY 2004 EQUIPMENT 1 2.300 1 2.300<br />

FY 2005 EQUIPMENT 0 0.000<br />

FY 2006 EQUIPMENT 0 0.000<br />

FY 2007 EQUIPMENT 0 0.000<br />

FY 2008 EQUIPMENT 0 0.0<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

0 0.0<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 6 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7<br />

Out 6 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7<br />

P-3A<br />

ITEM 33 PAGE 24 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: TSMS TYPE MODIFICATION: SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS<br />

DESCRIPTION/JUSTIFICATION:<br />

The installation funding cited in FY 2003 and FY 2004 ($1.1M) is for Design Services (development of a SHIPALT package). Total Ship Monitoring System (TSMS) provides own ship environmental and noise<br />

monitoring to enhance the ships situational awareness and provides necessary information for tactical decisions<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 0.000<br />

PROCUREMENT<br />

INSTALLATION KITS 9 7.191 5 4.000 9 7.300 10 8.500 13 11.200 5 4.395 7 6.300 58 48.886<br />

INSTALLATION KITS - UNIT COST 0.799 0.800 0.811 0.850 0.862 0.879 0.900<br />

INSTALLATION KITS NONRECURRING 0.000<br />

EQUIPMENT 0.000<br />

EQUIPMENT NONRECURRING 0.000<br />

ENGINEERING CHANGE ORDERS 0.000<br />

DATA 0.000<br />

TRAINING EQUIPMENT 0.000<br />

SUPPORT EQUIPMENT 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

INTERIM CONTRACTOR SUPPORT 0.000<br />

INSTALL COST 1.876 9 10.426 5 5.600 9 10.300 10 11.700 13 15.500 5 6.050 7 8.470 58 69.922<br />

TOTAL PROCUREMENT 9.067 14.426 12.900 18.800 22.900 19.895 12.350 8.470 118.808<br />

ITEM 33 PAGE 25 CLASSIFICATION: UNCLASSIFI


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: TSMS MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIP ALT<br />

ADMINISTRATIVE LEADTIME: 24 MOS PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: 03/03 FY 2004: 03/04 FY 2005: 03/05<br />

DELIVERY DATE: FY 2002: N/A FY 2003: 03/04 FY 2004: 03/05 FY 2005: 03/06<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 0 0.000<br />

FY 2002 EQUIPMENT 0 0.000<br />

FY 2003 EQUIPMENT 9 10.426 9 10.426<br />

FY 2004 EQUIPMENT 5 5.600 5 5.600<br />

FY 2005 EQUIPMENT 9 10.300 9 10.300<br />

FY 2006 EQUIPMENT 10 11.700 10 11.700<br />

FY 2007 EQUIPMENT 13 15.500 13 15.500<br />

FY 2008 EQUIPMENT 5 6.050 5 6.050<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

7 8.470 7 8.470<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 1 4 4 0 1 2 2 0 0 5 4 0 3 4 3 2 4 4 3 2 2 1 0 7 58<br />

Out 0 0 0 0 0 0 1 4 4 0 1 2 2 0 0 5 4 0 3 4 3 2 4 4 3 2 2 1 0 7 58<br />

P-3A<br />

Item No. 33 PAGE 26 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: ACTIVE INTERCEPT & RANGING KITS TYPE MODIFICATION: SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS<br />

DESCRIPTION/JUSTIFICATION:<br />

The installation funding cited for FY 2003 and FY 2004 ($1.1M) is for Design Services (SHIPALT package development). Replaces obsolete WLR-9 electronics with COTS Open Architecture digital<br />

processor integrated with ARCI, on both SSN and SSBN. Installed with sensor which improves accuracy and fidelity.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 0.000<br />

PROCUREMENT<br />

INSTALLATION KITS (INTERCEPT) 9 6.201 5 4.000 9 6.000 10 7.300 13 9.700 5 3.785 7 5.411 58 42.397<br />

INSTALLATION KITS - UNIT COST 0.689 0.800 0.667 0.730 0.746 0.757 0.773<br />

INSTALLATION KITS NONRECURRING 0.000<br />

EQUIPMENT (SENSOR) 0 0.000<br />

EQUIPMENT (SENSOR) - UNIT COST<br />

ENGINEERING CHANGE ORDERS 0.000<br />

DATA 0.000<br />

TRAINING EQUIPMENT 0.000<br />

SUPPORT EQUIPMENT 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

INTERIM CONTRACTOR SUPPORT 0.000<br />

INSTALL COST 1.000 9 3.400 5 1.300 9 2.300 10 2.700 13 3.500 5 1.350 7 1.960 58 17.510<br />

TOTAL PROCUREMENT 0.000 7.201 7.400 7.300 9.600 12.400 7.285 6.761 1.960 59.907<br />

ITEM 33 PAGE 27 CLASSIFICATION: UNCLASSIF


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: ACTIVE INTERCEPT & RANGING KITS MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIP ALT<br />

ADMINISTRATIVE LEADTIME: 24 MOS PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: 03/03 FY 2004: 03/04 FY 2005: 03/05<br />

DELIVERY DATE: FY 2002: N/A FY 2003: 03/04 FY 2004: 03/05 FY 2005: 03/06<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 0 0.000<br />

FY 2002 EQUIPMENT 0 0.000<br />

FY 2003 EQUIPMENT 9 3.400 9 3.400<br />

FY 2004 EQUIPMENT 5 2.300 5 2.300<br />

FY 2005 EQUIPMENT 9 2.300 9 2.300<br />

FY 2006 EQUIPMENT 10 2.700 10 2.700<br />

FY 2007 EQUIPMENT 13 3.500 13 3.500<br />

FY 2008 EQUIPMENT 5 1.350 5 1.350<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

7 1.960 7 1.960<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 1 4 4 0 1 2 2 0 0 5 4 1 3 4 2 1 4 4 4 2 2 1 0 7 58<br />

Out 0 0 0 0 0 0 1 4 4 0 1 2 2 0 0 5 4 1 3 4 2 1 4 4 4 2 2 1 0 7 58<br />

P-3A<br />

ITEM NO. 33 PAGE 28 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AI&R SENSORS (BACKFIT) TYPE MODIFICATION: NON-SHIPALT MODIFICATION TITLE: SSN Acoustics<br />

DESCRIPTION/JUSTIFICATION:<br />

The installation funding cited on this P3A is included in BLI 214700 not 214705;<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

INSTALLATION KITS 2 0.800 11 6.500 11 5.600 13 6.800 17 9.000 54 28.700<br />

INSTALLATION KITS - UNIT COST 0.400 0.591 0.509 0.523 0.529<br />

INSTALLATION KITS NONRECURRING<br />

EQUIPMENT<br />

EQUIPMENT NONRECURRING<br />

ENGINEERING CHANGE ORDERS<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

OTHER<br />

OTHER<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 2 0.400 11 2.200 11 2.200 13 2.600 17 3.400 54 10.800<br />

TOTAL PROCUREMENT 0.800 6.900 7.800 9.000 11.600 3.400 39.500<br />

ITEM NO. 33 PAGE 29 CLASSIFICATION: UNCLASSIF


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AI&R SENSORS (BACKMODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIPYARD<br />

ADMINISTRATIVE LEADTIME: 3-4 MOS PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: 2/01 FY 2004: FY 2005: 2/03<br />

DELIVERY DATE: FY 2002: N/A FY 2003: 2/02 FY 2004: FY 2005: 2/04<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 0 0.000<br />

FY 2002 EQUIPMENT 0 0.000<br />

FY 2003 EQUIPMENT 0 0.000<br />

FY 2004 EQUIPMENT 0 0.000<br />

FY 2005 EQUIPMENT 2 0.400 2 0.400<br />

FY 2006 EQUIPMENT 11 2.200 11 2.200<br />

FY 2007 EQUIPMENT 11 2.200 11 2.200<br />

FY 2008 EQUIPMENT 13 2.600 13 2.600<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

17 3.400 17 3.400<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 2 3 4 2 2 3 4 2 3 4 4 2 17 54<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 2 3 4 2 2 3 4 2 3 4 4 2 17 54<br />

P-3A<br />

ITEM N0. 33 PAGE 30 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AI&R SENSORS TYPE MODIFICATION: NON-SHIPALT MODIFICATION TITLE: SSN Acoustics<br />

DESCRIPTION/JUSTIFICATION:<br />

The funding cited in this P3A is included in BLI 214700 not 214705;<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

INSTALLATION KITS 8 4.100 22 11.200 30 15.300<br />

INSTALLATION KITS - UNIT COST 0.513 0.509<br />

INSTALLATION KITS NONRECURRING<br />

EQUIPMENT<br />

EQUIPMENT NONRECURRING<br />

ENGINEERING CHANGE ORDERS<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

OTHER<br />

OTHER<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 8 0.800 22 2.200 30 3.000<br />

TOTAL PROCUREMENT 4.100 12.000 2.200 18.300<br />

ITEM NO. 33 PAGE 31 CLASSIFICATION: UNCLASSIF


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AI&R SENSORS MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIPYARD<br />

ADMINISTRATIVE LEADTIME: 3-4 MOS PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: 2/01 FY 2004: FY 2005: 2/03<br />

DELIVERY DATE: FY 2002: N/A FY 2003: 2/02 FY 2004: FY 2005: 2/04<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 0 0.000<br />

FY 2002 EQUIPMENT 0 0.000<br />

FY 2003 EQUIPMENT 0 0.000<br />

FY 2004 EQUIPMENT 0 0.000<br />

FY 2005 EQUIPMENT 0 0.000<br />

FY 2006 EQUIPMENT 0 0.000<br />

FY 2007 EQUIPMENT 8 0.800 8 0.800<br />

FY 2008 EQUIPMENT 22 2.200 22 2.200<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

0 0.000<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 3 2 4 6 7 5 0 30<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 3 2 4 6 7 5 0 30<br />

P-3A<br />

ITEM NO. 33 PAGE 32 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED:<br />

DESCRIPTION/JUSTIFICATION:<br />

BQS-15A EC-19<br />

(SA105)<br />

TYPE MODIFICATION: NON-SHIPALT MODIFICATION TITLE: SSN Acoustics<br />

THE INSTALLATION FUNDING CITED IN FY 2008 IS INCLUDED IN BLI 214700 NOT 214705.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

INSTALLATION KITS 1 0.300 0 1 0.300<br />

INSTALLATION KITS - UNIT COST 0.300<br />

INSTALLATION KITS NONRECURRING<br />

EQUIPMENT<br />

EQUIPMENT NONRECURRING<br />

ENGINEERING CHANGE ORDERS<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

OTHER<br />

OTHER<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 1 0.100 0 1 0.100<br />

TOTAL PROCUREMENT 0.300 0.100 0 0.400<br />

ITEM NO. 33 PAGE 33 CLASSIFICATION: UNCLASSIF


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIPYARD<br />

ADMINISTRATIVE LEADTIME: 3-4 MOS PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: 2/01 FY 2004: FY 2005: 2/03<br />

DELIVERY DATE: FY 2002: N/A FY 2003: 2/02 FY 2004: FY 2005: 2/04<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 0 0.000<br />

FY 2002 EQUIPMENT 0 0.000<br />

FY 2003 EQUIPMENT 0 0.000<br />

FY 2004 EQUIPMENT 0 0.000<br />

FY 2005 EQUIPMENT 0 0.000<br />

FY 2006 EQUIPMENT 0 0.000<br />

FY 2007 EQUIPMENT 1 0.100 1 0.100<br />

FY 2008 EQUIPMENT 0 0.000<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

0 0.000<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 1<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 1<br />

P-3A<br />

ITEM NO. 33 PAGE 34 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: BQS-15A EC-20 TYPE MODIFICATION: SHIPALT MODIFICATION TITLE: SSN Acoustics<br />

DESCRIPTION/JUSTIFICATION:<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

INSTALLATION KITS 4 3.000 4 3.000 6 4.800 8 6.500 2 1.700 0 24 19.000<br />

INSTALLATION KITS - UNIT COST 0.750 0.750 0.800 0.813 0.850<br />

INSTALLATION KITS NONRECURRING<br />

EQUIPMENT<br />

EQUIPMENT NONRECURRING<br />

ENGINEERING CHANGE ORDERS<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

OTHER<br />

OTHER<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 4 0.800 4 1.000 6 1.500 8 2.100 2 0.600 24 6.000<br />

TOTAL PROCUREMENT 3.000 3.800 5.800 8.000 3.800 0.600 25.000<br />

ITEM NO. 33 PAGE 35 CLASSIFICATION: UNCLASSIF


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: BQS-15A EC-20 MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: NON-SHIPALT<br />

ADMINISTRATIVE LEADTIME: 3-4 MOS PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: 2/01 FY 2004: FY 2005: 2/03<br />

DELIVERY DATE: FY 2002: N/A FY 2003: 2/02 FY 2004: FY 2005: 2/04<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 0 0.000<br />

FY 2002 EQUIPMENT 0 0.000<br />

FY 2003 EQUIPMENT 0 0.000<br />

FY 2004 EQUIPMENT 0 0.000<br />

FY 2005 EQUIPMENT 4 0.800 4 0.800<br />

FY 2006 EQUIPMENT 4 1.000 4 1.000<br />

FY 2007 EQUIPMENT 6 1.500 6 1.500<br />

FY 2008 EQUIPMENT 8 2.100 8 2.100<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

2 0.600 2 0.600<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 2 1 0 1 2 1 0 2 2 2 0 2 4 2 2 24<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 2 1 0 1 2 1 0 2 2 2 0 2 4 2 2 24<br />

P-3A<br />

ITEM NO. 33 PAGE 36 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: SSN21 PHASE IV KIT (SA501) TYPE MODIFICATION: SHIPALT MODIFICATION TITLE: SSN Acoustics<br />

DESCRIPTION/JUSTIFICATION:<br />

INSTALLATION FUNDING CITED FOR FY 2002 & FY 2003 IS FOR DESIGN SERVICES (SHIPALT PACKAGE DEVELOPMENT);<br />

A-RCI PHASE IV KIT; ARCI-(V)5 KITS INCORPORATE ARCI PHASE II-IV CAPABILITY FOR THE SEAWOLF CLASS SUBMARINE.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

INSTALLATION KITS 1 6.683 1 9.700 1 10.100 0 3 26.483<br />

INSTALLATION KITS - UNIT COST 6.683 9.700 10.100<br />

INSTALLATION KITS NONRECURRING<br />

EQUIPMENT<br />

EQUIPMENT NONRECURRING<br />

ENGINEERING CHANGE ORDERS<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

OTHER<br />

OTHER<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST AP 0.635 AP 2.500 1 3.100 1 3.100 1 3.100 0 3 12.435<br />

TOTAL PROCUREMENT 7.318 12.200 3.100 13.200 3.100 0 38.918<br />

ITEM NO. 33 PAGE 37 CLASSIFICATION: UNCLASSIF


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: SSN21 PHASE IV KIT MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIPYARD<br />

ADMINISTRATIVE LEADTIME: 3-4 MOS PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: 2/01 FY 2004: FY 2005: 2/03<br />

DELIVERY DATE: FY 2002: N/A FY 2003: 2/02 FY 2004: FY 2005: 2/04<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 1 3.100 1 3.100<br />

FY 2002 EQUIPMENT 0 0.000<br />

FY 2003 EQUIPMENT 1 3.100 1 3.100<br />

FY 2004 EQUIPMENT 0 0.000<br />

FY 2005 EQUIPMENT 1 3.100 1 3.100<br />

FY 2006 EQUIPMENT 0 0.000<br />

FY 2007 EQUIPMENT 0 0.000<br />

FY 2008 EQUIPMENT 0 0.000<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

0 0.000<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 1 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3<br />

Out 0 0 0 0 0 0 1 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3<br />

P-3A<br />

ITEM NO. 33 PAGE 38 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: SSBN PHASE II KITS TYPE MODIFICATION: SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS<br />

DESCRIPTION/JUSTIFICATION:<br />

726 A-RCI TA KITS; FUNDS CITED FOR FY 2004 ARE FOR DESIGN SERVICES (SHIPALT PACKAGE DEVELOPMENT).<br />

PROVIDES TOWED ARRAY PASSIVE PROCESSING CAPABILITY<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 0 0.000<br />

PROCUREMENT<br />

INSTALLATION KITS 1 3.099 1 3.200 5 16.100 7 22.399<br />

INSTALLATION KITS - UNIT COST 3.099 3.200 3.220<br />

INSTALLATION KITS NONRECURRING 0.000<br />

EQUIPMENT 0.000<br />

EQUIPMENT NONRECURRING 0.000<br />

ENGINEERING CHANGE ORDERS 0.000<br />

DATA 0.000<br />

TRAINING EQUIPMENT 0.000<br />

SUPPORT EQUIPMENT 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

INTERIM CONTRACTOR SUPPORT 0.000<br />

INSTALL COST 3.500 1 1.500 1 1.500 5 7.600 7 14.100<br />

TOTAL PROCUREMENT 6.599 4.700 17.600 7.600 36.499<br />

ITEM NO. 33 PAGE 39 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: SSBN PHASE II KITS MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIP ALT<br />

ADMINISTRATIVE LEADTIME: 24 MOS PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: N/A FY 2004: 2/04 FY 2005: 2/05<br />

DELIVERY DATE: FY 2002: N/A FY 2003: N/A FY 2004: 2/05 FY 2005: 2/06<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 0 0.000<br />

FY 2002 EQUIPMENT 0 0.000<br />

FY 2003 EQUIPMENT 0 0.000<br />

FY 2004 EQUIPMENT 1 1.500 1 1.500<br />

FY 2005 EQUIPMENT 1 1.500 1 1.500<br />

FY 2006 EQUIPMENT 5 7.600 5 7.600<br />

FY 2007 EQUIPMENT 0 0.000<br />

FY 2008 EQUIPMENT 0 0.000<br />

FY 2009 EQUIPMENT 0 0.000<br />

TO COMPLETE 0 0.000<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 1 0 0 0 0 1 0 0 1 0 0 0 2 2 1 0 0 1 0 0 0 0 0 0 9<br />

Out 0 0 0 0 0 0 1 0 0 0 0 1 0 0 1 0 0 0 2 2 1 0 0 1 0 0 0 0 0 0 9<br />

P-3A<br />

ITEM NO. 33 PAGE 40 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: SSBN PHASE II - III KITS TYPE MODIFICATION: SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS<br />

DESCRIPTION/JUSTIFICATION:<br />

726 A-RCI TA - SA KITS; THE FUNDING CITED FOR FY2007 ($1.354M) IS FOR DESIGN SERVICES (SHIPALY PACKAGE DEVELOPMENT)<br />

PROVIDES SPHERICAL ARRAY PASSIVE PROCESSING CAPABILITY<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 0.000<br />

PROCUREMENT<br />

INSTALLATION KITS 1 7.600 4 31.400 5 39.000<br />

INSTALLATION KITS - UNIT COST 7.600 7.850<br />

INSTALLATION KITS NONRECURRING 0.000<br />

EQUIPMENT 0.000<br />

EQUIPMENT NONRECURRING 0.000<br />

ENGINEERING CHANGE ORDERS 0.000<br />

DATA 0.000<br />

TRAINING EQUIPMENT 0.000<br />

SUPPORT EQUIPMENT 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

INTERIM CONTRACTOR SUPPORT 0.000<br />

INSTALL COST 1.354 1 2.800 4 11.400 5 15.554<br />

TOTAL PROCUREMENT 0.000 8.954 2.800 11.400 23.154<br />

ITEM NO. 33 PAGE 41 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: SSBN PHASE II - III KITS MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIP ALT<br />

ADMINISTRATIVE LEADTIME: 24 MOS PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATE: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 0 0.000<br />

FY 2002 EQUIPMENT 0 0.000<br />

FY 2003 EQUIPMENT 0 0.000<br />

FY 2004 EQUIPMENT 0 0.000<br />

FY 2005 EQUIPMENT 0 0.000<br />

FY 2006 EQUIPMENT 0 0.000<br />

FY 2007 EQUIPMENT 1 2.800 1 2.800<br />

FY 2008 EQUIPMENT 0 0.000 0 0.000<br />

FY 2009 EQUIPMENT 4 11.400 4 11.400<br />

TO COMPLETE 0 0.000<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 4 5<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 4 5<br />

P-3A<br />

ITEM NO. 33 PAGE 42 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: SSBN PHASE III KITS TYPE MODIFICATION: SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS<br />

DESCRIPTION/JUSTIFICATION:<br />

726 A-RCI SA KITS; PROVIDES SPHERICAL ARRAY PASSIVE PROCESSING CAPABILITY<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 0 0.000<br />

PROCUREMENT<br />

INSTALLATION KITS 2 21.200 1 11.000 1 11.100 4 43.300<br />

INSTALLATION KITS - UNIT COST 10.600 11.000 11.100<br />

INSTALLATION KITS NONRECURRING 0.000<br />

EQUIPMENT 0.000<br />

EQUIPMENT NONRECURRING 0.000<br />

ENGINEERING CHANGE ORDERS 0.000<br />

DATA 0.000<br />

TRAINING EQUIPMENT 0 0.000<br />

SUPPORT EQUIPMENT 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

INTERIM CONTRACTOR SUPPORT 0.000<br />

INSTALL COST 2 5.200 2 5.400 4 10.600<br />

TOTAL PROCUREMENT 21.200 5.200 16.500 42.900<br />

ITEM NO. 33 PAGE 43 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: SSBN PHASE III KITS MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIP ALT<br />

ADMINISTRATIVE LEADTIME: 24 MOS PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATE: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 0 0.000<br />

FY 2002 EQUIPMENT 0 0.000<br />

FY 2003 EQUIPMENT 0 0.000<br />

FY 2004 EQUIPMENT 0 0.000<br />

FY 2005 EQUIPMENT 0 0.000<br />

FY 2006 EQUIPMENT 0 0.000<br />

FY 2007 EQUIPMENT 2 5.200 2 5.200<br />

FY 2008 EQUIPMENT 0 0.000<br />

FY 2009 EQUIPMENT 1 2.700 1 2.700<br />

TO COMPLETE 1 2.700 1 2.700<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 2 4<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 2 4<br />

P-3A<br />

ITEM NO. 33 PAGE 44 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: SSGN PHASE IV KITS (SA104) TYPE MODIFICATION: SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS<br />

DESCRIPTION/JUSTIFICATION:<br />

SSGN CONVERSION; THE INSTALLATION FUNDING CITED IN FY 2004 AND FY 2005 IS FOR DESIGN SERVICES (SHIPALT PACKAGE DEVELOPMENT).<br />

PROVIDES A-RCI Phase I-IV ON SSGN CONVERSIONS.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 0 0.000<br />

PROCUREMENT<br />

INSTALLATION KITS 2 31.000 2 31.000 4 62.000<br />

INSTALLATION KITS - UNIT COST 15.500 15.500<br />

INSTALLATION KITS NONRECURRING 0.000<br />

EQUIPMENT 0.000<br />

EQUIPMENT NONRECURRING 0.000<br />

ENGINEERING CHANGE ORDERS 0.000<br />

DATA 0.000<br />

TRAINING EQUIPMENT 0 0.000<br />

SUPPORT EQUIPMENT 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

INTERIM CONTRACTOR SUPPORT 0.000<br />

INSTALL COST 1.000 0.500 2 7.000 2 7.000 4 15.500<br />

TOTAL PROCUREMENT 1.000 31.500 38.000 7.000 77.500<br />

ITEM NO. 33 PAGE 45 CLASSIFICATION: UNCLASSIF


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: SSGN PHASE IV KITS MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIP ALT<br />

ADMINISTRATIVE LEADTIME: 24 MOS PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: 3/05<br />

DELIVERY DATE: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: 3/06<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 0 0.000<br />

FY 2002 EQUIPMENT 0 0.000<br />

FY 2003 EQUIPMENT 0 0.000<br />

FY 2004 EQUIPMENT 0 0.000<br />

FY 2005 EQUIPMENT 2 7.000 2 7.000<br />

FY 2006 EQUIPMENT 2 7.000 2 7.000<br />

FY 2007 EQUIPMENT 0 0.000<br />

FY 2008 EQUIPMENT 0 0.000<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

0 0.000<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 1 1 0 0 0 0 0 0 0 0 0 4<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 1 1 0 0 0 0 0 0 0 0 0 4<br />

P-3A<br />

ITEM NO. 33 PAGE 46 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: OA-9070 A/B UPGRADE TYPE MODIFICATION: SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS<br />

DESCRIPTION/JUSTIFICATION:<br />

PROVIDES NECESSARY TECHNICAL CONVERSION TO ACCOMMODATE TB-29 SERIES ARRAYS<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2001 & Prior FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 0.000<br />

PROCUREMENT 0.000<br />

INSTALLATION KITS 15 10.650 7 4.788 5 2.750 5 2.800 1 0.570 0 0.000 0 0.000 33 21.558<br />

INSTALLATION KITS - UNIT COST 0.710 0.684 0.550 0.560 0.570 0.000 0.000 0.000<br />

INSTALLATION KITS NONRECURRING 0.000<br />

EQUIPMENT 0.000<br />

EQUIPMENT NONRECURRING 0.000<br />

ENGINEERING CHANGE ORDERS 0.000<br />

DATA 0.000<br />

TRAINING EQUIPMENT 1 0.669 1 0.669<br />

SUPPORT EQUIPMENT 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

INTERIM CONTRACTOR SUPPORT 0.000<br />

INSTALL COST 10 17.085 5 7.905 7 9.613 9 15.879 2 4.734 1 2.530 0 0.000 0 0.000 34 57.746<br />

TOTAL PROCUREMENT 27.735 12.693 12.363 18.679 5.304 2.530 0.000 0.000 0.000 79.304<br />

ITEM NO. 33 PAGE 47 CLASSIFICATION: UNCLASSIF


CLASSIFICATION: UNCLASSIFIED May-2002<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: OA 9070 A/B UPGRADE MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIP ALT<br />

ADMINISTRATIVE LEADTIME: 24 MOS PRODUCTION LEADTIME: 6 - 8 Months<br />

CONTRACT DATES: FY 2002: 2/02 FY 2003: 2/03 FY 2004: 2/04 FY 2005: 2/05<br />

DELIVERY DATE: FY 2002: 10/02 FY 2003: 10/03 FY 2004: 10/04 FY 2005: 10/05<br />

($ in Millions)<br />

Cost: FY 2001 & Prior FY2002 FY 2003 FY2004 FY2005 FY2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 10 17.085 5 7.905 15 24.990<br />

FY 2002 EQUIPMENT 7 9.613 7 9.613<br />

FY 2003 EQUIPMENT 5 9.924 5 9.924<br />

FY 2004 EQUIPMENT 3 5.955 2 4.734 5 10.689<br />

FY 2005 EQUIPMENT 1 2.530 1 2.530<br />

FY 2006 EQUIPMENT 0 0.000<br />

FY 2007 EQUIPMENT 0 0.000<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

0 0.000<br />

INSTALLATION SCHEDULE:<br />

FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 10 3 1 2 0 2 3 2 0 2 1 1 1 3 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 33<br />

Out 10 3 1 2 0 2 3 2 0 2 1 1 1 3 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 33<br />

NOTE: DUE TO THE 1 OCTOBER 2004 AVAILABILITY FOR 3 SHIPS THEIR INSTALLATION IS FUNDED WITH FY04 FUNDS.<br />

P-3A<br />

ITEM NO. 33 PAGE 48 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: OK-542 TB-29 Conversion TYPE MODIFICATION: SHIP ALT SSN ACOUSTICS<br />

DESCRIPTION/JUSTIFICATION:<br />

PROVIDES NECESSARY TECHNICAL CONVERSION TO ACCOMMODATE TB-29 SERIES ARRAYS<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2001 & Prior FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 0.000<br />

PROCUREMENT 0.000<br />

INSTALLATION KITS 1 0.575 6 3.522 6 3.528 13 7.625<br />

INSTALLATION KITS - UNIT COST 0.587 0.588 0.000<br />

INSTALLATION KITS NONRECURRING 0.000<br />

EQUIPMENT 0.000<br />

EQUIPMENT NONRECURRING 0.000<br />

ENGINEERING CHANGE ORDERS 0.000<br />

DATA 0.000<br />

TRAINING EQUIPMENT 0.000<br />

SUPPORT EQUIPMENT 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

INTERIM CONTRACTOR SUPPORT 0.000<br />

INSTALL COST AP 0.684 1 1.679 6 9.000 6 9.411 13 20.774<br />

TOTAL PROCUREMENT 0.000 0.000 0.000 0.000 0.000 0.000 1.259 5.201 12.528 9.411 28.399<br />

ITEM NO. 33 PAGE 49 CLASSIFICATION: UNCLASSIF


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: OK-542 TB-29 Conversion MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIP ALT<br />

ADMINISTRATIVE LEADTIME: 24 MOS PRODUCTION LEADTIME: 6-9 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATE: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

($ in Millions)<br />

Cost: FY 2001 & Prior FY2002 FY 2003 FY2004 FY2005 FY2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 0 0.000<br />

FY 2002 EQUIPMENT 0 0.000<br />

FY 2003 EQUIPMENT 0 0.000<br />

FY 2004 EQUIPMENT 0 0.000<br />

FY 2005 EQUIPMENT 0 0.000<br />

FY 2006 EQUIPMENT 0 0.000<br />

FY 2007 EQUIPMENT AP 0.684 1 1.679 1 2.363<br />

FY 2008 EQUIPMENT 6 9.000 6 9.000<br />

FY 2009 EQUIPMENT 0 0.000<br />

TO COMPLETE 6 9.411 6 9.411<br />

INSTALLATION SCHEDULE:<br />

FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 12 13<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 12 13<br />

P-3A<br />

ITEM NO. 33 PAGE 50 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: Fiber Optic Receiver/Signal Path TYPE MODIFICATION: SHIP ALT SSN ACOUSTICS<br />

DESCRIPTION/JUSTIFICATION:<br />

PROVIDES NECESSARY TECHNICAL CONVERSION TO ACCOMMODATE FIBER OPTIC ARRAYS<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2001 & Prior FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 0.000<br />

PROCUREMENT 0.000<br />

INSTALLATION KITS 1 1.434 7 10.241 8 11.936 16 23.611<br />

INSTALLATION KITS - UNIT COST 1.434 1.463 1.492 0.000<br />

INSTALLATION KITS NONRECURRING 0.000<br />

EQUIPMENT 0.000<br />

EQUIPMENT NONRECURRING 0.000<br />

ENGINEERING CHANGE ORDERS 0.000<br />

DATA 0.000<br />

TRAINING EQUIPMENT 0 0.000<br />

SUPPORT EQUIPMENT 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

INTERIM CONTRACTOR SUPPORT 0.000<br />

INSTALL COST 1 0.950 7 6.783 8 8.160 16 15.893<br />

TOTAL PROCUREMENT 0.000 0.000 0.000 0.000 0.000 0.000 1.434 11.191 18.719 8.160 39.504<br />

ITEM NO. 33 PAGE 51 CLASSIFICATION: UNCLASSIF


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: Fiber Optic Receiver/Signal Path MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIP ALT<br />

ADMINISTRATIVE LEADTIME: 24 MOS PRODUCTION LEADTIME: 18 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATE: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

($ in Millions)<br />

Cost: FY 2001 & Prior FY2002 FY 2003 FY2004 FY2005 FY2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 0 0.000<br />

FY 2002 EQUIPMENT 0 0.000<br />

FY 2003 EQUIPMENT 0 0.000<br />

FY 2004 EQUIPMENT 0 0.000<br />

FY 2005 EQUIPMENT 0 0.000<br />

FY 2006 EQUIPMENT 0 0.000<br />

FY 2007 EQUIPMENT 1 0.950 1 0.950<br />

FY 2008 EQUIPMENT 7 6.783 7 6.783<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

8 8.160 8 8.160<br />

INSTALLATION SCHEDULE:<br />

FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 11 12<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 11 12<br />

P-3A<br />

ITEM NO. 33 PAGE 52 CLASSIFICATION: UNCLASSIFIED


BUDGET PRODUCTION SCHEDULE, P-21 DATE<br />

February 2004<br />

APPROPRIATION/BUDGET ACTIVITY Weapon System P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA2: COMMUNICATIONS AND ELECTRONICS SSN ACOUSTICS/H2SA<br />

Production Rate (Per Yr) Procurement Leadtimes<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

Item Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

TB-29A Array Lockheed Martin, Syracu 8 27 36*<br />

FISCAL YEAR 2002 FISCAL YEAR 2003<br />

ITEM / MANUFACTURER F S Q D B 2001 CALENDAR YEAR 2002 CALENDAR YEAR 2003<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L<br />

TB-29A Array/Lockheed Martin 2002 N 2 0 2 A 2<br />

TB-29A Array/TBD 2003 N 3 0 3 A 3<br />

FISCAL YEAR 2004 FISCAL YEAR 2005<br />

ITEM / MANUFACTURER F S Q D B 2003 CALENDAR YEAR 2004 CALENDAR YEAR 2005<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L<br />

TB-29A Array/Lockheed Martin 2002 N 2 0 2 1 1 2<br />

TB-29A Array/TBD 2003 N 3 0 3 1 1 1 3<br />

TB-29A Array/TBD 2004 N 4 0 4 A 1 1 2<br />

FISCAL YEAR 2006 FISCAL YEAR 2007<br />

ITEM / MANUFACTURER F S Q D B 2005 CALENDAR YEAR 2006 CALENDAR YEAR 2007<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L<br />

TB-29A Array/TBD 2004 N 4 2 2 1 1 0<br />

Remarks:<br />

* - Based on 2 shifts and minor additional test equipment.<br />

DD Form 2445, JUL 87 Previous editions are obsolete P-1 SHOPPING LIST<br />

311 / 244 ITEM NO 33 PAGE 53 Exhibit P-21 Production Schedule


BUDGET PRODUCTION SCHEDULE, P-21 DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY Weapon System P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA2: COMMUNICATIONS AND ELECTRONICS SSN ACOUSTICS/H2SA<br />

Production Rate (Per Yr) Procurement Leadtimes<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

Item Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

TB-16 Array Chesapeake Sciences<br />

Millersville, Maryland<br />

8 27 36*<br />

FISCAL YEAR 2002 FISCAL YEAR 2003<br />

ITEM / MANUFACTURER F S Q D B 2001 CALENDAR YEAR 2002 CALENDAR YEAR 2003<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L<br />

TB-16 Array/Chesapeake Sciences 2003 N 2 0 2 A 2<br />

FISCAL YEAR 2004 FISCAL YEAR 2005<br />

ITEM / MANUFACTURER F S Q D B 2003 CALENDAR YEAR 2004 CALENDAR YEAR 2005<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L<br />

TB-16 Array/Chesapeake Sciences 2003 N 2 0 2 1 1 0<br />

TB-16 Array/Chesapeake Sciences 2004 N 17 0 17 A 1 2 1 2 1 2 1 2 1 2 1 1 17<br />

Remarks:<br />

FISCAL YEAR 2006 FISCAL YEAR 2007<br />

ITEM / MANUFACTURER F S Q D B 2005 CALENDAR YEAR 2006 CALENDAR YEAR 2007<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

* - Based on 2 shifts and minor additional test equipment.<br />

DD Form 2445, JUL 87 Previous editions are obsolete P-1 SHOPPING LIST<br />

311 / 244 ITEM NO 33 PAGE 54 Exhibit P-21 Production Schedule<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L


BUDGET PRODUCTION SCHEDULE, P-21 DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY Weapon System P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA2: COMMUNICATIONS AND ELECTRONICS SSN ACOUSTICS/H2SA<br />

Production Rate (Per Yr) Procurement Leadtimes<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

Item Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

TB-16 Next Generation TBD 8 27 36*<br />

FISCAL YEAR 2002 FISCAL YEAR 2003<br />

ITEM / MANUFACTURER F S Q D B 2001 CALENDAR YEAR 2002 CALENDAR YEAR 2003<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

FISCAL YEAR 2004 FISCAL YEAR 2005<br />

ITEM / MANUFACTURER F S Q D B 2003 CALENDAR YEAR 2004 CALENDAR YEAR 2005<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

FISCAL YEAR 2006 FISCAL YEAR 2007<br />

ITEM / MANUFACTURER F S Q D B 2005 CALENDAR YEAR 2006 CALENDAR YEAR 2007<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L<br />

TB-16 Next Generation- TBD 2005 N 7 0 1 2 1 2 1 7<br />

Remarks:<br />

* - Based on 2 shifts and minor additional test equipment.<br />

DD Form 2445, JUL 87 Previous editions are obsolete P-1 SHOPPING LIST<br />

311 / 244 ITEM NO 33 PAGE 55 Exhibit P-21 Production Schedule<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L<br />

B<br />

A<br />

L


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

Other Procurement, Navy/Communications & Electronics Equipment, BA-2 UUV Program LI#217100<br />

Program Element for Code B Items: Other Related Program Elements<br />

Prior ID To Total<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Program<br />

QTY LMRS N/A B N/A 0 2 2 2 2 2 N/A N/A<br />

COST ($M) 0.0 0.0 0.0 61.3 49.0 63.3 63.5 64.4 Cont. Cont.<br />

Initial Spares ($M) 0.0 0.0 0.0 4.2 3.9 3.3 3.6 3.2 Cont. Cont.<br />

TOTAL ($M) 0.0 0.0 0.0 65.5 52.9 66.6 67.1 67.6 Cont. Cont.<br />

ITEM DESCRIPTION/JUSTIFICATION:<br />

The UUV project funds the procurement of the AN/BLQ-11 Long-Term Mine Reconnaissance System (LMRS) to provide a robust, long-term Fleet capability to conduct clandestine minefield reconnaissance. The<br />

system will use an advanced sensor suite to autonomously detect and classify mine like objects. The vehicle is 21 inches in diameter and is launched and recovered through an SSN torpedo tube. The system is<br />

designed as a carry on, carry off system for employment on both SSN 688 and Virginia Class submarines. A quantity of 12 LMRSs will be procured begining in FY05. Commencing in FY07 Pre Planned Product<br />

Improvements (P3I) will be introduced to the production buy.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 34 Page 1 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy<br />

BA-2: Communications and Electronics Equipment UUV Program / 72UV<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID Prior FY 2002 FY 2003 FY 2004 FY 2005<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

N77<br />

UV001 Hardware B 2 17,000.00 34,000<br />

UV011 Support equipment B 15,000<br />

UV830 Prod Eng (In-house) B 10,161<br />

UV840 Acceptance T & E B 2,000<br />

UV900 Consulting Services B 92<br />

0 0 0 61,253<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 34 Page 2<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy UUV Program / 72UV 72UV<br />

BA-2: Communications and Electronics Equipment<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

FY2005<br />

LMRS 2 17,000<br />

D. REMARKS<br />

NAVSEA Jan-05 SSFFP Boeing Jan-05 Jul-06 No NA<br />

Anaheim, CA<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Classification:<br />

ITEM NO. 34 Page 3 UNCLASSIFIED


FY 2005 BUDGET PRODUCTION SCHEDULE, P-21 DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY: Weapons Procurement, Navy<br />

BA-2: Communications and Electronics Equipment<br />

Weapon System P-1 ITEM NOMENCLATURE<br />

UUV Program/72UV<br />

Production Rate<br />

Procurement Leadtimes<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

Item Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

LMRS Boeing<br />

Anaheim, CA<br />

1 2 4<br />

0 4 14 12 18<br />

FISCAL YEAR 2002 FISCAL YEAR 2003<br />

ITEM / MANUFACTURER F S Q D B 2001 CALENDAR YEAR 2002 CALENDAR YEAR 2003<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

N<br />

O<br />

D<br />

E<br />

J<br />

A<br />

F<br />

E<br />

M<br />

A<br />

A<br />

P<br />

M<br />

A<br />

J<br />

U<br />

J<br />

U<br />

A<br />

U<br />

S<br />

E<br />

O<br />

C<br />

N<br />

O<br />

D<br />

E<br />

J<br />

A<br />

F<br />

E<br />

M<br />

A<br />

A<br />

P<br />

M<br />

A<br />

J<br />

U<br />

J<br />

U<br />

T V C N B R R Y N L G P T V C N B R R Y N L<br />

LMRS 2005 2 0 2 2<br />

FISCAL YEAR 2004 FISCAL YEAR 2005<br />

ITEM / MANUFACTURER F S Q D B 2003 CALENDAR YEAR 2004 CALENDAR YEAR 2005<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L<br />

LMRS 2005 2 0 2 A *2<br />

Remarks:<br />

*FY05 units will deliver in July FY06 and August FY06.<br />

DD Form 2445, JUL 87 Previous editions are obsolete P-1 SHOPPING LIST<br />

311 / 244 ITEM NO. 34 PAGE 4 Exhibit P-21 Production Schedule<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L


CLASSIFICATION:<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY BA-2 COMMUNICATIONS & ELECTRONIC EQUIPMENT UNDERSEA WARFARE SUPPORT EQUIPMENT (217600/217605) A2VM<br />

Program Element for Code B Items: Other Related Program Elements<br />

Prior ID To<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions) $13.4 $11.6 $14.1 $14.5 $12.3 $13.0 $6.7 Cont. Cont.<br />

SPARES COST<br />

(In Millions)<br />

Space Information Command and Control Programs (N61)<br />

Common Undersea Picture (CUP)<br />

The Common Undersea Picture (CUP) provides the Fleet with capabilities for significantly improved USW sensor and tactical situational awareness for own ship and own force vulnerability, as well as<br />

automated USW contact and information fusion, net based connectivity and collaboration, and computer aided mission planning and assessment. CUP will provide the Sea Combat Commander (SCC)<br />

with an expanded net-centric USW toolset reaching across all surface and submarine Expeditionary Strike Force (ESF) USW platforms as well as supporting USW shore nodes, theater assets, and<br />

aircraft. Funding identified provides for the procurement and installation of CUP capability on ESF platforms and supporting shore nodes as permanent alterations, and will support periodic technology<br />

refresh of CUP hardware/software to keep capabilities concurrent with leading COTS technology.<br />

Surface Programs (N76)<br />

Surface Sonar Windows and Domes<br />

AN/SQS-26/53 Sonar Dome Rubber Windows (SDRW) are installed in CG47, DDG51, and DD963 class ships. This program provides emergency replacement wire-reinforced, pressurized rubber<br />

acoustic windows which experience failure due to corrosion, fatigue, and impact in the splice region. The SDRW significantly improves the surface ship sonar performance by reducing flow-induced<br />

self-noise, and by providing increased source level receiving and sensitivity resulting from reduced attenuation. AN/SQS-56 Sonar Rubber Domes (SRD) are installed in FFG7 class ships. This<br />

program provides emergency replacement SRD for AN/SQS-56 active/passive duct sonar systems. Production engineering support provides technical evaluation, failure analyses, implementation of<br />

the inwater one-side backscatter xray program, GFE refurbishments, and field service engineering .<br />

Surface Ship Torpedo Defense<br />

The Surface Ship Torpedo Defense (SSTD) System consists of the AN/SLQ-25A NIXIE towed torpedo countermeasure. The SSTD system enhances ship survival capability against advanced acoustic<br />

and non-acoustic homing torpedoes. The AN/SLQ-25A Nixie is in the Countermeasure Passive Subsystem of the SSTD System. The AN/SLQ-25A projects decoy signals into the water via a towed<br />

body deployed astern of the ship. The projected signals are generated by a transmitter located on the ship which is controlled by an operator. FY 02/03/04 Congressional plus-ups were authorized to<br />

procure AN/SLQ-25A towed torpedo defense countermeasure improvements (i.e. an enhanced EC-16, improved tow cable and COTS signal generator as well as reliability mods). This effort will<br />

provide enhanced reliability and performance against evolving threat torpedoes and enhanced operation of the AN/SLQ-25A in shallow littoral waters.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 Item No. 35 Page No. 1<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY BA-2 COMMUNICATIONS & ELECTRONIC EQUIPMENT UNDERSEA WARFARE SUPPORT EQUIPMENT (217600/217605) A2VM<br />

Program Element for Code B Items: Other Related Program Elements<br />

Submarine Programs (N77)<br />

Acoustic Communications<br />

Acoustic Communications provides two-way and one-way acoustic communications equipment for submarines and surface ships. The equipment consists of : (1) AN/WQC-2/2A, a stand alone, single<br />

side band, general purpose, voice, continuous wave, multiple tone communication for surface ships, submarines, and some shore activities; (2) AN/WQC-6, which provides long range coded signaling<br />

from surface ASW ships to attack submarines when interfaced with the AN/SQS-26/53 and AN/BQQ-5; (3) AN/BQC-1( ), a stand-alone emergency voice and signal beacon for submarines, and (4)<br />

technical improvements (Engineering Changes) to acoustic communication equipment. Funding will provide for continued procurement of both Probe Alert (AN/WQC-6) improvements and AN/WQC-2A<br />

Engineering Changes plus associated production engineering support and consulting services for the SSN 21, SSN 637, SSN 688, SSBN 726, DD963, DDG 51, CG 47, MHC 51, MCM 1, CVN 65, ARS<br />

50, FFG 7, and CVN 68 class ships and submarines.<br />

Aircraft Carrier Programs (N78)<br />

Aircraft Carrier Tactical Support Center (CV-TSC)<br />

The CV-TSC of the Carrier Combat Direction System (CDS) is the focal point of supply for force ASW/SUW functions. The system supports the multi-mission, tactical deployment of embarked airborne<br />

weapon systems (S-3B and SH-60 Helicopters) by providing mission planning, in-flight support and post mission assessment/intelligence collection. CV-TSC provides real time and post mission<br />

analysis of relayed or taped acoustic and non-acoustic signals to support CV/CVN USW Self Defense. The system consists of digital computers, commercial workstation displays, mass memories,<br />

plotters, acoustic analysis equipment and interface devices. The CV-TSC furnishes timely evaluated USW and SUW information to the Officer in Tactical Command as inputs to the decision making<br />

process. Procurement of non-developmental engineering changes to maintain system IT-21 supportability and interoperability with embarked aircraft, airborne sensors, and shipboard interfaces will<br />

continue. Naval Undersea Warfare Center (NUWC), Division Keyport has been designated as the Alteration Installation Team (AIT) for all items. Installations will be accomplished at NUWC, the CV-<br />

TSC training site at Fleet Combat Training Center Atlantic (FCTCL) Dam Neck, VA, CV-TSC Ashore training site, and on board CV-63 through CVN-75. FY 02/03 Congressional plus-ups were<br />

authorized to provide additional Surface Network Embedded Analysis and Tactical Trainer (SNEATT) and Common Airborne Undersea Sensor Software (CAUSS) capabilities that will be integrated into<br />

CV-TSC systems. This effort will enhance operator and maintenance training, improve USW signal detection capabilities, and provide battle group USW platform interoperability.<br />

DD Form 2454, JUN 86 Item No. 35 Page No. 2<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS DATE:<br />

P-40a FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY BA-2 COMMUNICATIONS & ELECTRONIC EQUIPMENT UNDERSEA WARFARE SUPPORT EQUIPMENT (217600/217605) A2VM<br />

ID Prior To<br />

Procurement Items Code Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

Space Information Command and<br />

Control Programs (N61)<br />

COMMON UNDERSEA PICTURE (CUP) A -<br />

-<br />

- Hardware -<br />

SUB-TOTAL -<br />

Installation Support A -<br />

Surface Ship Programs (N76)<br />

SSTD A 5,977<br />

- Hardware (5,977)<br />

SUB-TOTAL 5,977<br />

SQS-26/53 SDRW A 2,723<br />

- Hardware (1,651)<br />

- Production Engineering (1,072)<br />

SUB-TOTAL 2,723<br />

Submarine Programs (N77)<br />

ACOUSTIC COMMUNICATIONS A 322<br />

- Hardware (256)<br />

- Production Engineering (66)<br />

Consulting Services A 50<br />

SUB-TOTAL 372<br />

-<br />

-<br />

5,906<br />

(5,906)<br />

5,906<br />

4,383<br />

(3,260)<br />

(1,123)<br />

4,383<br />

323<br />

(273)<br />

(50)<br />

70<br />

393<br />

1,743<br />

(1,743)<br />

1,743<br />

6,227<br />

-<br />

-<br />

-<br />

4,808<br />

(3,633)<br />

(1,175)<br />

4,808<br />

330<br />

(283)<br />

(47)<br />

70<br />

400<br />

cont. cont.<br />

cont. cont.<br />

cont. cont.<br />

cont. cont.<br />

cont. cont.<br />

cont. cont.<br />

cont. cont.<br />

cont. cont.<br />

cont. cont.<br />

cont. cont.<br />

cont. cont.<br />

cont. cont.<br />

cont. cont.<br />

cont. cont.<br />

Aircraft Carrier Programs (N78)<br />

CV-TSC EC Production Engineering A cont. cont.<br />

CV-TSC SNEATT A 3,188<br />

cont. cont.<br />

- Hardware (2,688)<br />

- Production Engineering (500)<br />

TACT COMP DATA LINK A 197<br />

cont. cont.<br />

- Hardware (137)<br />

- Production Engineering (60)<br />

SQQ-34A(V)5 CV-TSC A 764<br />

775<br />

722<br />

cont. cont.<br />

- Hardware (670) (680)<br />

(668)<br />

- Production Engineering (94)<br />

(95)<br />

(54)<br />

Helo Link Controllers<br />

- Hardware<br />

A cont. cont.<br />

EC Technical Insertion<br />

- Hardware<br />

- Production Engineering<br />

A cont. cont.<br />

Consulting Services A 81<br />

20<br />

20<br />

cont. cont.<br />

SUB-TOTAL 4,230<br />

Installation Support A 130<br />

GRAND TOTAL 13,432<br />

CLASSIFICATION: UNCLASSIFIED<br />

DD Form 2454, JUN 86 Item No. 35 Page No. 3<br />

795<br />

144<br />

11,621<br />

742<br />

196<br />

14,116<br />

cont. cont.<br />

cont. cont.<br />

cont. cont.


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy / BA-02 UNDERSEA WARFARE SUPPORT EQUIPMENT (217600/217605) A2VM<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID FY 2002 FY 2003<br />

FY 2004 FY 2005<br />

CODE Code and Prior<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

VM101 Surface Ship Torpedo Defense (SSTD) A 5,977 5,906<br />

(Congressional Add)<br />

VM201 Acoustic Communications (ACOMMs) A 256 273 283<br />

VM301 Aircraft Carrier Tactical Support Center A 137 680 668<br />

(CV-TSC)<br />

VM319 CV-TSC SNEATT A 3,188<br />

(FY 03 Congressional Add)<br />

VM329 CV-TSC AN/SQQ-34A(V)5 A 670<br />

VM401 Surface Sonar Windows and Domes A 1,651 3,260 3,633<br />

VMTBD Common Undersea Picture (CUP) A 1,743<br />

VM832 Production Support (ACOMMs) 66 50 47<br />

VM833 Production Support (CV-TSC) 154 95 54<br />

VM834 Production Support (Domes) 1,072 1,123 1,175<br />

VM902 Consulting Services (ACOMMs) 50 70 70<br />

VM903 Consulting Services (CV-TSC) 81 20 20<br />

VM128 Installation (CV-TSC) 130 144 196<br />

VMTBD Installation (CUP) 6,227<br />

13,432 11,621 14,116<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 35 PAGE NO. 4<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

FEBRUARY 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy / BA-02 UNDERSEA WARFARE SUPPORT EQUIPMENT A2VM<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

FY 2003<br />

N/A<br />

FY 2004<br />

N/A<br />

FY 2005<br />

N/A<br />

D. REMARKS<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST PAGE NO. Classification:<br />

ITEM NO. 35 5 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED FEBRUARY 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: TYPE MODIFICATION: MODIFICATION TITLE: Surface Ship Torpedo Defense (SSTD)<br />

DESCRIPTION/JUSTIFICATION:<br />

The Surface Ship Torpedo Defense (SSTD) System consists of the AN/SLQ-25A NIXIE towed torpedo countermeasure. The SSTD system enhances ship survival capability against advanced acoustic and non-acoustic<br />

homing torpedoes. The AN/SLQ-25A Nixie is in the Countermeasure Passive Subsystem of the SSTD System. The AN/SLQ-25A projects decoy signals into the water via a towed body deployed astern of the ship.<br />

The projected signals are generated by a transmitter located on the ship which is controlled by an operator. FY 02/03/04 Congressional plus-ups were authorized to procure AN/SLQ-25A towed torpedo defense<br />

countermeasure improvements (i.e. an enhanced EC-16, improved tow cable and COTS signal generator as well as reliability mods). This effort will provide enhanced reliability and performance against evolving threat<br />

torpedoes and enhanced operation of the AN/SLQ-25A in shallow littoral waters.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: N/A<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

INSTALLATION KITS 0.0<br />

INSTALLATION KITS - UNIT COST 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 6.0 5.9 11.9<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 0.0<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER - ECPs 0.0<br />

OTHER - ENGINEERING SUPPORT 0.0<br />

OTHER 0.0<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 0.0<br />

TOTAL PROCUREMENT 0.0 6.0 5.9 0.0 0.0 0.0 0.0 0.0 0.0 11.9<br />

ITEM PAGE CLASSIFICATION: UNCLASSIFIED<br />

35 6


CLASSIFICATION: UNCLASSIFIED FEBRUARY 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: TYPE MODIFICATION: MODIFICATION TITLE: Acoustic Communications (ACOMMs)<br />

DESCRIPTION/JUSTIFICATION:<br />

Acoustic Communications provides two-way and one-way acoustic communications equipment for submarines and surface ships. The equipment consists of : (1) AN/WQC-2/2A, a stand alone, single side band, general<br />

purpose, voice, continuous wave, multiple tone communication for surface ships, submarines, and some shore activities; (2) AN/WQC-6, which provides long range coded signaling from surface ASW ships to attack<br />

submarines when interfaced with the AN/SQS-26/53 and AN/BQQ-5; (3) AN/BQC-1( ), a stand-alone emergency voice and signal beacon for submarines, and (4) technical improvements (Engineering Changes) to<br />

acoustic communication equipment. Funding will provide for continued procurement of both Probe Alert (AN/WQC-6) improvements and AN/WQC-2A Engineering Changes plus associated production engineering<br />

support and consulting services for the SSN 21, SSN 637, SSN 688, SSBN 726, DD963, DDG 51, CG 47, MHC 51, MCM 1, CVN 65, ARS 50, FFG 7, and CVN 68 class ships and submarines.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: N/A<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

INSTALLATION KITS 0.0<br />

INSTALLATION KITS - UNIT COST 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 0.3 0.3 0.3 0.3 0.3 0.3 0.3 2.1<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 0.0<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER - ECPs 0.0<br />

OTHER - ENGINEERING SUPPORT 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.4<br />

OTHER 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.5<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 0.0<br />

TOTAL PROCUREMENT 0.0 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.0 3.0<br />

ITEM PAGE CLASSIFICATION: UNCLASSIFIED<br />

35 7


CLASSIFICATION: UNCLASSIFIED FEBRUARY 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: TYPE MODIFICATION: MODIFICATION TITLE: CV-TSC<br />

DESCRIPTION/JUSTIFICATION:<br />

The CV-TSC of the Carrier Combat Direction System (CDS) is the focal point of supply for force ASW/SUW functions. The system supports the multi-mission, tactical deployment of embarked airborne weapon<br />

systems (S-3B and SH-60 Helicopters) by providing mission planning, in-flight support and post mission assessment/intelligence collection. CV-TSC provides real time and post mission analysis of relayed or taped<br />

acoustic and non-acoustic signals to support CV/CVN USW Self Defense. The system consists of digital computers, commercial workstation displays, mass memories, plotters, acoustic analysis equipment and<br />

interface devices. The CV-TSC furnishes timely evaluated USW and SUW information to the Officer in Tactical Command as inputs to the decision making process. Procurement of non-developmental engineering<br />

changes to maintain system IT-21 supportability and interoperability with embarked aircraft, airborne sensors, and shipboard interfaces will continue. Naval Undersea Warfare Center (NUWC), Division Keyport has<br />

been designated as the Alteration Installation Team (AIT) for all items. Installations will be accomplished at NUWC, the CV-TSC training site at Fleet Combat Training Center Atlantic (FCTCL) Dam Neck, VA, CV-TSC<br />

Ashore training site, and on board CV-63 through CVN-75.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: N/A<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

INSTALLATION KITS 0.0<br />

INSTALLATION KITS - UNIT COST 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 0.8 0.7 0.7 0.7 0.8 0.8 0.8 5.3<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 0.0<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER - ECPs 0.0<br />

OTHER - ENGINEERING SUPPORT 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.5<br />

OTHER 0.1 0.0 0.0 0.0 0.1<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 0.1 0.1 0.2 0.2 0.2 0.2 0.2 1.3<br />

TOTAL PROCUREMENT 0.0 1.2 0.9 1.0 1.0 1.0 1.0 1.0 0.0 7.2<br />

ITEM PAGE CLASSIFICATION: UNCLASSIFIED<br />

35 8


CLASSIFICATION: UNCLASSIFIED FEBRUARY 2004<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: CVN MODIFICATION TITLE: CV-TSC<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: Shipyards & AITs<br />

ADMINISTRATIVE LEADTIME: 3 Months PRODUCTION LEADTIME:<br />

CONTRACT DATES: FY 2002: FY 2003: FY 2004: FY 2005:<br />

DELIVERY DATE: FY 2002: FY 2003: FY 2004: FY 2005:<br />

($ in Millions)<br />

Cost: FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009<br />

To Complete* Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

FY 2002 and PRIOR YEARS Var Var 0 0.0<br />

FY 2003 EQUIPMENT Var 0.1 0 0.1<br />

FY 2004 EQUIPMENT 1 0.1 1 0.1<br />

FY 2005 EQUIPMENT 1 0.2 1 0.2<br />

FY 2006 EQUIPMENT 1 0.2 1 0.2<br />

FY 2007 EQUIPMENT Var 0.2 0 0.2<br />

FY 2008 EQUIPMENT Var 0.2 0 0.2<br />

FY 2009 EQUIPMENT Var 0.20 0 0.2<br />

TO COMPLETE * TBD TBD TBD TBD<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC*<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 var 0 0 0 1 0 0 0 1 0 0 0 1 0 0 0 var 0 0 0 var 0 0 0 var 0 TBD TBD<br />

Out 0 0 0 0 var 0 0 0 1 0 0 0 1 0 0 0 1 0 0 0 var 0 0 0 var 0 0 0 var TBD TBD<br />

P-3A<br />

ITEM PAGE CLASSIFICATION: UNCLASSIFIED<br />

35 9


CLASSIFICATION: UNCLASSIFIED FEBRUARY 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: TYPE MODIFICATION: MODIFICATION TITLE: CV-TSC SNEATT<br />

DESCRIPTION/JUSTIFICATION:<br />

AN FY 03 Congressional plus-up was authorized to provide additional Surface Network Embedded Analysis and Tactical Trainer (SNEATT) capabilities that will be integrated into CV-TSC systems. This effort will<br />

enhance operator and maintenance training, improve USW signal detection capabilities, and provide battle group USW platform interoperability.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: N/A<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

INSTALLATION KITS 0.0<br />

INSTALLATION KITS - UNIT COST 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 2.7 2.7<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 0.0<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER - ECPs 0.0<br />

OTHER - ENGINEERING SUPPORT 0.5 0.5<br />

OTHER 0.0<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 0.0<br />

TOTAL PROCUREMENT 0.0 3.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.2<br />

ITEM PAGE CLASSIFICATION: UNCLASSIFIED<br />

35 10


CLASSIFICATION: UNCLASSIFIED FEBRUARY 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: TYPE MODIFICATION: MODIFICATION TITLE: Surface Sonar Windows and Domes<br />

DESCRIPTION/JUSTIFICATION:<br />

AN/SQS-26/53 Sonar Dome Rubber Windows (SDRW) are installed in CG47, DDG51, and DD963 class ships. This program provides emergency replacement wire-reinforced, pressurized rubber acoustic windows<br />

which experience failure due to corrosion, fatigue, and impact in the splice region. The SDRW significantly improves the surface ship sonar performance by reducing flow-induced self-noise, and by providing increased<br />

source level receiving and sensitivity resulting from reduced attenuation. AN/SQS-56 Sonar Rubber Domes (SRD) are installed in FFG7 class ships. This program provides emergency replacement SRD for AN/SQS-<br />

56 active/passive duct sonar systems. Production engineering support provides technical evaluation, failure analyses, implementation of the inwater one-side backscatter xray program, GFE refurbishments, and field<br />

service engineering .<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: N/A<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

INSTALLATION KITS 0.0<br />

INSTALLATION KITS - UNIT COST 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 1.7 3.3 3.6 3.8 3.9 4.0 4.1 24.2<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 0.0<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER - ECPs 0.0<br />

OTHER - ENGINEERING SUPPORT 1.1 1.1 1.2 1.2 1.2 1.2 1.2 8.1<br />

OTHER 0.0<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 0.0<br />

TOTAL PROCUREMENT 0.0 2.8 4.4 4.8 5.0 5.1 5.2 5.3 0.0 32.6<br />

ITEM PAGE CLASSIFICATION: UNCLASSIFIED<br />

35 11


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: Expeditionary Strike Forces (ESFs) TYPE MODIFICATION: Added Capability MODIFICATION TITLE: Common Undersea Picture (CUP)<br />

DESCRIPTION/JUSTIFICATION:<br />

Funding identified provides for the procurement and installation of CUP capability on ESF platforms and supporting shore nodes as permanent alterations, and will support periodic technology refresh of CUP hardware/software to<br />

keep capabilities concurrent with leading COTS technology.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: CUP Engineering Development Model (EDM) (R&D PE 0604518N/ Project 3094) installed on Carrier Strike Group 4Q04<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

FEBRUARY 2004<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

INSTALLATION KITS 0.0<br />

INSTALLATION KITS - UNIT COST 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 2 1.7 2 2.3 2 1.3 2 1.7 8 7.0<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 0.0<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER - ECPs 0.0<br />

OTHER - ENGR SUPT 0.0<br />

OTHER 0.0<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 2 6.2 2 5.8 2 4.5 2 4.7 8 21.2<br />

TOTAL PROCUREMENT 0.0 0.0 0.0 7.9 8.1 5.8 6.4 0.0 0.0 28.2<br />

ITEM PAGE CLASSIFICATION: UNCLASSIFIED<br />

35 12


CLASSIFICATION: UNCLASSIFIED FEBRUARY 2004<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: Expeditionary Strike MODIFICATION TITLE: Common Undersea Picture (CUP)<br />

Forces (ESFs)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: 1 Month PRODUCTION LEADTIME: 2 Months<br />

CONTRACT DATES: FY 2002: FY 2003: FY 2004: FY 2005:<br />

DELIVERY DATE: FY 2002: FY 2003: FY 2004: FY 2005:<br />

($ in Millions)<br />

Cost: FY 2002 & Prior<br />

FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

FY 2002 and PRIOR YEARS 0 0.0<br />

FY 2003 EQUIPMENT 0 0.0<br />

FY 2004 EQUIPMENT 0 0.0<br />

FY 2005 EQUIPMENT 2 6.2 2 6.2<br />

FY 2006 EQUIPMENT 2 5.8 2 5.8<br />

FY 2007 EQUIPMENT 2 4.5 2 4.5<br />

FY 2008 EQUIPMENT 2 4.7 2 4.7<br />

FY 2009 EQUIPMENT 0 0.0<br />

TO COMPLETE 0 0.0<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 1 1 0 0 1 1 0 0 1 1 0 0 0 0 0 8<br />

Out 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 1 1 0 0 1 1 0 0 1 1 0 0 0 0 0 8<br />

P-3A<br />

ITEM PAGE CLASSIFICATION: UNCLASSIFIED<br />

35 13


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE/LINE ITEM #<br />

OTHER PROCUREMENT, NAVY SONAR SWITCHES AND TRANSDUCERS 218100<br />

BA-2: COMMUNICATIONS & ELECTRONICS EQUIPMENT<br />

Program Element for Code B Items: OTHER RELATED PROGRAM ELEMENTS<br />

PE# 0204281N<br />

Prior ID To<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY N/A N/A N/A N/A N/A N/A N/A N/A 0<br />

EQUIPMENT COST<br />

(In Millions) $15.8 $13.5 $13.3 $12.8 $13.0 $13.4 $13.7 $95.6<br />

SPARES COST<br />

(In Millions) $0.6 $0.4 $0.4 $0.4 $0.4 $0.4 $0.4 $1.8<br />

PROGRAM DESCRIPTION/JUSTIFICATION:<br />

This program procures hydrophones, transducers, cables, associated OutBoard Electronics bottles (OBE), and acoustic windows for In Service Under Sea<br />

Warfare Sonars on all classes of submarines. The components are required to support units in the fleet on a replacement basis, at regularly scheduled ship<br />

overhauls, and at interim availabilities when units are defective, and for upgrades.<br />

PU100 SONAR SWITCHES AND TRANSDUCERS<br />

Included in this line are procurements of transducers, hydrophones, windows, cables, OutBoard Electronics (OBE), and domes and their associated mounting<br />

hardware and other support equipment and materials for the following Under Sea Warfare Sonars: BSY-1, BSY-2, BQQ-5, BQQ-6, BQQ-10, BQG-5, BQS-<br />

15, BQS-14A, WQC-2, WLR-9/12, BQN-13, BQN-17, BQA-8, and BQH-1.<br />

PU200 ENGINEERING CHANGES<br />

Funds ECPs, Value Engineering awards, and hardware changes affecting the SSN 688, 688I, SSN 21, and SSBN 726 (TRIDENT) Class submarines.<br />

PU300 PROGRAM SUPPORT<br />

Supports the procurement of equipment of sonar hydrophones, trandsducers, cables, OutBoard Electronics, and acoustic windows for In Service Under Sea<br />

Warfare Sonars.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 36 PAGE NO. 1<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy SONAR SWITCHES AND TRANSDUCERS (H2PU)<br />

BA-2: COMMUNICATIONS & ELECTRONICS EQUIPMENT<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID FY 2003 FY 2004 FY 2005<br />

CODE Code<br />

UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

QTY COST COST QTY COST COST QTY COST COST<br />

PU100 SONAR SWITCHES & TRANSDUCERS<br />

CW-1147 A 15 8.5 128<br />

CW-1181C A 22 27.3 601<br />

MX-10624 A 23 13.1 301 35 3.1 109<br />

MX-10616 () A 9 131.4 1,183 4 138.5 554 3 146.5 440<br />

WINDOW (NSSN HFSA) A 2 143.2 286 3 151.7 455 1 157.6 158<br />

MX-11474() A 1 151.2 151 1 162.2 162 1 166.1 166<br />

DT-574OBE A 75 18.6 1,395 85 13.6 1,156<br />

DT-511B A 30 29.7 891 25 17.3 433 15 17.6 264<br />

DT-513 ( ) A 166 2.4 398 150 3.7 555 100 2.3 230<br />

DT-592 A 40 18.7 748 30 19.1 573 20 19.2 384<br />

TR-232() A 30 16.8 504<br />

TR-233B A 26 7.2 187 25 8.1 203<br />

TR-282 A 20 46.6 932 20 27.216 544<br />

TR-302B & CBL A 33 38.1 1,257 30 27.7 831<br />

TR-302(WINDOW) A 10 0.6 6 10 0.6 6 10 0.6 6<br />

TR-317C A<br />

TR-321() A 75 7.8 585 70 11.9 833<br />

TR-321V CTD A 20 22.5 450<br />

TR-338A & CBL A 40 22.4 896 40 14.2 568 20 14.5 290<br />

TR-341() A 95 9.6 912 30 12.0 360 72 12.4 893<br />

WAA OBE A 384 8.6 3,302 120 7.6 912 80 7.8 624<br />

DT-677 A 245 6.2 1,519 150 6.3 945<br />

NCC CONNECTORS A 700 0.7 490 400 0.7 280 375 0.7 263<br />

DT-699() HFSA RECEIVE A 19 43.9 834 18 44.8 806 21 82.7 1,737<br />

TR-364() HFSP XMIT A 4 93.8 375 1 95.8 96 2 192.2 384<br />

TOTAL PU100 13,396 10,793 10,361<br />

PU200 ENGINEERING CHANGES A 239 150 165<br />

PU300 PROGRAM SUPPORT A 2,206 2,600 2,804<br />

TOTAL 15,841 13,543 13,330<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 36 PAGE NO. 2 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy<br />

BA-2: COMMUNICATIONS & ELECTRONICS EQUIPMENT<br />

SONAR SWITCHES AND TRANSDUCERS H2PU<br />

CONTRACT DATE OF SPECS IF NO<br />

Cost Element/ QTY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE WHEN<br />

FISCAL YEAR COST<br />

(000)<br />

OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

PU100<br />

FY 2003<br />

CW-1147 (AN/WLR-9) 15 8.537 NUWC OPTION ANTENNA ASSOCIATES 1/03 3/04 YES<br />

MX-10616 () (BSY-1 A-RCI IV) 9 131.383 NUWC OPTION** B F Goodrich 1/03 3/04 YES<br />

WINDOW NSSN HFSP 2 143.170 NUWC OPTION** B F Goodrich 1/03 3/04 YES<br />

MX-11474() (BSY-2-HFSA) 1 151.213 NUWC C/FP UNKNOWN 9/03 3/04 YES<br />

DT-511B (WLR-9)* 30 29.703 NUWC 10/02 C/FP ITC 3/03 3/04 YES<br />

DT-513() (AN/BQA-8) 166 2.373 NUWC OPTION SEABEAM 1/03 3/04 YES<br />

DT-592 (AN/WLR-9) 40 18.704 NUWC OPTION ITC 1/03 3/04 YES<br />

WAA OBE (AN/BQG-5)* 384 8.647 NUWC 10/02 C/FP HARRIS 5/03 3/04 YES<br />

DT-677 (AN/BQG-5) 245 6.248 NUWC OPTION EDO 1/03 3/04 YES<br />

TR-232() (AN/WQC-2) 30 16.774 NUWC OPTION EDO 1/03 3/04 YES<br />

TR-233B (AN/WQC-2) 26 7.206 NUWC OPTION HARRIS 1/03 3/04 YES<br />

TR-302 WINDOW (AN/BQN-17) 10 0.595 NUWC WX NUWC 1/03 3/04 YES<br />

TR-321() (AN/BQH-1C) 75 7.767 NUWC OPTION ITC 1/03 3/04 YES<br />

TR-338A & CABLE (AN/BSY-1)* 40 22.432 NUWC 10/02 C/FP ITC 3/03 3/04 YES<br />

TR-341() (AN/BQN-13A) 95 9.588 NUWC OPTION ITC 1/03 3/04 YES<br />

DT-699()HFSA REC (AN/BSY-1) 19 43.921 NUWC OPTION HARRIS 1/03 3/04 YES<br />

TR-364() HFSP XMIT (AN/BSY-1) 4 93.792 NUWC OPTION HARRIS 1/03 3/04 YES<br />

NCC CONNECTORS 700 0.665 NUWC C/FP VARIOUS 3/03 3/04 YES<br />

D. REMARKS<br />

* INCLUDES FIRST ARTICLE COSTS<br />

** Option on the FY01 NSSN/ ARCI Phase IV SHIPALT procurement contract<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 36 PAGE NO. 3 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy<br />

BA-2: COMMUNICATIONS & ELECTRONICS EQUIPMENT<br />

SONAR SWITCHES AND TRANSDUCERS H2PU<br />

CONTRACT DATE OF SPECS IF NO<br />

Cost Element/ QTY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE WHEN<br />

FISCAL YEAR COST<br />

(000)<br />

OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

PU100<br />

FY 2004<br />

MX-10624()(AN/BSY-1/2)* 23 13.124 NUWC WX NUWC 1/04 1/05 YES<br />

MX-10616 () (BSY-1 A-RCI IV) 4 138.458 NUWC OPTION** B F Goodrich 3/04 3/05 YES<br />

WINDOW (NSSN HFSA) 3 151.741 NUWC OPTION** B F Goodrich 3/04 3/05 YES<br />

MX-11474() (BSY-2 HFSA) 1 162.225 NUWC OPTION*** UNKNOWN 3/04 3/05 YES<br />

DT-574 OBE (AN/BSY-2)* 75 18.617 NUWC 7/03 C/FP UNKNOWN 3/04 3/-5 YES<br />

DT-511B (WLR-9 (AN/BSY-1/2) 25 17.270 NUWC OPTION ITC 3/04 3/05 YES<br />

DT-513() (AN/BQA-8)* 150 3.672 NUWC 7/03 C/FP UNKNOWN 3/04 10/05 YES<br />

DT-592 (AN/WLR-9) 30 19.072 NUWC OPTION ITC 3/04 3/05 YES<br />

WAA OBE (AN/BQG-5) 120 7.637 NUWC OPTION HARRIS 3/04 3/05 YES<br />

DT-677 (AN/BQG-5) 150 6.269 NUWC OPTION EDO 3/04 3/05 YES<br />

TR-282(AN/BQS-15)* 20 46.579 NUWC 7/03 C/FP UNKNOWN 3/04 3/05 YES<br />

TR-233B (AN/WQC-2) 25 8.076 NUWC OPTION HARRIS 3/04 3/05 YES<br />

TR-302B & CABLE (AN/BQN-17)* 33 38.090 NUWC 7/03 C/FP UNKNOWN 3/04 3/05 YES<br />

TR-302 WINDOW (AN/BQN-17) 10 0.605 NUWC WX NUWC 1/04 3/05 YES<br />

TR-338A & CABLE (AN/BSY-1) 40 14.195 NUWC OPTION ITC 3/04 3/05 YES<br />

TR-341() (AN/BQN-13A) 30 11.999 NUWC OPTION ITC 3/04 3/05 YES<br />

DT-699() HFSA REC (AN/BSY-1) 18 44.843 NUWC OPTION HARRIS 3/04 3/05 YES<br />

TR-364() HFSP XMIT (AN/BSY-1) 1 95.761 NUWC OPTION HARRIS 3/04 3/05 YES<br />

NCC CONNECTORS<br />

FY 2005<br />

400 0.711 NUWC C/FP VARIOUS 4/04 4/05 YES<br />

CW-1181C (WLR-9)* 22 27.303 NUWC 7/04 C/FP UNKNOWN 3/05 3/06 YES<br />

MX-10624() (AN/BSY-1/2) 35 3.095 NUWC WX NUWC 1/05 1/06 YES<br />

MX-10616 () (BSY-1 A-RCI IV) 3 146.454 NUWC OPTION** B F Goodrich 3/05 3/06 YES<br />

WINDOW (NSSN HFSA) 1 157.562 NUWC OPTION** B F Goodrich 3/05 3/06 YES<br />

MX-11474() (BSY-2 HFSA) 1 166.109 NUWC OPTION*** UNKKNOWN 3/05 3/06 YES<br />

DT-574 OBE (AN/BSY-2) 85 13.598 NUWC OPTION UNKNOWN 3/05 3/-6 YES<br />

DT-511B (WLR-9) 15 17.623 NUWC OPTION ITC 3/05 3/06 YES<br />

DT-513() (AN/BQA-8) 100 2.323 NUWC OPTION UNKNOWN 3/05 3/06 YES<br />

DT-592 (AN/WLR-9) 20 19.208 NUWC OPTION ITC 3/05 3/06 YES<br />

WAA OBE (AN/BQG-5) 80 7.816 NUWC OPTION HARRIS 3/05 3/06 YES<br />

TR-282 (AN/BQS-15) 20 27.216 NUWC OPTION UNKNOWN 3/05 3/06 YES<br />

TR-302B & CABLE (AN/BQN-17) 30 27.698 NUWC OPTION UNKNOWN 3/05 3/06 YES<br />

TR-302 WINDOW (AN/BQN-17) 10 0.618 NUWC WX NUWC 1/05 3/06 YES<br />

TR-321() (AN/BQH-1C)* 70 11.920 NUWC OPTION UNKNOWN 3/05 10/06 YES<br />

TR-321V CTD 20 22.454 NUWC 7/04 C/FP UNKNOWN 3/05 3/06 YES<br />

TR-338A & CABLE (AN/BSY-1) 20 14.493 NUWC OPTION ITC 3/05 3/06 YES<br />

TR-341() (AN/BQN-13A) 72 12.369 NUWC OPTION ITC 3/05 3/06 YES<br />

DT-699() HFSA REC (AN/BSY-1)* 21 82.671 NUWC 7/04 C/FP UNKNOWN 3/05 3/06 YES<br />

TR-364() HFSP XMIT (AN/BSY-1)* 2 192.150 NUWC 7/04 C/FP UNKNOWN 3/05 3/06 YES<br />

NCC CONNECTORS<br />

D. REMARKS<br />

* INCLUDES FIRST ARTICLE COSTS<br />

375 0.713 NUWC C/FP VARIOUS 4/05 4/06 YES<br />

** Option on the FY01 NSSN/ ARCI Phase IV SHIPALT procurement contract ***Option on FY02 BSY-2 SHIPALT Procurement contract<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 36 PAGE NO. 4 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY SUBMARINE ACOUSTIC WARFARE SYSTEM (SAWS) / H2WM<br />

Program Element for Code B Items: Other Related Program Elements<br />

221000<br />

Prior ID To<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions) CONT. $20.485 $25.937 $20.857 $23.563 $25.326 $25.924 $31.314 CONT. TBD<br />

SPARES COST<br />

(In Millions)<br />

PROGRAM DESCRIPTION/JUSTIFICATION:<br />

The Submarine Acoustic Warfare System (SAWS) provides submarines with an enhanced capability against guided and unguided torpedoes and the<br />

means to reduce the effectiveness of enemy sensors. This program provides ongoing production of countermeasure devices needed to sustain fleet<br />

inventories, production of preplanned improvements to enhance the readiness and effectiveness of acoustic intercept receivers and processors, and<br />

production of countermeasure devices and associated countermeasure launcher systems.<br />

The FY03 funds are required to procure 6" Countermeasures (ADC MK 3 and MK 4 with associated launch tubes), ADC MK 2, NAE Beacons, CSA MK 2 Mod 1 Countermeasure Launchers,<br />

CSA MK 2 CABLE Procurement, Acoustic Intercept Improvement, GG MK 77 for 6" Countermeasures, and associated production support.<br />

The FY04 funds are required to procure 6" Countermeasures (ADC MK 3 and MK 4 with associated launch tubes), ADC MK 2, NAE Beacons, CSA MK 2 Mod 1 Countermeasure Launchers,<br />

CSA MK 2 CABLE Procurement, Acoustic Intercept Improvement, GG MK 77 for 6" Countermeasures, and associated production support.<br />

The FY05 funds are required to procure 6" Countermeasures (ADC MK 3 and MK 4 with associated launch tubes), ADC MK 2, NAE Beacons, CSA MK 2 Mod 1 Countermeasure Launchers,<br />

Acoustic Intercept Improvement, GG MK 77 for 6" Countermeasures, and associated production support.<br />

CSA MK 2 Cable Installation:<br />

Type Date End Item Funding Type Date End Item Funding Type Date End Item Funding<br />

SHIPALT 3Q/FY01 SSN773 .169M SHIPALT 4Q/FY02 SSN766 .170M SHIPALT 3Q/FY04 SSN765 .170M<br />

SHIPALT 4Q/FY01 SSN767 .169M SHIPALT 1Q/FY03 SSN771 .170M SHIPALT 4Q/FY04 SSN764 .170M<br />

SHIPALT 4Q/FY01 SSN754 .169M SHIPALT 3Q/FY03 SSN770 .170M SHIPALT 3Q/FY04 SSN762 .170M<br />

SHIPALT 4Q/FY01 SSN753 .169M SHIPALT 3Q/FY03 SSN769 .170M SHIPALT 3Q/FY04 SSN761 .170M<br />

IMA EAST COAST 4Q/FY01 N/A N/A SHIPALT 3Q/FY03 SSN768 .170M SHIPALT 4Q/FY04 SSN751 .170M<br />

IMA WEST COAST 4Q/FY01 N/A N/A SHIPALT 3Q/FY03 SSN760 .170M SHIPALT 4Q/FY05 SSN752 .171M<br />

SHIPALT 2Q/FY02 SSN757 .170M SHIPALT 4Q/FY03 SSN759 .170M SHIPALT 1Q/FY05 SSN691 .171M<br />

SHIPALT 3Q/FY02 SSN763 .170M SHIPALT 3Q/FY04 SSN772 .170M SHIPALT 4Q/FY05 SSN758 .171M<br />

P-1 SHOPPING LIST 37 CLASSIFICATION:<br />

DD Form 2454, JUN 86 Page 1<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy<br />

BA-(2): Communication and Electronic Equipment - ASW SUBMARINE ACOUSTIC WARFARE SYSTEM (SAWS) / H2WM<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID Prior FY 2003 FY 2004 FY 2005<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

WM014 ADC MK3 (TORPEDO) A 90 19 1,738 142 24 3,463 160 24 3,913<br />

WM014 ADC MK 4 (SONAR) A 70 32 2,262 116 32 3,761 112 33 3,642<br />

WM014 6" COUNTERMEASURE (First Article) A 0 931 0<br />

WM014 6" COUNTERMEASURE LAUNCH TUBE A 160 5 800 258 5 1,290 272 6 1,531<br />

WM014 ADC MK 3/4 MOD 1 SEAWOLF EC A 68 1 89 20 1 26 20 1 26<br />

WM014 ADC MK 3/4 SEAWOLF N/R A 306 0 0<br />

WM015 ADC MK 2 MOD 1 A 254 3 764 370 5 1,878 487 5 2,481<br />

WM015 ADC MK 2 MOD 1 SEAWOLF EC A 0 20 2 47 20 2 48<br />

WM015 NAE BEACON A 687 5 3,702 787 6 4,798 156 6 954<br />

WM017 ACOUSTIC INTERCEPT IMPROVEMENT A 4,164 2,652 2,194<br />

WM019 CSA MK 2 MOD 1 LCP ENG. CHANGE A 2 318 635 2 317 634 4 318 1,271<br />

WM019 CSA MK 2 CABLE PROCUREMENT A 6 196 1,177 3 216 648 0<br />

WM019 6" CSA MK 2 NR A 75 0 0<br />

WM927 CSA MK2 CABLE INSTALLATION A 6 226 1,356 6 230 1,378 3 230 691<br />

WM022 GAS GENERATOR MK 77 A 160 8 1,280 258 8 2,064 272 8 2,293<br />

WM830 PRODUCTION ENGINEERING 1,700 1,967 1,588<br />

WM900 CONSULTING SERVICES 437 400 225<br />

20,485 25,937 20,857<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST 37 CLASSIFICATION:<br />

Page 2<br />

Notes: (1) WM015 FY 03 unit costs represents remanufacture costs versus new procurement cost of ADC MK 2. UNCLASSIFIED<br />

(2) FY 03 control reflects a $2.0M BTR to S.H. 81HJ


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

FEBRUARY 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy<br />

SUBMARINE ACOUSTIC WARFARE SYSTEM<br />

H2WM<br />

Cost Element/<br />

FISCAL YEAR<br />

QUANTITY UNIT<br />

COST<br />

(000)<br />

LOCATION<br />

OF PCO<br />

RFP ISSUE<br />

DATE<br />

CONTRACT<br />

METHOD<br />

& TYPE<br />

CONTRACTOR<br />

AND LOCATION<br />

AWARD<br />

DATE<br />

DATE OF<br />

FIRST<br />

DELIVERY<br />

SPECS<br />

AVAILABLE<br />

NOW<br />

DATE<br />

REVISIONS<br />

AVAILABLE<br />

FY03<br />

ADC MK 3 - WM014 90 19.306 NAVSEA OPTION BAE Systems, Braintree, MA 3/03 4/04 YES N/A<br />

ADC MK 4 - WM014 70 32.316 NAVSEA OPTION BAE Systems, Braintree, MA 3/03 4/04 YES N/A<br />

LAUNCH TUBES - WM014 160 5.000 NSWC/CRANE WX NRAD, SAN DIEGO, CA 1/03 7/03 YES N/A<br />

NAE BEACON - WM015 687 5.389 NSWC/CRANE RCP Allied Logistics, Ventura CA 1/03 4/04 YES N/A<br />

ADC MK 2 MOD 1 - WM015 254 3.007 NAVSEA WX NSWC/CRANE 6/03 4/04 YES N/A<br />

CSA MK 2 CABLES - WM019 6 196.200 NAVSEA OPTION BAE Systems, Braintree, MA 2/02 6/03 YES N/A<br />

GG MK 77 - WM022<br />

FY04<br />

160 8.000 NSWC/CRANE OPTION UPCO, PHOENIX, AZ 2/03 8/03 YES N/A<br />

ADC MK 3 - WM014 142 24.384 NAVSEA OPTION BAE Systems, Braintree, MA 4/04 4/05 YES N/A<br />

ADC MK 4 - WM014 116 32.419 NAVSEA OPTION BAE Systems, Braintree, MA 4/04 4/05 YES N/A<br />

LAUNCH TUBES - WM014 258 5.000 NSWC/CRANE WX NRAD, SAN DIEGO, CA 1/04 6/04 YES N/A<br />

NAE BEACON - WM015 787 6.096 NSWC/CRANE RCP Allied Logistics, Ventura CA 1/04 4/05 YES N/A<br />

ADC MK 2 MOD 1 - WM015 370 5.076 NAVSEA OPTION BAE Systems, Braintree, MA 12/03 1/05 YES N/A<br />

CSA MK 2 CABLES - WM019 3 216.000 NAVSEA OPTION BAE Systems, Braintree, MA 12/03 6/04 YES N/A<br />

GG MK 77 - WM022 258 8.000 NSWC/CRANE OPTION UPCO, PHOENIX, AZ 1/04 7/04 YES N/A<br />

FY05<br />

ADC MK 3 - WM014 160 24.456 NAVSEA OPTION BAE Systems, Braintree, MA 1/05 1/06 YES N/A<br />

ADC MK 4 - WM014 112 32.515 NAVSEA OPTION BAE Systems, Braintree, MA 1/05 1/06 YES N/A<br />

LAUNCH TUBES - WM014 272 5.628 NSWC/CRANE WX NRAD, SAN DIEGO, CA 1/05 7/05 YES N/A<br />

NAE BEACON - WM015 156 6.114 NSWC/CRANE RCP Allied Logistics, Ventura CA 1/05 4/06 YES N/A<br />

ADC MK 2 MOD 1 - WM015 487 5.095 NAVSEA OPTION BAE Systems, Braintree, MA 1/05 1/06 YES N/A<br />

GG MK 77 - WM022 272 8.430 NSWC/CRANE OPTION UPCO, PHOENIX, AZ 1/05 7/05 YES N/A<br />

D. REMARKS<br />

WM015 FY 03 unit costs represents remanufacture costs versus new procurement cost of ADC MK 2.<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST 37 Classification:<br />

PAGE 3 UNCLASSIFIED


CLASSIFICATIONUNCLASSIFIED<br />

P3A<br />

MODELS OF SYSTEM AFFECTED: CSA MK 2 SYSTEM (CABLE) TYPE MODIFICATION:SHIPALT MODIFICATION TITLE:<br />

DESCRIPTION/JUSTIFICATION:<br />

Installation of the CSA MK 2 Cables. (WM019 / WM927)<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY02 and Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS - UNIT COST<br />

INSTALLATION KITS NONRECURRING<br />

EQUIPMENT<br />

EQUIPMENT NONRECURRING<br />

ENGINEERING CHANGE ORDERS<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

OTHER<br />

OTHER<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

15 3.2 6 1.2 3 0.6 0.0 0.0 0.0 0.0 0.0 24 5.0<br />

INSTALL COST 7 1.3 6 1.4 6 1.4 3 0.7 0.0 0.0 0.0 0.0 22 4.8<br />

TOTAL PROCUREMENT 22.0 4.5 2.5 2.0 0.7 9.8<br />

P-1 SHOPPING LIST 37 PAGE 4 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: CSA MK 2 (CABLE) MODIFICATION TITLE: SHIPALT<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: Shipyard<br />

ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2000: FY 2001: FY 2002:<br />

DELIVERY DATE: FY 2000: FY 2001: FY 2002:<br />

PRIOR YEARS<br />

($ in Millions)<br />

Cost: 2002 and Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

FY 2002 EQUIPMENT and Prior 7 1.3 7 1.3<br />

FY 2003 EQUIPMENT 6 1.4 6 1.4<br />

FY 2004 EQUIPMENT 6 1.4 6 1.4<br />

FY 2005 EQUIPMENT 3 0.7 3 0.7<br />

FY 2006 EQUIPMENT 0.0 0.0<br />

FY 2007 EQUIPMENT 0.0 0.0<br />

FY 2008 EQUIPMENT 0.0 0.0<br />

FY 2009 EQUIPMENT 0.0 0.0<br />

TO COMPLETE 7 1.3 6 1.4 6 1.4 3 0.7 0.0 0.0 0.0 0.0 22 4.8<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 7 1 0 4 1 0 0 4 2 1 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22<br />

Out 7 1 0 4 1 0 0 4 2 1 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22<br />

NOTE:<br />

P-3A<br />

P-1 SHOPPING LIST 37 Page 5 CLASSIFICATION: UNCLASSIFIED


FY 2004/05 BUDGET PRODUCTION SCHEDULE, P-21 DATE FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY<br />

OTHER PROCUREMENT, NAVY<br />

Weapon System P-1 ITEM NOMENCLATURE<br />

Production Rate<br />

Procurement Leadtimes<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

Item Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

6" COUNTERMEASURES BAE, BRAINTREE, MA 10 200 200<br />

LAUNCH TUBES NRAD, SAN DIEGO, CA 40 400 400<br />

ADC MK 2 BAE, BRAINTREE, MA 10 200 200<br />

GG MK 77 UPCO, PHOENIX, AZ 15 200 200<br />

NAE BEACON ALLIED , VENTURA CA 10 200 200<br />

FISCAL YEAR 2003 FISCAL YEAR 2004<br />

ITEM / MANUFACTURER F S Q D B 2002 CALENDAR YEAR 2003 2003 CALENDAR YEAR 2004<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L<br />

ADC MK 3<br />

BAE Systems, Braintree, MA 03 90 0 90 A 10 10 10 10 10 10 30<br />

BAE Systems, Braintree, MA 04 142 0 142 A 142<br />

BAE Systems, Braintree, MA 05 160 0 160 160<br />

BAE Systems, Braintree, MA 06 210 0 210 210<br />

ADC MK 4<br />

BAE Systems, Braintree, MA 03 70 0 70 A 15 15 15 15 10 0<br />

BAE Systems, Braintree, MA 04 116 0 116 A 116<br />

BAE Systems, Braintree, MA 05 112 0 112 112<br />

BAE Systems, Braintree, MA 06 144 0 144 144<br />

HARDWARE CONTINUED ON P21(1)<br />

FISCAL YEAR 2005 FISCAL YEAR 2006<br />

ITEM / MANUFACTURER F S Q D B 2004 CALENDAR YEAR 2005 2005 CALENDAR YEAR 2006<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

N<br />

O<br />

D<br />

E<br />

J<br />

A<br />

F<br />

E<br />

M<br />

A<br />

A<br />

P<br />

M<br />

A<br />

J<br />

U<br />

J<br />

U<br />

A<br />

U<br />

S<br />

E<br />

O<br />

C<br />

N<br />

O<br />

D<br />

E<br />

J<br />

A<br />

F<br />

E<br />

M<br />

A<br />

A<br />

P<br />

M<br />

A<br />

J<br />

U<br />

J<br />

U<br />

T V C N B R R Y N L G P T V C N B R R Y N L<br />

ADC MK 3<br />

BAE Systems, Braintree, MA 03 90 60 30 10 10 10<br />

BAE Systems, Braintree, MA 04 142 0 142 16 16 16 16 15 15<br />

BAE Systems, Braintree, MA 05 160 0 160 A<br />

BAE Systems, Braintree, MA 06 210 0 210<br />

ADC MK 4<br />

BAE Systems, Braintree, MA 03 70 70 0<br />

BAE Systems, Braintree, MA 04 116 0 116 15 15 14 12 12 12<br />

BAE Systems, Braintree, MA 05 112 0 112 A<br />

BAE Systems, Braintree, MA 06 144 0 144<br />

HARDWARE CONTINUED ON P21(1)<br />

Remarks:<br />

DD Form 2445, JUL 87 Previous editions are obsolete P-1 SHOPPING LIST 37<br />

311 / 244 PAGE 6 Exhibit P-21 Production Schedule<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L


FY 2004/05 BUDGET PRODUCTION SCHEDULE, P-21 DATE FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY<br />

OTHER PROCUREMENT, NAVY<br />

Weapon System P-1 ITEM NOMENCLATURE<br />

Production Rate<br />

Procurement Leadtimes<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

Item Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

6" COUNTERMEASURES BAE, BRAINTREE, MA 10 200 200<br />

LAUNCH TUBES NRAD, SAN DIEGO, CA 40 400 400<br />

ADC MK 2 BAE, BRAINTREE, MA 10 200 200<br />

GG MK 77 UPCO, PHOENIX, AZ 15 200 200<br />

NAE BEACON ALLIED , VENTURA CA 10 200 200<br />

FISCAL YEAR 2003 FISCAL YEAR 2004<br />

ITEM / MANUFACTURER F S Q D B 2002 CALENDAR YEAR 2003 2003 CALENDAR YEAR 2004<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L<br />

ADC MK 2 MOD 1<br />

NSWC/CRANE 03 254 0 254 A 26 26 26 26 25 25 100<br />

BAE Systems, Braintree, MA 04 370 0 370 A 370<br />

BAE Systems, Braintree, MA 05 487 0 487 487<br />

BAE Systems, Braintree, MA 06 579 0 579 579<br />

LAUNCH TUBES<br />

NRAD, SAN DIEGO, CA 03 160 0 160 A 27 27 27 27 27 25 0<br />

NRAD, SAN DIEGO, CA 04 258 0 258 A 43 43 43 43 86<br />

NRAD, SAN DIEGO, CA 05 272 0 272 272<br />

NRAD, SAN DIEGO, CA 06 354 0 354 354<br />

HARDWARE CONTINUED ON P21(3)<br />

FISCAL YEAR 2005 FISCAL YEAR 2006<br />

ITEM / MANUFACTURER F S Q D B 2004 CALENDAR YEAR 2005 2005 CALENDAR YEAR 2006<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

N<br />

O<br />

D<br />

E<br />

J<br />

A<br />

F<br />

E<br />

M<br />

A<br />

A<br />

P<br />

M<br />

A<br />

J<br />

U<br />

J<br />

U<br />

A<br />

U<br />

S<br />

E<br />

O<br />

C<br />

N<br />

O<br />

D<br />

E<br />

J<br />

A<br />

F<br />

E<br />

M<br />

A<br />

A<br />

P<br />

M<br />

A<br />

J<br />

U<br />

J<br />

U<br />

T V C N B R R Y N L G P T V C N B R R Y N L<br />

ADC MK 2 MOD 1<br />

NSWC/Crane 03 254 154 100 25 25 25 25<br />

BAE Systems, Braintree, MA 04 370 0 370 31 31 31 31 31 31 31 31 31<br />

BAE Systems, Braintree, MA 05 487 0 487 A<br />

BAE Systems, Braintree, MA 06 579 0 579<br />

LAUNCH TUBES<br />

NRAD, SAN DIEGO, CA 03 160 160 0<br />

NRAD, SAN DIEGO, CA 04 258 172 86 43 43<br />

NRAD, SAN DIEGO, CA 05 272 0 272 A 45 45 45<br />

NRAD, SAN DIEGO, CA 06 354 0 354<br />

HARDWARE CONTINUED ON P21(3)<br />

Remarks:<br />

DD Form 2445, JUL 87 Previous editions are obsolete P-1 SHOPPING LIST 37<br />

311 / 244 PAGE 7 Exhibit P-21 Production Schedule<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L


FY 2004/05 BUDGET PRODUCTION SCHEDULE, P-21 DATE FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY<br />

OTHER PROCUREMENT, NAVY<br />

Weapon System P-1 ITEM NOMENCLATURE<br />

Production Rate<br />

Procurement Leadtimes<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

Item Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

6" COUNTERMEASURES BAE, BRAINTREE, MA 10 200 200<br />

LAUNCH TUBES NRAD, SAN DIEGO, CA 40 400 400<br />

ADC MK 2 BAE, BRAINTREE, MA 10 200 200<br />

GG MK 77 UPCO, PHOENIX, AZ 15 200 200<br />

NAE BEACON ALLIED , VENTURA CA 10 200 200<br />

FISCAL YEAR 2003 FISCAL YEAR 2004<br />

ITEM / MANUFACTURER F S Q D B 2002 CALENDAR YEAR 2003 2003 CALENDAR YEAR 2004<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L<br />

GG MK 77<br />

UPCO, PHOENIX, AZ 03 160 0 160 A 15 15 15 15 15 15 15 15 15 15 10 0<br />

UPCO, PHOENIX, AZ 04 258 0 258 A 23 23 23 189<br />

UPCO, PHOENIX, AZ 05 272 0 272 272<br />

UPCO, PHOENIX, AZ 06 354 0 354 354<br />

NAE BEACON<br />

Allied Logistics, Ventura CA 03 687 0 687 A 60 57 57 57 57 57 342<br />

Allied Logistics, Ventura CA 04 787 0 787 A 787<br />

Allied Logistics, Ventura CA 05 156 0 156 156<br />

Allied Logistics, Ventura CA 06 96 0 96 96<br />

HARDWARE CONTINUED ON P21(5)<br />

FISCAL YEAR 2005 FISCAL YEAR 2006<br />

ITEM / MANUFACTURER F S Q D B 2004 CALENDAR YEAR 2005 2005 CALENDAR YEAR 2006<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

N<br />

O<br />

D<br />

E<br />

J<br />

A<br />

F<br />

E<br />

M<br />

A<br />

A<br />

P<br />

M<br />

A<br />

J<br />

U<br />

J<br />

U<br />

A<br />

U<br />

S<br />

E<br />

O<br />

C<br />

N<br />

O<br />

D<br />

E<br />

J<br />

A<br />

F<br />

E<br />

M<br />

A<br />

A<br />

P<br />

M<br />

A<br />

J<br />

U<br />

J<br />

U<br />

T V C N B R R Y N L G P T V C N B R R Y N L<br />

GG MK 77<br />

UPCO, PHOENIX, AZ 03 160 160 0<br />

UPCO, PHOENIX, AZ 04 258 69 189 23 23 22 22 22 22 22 22 11<br />

UPCO, PHOENIX, AZ 05 272 0 272 A 23 23 23<br />

UPCO, PHOENIX, AZ 06 354 0 354<br />

NAE BEACON<br />

Allied Logistics, Ventura CA 03 687 687 342 57 57 57 57 57 57<br />

Allied Logistics, Ventura CA 04 787 0 787 70 70 70 70 70 70<br />

Allied Logistics, Ventura CA 05 156 0 156 A<br />

Allied Logistics, Ventura CA 06 96 0 96<br />

HARDWARE CONTINUED ON P21(5)<br />

Remarks:<br />

DD Form 2445, JUL 87 Previous editions are obsolete P-1 SHOPPING LIST 37<br />

311 / 244 PAGE 8 Exhibit P-21 Production Schedule<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L


CLASSIFICATION:<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY BA-2 SURFACE SHIP TORPEDO DEFENSE 221300/221305<br />

Program Element for Code B Items: Other Related Program Elements<br />

Prior ID To<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY 21 60 58 21 0 1 106 267<br />

COST<br />

(In Millions) $0.000 $0.000 $13.725 $22.273 $28.411 $8.406 $0.281 $4.467 Cont. Cont.<br />

SPARES COST<br />

(In Millions)<br />

SURFACE SHIP TORPEDO DEFENSE<br />

The Surface Ship Torpedo Defense (SSTD) System is comprised of two major systems. The AN/SLQ-25A (NIXIE) towed acoustic countermeasure system has recently been upgraded to<br />

enhance ship survivability against the torpedo threat. The recent upgrades include a more reliable power amplifier (EC9), COTS Signal Generator (EC10) with new operational capability,<br />

an enhanced EC16 capability, a new littoral cable for operation in shallow water, and associated upgraded “C” winch to accommodate the littoral cable. The funding stream provide for the<br />

FY 04-07 procurement and installation of this new capability on the majority of surface ship classes in the Navy. The second major system is the AN/WSQ-11 Torpedo Defense System<br />

comprised of an active (High Power Source) and passive (ACI) towed arrays and associate DCL Processor (Tripwire System) to detect and provide command orders for the launch of the<br />

associated hardkill Anti-Torpedo Torpedo (ATT). The procurement funding stream provides for procurement beginning in FY09 of AN/WSQ-11 Tripwire EDM shipsets for test and<br />

evaluation.<br />

P-1 SHOPPING LIST 38 CLASSIFICATION:<br />

DD Form 2454, JUN 86 Page No. 1<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System<br />

P-5<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy<br />

BA-2: Surface Ship Torpedo Defense 0204228N 221300/221305 Surface Ship Torpedo Defense (C2WL/H2WL)<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID Prior<br />

FY 2003 FY 2004 FY 2005<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

WL101<br />

Expeditionary Warfare N75<br />

AN/SLQ-25A Upgrade Kits A 0 9 Various 3,642 15 Various 3,584<br />

WL927 Install A 0 9 Various 799 15 Various 786<br />

WL830 Production Engineering - In House A 0 350 513<br />

WL900 Production Engineering - Out House A 0 75 75<br />

Total N75 0 4,866 4,958<br />

WL101<br />

Ship Programs N76<br />

AN/SLQ-25A Upgrade Kits A 0 7 Various 1,337 41 Various 9,559<br />

* DEC A 0 2,550 0<br />

WL927 Install A 0 7 Various 292 41 Various 1,400<br />

WL830 Production Engineering - In House A 0 225 400<br />

WL900 Production Engineering - Out House A 0 75 75<br />

Total N76 0 4,479 11,434<br />

WL101<br />

Aircraft Carrier Programs N78<br />

AN/SLQ-25A Upgrade Kits A 0 5 Various 3,262 4 Various 4,678<br />

WL927 Install A 0 5 Various 818 4 Various 806<br />

WL830 Production Engineering - In House A 0 250 347<br />

WL900 Production Engineering - Out House A 0 50 50<br />

Total N78 0 4,380 5,881<br />

Total OPN 0 13,725 22,273<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST 38<br />

PAGE NO. 2<br />

CLASSIFICATION:<br />

* Distributed Engineering Center (DEC) - FY 04 DEC Congressional Plus-Up UNCLASSIFIED<br />

DATE:<br />

February 2004


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy (C2WL/H2WL)<br />

Surface Ship Torpedo Defense<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

FY04<br />

AN/SLQ-25A Upgrade Kits - WL101 21 Var NAVSEA N/A SS/FFP St Production, Farmingdale NJ 01/04 04/04 N/A N/A<br />

FY05<br />

AN/SLQ-25A Upgrade Kits - WL101 60 Var NAVSEA N/A SS/FFP St Production, Uniontown PA 01/05 04/05 N/A N/A<br />

D. REMARKS<br />

AN/SLQ-25A Upgrade Kits unit cost will vary due to 11 various configurations. (Variations occur within ship classes).<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST 38 Classification:<br />

PAGE NO. 3 UNCLASSIFIED


UNCLASSIFIED<br />

CLASSIFICATION<br />

EXHIBIT P-40, BUDGET ITEM JUSTIFICATION<br />

DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE BLI 2237 SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Surveillance Towed Array Sensor (SURTASS) 72VG<br />

QUANTITY<br />

FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TO COMP TOTAL<br />

COST $19.9 $15.1 $7.2 $3.8 $0.4 $1.2 $1.4 Continuing Continuing<br />

(in millions)<br />

PROGRAM COVERAGE: Surveillance Towed Array Sensor System (SURTASS) is the mobile, tactical and strategic arm of the Navy's undersea surveillance capability that provides deep ocean<br />

and littoral acoustic detection and cueing for tactical weapon platforms against both diesel and nuclear submarines as well as surface vessels in any given Area of Operations worldwide.<br />

Dedicated ASW T-AGOS ships tow long acoustic arrays that collect acoustic data and relay that data to shore facilities via SHF satellites for processing and fusion of the resulting contact data<br />

with other sensors. Following TPOM 04 there are five T-AGOS ships with two system configurations operating in the Pacific area. Beginning in FY04, ship configurations will consist of the<br />

following: (1). Three T-AGOS Small Waterplane Area Twin Hull (SWATH) ships that were SCN funded in FY87 through FY89. This ship class utilizes the Next Evolution Signal Processing and<br />

Display System that was developed in 1997 and the Acoustic Rapid COTS Insertion (IUSS) signal processing and display system that was developed in 2002 and is common with the SSN Sonar<br />

Processing System. The RDA and A180R arrays provide improved detection and classification capability and allow those ships equipped with it to operate in a bi-static mode with the other<br />

active T-AGOS platforms that are equipped with the Low Frequency Active (LFA) system; and, (2). Two Low Frequency Active (LFA) equipped ships including the first "large" SWATH ship, T-<br />

AGOS 23 USNS IMPECCABLE, that was delivered in FY01, and the CORY CHOUEST. Both the CORY CHOUEST and T-AGOS 23 are configured with the Next Evolution Processing and<br />

Display system and both are equipped with the Low Frequency Active (LFA) capability. The active capability provides greatly improved detection against diesel submarines as well as the quiet<br />

nuclear submarine threat. In addition to the five T-AGOS ships above, two shore sites are configured with the Next Evolution processing and display and ARCI suites to receive the T-AGOS<br />

acoustic data via SHF satellite communication links. Major upgrades to these platforms and shore sites in FY02 through FY04 include TB-29 Twinline Arrays, Acoustic Rapid COTS Insertion<br />

(IUSS) (ARCI) processing and display upgrade that provide improved common ship processing suites for twinline arrays and Communication C4I upgrades that include the new SHF AN/WSC-<br />

6(V)7 terminals with seven foot antennas, INMARSAT B and ADNS in FY04. A cost sharing agreement with Japan also provides a shore site and two Japanese SWATH ships with similar<br />

capability to the T-AGOS SWATH ships for the Western Pacific region. The Japanese Auxiliary Ocean Surveillance Ship (JAOS) SWATH ships have been upgraded with the Next Evolution<br />

computer processing and display suites in FY98 and FY99 and currently utilize the original Production Baseline Arrays. Under the cost sharing agreement, the JAOS ships are being upgraded<br />

with the newer twinline A180R passive receiving arrays funded in FY00 and FY01. This budget includes the outfitting of a third J-AOS SWATH ship in FY05 with an ARCI processing and display<br />

system and a new Twinline array.<br />

SURTASS OPN funded subheads include:VG006 which provides for procurement and upgrade of existing arrays with the submarine common, SURTASS version of the TB-29A Twinline Array<br />

through FY04, ship ARCI trainers/configuration control modules (CCM) in FY03 and Communication/C4I Refresh upgrades through FY06. Jul-03VG006<br />

procurements beyond FY04 include ARCI<br />

processing and display suite for J-AOS 3 in FY05, refresh technology suites for communications/C4I suites in FY06. VG007 provides for procurement of field change kits resulting from in-service<br />

improvements of communications equipment, arrays, processing and display equipment and supporting systems. VG010 provides for procurement of ARCI upgrade of ship and shore site signal<br />

processing and display suite electronics in FY03. VG776 provides for non-FMP installation of equipment.<br />

P-40 Budget Item Justification Item No 40-1 of 40-16<br />

Exhibit P-40, Budget Item Justification


UNCLASSIFIED<br />

CLASSIFICATION<br />

EXHIBIT P-40, BUDGET ITEM JUSTIFICATION (Continued)<br />

DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE BLI 2237 SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Surveillance Towed Array Sensor (SURTASS) 72VG<br />

JUSTIFICATION OF BUDGET YEAR (FY04 & FY05): FY04 - Procurement of two twinline arrays to provide improved and common directional arrays for Indications and Warning (I&W)<br />

deepwater strategic and littoral missions. Field Change / Modifications replace aging / unsupportable shipboard equipment. Installation funding provides for installation of applicable<br />

equipment being installed in FY04. FY05- JAOS 3 array and processing suite are required for new construction JAOS SURTASS third platform. J-AOS 3 is cost share and funding is<br />

required for FY07 IOC. Field Change/Modifications replace aging/unsupportable shipboard equipments. Installation funding provides for installation of applicable equipment being<br />

installed in FY05. FY04-Procurement of ARCI Processing and display upgrade for JAOS 1 to improve performance and replace obsolescent equipment. FY05- Procurement of ARCI<br />

processing and display upgrade for JAOS 2 to improve performance and replace obsolescent equipment.<br />

INSTALLATION AGENTS: SSC Charleston, SSC San Diego, and General Dynamics, Anaheim Hills, CA.<br />

MODIFICATION SUMMARY ($M)<br />

Listed below are the costs for equipment being procured by BLI 2237 that have associated installation costs budgeted.<br />

EQUIPMENT FY03 FY04 FY05<br />

Block Upgrade (J-AOS 1 & 2) 0.77 0.34 0.31<br />

J-AOS 3 Array & Processing Suite 0.00 0.00 5.92<br />

Twinline Arrays 12.13 13.27 0.00<br />

Trainers/CCM 2.17 0.00 0.00<br />

Communication/C4I Upgrade 0.78 0.39 0.00<br />

Communication/C4I Upgrade Refresh Technolog 0.00 0.00 0.00<br />

Transformational Low Frequency Active 0.00 0.00 0.00<br />

Field Changes/Modifications 0.50 0.68 0.35<br />

ARCI Ship Electronics 0.00 0.00 0.00<br />

ARCI Ship Electronics Refresh Technology 0.00 0.00 0.00<br />

ARCI Shore Electronics 1.60 0.00 0.00<br />

ARCI Shore Electronics Refresh Technology 0.00 0.00 0.00<br />

P-40 Budget Item Justification Item No. 40-2 of 40-16<br />

Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

EXHIBIT P-40, BUDGET ITEM JUSTIFICATION (Continued)<br />

DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE BLI 2237 SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Surveillance Towed Array Sensor (SURTASS) 72VG<br />

Specific procurements by FY include:<br />

FY03: Funds are required for the following:<br />

VG006 Twinline array provides two improved and common directional array for Indications and Warning (I&W) deepwater strategic missions and littoral missions.<br />

Communications/C4I Upgrade provides two SHF WSC-6(V)7 terminals for network centric connectivity to BG. ARCI trainers at IOSC and SUBTRAFAC provide operation & maintenance training for<br />

MILDET and SURTASS ship personnel. ARCI processing and display upgrade for ASWC to support JAOS 1 and JAOS 2. ARCI Configuration Control Model (CCM) provides an ARCI signal processing.<br />

and display suite at the software support activity<br />

VG007 Field Changes/Modifications provide for correction of deficiencies identified by Fleet use, array support equipment, communication equipment, replacement of aging/unsupportable equipment.<br />

VG010 ARCI processing and display upgrades provide two shore site processing and display suites.<br />

VG776 Installation of equipment.<br />

FY04: Funds are required for the following:<br />

VG006 Twinline array provides two improved and common directional arrays for Indications and Warning (I&W) deepwater strategic missions and littoral missions.<br />

ARCI Processing and display upgrade for JAOS 1. Communications / C4I upgrades provide for five SHF Bandwidth Efficient Modems and one ADNS.<br />

VG007 Field Changes/Modifications provide for correction of deficiencies identified by Fleet use, array support equipment, communication equipment, and replacement of aging/unsupportable equipment.<br />

VG776 Installation of equipment.<br />

FY05: Funds are required for the following;<br />

VG006 ARCI Processing and display upgrade for JAOS 2. JA0S 3 Array and Processing Suite provides a twinline array and processing suite for new construction JAOS Swath platform<br />

VG007 Field Changes/Modifications provide for correction of deficiencies identified by Fleet use, array support equipment, communication equipment, and replacement of aging/unsupportable equipment.<br />

VG776 Installation of equipment.<br />

P-4- Budget Item Justification Item No. 40-3 of 40-16<br />

Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE<br />

EXHIBIT P-5, COST ANALYSIS February 2004<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE BLI 2237 SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT Surveillance Towed Array Sensor (SURTASS) 72VG<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

PY FY 2002 FY 2003 FY 2004 FY 2005<br />

COST ID TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE COST QTY COST COST QTY COST COST QTY COST COST QTY COST COST<br />

VG006 UPGRADE PROCUREMENT<br />

Block Upgrade/ARCI (ASWC and J-AOS 1 & 2) A 2 385 770 1 344 344 1 306 306<br />

J-AOS 3 Array & Processing Suite A 1 5,920 5,920<br />

Twinline Arrays A 0 0 0 2 6,065 12,130 2 6,633 13,266<br />

Trainers/CCM (Note 1) A 3 723 2,169<br />

Communication/C4I Upgrades (Note 2) A 0 0 2 390 780 5 77 387<br />

Communication/C4I Upgrades Refresh Technology A<br />

LFA Technology Refresh<br />

Transformational Low Frequency Active A<br />

VG007 FIELD CHANGES/MODIFICATIONS A 497 679 350<br />

VG010 ELECTRONICS UPGRADE<br />

ARCI Ship Electronics A<br />

ARCI Ship Electronics Refresh Technology A<br />

ARCI Shore Electronics A 0 0 0 2 797 1,594<br />

ARCI Shore Electronics Refresh Technology A<br />

VG776 INSTALLATION OF EQUIPMENT 2,002<br />

438 590<br />

NON-FMP Ship Installation 1,717 340 590<br />

NON-FMP Shore Installation 285 98<br />

TOTAL CONTROL 0 19,942 15,114 7,166<br />

Remarks:<br />

(1) FY03 Trainers/CCM line in VG006 funds ARCI Trainers at SSTF and SUBTRAFAC; and ARCI CCM. Unit cost for trainers are weighted average cost.<br />

(2) Communication/C4I Upgrades. FY03: SHF (V)7 Terminals. FY04 provides for 5-ea SHF Bandwidth Efficient Modems and 1-ea ADNS.<br />

DD FORM 2446, JUN 86 P-5 Cost Analysis- Item No. 40-4 of 40-16<br />

Exhibit P-5, Cost Analysis<br />

Unclassified


UNCLASSIFIED<br />

CLASSIFICATION<br />

EXHIBIT P-5a, PROCUREMENT HISTORY AND PLANNING February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE BLI 2237 SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Surveillance Towed Array Sensor (SURTASS) 72VG<br />

RFP CONTRACT CONTRACTOR DATE SPECS DATE<br />

QTY UNIT LOCATION ISSUE METHOD AND AWARD OF FIRST AVAILABLE REVISIONS<br />

ELEMENT OF COST<br />

COST OF PCO DATE & TYPE LOCATION DATE Delivery NOW AVAILABLE<br />

FY03<br />

UPGRADE PROCUREMENT<br />

Block Upgrade / ARCI (ASWC and J-AOS 1 & 2)<br />

J-AOS 3 Array & Processing Suite<br />

2 385 SPAWAR/NAVSEA CPAF/OP General Dynamics-AIS Jul-03 Jul-04 Yes n/a<br />

Twinline Arrays 2 6,065 NAVSEA CPFF/OP Lockheed Martin Dec-02 Dec-04 Yes n/a<br />

Trainers/CCM 3 723 SPAWAR CPAF/OP General Dynamics-AIS Dec-02 Nov-03 Yes n/a<br />

Communication/C4I Upgrades<br />

Communicatiion/C4I Upgrades Refresh Technology<br />

LFA Technology Refresh<br />

Transformational Low Frequency Active<br />

2 390 Various Various Various Various Various Yes n/a<br />

FIELD CHANGES/MODIFICATIONS<br />

ELECTRONICS UPGRADE<br />

ARCI Ship Electronics<br />

ARCI Ship Electronics Refresh Technology<br />

ARCI Shore Electronics<br />

ARCI Shore Electronics Refresh Technology<br />

2 797 SPAWAR CPAF/OP General Dynamics-AIS Dec-02 Aug-03 Yes n/a<br />

P-5a Procurement History Item No. 40-5 of 40-16<br />

A. DATE<br />

Exhibit P-5a, Procurement History and Planning<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

EXHIBIT P-5a, PROCUREMENT HISTORY AND PLANNING February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE BLI 2237 SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Surveillance Towed Array Sensor (SURTASS) 72VG<br />

RFP CONTRACT CONTRACTOR DATE SPECS DATE<br />

QTY UNIT LOCATION ISSUE METHOD AND AWARD OF FIRST AVAILABLE REVISIONS<br />

ELEMENT OF COST<br />

COST OF PCO DATE & TYPE LOCATION DATE Delivery NOW AVAILABLE<br />

FY04<br />

UPGRADE PROCUREMENT<br />

Block Upgrade / ARCI (ASWC and J-AOS 1 & 2)<br />

J-AOS 3 Array & Processing Suite<br />

1 344 SPAWAR CPAF/OP General Dynamics-AIS Sep-04 Sep-05 Yes n/a<br />

Twinline Arrays<br />

Trainers/CCM<br />

2 6,633 NAVSEA CPFF/OP Lockheed Martin Jun-04 Jun-06 Yes n/a<br />

Communication/C4I Upgrades<br />

Communicatiion/C4I Upgrades Refresh Technology<br />

LFA Technology Refresh<br />

Transformational Low Frequency Active<br />

5 77 Various Various Various Various Various Yes n/a<br />

FIELD CHANGES/MODIFICATIONS<br />

ELECTRONICS UPGRADE<br />

ARCI Ship Electronics<br />

ARCI Ship Electronics Refresh Technology<br />

ARCI Shore Electronics<br />

ARCI Shore Electronics Refresh Technology<br />

Notes:<br />

P-5a Procurement History Item No. 40-6 of 40-16<br />

A. DATE<br />

Exhibit P-5a, Procurement History and Planning<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

EXHIBIT P-5a, PROCUREMENT HISTORY AND PLANNING February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE BLI 2237 SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Surveillance Towed Array Sensor (SURTASS) 72VG<br />

RFP CONTRACT CONTRACTOR DATE SPECS DATE<br />

QTY UNIT LOCATION ISSUE METHOD AND AWARD OF FIRST AVAILABLE REVISIONS<br />

ELEMENT OF COST<br />

COST OF PCO DATE & TYPE LOCATION DATE Delivery NOW AVAILABLE<br />

FY05<br />

UPGRADE PROCUREMENT<br />

Block Upgrade / ARCI (ASWC and J-AOS 1 & 2) 1 306 SPAWAR CPAF/OP General Dynamics-AIS Sep-05 Sep-06 Yes n/a<br />

J-AOS 3 Array & Processing Suite<br />

Twinline Arrays<br />

Trainers/CCM<br />

Communication/C4I Upgrades<br />

Communicatiion/C4I Upgrades Refresh Technology<br />

LFA Technology Refresh<br />

Transformational Low Frequency Active<br />

1 5,920 SPAWAR CPAF/OP General Dynamics-AIS/IOSC Oct-04 Jul 05 and Aug 06 Yes n/a<br />

FIELD CHANGES/MODIFICATIONS<br />

ELECTRONICS UPGRADE<br />

ARCI Ship Electronics<br />

ARCI Ship Electronics Refresh Technology<br />

ARCI Shore Electronics<br />

ARCI Shore Electronics Refresh Technology<br />

Notes:<br />

P-5a Procurement History Item No. 40-7 of 40-16<br />

A. DATE<br />

Exhibit P-5a, Procurement History and Planning<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Block Upgrade / ARCI (ASWC and J-AOS 1 & 2) February 2004<br />

COST CODE: VG006<br />

MODELS OF SYSTEMS AFFECTED: JAOS Shore (ASWC/SES) and JAOS Ship (J-AOS 1 & J-AOS 2)<br />

DESCRIPTION/JUSTIFICATION:<br />

J-AOS SURTASS upgrades to ARCI Baseline on a cost share basis is planned so that software is common with US. In FY03 ASWC / SES shore upgrades will be procured. In FY04 and FY05, J-AOS 1 and J-AOS-2 will<br />

be procured respectively. FY03 Installation funding installs two A-180R Twinline Arrays on J1 and J2.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

N/A<br />

Prior Yrs FY 03 FY 04 FY 05 FY06 FY07<br />

FY08 FY09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E 0.000 0.00<br />

PROCUREMENT: 0.000 0.00<br />

Kit Quantity 0.000 0.00<br />

Installation Kits 0.000 0.00<br />

Installation Kits Nonrecurring 0.000 0.00<br />

Equipment 1.000 2.035 2.000 0.770 1.000 0.344 1.000 0.306 5.000 3.46<br />

Equipment Nonrecurring 0.000 0.00<br />

Engineering Change Orders 0.000 0.00<br />

Data 0.000 0.00<br />

Training Equipment 0.000 0.00<br />

Support Equipment 0.000 0.00<br />

Other 0.000 0.00<br />

Interim Contractor Support 0.000 0.00<br />

Installation of Hardware 1.000 0.050 2.000 0.100 1.000 0.050 1.000 0.050 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.000 0.25<br />

PRIOR YR EQUIP 0.000 0.00<br />

FY 02 EQUIP 1.000 0.050 1.000 0.05<br />

FY 03 EQUIP 2.000 0.100 2.000 0.10<br />

FY 04 EQUIP 1.000 0.050 1.000 0.05<br />

FY 05 EQUIP 1.000 0.050 1.000 0.05<br />

FY 06 EQUIP 0.000 0.00<br />

FY 07 EQUIP 0.000 0.00<br />

FY 08 EQUIP 0.000 0.00<br />

FY 09 EQUIP 0.000 0.00<br />

FY TC EQUIP 0.000 0.00<br />

TOTAL INSTALLATION COST 0.000 0.000 1.000 0.050 2.000 0.100 1.000 0.050 1.000 0.050 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.000 0.25<br />

TOTAL PROCUREMENT COST 1.000 2.035 2.000 0.820 1.000 0.444 1.000 0.356 0.000 0.050 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.000 3.71<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 Months PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: FY 2003: Jul-03<br />

FY2004: Sep-04 FY2005: Sep-05<br />

DELIVERY DATES: FY 2002: FY 2003: Jul-04<br />

FY2004: Sep-05 FY2005: Sep-06<br />

FY04 FY 05 FY 06 FY 07<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 1 2 1 1<br />

OUTPUT 1 2 1 1<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 5<br />

OUTPUT 5<br />

Notes/Comments<br />

One of the two items procured in FY03 does not require installation funds. The second item will be funded and installed in FY04<br />

P-3a IMP Item No. 40-8 of 40-16<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: JAOS #3 Array and Processing Suite February 2004<br />

COST CODE: VG006<br />

MODELS OF SYSTEMS AFFECTED: JAOS Ship #3 Processing and Display Suite and Array<br />

DESCRIPTION/JUSTIFICATION:<br />

JAOS Ship #3 provides a ship processing and display suite and a Twinline Array in FY05 for a new construction Japanese vessel. Installation will be initiated in FY05 in accordance with shipyard building plans. OPN data is US<br />

Cost Share<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

N/A<br />

Prior Yrs FY 03 FY 04 FY 05 FY06 FY07 FY08 FY09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E 0.000 0.000<br />

PROCUREMENT: 0.000 0.000<br />

Kit Quantity 0.000 0.000<br />

Installation Kits 0.000 0.000<br />

Installation Kits Nonrecurring 0.000 0.000<br />

Equipment 1.000 5.920 1.000 5.920<br />

Equipment Nonrecurring 0.000 0.000<br />

Engineering Change Orders 0.000 0.000<br />

Data 0.000 0.000<br />

Training Equipment 0.000 0.000<br />

Support Equipment 0.000 0.000<br />

Other 0.000 0.000<br />

Interim Contractor Support 0.000 0.000<br />

Installation of Hardware 0.000 0.000 0.000 0.000 0.000 0.000 1.000 0.270 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.000 0.270<br />

PRIOR YR EQUIP 0.000 0.000<br />

FY 02 EQUIP 0.000 0.000<br />

FY 03 EQUIP 0.000 0.000<br />

FY 04 EQUIP 0.000 0.000<br />

FY 05 EQUIP 1.000 0.270 1.000 0.270<br />

FY 06 EQUIP 0.000 0.000<br />

FY 07 EQUIP 0.000 0.000<br />

FY 08 EQUIP 0.000 0.000<br />

FY 09 EQUIP 0.000 0.000<br />

FY TC EQUIP 0.000 0.000<br />

TOTAL INSTALLATION COST 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.000 0.270 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.000 0.270<br />

TOTAL PROCUREMENT COST 0.000 0.000 0.000 0.000 0.000 0.000 1.000 5.920 0.000 0.270 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.000 6.190<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 mos. PRODUCTION LEADTIME: Ship Electronics - 10 mos. Ship Array - 24 mos.<br />

CONTRACT DATES: FY 2002: FY 2003: FY2004: FY2005: Oct-04<br />

DELIVERY DATES: FY 2002: FY 2003: FY2004: FY2005: Jul-05;Aug-06<br />

FY04 FY 05 FY 06 FY 07<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 1<br />

OUTPUT<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 1<br />

OUTPUT 1 1<br />

Notes/Comments<br />

(1) FY05 Funds required to facilitate electronics suite preparation during array manufacturing timeline. Additional delay due to ship availability.<br />

(2) The J-AOS 3 System consists of two major subcomponents procured from two separate contractors. Full delivery is defined as both part being simultaneously available.<br />

The installation of the JAOS #3 equipment will begin in late FY06 and be completed in 1st Qtr FY07.<br />

P3a IMP Item No. 40-9 of 40-16<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Twinline Arrays February 2004<br />

COST CODE: VG006<br />

MODELS OF SYSTEMS AFFECTED: SURTASS T-AGOS Ships<br />

DESCRIPTION/JUSTIFICATION:<br />

The Twinline is a shallow water variant of the common array that is being produced by NAVSEA. The array consists of 2 short array lengths and is designed for increased surveillance capability in high clutter<br />

environments and littoral areas. The inventory objective for the Common Twinline Array is 5 arrays.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

N/A<br />

Prior Yrs FY 03 FY 04 FY 05 FY06 FY07 FY08 FY09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E 0.000 0.000<br />

PROCUREMENT: 0.000 0.000<br />

Kit Quantity 0.000 0.000<br />

Installation Kits 0.000 0.000<br />

Installation Kits Nonrecurring 0.000 0.000<br />

Equipment 1.000 7.200 2.000 12.130 2.000 13.266 5.000 32.596<br />

Equipment Nonrecurring 0.000 0.000<br />

Engineering Change Orders 0.000 0.000<br />

Data 0.000 0.000<br />

Training Equipment 0.000 0.000<br />

Support Equipment 0.000 0.000<br />

Other 0.000 0.000<br />

Interim Contractor Support 0.000 0.000<br />

Installation of Hardware 0.000 0.000 0.000 0.000 0.000 0.000 3.000 0.450 2.000 0.300 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.000 0.750<br />

PRIOR YR EQUIP 0.000 0.000<br />

FY 02 EQUIP 1.000 0.150 1.000 0.150<br />

FY 03 EQUIP 2.000 0.300 2.000 0.300<br />

FY 04 EQUIP 2.000 0.300 2.000 0.300<br />

FY 05 EQUIP 0.000 0.000<br />

FY 06 EQUIP 0.000 0.000<br />

FY 07 EQUIP 0.000 0.000<br />

FY 08 EQUIP 0.000 0.000<br />

FY 09 EQUIP 0.000 0.000<br />

FY TC EQUIP 0.000 0.000<br />

TOTAL INSTALLATION COST 0.000 0.000 0.000 0.000 0.000 0.000 3.000 0.450 2.000 0.300 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.000 0.750<br />

TOTAL PROCUREMENT COST 1.000 7.200 2.000 12.130 2.000 13.266 0.000 0.450 0.000 0.300 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.000 33.346<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 months PRODUCTION LEADTIME: 21 to 24 months depending on total buy<br />

CONTRACT DATES: FY 2002: FY 2003: Dec-02<br />

FY2004: Jun-04 FY2005:<br />

DELIVERY DATES: FY 2002: FY 2003: Dec-04<br />

FY2004: Jun-06 FY2005:<br />

FY04 FY 05 FY 06 FY 07<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 1 1 1 1 1<br />

OUTPUT 1 1 1 1 1<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 5<br />

OUTPUT 5<br />

Notes/Comments:<br />

P3a IMP Item No. 40-10 of 40-16<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Trainers/Configuration Control Model (CCM) February 2004<br />

COST CODE: VG006<br />

MODELS OF SYSTEMS AFFECTED: SURTASS Shore Trainers and Configuration Control Model (CCM)<br />

DESCRIPTION/JUSTIFICATION:<br />

The ARCI trainer suite at IOSC, Norfolk VA., in FY03 will provide operation and maintenance training for MILDET and SURTASS ship personnel. The ARCI SUBTRAFAC Trainer in FY03 will provide operations and maintenance<br />

training for SURTASS shore and MILDET personnel. The FY03 ARCI configuration Control Model (CCM) at the SURTASS software developer's lab will provide a hardware suite for software maintenance and test purposes.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

N/A<br />

Prior Yrs FY 03 FY 04 FY 05 FY06 FY07 FY08 FY09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E 0.000 0.000<br />

PROCUREMENT: 0.000 0.000<br />

Kit Quantity 0.000 0.000<br />

Installation Kits 0.000 0.000<br />

Installation Kits Nonrecurring 0.000 0.000<br />

Equipment 0.000 0.000<br />

Equipment Nonrecurring 0.000 0.000<br />

Engineering Change Orders 0.000 0.000<br />

Data 0.000 0.000<br />

Training Equipment 3.000 2.169 0.000 0.000 3.000 2.169<br />

Support Equipment 0.000 0.000<br />

Other 0.000 0.000<br />

Interim Contractor Support 0.000 0.000<br />

Installation of Hardware 0.000 0.000 2.000 0.129 1.000 0.098 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.000 0.227<br />

PRIOR YR EQUIP 0.000 0.000<br />

FY 02 EQUIP 0.000 0.000<br />

FY 03 EQUIP 2.000 0.129 1.000 0.098 3.000 0.227<br />

FY 04 EQUIP 1.000 0.000<br />

FY 05 EQUIP 0.000 0.000<br />

FY 06 EQUIP 0.000 0.000<br />

FY 07 EQUIP 0.000 0.000<br />

FY 08 EQUIP 0.000 0.000<br />

FY 09 EQUIP 0.000 0.000 0.000 0.000<br />

FY TC EQUIP 0.000 0.000<br />

TOTAL INSTALLATION COST 0.000 0.000 2.000 0.129 1.000 0.098 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.000 0.227<br />

TOTAL PROCUREMENT COST 0.000 0.000 3.000 2.298 0.000 0.098 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.000 2.396<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 month PRODUCTION LEADTIME: 10 months<br />

CONTRACT DATES: FY2002: FY 2003: Dec-02 Jun-03 FY2004: FY2005:<br />

DELIVERY DATES: FY2002: FY 2003: Nov-03 Apr-04 FY2004: FY2005:<br />

FY04 FY 05 FY 06 FY 07<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 1 1 1<br />

OUTPUT 1 1 1<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 3<br />

OUTPUT 3<br />

Notes/Comments<br />

The reported 2 contract and delivery dates for FY03 are due to exercising 2 separate contract options resulting in 2 separate schedules.<br />

P3a IMP Item No. 40-11 of 40-16<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Communications/C4I Upgrades February 2004<br />

COST CODE: VG006<br />

MODELS OF SYSTEMS AFFECTED: SURTASS T-AGOS Ships<br />

DESCRIPTION/JUSTIFICATION:<br />

Communication/C4I Upgrades provides IT-21 communications upgrades for SURTASS ships for improved network centric connectivity to deploying Battle Groups. FY 03 provides SHF WSC-6 (V)7<br />

terminal, ADNS, and integration of suites. FY04 provides for 5-ea SHF Bandwidth Efficient Modems and 1-ea ADNS.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

N/A<br />

Prior Yrs FY 03 FY 04 FY 05 FY06 FY07 FY08 FY09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E 0.000 0.000<br />

PROCUREMENT: 0.000 0.000<br />

Kit Quantity 0.000 0.000<br />

Installation Kits 0.000 0.000<br />

Installation Kits Nonrecurring 0.000 0.000<br />

Equipment 3.000 2.630 2.000 0.780 5.000 0.387 10.000 3.797<br />

Equipment Nonrecurring 0.000 0.000<br />

Engineering Change Orders 0.000 0.000<br />

Data 0.000 0.000<br />

Training Equipment 0.000 0.000<br />

Support Equipment 0.000 0.000<br />

Other 0.000 0.000<br />

Interim Contractor Support 0.000 0.000<br />

Installation of Hardware 3.000 2.070 2.000 1.100 5.000 0.200 10.000 3.370<br />

PRIOR YR EQUIP 0.000 0.000<br />

FY 02 EQUIP 3.000 2.070 3.000 2.070<br />

FY 03 EQUIP 2.000 1.100 2.000 1.100<br />

FY 04 EQUIP 5.000 0.200 5.000 0.200<br />

FY 05 EQUIP 0.000 0.000<br />

FY 06 EQUIP 0.000 0.000<br />

FY 07 EQUIP 0.000 0.000<br />

FY 08 EQUIP 0.000 0.000<br />

FY 09 EQUIP 0.000 0.000<br />

FY TC EQUIP 0.000 0.000<br />

TOTAL INSTALLATION COST 3.000 2.070 2.000 1.100 5.000 0.200 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 10.000 3.370<br />

TOTAL PROCUREMENT COST 3.000 4.700 2.000 1.880 5.000 0.587 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 10.000 7.167<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME:<br />

CONTRACT DATES: FY2002: Various FY2003: Various FY2004: Various FY2005: FY2006:<br />

DELIVERY DATES: FY2002: Various FY2003: Various FY2004: Various FY2005: FY2006:<br />

FY04 FY 05 FY 06 FY 07<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 5 5<br />

OUTPUT 5 5<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 10<br />

OUTPUT 10<br />

Notes/Comments<br />

P3a IMP Item No. 40-12 of 40-16<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Communications/C4I Upgrade Refresh Technology February 2004<br />

COST CODE: VG006<br />

MODELS OF SYSTEMS AFFECTED: SURTASS TAGOS Ships<br />

DESCRIPTION/JUSTIFICATION:<br />

Communications/C4I Upgrade Refresh Technology upgrades existing GCCS-M 3.1.1.2 Hardware/Software to GCCS-M 4.0 in FY06.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

N/A<br />

Prior Yrs FY 03 FY 04 FY 05 FY06 FY07 FY08 FY09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E 0 0.00<br />

PROCUREMENT: 0 0.00<br />

Kit Quantity 0.000 0.000<br />

Installation Kits 0.000 0.000<br />

Installation Kits Nonrecurring 0.000 0.000<br />

Equipment 5.000 1.072 - -<br />

5.000 1.072<br />

Equipment Nonrecurring 0.000 0.000<br />

Engineering Change Orders 0.000 0.000<br />

Data 0.000 0.000<br />

Training Equipment 0.000 0.000<br />

Support Equipment 0.000 0.000<br />

Other 0.000 0.000<br />

Interim Contractor Support 0.000 0.000<br />

Installation of Hardware 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.000 0.873 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.000 0.873<br />

PRIOR YR EQUIP 0.000 0.000<br />

FY 02 EQUIP 0.000 0.000<br />

FY 03 EQUIP 0.000 0.000<br />

FY 04 EQUIP 0.000 0.000<br />

FY 05 EQUIP 0.000 0.000<br />

FY 06 EQUIP 5.000 0.873 5.000 0.873<br />

FY 07 EQUIP 0.000 0.000<br />

FY 08 EQUIP 0.000 0.000<br />

FY 09 EQUIP 0.000 0.000<br />

FY TC EQUIP 0.000 0.000<br />

TOTAL INSTALLATION COST 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.000 0.873 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.000 0.873<br />

TOTAL PROCUREMENT COST 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.000 1.945 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.000 1.945<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 Months PRODUCTION LEADTIME: FY06 GCCS-M -10 Months<br />

CONTRACT DATES: FY 2002: FY 2003: FY2004: FY2005: FY2006: Oct-05<br />

DELIVERY DATES: FY 2002: FY 2003: FY2004: FY2005: FY2006: Aug-06<br />

FY04 FY 05 FY 06 FY 07<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 5<br />

OUTPUT 5<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 5<br />

OUTPUT 5<br />

P3a IMP Item No. 40-13 of 40-16<br />

Notes/Comments<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Field Changes/Modifications February 2004<br />

COST CODE: VG007<br />

MODELS OF SYSTEMS AFFECTED: SURTASS T-AGOS Ship and Shore Facilities<br />

DESCRIPTION/JUSTIFICATION:<br />

Field Changes/Modifications for correction of deficiencies identified by Fleet use, array support, communications equipment and replacement of aging/unsupportable equipment.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: N/A<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 03 FY 04 FY 05 FY06 FY07 FY08 FY09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E 0 0.00<br />

PROCUREMENT: 0 0.00<br />

Kit Quantity 0 0.00<br />

Installation Kits 7.000 0.482 5.000 0.497 5.000 0.679 6.000 0.350 10.000 0.960 2.000 0.340 10.000 0.912 10.000 1.000 55 5.22<br />

Installation Kits Nonrecurring 0 0.00<br />

Equipment 0 0.00<br />

Equipment Nonrecurring 0 0.00<br />

Engineering Change Orders 0 0.00<br />

Data 0 0.00<br />

Training Equipment 0 0.00<br />

Support Equipment 0 0.00<br />

Other 0 0.00<br />

Interim Contractor Support 0 0.00<br />

Installation of Hardware 7.000 0.170 5.000 0.360 5.000 0.090 6.000 0.090 10.000 0.300 2.000 0.105 10.000 0.254 10.000 0.380 55 1.75<br />

PRIOR YR EQUIP 0 0.00<br />

FY 02 EQUIP 7.000 0.170 7 0.17<br />

FY 03 EQUIP 5.000 0.360 5 0.36<br />

FY 04 EQUIP 5.000 0.090 5 0.09<br />

FY 05 EQUIP 6.000 0.090 6 0.09<br />

FY 06 EQUIP 10.000 0.300 10 0.30<br />

FY 07 EQUIP 2.000 0.105 2 0.11<br />

FY 08 EQUIP 10.000 0.254 10 0.25<br />

FY 09 EQUIP 10.000 0.380 10 0.38<br />

FY TC EQUIP 0 0.00<br />

TOTAL INSTALLATION COST 7.000 0.170 5.000 0.360 5.000 0.090 6.000 0.090 10.000 0.300 2.000 0.105 10.000 0.254 10.000 0.380 0.00 0.00 55 1.75<br />

TOTAL PROCUREMENT COST 7.000 0.652 5.000 0.857 5.000 0.769 6.000 0.440 10.000 1.260 2.000 0.445 10.000 1.166 10.000 1.380 0.00 0.00 55 6.97<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 months PRODUCTION LEADTIME: 10 months<br />

CONTRACT DATES: FY2002: Various FY 2003: Various FY2004: Various FY2005: Various<br />

DELIVERY DATES: FY2002: Various FY 2003: Various FY2004: Various FY2005: Various<br />

FY04 FY 05 FY 06 FY 07<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 12 5 6 10 2<br />

OUTPUT 12 5 6 10 2<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 10 10 55<br />

OUTPUT 10 10 55<br />

Notes/Comments<br />

Quantity reflects various field changes<br />

P3a IMP Item No. 40-14 of 40-16<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: ARCI Ship Electronics February 2004<br />

COST CODE: VG010<br />

MODELS OF SYSTEMS AFFECTED: SURTASS T-AGOS Ships<br />

DESCRIPTION/JUSTIFICATION:<br />

ARCI Ship Electronics provides upgraded ship processing and display suite consisting of SMP technology server configuration to accommodate improved and expanded twinline data from SURTASS Ships.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

N/A<br />

Prior Yrs FY 03 FY 04 FY 05 FY06 FY07 FY08 FY09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E 0.000 0.000<br />

PROCUREMENT: 0.000 0.000<br />

Kit Quantity 0.000 0.000<br />

Installation Kits 0.000 0.000<br />

Installation Kits Nonrecurring 0.000 0.000<br />

Equipment 5.000 3.340 5.000 3.340<br />

Equipment Nonrecurring 0.000 0.000<br />

Engineering Change Orders 0.000 0.000<br />

Data 0.000 0.000<br />

Training Equipment 0.000 0.000<br />

Support Equipment 0.000 0.000<br />

Other 0.000 0.000<br />

Interim Contractor Support 0.000 0.000<br />

Installation of Hardware 5.000 0.420 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.000 0.420<br />

PRIOR YR EQUIP 0.000 0.000<br />

FY 02 EQUIP 5.000 0.420 5.000 0.420<br />

FY 03 EQUIP 0.000 0.000<br />

FY 04 EQUIP 0.000 0.000<br />

FY 05 EQUIP 0.000 0.000<br />

FY 06 EQUIP 0.000 0.000<br />

FY 07 EQUIP 0.000 0.000<br />

FY 08 EQUIP 0.000 0.000<br />

FY 09 EQUIP 0.000 0.000<br />

FY TC EQUIP 0.000 0.000<br />

TOTAL INSTALLATION COST 5.000 0.420 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.000 0.420<br />

TOTAL PROCUREMENT COST 5.000 3.760 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.000 3.760<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 month PRODUCTION LEADTIME: 10 Months #1; 10.5 Months #2; 11 Months #3, #4 & #5<br />

CONTRACT DATES: FY2002: FY2003: FY2004: FY2005:<br />

DELIVERY DATES: FY2002: FY2003: FY2004: FY2005:<br />

FY04 FY 05 FY 06 FY 07<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 5<br />

OUTPUT 5<br />

FY 08 FY 09 TC TOTAL<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4<br />

5<br />

INPUT<br />

5<br />

OUTPUT<br />

Notes/Comments<br />

P3a IMP Item No. 40-15 of 40-16<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: ARCI Shore Electronics<br />

COST CODE:<br />

MODELS OF SYSTEMS AFFECTED:<br />

VG010<br />

DESCRIPTION/JUSTIFICATION:<br />

ARCI Shore Electronics provides SURTASS Signal Processing and Display Suites at two Naval Oceanographic Processing Facilities (NOPF).<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

N/A<br />

Prior Yrs FY 03 FY 04 FY 05 FY06 FY07 FY08 FY09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E 0.000 0.000<br />

PROCUREMENT: 0.000 0.000<br />

Kit Quantity 0.000 0.000<br />

Installation Kits 0.000 0.000<br />

Installation Kits Nonrecurring 0.000 0.000<br />

Equipment 2.000 1.594 2.000 1.594<br />

Equipment Nonrecurring 0.000 0.000<br />

Engineering Change Orders 0.000 0.000<br />

Data 0.000 0.000<br />

Training Equipment 0.000 0.000<br />

Support Equipment 0.000 0.000<br />

Other 0.000 0.000<br />

Interim Contractor Support 0.000 0.000<br />

Installation of Hardware 0.000 0.000 2.000 0.156 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.000 0.156<br />

PRIOR YR EQUIP 0.000 0.000<br />

FY 02 EQUIP 0.000 0.000<br />

FY 03 EQUIP 2.000 0.156 2.000 0.156<br />

FY 04 EQUIP 0.000 0.000<br />

FY 05 EQUIP 0.000 0.000<br />

FY 06 EQUIP 0.000 0.000<br />

FY 07 EQUIP 0.000 0.000<br />

FY 08 EQUIP 0.000 0.000<br />

FY 09 EQUIP 0.000 0.000<br />

FY TC EQUIP 0.000 0.000<br />

TOTAL INSTALLATION COST 0.000 0.000 2.000 0.156 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.000 0.156<br />

TOTAL PROCUREMENT COST 0.000 0.000 2.000 1.750 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.000 1.750<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 month PRODUCTION LEADTIME: 9 months<br />

CONTRACT DATES: FY2002: FY2003: Dec. 02 FY2004: FY2005:<br />

DELIVERY DATES: FY2002: FY2003: Aug. 03 FY2004: FY2005:<br />

FY04 FY 05 FY 06 FY 07<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 2<br />

OUTPUT 1 1<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 2<br />

OUTPUT 2<br />

Notes/Comments<br />

P3a IMP Item No. 40-16 of 40-16<br />

February 2004<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Tactical Support Centers (#2246) 52WH<br />

QUANTITY<br />

FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TO COMP TOTAL<br />

COST<br />

(in millions) $5.1 $9.4 $5.1 $5.3 $5.3 $5.4 $5.5 Continuing Continuing<br />

Narrative Description /Justification: The Tactical Support Center (TSC) program provides evolutionary systems and ancillary equipment upgrades to support the Maritime Sector Commanders<br />

(Ashore) with the capability to plan, direct and control the tactical operations of Joint and Naval Expeditionary Forces and other assigned units within their respective area of responsibility.<br />

These operations include littoral, open ocean, and over land all sensor (i.e. EO, IR, ISAR, etc.) surveillance, anti-surface warfare, over-the-horizon targeting, counter-drug operations, power<br />

projection, antisubmarine warfare, mining, search and rescue, and special operations.<br />

The Tactical Support Center (TSC) program includes fixed site TSCs and Mobile Operations Control Centers (MOCCs). TSC's provide C4I capability, air-ground, satellite and point-to-point<br />

communications systems; sensor analysis capabilities; avionics and weapons system interfaces and facilities equipment. MOCC is a scalable and mobile version of the TSC for contingency<br />

operations and for support of operations from airfields that do not have a TSC.<br />

WH046. Analysis Interface Equipment. This cost code contains TSC sensor analysis capabilities, avionics and weapons system interfaces, computer upgrades<br />

and associated software for interfacing analysis and processing equipment to the supported weapons systems (aircraft).<br />

WH050. Facilities Equipment. This Cost Code contains the Facilities Equipment necessary to power and support the processing equipment and interfaces.<br />

This Budget Request Procures: 1. TSC Upgrade Equipment; 2. Facilities Equipment; and 3. Installation of Equipment.<br />

INSTALLATION DATA: 14 TSC systems at 12 operational sites (located at Keflavik, Iceland; Brunswick, ME; Jacksonville, FL; Sigonella, Italy; Kaneohe Bay, HI; Whidbey Island, WA; Kadena,<br />

Japan; Misawa, Japan; North Island, CA; Diego Garcia, Indian Ocean; Roosevelt Roads, Puerto Rico, and Masirah, Oman); 1 training site at Fleet Combat Training Center (FCTC) Dam Neck, VA<br />

and 1 lab site at SSC CHARLESTON DET Patuxent River, MD. 9 MOCCs at 8 operational sites (Homeported at Brunswick, ME; Jacksonville, FL; Sigonella, Italy; 2 at Barbers Point/Kaneohe Bay,<br />

HI; Misawa, Japan; Whidbey Island, WA; Willow Grove, PA; and Point Mugu, CA.) and 1 MOCC C2 Engineering Development, Software Support Facility (SSC CHARLESTON). 1 Maritime Patrol<br />

and Reconnaissance (MPR) Operations Center in Bahrain.<br />

TSC Roosevelt Roads was decommissioned the end of FY03. It is being replaced by a mobile MOCC capability that will be staged from TSC Jacksonville to handle continued support in the<br />

SOUTHCOM AOR.<br />

MOCC Souda Bay, Greece was stood up for permanent operations in FY03 to support Mideast AOR.<br />

FY04 includes Congressional Add of $3M for P-3C AIP TCDL Upgrade Program.<br />

P-1 Shopping List No. 41-1 of 4<br />

Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE<br />

COST ANALYSIS February 2004<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT Tactical Support Centers (#2246) 52WH<br />

PY FY 2003 FY 2004<br />

FY 2005<br />

COST ID TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE COST QTY COST COST QTY COST COST QTY COST COST<br />

WH046 ANALYSIS INTERFACE EQUIP* A 4,310 8,712 4,626<br />

WH050 FACILITIES EQUIP A<br />

WH776 NON-FMP INSTALLATION A 750 710 474<br />

*FY04 includes Congressional Add of $3M for P-3C AIP TCDL Upgrade Program<br />

TOTAL CONTROL 5,060 9,422 5,100<br />

DD FORM 2446, JUN 86 P-1 Shopping List No. 41-2 of 4<br />

* Mobile Operations Control Centers (MOCCs) systems are procured under a "turn-key" structure and therefore Installation funds are not shown separately.<br />

Exhibit P-5, Budget Item Justification<br />

Unclassified


UNCLASSIFIED<br />

MODIFICATION TITLE: TACTICAL SUPPORT CENTERS (TSC) SUBHEAD/COST CODE: 52WH/WH046<br />

COST CODE WH046<br />

MODELS OF SYSTEMS AFFECTED: N/A<br />

DESCRIPTION/JUSTIFICATION: This cost code contains fixed-site TSC sensor analysis capabilities, avionics and weapons system interfaces, computer upgrade<br />

and associated software for interfacing analysis and processing equipment to the supported weapons systems (aircraft<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

February 2004<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

Other<br />

Interm Contractor Support<br />

VAR 50.76 VAR 3.72 VAR 4.31 VAR 8.71 VAR 4.63 VAR 4.61 VAR 4.43 VAR 4.56 VAR 4.56 CONT CONT CONT CONT<br />

Installation of Hardware* 181 16.66 13 1.76 10 0.75 7 0.71 6 0.47 8 0.70 3 0.88 6 0.87 7 0.98 CONT CONT 241 23.79<br />

PRIOR YR EQUIP 181 16.66 181 16.66<br />

FY 02 EQUIP 13 1.76 13 1.76<br />

FY 03 EQUIP 10 0.75 10 0.75<br />

FY 04 EQUIP 7 0.71 7 0.71<br />

FY 05 EQUIP 6 0.47 6 0.47<br />

FY 06 EQUIP 8 0.70 8 0.70<br />

FY 07 EQUIP 3 0.88 3 0.88<br />

FY 08 EQUIP 6 0.87 6 0.87<br />

FY 09 EQUIP 7 0.98 7 0.98<br />

FY TC EQUIP CONT CONT 0 0.00<br />

TOTAL INSTALLATION COST 16.66 1.76 0.75 0.71 0.47 0.70 0.88 0.87 0.98 CONT CONT 23.79<br />

TOTAL PROCUREMENT COST 67.43 5.48 5.06 9.42 5.10 5.31 5.31 5.43 5.54 CONT CONT 90.29<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: VAR PRODUCTION LEADTIME: VAR<br />

CONTRACT DATES: FY 2003: VAR FY 2004: VAR FY 2005: VAR<br />

DELIVERY DATES: FY 2003: VAR FY 2004: VAR FY 2005: VAR<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 194 2 1 3 4 1 2 2 2 2 2 2 2 3 3<br />

OUTPUT 194 2 1 3 4 1 2 2 2 2 2 2 2 3 3<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 1 1 1 2 2 2 2 2 3 CONT 241<br />

OUTPUT 1 1 1 2 2 2 2 2 3 CONT 241<br />

Notes/Comments<br />

* P-3A quantities are "Shore Sites installed". Additionally, the Installation quantities only represent TSC units<br />

* Install costs vary across fiscal years due to different equipment mix and locations.<br />

P-1 Shopping List-Item No 41-3 of 4 Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: TACTICAL SUPPORT CENTERS (TSC) SUBHEAD/COST CODE: 52WH/WH050<br />

COST CODE WH050<br />

MODELS OF SYSTEMS AFFECTED: N/A<br />

DESCRIPTION/JUSTIFICATION: This Cost Code contains the Facilities Equipment necessary to power and support the processing equipment and interfaces.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment VAR 6.41 VAR 0.41 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 CONT CONT VAR 6.82<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

Other<br />

Interm Contractor Support<br />

Installation of Hardware* 20 1.97 2 0.02 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 CONT CONT 22 2<br />

PRIOR YR EQUIP 20 1.97 20 1.97<br />

FY 01 EQUIP 1 0.01 1 0.01<br />

FY 02 EQUIP 1 0.01 1 0.01<br />

FY 03 EQUIP 0 0.00<br />

FY 04 EQUIP 0 0.00<br />

FY 05 EQUIP 0 0.00<br />

FY 06 EQUIP 0 0.00<br />

FY 07 EQUIP 0 0.00<br />

FY 08 EQUIP 0 0.00<br />

FY 09 EQUIP 0 0.00<br />

FY TC EQUIP 0 0.00<br />

TOTAL INSTALLATION COST 1.97 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CONT CONT 1.99<br />

TOTAL PROCUREMENT COST 8.38 0.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CONT CONT 8.81<br />

METHOD OF IMPLEMENTATION ADMINISTRATIVE LEADTIME: VAR PRODUCTION LEADTIME: VAR<br />

CONTRACT DATES: FY 2003: VAR FY 2004: VAR FY 2005: VAR<br />

DELIVERY DATES: FY 2003: VAR FY 2004: VAR FY 2005: VAR<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 22<br />

OUTPUT 22<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT CONT 22<br />

OUTPUT CONT 22<br />

Notes/Comments<br />

* P-3A quantities are "Shore Sites installed".<br />

February 2004<br />

P-1 Shopping List-Item No 41-4 of 4 Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY<br />

Other Procurement, Navy<br />

P-1 ITEM NOMENCLATURE<br />

BA-2: Communications and Electronic Eq<br />

AN/SLQ-32(V) / 2312<br />

Program Element for Code B Items: Other Related Program Elements<br />

FY 2002 ID To Total<br />

and Prior Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Program<br />

QUANTITY 0 0 0 0 0 0 0 0 0 0<br />

COST ($M)<br />

Initial Spares ($M)<br />

PROGRAM OVERVIEW:<br />

5.7 1.8 22.3 18.7 22.0 27.9 25.2 21.4 contd contd<br />

PROGRAM DESCRIPTION/JUSTIFICATION:<br />

.<br />

The AN/SLQ-32(V) provides a family of modular shipborne electronic warfare equipment which is installed in most combatants, CV/CVN, amphibious ships and auxiliaries in the surface Navy.<br />

The system, which consists of five configurations, performs the mission of early detection, analyses, threat warning, and protection from anti-ship missiles.<br />

The Shipboard EW Improvement Program (SEWIP) will develop a modern, highly capable family of EW systems by block upgrade of the current AN/SLQ-32 system that are robust in detecting<br />

and countering today's and future threats and will extend the service of the AN/SLQ-32(V) systems presently installed on approximately 159 U.S. Navy ships.<br />

FY 02 and prior: Procurement and installation of Field Change Kits for the Fleet Modernization Program (FMP).<br />

TC055: Funding in FY03 - FY09 is for procurement of Engineering Change Proposals (ECPs)/Field Change Kits to ensure future tactical suitability and viability of the AN/SLQ-32(V) and to<br />

address obsolescence and diminishing material source issues. Field Change Kits consist of: Digital Radio Frequency Memory Units (DRFMU), Deceptive Electronic Countermeasures/Decoy<br />

Integrations (DDI), Video Blanking, CFR Blanking, Sidekicks, Cartridge Tape Transport (CTT) replacement, Electromagnetic Interference (EMI) Fixes, AFT Facing Launchers, High Voltage<br />

Distribution Unit (HVDU) replacements, and (V)5 Pump & Motor ECP.<br />

Funding in FY04 - FY09 for procurement of Small Ship Electronic Surveillance Systems (SSESM) . These are required to provide Specific Emitter Identification (SEI) capability to various<br />

ships/ship classes.<br />

FY08 - FY09 for procurements of High Gain High Sensitivity (HGHS) capability to improve situational awareness and threat warning.<br />

Funding in FY04 - FY09 for procurement of Improved Control and Display (ICAD) consoles for the AN/SLQ-32(V). ICAD replaces the current Display Control Console (DCC) with a UYQ-70<br />

console. ICAD is a low-risk improvement that provides the EW operator with the tools necessary to improve tactical performance, situational awareness and battle readiness. FY 04 includes<br />

Congressional Plus-up for development of IETMs for ICAD.<br />

Funding in FY04-FY09 for procurement of Electronic Surveillance Enhancement (ESE) kits for the AN/SLQ-32(V). ESE replaces the Digital Processing Unit and Digital Tracking Unit with a<br />

modern computer structure. This enhanced functionality increases Anti-Ship Missile Defense (ASMD) capabilities by increasing the probability of correct identification of threats.<br />

TC5IN: Shipboard installation of ECP/Field Changes (including ESE), SSESM, and ICAD. TC6IN: Installation of ECP/Field Changes (including ESE), SSESM, and ICAD at shore sites.<br />

DD Form 2454, JUN 86 P-1 SHOPPING LIST PAGE N0. CLASSIFICATION:<br />

42 1<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY<br />

Other Procurement, Navy<br />

ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

BA-2: Communications and Electronic Eq<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

AN/SLQ-32(V) / 2312 SUBHEAD: A2TC<br />

COST ELEMENT OF COST ID FY 2003 FY 2004 FY 2005<br />

CODE Code<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

SPONSOR N76<br />

Equipment<br />

TC055 ECP/FIELD CHANGE KITS A 833 4,091 3,765<br />

TC055 Small Ship ESM systems (SSESM) B 13 325 4,225 10 325 3,250<br />

Production Support SSESM 330 287<br />

TC055 SEI/High Gain High Sensitivity (HGHS) B<br />

TC055 ICAD B 10 260 2,600 14 260 3,640<br />

Production Support ICAD 386 419<br />

Logistics Support ICAD 2,967<br />

TC055 ESE B 20 202 4,040 20 202 4,040<br />

Production Support ESE 341 287<br />

TC5IN FMP INSTALLATIONS 949 3,178 2,952<br />

TC6IN NON-FMP INSTALLATIONS 0 104 88<br />

1,782 43 22,262 44 18,728<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST PAGE NO. CLASSIFICATION:<br />

42 2<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OTHER PROCUREMENT, NAVY AN/SLQ-32(V) / 2312 A2TC<br />

BA-2: Communications and Electronic Eq<br />

CONTRACT DATE OF SPECS IF NO<br />

Cost Element/ QTY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE WHEN<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

FISCAL YEAR 04<br />

SSESM 13 325 NRL 11/03 FFP ITT Industries 1/2004 6/04 YES<br />

ICAD 10 260 NAVSEA N/A FFP LM -Eagan 7/04 2/05 YES<br />

ESE 20 202 NSWC Crane 4/02 FFP Northrop Grumman 6/04 9/04 YES<br />

FISCAL YEAR 05<br />

SSESM 10 325 NAVSEA TBD FFP GD AIS 12/04 5/05 YES<br />

ICAD 14 260 NAVSEA N/A FFP LM -Eagan 12/04 10/05 YES<br />

ESE 20 202 NSWC Crane 4/02 FFP Northrop Grumman 1/05 4/05 YES<br />

D. REMARKS<br />

FEBRUARY 2004<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST PAGE NO. CLASSIFICATION:<br />

42 3 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED FEBRUARY 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AN/SLQ-32(V) TYPE MODIFICATION: ECPs/SARs MODIFICATION TITLE: Various<br />

DESCRIPTION/JUSTIFICATION:<br />

Funding is for Surface Electronic Warfare Improvements to AN/SLQ-32(V) . Procurement and installation of improvements is necessary to ensure future mission tactical suitability and viability for SLQ-32(V).<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: BLOCK 1A:ESE(DT/OA:2QFY04) ICAD (DT/OA:1Q-3QFY04,OT:1QFY05)<br />

FY 2002<br />

and Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E 0 182.0 0 0 36.5 0 43.6 0 25.8 0 14.5 0 10.5 0 19.4 0 19.1 Cont. 351.4<br />

PROCUREMENT<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT - SSESM 13 4.2 10 3.3 14 4.6 18 5.9 15 4.9 1 0.3 71 23.1<br />

EQUIPMENT NONRECURRING<br />

ENGINEERING CHANGES 1.0 0.8 4.1 3.8 2.9 3.6 3.7 5.2 24.0<br />

UNIT COST DATA FOR EQUIPMENT 0.0<br />

TRAINING EQUIPMENT 0.0<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER - ICAD 10 2.6 14 3.6 17 4.4 15 3.9 12 3.1 8 2.3 Cont 76 20.0<br />

OTHER - ESE 20 4.0 20 4.0 27 5.5 44 8.9 38 7.7 Cont 149 30.1<br />

OTHER - SEI/HGHS 1 1.3 8 10.3 Cont 9 11.6<br />

LOGISTICS SUPPORT 3.0 3.0<br />

PRODUCTION ENGINEERING 1.1 1.0 1.1 1.0 1.1 0.8 6.0<br />

INTERIM CONTRACTOR SUPPORT<br />

PROCUREMENT COST 1.0 0 0.0 0 0.8 43 19.0 44 15.7 58 18.4 77 23.2 66 21.7 17 18.9 0.0 305 117.8<br />

INSTALL COST (Includes FMP & Non-FMP) 4.7 0.0 0.9 3.3 3.0 0 3.6 4.7 0 3.5 2.4 26.2<br />

TOTAL PROGRAM 5.8 0.0 1.8 22.3 18.7 22.0 27.9 25.2 21.4 144.0<br />

P-1 SHOPPING LIST PAGE NO. CLASSIFICATION:<br />

42 4


CLASSIFICATION: UNCLASSIFIED FEBRUARY 2004<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AN/SLQ-32A(V)2, A(V)3 MODIFICATION TITLE: Small Ship Electronic Surveillance Systems (SSESM)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIPALT/AIT<br />

ADMINISTRATIVE LEADTIME: 1 Month PRODUCTION LEADTIME: 4 Months<br />

CONTRACT DATES: FY 2002: FY 2003: FY 2004: Jan-04<br />

FY 2005:<br />

DELIVERY DATE: FY 2002: FY 2003: FY 2004: Jun-04<br />

FY 2005:<br />

Cost: FY 2001 and Prior FY 2002 FY 2003 FY 2004 FY 2005<br />

($ in Millions)<br />

FY 2006 FY 2007<br />

FY 2008<br />

FY 2009 To Complete Total<br />

Qty $<br />

$ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2001 AND PRIOR 0 0.00<br />

FY 2002 EQUIPMENT 0 0.00<br />

FY 2003 EQUIPMENT 0 0.00<br />

FY 2004 EQUIPMENT 13 0.71 13 0.71<br />

FY 2005 EQUIPMENT 10 0.29<br />

10 0.29<br />

FY 2006 EQUIPMENT 14 0.43 14 0.43<br />

FY 2007 EQUIPMENT 18 0.85<br />

18 0.85<br />

FY 2008 EQUIPMENT 15 0.85<br />

15 0.85<br />

FY 2009 EQUIPMENT 1 0.79<br />

1 0.79<br />

TO COMPLETE ** Cont 71 3.92<br />

INSTALLATION SCHEDULE: SHIP AVAILABILITIES<br />

FY2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

AND PRIOR 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

IN 6 7 6 4 4 5 5 6 6 6 5 5 5 1 71<br />

OUT 6 7 6 4 4 5 5 6 6 6 5 5 5 1 71<br />

Dec-04<br />

May-05<br />

P-1 SHOPPING LIST 42 PAGE 5 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED FEBRUARY 2004<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AN/SLQ-32A(V)1,A(V)2 MODIFICATION TITLE: Improved Control and Display (ICAD)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIPALT/AIT<br />

ADMINISTRATIVE LEADTIME: 3 Months PRODUCTION LEADTIME: 7 Months<br />

CONTRACT DATES: FY 2002: FY 2003: FY 2004: July 2004 FY 2005: December 2004<br />

DELIVERY DATE: FY 2002: FY 2003: FY 2004: February 2005 FY 2005: October 2005<br />

Cost: FY 2001 and Prior FY 2002 FY 2003 FY 2004 FY 2005<br />

($ in Millions)<br />

FY 2006 FY 2007 FY 2008<br />

FY 2009 To Complete Total<br />

Qty $<br />

$ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2001 AND PRIOR 0 0.00<br />

FY 2002 EQUIPMENT 0 0.00<br />

FY 2003 EQUIPMENT 0 0.00<br />

FY 2004 EQUIPMENT 9 1.33 9 1.33<br />

FY 2005 EQUIPMENT 13 1.9 13 1.90<br />

FY 2006 EQUIPMENT 15 2.16<br />

15 2.16<br />

FY 2007 EQUIPMENT 9 1.29<br />

9 1.29<br />

FY 2008 EQUIPMENT 7 1.02<br />

7 1.02<br />

FY 2009 EQUIPMENT 7 1.82 7 1.82<br />

TO COMPLETE ** Cont 60 9.52<br />

NOTE: QUANTITIES DIFFER FROM P-5 BECAUSE OF INSTALLATIONS AT SHORE SITES (17).<br />

INSTALLATION SCHEDULE: SHIP AVAILABILITIES<br />

FY2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

AND PRIOR 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

IN 5 4 7 6 8 7 5 4 4 3 7 60<br />

OUT 5 4 4 5 4 4 4 4 3 3 2 2 2 2 2 2 1 7 60<br />

P-1 SHOPPING LIST 42 PAGE 6 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED FEBRUARY 2004<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AN/SLQ-32A(V)2, A(V)3 MODIFICATION TITLE: High Gain High Sensitivity<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIPALT/AIT<br />

ADMINISTRATIVE LEADTIME: 3 Months PRODUCTION LEADTIME: TBD<br />

CONTRACT DATES: FY 2002: FY 2003: FY 2004: FY 2005:<br />

DELIVERY DATE: FY 2002: FY 2003: FY 2004: FY 2005:<br />

Cost: FY 2001 and Prior FY 2002 FY 2003 FY 2004 FY 2005<br />

($ in Millions)<br />

FY 2006 FY 2007<br />

FY 2008<br />

FY 2009 To Complete Total<br />

Qty $<br />

$ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2001 AND PRIOR 0 0.00<br />

FY 2002 EQUIPMENT 0 0.00<br />

FY 2003 EQUIPMENT 0 0.00<br />

FY 2004 EQUIPMENT 0 0.00<br />

FY 2005 EQUIPMENT 0 0.00<br />

FY 2006 EQUIPMENT 0 0.00<br />

FY 2007 EQUIPMENT 0 0.00<br />

FY 2008 EQUIPMENT 1 0.05<br />

1 0.05<br />

FY 2009 EQUIPMENT 8 0.36<br />

8 0.36<br />

TO COMPLETE ** Cont 9 0.41<br />

NOTE: FY04 & FY05 QUANTITIES DIFFER FROM P-5 BECAUSE OF INSTALLATIONS AT SHORE SITES (2).<br />

INSTALLATION SCHEDULE: SHIP AVAILABILITIES<br />

FY2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

AND PRIOR 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

IN 1 4 4 9<br />

OUT 1 4 4 9<br />

P-1 SHOPPING LIST 42 PAGE 7 CLASSIFICATION: UNCLASSIFIED


Exhibit P-40, Budget Item Justification<br />

Appropriation (Treasury) Code/CC/BA/BSA/Item Control Number<br />

Other Procurement, Navy/2/234000/234006<br />

Program Element for Code B Items:<br />

ID<br />

Code<br />

Prior Years<br />

FY 2002<br />

FY 2003<br />

Date<br />

February 2004<br />

P-1 Line Item Nomenclature<br />

Information Warfare Systems<br />

Other Related Program Elements<br />

FY 2004<br />

FY 2005<br />

4-1<br />

FY 2006<br />

FY 2007<br />

FY 2008<br />

FY 2009<br />

To<br />

Complete<br />

Proc Qty<br />

Gross Cost A 24.723 2.718 4.787 3.909 3.784 3.651 3.759 3.835 3.922 Cont. Cont.<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc (=P-1)<br />

Initial Spares A .975 .150 .250 .250 .250 .250 .250 .250 .250 Cont. Cont.<br />

Total Proc Cost A 25.698 2.868 5.037 4.159 4.034 3.901 4.001 4.085 4.172 Cont. Cont.<br />

Flyaway U/C<br />

Wpn Sys Proc U/C<br />

Description:<br />

The Naval Information Warfare Activity (NIWA) serves as the Program Manager for the Offensive Information Warfare (IW) program. As such, NIWA is tasked as the<br />

Navy's principal technical agent to research, assess, develop, and prototype IW capabilities. The key focus is to provide tactical commanders with both an IW Mission<br />

Planning, Analysis and Command and Control Targeting System (IMPACTS) tool and state-of-the-art Electronic Attack (EA) hardware and software.<br />

.<br />

P-1 Shopping List - Item No 43<br />

Total<br />

Exhibit P-40, Budget Item Justification


Exhibit P-40a, Budget Item Justification for Aggregated Items<br />

Appropriation/Budget Activity OPN/2/234000/234006<br />

4-2<br />

Date<br />

February 2004<br />

Information Warfare Systems<br />

Procurement Items<br />

ID<br />

Code<br />

Prior<br />

Years<br />

FY 2003 FY 2004 FY 2005<br />

Total<br />

Production Support A 11.450 0.000 0.000 0.000 11.450<br />

IW/CW Equipment A 0.900 0.000 0.000 0.000 0.900<br />

EA Equipment A 7.080 1.488 2.284 2.459 Cont.<br />

EA Equipment Spares A 0.975 0.000 0.000 0.000 .975<br />

EA Installation A 0.300 0.000 0.250 0.000 0.550<br />

Perception Mngmnt A 2.406 0.000 0.000 0.000 2.861<br />

IMPACTS Support A 0.725 0.600 0.875 0.775 Cont.<br />

SSA Support A 0.100 0.200 0.250 0.250 Cont.<br />

Fleet HPC HW A 0.400 0.300 0.300 0.300 Cont.<br />

Contractor HW A 0.780 0.318 0.200 0.250 Cont.<br />

IW Misc. A 0.582 0.000 0.000 0.000 0.582<br />

Cont.<br />

Computer Network<br />

Defense (CND)<br />

A 0.000 2.131 0.000 0.000 2.131<br />

Cont.<br />

Cont.<br />

Cont.<br />

Cont.<br />

Total Quantity Var Var Var Var Cont.<br />

Total Cost A 25.698 5.037 4.159 4.034 Cont.<br />

P-1 Shopping List - Item No 43 Exhibit P-40a, Budget Item Justification for Aggregated Items


Exhibit P-18 Initial and Replenishment Spare and Repair Parts Justification<br />

4-3<br />

Date: February 2004<br />

Appropriation (Treasury) OPN/2/234000/234006<br />

Prior<br />

Information Warfare Systems<br />

End Item P-1 Line Item<br />

INITIAL<br />

Years FY 2002 FY 2003 FY 2004 FY 2005<br />

Total<br />

Information Warfare<br />

Spares<br />

.975 .150 .250 .250 .250 Cont.<br />

TOTAL INITIAL .975 .150 .250 .250 .250 Cont.<br />

REPLENISHMENT<br />

N/A<br />

TOTAL<br />

REPLENISHMENT<br />

Remarks:<br />

Funded Initial Spares<br />

P-1 Shopping List Item No 43 Exhibit P-18, Initial and Replenishment Spares and Repair Parts Justification


UNCLASSIFIED<br />

CLASSIFICATION<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT SHIPBOARD IW EXPLOIT SYSTEMS 2360 521U<br />

QUANTITY<br />

DATE: February 2004<br />

FY 2003 FY 2004 FY 2005 FY 2006 FY2007 FY 2008 FY 2009<br />

COST<br />

(in millions) 82.1 122.2 69.2 35.9 112.9 78.1 79.7<br />

PROGRAM COVERAGE:<br />

BUDGET ITEM JUSTIFICATION SHEET<br />

JUSTIFICATION OF BUDGET REQUIREMENTS:<br />

(U) This line procures the following:<br />

(U) A Cooperative Outboard Logistics Update (COBLU) joint cooperative program between the United States and the United Kingdom (U.K.) was established 1 July 1994 with a Memorandum of Understanding (MOU) being signed by both governments.<br />

The COBLU program provides upgrades to the existing OUTBOARD System (AN/SSQ-108) to provide Comprehensive Surface Tactical (CESM) capability to the 21st century. The program will make maximum use of already developed military and<br />

commercial signal exploitation equipment. The systems architecture will require minimal effort to implement future technologies necessary to handle the evolving threat. Program is being executed in two phases; Phase 0 is an interim update that focuses on<br />

transitioning Human Computer Interface (HCI) to a Joint Maritime Command Information System (JMCIS) environment and integrating with Direction Finding Engineering Change Proposal (DFECP). Phase 1 focuses on a total update of front-end sensors.<br />

(U) The Ships Signal Exploitation Equipment (SSEE) Phase 2 program is an evolutionary acquisition, commercial off-the-shelf/non-developmental item (COTS/NDI) program designed as the building block to improve the tactical cryptologic and<br />

Information Warfare (C2W/IW) exploitation capability across Navy surface combatant platforms. SSEE provides the afloat cryptologist with threat identification and analysis of Communications Intelligence (COMINT) as well as queuing of radio direction<br />

finding assets. Equipment Includes Receivers, RF Management Systems, Recorders, Audio Distribution Systems, Computers, Antennas and Ancillary Hardware. The system is upgraded incrementally, as improvements are developed. Currently, Increment D<br />

is in production and fielding. SSEE PHASE 2 Increment D: Procures equipment that digitizes the Receivers and RF Management systems, adds signal analysis/processing capability and provides an open architecture that accommodates additional functional<br />

capabilities. SSEE Increment E shall employ the Maritime Cryptologic Strategy for the 21st century (MCS-21) concept of a single core architecture that is easily modernized and scaled in capability. The system design permits the rapid insertion of new and<br />

emerging P3I to address the evolving threat. The system will utilize generic processor technology to counteract obsolescence issues with Digital Signal Processing (DSP) technologies and provide software receivers for ease of modification to deal with known<br />

and projected exotic threat signals of interest. Automated signal acquisition and integrated Radio Direction Finding (RDF) will be incorporated into the Increment E system.<br />

(U) The Transportable Radio Direction Finding (T-RDF) and associated deck and/or mast antenna is a complete communication band shipboard Direction Finding system for bearing computation for surface combatants and is designed to operate in the harsh<br />

shipboard environment.<br />

P-1 Shopping List-Item No 44 - 1 of 19 Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET DATE: February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT<br />

JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: (continued)<br />

SHIPBOARD IW EXPLOIT SYSTEMS 2360 521U<br />

(U) ECP/Obsolecence integration procures COTS/NDI equipment to replace obsolete and unsupportable equipment for the SSEE, COBLU, BGPHES-ST and COMBAT DF/ADAS, CDL-N programs. These changes allow for a<br />

common logistic support baseline for these programs and provides the hardware to support the DII COE/GCCS-M software upgrades.<br />

(U) Battle Group Passive Horizon Extension System (BGPHES) provides the ability for cryptologic operators to monitor, record and analyze selected signals of interest. BGPHES is a fully digital, open architecture SCI system which<br />

is built upon the USN GCCS-M and USAF Deployable Ground Intercept Facility (DGIF) baselines. The surface terminal consists of two basic subsystems: Local Monitoring Systems (LMS) and Airborne Receiving Systems (ARS).<br />

BGPHES is projected to become the Navy's Signals Intelligence (SIGINT) component of the Distributed Common Ground Station (DCGS) and must be multi-service interoperable and Joint SIGINT Avionics Family (JSAF) complian<br />

FY01 Funding supports the procurement of BGPHES V(1) and BGPHES Airborne Test Fixture. BGPHES V(1) system design permits P3I to the local monitoring system (LMS) and the Airborne Receiver System (ARS). The BATF<br />

P3I includes changes to the hardware interfaces and upgrades the system processors.<br />

(U) Special Modulation Detection Assembly (SMDA). A VME compliant digitizer used by Navy Electronic Support Measures (ESM) processors to provide a digitized intermediate frequency suitable for obtaining a Specific Emitter<br />

ID (SEI) signature on certain types of radiated electronic signals. This digitized signal is then used by algorithms developed and supported by the Naval Research Lab within the host processor to provide the SEI signature to the<br />

system. The current production model SMDA consists of a two VME card set. Current processors which are compatible with the SEI SMDA are the AN/SP-160 installed in the P-3C AIP (SMDA funding executed by NAVAIR PMA<br />

290C) and the AN/SP-110 (a subcomponent of the BLQ-10 ESM system procured by NAVSEA PMS-473). The SMDA cards supported by this line item are intended for the SP-110 and are delivered to Naval Surface Warfare Center<br />

Dahlgren, VA. for installation under the SP-110 program. Total procurement across the FYDP provides one assembly for each SP-110 processor.<br />

(U) The Common Data Link - NAVY (CDL-N) (formerly called Common High Bandwidth Data Link-Shipboard Terminal (CHBDL-ST)). FY2000 and prior procured CHBDL-ST systems. FY2001 and FY2002 procured CDL-N<br />

systems. FY 03 - FY 05 will procure CDL-N Block 1 Systems. The CDL-N system provides network interface capability, wideband encryption, and command link upgrades to the CHBDL-ST baseline system. CDL-N provides a<br />

wideband data link between Navy/Joint airborne sensor systems and the shipboard processors of national and tactical reconnaissance programs. It is designed to communicate with the BGPHES-ST and the Joint Services Imagery<br />

Processing System - Navy (JSIPS-N). CDL-N benefits the fleet by providing horizon extension for line-of-sight sensor systems for use in time critical strike missions and is interoperable with the F/A-18 SHARP, TCDL Equipped P-<br />

3C and EP-3E Navy Aircraft, USAF Dual Data Link II equipped Special Aircraft, and Global Hawk HAE UAV. The NIU Kit (prevously known as DSM/ATM kits) provides a second Link Controller Rack with network interface<br />

capability, Sun workstation, wideband encryption, and command link upgrades to the CHBDL-ST baseline system. The Video Interface Group (VIG) Kit provides an additional workstation that provides streaming video display,<br />

record, and playback capability to support TCDL Equipped Navy Aircraft.<br />

(U) IW Training Equipment provides operator, unit or multi-unit level training on Tactical Cryptologic Systems (TCS). This training enhances initial skills, provides refresher taining and increases proficiency of the operator on the<br />

TCS through the generation and replay of operational scenarios by software simulation versus hardware stimulation. Additionally this line supports the procurement of the Cryptologic On-Line Trainer (COLT) hardware for Shipboard<br />

IW team training.<br />

(U) Installation Agent(s): Installations are accomplished by formal shipalt by Alteration Installation Team (AIT).<br />

P-1 Shopping List-Item No 44 - 2 of 19 Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

COST ANALYSIS DATE:<br />

February 2004<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT SHIPBOARD IW EXPLOIT SYSTEMS 2360<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

521U<br />

COST ID UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE QTY COST COST QTY COST COST QTY COST COST<br />

1U004 COBLU PHASE I A<br />

1U008 SSEE PHASE 2 INCREMENT D A<br />

1U009 T-RDF SYSTEMS A<br />

1U010 T-RDF ANTENNAS A 6 213.0<br />

1,278 7 302.7<br />

2,119 2 317.0<br />

1U013 ECP/OBSOLESCENCE A VAR VAR 4,924 VAR VAR 6,782 VAR VAR 1,450<br />

1U017 SSEE INCREMENT E VARIANT 1 A 6 2836.0 17,016 14 3,653<br />

1U019 BGPHES-ST VARIANT 1 A<br />

1U020 SMDA EQUIPMENT A 10 49.7<br />

51,145 9 3,610.5<br />

497 10 52.0<br />

1U027 CDL - N BLOCK 1 A 6 5,785.6<br />

34,714 7 3,549.0<br />

24,843 3 2,900.0<br />

8,700<br />

1U028 CDL-N BACKFIT KITS A VAR VAR 4,105 VAR VAR 3,634<br />

1U029 IW TRAINING EQUIPMENT A VAR VAR 1,018 VAR VAR 5,387 VAR VAR 1,456<br />

1U555 PRODUCTION SUPPORT 5,308 8,886 3,829<br />

INSTALLATION 13,784 18,913 20,110<br />

1U777 INSTALL-FMP 10,792 13,329 15,825<br />

1U777 DSA 2,381 3,451 1,331<br />

1U776 INSTALLATION-NON FMP 611 2,133 2,954<br />

DD FORM 2446, JUN 86<br />

DERF FUNDING<br />

NIU KIT<br />

SYSTEMS ENGINEERING & INTEGRATION SUPPORT<br />

CDL-N INSTALLATION<br />

TOTAL 82,147 122,206 69,194<br />

TOTAL<br />

Cost Code: 1U010 Increase in UPC from FY03 to FY04. FY04 antennas will be delivered with performance enhancement.<br />

Cost Code: 1U013 Unit cost and quantity varies because the equipment being procured is COTS/NDI and supports all the programs within the Shipboard IW Exploit Budget.<br />

Cost Code: 1U017 Increase in UPC from FY03 to FY04 is due to FY04 systems includes the antennas as part of UPC.<br />

Cost Code: 1U027 FY00 and prior are CHBDL systems. FY01 and FY02 are CDL-N systems. FY03 - FY04 will procure CDL-N Block 1 systems. FY05 systems will begin backfitting fielded CHBDL systems. FY03 UPC reflects NRE cost associated with awarding a new contract.<br />

Cost Code: 1U028 QTY changed to various in FY03 and name changed from NIU kits to CDL-N Backfit kits to include both Network Interface Unit (NIU) and Video Interface Group (VIG) backfit kits.<br />

NIU Kits backfit FY02 and prior CDL-N procurements. In FY03 the VIG capability will be introduced with CDL-N procurements and will backfit fielded systems.<br />

Cost Code: 1U029, IW Training Equipment was previously included in the 1U013, ECP/OBS cost code. Quantity varies because of different configurations of training systems<br />

that support all of the programs within the Shipboard IW Exploit Budget.<br />

FY2003<br />

P-1 Shopping List-Item No 44 - 3 of 19 Exhibit P-5,Cost Analysis<br />

Unclassified<br />

Classification<br />

FY2004<br />

FY2005<br />

634<br />

32,495<br />

520


UNCLASSIFIED<br />

CLASSIFICATION<br />

PROCUREMENT HISTORY AND PLANNING<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT SHIPBOARD IW EXPLOIT SYSTEMS 2360 521U<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE DELIVERY COST NOW AVAILABLE<br />

1U010 T-RDF ANTENNAS 04 SWRI SA, TEXAS OPTION/FFP SSC/CH N/A Jan-04 Jun-04 7 302.7<br />

05 SWRI SA, TEXAS OPTION/FFP SSC/CH N/A Jan-05 Jun-05 2 317.0<br />

1U017 SSEE INCREMENT E VARIANT 1 03 ARGON, VA COMP/FFP OSP Sep-00 Jan-03 Jan-04 6 2,836.0<br />

04 ARGON, VA OPTION/FFP OSP N/A Nov-03 Nov-04 14 3,653.0<br />

05 ARGON, VA OPTION/FFP OSP N/A Nov-04 Nov-05 9 3,610.5<br />

1U020 SMDA EQUIPMENT 04 EDO ESG, CA OPTION/FFP NAWC PAX N/A Feb-04 May-04 10 49.7<br />

05 EDO ESG, CA OPTION/FFP NAWC PAX N/A Dec 04 Mar-05 10 52.0<br />

1U027 CDL - N 03 CUBIC CORP COMP/FFP SPAWAR Jun-02 Mar-03 Aug-04 6 5,785.6<br />

04 CUBIC CORP OPTION/FFP SPAWAR N/A Jan-04 Aug-05 7 3,549.0<br />

05 CUBIC CORP OPTION/FFP SPAWAR N/A Dec-04 Jul-06 3 2,900.0<br />

D. REMARKS<br />

1U017 - Jan 03 is the LRIP award date, Nov 03 is the FRP award date.<br />

DD FORM 2446, JUN 87 P-1 Shopping List-Item No 44 -4 of 19<br />

DATE:<br />

February 2004<br />

YES N/A<br />

YES N/A<br />

YES N/A<br />

YES N/A<br />

YES N/A<br />

YES N/A<br />

YES N/A<br />

YES N/A<br />

YES N/A<br />

YES N/A<br />

Exhibit P-5a, Procurement History and Planning<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: COBLU-SHIP<br />

COST CODE 1U004/1U777<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: (U) The COBLU system provides comprehensive surface tactical CESM capability into the 21st century and focuses on a total update of OUTBOARD sensors<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 6 35.3 2 14.2 8 49.5<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 1.2 0.2 0.1 0.1 1.6<br />

Other (DSA) 0.4 0.3 0.4 0.0 1.2<br />

Interm Contractor Support<br />

Installation of Hardware 1 0.0 2 1.1 4 4.0 1 0.7 8 5.8<br />

PRIOR YR EQUIP 1 0.0 2 1.1 3 3.0 6 4.1<br />

FY 02 EQUIP 1 1.0 1 0.7 2 1.7<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP<br />

FY 06 EQUIP<br />

FY 07 EQUIP<br />

FY 08 EQUIP<br />

FY 09 EQUIP<br />

FY TC EQUIP<br />

TOTAL INSTALLATION COST 0.4 1.4 4.4 0.7 0.0 0.0 0.0 0.0 0.0 0.0 6.9<br />

TOTAL PROCUREMENT COST 36.9 15.7 4.6 0.8 0.0 0.0 0.0 0.0 0.0 0.0 58.0<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 MOS PRODUCTION LEADTIME: 16 MOS<br />

CONTRACT DATES: FY 2002: Feb-02<br />

DELIVERY DATES: FY 2002: Jun-03<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 3 1 1 2 1<br />

OUTPUT 3 1 1 2 1<br />

FY 07 FY08 FY09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 8<br />

OUTPUT 8<br />

Notes/Comments: Prior Year hardware buy includes an EDM Upgrade. FY01 Install is not priced seperately because it is a turnkey installation.<br />

February 2004<br />

P-1 Shopping List - Item No. 44<br />

- 5 of 19 Exhibit P-3A, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: COBLU-SHORE<br />

COST CODE 1U004/1U776<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: (U) The COBLU Phase provides comprehensive surface tactical CESM capability into the 21st century and focuses on a total update of OUTBOARD sensors.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support *<br />

Other (DSA)<br />

Interm Contractor Support<br />

1 6.7 1 6.7<br />

Installation of Hardware 1 0.4 1 0.4<br />

PRIOR YR EQUIP<br />

FY 02 EQUIP<br />

FY 03 EQUIP<br />

FY 04 EQUIP<br />

FY 05 EQUIP<br />

FY 06 EQUIP<br />

FY 07 EQUIP<br />

FY 08 EQUIP<br />

FY 09 EQUIP<br />

FY TC EQUIP<br />

1 0.4<br />

TOTAL INSTALLATION COST 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4<br />

TOTAL PROCUREMENT COST 6.7 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.1<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 MOS PRODUCTION LEADTIME: 16 MOS<br />

CONTRACT DATES: FY 2002: Feb-02<br />

DELIVERY DATES: FY 2002: Jun-03<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 1<br />

OUTPUT 1<br />

FY 07 FY08 FY09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 1<br />

OUTPUT 1<br />

Notes/Comments:<br />

* Production Support shown on P3-A, COBLU SHIP<br />

February 2004<br />

P-1 Shopping List - Item No. 44<br />

- 6 of 19 Exhibit P-3A, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: T-RDF ANTENNAS-SHIP<br />

COST CODE 1U010 / 1U777<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: (U) Transportable Radio Direction Finding (T-RDF) is a complete communication band shipboard T-RDF system for signal acquisition and<br />

bearing computation for surface combatants and is designed to operate in the harsh shipboard environment.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

15 1.6 5 1.0 6 1.3 7 2.2 2 0.6 3 1.0 38 7.6<br />

Production Support 0.7 0.1 0.7 0.5 0.2 0.0 0.1 2.3<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.3 0.4 0.5 0.5 0.3 0.0 0.2 2.1<br />

Installation of Hardware 15 2.4 3 2.1 3 2.3 7 4.1 5 3.0 2 1.2 3 1.9 38 17.0<br />

PRIOR YR EQUIP 15 2.4 15 2.4<br />

FY 02 EQUIP 3 2.1 2 1.6 5 3.7<br />

FY 03 EQUIP 1 0.8 5 2.9 6 3.7<br />

FY 04 EQUIP 2 1.2 5 3.0 7 4.1<br />

FY 05 EQUIP 2 1.2 2 1.2<br />

FY 06 EQUIP<br />

FY 07 EQUIP<br />

FY 08 EQUIP<br />

FY 09 EQUIP<br />

FY TC EQUIP<br />

3 1.9 3 1.9<br />

TOTAL INSTALLATION COST 2.7 2.5 2.8 4.5 3.2 1.3 2.0 0.0 0.0 0.0 0.0 19.1<br />

TOTAL PROCUREMENT COST 5.0 3.6 4.8 7.2 4.1 1.3 3.1 0.0 0.0 0.0 0.0 29.0<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 MOS PRODUCTION LEADTIME: 5 MOS<br />

CONTRACT DATES: FY 2003: Jan-03 FY 2004: Jan-04 FY 2005: Jan-05<br />

DELIVERY DATES: FY 2003: Jun-03 FY 2004: Jun-04 FY 2005: Jun-05<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 18 2 1 1 2 3 1 1 3 1 1 1<br />

OUTPUT 18 2 1 1 2 3 1 1 3 1 1 1<br />

FY07 FY08 FY09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 3 38<br />

OUTPUT 3 38<br />

Notes/Comments: PY reflects the procurement of individual antennas vice a suite of antennas which is reflected in the procurement quantities in FY 00-FY 05.<br />

Each installed suite includes 1 mast and 6 deck edge antennas. These installs are required to utilize the T-RDF systems as carry-on hardware during critical missions.<br />

P-1 Shopping List - Item No. 44<br />

- 7 of 19 Exhibit P-3A, Individual Modification Program<br />

Unclassified<br />

Classification<br />

February 2004


UNCLASSIFIED<br />

February 2004<br />

MODIFICATION TITLE: ECP/Obsolecence - SHIP<br />

COST CODE 1U013/1U777<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION:<br />

Technology refresh procures COTS/NDI equipment to replace obsolete and unsupportable equipment for the SSEE, COBLU, BGPHES-ST and COMBAT DF/ADAS programs. These changes allow for a common logistic support baseline<br />

for these programs and provides the hardware to support the DII COE/GCCS-M software upgrades.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

VAR 0.8 VAR 2.1 VAR 4.6 VAR 6.5 VAR 1.5 VAR 3.0 VAR 1.1 VAR 1.0 cont VAR cont<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.461<br />

0.596<br />

0.146<br />

0.137<br />

0.207<br />

0.087<br />

0.072<br />

cont cont<br />

Installation of Hardware VAR 0.5 VAR 1.3 VAR 3.2 VAR 1.2 VAR 0.5 VAR 0.4 VAR 0.2 cont VAR cont<br />

PRIOR YR EQUIP VAR 0.0<br />

FY 01 EQUIP VAR 0.0<br />

FY 02 EQUIP VAR 0.5 VAR 0.5<br />

FY 03 EQUIP VAR 1.3 VAR 1.3<br />

FY 04 EQUIP VAR 3.2 VAR 3.2<br />

FY 05 EQUIP VAR 1.2 VAR 1.2<br />

FY 06 EQUIP VAR 0.0<br />

FY 07 EQUIP VAR 0.5 VAR 0.5<br />

FY 08 EQUIP VAR 0.4 VAR 0.4<br />

FY 09 EQUIP VAR 0.2 VAR 0.2<br />

FY TC EQUIP cont VAR cont<br />

TOTAL INSTALLATION COST 0.0 0.5 1.3 3.2 1.2 0.0 0.5 0.4 0.2 cont VAR cont<br />

TOTAL PROCUREMENT COST 0.8 3.1 6.5 9.9 2.8 0.0 3.7 1.5 1.3 cont VAR cont<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 MOS PRODUCTION LEADTIME: 6 MOS<br />

CONTRACT DATES:<br />

DELIVERY DATES:<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 0<br />

OUTPUT 0<br />

FY07 FY08 FY09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT<br />

OUTPUT<br />

Notes/Comments<br />

Cost Code: 1U013 Unit cost and quantity varies because the equipment being procured is COTS/NDI and supports all the programs within the Shipboard IW Exploit Budget.<br />

P-1 Shopping List - Item No. 44 - 8 of 19<br />

Exhibit P-3A, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

February 2004<br />

MODIFICATION TITLE: ECP/OBSOLECENCE - SHORE<br />

COST CODE 1U013/1U776<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION:<br />

Technology refresh procures COTS/NDI equipment to replace obsolete and unsupportable equipment for the SSEE, COBLU, BGPHES-ST and COMBAT DF/ADAS programs. These changes allow for a common logistic support baseline for<br />

these programs and provides the hardware to support the DII COE/GCCS-M software upgrades.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment VAR 1.0 VAR 0.3 VAR 0.3 cont. VAR cont<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support *<br />

Other (DSA)<br />

Interm Contractor Support<br />

Installation of Hardware VAR 0.2 VAR 0.4 VAR 0.1 VAR 0.1 cont. VAR cont<br />

PRIOR YR EQUIP VAR 0.0<br />

FY 01 EQUIP VAR 0.2 VAR 0.0<br />

FY 02 EQUIP VAR 0.4 VAR 0.4<br />

FY 03 EQUIP VAR 0.13 VAR 0.1<br />

FY 04 EQUIP VAR 0.11 VAR 0.1<br />

FY 05 EQUIP VAR 0.0<br />

FY 06 EQUIP VAR 0.0<br />

FY 07 EQUIP VAR 0.0<br />

FY 08 EQUIP VAR 0.0<br />

FY 09 EQUIP VAR 0.0<br />

FY TC EQUIP cont. var cont<br />

TOTAL INSTALLATION COST 0.0 0.2 0.4 0.1 0.1 0.0 0.0 0.0 0.0 cont. cont<br />

TOTAL PROCUREMENT COST 0.0 1.2 0.8 0.4 0.1 0.0 0.0 0.0 0.0 cont. cont<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 MOS PRODUCTION LEADTIME: 6 MOS<br />

CONTRACT DATES:<br />

DELIVERY DATES:<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT<br />

OUTPUT<br />

FY07 FY08 FY09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT<br />

OUTPUT<br />

Notes/Comments * Production Support shown on P-3A, ECP/OBS-Ship<br />

Cost Code: 1U013 Unit cost and quantity varies because the equipment being procured is COTS/NDI and supports all the programs within the Shipboard IW Exploit Budget.<br />

P-1 Shopping List - Item No. 44 - 9 of 19<br />

Exhibit P-3A, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: SSEE INCREMENT E V(1) - SHIP<br />

COST CODE 1U017/1U777<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: (U) The SSEE Program will provide the battle group the capability to exploit Signals Of Interest (SOI) by providing a state-of-the-art system which detects, acquires, and collects<br />

data on any potential threat to the battle group. This information, in conjunction with Combat/EW Systems and C3I elements, supports the tactical combat decision<br />

making process and the national or strategic collection objective.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

4 11.3 11 40.2 9 32.4 4 16.6 16 76.8 12 50.4 13 53.9 36 152.3 105 434.0<br />

Production Support 1.1 4.1 2.7 1.0 3.8 3.0 4.1 19.7<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.2 0.3 1.6 0.5 0.8 1.5 1.5 1.6 8.0<br />

Installation of Hardware<br />

PRIOR YR EQUIP<br />

FY 02 EQUIP<br />

4 2.1 11 5.8 9 4.9 4 2.2 16 9.0 12 6.9 49 29.1 105 60.0<br />

FY 03 EQUIP 4 2.1 4 2.1<br />

FY 04 EQUIP 11 5.8 11 5.8<br />

FY 05 EQUIP 9 4.9 9 4.9<br />

FY 06 EQUIP 4 2.2 4 2.2<br />

FY 07 EQUIP 16 9.0 16 9.0<br />

FY 08 EQUIP 12 6.9 12 6.9<br />

FY 09 EQUIP 13 7.6 13 7.6<br />

FY TC EQUIP 36 21.5 36 21.5<br />

TOTAL INSTALLATION COST 0.0 0.2 0.3 3.6 6.4 5.7 3.7 10.5 8.5 29.1 68.0<br />

TOTAL PROCUREMENT COST 0.0 0.2 12.7 48.0 41.5 23.2 84.3 63.9 66.4 181.4 521.7<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 MOS PRODUCTION LEADTIME: 12 MOS<br />

CONTRACT DATES: FY 2003: Jan-03 FY 2004: Nov-03 FY 2005: Nov-04<br />

DELIVERY DATES: FY 2003: Jan-04 FY 2004: Nov-04 FY 2005: Nov-05<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 1 1 2 4 3 4 4 3 2<br />

OUTPUT 1 1 1 1 4 3 4 4 3 2<br />

FY07 FY08 FY09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 2 1 1 4 4 4 4 4 4 4 49 105<br />

OUTPUT 2 1 1 4 4 4 4 4 4 4 49 105<br />

Notes/Comments<br />

SSEE Inc X is a spiral development program. FY03 - FY07 will procure Increment E. FY08 will introduce Increment F with new antenna design and P3I.<br />

P-1 Shopping List - Item No. 44<br />

- 10 of 19 Exhibit P-3A, Individual Modification Program<br />

Unclassified<br />

Classification<br />

February 2004


UNCLASSIFIED<br />

MODIFICATION TITLE: SSEE INCREMENT E V(1) - SHORE<br />

COST CODE 1U017/1U776<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: (U) The SSEE Program will provide the battle group the capability to exploit Signals Of Interest (SOI) by providing a state-of-the-art system which detects, acquires, and collects<br />

data on any potential threat to the battle group. This information, in conjunction with Combat/EW Systems and C3I elements, supports the tactical combat decision<br />

making process and the national or strategic collection objective.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

2 5.7 3 11.0 5 16.6<br />

Installation of Hardware<br />

PRIOR YR EQUIP<br />

FY 02 EQUIP<br />

2 0.4 3 0.6 5 1.0<br />

FY 03 EQUIP 2 0.4 2 0.4<br />

FY 04 EQUIP<br />

FY 05 EQUIP<br />

FY 06 EQUIP<br />

FY 07 EQUIP<br />

FY 08 EQUIP<br />

FY 09 EQUIP<br />

FY TC EQUIP<br />

3 0.6 3 0.6<br />

TOTAL INSTALLATION COST 0.0 0.0 0.0 0.4 0.6 0.0 0.0 0.0 0.0 0.0 1.0<br />

TOTAL PROCUREMENT COST 0.0 0.0 5.7 11.4 0.6 0.0 0.0 0.0 0.0 0.0 17.6<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 MOS PRODUCTION LEADTIME: 12 MOS<br />

CONTRACT DATES: FY 2003: Jan-03 FY 2004: Nov-03<br />

DELIVERY DATES: FY 2003: Jan-04 FY 2004: Nov-04<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 1 1 1 2<br />

OUTPUT 1 1 1 2<br />

FY 07 FY08 FY09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 5<br />

OUTPUT 5<br />

Notes/Comments<br />

February 2004<br />

P-1 Shopping List - Item No. 44<br />

- 11 of 19 Exhibit P-3A, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Battle Group Passive Horizon Extension System-Surface Terminal (BGPHES-ST) -Ship<br />

COST CODE 1U019/1U777<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: (U) The Battle Group Passive Horizon Extension System-Surface Terminal (BGPHES-ST) extends the Battle Groups line-of-sight radio horizon by controlling remote receivers in an aircraft sensor payload.<br />

BGPHES-ST provides the ability for cryptologic operators to monitor, record, and analyze selected signal of interest. Reports can be prepared and information disseminated from BGPHES-ST via the<br />

Tactical Intelligence Information Exchange System (TACINTEL), ADNS, or directly to the host ship's C4I network.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 12 17.6 2 3.4 14 21.0<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 1.5 0.4 0.2 2.1<br />

Other (DSA) 0.5 0.1 0.0 0.2 0.8<br />

Interm Contractor Support<br />

Installation of Hardware 12 8.5 2 1.0 14 9.5<br />

PRIOR YR EQUIP 12 8.5 12 8.5<br />

FY 02 EQUIP 2 1.0 2 1.0<br />

FY 03 EQUIP<br />

FY 04 EQUIP<br />

FY 05 EQUIP<br />

FY 06 EQUIP<br />

FY 07 EQUIP<br />

FY 08 EQUIP<br />

FY 09 EQUIP<br />

FY TC EQUIP<br />

TOTAL INSTALLATION COST 9.0 0.1 0.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 10.2<br />

TOTAL PROCUREMENT COST 28.1 3.9 0.2 1.2 0.0 0.0 0.0 0.0 0.0 0.0 33.3<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 MOS PRODUCTION LEADTIME: 12 MOS<br />

CONTRACT DATES: FY 2002: Dec-01<br />

DELIVERY DATES: FY 2002: Dec-02<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 12 1 1<br />

OUTPUT 12 1 1<br />

FY 07 FY08 FY09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 14<br />

OUTPUT 14<br />

Notes/Comments<br />

Installs were delayed to FY04 due to a change in ship availability.<br />

February 2004<br />

P-1 Shopping List - Item No. 44<br />

- 12 of 19 Exhibit P-3A, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

February 2004<br />

MODIFICATION TITLE: Common Data Link - NAVY (CDL-N) - Ship<br />

COST CODE 1U027/1U777<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: CDL-N provides a wideband data link between Navy/Joint Airborne systems and the shipboard processors of national tactical reconnaissance programs. It is designed to communicate with the BGPHES-ST, the<br />

Joint Services Imagery Processing System - Navy (JSIPS-N), the Aircraft Carrier Tactical Support Center (CV-TSC), and the Joint Surveillance Target Attack Radar System (JSTARS).<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity 3 8.7 1 2.5 5 12.8 2 5.2 3 8.0 14 37.1<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 14 84.8 2 13.0 3 17.4 6 21.3 25 136.5<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 1.2 2.4 3.5 0.7 0.4 0.9 0.7 0.6 10.3<br />

Other (DSA) 0.3 1.2 1.2 0.5 0.6 0.3 4.0<br />

Interm Contractor Support<br />

Installation of Hardware 11 12.1 3 2.8 1 1.4 2 2.9 3 3.3 5 5.8 4 4.6 5 5.8 2 2.3 3 3.5 39 44.4<br />

PRIOR YR EQUIP 11 12.1 3 2.8 14 14.9<br />

FY 02 EQUIP 1 1.4 1 1.5 2 2.9<br />

FY 03 EQUIP 1 1.5 2 2.2 3 3.7<br />

FY 04 EQUIP 1 1.1 5 5.8 6 6.9<br />

FY 05 EQUIP 3 3.4 3 3.4<br />

FY 06 EQUIP 1 1.1 1 1.1<br />

FY 07 EQUIP 5 5.8 5 5.8<br />

FY 08 EQUIP 2 2.3 2 2.3<br />

FY 09 EQUIP 3 3.5 3 3.5<br />

FY TC EQUIP<br />

TOTAL INSTALLATION COST 12.1 3.1 2.6 4.1 3.8 6.4 4.8 5.8 2.3 3.5 48.5<br />

TOTAL PROCUREMENT COST 96.9 17.3 22.3 28.8 13.2 9.3 18.4 11.6 10.9 3.5 232.3<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 MOS PRODUCTION LEADTIME: 17 MOS<br />

CONTRACT DATES: FY 2003: Mar-03 FY 2004: Jan-04 FY 2005: Dec-04<br />

DELIVERY DATES: FY 2003: Aug-04 FY 2004: Aug-05 FY 2005: Jul-06<br />

FY 03 FY 04 FY 05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 14 1 1 1 1 1 1 2 1 1 1<br />

OUTPUT 13 1 1 1 1 1 1 1 2 1 1<br />

FY07 FY08 FY09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 2 1 1 2 3 1 1 3 39<br />

OUTPUT 1 2 1 1 2 3 1 4 39<br />

Notes/Comments<br />

1U027 - FY00 and prior are CHBDL systems. FY01 and FY02 are CDL-N systems, FY03 and out are CDL-N Block 1 systems. FY 05 will begin backfitting fielded CHBDL systems.<br />

In support of Operation Enduring Freedom a shore system was moved to a ship in FY 02 to meet Naval Fires Network (NFN) emergent requirements.<br />

The redirection install was paid for by NFN DERF funding in the amount of $1.4M.<br />

P-1 Shopping List - Item No. 44<br />

- 13 of 19 Exhibit P-3A, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

February 2004<br />

MODIFICATION TITLE: Common Data Link - NAVY (CDL-N) - Shore<br />

COST CODE 1U027/1U776<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: CDL-N provides a wideband data link between Navy/Joint Airborne systems and the shipboard processors of national tactical reconnaissance programs. It is designed to communicate with the BGPHES-ST,<br />

the Joint Services Imagery Processing Sysem - Navy (JSIPS-N), the Aircraft Carrier Tactical Support Center (CV-TSC) and the Joint Survillance Target Attack Radar System (JSTARS).<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08<br />

FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support *<br />

Other (DSA)<br />

Interm Contractor Support<br />

3 16.8 3 17.4 1 3.5 7 37.7<br />

Installation of Hardware 3 2.3 1 0.5 2 1.0 1 0.5 7 4.3<br />

PRIOR YR EQUIP<br />

FY 02 EQUIP<br />

3 2.3 3 2.3<br />

FY 03 EQUIP 1 0.5 2 1.0 3 1.5<br />

FY 04 EQUIP<br />

FY 05 EQUIP<br />

FY 06 EQUIP<br />

FY 07 EQUIP<br />

FY 08 EQUIP<br />

FY 09 EQUIP<br />

FY TC EQUIP<br />

1 0.5 1 0.5<br />

TOTAL INSTALLATION COST 2.3 0.0 0.0 0.5 1.0 0.5 0.0 0.0 0.0 0.0 4.3<br />

TOTAL PROCUREMENT COST 19.1 0.0 17.4 4.0 1.0 0.5 0.0 0.0 0.0 0.0 42.0<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 MOS PRODUCTION LEADTIME: 17 MOS<br />

CONTRACT DATES: FY 2003: Mar-03 FY 2004: Jan-04<br />

DELIVERY DATES: FY 2003: Aug-04 FY 2004: Aug-05<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 3 1 1 1 1<br />

OUTPUT 3 1 1 1 1<br />

FY07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 3 4 TC TOTAL<br />

INPUT 7<br />

OUTPUT 7<br />

Notes/Comments<br />

* Production Support shown on P-3A, CDL-N SHIP<br />

1U027 - FY00 and prior are CHBDL systems. FY01 and FY02 are CDL-N systems, FY03 and out are CDL-N Block 1 systems. FY 05 will begin backfitting fielded CHBDL systems.<br />

In support of Operation During Freedom a shore system was moved to a ship in FY 02 to meet Naval Fires Network (NFN) emergent requirements. The redirection install was paid for by NFN DERF funding in the amount of $1.4M.<br />

P-1 Shopping List - Item No. 44<br />

- 14 of 19 Exhibit P-3A, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: CDL-N Backfit Kits (NIU) - Ship<br />

COST CODE 1U028/1U777<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: The NIU Kit (prevously known as DSM/ATM kits) provides a second Link Controller Rack with network interface capability, Sun workstation, wideband encryption, and command link upgrades.<br />

The Video Interface Group (VIG) Kit provides an additional workstation that provides streaming video display, record, and playback capability to support TCDL Equipped Navy Aircraft.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 3 2.3 2 1.5 VAR 4.1 VAR 2.6 VAR 10.5<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support *<br />

Other (DSA)<br />

Interm Contractor Support<br />

.<br />

Installation of Hardware 3 0.4 2 0.5 VAR 3.3 VAR 2.6 VAR 6.8<br />

PRIOR YR EQUIP 3 0.4<br />

FY 02 EQUIP 2 0.5 2 0.5<br />

FY 03 EQUIP VAR 3.3 VAR 3.3<br />

FY 04 EQUIP<br />

FY 05 EQUIP<br />

FY 06 EQUIP<br />

FY 07 EQUIP<br />

FY 08 EQUIP<br />

FY 09 EQUIP<br />

FY TC EQUIP<br />

VAR 2.6 VAR 2.6<br />

TOTAL INSTALLATION COST 0.0 0.4 0.5 3.3 2.6 0.0 0.0 0.0 0.0 0.0 6.8<br />

TOTAL PROCUREMENT COST 2.3 1.9 4.6 5.9 2.6 0.0 0.0 0.0 0.0 0.0 17.3<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 MOS PRODUCTION LEADTIME: 12 MOS<br />

CONTRACT DATES: FY 2003: Mar-03 FY 2004: Dec-03<br />

DELIVERY DATES: FY 2003: Mar-04 FY 2004: Dec-04<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 3 2<br />

OUTPUT 3 1 1<br />

FY07 FY08 FY09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 5<br />

OUTPUT 5<br />

Notes/Comments<br />

* Production Support shown on P-3A, CDL-N Ship.<br />

QTY changed to various in FY03 and name changed from NIU kits to CDL-N Backfit kits to include both NIU and VIG backfit kits.<br />

NIU Kits backfit FY02 and prior CDL-N procurements. In FY03 the VIG capability will be introduced with CDL-N procurements and will backfit<br />

fielded systems.<br />

February 2004<br />

P-1 Shopping List - Item No. 44<br />

-15 of 19 Exhibit P-3A, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: CDL-N Backfit Kits (NIU) - Shore<br />

COST CODE 1U028/1U776<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: The NIU Kit (prevously known as DSM/ATM kits) provides a second Link Controller Rack with network interface capability, Sun workstation, wideband encryption, and command link upgrades.<br />

The Video Interface Group (VIG) Kit provides an additional workstation that provides streaming video display, record, and playback capability to support TCDL Equipped Navy Aircraft.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 3 2.3 VAR 1.0 VAR 3.3<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support *<br />

Other (DSA)<br />

Interm Contractor Support<br />

Installation of Hardware 3 0.5 VAR 0.3 VAR 0.8<br />

PRIOR YR EQUIP 3 0.5 3 0.5<br />

FY 02 EQUIP<br />

FY 03 EQUIP<br />

FY 04 EQUIP VAR 0.3 VAR 0.3<br />

FY 05 EQUIP<br />

FY 06 EQUIP<br />

FY 07 EQUIP<br />

FY 08 EQUIP<br />

FY 09 EQUIP<br />

FY TC EQUIP<br />

TOTAL INSTALLATION COST 0.5 0.0 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.8<br />

TOTAL PROCUREMENT COST 2.8 0.0 0.0 1.0 0.3 0.0 0.0 0.0 0.0 0.0 4.1<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME 2 MOS PRODUCTION LEADTIME: 12 MOS<br />

CONTRACT DATES: FY 2001: FY 2002: FY 2003: FY 2004: Dec-03<br />

DELIVERY DATES: FY 2001: FY 2002: FY 2003: FY 2004: Dec-04<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 3<br />

OUTPUT 3<br />

FY07 FY08 FY09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 3<br />

OUTPUT 3<br />

Notes/Comments * Production Support shown on P-3A, CDL-N, Ship.<br />

QTY changed to various in FY03 and name changed from NIU kits to CDL-N Backfit kits to include both NIU and VIG backfit kits.<br />

NIU Kits backfit FY02 and prior CDL-N procurements. In FY03 the VIG capability will be introduced with CDL-N procurements and will backfit<br />

fielded systems.<br />

February 2004<br />

P-1 Shopping List - Item No. 44<br />

- 16 of 19 Exhibit P-3A, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

February 2004<br />

MODIFICATION TITLE: IW TRAINING EQUIPMENT<br />

COST CODE 1U029/1U776<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION:<br />

IW Training equipment provides operator, unit or multi-unit level training on Tactical Cryptologic Systems (TCS). This training enhances initial skills, provides refresher taining and increases proficiency of the operator on the TCS through the<br />

generation and replay of operational scenarios by software simulation versus hardware stimulation.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment VAR 1.0 VAR 5.5 VAR 1.5 VAR 0.0 VAR 0.8 VAR 0.8 VAR 0.8 VAR 10.3<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support * 0.2 0.5 0.2 0.0 0.1 0.1 0.1 1.1<br />

Other (DSA)<br />

Interm Contractor Support<br />

Installation of Hardware 3 0.2 3 0.3 9 0.9 0 0.0 5 0.5 2 0.2 2 0.2 24 2.3<br />

PRIOR YR EQUIP<br />

FY 02 EQUIP<br />

FY 03 EQUIP 3 0.2 3 0.2<br />

FY 04 EQUIP 3 0.3 3 0.3<br />

FY 05 EQUIP 9 0.9 9 0.9<br />

FY 06 EQUIP 0 0.0 0 0.0<br />

FY 07 EQUIP 5 0.5 5 0.5<br />

FY 08 EQUIP 2 0.2 2 0.2<br />

FY 09 EQUIP 2 0.2 2 0.2<br />

FY TC EQUIP<br />

TOTAL INSTALLATION COST 0.0 0.0 0.2 0.3 0.9 0.0 0.5 0.2 0.2 2.3<br />

TOTAL PROCUREMENT COST 0.0 0.0 1.3 6.3 2.5 0.0 1.4 1.0 1.1 13.7<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 MOS PRODUCTION LEADTIME: 3 MOS<br />

CONTRACT DATES: FY 2001: FY 2002: FY 2003: Nov-03 FY 2004: Nov-04 FY 2005: Nov-05<br />

DELIVERY DATES: FY 2001: FY 2002: FY 2003: Feb-04 FY 2004: Feb-05 FY 2005: Feb-06<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 1 1 1 1 1 1 3 3 3<br />

OUTPUT 1 1 1 1 1 1 3 3 3<br />

FY07 FY08 FY09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 2 2 1 1 1 1 1 24<br />

OUTPUT 2 2 1 1 1 1 1 24<br />

Note: Install Quantities equates to the number of locations/sites where the equipment will go.<br />

FY04 Training equipment procurements have an extended leadtime due to contract negotiations.<br />

P-1 Shopping List - Item No. 44<br />

- 17 of 19 Exhibit P-3A, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

PRODUCTION SCHEDULE<br />

February 2004<br />

(DOD EXHIBIT P-21A)<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD NO.<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT SHIPBOARD IW EXPLOIT SYSTEMS 2360 521U<br />

FY 02 FISCAL YEAR 03 FISCAL YEAR 04 FISCAL YEAR 05 L<br />

COST ITEM/MANUFACTURER/ FISCAL CARRY CY 02 CALENDAR YEAR 03 CALENDAR YEAR 04 CY05 A<br />

CODE PROCUREMENTY YEAR YEAR OVER J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M T<br />

U U U E C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A E<br />

N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y R<br />

1U010 T-RDF ANTENNAS 04 7 A 2 1 2 1 1 0<br />

1U010 T-RDF ANTENNAS 05 2 A 2<br />

1U017 SSEE INCREMENT E VARIANT 1 03 6 A 1 1 1 1 1 1 0<br />

1U017 SSEE INCREMENT E VARIANT 1 04 14 A 1 2 1 1 2 1 2 4<br />

1U017 SSEE INCREMENT E VARIANT 1 05 9 A 9<br />

1U020 SMDA EQUIPMENT 04 10 A 2 2 2 2 2<br />

1U020 SMDA EQUIPMENT 05 10 A 2 2 2 4<br />

1U027 CDL-N 03 6 A 1 1 1 1 1 1<br />

1U027 CDL-N 04 7 A 7<br />

1U027 CDL-N 05 3 A 3<br />

NOTE:<br />

JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN<br />

PRODUCTION RATE PROCUREMENT LEADTIMES<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

ITEM Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

1U010 - T-RDF Antennas SWRI SA, Texas 2 8 10<br />

1U017 - SSEE Phase 2 Increment E Variant 1 ARGON, VA<br />

* * *<br />

1U020 - SMDA Equipment EDO ESG, CA 2 12 24<br />

1U027 - CDL-N Cubic, CA 2 8 10<br />

*SSEE is COTS procurement, there is no MSR or MAX<br />

NAVMAT FORM 7110/4 (REVISED 11/77)<br />

P-1 Shopping List - Item No. 44<br />

- 18 of 19 Exhibit P-21A, Production Schedule<br />

Unclassified<br />

Classification<br />

DATE


UNCLASSIFIED<br />

CLASSIFICATION<br />

PRODUCTION SCHEDULE<br />

February 2004<br />

(DOD EXHIBIT P-21A)<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD NO.<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT SHIPBOARD IW EXPLOIT SYSTEMS 2360 521U<br />

FY 05 FISCAL YEAR 06 FISCAL YEAR 07 FISCAL YEAR 08 L<br />

COST ITEM/MANUFACTURER/ FISCAL CARRY CALENDAR YEAR 05 CALENDAR YEAR 06 CALENDAR YEAR 07 CY 08 A<br />

CODE PROCUREMENTY YEAR YEAR OVER J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M T<br />

U U U E C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A E<br />

N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y R<br />

1U010 T-RDF ANTENNAS 05 2 1 1 0<br />

1U017 SSEE INC E V(1) 03 0 0<br />

1U017 SSEE INC E V(1) 04 4 1 2 1 0<br />

1U017 SSEE INC E V(1) 05 9 1 2 1 1 1 1 1 1 0<br />

1U020 SMDA EQUIPMENT 05 4 2 2 0<br />

1U027 CDL-N 03 1 1 0<br />

1U027 CDL-N 04 7 1 1 1 1 1 1 1 0<br />

1U027 CDL-N 05 3 1 1 1 0<br />

NAVMAT FORM 7110/4 (REVISED 11/77)<br />

JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY<br />

P-1 Shopping List - Item No. 44<br />

- 19 of 19 Exhibit P-21A, Production Schedule<br />

Unclassified<br />

Classification<br />

DATE


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA-2 SUB SUPPORT EQUIPMENT PROGRAM/256000/256005<br />

Program Element for Code B Items: Other Related Program Elements<br />

Prior ID To<br />

Years Code FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions) $86.3 $70.9 $79.0 $96.3 $78.8 $104.3 $108.6 $0.0 $624.1<br />

SPARES COST<br />

(In Millions) $0.0<br />

ES SYSTEMS<br />

This program consolidated the following programs in FY2000:<br />

From: 251600 AN/WLQ-4<br />

218000/05 Sonar Support Equipment<br />

232000/05 AN/WLR-1<br />

To: 256000/05 Submarine Support Equipment Program<br />

SSEP:<br />

(U) The Submarine Support Equipment Program was established to develop and support systems which provide the capability to exploit signal intercepts for tactical support and early warning of<br />

threat sensors. The Electronic Warfare Support (ES) and ICADF Operational Requirements Document (ORD) Ser. No. 570-77-00 dated 20 Dec. 2000, established funding to procure AN/BLQ-10(V)<br />

Electronic Warfare Support (ES) systems to provide a modern ES capability to LOS ANGELES, SEAWOLF and OHIO Class submarines. Funds also procure Reliability & Maintainability,<br />

obsolescence and Operational Field Change Kits for the AN/WLR-8(V)2, a tactical ES Receiver for the LOS ANGELES Class submarines providing intercept, surveillance, and signal parameter<br />

analysis of electromagnetic signals for threat warning. Funds buy unique equipment in limited quantities that are maintained in a pool and rotated among attack submarines as dictated by scheduled<br />

operations and to provide specific capability improvements to major SSN sensor systems. This program also procures support equipment for shore based acoustic intelligence analysis centers, and<br />

procures field changes to the AN/WLR-8 (V)2 threat detection system and AN/BRD-7 direction finding system, as well as modification kits to the AN/WLR-1H(V)7 Countermeasures Receiving Set for<br />

CV/CVNs and WHEC Cutters.<br />

A. ML001 - Procures the Troll COMINT Exploitation Suite commencing in FY-03. This line provides an enhanced COMINT exploitation capability for the AN/BLQ-10 (V)2/3 System in support of CVBG,<br />

fleet and national operational requirements, implements Maritime Cryptologic Architecture (MCA), and is synchronized with Navy IT-21 to deliver critical intelligence to tactical, theater, and national<br />

commanders in real time. Procures Delta Kit portion of CLASSIC TROLL carry-on equipment for advanced signal analysis and recording capability in forward deployed special operations.<br />

B. ML002 - Procures the Interactive Multi-media Instruction (IMI) upgrade for the AN/BLQ-10 (V)1 Land Based Trainer in FY-03.<br />

DD Form 2454, JUN 86 ITEM NO. 45 PAGE NO. 1<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA-2 SUB SUPPORT EQUIPMENT PROGRAM/256000/5<br />

C. ML003 - SSEP special support equipment allows the procurement of special purpose test equipment utilized by the Type Commander Groom Teams. Exact quantities vary from year to year based on<br />

Fleet requirements. Provides analysis equipment for SSEP Aural Analysis Booths at New London, CT; Pearl Harbor, HI; and San Diego, CA. Equipment is used for analysis of AN/BQH-5(V)4 acoustic<br />

intelligence data. Variable quantities and types are bought in each fiscal year.<br />

D. ML005 - Procures AN/BRD-7 Reliability and Maintainability (R&M), obsolescence and operational Field Change Kits (i.e.); Digital Compression Filter, and related H,M&E sail components.<br />

E. ML007 - Procures the ICADFcommunications direction finding system below deck units for installation on LOS ANGELES and SEAWOLF Class submarines.<br />

F. ML008 - Procures the ICADF antenna for installation on LOS ANGELES and SEAWOLF Class submarines.<br />

G. ML009 - Procures AN/BLQ-10 (V) Advance Processor Build (APB-EW) software builds for installation on LOS ANGELES and SEAWOLF Class submarines.<br />

H. ML010 - Procures AN/BLQ-10 (V) APB-EW technical refresh upgrades hardware builds including the Digital Radio Frequency Processing upgrade and VME Receiver for installation on LOS<br />

ANGELES and SEAWOLF Class submarines.<br />

I. ML011 - Procures AN/WLR-8 R&M Field Change Kits (i.e.); Digital Display Unit (DDU) obsolescence upgrade.<br />

J. ML013 - Procures special purpose test equipment to aid in testing and troubleshooting ES Systems at the Submarine Intermediate Maintenance Activity (IMAs) and depot facilities.<br />

K. ML015 - Procures the AN/BLQ-10(V)2/3/4 ES System for installation on LOS ANGELES, SEAWOLF and TRIDENT Class submarines.<br />

L. ML017 - Procures AN/BLQ-10 (V) Product Improvement Field Change Kits including: Passive Surveillance Radar/ES Vulnerability Server (PSR/EVS) upgrade, GALE LITE upgrade, Info Assurance<br />

(IA)/Solaris upgrade, Exterior Comms System (ECS) Point to Point upgrade, SIGINT carry-on equipment racks, LPI Radar Receiver, and Submarine Weapon Systems upgrades. Also procures High<br />

Probability Intercept (HPI) Reliability & Maintainability and obsolescence Field Change Kits (i.e.); Control Display Processor Unit (CDPU) and Receiver Processor Unit (RPU).<br />

M. ML5IN - Provides for the Installation of Equipment including Fleet Modernization Program Installations for shipboard systems.<br />

N. MLDSA - The budget reflects the transfer of design services into the appropriate equipment P1 line item in accordance with full funding policy.<br />

DD Form 2454, JUN 86 ITEM NO. 45 PAGE NO. 2<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA-2 SUB SUPPORT EQUIPMENT PROGRAM/256000/256005<br />

AN/WLQ-4<br />

(U) This line procures upgrades to the AN/WLQ-4(V)1 and modification kits resulting from redesign of obsolescent subassemblies of the AN/WLQ-4(V) Submarine ESM Systems. It supports training<br />

curricula updates for the WLQ-4(V)1 System. It procures upgrades to the AN/WLQ-4(V)/(V)1 software support and maintenance support equipment. Funding also procures Test Program Sets (TPS)<br />

which provide technical and workload capability to test all analog, digital, radio frequency, and hybrid spare units of the AN/WLQ-4(V)/(V)1 systems. TPSs are used with existing Automatic Test<br />

Equipment (ATE) located at the Repair Depot, SSC, San Diego. The Repair/Test Stations inlude ATE, TPS, test fixtures special repair tools, test equipment and documentation. The description of<br />

each building block line item is as follows:<br />

A. ML019 - Reliability & Maintainability Mod Kits provides various AN/WLQ-4(V)1 upgrades, AN/WLQ-4(V)/(V)1 obsolescence replacement kits, R&M Kits and Software Support Activity (SSA)<br />

equipment upgrades.<br />

B. ML021 - AN/WLQ-4(V)1 Trainer - Procures curriculum updates associated with system upgrades and various R&M Mod Kits.<br />

C. ML022 - AN/WLQ-4(V)1 Depot Upgrade - Provides various upgrades to system Test Program Sets (TPS) as well as upgrades to Depot Test Support Equipment.<br />

D. ML024 - AN/WLQ-4(V)1 Intermediate Maintenance Activity (IMA) Support.<br />

DD Form 2454, JUN 86 ITEM NO. 45 PAGE NO. 3<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA-2 SUB SUPPORT EQUIPMENT PROGRAM/256000/256005<br />

SONAR SUPPORT EQUIPMENT *<br />

Program provides significant OPNAV approved performance enhancement field changes for in-service ASW sonars on submarines. It also provides life cycle support in producing field changes<br />

required because of aging, obsolete, or unreliable components or casualities. Funding is included for the installation of equipment including Fleet Modernization Program installations, trainer and shore<br />

site installations. In addition, various modifications to sonar general equipments are procured. This funding includes execution of the following major upgrades:<br />

A. ML025 - Procures planned improvements for ancillary sonars, including their support equipment and materials<br />

Procured the AN/BQN-17 Upgrade in FY02 and FY03.<br />

Procured the AN/BQS-15 EC-19 Precision Bottom Mapping Upgrade in FY02. This upgrade assists the ship in making decisions on how to safely exit the minefield. The total objective is thirty two<br />

(32) kits. Nine (9) kits were procured in FY02; five (5) kits procured in FY03.<br />

B. ML830 - Funds production engineering services that support procurement and installation of these systems. (Funds reprogrammed in FY-03 to Cost Code ML025)<br />

C. ML900 - Funds consulting services that support procurement and installation of these systems. (Funds reprogrammed in FY-03 to Cost Code ML025)<br />

D. ML5IN - Funds actual hardware installation during shipyard availabilities.<br />

* Note: Starting in FY-04, this Program is funded in BLI# 214700/SSN Acoustics (H2SA).<br />

DD Form 2454, JUN 86 ITEM NO. 45 PAGE NO. 4<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA-2 SUB SUPPORT EQUIPMENT PROGRAM/256000/256005<br />

AN/WLR-1H AIR - N78<br />

A. ML027 - FY03-FY04 funding is for the procurement of modification kits required to replace obsolete and high maintenance components on CV/CVNs.<br />

B. ML5IN: FY03-FY04 funding is for the installation of modification kits required to replace obsolete and high maintenance components on CV/CVNs.<br />

AN/WLR-1 SURFACE - N76<br />

SURFACE WARFARE (N76):<br />

A. ML028 - FY03-FY09 funding is for the procurement of modification kits required to replace obsolete and high maintenance components and to extend the life cycle of the system on WHEC Class<br />

Cutters.<br />

B. ML5IN: FY03-FY04 funding is for the installation of modification kits required to replace obsolete and high maintenance components on WHEC Class Cutters.<br />

DD Form 2454, JUN 86 ITEM NO. 45 PAGE NO. 5<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy<br />

BA2: COMMUNICATION & ELECTRONIC EQUIPMENT A SUB SUPPORT EQUIPMENT PROGRAM/H2ML/256000<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID FY 2003 FY 2004 FY 2005<br />

CODE Code<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

ML001<br />

SUBMARINE WARFARE (N77)<br />

TROLL COMINT Exploitation Suite A 4 3,675 14,700 4 3,734 14,935 0<br />

ML002<br />

AN/BLQ-10(V) TRAINER InterActive Multi-<br />

Media Instruction Package (IMI) A 1 3,100 3,100 0 0<br />

ML003 SSEP Special Support Equipment A 256 260 265<br />

ML005 AN/BRD-7 FCKs A 637 721 735<br />

ML007 ICADF A 3 4,280 12,840 2 6,626 13,251 7 1,297 9,079<br />

ML008 ICADF Antenna A 5 2,115 10,575 6 1,548 9,289 7 1,504 10,529<br />

ML009 APB - EW A 657 668 1,452<br />

ML010 Tech Refresh Upgrades A 0 3,456 2,093<br />

ML011 AN/WLR-8 R&M FCKs A 826 509 519<br />

ML013 ESM IMA Support A 157 176 179<br />

ML015 AN/BLQ-10(V) SSN ES System A 6 5,599 33,596 2 9,144 18,288 5 7,249 36,244<br />

ML017 AN/BLQ-10(V) FCKs A 737 3,701 5,218<br />

ML019 Reliability Modification Kits - WLQ-4 A 81 0 0<br />

ML021 AN/WLQ(V) Trainer A 309 0 0<br />

ML024 AN/WLQ-4(V)1 IMA Support A 24 0 0<br />

SUB-TOTAL PROCUREMENT 0 0 78,495 65,254 66,313<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 45 PAGE NO 6.<br />

UNCLASSIFIED


+<br />

CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY<br />

Other Procurement, Navy/BA-2<br />

ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

BA2: COMMUNICATION & ELECTRONIC EQUIPMENT A SUB SUPPORT EQUIPMENT PROGRAM/H2ML/256000<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID FY 2003 FY 2004 FY 2005<br />

CODE Code<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

SUBMARINE WARFARE (N77)<br />

ML025 Ancillary Sonar Improvement A<br />

AN/BQS-15 EC-19 (Bottom Mapping) 5 247 1,237 0 0<br />

AN/BQN-17 (Upgrade) 318 0 0<br />

ML027 Air AN/WLR-1H(V)7 Mod Kits - N78 A 0 0 0 1 513 513 0<br />

ML028 Surface AN/WLR-1H(V)7 Mod Kits - N76 A 3 473 1,418 2 564 1,127 111<br />

ML830 Sonar Production Support A 0 0 0<br />

ML900 Sonar Consulting Services A 0 0 0<br />

SUB TOTAL PROCUREMENT 2,973 1,640 111<br />

TOTAL PROCUREMENT 81,468 66,894 66,424<br />

ML5IN FMP Installation of Equipment<br />

ICADF A 0 0 1,068<br />

ICADF DSA A 0 0 267<br />

ICADF Antenna A 0 0 2,635<br />

ICADF Antenna DSA A 0 0 657<br />

AN/BLQ-10(V) SSN ES System A 2,795 2,923 5,896<br />

AN/BLQ-10(V) SSN ES System DSA A 941 590 1,231<br />

SIGINT Carry-On Equipment Racks A 0 0 632<br />

SIGINT Carry-On Equipment Racks DSA A 0 0 158<br />

AN/UNQ-9 (IDARS Replacement) A 65 0 0<br />

AN/UNQ-9 (IDARS Replacement) DSA A 30 0 0<br />

AN/BQS-15 (EC-19 Bottom Mapping) A 180 0 0<br />

AN/BQS-15 (EC-19 Bottom Mapping)DSA A 68 0 0<br />

AN/BQN-17 Upgrade - N77 A 180 0 0<br />

AN/BQN-17 DSA - N77 A 65 0 0<br />

Air AN/WLR-1H(V)7 - N78 A 32 112 0<br />

Surface AN/WLR-1H(V)7 - N76 A 426 352 0<br />

SUB TOTAL FMP INSTALL 4,782 3,977 12,544<br />

GRAND TOTAL 0 0 86,250 70,871 78,968<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 45 PAGE NO. 7<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy SUB SUPPORT EQUIPMENT PROGRAM/256000/05 H2ML<br />

BA-2<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

FY-03<br />

ML001-Troll COM. Expl. 4 3675 CNSG 10/02 SS/FFP Argon, VA 7/03 1/05 YES N/A<br />

Chantilly, VA<br />

ML002-AN/BLQ-10(V) trainer 1 3100 NSSSO 10/02 SS/FFP Lockheed Martin, NY 7/03 1/05 YES N/A<br />

IMI Upgrade<br />

ML007-ICADF 3 4280 NSSSO 10/02 SS/FFP Argon, VA 7/03 1/05 YES N/A<br />

ML008-ICADF Antenna 5 2115 NSSSO 10/02 SS/FFP Argon, VA 7/03 1/05 YES N/A<br />

ML015- AN/BLQ-10 6 5599 NSSSO 10/02 SS/FFP Lockheed Martin, NY 3/03 9/04 YES N/A<br />

ML025 AN/BQS-15 EC-19 5 247 NAVSEA 10/02 C/FP NSWC CRANE, IN 10/02 7/03 YES N/A<br />

ML028 Sur.WLR-1H(V)7MK 3 473 NAVSEA 01/03 C/FFP Wideband Systems NJ 02/03 8/03 YES N/A<br />

FY-04<br />

ML001-Troll COM. Expl. 4 3734 CNSG 10/03 SS/FFP Argon, VA 3/04 9/05 YES N/A<br />

ML007-ICADF 2 6626 NSSSO 10/03 SS/FFP Lockheed Martin, NY 6/04 12/05 YES N/A<br />

ML008-ICADF Antenna 6 1548 NSSSO 10/03 SS/FFP Lockheed Martin, NY 6/04 12/05 YES N/A<br />

ML015- AN/BLQ-10 2 9144 NSSSO 10/03 SS/FFP Lockheed Martin, NY 6/04 12/05 YES N/A<br />

ML027Air WLR-1H(V)7MK 1 513 NAVSEA 01/04 C/FFP Wideband Systems NJ 02/04 8/04 YES N/A<br />

ML028 Sur.WLR-1H(V)7MK 2 564 NAVSEA 01/04 C/FFP Wideband Systems NJ 02/04 8/04 YES N/A<br />

FY-05<br />

ML007-ICADF 7 1297 NSSSO 10/04 SS/FFP Lockheed Martin, NY 4/05 10/06 YES N/A<br />

ML008-ICADF Antenna 7 1504 NSSSO 10/04 SS/FFP Lockheed Martin, NY 4/05 10/06 YES N/A<br />

ML015- AN/BLQ-10 5 7249 NSSSO 10/04 SS/FFP Lockheed Martin, NY 4/05 10/06 YES N/A<br />

D. REMARKS<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST 45 Classification:<br />

PAGE NO. 10 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED:<br />

DESCRIPTION/JUSTIFICATION:<br />

ES System COMMS DF<br />

ML007<br />

TYPE MODIFICATION: Shipalt MODIFICATION TITLE: ICADF (Below Decks)<br />

Provides advanced low-band COMINT Direction Finding (DF) capability compatible with CLASSIC TROLL and AN/BLQ-10 SSN ES system. Replaces obsolete AN/BRD-7 below decks equipment with modern, openarchitecture<br />

system compliant with Maritime Cryptologic Architecture.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

0 0.0<br />

INSTALLATION KITS<br />

INSTALLATION KITS - UNIT COST<br />

0 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 3 12.8 2 13.2 7 9.1 6 8.7 6 8.3 6 9.0 6 9.1 21 32.0 57 102.2<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 0 0.0<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER: CCM 0 0.0<br />

OTHER 0.0<br />

OTHER 0.0<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 3 1.3 2 0.9 7 2.9 6 2.8 6 2.9 33 16.4 57 27.2<br />

TOTAL PROCUREMENT 0 0.0 0 0.0 3 12.8 2 13.2 7 9.1 6 8.7 6 8.3 6 9.0 6 9.1 21 32 57 102.2<br />

ITEM 45 PAGE 11 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: ES System COMMS DF MODIFICATION TITLE: ICADF (Below Decks)<br />

ML007<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AITs<br />

ADMINISTRATIVE LEADTIME: 6 Months PRODUCTION LEADTIME: 18 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: Jul-03 FY 2004: Jun-04 FY 2005: Apr-05<br />

DELIVERY DATE: FY 2002: N/A FY 2003: Jan-05 FY 2004: Dec-05 FY 2005: Oct-06<br />

($ in Millions)<br />

Cost: FY 2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

FY 2002 & PRIOR 0 0.0<br />

FY 0 0.0<br />

FY 2003 EQUIPMENT 3 1.3 3 1.3<br />

FY 2004 EQUIPMENT 2 0.9 2 0.9<br />

FY 2005 EQUIPMENT 7 2.9 7 2.9<br />

FY 2006 EQUIPMENT 6 2.8 6 2.8<br />

FY 2007 EQUIPMENT 6 2.9 6 2.9<br />

FY 2008 EQUIPMENT 6 2.9 6 2.9<br />

FY 2009 EQUIPMENT 6 3.0 6 3.0<br />

TO COMPLETE 21 10.5 21 10.5<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 0 0 0 0 1 1 1 0 1 1 0 1 3 3 0 1 2 3 0 0 3 3 0 33 57<br />

Out 0 0 0 0 0 0 0 0 0 0 1 1 1 0 1 1 0 1 3 3 0 1 2 3 0 0 3 3 0 33 57<br />

P-3A<br />

ITEM 45 PAGE 12 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED:<br />

DESCRIPTION/JUSTIFICATION:<br />

ES System COMMS DF<br />

ML008<br />

TYPE MODIFICATION: Shipalt MODIFICATION TITLE: ICADF Antenna<br />

Synchronizes improved low-band direction finding SIGINT sensor with coordinated N77/CNSG CLASSIC TROLL procurement. Replaces obsolete AN/BRD-7 antenna equipment with modern, open-architecture<br />

system compliant with Maritime Cryptologic Architecture.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

0 0.0<br />

INSTALLATION KITS<br />

INSTALLATION KITS - UNIT COST<br />

0 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 5 10.6 6 9.3 7 10.5 6 9.4 6 9.6 6 9.5 6 9.7 15 24.3 57 93.0<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 0 0.0<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER: CCM 0 0.0<br />

OTHER 0.0<br />

OTHER 0.0<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 5 3.3 6 4.1 7 4.3 6 4.2 6 4.3 27 20.2 57 40.4<br />

TOTAL PROCUREMENT 5 10.6 6 9.3 7 10.5 6 9.4 6 9.6 6 9.5 6 9.7 15 24 57 93.0<br />

ITEM 45 PAGE 13 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: ES System COMMS DF MODIFICATION TITLE: ICADF Antenna<br />

ML008<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AITs<br />

ADMINISTRATIVE LEADTIME: 6 Months PRODUCTION LEADTIME: 18 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: Jul-03 FY 2004: Jun-04 FY 2005: Apr-05<br />

DELIVERY DATE: FY 2002: N/A FY 2003: Jan-05 FY 2004: Dec-05 FY 2005: Oct-06<br />

($ in Millions)<br />

Cost: FY 2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

FY 2002 & PRIOR 0 0 0.0<br />

FY 0 0.0<br />

FY 2003 EQUIPMENT 5 3.3 5 3.3<br />

FY 2004 EQUIPMENT 6 4.1 6 4.1<br />

FY 2005 EQUIPMENT 7 4.3 7 4.3<br />

FY 2006 EQUIPMENT 6 4.2 6 4.2<br />

FY 2007 EQUIPMENT 6 4.3 6 4.3<br />

FY 2008 EQUIPMENT 6 4.4 6 4.4<br />

FY 2009 EQUIPMENT 6 4.5 6 4.5<br />

TO COMPLETE 15 11.3 15 11.3<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 0 0 0 0 2 2 1 0 3 3 0 1 3 3 0 1 2 3 0 1 2 3 0 27 57<br />

Out 0 0 0 0 0 0 0 0 0 0 2 2 1 0 3 3 0 1 3 3 0 1 2 3 0 1 2 3 0 27 57<br />

P-3A<br />

ITEM 45 PAGE 14 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED:<br />

DESCRIPTION/JUSTIFICATION:<br />

AN/BLQ-10 SSN ES Backfit SysTYPE MODIFICATION:<br />

ML015<br />

Shipalt MODIFICATION TITLE: AN/BLQ-10(V)2/3/4<br />

Provides fully Integrated, covert, forward area radar signal intercept and ID capability for installation on LOS ANGELES and SEAWOLF Class, and SSGN Project Submarines.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

0 0.0<br />

INSTALLATION KITS<br />

INSTALLATION KITS - UNIT COST<br />

0 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 8 37.1 6 33.6 2 18.3 5 36.2 9 59.7 7 45.0 8 52.0 7 46.3 5 7.4 57 335.6<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 0 0.0<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER: CCM 0.0<br />

OTHER 0.0<br />

OTHER 0.0<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 3 2.7 2 3.7 3 3.5 5 7.1 3 3.8 5 5.8 9 11.8 7 9.3 20 29.5 57 77.2<br />

TOTAL PROCUREMENT 8 37.1 0 0.0 6 33.6 2 18.3 5 36.2 9 59.7 7 45.0 8 52.0 7 46.3 5 7.4 57 335.6<br />

ITEM 45 PAGE 15 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AN/BLQ-10 SSN ES Backfit Sys. MODIFICATION TITLE: AN/BLQ-10(V)2/3/4<br />

ML015<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AITs<br />

ADMINISTRATIVE LEADTIME: 6 Months PRODUCTION LEADTIME: 18 Months<br />

CONTRACT DATES: FY 2002: Mar-02 FY 2003: Mar-03 FY 2004: Jun-04 FY 2005: Apr-05<br />

DELIVERY DATE: FY 2002: Sep-03 FY 2003: Sep-04 FY 2004: Dec-05 FY 2005: Oct-06<br />

($ in Millions)<br />

Cost: FY 2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

FY 2002 & PRIOR 3 2.7 2 3.7 3 3.5 8 7.2<br />

FY 0 0.0<br />

FY 2003 EQUIPMENT 5 7.1 1 1.3 6 8.4<br />

FY 2004 EQUIPMENT 2 2.5 2 2.5<br />

FY 2005 EQUIPMENT 5 5.8 5 5.8<br />

FY 2006 EQUIPMENT 9 11.8 9 11.8<br />

FY 2007 EQUIPMENT 7 9.3 7 9.3<br />

FY 2008 EQUIPMENT 8 11.8 8 11.8<br />

FY 2009 EQUIPMENT 7 10.3 7 10.3<br />

TO COMPLETE 5 7.4 5 7.4<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 3 1 1 0 0 1 2 0 0 1 2 2 0 1 1 1 0 2 2 1 0 2 3 3 1 2 3 1 1 20 57<br />

Out 3 1 1 0 0 1 2 0 0 1 2 2 0 1 1 1 0 2 2 1 0 2 3 3 1 2 3 1 1 20 57<br />

P-3A<br />

ITEM 45 PAGE 16 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED:<br />

DESCRIPTION/JUSTIFICATION:<br />

AN/BLQ-10 SSN ES Backfit SysTYPE MODIFICATION:<br />

ML017<br />

Shipalt MODIFICATION TITLE: PSR/ES Vulnerability Server<br />

Provides forward deployed SSN with ability to passively exploit off-board surface search radars and display threat radar picture in real time. ES Vulnerability Server provides capability to monitor own ship's<br />

susceptibility to detection by threat radars. Systems are integrated into AN/BLQ-10 mainframe ES system.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

0 0.0<br />

INSTALLATION KITS<br />

INSTALLATION KITS - UNIT COST<br />

0 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 6 3.2 2 1.1 2 1.1 6 3.3 16 8.7<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 0 0.0<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER: CCM 0 0.0<br />

OTHER 0.0<br />

OTHER 0.0<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 6 0.3 10 0.5 16 0.8<br />

TOTAL PROCUREMENT 6 3.2 2 1.1 2 1.1 6 3.3 16 8.7<br />

ITEM 45 PAGE 17 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AN/BLQ-10 SSN ES Backfit Sys. MODIFICATION TITLE: PSR/ES Vulnerability Server<br />

ML017<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AITs<br />

ADMINISTRATIVE LEADTIME: 6 Months PRODUCTION LEADTIME: 18 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATE: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

($ in Millions)<br />

Cost: FY 2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

FY 2002 & PRIOR 0 0 0.0<br />

FY 0 0.0<br />

FY 2003 EQUIPMENT 0 0.0<br />

FY 2004 EQUIPMENT 0 0.0<br />

FY 2005 EQUIPMENT 0 0.0<br />

FY 2006 EQUIPMENT 6 0.3 6 0.3<br />

FY 2007 EQUIPMENT 0 0.0<br />

FY 2008 EQUIPMENT 2 0.1 2 0.1<br />

FY 2009 EQUIPMENT 2 0.1 2 0.1<br />

TO COMPLETE 6 0.3 6 0.3<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 2 0 0 0 0 0 10 16<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 2 0 0 0 0 0 10 16<br />

P-3A<br />

ITEM 45 PAGE 18 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED:<br />

DESCRIPTION/JUSTIFICATION:<br />

AN/BLQ-10 SSN ES Backfit SysTYPE MODIFICATION:<br />

ML017<br />

Shipalt MODIFICATION TITLE: GALE LITE (LONG TERM)<br />

Provides forward-deployed SSNs with capability to access national SIGINT sensor data via direct downlink for enhanced situational awareness in littoral operations.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

0 0.0<br />

INSTALLATION KITS<br />

INSTALLATION KITS - UNIT COST<br />

0 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 3 0.3 3 0.3 24 2.4 30 3.0<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 0 0.0<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER: CCM 0 0.0<br />

OTHER 0.0<br />

OTHER 0.0<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 30 1.3 30 1.3<br />

TOTAL PROCUREMENT 3 0.3 3 0.3 24 2.4 30 3.0<br />

ITEM 45 PAGE 19 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AN/BLQ-10 SSN ES Backfit Sys. MODIFICATION TITLE: GALE LITE (LONG TERM)<br />

ML017<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AITs<br />

ADMINISTRATIVE LEADTIME: 6 Months PRODUCTION LEADTIME: 18 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATE: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

($ in Millions)<br />

Cost: FY 2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

FY 2002 & PRIOR 0 0 0.0<br />

FY 0 0.0<br />

FY 2003 EQUIPMENT 0 0.0<br />

FY 2004 EQUIPMENT 0 0.0<br />

FY 2005 EQUIPMENT 0 0.0<br />

FY 2006 EQUIPMENT 0 0.0<br />

FY 2007 EQUIPMENT 0 0.0<br />

FY 2008 EQUIPMENT 3 0.2 3 0.2<br />

FY 2009 EQUIPMENT 3 0.2 3 0.2<br />

TO COMPLETE 24 1.2 24 1.2<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30 30<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30 30<br />

P-3A<br />

ITEM 45 PAGE 20 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED:<br />

DESCRIPTION/JUSTIFICATION:<br />

AN/BLQ-10 SSN ES Backfit SysTYPE MODIFICATION:<br />

ML017<br />

Shipalt MODIFICATION TITLE: SIGINT Carry-on Equip Racks<br />

Provides permanent infrastructure (racks, wiring harnesses, cooling capacity) for SSN SIGINT special operations carry-on equipment. Enables efficient carry-on equipment installation/de-installation associated with<br />

deployment, resulting in significant cost savings and less wear/tear on ship & crew.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

0 0.0<br />

INSTALLATION KITS<br />

INSTALLATION KITS - UNIT COST<br />

0 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 8 2.0 8 2.0<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 0 0.0<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER: CCM 0 0.0<br />

OTHER 0.0<br />

OTHER 0.0<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 8 0.8 0.0 8 0.8<br />

TOTAL PROCUREMENT 8 2.0 0 8 2.0<br />

ITEM 45 PAGE 21 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AN/BLQ-10 SSN ES Backfit Sys. MODIFICATION TITLE: SIGINT Carry-on Equip Racks<br />

ML017<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AITs<br />

ADMINISTRATIVE LEADTIME: 6 Months PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: Apr-05<br />

DELIVERY DATE: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: Apr-06<br />

($ in Millions)<br />

Cost: FY 2002 & Prior FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

FY 2002 & PRIOR 0 0 0.0<br />

FY 0 0.0<br />

FY 2003 EQUIPMENT 0 0.0<br />

FY 2004 EQUIPMENT 8 0.8 8 0.8<br />

FY 2005 EQUIPMENT 0 0.0<br />

FY 2006 EQUIPMENT 0 0.0<br />

FY 2007 EQUIPMENT 0 0.0<br />

FY 2008 EQUIPMENT 0 0.0<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

0 0.0<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 0 0 0 2 2 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8<br />

Out 0 0 0 0 0 0 0 0 0 2 2 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8<br />

P-3A<br />

ITEM 45 PAGE 22 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED:<br />

DESCRIPTION/JUSTIFICATION:<br />

AN/BLQ-10 SSN ES Backfit SysTYPE MODIFICATION:<br />

ML017<br />

Shipalt MODIFICATION TITLE: Information Assurance (IA)/Solaris<br />

Enables SSN to coordinate with other friendly SIGINT intercept systems to accurately determine geolocation of threat emitters.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

0 0.0<br />

INSTALLATION KITS<br />

INSTALLATION KITS - UNIT COST<br />

0 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 6 2.7 4 1.9 6 2.9 16 7.5<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 0 0.0<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER: CCM 0 0.0<br />

OTHER 0.0<br />

OTHER 0.0<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 6 0.8 10 1.3 16 2.1<br />

TOTAL PROCUREMENT 6 2.7 4 1.9 6 2.9 0 0.0 16 7.5<br />

ITEM 45 PAGE 23


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AN/BLQ-10 SSN ES Backfit Sys MODIFICATION TITLE: Information Assurance (IA)/Solaris<br />

ML017<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AITs<br />

ADMINISTRATIVE LEADTIME: 6 Months PRODUCTION LEADTIME: 18 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATE: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

($ in Millions)<br />

Cost: FY 2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

FY 2002 & PRIOR 0 0 0.0<br />

FY 0 0.0<br />

FY 2003 EQUIPMENT 0 0.0<br />

FY 2004 EQUIPMENT 0 0.0<br />

FY 2005 EQUIPMENT 0 0.0<br />

FY 2006 EQUIPMENT 6 0.3 6 0.3<br />

FY 2007 EQUIPMENT 0 0.0<br />

FY 2008 EQUIPMENT 4 0.5 4 0.5<br />

FY 2009 EQUIPMENT 6 0.8 6 0.8<br />

TO COMPLETE 0 0.0<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 2 0 0 0 0 0 10 16<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 2 0 0 0 0 0 10 16<br />

P-3A<br />

ITEM 45 PAGE 24 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

AN/WLR-1H(V)7 MOD KITS<br />

MODELS OF SYSTEM AFFECTED: AN/WLR-1H(V)7 TYPE MODIFICATION: MODIFICATION TITLE: ML027/ML028<br />

DESCRIPTION/JUSTIFICATION:<br />

For FY-02 thru FY05 funding is for the procurement of modifications kits. These modification kits are required to replace obsolete and high maintenance components to extend the life cycle of the system until<br />

installation of AIEWS Increment 1 aboard CV/CVNs (N78) and to replace existing systems on WHEC Class Cutters (N76). Requirement includes the procurement of COTS/NDI equipment and the installation and<br />

support of the upgraded equipment.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

0 0.0<br />

INSTALLATION KITS<br />

INSTALLATION KITS - UNIT COST<br />

0 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 10 5.4 3 1.4 3 1.1 16 7.9<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.1 0.1 0.1 0.1 0.1 0.5<br />

DATA 0.0<br />

TRAINING EQUIPMENT 0 0.0<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER: 0 0.0<br />

OTHER 0.0<br />

OTHER 0.0<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 10 1.7 0 0.0 3 0.5 3 0.5 16 2.6<br />

TOTAL PROCUREMENT 10 5.4 0 0.0 3 1.4 3 1.1 0 0.1 0 0.1 0 0.1 0 0.1 0 0.1 0 0 16 8.4<br />

ITEM 45 PAGE 25 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AN/WLR-1H(V)7 MODIFICATION TITLE: AN/WLR-1H(V)7 Mod Kits ML027/ML028<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION:<br />

ADMINISTRATIVE LEADTIME: 2 Months PRODUCTION LEADTIME: 6 Months<br />

CONTRACT DATES: FY 2002: Feb-02 FY 2003: Feb-03 FY 2004: Feb-04 FY 2005: Feb-04<br />

DELIVERY DATE: FY 2002: Aug-02 FY 2003: Aug-03 FY 2004: Aug-04 FY 2005: Aug-05<br />

($ in Millions)<br />

Cost: FY2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

FY 2002 & PRIOR 10 1.7 10 1.7<br />

FY 0 0.0<br />

FY 2003 EQUIPMENT 3 0.5 3 0.5<br />

FY 2004 EQUIPMENT 3 0.5 3 0.5<br />

FY 2005 EQUIPMENT 0 0.0<br />

FY 2006 EQUIPMENT 0 0.0<br />

FY 2007 EQUIPMENT 0 0.0<br />

FY 2008 EQUIPMENT 0 0.0<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

0 0.0<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 10 1 2 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16<br />

Out 10 1 1 1 0 0 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16<br />

P-3A<br />

ITEM 45 PAGE 26 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AN/BQS-15 TYPE MODIFICATION: Shipalt MODIFICATION TITLE: Remote Ahead Profiling Upgrade<br />

DESCRIPTION/JUSTIFICATION:<br />

ML025 ML025<br />

Provides enhanced display features for mine detection for SSN 688 Class Submarines.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

0 0.0<br />

INSTALLATION KITS<br />

INSTALLATION KITS - UNIT COST<br />

0 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 8 2.2 8 2.2<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 0 0.0<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER: CCM 0 0.0<br />

OTHER 0.0<br />

OTHER 0.0<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 8 0.6 0.0 8 0.6<br />

TOTAL PROCUREMENT 8 2.2 0 8 2.2<br />

ITEM 45 PAGE 27 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AN/BQS-15 MODIFICATION TITLE: Remote Ahead Profiling Upgrade/ML025<br />

ML025<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AITs<br />

ADMINISTRATIVE LEADTIME: 1 Month PRODUCTION LEADTIME: 5 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATE: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

($ in Millions)<br />

Cost: FY 2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

FY 2002 & PRIOR 8 0.6 8 0.6<br />

FY 0 0.0<br />

FY 2003 EQUIPMENT 0 0.0<br />

FY 2004 EQUIPMENT 0 0.0<br />

FY 2005 EQUIPMENT 0 0.0<br />

FY 2006 EQUIPMENT 0 0.0<br />

FY 2007 EQUIPMENT 0 0.0<br />

FY 2008 EQUIPMENT 0 0.0<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

0 0.0<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8<br />

Out 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8<br />

P-3A<br />

ITEM 45 PAGE 28 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AN/BQS-15 TYPE MODIFICATION: Shipalt MODIFICATION TITLE: BOTTOM MAPPING<br />

DESCRIPTION/JUSTIFICATION:<br />

ML025 ML025<br />

Provides ship capability to map littoral areas.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

0 0.0<br />

INSTALLATION KITS<br />

INSTALLATION KITS - UNIT COST<br />

0 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 9 3.2 5 1.4 14 4.6<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 0 0.0<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER: CCM 0 0.0<br />

OTHER 0.0<br />

OTHER 0.0<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 9 0.2 5 0.2 0.0 14 0.5<br />

TOTAL PROCUREMENT 9 3.2 0 0.0 5 1.4 0 14 4.6<br />

ITEM 45 PAGE 29 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AN/BQS-15 MODIFICATION TITLE: BOTTOM MAPPING/ML025<br />

ML025<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AITs<br />

ADMINISTRATIVE LEADTIME: 1 Month PRODUCTION LEADTIME: 5 Months<br />

CONTRACT DATES: FY 2002: Oct-01 FY 2003: Oct-02 FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATE: FY 2002: Mar-02 FY 2003: Mar-03 FY 2004: N/A FY 2005: N/A<br />

($ in Millions)<br />

Cost: FY 2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

FY 2002 & PRIOR 9 0.2 9 0.2<br />

FY 0 0.0<br />

FY 2003 EQUIPMENT 5 0.2 5 0.2<br />

FY 2004 EQUIPMENT 0 0.0<br />

FY 2005 EQUIPMENT 0 0.0<br />

FY 2006 EQUIPMENT 0 0.0<br />

FY 2007 EQUIPMENT 0 0.0<br />

FY 2008 EQUIPMENT 0 0.0<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

0 0.0<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 9 2 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14<br />

Out 9 2 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14<br />

P-3A<br />

ITEM 45 PAGE 30 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AN/BQN-17 UPGRADE TYPE MODIFICATION: Shipalt MODIFICATION TITLE: BQN-17 UPGRADE<br />

DESCRIPTION/JUSTIFICATION:<br />

This is a COTS Upgrade.<br />

ML025 ML025<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

0 0.0<br />

INSTALLATION KITS<br />

INSTALLATION KITS - UNIT COST<br />

0 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 21 9.1 21 9.1<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 1 0.3 1 0.3<br />

SUPPORT EQUIPMENT 1 0.3 1 0.3<br />

OTHER: CCM 1 0.3 1 0.3<br />

OTHER 0.0<br />

OTHER 0.0<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 11 0.4 10 0.2 0.0 21 0.6<br />

TOTAL PROCUREMENT 24 10.0 24 10.0<br />

ITEM 45 PAGE 31 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AN/BQN-17 UPGRADE MODIFICATION TITLE: AN/BQN-17 UPGRADE/ML025<br />

ML025<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AITs<br />

ADMINISTRATIVE LEADTIME: 1 Month PRODUCTION LEADTIME: 5 Months<br />

CONTRACT DATES: FY 2002: Feb-02 FY 2003: Feb-03 FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATE: FY 2002: Jul-02 FY 2003: Jul-03 FY 2004: N/A FY 2005: N/A<br />

($ in Millions)<br />

Cost: FY 2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

FY 2002 & PRIOR 11 0.4 10 0.2 21 0.6<br />

FY 0 0.0<br />

FY 2003 EQUIPMENT 0 0.0<br />

FY 2004 EQUIPMENT 0 0.0<br />

FY 2005 EQUIPMENT 0 0.0<br />

FY 2006 EQUIPMENT 0 0.0<br />

FY 2007 EQUIPMENT 0 0.0<br />

FY 2008 EQUIPMENT 0 0.0<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

0 0.0<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 11 3 3 3 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21<br />

Out 11 3 3 3 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21<br />

P-3A<br />

ITEM 45 PAGE 32 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AN/UNQ-9 IDARS Replacemen TYPE MODIFICATION: Shipalt MODIFICATION TITLE: AN/UNQ-9 IDARS Replacement<br />

DESCRIPTION/JUSTIFICATION:<br />

ML025 ML025<br />

IDARS is a COTS Recorder. This change will provide a common recorder across the entire SSN 688 Class Submarines.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

0 0.0<br />

INSTALLATION KITS<br />

INSTALLATION KITS - UNIT COST<br />

0 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 0 0.0<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 0 0.0<br />

SUPPORT EQUIPMENT 0 0.0<br />

OTHER: CCM 0 0.0<br />

OTHER 0.0<br />

OTHER 0.0<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 39 1.0 6 0.1 0.0 45 1.1<br />

TOTAL PROCUREMENT 0 0 0.0<br />

ITEM 45 PAGE 33 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AN/UNQ-9 IDARS MODIFICATION TITLE: AN/UNQ-9 IDARS REPLACEMENT<br />

ML025<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AITs<br />

ADMINISTRATIVE LEADTIME: 1 Month PRODUCTION LEADTIME: 2 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATE: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

($ in Millions)<br />

Cost: FY 2002 & Prior FY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

FY 2002 & PRIOR 39 1 6 0.1 45 1.1<br />

FY 0 0.0<br />

FY 2003 EQUIPMENT 0 0.0<br />

FY 2004 EQUIPMENT 0 0.0<br />

FY 2005 EQUIPMENT 0 0.0<br />

FY 2006 EQUIPMENT 0 0.0<br />

FY 2007 EQUIPMENT 0 0.0<br />

FY 2008 EQUIPMENT 0 0.0<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

0 0.0<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 39 3 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 45<br />

Out 39 3 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 45<br />

P-3A<br />

ITEM 45 PAGE 34 CLASSIFICATION: UNCLASSIFIED


BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY<br />

Other Procurement, Navy<br />

P-1 ITEM NOMENCLATURE<br />

BA-2: Communications and Electronic Eq<br />

NAVY TACTICAL DATA SYSTEM (NTDS)/260500<br />

Program Element for Code B Items: Other Related Program Elements<br />

FY 2002 ID To Total<br />

and Prior Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2006 FY 2007 FY 2009 TBD Complete Program<br />

QUANTITY n/a A $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0<br />

COST ($M) $58.4 $7.5 $12.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $77.9<br />

Initial Spares ($M)<br />

PROGRAM OVERVIEW:<br />

$0.8 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.8<br />

The Navy Tactical Data System Program provides for the Advanced Combat Direction System (ACDS) as a general purpose Combat Direction System (CDS) in major warships,<br />

permitting rapid integration of ship sensor information, analysis and display of tactical information, and designation of weapon systems to force threats. ACDS consists of three major<br />

subsystems, namely, the Data Processing, Data Display and Data Link Subsystems. Data Processing and Data Display Subsystems are assigned to the Program Executive Office,<br />

Integrated Warfare Systems and the Data Links are assigned to the Space and Naval Warfare Systems Command. The ACDS is an upgrade to the NTDS Data Processing and Data<br />

Display subsystems and associated computer programs and documentation.<br />

FY03 Funds are for:<br />

(LU010) AN/UYQ-70 fleet peripheral emulation fielding for $4.2 M<br />

(LU011) AN/UYQ-70 consoles at the shore base Integrated PT Hueneme Detachment, NSWC Center (formerly ICSTF) for $3.3M.<br />

***These are Congressional Plus-up Funds ***<br />

FY04 Funds are for:<br />

(LU059) Fleet Peripheral Equipment Replacement for $3.4 M<br />

(LU061) Shore Site Emulation Equipment - Funding is for the procurement of AN/UYQ-70(V) display emulator systems/equipment and for upgrade of existing display emulator<br />

systems/equipment for shore sites for $7.6 M ***These are Congressional Plus-up Funds ***<br />

* $991K of the FY04 funds (Congressional Add) are applied to the Aegis Combat System Production project unit (LUXXX).<br />

.<br />

DD Form 2454, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 46 PAGE NO. 1<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD SUBHEAD:<br />

Other Procurement, Navy NAVY TACTICAL DATA SYSTEM (NTDS)/260500<br />

BA-2: Communications and Electronic Eq A2LU<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID<br />

CODE Code FY 2003 FY 2004 FY 2005<br />

Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

LU010 AN/UYQ-70 Fleet Peripheral Emulation 4,203<br />

Equipment<br />

LU011 AN/UYQ-70 Shore Site Equipment 3,336<br />

LU061 Shore Site Emulation Equipment A 7,595<br />

LHA ITAWDS Upgrade<br />

LU059 Fleet Peripheral Equipment Replacement A 3,375<br />

AN/UYQ-70<br />

LUXXX AEGIS Combat System Production 991<br />

0 7,539 11,961 0<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 46 PAGE NO. 2<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

FEBRUARY 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy<br />

BA-2: Communications and Electronic Eq NAVY TACTICAL DATA SYSTEM (NTDS)/260500 A2LU<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

FY 2003<br />

LU010 4,203.00 NAVSEA (R1) FFP Lockheed Martin (R1) 01/03 08/03 NO<br />

EAGAN, MN<br />

LU011 3,336.00 NAVSEA (R1) FFP Lockheed Martin 02/03 10/03 N0<br />

EAGAN, MN<br />

NAVSEA/DN (R2)<br />

FY 2004<br />

LU059 3,375.00 NAVSEA (R1) FFP Lockheed Martin (R1) 01/03 08/03 NO<br />

Bethesda, MD/<br />

LU061 7,595.00 NAVSEA (R1) FFP DRS Technoligics 02/03 10/03 N0<br />

Parsippany, NJ/<br />

NAVSEA/DN (R2)<br />

DAM NECK, VA/<br />

NSWC/IH (R3)<br />

INDIAN HEAD, MD<br />

LUXXX 911.00<br />

D. REMARKS<br />

(1) Contracts in place; procurement will be accomplished by placing delivery order and task instructions on contract.<br />

(2) NAVSEA Dam Neck will accomplish the equipment integration, testing, installation and ILS.<br />

(3) NSWC IH will handle procurement of mod kits, contract administration, acceptance testing, kit installation, system integration testing and ECPs.<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Classification:<br />

ITEM NO. 46 PAGE NO. 3 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA-2 Cooperative Engagement Capability (CEC)/260600<br />

Program Element for Code B Items: Other Related Program Elements<br />

0603755N (FY 1994-97); 0603658N (FY 1998-07) N/A<br />

2002 and ID To<br />

Prior Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY<br />

COST<br />

23 6 4 3 3 3 6 4 2 54<br />

(In Millions)<br />

SPARES COST<br />

$327.1 $70.1 $66.6 $57.5 $46.7 $46.5 $62.0 $49.8 $57.3 $783.6<br />

(In Millions) $13.3 $2.9 $2.1 $4.6 $3.0 $11.0 $5.2 $0.7 Cont. Cont.<br />

A. (U) Mission Description and Budget Item Justification: Cooperative Engagement Capability (CEC) significantly improves Battle Force Anti-Air Warfare (AAW)<br />

capability by coordinating all Battle Force AAW sensors into a single, real-time, composite track picture capable of fire control quality. CEC distributes sensor data from<br />

each ship and aircraft, or cooperating unit (CU), to all other CUs in the battle force through a real-time, line of sight, high data rate sensor and engagement data<br />

distribution network. CEC is highly resistant to jamming and provides accurate gridlocking between CUs. Each CU independently employs high capacity, parallel<br />

processing and advanced algorithms to combine all distributed sensor data into a fire control quality track picture which is the same for all CUs. CEC data is presented<br />

as a superset of the best AAW sensor capabilities from each CU, all of which are integrated into a single input to each CU's combat weapons system. CEC will<br />

significantly improve our Battle Force defense in depth, including both local area and ship defense capabilities against current and future AAW threats. Moreover, CEC<br />

will provide critical connectivity and integration of over-land air defense systems capable of countering emerging air threats, including land attack cruise missiles, in a<br />

complex littoral environment.<br />

(U) CEC consists of the Data Distribution System (DDS), the Cooperative Engagement Processor (CEP), and Combat System modifications. The DDS encodes and<br />

distributes ownship sensor and engagement data, is a high capacity, jam resistant, directive system providing a precision gridlocking and high throughput of data. The<br />

CEP is a high capacity distributed processor that is able to process force levels of data in near real-time. This data is passed to the ship's combat system as high quality<br />

data, which the ship can use to cue its onboard sensors to engage targets without actually tracking them.<br />

CEC is planned for shipboard installations at various Naval and commercial shipyards aboard CG, DDG, CV/CVN and LHD ship classes and at land based test sites<br />

during scheduled ship availability periods.<br />

CEC was approved for entry into Engineering and Manufacturing Development (E&MD) in May 1995. Eleven (11) Advanced Development Models (ADM) and<br />

Engineering Development Models (EDM), and eleven (11) Pre-Production Units (PPU) were purchased under the development contract.<br />

NOTE: No ERF,D funds.<br />

DD Form 2454, JUN 86<br />

P-1 SHOPPING LIST CLASSIFICATION: UNCLASSIFIED<br />

ITEM NO. 047 PAGE NO. 01


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

OTHER PROCUREMENT, NAVY/BA-2 B Cooperative Engagement Capability (CEC)/A2UC BLI: 260600<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID 2002 and FY 2003 FY 2004<br />

FY 2005<br />

CODE Code Prior<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

UC001 Coop. Eng. Transmitting/Proc. B 201,506 6 8,300 49,803 4 9,355 37,421 3 8,152 24,455<br />

Sys. (CETPS) (AN/USG-2)<br />

UC002 AN/UYQ-70 Display A 21,494<br />

UC830 Production Engr. Support A 31,205 6,106 6,200 6,299<br />

UC004 ECP/Kit Procurement A 23,267 8,313 9,624 13,981<br />

UC005 Non-recurring Depot Cost 4,500<br />

UC006 VISTA Training 700<br />

UC007 CETPS (AN/USG-3) (Airborne) B 0<br />

UC008 Supply Support 6,094 0 0 0<br />

INSTALLATION:<br />

UC51N FMP 24,049 5,846 13,352 12,796<br />

UC61N Non-FMP 14,291<br />

327,106 70,068 66,597 57,531<br />

DD FORM 2446, JUN 86 CLASSIFICATION:<br />

P-1 SHOPPING LIST<br />

ITEM NO. 047 PAGE NO. 02<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OTHER PROCUREMENT, NAVY/BA-2 Cooperative Engagement Capability (CEC)/BLI: 260600 A2UC<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

FY 2003<br />

AN/USG-2 6 8,300 Arlington, VA Dec-02 FFP Raytheon Sys. Co., May-03 Nov-04 Yes N/A<br />

St. Petersburg, FL<br />

FY 2004<br />

AN/USG-2 4 9,355 Arlington, VA Jul-03 FFP Raytheon Sys. Co., Oct-03 Apr-05 Yes N/A<br />

St. Petersburg, FL<br />

FY 2005<br />

AN/USG-2 3 8,152 Arlington, VA Jul-04 FFP Raytheon Sys. Co., Oct-04 Apr-06 Yes N/A<br />

St. Petersburg, FL<br />

D. REMARKS<br />

DD Form 2446-1, JUL 87<br />

P-1 SHOPPING LIST CLASSIFICATION: UNCLASSIFIED<br />

ITEM NO. 047 PAGE NO. 03


CLASSIFICATION: UNCLASSIFIED February 2004<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AN/USG-2 TYPE MODIFICATION: BGAAW Improvement MODIFICATION TITLE: CETPS<br />

DESCRIPTION/JUSTIFICATION:<br />

Battle Group Anti-Air Warfare (AAW) Improvement<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: M/S II (May 95) M/S III (2Q FY 2002) TDP AVAIL (Sep 98)<br />

FY 2002 & Prior<br />

FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

22 1691.4 106.0 86.7 103.5 114.0 67.3 63.6 63.6 Cont. 22 Cont.<br />

INSTALLATION KITS 0.0<br />

INSTALLATION KITS - UNIT COST 0.0<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT (AN/USG-2) 17 148.6 6 49.8 4 37.4 3 24.5 3 18.5 3 20.3 6 33.9 4 25.1 2 13.2 48 371.3<br />

EQUIPMENT (AN/USG-3) 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

SUPPLY SUPPORT 6.1 6.1<br />

TRAINING EQUIPMENT (AN/USG-2) 6 52.9 6 52.9<br />

SUPPORT EQ. (VISTA Trng) 0.7 0.7<br />

OTHER (N/R Depot Standup) 4.5 4.5<br />

OTHER (ECP/Kit Procurement) 23.3 8.3 9.6 13.9 13.6 14.0 13.9 9.2 8.6 114.4<br />

OTHER (Production Engr. Support) 31.2 6.1 6.2 6.3 6.4 6.5 6.6 6.8 6.9 83.0<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST * 29.8 5.9 13.4 12.8 8.2 5.7 7.6 8.7 28.6 120.7<br />

TOTAL PROCUREMENT 23 297.1 0 0.0 6 70.1 4 66.6 3 57.5 3 46.7 3 46.5 6 62.0 4 49.8 2 57.3 54 753.6<br />

* Includes FMP and Non-FMP P-1 SHOPPING LIST CLASSIFICATION: UNCLASSIFIED<br />

ITEM NO. 047 PAGE NO. 04


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AN/USG-2 MODIFICATION TITLE: CETPS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION:<br />

ADMINISTRATIVE LEADTIME: 12 Months PRODUCTION LEADTIME: 18 Months<br />

CONTRACT DATES: FY 2002 May 2002 FY 2003 May 2003 FY 2004 October 2003 FY 2005 October 2004<br />

DELIVERY DATE: FY 2002 November 2003 FY 2003 November 2004 FY 2004 April 2005 FY 2005 April 2006<br />

Cost: Prior Years<br />

FY 2003 FY 2004<br />

($ in Millions)<br />

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 12 29.4 4 4.5 0.0 0.9 1 1.4 17<br />

FY 2002 EQUIPMENT 0.4 1 1.0 5 6.3 6<br />

FY 2003 EQUIPMENT 0.3 2 5.3 4 6.9 6<br />

FY 2004 EQUIPMENT 0.1 1.8 2 3.0 2 3.1 4<br />

FY 2005 EQUIPMENT 2.0 1 2.6 2 3.1 3<br />

FY 2006 EQUIPMENT 1.1 1 2.1 2 4.2 3<br />

FY 2007 EQUIPMENT 0.5 2.5 3 5.4 3<br />

FY 2008 EQUIPMENT 0.9 2 3.3 4 14.0 6<br />

FY 2009 EQUIPMENT 4 12.0 4<br />

TO COMPLETE 2 2.6 2<br />

February 2004<br />

INSTALLATION SCHEDULE:<br />

FY 2002<br />

& Prior 1<br />

FY 2003<br />

2 3 4 1<br />

FY 2004<br />

2 3 4 1<br />

FY 2005<br />

2 3 4 1<br />

FY 2006<br />

2 3 4 1<br />

FY 2007<br />

2 3 4 1<br />

FY 2008<br />

2 3 4 1<br />

FY 2009<br />

2 3 4<br />

TC<br />

TOTAL<br />

In 12 1 1 2 1 2 2 1 2 1 2 1 2 0 2 1 1 0 1 1 1 1 0 0 1 1 1 2 1 10 54<br />

Out 12 1 1 2 1 2 2 1 2 1 2 1 2 0 2 1 1 0 1 1 1 1 0 0 1 1 1 2 1 10 54<br />

P-3A<br />

ITEM NO. 047 PAGE NO. 05 CLASSIFICATION: UNCLASSIFIED<br />

36.2<br />

7.7<br />

12.5<br />

8.0<br />

7.7<br />

7.4<br />

8.4<br />

18.2<br />

12.0<br />

2.6


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET DATE<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Naval Command and Control Systems (NCCS) 2608 52JG<br />

QUANTITY<br />

PY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To COMP TOTAL<br />

COST<br />

(in millions) $206.7 $58.4 $51.8 $63.4 $106.7 $63.7 $85.9 $105.3 CONT CONT<br />

PROGRAM COVERAGE/JUSTIFICATION FOR BUDGET YEAR REQUIREMENTS:<br />

February 2004<br />

GCCS-M (Overall Description):<br />

Global Command and Control System-Maritime (GCCS-M) is the Navy’s fielded Command and Control system, a key component of the Copernicus forward C4ISR strategy and is the Navy’s<br />

tactical implementation of the Joint Services Global Command and Control System (GCCS). GCCS-M has aggressively pursued an Evolutionary Acquisition strategy in rapidly developing and<br />

fielding new Command, Control, Computers and Intelligence (C3I) capabilities for Naval users. GCCS-M includes migration to DISA's Defense Information Infrastructure (DII) Common Operating<br />

Environment (COE), incorporation of Fleet requirements for merging tactical and non-tactical networks, support for the IT-21 / Network Centric Warfare initiative and utilization of PC, WEB and other<br />

COTS Information Technology. System upgrades are required to support the evolutionary nature of the GCCS-M software releases in order to meet Fleet / mission requirements. GCCS-M was<br />

designated an ACAT 1AC program on 30 March 2001.<br />

JG010: GCCS-M Afloat supports Next Generation Networks (NGN) while providing Tactical C3I systems tailored to meet platform missions and functions to ensure joint interoperability among<br />

Numbered Fleet Commanders (NFC), Commander, Joint Task Force (CJTF), Joint Force Air Component Commander (JFACC), Officer in Tactical Command (OTC), Composite Warfare<br />

Commander (CWC), Subordinate Warfare Commanders (SWC), Commander Amphibious Task Forces (CATF), Commander, Landing Forces (CLF) and Commanding Officer/Tactical Action Officer<br />

(CO/TAO). GCCS-M Afloat provides both General Service (GENSER) and Sensitive Compartmented Information (SCI) source information management systems which receive, process, correlate,<br />

fuse, assess, and display the readiness and disposition of own, neutral, and potentially hostile forces together with Electronic Warfare (EW) resource and environmental information. GCCS-M Afloat<br />

provides tactical commanders with an accurate, reliable and survivable Common Operational Picture (COP) which includes complete all-source information management, display and dissemination,<br />

rapid access to organic/theater/national intelligence and databases, and multi-source data fusion and imagery exploitation.<br />

GCCS-M Afloat provides C3I capability to 29 Force Level Ships (i.e., CV/CVN, LCC, LHA, LHD, MCS and AGF), 224 Unit Level Ships (i.e., AO/AOE/AE/ARS, CG, DD/DDG, FFG, MHC/MCM,<br />

LPD/LSD/LST), 69 Submarines (i.e., SSN/SSBN), the Software Support Activity (SSA), and the In-Service Engineering Activity (ISEA). Force Level ships receive a GCCS-M GENSER system<br />

(UNIX and NT) and a GCCS-M SCI system (UNIX and NT). Unit Level ships receive a GCCS-M GENSER system (UNIX and NT). Submarines receive a GCCS-M GENSER system (UNIX and<br />

NT). The SSA and ISEA receive a GCCS-M GENSER system (UNIX and NT) and a GCCS-M SCI system (UNIX and NT).<br />

JG015: Theater Battle Management Core System (TBMCS) provides interoperability with Joint and Combined forces for Joint strike planning and execution. TBMCS is required to plan and<br />

publish Air Tasking Orders in support of a Joint Forces Air Component Commander (JFACC) assigned by the theater CINC. It is fielded on all Force Level Ships (CV/CVN, LHA/LHD, LCC, AGF<br />

platforms) and selected shore sites to permit air wing interaction with theater planners for all airborne missions.<br />

JG016: Shipboard Video Distribution System (SVDS) provides a system of briefing and display capabilities. SVDS is fielded on all force level platforms. It is used to provide commanders and<br />

staff watch standers with constantly updated situational awareness through display of the COP, and other C4I information sources. It consists of video switches, video cameras, and large screen<br />

display surfaces connected with audio announcing systems in all tactical watch standing areas.<br />

JG020: GCCS-M Ashore supports NGN while providing evolutionary systems and ancillary equipment upgrades to support CNO, Fleet Commanders in Chief, Unified Commanders, Type<br />

Commanders, Force Anti-Submarine Warfare (ASW) Commanders, and Submarine Operating Authorities worldwide. GCCS-M Ashore provides systems that receive, process, display, maintain<br />

and/or assess unit characteristics, employment scheduling, material condition, combat readiness, war fighting capabilities, and positional information of own, allied, and hostile forces. GCCS-M<br />

Ashore provides the tools necessary for Fleet and Shore based commanders to execute plans, transmit tasking, and provide tactical information to subordinate forces.<br />

P-1 Shopping List-Item No 48 - 1 of 15 Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET (Continued) DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Naval Command and Control Systems (NCCS) 2608 52JG<br />

JG030: Trusted Information Systems is a combination of the Ocean Surveillance Information System (OSIS) Evolutionary Development (OED) system, and the Radiant Mercury (RM) system<br />

incorporating multi-level security (MLS) web technologies. TIS provides the core on-line, automated, near-real time, multi-level secure, information analysis, dissemination, and receipt capabilities that<br />

enable Unified Commanders-in-Chief and Joint Task Force Commanders afloat and ashore to disseminate and receive critical operational and intelligence information with own forces and Coalition/Allied<br />

forces via tactical and record communications circuits. TIS provides evolutionary systems and ancillary equipment upgrades to support three Joint Intelligence Centers (JIC) and the Office of Naval<br />

Intelligence (ONI). OED provides near-real-time all-source fusion, correlation and analysis tools for the analysis of multi-source intelligence to produce comprehensive tactical threat warnings, decision<br />

making support, and support of Over-the-Horizon-Targeting. Radiant Mercury is a tool for the automated sanitizing, downgrading, and transliteration of formatted message traffic. A linchpin of networkcentric<br />

warfare aboard afloat platforms, Radiant Mercury helps ensure critical Indications and Warning intelligence is provided quickly to operational decision-makers.<br />

JG040: GCCS (Joint) is an operational multi-service/agency C4I program encompassing both strategic and tactical C4I functions. GCCS (Joint) supports the National Command Authority and the CINCs<br />

by providing C4I data processing capabilities, including status of forces and support requirements for use in national security decision making, force preparation and operational planning execution.<br />

JG050: Tactical/Mobile provides evolutionary systems and ancillary equipment upgrades to support the Unified, Fleet, and Navy Component Commanders, the Maritime Sector, Theater, and the Naval<br />

Liaison Element Commanders (Ashore) with the capability to plan, direct and control the tactical operations of Joint and Naval Expeditionary Forces and other assigned units within their respective area of<br />

responsibility. These operations include littoral, open ocean, and over land all sensor (i.e. EO, IR, ISAR, etc.) surveillance, anti-surface warfare, over-the-horizon targeting, counter-drug operations, power<br />

projection, antisubmarine warfare, mining, search and rescue, and special operations. Each TAC/Mobile system has a command & control component and a communications & mobility component. The<br />

Command and Control services are provided by GCCS-M and include core GCCS-M capabilities, analysis and correlation of diverse sensor information; data management support, command decision<br />

aids; access to rapid data communication, mission planning and evaluation; dissemination of ocean surveillance positional data and threat alerts to operational users ashore and afloat. The<br />

communications and mobility component provides communications interconnectiviity between various joint and naval commands, as well as the components necessary to make the systems mobile and<br />

self-sustaining in operational environments.The Tactical/Mobile System includes the fixed site Tactical Support Centers (TSCs) and the Mobile Operations Control Centers (MOCCs) which is a mobile<br />

version of the TSC for contingency operations; and the scaleable and highly portable Joint Mobile Ashore Support Terminal (JMAST), which has merged the capabilities of the previous MAST and<br />

MICFACs. A Maritime Patrol and Reconnaissance (MPR) Operations Center (MOC) is being activated in Bahrain during FY05. This facility will provide a limited C4I and ground support capability for<br />

deployed MPR aircraft within that AOR.<br />

PROCUREMENT DATA:<br />

The FY 04 Budget Procures: 1. GCCS-M Ashore Command Center equipment; 2. TIS upgrades; 3. GCCS (JOINT) Workstations, Servers, LAN hardware and software, communications equipment; 4.<br />

Tactical/Mobile GCCS-M and communications & mobility upgrade equipment; 5. GCCS-M Afloat C3I systems; and installation of equipment, and production engineering support.<br />

The FY 05 Budget Procures: 1. GCCS-M Ashore Command Center equipment; 2. TIS upgrades; 3. GCCS (JOINT) Workstations, Servers, LAN hardware and software, communications equipment; 4.<br />

Tactical/Mobile GCCS-M and communications & mobility upgrade equipment; 5. GCCS-M Afloat C3I systems; and installation of equipment, and production engineering support.<br />

P-1 Shopping List-Item No 48 - 2 of 15 Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

COST ANALYSIS<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT Naval Command and Control Systems (NCCS) 2608<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

52JG<br />

PYs FY 2003 FY 2004 FY 2005<br />

COST ID TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE COST QTY COST COST QTY COST COST QTY COST COST<br />

JG010 GCCS-M Afloat 55,290<br />

GCCS-M Afloat Unit Level A 28,778<br />

GCCS-M Aloat Force Level A 23,639<br />

GCCS-M Afloat Shore Site A 2,873<br />

JG015 Theater Battle Management Core System (TBMCS) 6,825<br />

TBMCS Afloat Force Level A 5,648<br />

TBMCS Ashore Site A 1,177<br />

JG016 Shipboard Video Distribution System (SVDS) 7,977<br />

Shipboard Video Distribution System A 7,977<br />

JG020 GCCS-M Ashore 19,056<br />

GCCS-M Ashore A 19,056<br />

JG030 Trusted Information Systems (TIS) 4,180<br />

TIS - OED A 4,180 3<br />

TIS - Radiant Mercury (RM) Afloat A 2<br />

JG040 GCCS (Joint) Support Equip 6,848<br />

GCCS (Joint) Support Equipment A 6,848<br />

JG050 Tactical Mobile 25,050<br />

Upgrade Equipment TSC A 7,966<br />

JMAST A 17,084<br />

GCCS-M Upgrades A -<br />

Communications & Mobility Equipment Upgrades A -<br />

JG555 Production Support (GCCS-M Afloat) 2,089<br />

48<br />

8<br />

14<br />

4<br />

1<br />

19<br />

20<br />

4<br />

9<br />

119.92<br />

12,412<br />

5,756<br />

832.00 6,656<br />

187.64<br />

3,469<br />

2,627<br />

210.50 842<br />

1,005<br />

1,005.00 1,005<br />

8,867<br />

466.68 8,867<br />

287.00<br />

1,461<br />

861<br />

300.00 600<br />

1,424<br />

71.20 1,424<br />

11,057<br />

343.50 1,374<br />

1,075.89 9,683<br />

Remarks: 1. GCCS-M quantities reflect number of ships or shore sites.<br />

2 . Unit Costs are based on the average cost of all the number of ships or shore sites installed. Variances are due to the diverse types of ship or shore site requirements.<br />

3. Radiant Mercury is procured under a "turn key" contract, therefore, installation funds are not shown separately.<br />

4. Beginning in FY04, mobile systems in the Tac/Mobile program are procured "turn key".<br />

5. All "Prior Years" columns include funding for FY99-FY01, which is consistent with all ACAT 1 documentation.<br />

17<br />

4<br />

10<br />

2<br />

2<br />

11<br />

4<br />

-<br />

20<br />

3<br />

15<br />

DATE<br />

360.29<br />

12,663<br />

6,125<br />

1,634.50 6,538<br />

361.30<br />

4,109<br />

3,613<br />

248.00 496<br />

1,831<br />

915.50 1,831<br />

6,878<br />

625.27 6,878<br />

1,454<br />

363.50 1,454<br />

- -<br />

1,561<br />

78.05 1,561<br />

9,497<br />

410.33 1,231<br />

551.07 8,266<br />

10<br />

8<br />

10<br />

2<br />

2<br />

24<br />

4<br />

1<br />

20<br />

11<br />

14<br />

February 2004<br />

352.00<br />

12,862<br />

3,520<br />

1,167.75 9,342<br />

374.80<br />

4,263<br />

3,748<br />

257.50 515<br />

1,920<br />

960.00 1,920<br />

12,652<br />

527.17 12,652<br />

395.25<br />

1,891<br />

1,581<br />

310.00 310<br />

2,491<br />

124.55 2,491<br />

9,354<br />

448.00 4,928<br />

316.14 4,426<br />

DD FORM 2446, JUN 86 P-1 Shopping List-Item No 48 - 3 of 15 Exhibit P-5, Cost Analysis<br />

Classification: Unclassified


UNCLASSIFIED<br />

CLASSIFICATION<br />

COST ANALYSIS<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT Naval Command and Control Systems (NCCS) 2608<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

52JG<br />

PYs FY 2003 FY 2004 FY 2005<br />

COST ID TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE COST QTY COST COST QTY COST COST QTY COST COST<br />

JG777 INSTALLATION 79,428<br />

Non FMP 14,923<br />

GCCS-M Afloat 2,135<br />

TBMCS Ashore 220<br />

GCCS-M Ashore 3,720<br />

TIS - OED 205<br />

GCCS (Joint) Support Equipment 1,961<br />

Tactical Mobile (TSC & JMAST) 6,684<br />

Tactical Mobile (GCCS-M) -<br />

Tactical Mobile Communications & Mobility -<br />

FMP 64,504<br />

GCCS-M Afloat 52,322<br />

DSA 2,568<br />

TBMCS Afloat 2,163<br />

DSA 329<br />

SVDS 6,776<br />

DSA 346<br />

TOTAL 206,743<br />

18,656<br />

6,234<br />

-<br />

124<br />

4,199<br />

78<br />

419<br />

-<br />

49<br />

1,365<br />

12,422<br />

8,255<br />

1,358<br />

1,212<br />

655<br />

853<br />

89<br />

58,351<br />

DATE<br />

13,801<br />

2,494<br />

-<br />

86<br />

1,021<br />

75<br />

412<br />

-<br />

526<br />

374<br />

11,307<br />

4,885<br />

690<br />

3,360<br />

450<br />

1,756<br />

166<br />

51,794<br />

February 2004<br />

DD FORM 2446, JUN 86 P-1 Shopping List-Item No 48 - 4 of 15<br />

Exhibit P-5, Cost Analysis<br />

Unclassified<br />

Classification<br />

17,930<br />

4,395<br />

-<br />

89<br />

2,274<br />

75<br />

412<br />

-<br />

757<br />

788<br />

13,535<br />

6,433<br />

1,242<br />

3,490<br />

464<br />

1,730<br />

176<br />

63,363


UNCLASSIFIED<br />

CLASSIFICATION<br />

PROCUREMENT HISTORY AND PLANNING February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Naval Command and Control Systems (NCCS) 2608 52JG<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE DELIVERY COST NOW AVAILABLE<br />

JG010 GCCS-M Afloat Unit Level 04 SSC Charleston/San Diego/GSA WX/IP SPAWAR Oct-03 Jan-04 17 360 YES N/A<br />

05 SSC Charleston/San Diego/GSA WX/IP SPAWAR Oct-04 Jan-05 10 352 YES N/A<br />

JG010 GCCS-M Afloat Force Level 04 SSC Charleston/San Diego/GSA WX/IP SPAWAR Oct-03 Jan-04 4 1,635 YES N/A<br />

05 SSC Charleston/San Diego/GSA WX/IP SPAWAR Oct-04 Jan-05 8 1,168 YES N/A<br />

JG015 TBMCS Afloat Force Level 04 SSC Charleston/San Diego/GSA WX/IP SPAWAR Oct-03 Jan-04 10 361 YES N/A<br />

05 SSC Charleston/San Diego/GSA WX/IP SPAWAR Oct-04 Jan-05 10 375 YES N/A<br />

JG015 TBMCS Ashore 04 SSC Charleston/San Diego/GSA WX/IP SPAWAR Oct-03 Jan-04 2 248 YES N/A<br />

05 SSC Charleston/San Diego/GSA WX/IP SPAWAR Oct-04 Jan-05 2 258 YES N/A<br />

JG016 Shipboard Video Distribution System 04 SSC Charleston WX SPAWAR Oct-03 Jan-04 2 916 YES N/A<br />

05 SSC Charleston WX SPAWAR Oct-04 Jan-05 2 960 YES N/A<br />

JG020 GCCS-M Ashore 04 SSC Charleston/San Diego/GSA WX/IP SPAWAR Oct-03 Jan-04 11 625 YES N/A<br />

05 SSC Charleston/San Diego/GSA WX/IP SPAWAR Oct-04 Jan-05 24 527 YES N/A<br />

JG030 Trusted Information Systems - OED 04 Maxim San Diego RC NSMA Jan-04 Mar-04 4 364 YES N/A<br />

05 Maxim San Diego RC NSMA Dec-04 Mar-05 4 395 YES N/A<br />

JG030 Trusted Information Systems - Radiant Mercury 05 Lockheed Martin Denver RC NSMA Dec-04 Mar-05 1 310 YES N/A<br />

JG040 GCCS (Joint) Support Equipment 04 SSC Charleston/San Diego WX SPAWAR Oct-03 Jan-04 20 78 YES N/A<br />

05 SSC Charleston/San Diego WX SPAWAR Oct-04 Jan-05 20 125 YES N/A<br />

JG050 Tactical Mobile<br />

GCCS-M Upgrades 04 SSC Charleston WX SPAWAR various various 3 410 YES N/A<br />

Communications & Mobility 04 SSC Charleston WX SPAWAR various various 15 551 YES N/A<br />

GCCS-M Upgrades 05 SSC Charleston WX SPAWAR various various 11 448 YES N/A<br />

Communications & Mobility 05 SSC Charleston WX SPAWAR various various 14 316 YES N/A<br />

D. REMARKS<br />

Note: SSC Charleston/San Diego are integrating agents. There are multiple hardware contracts awarded under each cost code.<br />

Exhibit P-5A, Procurement History and Planning<br />

P-1 Shopping List-Item No 48 - 5 of 15 Unclassifed<br />

Classification<br />

A. DATE


UNCLASSIFIED<br />

February 2004<br />

MODIFICATION TITLE: GCCS-M Afloat Unit Level<br />

COST CODE JG010<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: The GCCS-M Afloat Unit Level system is the tactical C3I system for the BG / ARG Unit Level warfighting combatants and submarines and consists of both UNIX and NT servers / workstations running on a IT-21<br />

LAN while providing the tactical commander with the COP, automated decision aids and an integrated tactical shipboard intelligence system that utilize joint organic, non-organic (remote sources) and<br />

environmental information/intelligence in the decision making and warfighting process. It also provides tactical commanders with an accurate, reliable and survivable Common Operational Picture (COP) which<br />

includes complete all-source information management, display and dissemination, rapid access to organic/theater/national intelligence and databases, and multi-source data fusion and imagery exploitation.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PYs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 246 23.56 52 5.22 48 5.76 17 6.13 10 3.52 46 17.01 15 5.67 44 17.21 46 18.51 CONT CONT CONT CONT<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 0.18 0.31<br />

Other (DSA) 1.62 0.66 1.31 0.50 0.32 1.51 0.51 1.53 1.64 CONT CONT CONT CONT<br />

Interm Contractor Support<br />

Installation of Hardware 246 25.00 52 5.05 48 4.41 17 1.90 10 1.62 46 7.83 15 2.62 44 7.93 46 8.53 CONT CONT 524 64.88<br />

PRIOR YR EQUIP 246 25.00 246 25.00<br />

FY 02 EQUIP 52 5.05 52 5.05<br />

FY 03 EQUIP 48 4.41 48 4.41<br />

FY 04 EQUIP 17 1.90 17 1.90<br />

FY 05 EQUIP 10 1.62 10 1.62<br />

FY 06 EQUIP 46 7.83 46 7.83<br />

FY 07 EQUIP 15 2.62 15 2.62<br />

FY 08 EQUIP 44 7.93 44 7.93<br />

FY 09 EQUIP 46 8.53 46 8.53<br />

FY TC EQUIP CONT CONT CONT CONT<br />

TOTAL INSTALLATION COST 25.00 5.05 4.41 1.90 1.62 7.83 2.62 7.93 8.53 CONT 64.88<br />

TOTAL PROCUREMENT COST 50.35 11.23 11.48 8.53 5.46 26.35 8.80 26.67 28.67 CONT CONT<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 mo. PRODUCTION LEADTIME: 3 mos.<br />

CONTRACT DATES: FY 2003: Oct-02 FY 2004: Oct-03 FY 2005: Oct-04<br />

DELIVERY DATES: FY 2003: Jan-03 FY 2004: Jan-04 FY 2005: Jan-05<br />

FY 03<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PYs 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 298 19 19 10 6 6 5 4 3 3 16 15 15<br />

OUTPUT 298 19 19 10 6 6 5 4 3 3 16 15 15<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 5 5 5 15 15 14 16 15 15 CONT CONT<br />

OUTPUT 5 5 5 15 15 14 16 15 15 CONT CONT<br />

Notes/Comments: Quantities refer to Unit Level ships and submarines. Currently, there are 224 Unit Level ships and 69 submarines in the Fleet.<br />

P-1 Shopping List-Item No 48 - 6 of 15 Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

February 2004<br />

MODIFICATION TITLE: GCCS-M Afloat Force Level<br />

COST CODE JG010<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: The GCCS-M Afloat Force Level system is the core battle group/force commander's warfighting system and consists of both UNIX and NT servers / workstations, color large screen displays, remote displays and switches<br />

running on a IT-21 LAN while providing the tactical commander with the COP, automated decision aids and an integrated tactical shipboard intelligence system that utilize joint organic, non-organic (remote sources) and<br />

environmental information/intelligence in the decision making and warfighting process. The Force Level system provides Tactical C3I systems tailored to meet platform missions and functions to ensure joint interoperability<br />

among various Fleet Commanders. It also provides both General Service (GENSER) and Sensitive Compartmented Information (SCI) source information management systems which receive, process, correlate, fuse,<br />

assess, and display the readiness and disposition of own, neutral, and potentially hostile forces together with Electronic Warfare (EW) resource and environmental information. Lastly, it provides tactical commanders with an<br />

accurate, reliable and survivable Common Operational Picture (COP) which includes complete all-source information management, display and dissemination, rapid access to organic / theater / national intelligence and<br />

databases, and multi-source data fusion and imagery exploitation.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PYs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 61 15.39 14 8.25 8 6.66 4 6.54 8 9.34 8 9.75 8 10.00 8 10.12 8 10.44 CONT CONT CONT CONT<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 0.30<br />

Other (DSA) 0.20 0.09 0.05 0.19 0.92 0.95 0.98 1.00 1.03 CONT CONT CONT CONT<br />

Interm Contractor Support<br />

Installation of Hardware 61 13.23 14 9.06 8 3.84 4 2.98 8 4.81 8 4.96 8 5.11 8 5.26 8 5.42 CONT CONT 127 54.67<br />

PRIOR YR EQUIP 61 13.23 61 13.23<br />

FY 02 EQUIP 14 9.06 14 9.06<br />

FY 03 EQUIP 8 3.84 8 3.84<br />

FY 04 EQUIP 4 2.98 4 2.98<br />

FY 05 EQUIP 8 4.81 8 4.81<br />

FY 06 EQUIP 8 4.96 8 4.96<br />

FY 07 EQUIP 8 5.11 8 5.11<br />

FY 08 EQUIP 8 5.26 8 5.26<br />

FY 09 EQUIP 8 5.42 8 5.42<br />

FY TC EQUIP CONT CONT CONT CONT<br />

13.23 9.06 3.84 2.98 4.81 4.96 5.11 5.26 5.42 CONT 54.67<br />

TOTAL PROCUREMENT COST 28.82 17.69 10.55 9.71 15.08 15.66 16.09 16.38 16.89 CONT CONT<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 mo. PRODUCTION LEADTIME: 3 mos.<br />

CONTRACT DATES: FY 2003: Oct-02 FY 2004: Oct-03 FY 2005: Oct-04<br />

DELIVERY DATES: FY 2003: Jan-03 FY 2004: Jan-04 FY 2005: Jan-05<br />

FY 03 FY 04<br />

FY 05<br />

FY 06<br />

INSTALLATION SCHEDULE: PYs 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 75 2 3 3 2 2 2 2 4 2 2 4<br />

OUTPUT 75 2 3 3 2 2 2 2 4 2 2 4<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 2 2 4 2 2 4 2 2 4 CONT CONT<br />

OUTPUT 2 2 4 2 2 4 2 2 4 CONT CONT<br />

Notes/Comments: Quantities refer to Force Level ships. Currently, there are 29 Force Level ships in the Fleet.<br />

P-1 Shopping List-Item No 48 - 7 of 15 Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: TBMCS Afloat<br />

COST CODE JG015<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION:<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PYs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 25 2.29 18 3.18 14 2.63 10 3.61 10 3.75 10 3.86 10 3.97 10 4.10 10 4.23 CONT CONT CONT CONT<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 0.18<br />

Other (DSA) 0.13 0.20 0.66 0.45 0.46 0.48 0.49 0.51 0.52 CONT CONT CONT CONT<br />

Interm Contractor Support<br />

Installation of Hardware 25 1.16 18 1.00 14 1.21 10 3.36 10 3.49 10 3.59 10 3.70 10 3.82 10 3.94 CONT CONT 117 25.27<br />

PRIOR YR EQUIP 25 1.16 25 1.16<br />

FY 02 EQUIP 18 1.00 18 1.00<br />

FY 03 EQUIP 14 1.21 14 1.21<br />

FY 04 EQUIP 10 3.36 10 3.36<br />

FY 05 EQUIP 10 3.49 10 3.49<br />

FY 06 EQUIP 10 3.59 10 3.59<br />

FY 07 EQUIP 10 3.70 10 3.70<br />

FY 08 EQUIP 10 3.82 10 3.82<br />

FY 09 EQUIP 10 3.94 10 3.94<br />

FY TC EQUIP CONT CONT CONT CONT<br />

TOTAL INSTALLATION COST 1.16 1.00 1.21 3.36 3.49 3.59 3.70 3.82 3.94 CONT 25.27<br />

TOTAL PROCUREMENT COST 3.58 4.56 4.49 7.42 7.70 7.92 8.16 8.42 8.69 CONT CONT<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 mos. PRODUCTION LEADTIME: 3 mos.<br />

CONTRACT DATES: FY 2003: Oct-02 FY 2004: Oct-03 FY 2005: Oct-04<br />

DELIVERY DATES: FY 2003: Jan-03 FY 2004: Jan-04 FY 2005: Jan-05<br />

FY 03 FY 04 FY 05<br />

FY 06<br />

INSTALLATION SCHEDULE: PYs 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 43 7 7 4 4 2 4 4 2 4 4 2<br />

OUTPUT 43 7 7 4 4 2 4 4 2 4 4 2<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 4 4 2 4 4 2 4 4 2 CONT CONT<br />

OUTPUT 4 4 2 4 4 2 4 4 2 CONT CONT<br />

Notes/Comments: Quantities refer to number of Force Level ships. Currently there are 29 Force Level ships in the Fleet.<br />

FY 07 FY 08 FY 09<br />

P-1 Shopping List-Item No 48 - 8 of 15<br />

February 2004<br />

Supports acquisition of hardware and software for the Theater Battle Management Core System (TBMCS). This system is a suite of USAF software applications that support air and space operations. TBMCS provides<br />

US forces with the ability to plan and control air operations. All DoD air operations, planners will use TBMCS to produce, generate, disseminate, and monitor execution of the ATO, air defense plan, master air attack plan,<br />

target nomination list, joint integrated prioritize target list, candidate target list.<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: TBMCS Ashore<br />

COST CODE JG015<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION:<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PYs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 5 0.97 1 0.16 4 0.84 2 0.50 2 0.52 2 0.52 4 1.08 2 0.65 2 0.68 CONT CONT CONT CONT<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 0.05<br />

Other (DSA)<br />

Interm Contractor Support<br />

Installation of Hardware 5 0.18 1 0.04 4 0.12 2 0.09 2 0.09 2 0.09 4 0.23 2 0.15 2 0.18 CONT CONT 24 1.16<br />

PRIOR YR EQUIP 5 0.18 5 0.18<br />

FY 02 EQUIP 1 0.04 1 0.04<br />

FY 03 EQUIP 4 0.12 4 0.12<br />

FY 04 EQUIP 2 0.09 2 0.09<br />

FY 05 EQUIP 2 0.09 2 0.09<br />

FY 06 EQUIP 2 0.09 2 0.09<br />

FY 07 EQUIP 4 0.23 4 0.23<br />

FY 08 EQUIP 2 0.15 2 0.15<br />

FY 09 EQUIP 2 0.18 2 0.18<br />

FY TC EQUIP CONT CONT CONT CONT<br />

TOTAL INSTALLATION COST 0.18 0.04 0.12 0.09 0.09 0.09 0.23 0.15 0.18 CONT 1.16<br />

TOTAL PROCUREMENT COST 1.15 0.25 0.97 0.58 0.60 0.62 1.30 0.80 0.85 CONT CONT<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 mos. PRODUCTION LEADTIME: 3 mos.<br />

CONTRACT DATES: FY 2003: Oct-02 FY 2004: Oct-03 FY 2005: Oct-04<br />

DELIVERY DATES: FY 2003: Jan-03 FY 2004: Jan-04 FY 2005: Jan-05<br />

FY 03 FY 04 FY 05<br />

FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 6 2 2 1 1 1 1 1 1<br />

OUTPUT 6 2 2 1 1 1 1 1 1<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 2 2 1 1 1 1 CONT CONT<br />

OUTPUT 2 2 1 1 1 1 CONT CONT<br />

Notes/Comments: Quantities represent sites. Currently, there are 6 TBMCS shore sites.<br />

FY 07 FY 08 FY 09<br />

P-1 Shopping List-Item No 48 - 9 of 15<br />

February 2004<br />

Supports aquisition of hardware and software for the Theater Battle Management Core System (TBMCS) shore sites.<br />

This system is a suite of USAF software applications that support air and space operations. TBMCS provides US forces with the ability to plan and control air operations, including air and space control and air and<br />

missile defense. All DoD air operations, planners will use TBMCS to produce, generate, disseminate, and monitor execution of the air defense plan.<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Shipboard Video Distribution System<br />

COST CODE JG016<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION:<br />

The Shipboard Video Distribution System upgrade for Force Level ships provides the ability to route video signals (up to 96 inputs and 96 outputs) throughout selected areas of the ship. The system will be<br />

upgraded to provide digital signal routing via the IT-21 LAN to configured command, control and mission planning spaces on force level combatants and off board ship via VIXIS.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 10 6.23 2 1.58 1 1.01 2 1.83 2 1.92 2 1.94 2 1.97 2 2.00 2 2.03 CONT CONT CONT CONT<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 0.18<br />

Other (DSA) 0.17 0.18 0.09 0.17 0.18 0.18 0.18 0.18 0.18 CONT CONT CONT CONT<br />

Interm Contractor Support<br />

Installation of Hardware 9 5.27 2 1.50 1 0.85 2 1.76 2 1.73 2 1.75 2 1.77 2 1.79 2 1.81 CONT CONT 24 18.23<br />

PRIOR YR EQUIP 9 5.27 9 5.27<br />

FY 02 EQUIP 2 1.50 2 1.50<br />

FY 03 EQUIP 1 0.85 1 0.85<br />

FY 04 EQUIP 2 1.76 2 1.76<br />

FY 05 EQUIP 2 1.73 2 1.73<br />

FY 06 EQUIP 2 1.75 2 1.75<br />

FY 07 EQUIP 2 1.77 2 1.77<br />

FY 08 EQUIP 2 1.79 2 1.79<br />

FY 09 EQUIP 2 1.81 2 1.81<br />

FY TC EQUIP CONT CONT CONT CONT<br />

TOTAL INSTALLATION COST 5.27 1.50 0.85 1.76 1.73 1.75 1.77 1.79 1.81 CONT CONT 18.23<br />

TOTAL PROCUREMENT COST 11.67 3.43 1.95 3.75 3.83 3.87 3.91 3.96 4.02 CONT CONT CONT<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 mos. PRODUCTION LEADTIME: 3 mos.<br />

CONTRACT DATES: FY 2003: Oct-02 FY 2004: Oct-03 FY 2005: Oct-04<br />

DELIVERY DATES: FY 2003: Jan-03 FY 2004: Jan-04 FY 2005: Jan-05<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 11 1 1 1 1 1 1 1<br />

OUTPUT 11 1 1 1 1 1 1 1<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 1 1 1 1 1 1 CONT CONT<br />

OUTPUT 1 1 1 1 1 1 CONT CONT<br />

Notes/Comments: Quantities refer to number of Force Level Ships. Currently, there are 29 Force Level Ships in the Fleet.<br />

P-1 Shopping List-Item No 48 - 10 of 15<br />

February 2004<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

February 2004<br />

MODIFICATION TITLE: GCCS-M Ashore<br />

COST CODE JG020<br />

MODELS OF SYSTEMS AFFECTED: N/A<br />

DESCRIPTION/JUSTIFICATION: Provides evolutionary systems and ancillary equipment upgrades to support CNO, Fleet Commanders in Chief, Unified Commanders, Type Commanders, Force Anti-Submarine Warfare (ASW) Commanders, and<br />

Submarine Operating Authorities worldwide. The GCCS-M Ashore provides a single system to receive, process, display, maintain and/or assess unit characteristics, employment scheduling, material condition,<br />

combat readiness, warfighting capabilities, and positional information of own, allied, and hostile forces. GCCS-M Ashore provides the tools necessary for Fleet and Shore based commanders to execute plans,<br />

transit tasking, and provide tactical information to subordinate forces. Offers distributed briefing capabilities among commands using video and large screen displays.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PYs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 138 13.12 33 5.94 19 8.9 11 6.88 24 12.65 73 28.71 71 13.64 71 16.92 73 23.41 CONT CONT. CONT CONT.<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

Installation of Hardware 138 2.10 33 1.62 19 4.20 11 1.02 24 2.27 73 6.08 71 1.60 71 2.52 73 4.20 CONT CONT. 513 25.60<br />

PRIOR YR EQUIP 138 2.10 138 2.10<br />

FY 02 EQUIP 33 1.62 33 1.62<br />

FY 03 EQUIP 19 4.2 19 4.20<br />

FY 04 EQUIP 11 1.02 11 1.02<br />

FY 05 EQUIP 24 2.27 24 2.27<br />

FY 06 EQUIP 73 6.08 73 6.08<br />

FY 07 EQUIP 71 1.60 71 1.60<br />

FY 08 EQUIP 71 2.52 71 2.52<br />

FY 09 EQUIP 73 4.20 73 4.20<br />

FY TC EQUIP CONT CONT. CONT CONT.<br />

TOTAL INSTALLATION COST 2.10 1.62 4.20 1.02 2.27 6.08 1.60 2.52 4.20 CONT. 25.60<br />

TOTAL PROCUREMENT COST 15.22 7.56 13.07 7.90 14.93 34.79 15.23 19.44 27.61 CONT. CONT.<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 mos. PRODUCTION LEADTIME: 3 mos.<br />

CONTRACT DATES: FY 2003: Oct-02 FY 2004: Oct-03 FY 2005: Oct-04<br />

DELIVERY DATES: FY 2003: Jan-03 FY 2004: Jan-04 FY 2005: Jan-05<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PYs 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 171 7 6 6 3 3 5 8 8 8 29 29 15<br />

OUTPUT 171 7 6 6 3 3 5 8 8 8 29 29 15<br />

INSTALLATION SCHEDULE: FY 07 FY 08 FY 09<br />

INPUT<br />

OUTPUT<br />

Notes/Comments: Quantities represent sites. Currently, there are 73 ashore sites.<br />

1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

28 28 15 28 28 15 29 29 15 CONT CONT<br />

28 28 15 28 28 15 29 29 15 CONT CONT<br />

P-1 Shopping List-Item No 48 - 11 of 15<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

February 2004<br />

MODIFICATION TITLE: Trusted Information Systems<br />

COST CODE JG030<br />

MODELS OF SYSTEMS AFFECTED: N/A<br />

DESCRIPTION/JUSTIFICATION: Trusted Information Systems (TIS) Ocean Surveillance Information System (OSIS) Evolutionary Development (OED) system provides for the analysis of intelligence information from multiple sources to produce a<br />

comprehensive report of foreign forces and potential hostile activity. In addition, it provides near-real-time all-source fusion, correlation and analysis tools, directly feeding automated reporting capabilities. TIS-OED<br />

provides positional data and operational intelligence to commanders at all levels. TIS - Radiant Mercury provides automated sanitizing, downgrading, and transliteration of formatted message traffic.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 9 2.30 4 1.88 5 1.46 4 1.45 5 1.89 6 3.06 5 1.67 5 1.22 5 3.22 CONT CONT CONT CONT<br />

Equipment - TIS OED 9 2.30 4 1.88 3 0.86 4 1.45 4 1.58 4 2.55 4 1.35 4 0.97 4 2.96 CONT CONT CONT CONT<br />

Equipment - TIS Radiant Mercury<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

2 0.60 0 0.00 1 0.31 2 0.50 1 0.32 1 0.25 1 0.25 CONT CONT CONT CONT<br />

Installation of Hardware 9 0.13 4 0.07 3 0.08 4 0.08 4 0.08 4 0.08 4 0.08 4 0.09 4 0.09 CONT CONT. 40 0.77<br />

PRIOR YR EQUIP 9 0.13 9 0.13<br />

FY 02 EQUIP 4 0.07 4 0.07<br />

FY 03 EQUIP 3 0.08 3 0.08<br />

FY 04 EQUIP 4 0.08 4 0.08<br />

FY 05 EQUIP 4 0.08 4 0.08<br />

FY 06 EQUIP 4 0.08 4 0.08<br />

FY 07 EQUIP 4 0.08 4 0.08<br />

FY 08 EQUIP 4 0.09 4 0.09<br />

FY 09 EQUIP 4 0.09 4 0.09<br />

FY TC EQUIP CONT. CONT.<br />

TOTAL INSTALLATION COST 0.13 0.07 0.08 0.08 0.08 0.08 0.08 0.09 0.09 CONT. 0.77<br />

TOTAL PROCUREMENT COST 2.43 1.95 1.54 1.53 1.97 3.14 1.75 1.31 3.31 0.00 0.77<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 mos. PRODUCTION LEADTIME: 3 mos.<br />

CONTRACT DATES: FY 2003: Dec-02 FY 2004: Jan-04 FY 2005: Dec-04<br />

DELIVERY DATES: FY 2003: Mar-03 FY 2004: Mar-04 FY 2005: Mar-05<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 13 2 1 2 2 2 2 2 2<br />

OUTPUT 13 2 1 2 2 2 2 2 2<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 2 2 2 2 2 2 CONT CONT<br />

OUTPUT 2 2 2 2 2 2 CONT CONT<br />

Notes/Comments: Quantities represent sites. Currently, there are 4 TIS-OED sites.<br />

TIS - Radiant Mercury is procured under a "turn key" contract, therefore, installation funds are not shown separately.<br />

P-1 Shopping List-Item No 48 - 12 of 15<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Global Command and Control System (GCCS) - Joint<br />

February 2004<br />

COST CODE<br />

MODELS OF SYSTEMS AFFECTED:<br />

JG040<br />

DESCRIPTION/JUSTIFICATION:<br />

GCCS-Joint is an operational multi-service/agency program. GCCS-Joint supports the National Command Authority (NCA) and the CINC's by providing Command, Control and Communication (C3) data processing<br />

capabilities including status of forces and support requirements for use in security decision making, force preparation and operational planning execution. Equipment is scheduled for installation at Navy supported<br />

GCCS-Joint shore sites. Procurements includes intelligent workstations, servers and software equipment.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 41 5.03 20 1.82 20 1.42 20 1.56 20 2.49 20 1.571 20 2.00 20 2.41 20 1.63 CONT CONT. CONT CONT.<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

Installation of Hardware 41 1.48 20 0.48 20 0.42 20 0.41 20 0.41 20 0.42 20 0.43 20 0.43 20 0.44 CONT CONT. 201 4.91<br />

PRIOR YR EQUIP 41 1.48 41 1.48<br />

FY 02 EQUIP 20 0.48 20 0.48<br />

FY 03 EQUIP 20 0.42 20 0.42<br />

FY 04 EQUIP 20 0.41 20 0.41<br />

FY 05 EQUIP 20 0.41 20 0.41<br />

FY 06 EQUIP 20 0.420 20 0.42<br />

FY 07 EQUIP 20 0.43 20 0.43<br />

FY 08 EQUIP 20 0.43 20 0.43<br />

FY 09 EQUIP 20 0.44 20 0.44<br />

FY TC EQUIP CONT CONT. CONT CONT.<br />

TOTAL INSTALLATION COST 0.00 0.48 0.42 0.41 0.41 0.42 0.43 0.43 0.44 CONT CONT. CONT 4.91<br />

TOTAL PROCUREMENT COST 6.50 2.31 1.84 1.97 2.90 1.99 2.42 2.84 2.06 CONT CONT. CONT CONT.<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 mo. PRODUCTION LEADTIME: 3 mos.<br />

CONTRACT DATES: FY 2003: Oct-02 FY 2004: Oct-03 FY 2005: Oct-04<br />

DELIVERY DATES: FY 2003: Jan-03 FY 2004: Jan-04 FY 2005: Jan-05<br />

FY 03 FY 04 FY 05<br />

FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 61 8 8 4 8 8 4 8 8 4 8 8 4<br />

OUTPUT 61 8 8 4 8 8 4 8 8 4 8 8 4<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 8 8 4 8 8 4 8 8 4 CONT. CONT.<br />

OUTPUT 8 8 4 8 8 4 8 8 4 CONT. CONT.<br />

Notes/Comments: Quantities represent sites. Currently, there are 20 GCCS-Joint sites.<br />

FY 07<br />

P-1 Shopping List-Item No 48 - 13 of 15<br />

FY 08 FY 09<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Tactical/Mobile (GCCS-M) Upgrades<br />

February 2004<br />

COST CODE JG050<br />

MODELS OF SYSTEMS AFFECTED: N/A<br />

DESCRIPTION/JUSTIFICATION: DESCRIPTION/JUSTIFICATION: This line procures various types of Command and Control Equipment in order to provide an upgraded capability to present TSC systems and to replace the equipment when it has<br />

reached the end of service life, assuring the existing system are interoperable with other Navy and Joint C3I systems.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 8 4.57 1 3.39 4 1.37 3 1.23 11 4.93 11 4.25 12 0.90 14 1.25 5 2.23 CONT CONT CONT CONT<br />

Equipment (TSC - fixed sites) 8 4.57 1 3.39 1 0.58 1 0.53 5 1.16 5 1.19 7 0.37 5 0.27 2 0.51 CONT CONT CONT CONT<br />

Equipment (Mobile Systems) 3 0.80 2 0.70 6 3.77 6 3.05 5 0.53 9 0.98 3 1.72 CONT CONT CONT CONT<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

Installation of Hardware 7 0.61 2 0.56 1 0.05 1 0.53 5 0.76 5 0.78 7 0.37 5 0.27 2 0.33 CONT CONT 35 4.27<br />

PRIOR YR EQUIP 7 0.61 7 0.61<br />

FY 01 EQUIP 1 0.28 1 0.28<br />

FY 02 EQUIP 1 0.28 1 0.28<br />

FY 03 EQUIP 1 0.05 1 0.05<br />

FY 04 EQUIP 1 0.53 1 0.53<br />

FY 05 EQUIP 5 0.76 5 0.76<br />

FY 06 EQUIP 5 0.78 5 0.78<br />

FY 07 EQUIP 7 0.37 7 0.37<br />

FY 08 EQUIP 5 0.27 5 0.27<br />

FY 09 EQUIP 2 0.33 2 0.33<br />

FY TC EQUIP CONT CONT CONT CONT<br />

TOTAL INSTALLATION COST 0.61 0.56 0.05 0.53 0.76 0.78 0.37 0.27 0.33 CONT CONT CONT 4.27<br />

TOTAL PROCUREMENT COST 5.19 3.96 1.42 1.76 5.69 5.03 1.28 1.52 2.56 CONT 0.00 CONT 4.27<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: Various PRODUCTION LEADTIME: Various<br />

CONTRACT DATES: FY 2003: various FY 2004: various FY 2005: various<br />

DELIVERY DATES: FY 2003: various FY 2004: various FY 2005: various<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 9 1 1 1 2 2 1 2 2<br />

OUTPUT 9 1 1 1 2 2 1 2 2<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 2 2 3 1 2 2 1 1 CONT CONT<br />

OUTPUT 2 2 3 1 2 2 1 1 CONT CONT<br />

Notes/comments:<br />

For FY03, quantities represent only the GCCS-M component system upgrades of T/M systems. T/M I/O includes: TSC (14), MOCC (9), JMAST (4), and MOC (1) . The total I/O is 28.<br />

For FY04 through FY07, quantities represent only the GCCS-M component system upgrades for TSC systems. The total I/O for TSC systems is 14.<br />

Mobile systems in the Tac/Mobile program are procured "turn key".<br />

P-1 Shopping List-Item No 48 - 14 of 15<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

February 2004<br />

MODIFICATION TITLE: Tactical/Mobile Communications & Mobility Upgrades<br />

COST CODE JG050<br />

MODELS OF SYSTEMS AFFECTED: N/A<br />

DESCRIPTION/JUSTIFICATION: This line procures various types of Communications and Mobility Equipment in order to provide an upgraded capability to present TSC systems and to replace the equipment when it has reached the end of service<br />

life, assuring the existing system remains interoperable with Joint and Naval Forces, as well as updated aircraft, sensors, and weapons systems.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 20 12.03 14 5.05 9 9.68 15 8.27 14 4.43 13 6.53 7 4.45 9 4.27 13 10.01 CONT CONT CONT CONT<br />

Equipment (TSC - fixed sites) 20 12.03 14 5.05 9 9.68 9 2.89 7 1.40 5 3.62 2 1.31 2 1.34 6 4.80 CONT CONT CONT CONT<br />

Equipment (Mobile Systems) 6 5.37 7 3.02 8 2.91 5 3.14 7 2.93 7 5.21 CONT CONT CONT CONT<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

Installation of Hardware 19 4.19 14 1.32 10 1.37 9 0.37 7 0.79 5 0.82 2 0.25 2 0.23 6 0.61 CONT CONT 74 9.94<br />

PRIOR YR EQUIP 19 4.19 19 4.19<br />

FY 01 EQUIP 1 0.26 1 0.26<br />

FY 02 EQUIP 13 1.06 1 0.20 14 1.26<br />

FY 03 EQUIP 9 1.16 9 1.16<br />

FY 04 EQUIP 9 0.37 9 0.37<br />

FY 05 EQUIP 7 0.79 7 0.79<br />

FY 06 EQUIP 5 0.82 5 0.82<br />

FY 07 EQUIP 2 0.25 2 0.25<br />

FY 08 EQUIP 2 0.23 2 0.23<br />

FY 09 EQUIP 6 0.61 6 0.61<br />

FY TC EQUIP CONT CONT CONT CONT<br />

TOTAL INSTALLATION COST 4.19 1.32 1.37 0.37 0.79 0.82 0 0.23 0.61 CONT CONT CONT 9.94<br />

TOTAL PROCUREMENT COST 16.22 6.37 11.05 8.64 5.21 7.35 4.70 4.50 10.62 CONT 0 CONT 9.94<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: Various PRODUCTION LEADTIME: Various<br />

CONTRACT DATES: FY 2003: various FY 2004: various FY 2005: various<br />

DELIVERY DATES: FY 2003: various FY 2004: various FY 2005: various<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 33 2 4 4 3 3 3 1 2 4 1 2 2<br />

OUTPUT 33 2 4 4 3 3 3 1 2 4 1 2 2<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 1 1 1 1 1 2 3 CONT CONT<br />

OUTPUT 1 1 1 1 1 2 3 CONT CONT<br />

Notes/comments:<br />

For FY03 through FY07, quantities represent only the Comms & Mobility component system upgrades of T/M TSC systems. Total I/O is 14.<br />

Mobile systems in the Tac/Mobile program are procured "turn key".<br />

P-1 Shopping List-Item No 48 - 15 of 15<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT 261100 Naval Tactical Command Support System 52DY<br />

QUANTITY<br />

COST<br />

(in millions)<br />

Narrative Description/Justification:<br />

PY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TO COMP TOTAL<br />

338.5 31.6 51.3 26.2 81.1 13.8 31.0 39.3 CONTINUING CONTINUING<br />

PROGRAM COVERAGE/JUSTIFICATION FOR BUDGET YEAR REQUIREMENTS: The Naval Tactical Command Support System (NTCSS) is a multi-function program designed to provide<br />

standard tactical support information systems to various afloat and associated shore-based fleet activities. The mission is to provide the full range of responsive tactical support ADP hardware<br />

and software in support of the management of information, personnel, material and funds $47required<br />

to maintain and operate ships, submarines, and aircraft. NTCSS is to provide an efficient<br />

management of afloat tactical support data, through the use of standardized hardware and $47software,<br />

to meet the mission support information management requirements for force sustainment. On<br />

6 June 1995, NTCSS and its component subsystems, discussed below, were selected as Command and Control migration systems under the auspices of ASD (C3I).<br />

NTCSS incorporates the functionality of the Shipboard Non-Tactical ADP Program (SNAP) systems, the Naval Aviation Logistics Command Management Information System (NALCOMIS), and<br />

the Maintenance Resource Management System (MRMS).<br />

$31 $6 $2<br />

SNAP is an automated information system that supports organizational level maintenance, supply, financial and administrative functions on afloat units, at Marine Aviation Logistics Squadrons<br />

(MALS) and at associated shore activities. Due to the age and obsolescence of SNAP I and SNAP II, these systems are being replaced with SNAP III in the 1994 through 2000 time frame. SNAP<br />

improves equipment supportability and maintainability and thus readiness through: improvement in the accuracy of maintenance, supply, financial and related support data maintained and<br />

reported by the ship; and acceleration of management report preparation and data transmission. The scope of SNAP includes approximately 300 sites.<br />

NALCOMIS is an automated, real time, interactive, management information system that provides a modern management tool for day-to-day management of aircraft maintenance at the<br />

organizational and intermediate levels. NALCOMIS automates management of the aviation repairables inventory, providing nose-to-tail tracking through the repair and operations cycles. The<br />

scope of NALCOMIS includes 66 aviation intermediate maintenance activities located afloat (CV/LHA/LHD/MALS), at Naval Air Stations (NASs), and approximately 326 Navy and Marine<br />

Squadrons.<br />

MRMS is an automated information system that supports ship intermediate maintenance management of the Atlantic and Pacific Fleets. MRMS supports Type Commands, Group Commanders,<br />

Area Coordinators, Readiness Support Groups, Submarine Squadrons, Ship Repair Facilities, and various Intermediate Maintenance Activities, both afloat and ashore, for budgeting, planning,<br />

production and analysis of ship maintenance. MRMS improves ship readiness through improved maintenance and ship repair management, information resource management , and maintenance<br />

data processing. The scope of MRMS includes approximately 16 shipboard and 65 shore based intermediate and maintenance and planning activities.<br />

Funding for FY03-09 procures: 1) NTCSS system upgrades for ships; 2) NTCSS system upgrades for Naval Air Stations, Squadrons, Shore Support Facilities, Fleet Training Centers and MALS;<br />

and 3) necessary production engineering and installation support.<br />

INSTALLATION AGENT: All FMP installations will be accomplished by Yard Availability.<br />

P-1 SHOPPING LIST<br />

ITEM NO. 49-1 of 49-8<br />

Exhibit P-40, Budget Item Justification<br />

UNCLASSIFIED<br />

CLASSIFICATION


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT 261100 Naval Tactical Command Support System 52DY<br />

Narrative Description/Justification: (continued)<br />

The Navy Marine Corps Intranet (NMCI) provides the LAN and PCs at CONUS Naval Air Stations and training sites. NTCSS will continue to procure and install application servers, and printers for CONUS<br />

Naval Air Stations and training sites. Because ships, OCONUS sites, and MALS are not included in the scope of the seat management concept under NMCI, NTCSS will continue to procure and install<br />

PCs, COTS software, printers, and NTCSS application servers and server software.<br />

Beginning in FY03, NTCSS will procure and install Intel servers procured from NAVSEA's Q70 contract. The hardware change represents a hardware end-of-life platform changeover. Also beginning in<br />

FY03, NTCSS will field the Web-enabled version of the<br />

$89<br />

NTCSS applications. There is no change in the functionality of the NTCSS software. No COMOPTEVFOR testing is required.<br />

In FY04 and FY05, NTCSS will continue with the procurement and install of Intel servers, standard PCs and printers to meet Next Generation Network (NGN) requirements both afloat and ashore.<br />

$47<br />

$47<br />

$31 $6 $2<br />

P-1 SHOPPING LIST<br />

ITEM NO. 49-2 of 49-8<br />

Exhibit P-40, Budget Item Justification<br />

UNCLASSIFIED<br />

CLASSIFICATION


UNCLASSIFIED<br />

CLASSIFICATION<br />

COST ANALYSIS February 2004<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT 261100 Naval Tactical Command Support System 52DY<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

PY FY 2003 FY 2004 FY 2005<br />

COST ID TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE QTY COST QTY COST COST QTY COST COST QTY COST COST<br />

DY002 MALS/Shore Equipment A 41 29,059<br />

DY004 Ship Set Equipment A 122 75,090<br />

DY005 Ship Set Equipment Upgrades A 143 60,483 12 288.22 3,459 38 383.26 14,564 8 314.21 2,514<br />

DY006 MALS/Shore Equipment Upgrades A 339 70,106 108 119.48 12,904 98 180.21 17,660 96 104.15 9,998<br />

DY500 Production Support 11,026<br />

DY555 Production Support A 10,139 1,409 2,626 989<br />

INSTALLATION 82,732 13,844 16,403 12,707<br />

Non-FMP Installation<br />

DY776 NTCSS A 29,707 10,053 12,175 11,449<br />

FMP Installation<br />

DY777 NTCSS A 51,000 3,700 3,523 954<br />

NTCSS-DSA 2,025 91 705 304<br />

TOTAL CONTROL 338,635 31,616 51,253 26,208<br />

DD FORM 2446, JUN 86 Exhibit P-5, Cost Analysis<br />

P-1 SHOPPING LIST<br />

ITEM NO. 49-3 of 49-8<br />

DATE<br />

UNCLASSIFIED<br />

CLASSIFICATION


UNCLASSIFIED<br />

CLASSIFICATION<br />

PROCUREMENT HISTORY AND PLANNING February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT 261100 Naval Tactical Command Support System 52DY<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE DELIVERY COST NOW AVAILABLE<br />

DY005 Ship Set Equipment Upgrades 03 Q70 IDIQ Navy Nov-02 Jan-03 12 220,704 Yes<br />

SPAWAR Consolidated IDIQ Navy Nov-02 Jan-03 12 66,731 Yes<br />

Various IDIQ Navy Nov-02 Jan-03 12 789 Yes<br />

Ship Set Equipment Upgrades 04 Q70 IDIQ Navy Nov-03 Jan-04 38 311,839 Yes<br />

SPAWAR Consolidated IDIQ Navy Nov-03 Jan-04 38 70,086 Yes<br />

Various IDIQ Navy Nov-03 Jan-04 38 1,333 Yes<br />

Ship Set Equipment Upgrades 05 Q70 IDIQ Navy Nov-04 Jan-05 8 267,950 Yes<br />

SPAWAR Consolidated IDIQ Navy Nov-04 Jan-05 8 45,195 Yes<br />

Various IDIQ Navy Nov-04 Jan-05 8 1,069 Yes<br />

D. REMARKS<br />

Between years, the composition of ships changes, i.e., one year may have more larger ships like CVs while another year may consist mainly of SSNs. As a result, the<br />

per unit costs are different. Moreover, different ships require different peripherals listed under the "Various" category, which leads to per unit cost differences in that<br />

category.<br />

DD FORM 2446, JUN 87 Exhibit P-5A, Procurement History and Planning<br />

P-1 SHOPPING LIST<br />

ITEM NO. 49-4 of 49-8<br />

A. DATE<br />

UNCLASSIFIED<br />

CLASSIFICATION


UNCLASSIFIED<br />

CLASSIFICATION<br />

PROCUREMENT HISTORY AND PLANNING February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT 261100 Naval Tactical Command Support System 52DY<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE DELIVERY COST NOW AVAILABLE<br />

DY006 MALS Equipment Upgrades 03 Q70 IDIQ Navy Nov-02 Jan-03 108 79,868 Yes<br />

SPAWAR Consolidated IDIQ Navy Nov-02 Jan-03 108 39,201 Yes<br />

Various IDIQ Navy Nov-02 Jan-03 108 411 Yes<br />

A. DATE<br />

MALS Equipment Upgrades 04 Q70 IDIQ Navy Nov-03 Jan-04 98 101,018 Yes<br />

SPAWAR Consolidated IDIQ Navy Nov-03 Jan-04 98 78,371 Yes<br />

Various IDIQ Navy Nov-03 Jan-04 98 818 Yes<br />

MALS Equipment Upgrades 05 Q70 IDIQ Navy Nov-04 Jan-05 96 60,699 Yes<br />

SPAWAR Consolidated IDIQ Navy Nov-04 Jan-05 96 43,005 Yes<br />

Various IDIQ Navy Nov-04 Jan-05 96 445 Yes<br />

D. REMARKS<br />

Between years, shore site configurations change, i.e., more larger sites in one year compared to another. As a result, the per unit costs are different.<br />

Moreover, different shore site configurations require different peripherals listed under the "Various" category, which leads to per unit cost differences<br />

in that category.<br />

DD FORM 2446, JUN 87 Exhibit P-5A, Procurement History and Planning<br />

P-1 SHOPPING LIST<br />

ITEM NO. 49-5 of 49-8<br />

UNCLASSIFIED<br />

CLASSIFICATION


UNCLASSIFIED<br />

February 2004<br />

MODIFICATION TITLE: 261100 Naval Tactical Command Support System Ship Set Equipment Upgrades (52DY/DY005).<br />

MODELS OF SYSTEMS AFFECTED: Provides modern centrally managed mission support ADP system upgrades and NTCSS-Optimized software to replace aging systems for Battle Group and unit level ships.<br />

DESCRIPTION/JUSTIFICATION: Application subsystems include/financial/inventory management, organizational and surface maintenance management, and administrative information systems support. NTCSS procurements will also<br />

provide ship capabilities for displaying and storing Computer-aided Acquisition and Logistics Support (CALS) initiative information (digitized engineering drawings, automated technical manuals, etc.).<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 126 55.3 17 5.2 12 3.5 38 14.6 8 2.5 91 33.2 0 0.0 0 0.0 5 1.5 Continuing 0.0 297 115.8<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 4.9 0.4 0.3 1.2 0.2 2.6 0.0 0.0 0.1 Continuing 0.0 9.7<br />

Other (DSA) 1.6 0.1 0.1 0.7 0.3 1.8 0.0 0.0 0.1 Continuing 0.0 4.7<br />

Interm Contractor Support<br />

Installation of Hardware* 120 19.7 20 6.5 14 3.7 33 3.5 11 1.0 94 12.1 0 0.0 0 0.0 5 0.4 Continuing 0.0 297 46.9<br />

PRIOR YR EQUIP 120 19.7 120 19.7<br />

FY 01 EQUIP 6 2.4 6 2.4<br />

FY 02 EQUIP 14 4.1 3 1.2 17 5.3<br />

FY 03 EQUIP 11 2.5 1 0.1 12 2.6<br />

FY 04 EQUIP 32 3.4 6 0.6 38 4.0<br />

FY 05 EQUIP 5 0.4 3 0.3 8 0.7<br />

FY 06 EQUIP 91 11.8 91 11.8<br />

FY 07 EQUIP 0 0.0 0 0.0<br />

FY 08 EQUIP 0 0.0 0 0.0<br />

FY 09 EQUIP 5 0.4 5 0.4<br />

FY TC EQUIP<br />

TOTAL INSTALLATION COST 120 19.7 20 6.5 14 3.7 33 3.5 11 1.0 94 12.1 0 0.0 0 0.0 5 0.4 297 46.9<br />

TOTAL PROCUREMENT COST 81.5 12.2 7.6 20.0 4.0 49.7 0.0 0.0 2.1 177.1<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 months PRODUCTION LEADTIME: 2 months<br />

CONTRACT DATES: FY 2003: Nov-02 FY 2004: Nov-03 FY 2005: Nov-04<br />

DELIVERY DATES: FY 2003: Jan-03 FY 2004: Jan-04 FY 2005: Jan-05<br />

FY04 FY05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 154 1 10 11 11 6 1 2 2 3 30 30 31<br />

OUTPUT 154 1 10 11 11 6 1 2 2 3 30 30 31<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL *<br />

INPUT 0 0 0 0 0 0 1 2 2 297<br />

OUTPUT 0 0 0 0 0 0 1 2 2 297<br />

* NTCSS Afloat Inventory Objective is 256. Total quantity indicate hardware & Software<br />

upgrades, procurement, Y2K fixes and installation.<br />

P-1 SHOPPING LIST<br />

ITEM NO. 49-6 of 49-8<br />

P-3A Exhibit,Individual Modification History<br />

UNCLASSIFIED


UNCLASSIFIED<br />

February 2004<br />

MODIFICATION TITLE: 261100 Naval Tactical Command Support SystemMALS/Shore Equipment Upgrades(52DY/DY006)<br />

MODELS OF SYSTEMS AFFECTED: Provides modern centrally managed mission support ADP system upgrades, and IMA-Optimized and OMA-Optimized software to replace aging systems at MALS, Naval Air Stations,<br />

squadrons, and training sites. IMA is the aviation Intermediate Maintenance Activity and OMA is the aviation Organizational Maintenance Activity.<br />

DESCRIPTION/JUSTIFICATION: Application subsystems include/financial/inventory management, organizational and surface maintenance management, and administrative information systems support. NTCSS procurements will also<br />

provide ship/shore capabilities for displaying and storing Computer-aided Acquisition and Logistics Support (CALS) initiative information (digitized engineering drawings, automated technical manuals, etc.).<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

230 54.5 109 15.6 108 12.9 98 17.7 96 10.0 100 18.0 45 7.8 98 17.4 105 21.0 Continuing 989 174.9<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

3.6 1.2 1.1 1.4 0.8 1.4 0.6 1.4 1.7 Continuing 0 13.2<br />

Installation of Hardware* 230 15.0 109 12.0 108 10.1 98 12.2 96 11.4 100 12.4 45 5.4 98 12.2 105 14.4 Continuing 650 78.0<br />

PRIOR YR EQUIP<br />

FY 01 EQUIP<br />

230 15.0<br />

FY 02 EQUIP 109 12.0<br />

FY 03 EQUIP 108 10.1 108 10.1<br />

FY 04 EQUIP 98 12.2 98 12.2<br />

FY 05 EQUIP 96 11.4 96 11.4<br />

FY 06 EQUIP 100 12.4 100 12.4<br />

FY 07 EQUIP 45 5.4 45 5.4<br />

FY 08 EQUIP 98 12.2 98 12.2<br />

FY 09 EQUIP<br />

FY TC EQUIP<br />

105 14.4 105 14.4<br />

TOTAL INSTALLATION COST 230 15.0 109 12.0 108 10.1 98 12.2 96 11.4 100 12.4 45 5.4 98 12.2 105 14.4 650 78.0<br />

TOTAL PROCUREMENT COST 73.1 28.8 24.1 31.3 22.2 31.8 13.8 31.0 37.1 266.1<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 months PRODUCTION LEADTIME: 2 months<br />

CONTRACT DATES: FY 2003: Nov-02 FY 2004: Nov-03 FY 2005: Nov-04<br />

DELIVERY DATES: FY 2003: Jan-03 FY 2004: Jan-04 FY 2005: Jan-05<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 447 32 33 33 32 32 32 33 33 34<br />

OUTPUT 447 32 33 33 32 32 32 33 33 34<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL *<br />

INPUT 15 15 15 32 33 33 35 35 35 989<br />

OUTPUT 15 15 15 32 33 33 35 35 35 989<br />

* NTCSS Shore Inventory Objective is 397. Total quantity indicate hardware & Software<br />

upgrades, procurement, Y2K fixes and installation.<br />

P-1 SHOPPING LIST<br />

ITEM NO. 49-7 of 49-8<br />

P-3A Exhibit,Individual Modification History<br />

UNCLASSIFIED


UNCLASSIFIED<br />

CLASSIFICATION<br />

PRODUCTION SCHEDULE February 2004<br />

(DOD EXHIBIT P-21A)<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD NO.<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT 261100 Naval Tactical Command Support System 52DY<br />

S ACCEP BAL FISCAL YEAR 03 FISCAL YEAR 04 FISCAL YEAR 05<br />

COST ITEM/MANUFACTURER E PROC PRIOR DUE CY 02 CALENDAR YEAR 03 CALENDAR YEAR 04 CALENDAR YEAR 05<br />

CODE R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S<br />

V 30-Sep 30-Sep C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E<br />

FY T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P<br />

DY005 COTS H/W and S/W 03 12 11 1 A 1 1 1 1 1 2 1 1 2 1<br />

DY005 COTS H/W and S/W 04 38 32 6 A 3 3 4 3 4 4 3 4 4 2 2 2<br />

DY005 COTS H/W and S/W 05 8 5 3 A 1 2 2<br />

DY006 COTS H/W and S/W 04 98 98 A 10 11 11 11 11 11 11 11 11<br />

DY006 COTS H/W and S/W 05 96 96 A 10 11 11 10 11 11 10 11 11<br />

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP<br />

PRODUCTION RATE PROCUREMENT LEADTIMES<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

ITEM Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

COTS Hardware and Software N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A<br />

NAVMAT FORM 7110/4 (REVISED 11/77) Exhibit P-21, Production Schedule<br />

P1- SHOPPING LIST<br />

ITEM NO. 49-8 of 49-8<br />

DATE<br />

UNCLASSIFIED<br />

CLASSIFICATION


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Advanced Tactical Data Link Systems 2614 52DR<br />

QUANTITY<br />

FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TO COMP TOTAL<br />

COST<br />

(in millions) 9.004 16.063 2.386 13.237 11.562 11.795 12.033 Continuing Continuing<br />

PROGRAM COVERAGE: The Advanced Tactical Data Link Systems (ATDLS) funds the Time Division Multiple Access (TDMA) family of Link 16 terminals including the Joint Tactical Information<br />

Distribution System (JTIDS) terminals and the Multifunctional Information Distribution System - Low Volume Terminal (MIDS-LVT) and the Tactical Digital Information Link J (TADIL J) message<br />

standard databases resident in the Command & Control Processor (C2P) sub-system. The Common Data Link Management System (CDLMS) is designated as Pre-planned Product Improvement (P3I) of the<br />

C2P. ATDLS also funds the LMS 16 Link Monitoring System and the Next Generation C2P which will support Link-22, Joint Range Extension and other ATDLS enhancements.<br />

AN/URC-107(V) TERMINALS (JTIDS): AN/URC-107(V) Joint Tactical Information Distribution System (JTIDS) is an advanced radio system that provides information distribution, position location, and<br />

identification capabilities in an integrated form for application to military operations. The system is able to distribute information at high rates, encrypted to provide security, and with sufficient jam<br />

resistance to yield high reliability communications in a hostile electromagnetic environment. JTIDS provides the ability to interconnect multiple sources (air, ground, maritime, subsurface, and electronic<br />

warfare) and users of information. It provides surface and airborne elements with both a position location capability within a common position reference grid and an intrinsic identification capability through<br />

the dissemination of secure position and identity information. It is a multiservice system in that Army JTIDS interoperates with the U.S. Air Force, U.S. Navy, and U.S. Marines JTIDS Class 2 terminals.<br />

AN/UYQ-86 COMMAND AND CONTROL PROCESSOR (C2P) REHOST (C2P(R))/COMMON DATA LINK MANAGEMENT SYSTEM (CDLMS): AN/UYQ-86 C2P(R)/CDLMS program is the<br />

acquisition of commercial-off-the-shelf (COTS) versa module eurocards (VME) based Navy computers in conjunction with a software suite to provide the interface between tactical and digital<br />

communication systems and selected shipboard processors (Advanced Combat Direction Systems (ACDS) and AEGIS Command & Decision (C&D)). C2P extracts information from the Tactical Digital<br />

Information Links (TADILS) A, C & J (or Link 11, Link 4A, and Link 16), translates between TADILS and provides the information back to the on-board processor. This provides flexible capability for<br />

rapidly exchanging tactical information using a universal database for translating various Link formats while remaining independent of communication equipment and tactical data computing systems. C2P<br />

Rehost uses COTS hardware (AN/UYQ-70), making the system easier and cheaper to upgrade and maintain.<br />

CDLMS is designated as the pre-planned product improvement to the C2P. It is integrated with the C2P(R) via a set of commercial VME processors to provide enhanced, consolidated displays to monitor<br />

and analyze multi-TADIL networks graphically. All procurement of CDLMS hardware will include the Satellite-TADIL-J (S-TADIL-J), and the Electronic JTIDS Network Library (EJNL) . S-TADIL-J<br />

consists of an additional set of cards and cables integrated into the CDLMS chassis, enabling the system to send Link 16 information over satellite, providing range extension beyond the Theater of Operation<br />

E-JNL provides pre-defined networks (configurations of ships and aircraft) allowing immediate access to different operational configurations. This minimizes delays for reconfiguring the network when new<br />

platforms are introduced to a mission.<br />

P-1 Shopping List - Item No. 50 - 1 of 13<br />

Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

GET ITEM JUSTIFICATION SHEET (Continued) DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT<br />

Advanced Tactical Data Link System 2614 52DR<br />

CDLMS TECHNOLOGY REFRESH: The CDLMS is comprised of Commercial-Off-the Shelf (COTS) products. Existing processors have become obsolete and no longer available for procurement. In addition, the existing processor's current<br />

speed and memory capabilities do not support efficient software performance. The CDLMS Technology Refresh Program will allow fielding of current processing capability to ensure optimum operational performance.<br />

NEXT GENERATION COMMAND AND CONTROL PROCESSOR (NGC2P) FIELD CHANGE KIT Ship/Shore: The NGC2P (Link 22) Field Change Kit provides existing Model 5 CDLMS units on the ship and shore to next generation open<br />

system hardware and software architecture. NGC2P provides a system capable of supporting critical data link functions including simultaneous processing of Dual Net Multi-Frequency Link 11, Link 16, Link 22, Joint Range Extension (JRE) and<br />

High Throughput Link 16.<br />

MODEL 4 NEXT GENERATION COMMAND AND CONTROL PROCESSOR (NGC2P) Upgrade: The Model 4 NGC2P Upgrade (DN Link 11/ Link 22) upgrades existing Model 4 C2P rehost units to next generation open system hardware<br />

and software architecture. NGC2P provides a system capable of supporting critical data link functions including simultaneous processing of Dual Net Multi-Frequency Link 11, Link 16, Link 22, Joint Range Extension (JRE) and High<br />

Throughput Link 16.<br />

MODEL 4 NEXT GENERATION COMMAND AND CONTROL PROCESSOR (NGC2P) Backfit: The Model 4 NGC2P Back Fit replaces outdated AN/UYK-43 C2P on Model 4 ships with next generation open system hardware and software<br />

architecture. NGC2P provides a system capable of supporting critical data link functions including simultaneous processing of Dual Net Multi-Frequency Link 11, Link 16, Link 22, Joint Range Extension (JRE) and High Throughput Link 16.<br />

LMS-16 (LINK MONITORING SYSTEM): The LMS-16 provides for improved Link 16 network diagnostics, system monitoring and control capabilities. Network performance monitoring by platform and time slot allocation provide critical data<br />

to optimize the Link 16 network. Ruggedized LMS-16 hardware/software will allow the operator to analyze the Link-16 network in real-time and adjust network performance to support Theater Air Defense/Theater Missile Defense by Battle<br />

Groups and Joint Task Forces.<br />

MIDS ON SHIP (MOS): The Multi-Functional Information Distribution System Low Volume Terminal (MIDS-LVT) is a five nation cooperative program that provides a third generation Link 16 system that satisfies U.S. and allied requirements<br />

to exchange tactical information in a digital format across a broad range of sources. Building on JTIDS, MIDS uses the latest technology to reduce system size and weight. It is designed to be readily reconfigurable for different user needs. MOS<br />

consists of a MIDS-LVT integrated into a JTIDS type Electronics Cabinet Assembly including a Terminal Controller, High Power Amplifier/Adapter, and Ship Antenna Power Supplies.<br />

JUSTIFICATION OF FY 03 REQUIREMENTS: FY03 funds will be used to procure CDLMS Technology Refresh, Link Monitoring System (LMS-16), MIDS on Ship - Shore and associated production support and training. Funding will be also<br />

used for Link 16 Alteration Installation Team (AIT) and shipyard installs for C2P(R)/CDLMS Backfits and LMS-16.<br />

JUSTIFICATION OF FY 04 REQUIREMENTS: FY04 funds will be used to procure C2P(R)/CDLMS Forward Fit, NGC2P Field Change Kit for Ship and Shore, MIDS on Ship -Shore, MIDS on Ship Forward Fit and associated production<br />

support and training. Funding will be also used for Link 16 Alteration Installation Team (AIT) and shipyard installs for C2P(R)/CDLMS Backfit .<br />

JUSTIFICATION OF FY 05 REQUIREMENTS: FY05 funds will be used for C2P(R)/CDLMS Forward Fit, NGC2P Field Change Kit Ship/Shore, and MIDS on Ship Shore Production Support. FY05 funds will also be used for Link 16<br />

Alteration Installation Team (AIT) and shipyard installs for NGC2P Field Change Kit for Ship and Shore and MIDS on Ship - Shore.<br />

INSTALLATION AGENT: Space and Naval Warfare Systems Center, San Diego (SSC-SD) and Charleston (SSC-CH).<br />

P-1 Shopping List - Item No. 50 - 2 of 13<br />

Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET (Continued) DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT<br />

Advanced Tactical Data Link System 2614 52DR<br />

DEFINITIONS OF COST CODES:<br />

DR003: AN/UYQ-86 (C2P/C2P(R)/CDLMS): All hardware costs associated with Command and Control Processor (C2P), C2P Rehost, Common Data Link Management System (CDLMS), Common Shipboard Data Terminal Sets<br />

(CSDTS), Satellite-TADIL-J, Electronic JTIDS Network Library (E-JNL), CDLMS Technology Refresh, Next Generation C2P and all associated ECPs.<br />

DR006: LMS-16 (LINK MONITORING SYSTEM): All hardware costs associated with a stand-alone LMS-16 workstation which includes monitor, keyboard, associated antenna and software license agreement.<br />

DR010: MIDS ON SHIP: All hardware and nonrecurring engineering cost associated with MIDS on Ship High Power Link 16 terminal includes MIDS Low Volume Terminal (LVT), Ship Antennas, Electronic Cabinet Assembly, Filtering<br />

devices, High Power Amplifier Group (HPAG), Terminal controller, and all associated ECPs. MOS terminals scheduled to be procured for training sites will not require the procurement of a new antenna.<br />

DR555: PRODUCTION SUPPORT (AN/UYQ-86): Annualized production support includes evaluation of C2P(R)/CDLMS ECPs and production support services for CDLMS, S-TADIL-J, E-JNL, and CDLMS Technology Refresh, Next<br />

Generation C2P; and MIDS on Ship production support services and the evaluation of MIDS Engineering Change Proposals (ECPs).<br />

DR666: TRAINING CURRICULUM: Training Curriculum (end-item) for MIDS on Ship Terminal and Next Generation C2P.<br />

DR777: INSTALLATION: Link 16 equipment installations into shore and training facilities. Link 16 Alteration Installation Team (AIT), shipyard installs and DSA, Electronic Environment Effects (EEE) testing , and installation<br />

engineering and integration coordination for the Fleet. Covers AIT ship installs for JTIDS/C2P(R), MIDS/CDLMS, C2P(R)/CDLMS backfits, S-TADIL-J backfits, E-JNL backfits and Next Generation C2P.<br />

P-1 Shopping List - Item No. 50 - 3 of 13<br />

Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

COST ANALYSIS DATE February 2004<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT Advanced Tactical Data Link Systems 2614 52DR<br />

PY FY 2003 FY 2004 FY 2005<br />

COST ID TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE COST QTY COST COST QTY COST COST QTY COST COST<br />

DR003 AN/UYQ-86 (C2P / C2P (R) / CDLMS) Forward Fit A 2 558.0 1,116<br />

DR003 CDLMS Technology Refresh (Field Change Kit) (Note 1) A 15 23.7 356<br />

DR003 NGC2P Field Change Kit Ship (Note 2) B 19 194.5 3,696<br />

DR003 NGC2P Field Change Kit Shore (Note 2) B 6 200.0 1,200<br />

DR006 Link Monitoring System (LMS-16) A 2 309.0 618<br />

DR010 MIDS on Ship Shore A 2 1,478.0 2,956 2 1,500.0 3,000<br />

DR010 MIDS on Ship Forward Fit B 2 1,604.0 3,208<br />

DR555 Production Support N/A 268 813 514<br />

DR666 Training Curriculum N/A 766 500<br />

DR777 Installation N/A 4,040 2,530 1,872<br />

Installation of Equipment / Non-FMP 1,202<br />

Installation of Equipment / FMP 3,521 2,162 276<br />

DSA 519 368 394<br />

DD FORM 2446, JUN 86<br />

TOTAL CONTROL 9,004 16,063 2,386<br />

Note 1: No installation costs are associated with the CDLMS Technology Refresh (Field Change Kit).<br />

Note 2: The PB 04 budget reflected the procurement of five Interim NGC2P w/DNMFL units in FY 04. Due to the acceleration of Next Generation Command and Control Processor capability into the fleet, stand alone Interim NGC2P units are<br />

no longer required. NGC2P Field Change Kits will implement the capability into existing equipment.<br />

P-1 Shopping List - Item No. 50 - 4 of 13<br />

Exhibit P-5, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

PROCUREMENT HISTORY AND PLANNING DATE February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Advanced Tactical Data Link Systems 2614 52DR<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE Delivery COST NOW AVAILABLE<br />

DR003 AN/UYQ-86 (C2C / C2P (R) / CDLMS) Forward Fit 04 TBD FFP TBD N/A Apr-04 Oct-05 2 558.0 YES N/A<br />

DR003 NGC2P Field Change Kit ship 04 TBD FFP TBD N/A Aug-04 Aug-05 19 194.5 YES N/A<br />

DR003 NGC2P Field Change Kit shore 04 TBD FFP TBD N/A Aug-04 Aug-05 6 200.0 Yes N/A<br />

DR010 MIDS on Ship Shore (Note 1) 03 DLS, Inc., Cedar Rapids, IA FFP SPAWAR N/A Dec-02 Dec-04 2 1,478.0 YES N/A<br />

04 DLS, Inc., Cedar Rapids, IA FFP SPAWAR N/A Mar-04 Mar-06 2 1,500.0 YES N/A<br />

DR010 MIDS on Ship Forward Fit (Note 1) 04 DLS, Inc., Cedar Rapids, IA FFP SPAWAR N/A Mar-04 Mar-06 2 1,604.0 YES N/A<br />

REMARKS<br />

Note 1: For FY04 procurement only. Pending ASN (RD&A) approval of emerging requirements under Navy LRIP Lot 4 decision.<br />

P-1 Shopping List - Item No. 50 - 5 of 13<br />

Exhibit P-5a, Procurement History and Planning<br />

Unclassified<br />

classification


UNCLASSIFIED<br />

MODIFICATION TITLE: AN/UYQ-86 (C2P(R)/CDLMS) BACKFIT SHIP INSTALLATIONS<br />

COST CODE DR003<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: The C2P(R)/CDLMS equipment performs data link processing functions and provides the interface between the Tactical Digital Information Links (TADILS) and selected shipboard processors.<br />

CDLMS provides the ability to graphically display multiple TADIL networks for monitoring and analysis. The purpose of C2P(R)/ CDLMS backfits is to upgrade the outdated AN/UYK-43 in the fleet<br />

with the new AN/UYQ-86 COTS equipment. CDLMS includes S-TADIL-J and E-JNL. Identified installation costs include S-TADIL-J and E-JNL installations in FY 01.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: POST MS III<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring 0.4 0.4<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

37 19.9 4 1.9 41 21.8<br />

Production Support 0.7 0.2 0.9<br />

Other (DSA)<br />

Interm Contractor Support<br />

2.0 0.5 0.2 0.1 2.8<br />

Installation of Hardware* 20 12.6 12 4.4 5 3.1 4 2.2 41 22.2<br />

PRIOR YR EQUIP 12 7.6 12 7.6<br />

FY 00 EQUIP 8 5.0 9 3.8 17 8.8<br />

FY 01 EQUIP 3 0.6 5 3.1 8 3.7<br />

FY 02 EQUIP<br />

FY 03 EQUIP<br />

FY 04 EQUIP<br />

FY 05 EQUIP<br />

FY 06 EQUIP<br />

FY 07 EQUIP<br />

FY TC EQUIP<br />

4 2.2 4 2.2<br />

TOTAL INSTALLATION COST 12.6 4.4 3.1 2.2 22.2<br />

TOTAL PROCUREMENT COST 35.5 7.0 3.3 2.3 48.1<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 MOS PRODUCTION LEADTIME: 12 MOS<br />

CONTRACT DATES: FY 2003: FY 2004: FY 2005:<br />

DELIVERY DATES: FY 2003: FY 2004: FY 2005:<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 37 1 1 1 1<br />

OUTPUT 35 2 1 1 1 1<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 41<br />

OUTPUT 41<br />

Notes/Comments<br />

1. Total quantity meets inventory objective.<br />

3. FY02 costs include C2P upgrade.<br />

P-1 Shopping List - Item No. 50 - 6 of 13<br />

February 2004<br />

Exhibit P-3A, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: AN/UYQ-86 (C2P(R)/CDLMS) FORWARD FIT INSTALLATIONS<br />

COST CODE DR003<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: The C2P(R)CDLMS equipment performs data link processing functions and provides the interface between the Tactical Digital Information Links (TADILS) and selected shipboard processors<br />

CDLMS provides the ability to graphically display multiple TADIL networks for monitoring and analysis.<br />

The cost of installing C2P(R)/CDLMS is included in the JTIDS terminal installation cost (reflected in P3-A for DR001) for FY PY-02 and in MIDS on Ship installation cost (reflected in P-3A for DR010) for FY 06.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: POST MS III<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

58 58.0 2 1.1 60 59.1<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.1 0.1 0.1<br />

Installation of Hardware* 57 0.0 1 0.0 2 0.0 60 0.0<br />

PRIOR YR EQUIP<br />

FY 00 EQUIP<br />

FY 01 EQUIP<br />

FY 02 EQUIP<br />

FY 03 EQUIP<br />

57 0.0 1 0.0 58 0.0<br />

FY 04 EQUIP<br />

FY 05 EQUIP<br />

FY 06 EQUIP<br />

FY 07 EQUIP<br />

FY TC EQUIP<br />

2 0.0 2 0.0<br />

TOTAL INSTALLATION COST 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0<br />

TOTAL PROCUREMENT COST 58.0 0.0 0.0 1.2 0.1 0.0 0.0 0.0 0.0 59.2<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 MOS PRODUCTION LEADTIME: 18 MOS<br />

CONTRACT DATES: FY 2003: FY 2004: Apr-04 FY 2005:<br />

DELIVERY DATES: FY 2003: FY 2004: Oct-05 FY 2005:<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 58 1 1<br />

OUTPUT 58 1 1<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 60<br />

OUTPUT 60<br />

Notes/Comments<br />

1. Total quantity meets inventory objective.<br />

2. Production leadtime varies between 12 to 18 months. For forward fit ships, JTIDS or MIDS on Ship and UYQ-86(C2P/CDLMS) are installed as a ship set except for command ships. Delivery of forward fit units takes six months longer than those procured<br />

into existing suites. This is due to longer integration and testing time at the SPAWAR Systems Center.<br />

3. Installation costs are included in the JTIDS (DR001) or MIDS on Ship (DR010) installation costs.<br />

P-1 Shopping List - Item No. 50 - 7 of 13<br />

February 2004<br />

Exhibit P-3A, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: NEXT GENERATION COMMAND AND CONTROL PROCESSOR (NGC2P) FIELD CHANGE KIT SHIP<br />

COST CODE DR003<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: The NGC2P (Link 22) Field Change Kit provides existing Model 5 CDLMS units on the ship to next generation open system hardware and software architecture. NGC2P provides a system capable of supporting critical data link functions<br />

including simultaneous processing of Dual Net Multi-Frequency Link 11, Link 16, Link 22, Joint Range Extension (JRE) and High Throughput Link 16.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: POST MS III (NGC2P is a P3I to C2P/CDLMS)<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

19 3.7 25 5.2 17 3.7 19 4.2 5 1.2 85 17.9<br />

Training Equipment 0.5 0.5<br />

Production Support 0.2 0.01 0.2 0.3 0.3 0.1 0.1 1.1<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.3 0.3 0.8 0.6 0.6 0.3 0.0 2.8<br />

Installation of Hardware*<br />

PRIOR YR EQUIP<br />

FY 00 EQUIP<br />

FY 01 EQUIP<br />

FY 02 EQUIP<br />

FY 03 EQUIP<br />

3 0.3 16 1.5 25 2.4 17 1.7 19 2.0 5 0.5 85 8.4<br />

FY 04 EQUIP<br />

FY 05 EQUIP<br />

3 0.3 16 1.5 19 1.8<br />

FY 06 EQUIP 25 2.4 25 2.4<br />

FY 07 EQUIP 17 1.7 17 1.7<br />

FY 08 EQUIP 19 2.0 19 2.0<br />

FY TC EQUIP 5 0.5 5 0.5<br />

TOTAL INSTALLATION COST 0.3 1.5 2.4 1.7 2.0 0.5 8.4<br />

TOTAL PROCUREMENT COST 4.6 0.6 7.6 7.0 6.8 3.5 0.6 30.7<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 MOS PRODUCTION LEADTIME: 12 MOS<br />

CONTRACT DATES: FY 2004: Aug-04 FY 2005:<br />

DELIVERY DATES: FY 2004: Aug-05 FY 2005:<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 3 4 4 4 4<br />

OUTPUT 3 4 4 4<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 7 6 6 6 5 4 4 4 5 5 5 4 5 85<br />

OUTPUT<br />

Notes/Comments<br />

1. Total quantity meets inventory objective.<br />

4 7 6 6 6 5 4 4 4 5 5 5 9 85<br />

P - 1 Shopping List - Item No. 50 - 8 of 13<br />

February 2004<br />

Exhibit P-3A, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: NEXT GENERATION COMMAND AND CONTROL PROCESSOR (NGC2P) FIELD CHANGE KIT SHORE<br />

COST CODE DR003<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: The NGC2P (Link 22) Field Change Kit provides existing Model 5 CDLMS units on the shore to next generation open system hardware and software architecture. NGC2P provides a system capable of supporting critical data link function<br />

including simultaneous processing of Dual Net Multi-Frequency Link 11, Link 16, Link 22, Joint Range Extension (JRE) and High Throughput Link 1<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: POST MS III (NGC2P is a P3I to C2P/CDLMS)<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

6 1.2 6 1.2<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.1 0.1 0.2<br />

Installation of Hardware*<br />

PRIOR YR EQUIP<br />

FY 00 EQUIP<br />

FY 01 EQUIP<br />

FY 02 EQUIP<br />

FY 03 EQUIP<br />

6 0.5 6 0.5<br />

FY 04 EQUIP<br />

FY 05 EQUIP<br />

FY 06 EQUIP<br />

FY 07 EQUIP<br />

FY TC EQUIP<br />

6 0.5 6 0.5<br />

TOTAL INSTALLATION COST 0.5 0.5<br />

TOTAL PROCUREMENT COST 1.3 0.5 1.8<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 MOS PRODUCTION LEADTIME: 12 MOS<br />

CONTRACT DATES: FY 2004: Dec-03 FY 2005:<br />

DELIVERY DATES: FY 2004: Dec-04 FY 2005:<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 6<br />

OUTPUT 6<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 6<br />

OUTPUT 6<br />

Notes/Comments<br />

P-1 Shopping List - Item No. 50 - 9 of 13<br />

February 2004<br />

Exhibit P-3A, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: LMS-16 LINK MONITORING SYSTEM INSTALLATIONS<br />

COST CODE DR006<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: LMS-16 provides improved Link 16 network diagnostics, system monitoring and control capabilities. Network performance monitoring by platform and time slot allocation provide critical data to optimize the<br />

Link 16 network. LMS-16 are being installed at five NCTSI shore based detachments, one on the USS Stennis, one on the USS Nimitz and one on the USS Enterprise.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: POST MS III<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

6 2.4 2 0.6 8 3.0<br />

Production Support 0.1 0.1 0.2<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.3 0.3<br />

Installation of Hardware*<br />

PRIOR YR EQUIP<br />

FY 00 EQUIP<br />

1 0.1 2 0.4 3 0.6<br />

FY 01 EQUIP<br />

FY 02 EQUIP<br />

1 0.1 1 0.1<br />

FY 03 EQUIP<br />

FY 04 EQUIP<br />

FY 05 EQUIP<br />

FY 06 EQUIP<br />

FY 07 EQUIP<br />

FY TC EQUIP<br />

2 0.4 2 0.4<br />

TOTAL INSTALLATION COST 0.1 0.4 0.6<br />

TOTAL PROCUREMENT COST 2.7 1.5 4.2<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 MOS PRODUCTION LEADTIME: 6 MOS<br />

CONTRACT DATES: FY 2003: Dec-02 FY 2004: FY 2005:<br />

DELIVERY DATES: FY 2003: Dec-02 FY 2004: FY 2005:<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 3<br />

OUTPUT 3<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 3<br />

OUTPUT 3<br />

Notes/Comments<br />

1. Total quantity meets inventory objective.<br />

2. NCTSI is funding the installation costs for the five LMS 16 units being installed at NCTSI detachments.<br />

P-1 Shopping List - Item No. 50 - 10 of 13<br />

February 2004<br />

Exhibit P-3A, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: MIDS ON SHIP SHORE INSTALLATIONS<br />

COST CODE DR010<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: MIDS is an advanced radio system providing information distribution, position location, and identification capability at high rates of speed, crypto-secure, and jam resistant.<br />

MIDS Terminals are the result of a five-nation cooperative program to provide third generation Link 16 capability at a reduced size, reduced weight, and ultimately a lower cost.<br />

Installation of MIDS on Ship at a shore installation (training site) does not require the installation of the associated antenna.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 03 - LRIP 3/FY 04 - MS III<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

2 3.0 2 3.0 4 6.0<br />

Training Equipment 0.8 0.8<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.2 0.3 0.4 0.2 1.1<br />

Installation of Hardware*<br />

PRIOR YR EQUIP<br />

FY 00 EQUIP<br />

FY 01 EQUIP<br />

FY 02 EQUIP<br />

2 0.8 2 0.9 4 1.6<br />

FY 03 EQUIP 2 0.8 2 0.8<br />

FY 04 EQUIP<br />

FY 05 EQUIP<br />

FY 06 EQUIP<br />

FY 07 EQUIP<br />

FY TC EQUIP<br />

2 0.9 2 0.9<br />

TOTAL INSTALLATION COST 0.8 0.9 1.6<br />

TOTAL PROCUREMENT COST 3.9 3.3 1.2 1.1 9.4<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 MOS PRODUCTION LEADTIME: 24 MOS<br />

CONTRACT DATES: FY 2003: Dec-02 FY 2004: Mar-04 FY 2005:<br />

DELIVERY DATES: FY 2003: Dec-04 FY 2004: Mar-06 FY 2005:<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 2 2<br />

OUTPUT 2 2<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 4<br />

OUTPUT 4<br />

Notes/Comments<br />

1. Total Quantity meets inventory objective.<br />

P-1 Shopping List - Item No. 50 - 11 of 13<br />

February 2004<br />

Exhibit P-3A, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: MIDS ON SHIP FORWARD FIT INSTALLATIONS<br />

COST CODE DR010<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: MIDS is an advanced radio system providing information distribution, position location, and identification capability at high rates of speed, crypto-secure, and jam resistant.<br />

MIDS Terminals are the result of a five-nation cooperative program to provide third generation Link 16 capability at a reduced size, reduced weight, and ultimately a lower cost.<br />

Shipboard installation of MIDS on Ship requires an AS-4127A and an AS-4400 antenna set.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: MS III<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

2 3.2 2 3.2<br />

Production Support 0.2 0.2<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.1 0.0 0.2<br />

Installation of Hardware*<br />

PRIOR YR EQUIP<br />

FY 00 EQUIP<br />

FY 01 EQUIP<br />

FY 02 EQUIP<br />

FY 03 EQUIP<br />

2 1.7 2 1.7<br />

FY 04 EQUIP<br />

FY 05 EQUIP<br />

FY 06 EQUIP<br />

FY 07 EQUIP<br />

FY TC EQUIP<br />

2 1.7 2 1.7<br />

TOTAL INSTALLATION COST 1.7 1.7<br />

TOTAL PROCUREMENT COST 3.4 0.1 1.7 5.2<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 MOS PRODUCTION LEADTIME: 24 MOS<br />

CONTRACT DATES: FY 2004: Mar-04 FY 2005:<br />

DELIVERY DATES: FY 2004: Mar-06 FY 2005:<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 2<br />

OUTPUT 2<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 2<br />

OUTPUT 2<br />

Notes/Comments<br />

1. Total Quantity meets inventory objective.<br />

2. MIDS on Ship and AN/UYQ-86 (C2P/C2P(R)/CDLMS) are installed as a ship set.<br />

P-1 Shopping List Item No. 50 - 12 of 13<br />

February 2004<br />

Exhibit P-3A, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

PRODUCTION SCHEDULE February 2004<br />

(DOD EXHIBIT P-21)<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD NO.<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT 52DR<br />

S ACCEP BAL FISCAL YEAR 04 FISCAL YEAR 05 FISCAL YEAR 06<br />

COST ITEM/MANUFACTURER E PROC PRIOR DUE 03 CALENDAR YEAR 04 04 CALENDAR YEAR 05 05<br />

CALENDAR YEAR 06<br />

CODE R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S<br />

V 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E<br />

FY T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P<br />

DR003 AN/UYQ-86 (C2P/C2P(R)/CDLMS) Forward Fit 04 2 2 A 1 1<br />

DR003 NGC2P Field Change Kit Ship 04 19 19 A 1 2 1 1 2 1 1 2 1 1 2 1 1 2<br />

DR003 NGC2P Field Change Kit Shore 04 6 6 A 3 3<br />

DR010 MIDS on Ship Shore 03 2 2 1 1<br />

04 2 2 A 1 1<br />

.<br />

DR010 MIDS on Ship Forward Fit 04 2 2 A 1 1<br />

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP<br />

PRODUCTION RATE PROCUREMENT LEADTIMES<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

ITEM Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

AN/UYQ-86 (C2P/C2P(R)/CDLMS) Forward Fit TBD<br />

1-8-5<br />

18 months<br />

NGC2P Field Change Kit Ship TBD<br />

1-8-5<br />

12 months<br />

NGC2P Field Change Kit Shore TBD<br />

1-8-5<br />

12 months<br />

MIDS on Ships Shore DLS, Inc. Cedar Rapids, IA 1 1-8-5<br />

4 24 months<br />

MIDS on Ships Forward Fit DLS, Inc. Cedar Rapids, IA<br />

1 1-8-5<br />

4 24 months<br />

P-1 Shopping List - Item No. 50 - 13 of 13<br />

DATE<br />

Exhibit P-21A, Production Schedule<br />

Unclassified<br />

Classification


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY BA-2: COMMUNICATIONS/ELECTRONICS MINESWEEPING SYSTEM REPLACEMENT/262200/72LV<br />

Program Element for Code B Items: Other Related Program Elements<br />

0603502N PE 0204302N<br />

ID Prior To<br />

Code Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY<br />

EQUIPMENT COST<br />

(In Millions) A N/A $0.1 $18.2 $78.0 $112.2 $54.6 $36.2 $22.4 CONT. CONT.<br />

SPARES COST<br />

(In Millions) A N/A $0.6 $1.7 $9.3 $8.9 $5.0 $1.2 $0.0 CONT. CONT.<br />

PROGRAM DESCRIPTION/JUSTIFICATION :<br />

Provide systems, subsystems, and engineering change kits for minehunting, navigation, and tactical display operations by the surface MCM force. Engineering change kits improve<br />

reliability and maintainability and correct deficiencies to allow equipment to perform in accordance with operational requirements.<br />

Remote Minehunting System (RMS) (LV064): The AN/WLD-1(V)1 system will consist of Remote Minehunting Vehicle (RMV), Variable Depth Sensor (VDS, AN/AQS-20), and shipboard equipment<br />

consisting of a Command Control Combat System, Launch and Recovery System, radio antennas and support equipment. The AN/AQS-20 is specifically designed for the detection, classification, and<br />

localization of subsurface mines.<br />

MCM/MHC Propulsion Improvement Program (LV072): This program is critical to correct design deficiencies, improve the Mean Time Between Failure for increased ship operational availability, and<br />

improve Reliability and Maintainability.<br />

MCM/MHC Integrated Ship Control System (ISCS) (LV073): This program replaces the existing MHC Machinery Control System, which will bring all MHC ships to a common configuration and funds<br />

software integration upgrades to the MCM-1 class ships.<br />

Force Protection Equipment (LV074): Provides Force Protection equipment for sailors to conduct maritime interdiction operations.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 51 PAGE NO. 1<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 CONTINUATION February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY BA-2: COMMUNICATIONS / ELECTRONICS MINESWEEPING SYSTEM REPLACEMENT/ 262200/72LV<br />

ITEM DESCRIPTION / JUSTIFICATION (CONTINUED) :<br />

Mine Countermeasures Combat System Upgrades (LV075): The MCM Combat System Upgrades program will consist of a series of incremental upgrades to the current combat system via Engineering<br />

Change Kits. The upgrades will improve reliability and maintainability and correct deficiencies to allow the equipment to perform in accordance with operational requirements. The current planned<br />

upgrades include:<br />

-Acoustic Sweep Replacement - replace the TB-26 and TB-27 with the Advanced Acoustic Generator (AAG) to solve obsolesence problems, reduce aft deck weight and improve performance.<br />

-AN/SQQ-32 Sonar Data Recorder - upgrade the minehunting sonar on MCM ships, which will provide the capability to record, playback, and display, detect and classify data for sonar contact<br />

recognition training.<br />

- MCM Communication Upgrade - upgrade and modernization of the communications systems for MCM ships.<br />

- Supportability Engineering Changes - upgrade and modernization of the combat systems upgrade to reduce emergent obsolesence and supportability issues such as OK520 HPU, SQQ-32 touch<br />

panel, SLQ-48 PDU, and Mine Countermeasure Navigation Command and Control (NAVCC) upgrade.<br />

Items to procured in FY 03: MCM Combat System Upgrades consisting of the following changes: SQQ-32 ECP for the replacement of obsolete touch panel.<br />

Items to be procured in FY 04: MCM Combat System Upgrades consisting of the following changes: Acoustic Sweep Upgrade - 1 system; OK-520 HPU upgrade ECP - 4 systems, NAVCC upgrade ECP-<br />

1 system.<br />

Items to be procured in FY05: MCM Combat System Upgrades consisting of the following changes: Acoust Sweep Upgrades - 1 system; OK-520 HPU upgrade ECP - 4 systems; SQQ-32 Sonar Data<br />

Recorder - 15 systems; Communications upgrade - 3 systems, NAVCC upgrade ECP-1 system; 2 Remote Minehunting Vehicles; 2 Variable Depth Sensors (VDS)<br />

*LV075 encompasses the old cost codes LV066, Integrated Combat Weapon System; LV069, Australian Accoustic Generator; LV070, AN/SQQ-32 Sonar Data Recorder; and LV071, MCM-1<br />

Communications Upgrade<br />

Code "B" Items: RMS Systems, PE 0603502N Planned<br />

DT Assist 4th QTR FY 02 / 1st QTR FY03<br />

TECHEVAL Phase I 4th QTR FY 03 / 3rd QTR FY04<br />

TECHEVAL Phase II 3rd QTR FY 04 / 1st QTR FY05<br />

OPEVAL 3rd QTR FY 04 / 1st QTR FY05<br />

Estimates include competitive sourcing savings associated with consolidation of production support contracting efforts.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 51 PAGE NO. 2<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy<br />

BA-2: COMMUNICATIONS / ELECTRONICS A MINESWEEPING SYSTEM REPLACEMENT/262200/72LV<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID Prior FY 2003 FY 2004 FY 2005<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

LV064<br />

MINE WARFARE, N752<br />

REMOTE MINEHUNTING SYSTEM (RMS) 4 11,677 46,708<br />

LV072 MCM/MHC PROPULSION IMPRV. PROG., A 5,338 13,909<br />

- MCM 1 1,414 1,414 7 1,410 9,870<br />

- SUPPORT 3,924 4,039<br />

LV073 MCM/MHC INTEGRATED SHIP CONT SYS A 2,953 649<br />

- MSCS 1 2,600 2,600 0<br />

- SOFTWARE INTEGRATION 353 649<br />

LV074 FORCE PROTECTION EQUIPMENT A 822 0<br />

LV075 MCM COMBAT SYSTEMS UPGRADES Var Var 113 Var Var 8,226 Var Var 13,857<br />

LV830 PRODUCTION ENGINEERING 420 2,467<br />

- RMS 0 1,854<br />

- MCM COMBAT SYS 420 613<br />

LV900 CONSULTING SERVICES 429 366<br />

- MCM COMBAT SYS 429 366<br />

TOTAL 0 113 18,188 77,956<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 51 PAGE NO. 3<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY<br />

Other Procurement, Navy<br />

C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

BA-2: COMMUNICATIONS / ELECTRONICS MINESWEEPING SYSTEM REPLACEMENT/262200 72LV<br />

Cost Element/<br />

FISCAL YEAR<br />

FISCAL YEAR 03<br />

QUANTITY UNIT<br />

COST<br />

(000)<br />

LOCATION<br />

OF PCO<br />

RFP ISSUE<br />

DATE<br />

CONTRACT<br />

METHOD<br />

& TYPE<br />

CONTRACTOR<br />

AND LOCATION<br />

AWARD<br />

DATE<br />

DATE OF<br />

FIRST<br />

DELIVERY<br />

SPECS<br />

AVAILABLE<br />

NOW<br />

DATE<br />

REVISIONS<br />

AVAILABLE<br />

LV075 MCM Comb Sys VAR* VAR* NAVSEA/ NSWC<br />

CRANE/ DAHL/ CSS<br />

N/A WR VARIOUS VAR** VAR** YES 11/02<br />

FISCAL YEAR 04<br />

LV072 Prop. Imprv. Prog. 1 1414 NAVSSES, PHIL N/A WR/RC NAVSSES, PHIL. 11/03 6/04 YES 11/03<br />

LV073 MSCS 1 2600 NAVSSES, PHIL. N/A WR/RC NAVSSES, PHIL. 11/03 6/04 YES 11/03<br />

LV075 MCM Comb Sys VAR* VAR* NAVSEA/ NSWC<br />

CRANE/ CSS/NAWC<br />

N/A WR VARIOUS VAR** VAR** NO 11/03<br />

FISCAL YEAR 05<br />

LV064 RMS<br />

LV072 Prop. Imprv. Prog.<br />

4 11677 TBD TBD TBD TBD TBD TBD NO 11/04<br />

- MCM 7 1410 NAVSSES, PHIL. N/A WR/RC NAVSSES,PHIL. 11/04 6/05 YES 11/04<br />

LV075 MCM Comb Sys VAR* VAR* NAVSEA/ NSWC<br />

CRANE/ CSS/NAWC<br />

N/A WR VARIOUS VAR** VAR** NO 11/04<br />

D. REMARKS<br />

* SEE SYSTEM DESCRIPTION ON P-40 FOR MORE DETAILS<br />

** Dates of award and delivery vary based on when ECPs are submitted and approved.<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Classification:<br />

ITEM NO. 51 PAGE NO. 4 UNCLASSIFIED


FY 2004/05 BUDGET PRODUCTION SCHEDULE, P-21 DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY<br />

OTHER PROCUREMENT, NAVY<br />

Weapon System P-1 ITEM NOMENCLATURE<br />

Minesweeping System Replacement/262200/72LV<br />

Production Rate Procurement Lead-times<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

Item Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

LV064 RMS TBD<br />

LV072 PROP IMPR PROG NAVSSES, PHIL. 1 1 1 7 7 23 EACH<br />

LV073 MSCS NAVSSES, PHIL. 1 1 1 7 7 9 EACH<br />

FISCAL YEAR 2002 FISCAL YEAR 2003<br />

ITEM / MANUFACTURER F S Q D B 2001 CALENDAR YEAR 2002 CALENDAR YEAR 2003<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

N<br />

O<br />

D<br />

E<br />

J<br />

A<br />

F<br />

E<br />

M<br />

A<br />

A<br />

P<br />

M<br />

A<br />

J<br />

U<br />

J<br />

U<br />

A<br />

U<br />

S<br />

E<br />

O<br />

C<br />

N<br />

O<br />

D<br />

E<br />

J<br />

A<br />

F<br />

E<br />

M<br />

A<br />

A<br />

P<br />

M<br />

A<br />

J<br />

U<br />

J<br />

U<br />

T V C N B R R Y N L G P T V C N B R R Y N L<br />

FISCAL YEAR 2004 FISCAL YEAR 2005<br />

ITEM / MANUFACTURER F S Q D B 2003 CALENDAR YEAR 2004 CALENDAR YEAR 2005<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L<br />

LV072 PROP IMPR - MCM 04 N 1 0 1 A 1 0<br />

LV073 MSCS 04 N 1 0 1 A 1 0<br />

LV064 RMS (TBD) 05 N 4 0 4 4<br />

LV072 PROP IMPR - MCM 05 N 7 0 7 A 7 0<br />

Remarks:<br />

DD Form 2445, JUL 87 Previous editions are obsolete P-1 SHOPPING LIST<br />

311 / 244 ITEM NO 51 PAGE 5 Exhibit P-21 Production Schedule<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT NAVSTAR GPS BLI 2657 521R<br />

QUANTITY<br />

FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TO COMP TOTAL<br />

COST<br />

(in millions) $11.4 $15.5 $11.7 $13.2 $12.5 $12.8 $13.0 Cont. Cont.<br />

PROGRAM COVERAGE: Navigation Sensor System Interface (NAVSSI) is a surface based system that integrates shipboard navigation signals and<br />

distributes the processed output to user systems and networks. NAVSSI provides position, velocity, time and almanac data to onboard command and<br />

control systems in real time with Global Positioning System (GPS) as the primary source of navigation data. The navigation team uses an automated work<br />

station that includes automated planning functions and the use of Digital Nautical Charts (DNC). NAVSSI uses Non-Developmental Item (NDI) hardware and<br />

a combination of commercial off the shelf (COTS) and newly developed software. The GPS VME (Versa Module Europa) Receiver Card (GVRC) replaces<br />

the 13 card GPS receiver with a single card and is hosted within NAVSSI. A subset of the NAVSSI program is NAVSSI Lite, which provides electronic<br />

charting capability to vessels not requiring the full NAVSSI system.<br />

JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: Procurement and installation of Navigation Sensor System Interface (NAVSSI) are required to<br />

provide Global Positioning System (GPS) and other navigation sensor data to ship-board C4ISR, Combat, and Weapons Systems. NAVSSI enables<br />

utilization and display of electronic chart products. NAVSSI is the only available system that performs the full functions of collection, integration, and<br />

distribution of navigation data. Common charting and precision navigation data are required to allow a common and correlated ship-to-ship tactical and<br />

operational picture. NAVSSI ensures precise Strike and Theater Ballistic Missile Defense (TBMD) weapon systems to have the necessary navigational data.<br />

Failure to procure and install NAVSSI would result in loss of critical navigation data required by Combat and Weapons Systems.<br />

FY 04 funding procures 9 NAVSSI systems and 9 RTS/DCS retrofit kits and installation of 9 NAVSSI systems and 8 RTS/DCS retrofits.<br />

FY 05 funding procures 5 NAVSSI systems and 3 RTS/DCS retrofit kits and installation of 6 NAVSSI systems, and 4 RTS/DCS retrofits.<br />

Installations are being done for each class/ship through the preparation of ship alteration proposals and ship alteration records.<br />

Installation Agent: Installation teams and/or overhaul - to be determined for each ship during execution.<br />

P-1 Shopping List-Item No - 52 (1 of 11) Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET (Continued) DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT NAVSTAR GPS BLI 2657 521R<br />

PROGRAM COVERAGE: The Naval Research Advisory Committee (NRAC) GPS Vulnerability Study Panel tasked by OPNAV N6 and ASN(RD&A), assessed the Navy's GPS<br />

Vulnerabilities and recommended specific actions to resolve serious issues to ensure the continued availability of GPS information in a high risk hostile jamming environment. As a<br />

result, OPNAV N633 (now N611) and N880 (now N78) drafted the Navy Enhanced GPS User Equipment ORD to address operational requirements. These were validated and the<br />

ORD was approved on June 7, 2000. With this beginning, OSD directed the first phase of the Navy's overall GPS upgrade program with RDT&E leading to initial OPN procurements of<br />

GPS anti-jam antennas beginning in 2002 for ships. RDT&E continues to support platform integration requirements, DT/OT, and Anti Jam (AJ) solutions for submarines. An ACAT III<br />

program was established for Sea NAVWAR and this combined with the Navy Enhanced GPS User Equipment ORD have become the basis for the Navy’s Sea NAVWAR program.<br />

JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: Procurement and installation anti-jam GPS user equipment and prevention equipment is required to ensure the continued<br />

utility of GPS signals from space in a hostile jamming environment. The NAVWAR program will equip selected ships and submarines with anti-jam GPS antennas and other GPS<br />

Modernization enhancements to ensure the continued availability of GPS to support surface and subsurface combat operations and provide reliable GPS and other navigation sensor<br />

data to ship-board C4ISR, Combat, and Weapons Systems. Failure to procure and install NAVWAR anti-jam antennas on the above platforms would result in the potential loss of<br />

critical GPS information resulting in serious impact on platform combat mission effectiveness.<br />

FY04 will continue with the procurement of 38 GAS-1 systems with groundplanes and the installation of 17 units.<br />

FY05 will continue with the procurement of 27 GAS-1 systems with groundplanes and the installation of 38 units.<br />

Installations are being done for each class/ship through the preparation of ship alteration proposals and ship alteration records.<br />

Installation Agent: Installation teams and/or overhaul - to be determined for each ship class during execution.<br />

P-1 Shopping List-Item No - 52 (2 of 11) Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE<br />

COST ANALYSIS February 2004<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT NAVSTAR GPS BLI 2657 521R<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

FY 2003 FY 2004 FY 2005<br />

COST ID UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE QTY COST COST QTY COST COST QTY COST COST<br />

1R555 Production Support NAVSSI FMP A 857 448 509<br />

Production Support NAVSSI Retrofit A 297 454 80<br />

Production Support NAVSSI Lite A 285<br />

Production Support NAVWAR A 35 765 804<br />

1R009 NAVSSI FMP A 4 538 2,151 6 465 2,790 5 465 2,325<br />

NAVSSI - Schools A 3 250 750 3 250 750<br />

1R011 NAVSSI - Retrofit A 4 138 553 9 200 1,800 3 175 525<br />

1R012 NAVSSI - Land Based Test Upgrades A 1 500 500<br />

1R013 NAVWAR A 17 49 840 38 85 3,230 27 90 2,430<br />

1R015 NAVSSI Lite A<br />

1R777 Installation 5,668 4,782 4,977<br />

Install - NAVSSI FMP A 1,660 2,372 2,195<br />

Install - Design Service Agent (NAVSSI FMP) A 114 443 389<br />

Install - NAVSSI Retrofit A 1,113 725 315<br />

Install - Design Service Agent (NAVSSI Retrofit) A 430 17<br />

Install - NAVSSI Lite A 1,320<br />

Install - Design Service Agent (NAVSSI Lite) A 173<br />

Install - NAVSSI Schools A 90 260<br />

Install - NAVWAR A 672 678 1,558<br />

Install - Design Service Agent (NAVWAR) A 96 287 520<br />

TOTAL 11,436 15,519 11,650<br />

Remarks:<br />

Note 1: 1R011 Unit cost is the average cost of retrofit hardware on different classes of ships. Starting in FY 02 major combatants, which require more hardware, will be retrofitted, resulting in higher costs per unit.<br />

Note 2: 1R013 The baseline GAS-1 procurement is a combined Navy OPN/APN buy with unit price being determined based on quantity/year ordered. Unit cost per year also reflects multiple hardware configurations. FY04 begins procurement<br />

of 2 Ground Plane Assemblies per ship (several classes) and the Fiber Optic Antenna Link and GAS-1 to GVRC/NAVSSI interface.<br />

DD FORM 2446, JUN 86 P-1 Shopping List-Item No 52 (3 of 11) Exhibit P-5, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

A. DATE<br />

PROCUREMENT HISTORY AND PLANNING February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT NAVSTAR GPS BLI 2657 521R<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE Delivery COST NOW AVAILABLE<br />

1R009 NAVSSI 03 Various WX/RCP Various Various Nov-02 Mar-03 7 538,000 Yes<br />

04 Various WX/RCP Various Various Nov-03 Mar-04 9 465,000 Yes<br />

05 Various WX/RCP Various Various Nov-04 Mar-05 5 465,000 Yes<br />

1R011 NAVSSI - Retrofit 03 Various WX/RCP Various Various Nov-02 Mar-03 4 138,000 Yes<br />

04 Various WX/RCP Various Various Nov-03 Mar-04 9 200,000 Yes<br />

05 Various WX/RCP Various Various Nov-04 Mar-05 3 175,000 Yes<br />

1R013 NAVWAR Hardware<br />

D. REMARKS<br />

1R009 - FY 03 includes 3 school units at a unit cost of $250K each. FY04 includes 3 schools at a unit cost of $250K each.<br />

03 Various FFP GPS JPO/SSC-SD Nov-02 Aug-03 Jan-04 17 49,000 Yes May-03<br />

04 Various FFP GPS JPO/SSC-SD Mar-04 Oct-04 38 85,000 Yes<br />

05 Various FFP GPS JPO/SSC-SD Nov-04 Oct-05 27 90,000 Yes<br />

P-1 Shopping List-Item No 52 (4 of 11) Exhibit P-5a, Procurement History and Planning<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: NAVSTAR Global Positioning System (GPS) (521R) NAVSSI FMP February 2004<br />

COST CODE 1R009<br />

MODELS OF SYSTEMS AFFECTED: All models of ships will have NAVSTAR GPS<br />

DESCRIPTION/JUSTIFICATION: The NAVSTAR Global Positioning System (GPS) is a joint Service Program which will provide advance satellite positioning. The ultimate system will consist of a constellation<br />

of satellites, control/tracking network, and user equipment installed aboard a variety of airborne, shipborne and land-based platforms.<br />

With the advent of Over the Horizon - Targeting (OTH-T), it is imperative that all ships continuously know their geographic position to correlate sensor data and prevent escort<br />

ships from becoming unwilling targets. To meet this need, the Navigation Sensor System Interface (NAVSSI) program was initiated. NAVSSI will<br />

distribute position, velocity, time and almanac data to onboard command and control and combat systems in real time with GPS as the primary source of navigation data.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

103 28.5 4 2.2 6 2.8 5 2.3 5 2.3 7 3.3 5 2.3 4 1.9 139 45.6<br />

Production Support 5.4 0.9 0.4 0.5 0.3 0.3 0.3 0.2 8.3<br />

Other (DSA)<br />

Interim Contractor Support<br />

1.8 0.1 0.5 0.4 0.4 0.3 0.2 0.1 3.8<br />

Installation of Hardware 101 23.5 4 1.7 6 2.4 6 2.2 6 2.2 7 2.5 5 1.9 4 1.6 139 38.0<br />

PRIOR YR EQUIP 101 23.5 101 23.5<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 2 0.8 2 0.8<br />

FY 03 EQUIP 2 0.9 2 0.8 4 1.7<br />

FY 04 EQUIP 4 1.6 2 0.7 6 2.3<br />

FY 05 EQUIP 4 1.5 1 0.4 5 1.9<br />

FY 06 EQUIP 5 1.8 5 1.8<br />

FY 07 EQUIP 7 2.5 7 2.5<br />

FY 08 EQUIP 5 1.9 5 1.9<br />

FY 09 EQUIP 4 1.6 4 1.6<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 23.5 0.0 1.7 2.4 2.2 2.2 2.5 1.9 1.6 0.0 38.0<br />

TOTAL PROCUREMENT COST 59.2 0.0 4.9 6.1 5.4 5.2 6.4 4.7 3.8 0.0 95.7<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 PRODUCTION LEAD-TIME: 4<br />

CONTRACT DATES: FY 2003: Nov-02 FY 2004: Nov-03 FY 2005: Nov-04<br />

DELIVERY DATES: FY 2003: Mar-03 FY 2004: Mar-04 FY 2005: Mar-05<br />

FY 04 FY 05<br />

FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 105 2 2 1 1 2 2 1 1 1 2 2 1<br />

OUTPUT 105 2 2 1 1 2 2 1 1 1 2 2 1<br />

FY 07 FY 08<br />

FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 3 2 2 0 2 2 1 0 2 1 1 0 139<br />

OUTPUT 0 3 2 2 0 2 2 1 0 2 1 1 0 139<br />

Notes/Comments<br />

P-1 Shopping List-Item No 52 (5 of 11)<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: NAVSTAR Global Positioning System (GPS) (521R) NAVSSI Retrofit February 2004<br />

COST CODE 1R011<br />

MODELS OF SYSTEMS AFFECTED: All models of ships will have NAVSTAR GPS<br />

DESCRIPTION/JUSTIFICATION: The NAVSTAR Global Positioning System (GPS) is a joint Service Program which will provide advance satellite positioning. The ultimate system will consist of a constellation<br />

of satellites, control/tracking network, and user equipment installed aboard a variety of airborne, shipborne and land-based platforms.<br />

With the advent of Over the Horizon - Targeting (OTH-T), it is imperative that all ships continuously know their geographic position to correlate sensor data and prevent<br />

escort ships from becoming unwilling targets. To meet this need, the Navigation Sensor System Interface (NAVSSI) program was initiated. NAVSSI will<br />

distribute position, velocity, time and almanac data to onboard command and control and combat systems in real time with GPS as the primary source of navigation data.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

48 2.7 4 0.6 9 1.8 3 0.5 5 1.0 2 0.4 7 1.4 10 2.0 11 2.2 99 12.6<br />

Production Support 2.4 0.3 0.5 0.1 0.2 0.1 0.1 0.4 0.4 4.5<br />

Other (DSA)<br />

Interim Contractor Support<br />

1.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 1.4<br />

Installation of Hardware 46 2.6 6 1.1 8 0.7 4 0.3 5 0.4 2 0.2 7 0.5 10 0.8 11 0.9 99 7.5<br />

PRIOR YR EQUIP 46 2.6 46 2.6<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 2 0.3 2 0.3<br />

FY 03 EQUIP 4 0.8 4 0.8<br />

FY 04 EQUIP 8 0.7 1 0.1 9 0.8<br />

FY 05 EQUIP 3 0.2 3 0.2<br />

FY 06 EQUIP 5 0.4 5 0.4<br />

FY 07 EQUIP 2 0.2 2 0.2<br />

FY 08 EQUIP 7 0.5 7 0.5<br />

FY 09 EQUIP 10 0.8 10 0.8<br />

FY TC EQUIP 11 0.9 11 0.9<br />

TOTAL INSTALLATION COST 2.6 0.0 0.0 1.1 0.7 0.3 0.4 0.2 0.5 0.8 0.9 7.5<br />

TOTAL PROCUREMENT COST 8.7 0.0 0.0 2.4 3.0 0.9 1.6 0.7 1.9 3.2 3.5 26.0<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 PRODUCTION LEADTIME: 4<br />

CONTRACT DATES: FY 2003: Nov-02 FY 2004: Nov-03 FY 2005: Nov-04<br />

DELIVERY DATES: FY 2003: Mar-03 FY 2004: Mar-04 FY 2005: Mar-05<br />

FY 04 FY 05<br />

FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 52 0 3 3 2 1 1 1 1 0 2 2 1<br />

OUTPUT 52 0 3 3 2 1 1 1 1 0 2 2 1<br />

FY 07 FY 08<br />

FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 1 1 0 0 3 2 2 0 4 3 3 11 99<br />

OUTPUT 0 1 1 0 0 3 2 2 0 4 3 3 11 99<br />

Notes/Comments<br />

P-1 Shopping List-Item No 52 (6 of 11)<br />

Exhibit P-3a, Individual Modification Program


UNCLASSIFIED<br />

MODIFICATION TITLE: NAVSTAR Global Positioning System (GPS) (521R) NAVSSI Schools February 2004<br />

COST CODE 1R009<br />

MODELS OF SYSTEMS AFFECTED: All models of ships will have NAVSTAR GPS<br />

DESCRIPTION/JUSTIFICATION: The NAVSTAR Global Positioning System (GPS) is a joint Service Program which will provide advance satellite positioning. The ultimate system will consist of a constellation<br />

of satellites, control/tracking network, and user equipment installed aboard a variety of airborne, shipborne and land-based platforms.<br />

With the advent of Over the Horizon - Targeting (OTH-T), it is imperative that all ships continuously know their geographic position to correlate sensor data and prevent escort<br />

ships from becoming unwilling targets. To meet this need, the Navigation Sensor System Interface (NAVSSI) program was initiated. NAVSSI will<br />

distribute position, velocity, time and almanac data to onboard command and control and combat systems in real time with GPS as the primary source of navigation data.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

3 0.8 3 0.8 6 1.6<br />

Production Support 0.0<br />

Other (DSA)<br />

Interim Contractor Support<br />

0.0<br />

Installation of Hardware 0 0.0 3 0.1 3 0.3 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 6 0.4<br />

PRIOR YR EQUIP 0 0.0<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 3 0.1 3 0.1<br />

FY 04 EQUIP 3 0.3 3 0.3<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.0 0.1 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.4<br />

TOTAL PROCUREMENT COST 0.0 0.0 0.9 1.1 0.0 0.0 0.0 0.0 0.0 0.0 2.0<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 PRODUCTION LEAD-TIME: 4<br />

CONTRACT DATES: FY 2003: Nov-02 FY 2004: Nov-03 FY 2005:<br />

DELIVERY DATES: FY 2003: Mar-03 FY 2004: Mar-04 FY 2005:<br />

FY 04 FY 05<br />

FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 3 0 1 2 0 0 0 0 0 0 0 0 0<br />

OUTPUT 3 0 1 2 0 0 0 0 0 0 0 0 0<br />

FY 07 FY 08<br />

FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 0 0 0 0 0 0 0 0 0 0 0 0 6<br />

OUTPUT 0 0 0 0 0 0 0 0 0 0 0 0 0 6<br />

Notes/Comments<br />

P-1 Shopping List-Item No 52 (7 of 11)<br />

Exhibit P-3a, Individual Modification Progr<br />

Unclassifi<br />

Classificatio


UNCLASSIFIED<br />

MODIFICATION TITLE: NAVSTAR Global Positioning System (GPS) (521R) NAVWAR February 2004<br />

COST CODE 1R013<br />

MODELS OF SYSTEMS AFFECTED: LCACs, all M-Class, all CG, DDG, DD, FFGs, all CV/CVN, all L-Class, and all SSNs will be equipped with Anti-Jam Antennas.<br />

DESCRIPTION/JUSTIFICATION: Procurement and installation of anti-jam GPS user equipment and prevention equipment is required to ensure the continued utility of GPS signals from space in a hostile jamming environment.<br />

The NAVWAR program will equip selected ships and submarines with anti-jam GPS antennas and other GPS Modernization enhancements to ensure the continued availability of GPS<br />

to support surface and subsurface combat operations and provide reliable GPS and other navigation sensor data to ship-board C4ISR, Combat, and Weapons Systems.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 15 0.7 17 0.8 38 3.2 27 2.4 41 3.8 24 2.3 34 3.2 28 2.7 179 16.2 403 35.3<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 0.2 0.1 0.8 0.8 1.0 1.0 1.0 1.1 10.1 15.9<br />

Other (DSA) 0.1 0.1 0.3 0.5 0.5 0.6 0.4 0.4 2.7 5.9<br />

Interim Contractor Support<br />

Installation of Hardware 15 0.7 17 0.7 38 1.6 27 1.2 41 1.9 24 1.2 34 1.8 207 11.1 403 20.2<br />

PRIOR YR EQUIP 0 0.0<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 15 0.7 15 0.7<br />

FY 03 EQUIP 17 0.7 17 0.7<br />

FY 04 EQUIP 38 1.6 38 1.6<br />

FY 05 EQUIP 27 1.2 27 1.2<br />

FY 06 EQUIP 41 1.9 41 1.9<br />

FY 07 EQUIP 24 1.2 24 1.2<br />

FY 08 EQUIP 34 1.8 34 1.8<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 207 11.1 207 11.1<br />

TOTAL INSTALLATION COST 0.0 0.0 0.7 0.7 1.6 1.2 1.9 1.2 1.8 11.1 20.2<br />

TOTAL PROCUREMENT COST 1.0 0.0 1.7 5.0 5.3 6.5 5.8 5.8 6.0 40.1 77.3<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 PRODUCTION LEADTIME: 9<br />

CONTRACT DATES: FY 2003: Aug-03 FY 2004: Mar-04 FY 2005: Nov-04<br />

DELIVERY DATES: FY 2003: Jan-04 FY 2004: Oct-04 FY 2005: Oct-05<br />

FY 04 FY 05<br />

FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 15 0 5 6 6 9 10 10 9 6 7 7 7<br />

OUTPUT 15 0 5 6 6 9 10 10 9 6 7 7 7<br />

FY 07 FY 08<br />

FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 11 10 10 10 6 6 6 6 8 8 9 9 207 403<br />

OUTPUT 11 10 10 10 6 6 6 6 8 8 9 9 207 403<br />

Note: Quantity indicates number of Ground Plane Assemblies procured and installed. Some classes of ships have two Ground Plane Assemblies.<br />

P-1 Shopping List-Item No 52 (8 of 11) Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: NAVSTAR Global Positioning System (GPS) (521R) NAVSSI Lite February 2004<br />

COST CODE 1R015<br />

MODELS OF SYSTEMS AFFECTED: Ship classes receiving NAVSSI Lite will be: MCM, MHC, ARS, AS FFG, DD, AOE, LPD, LSD<br />

DESCRIPTION/JUSTIFICATION: Field a relatively low cost electronic chart-based NAVSSI variant system on those ships which do not require full NAVSSI capabilities.<br />

Program was mandated by CNO during Jan 2001 CEB meeting<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 38 4.2 38 4.2<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 1.0 0.3 1.3<br />

Other (DSA) 0.5 0.2 0.7<br />

Interim Contractor Support<br />

Installation of Hardware 18 1.3 7 1.3 25 2.6<br />

PRIOR YR EQUIP 0 0.0<br />

FY 01 EQUIP 18 1.3 18 1.3<br />

FY 02 EQUIP 7 1.3 7 1.3<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 1.3 0.0 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.6<br />

TOTAL PROCUREMENT COST 7.0 0.0 0.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.8<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 PRODUCTION LEAD-TIME: 2<br />

CONTRACT DATES: FY 2003: FY 2004: FY 2005:<br />

DELIVERY DATES: FY 2003: FY 2004: FY 2005:<br />

FY 04 FY 05<br />

FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 25 0 0 0 0 0 0 0 0 0 0 0 0<br />

OUTPUT 25 0 0 0 0 0 0 0 0 0 0 0 0<br />

FY 07 FY 08<br />

FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 0 0 0 0 0 0 0 0 0 0 0 0 25<br />

OUTPUT 0 0 0 0 0 0 0 0 0 0 0 0 0 25<br />

Notes/Comments; Following procurement of some NAVSSI Lite units, OPNAV Sponsor directed no further installations after 25 installations accomplished in light of new<br />

Navy direction to scale back to a single electronic charting system (Scalable IBS vice NAVSSI Lite). Remaining assets will be used in Scalable IBS program.<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

P-1 Shopping List-Item No 52 (9 of 11) Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE<br />

PRODUCTION SCHEDULE February 2004<br />

(DOD EXHIBIT P-21)<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD NO.<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT NAVSTAR GPS BLI 2657 521R<br />

S ACCEP BAL FISCAL YEAR 03 FISCAL YEAR 04 FISCAL YEAR 05<br />

COST ITEM/MANUFACTURER E PROC PRIOR DUE CY 02 CALENDAR YEAR 03 CALENDAR YEAR 04 CALENDAR YEAR 05<br />

CODE R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S<br />

V 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E<br />

FY T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P<br />

1R009 NAVSSI 04 6 6 A 2 1 1 2<br />

05 5 5 A 2 1 1<br />

1R009 NAVSSI Schools 04 3 3 A 1 1 1<br />

1R011 NAVSSI - Retrofit 04 9 9 A 3 1 1 1 1 1 1<br />

05 3 3 A 1 1 1<br />

1R013 NAVWAR Hardware<br />

1R013 NAVWAR is a joint service program, production rates apply to a combination of all the military services procurements.<br />

03 17 17 A 1 2 2 2 2 2 2 2 2<br />

04 38 38 A 3 3 3 4 3 3 4 3 3 3 3 3<br />

05 27 27 A<br />

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP<br />

PRODUCTION RATE PROCUREMENT LEADTIMES<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

ITEM Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

NAVSSI ACS<br />

1<br />

25<br />

50<br />

NAVSSI LITTON<br />

1<br />

25<br />

50<br />

NAVWAR RSL, UK/TBD for Groundplane<br />

250<br />

480<br />

1272<br />

Exhibit P-21 Production Schedule<br />

P-1 Shopping List-Item No 52 (10 of 11) Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE<br />

PRODUCTION SCHEDULE (Continued) February 2004<br />

(DOD EXHIBIT P-21)<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD NO.<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT NAVSTAR GPS BLI 2657 521R<br />

S ACCEP BAL FISCAL YEAR 06 FISCAL YEAR 07 FISCAL YEAR 08<br />

COST ITEM/MANUFACTURER E PROC PRIOR DUE CY 05 CALENDAR YEAR 06 CALENDAR YEAR 07 CALENDAR YEAR 08<br />

CODE R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S<br />

1R009 NAVSSI<br />

1R011 NAVSSI - Retrofit<br />

1R013 NAVWAR Hardware<br />

1R015 NAVSSI Lite<br />

V 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E<br />

FY T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P<br />

04<br />

05 5 4 1 1<br />

04<br />

05<br />

04<br />

05 27 27 2 2 2 3 2 2 3 2 2 3 2 2<br />

04<br />

05<br />

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP<br />

PRODUCTION RATE PROCUREMENT LEADTIMES<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

ITEM Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

P-1 Shopping List-Item No 52 (11 of 11) Exhibit P-21 Production Schedule<br />

Unclassified<br />

Classification


CLASSIFICATION:<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA-2 Communications and Electronic Equipment Armed Forces Radio and TV Service/BLI: 266600 - Subhead 82K0<br />

Program Element for Code B Items: Other Related Program Elements<br />

Prior ID To<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions) $28.0 $4.1 $4.2 $4.2 $4.3 $4.4 $4.5 $4.6 $30.3<br />

SPARES COST<br />

(In Millions) $0.0<br />

PUC K0001: AFRTS Program - AFRTS shipboard entertainment systems provide improved quality of life at sea and at overseas shore bases. These systems contribute significantly<br />

to the habitability of Navy ships by providing and distributing news, command information, training, and entertainment programming using the latest technology available. These<br />

systems improve morale, combat effectiveness and retention rates of deployed personnel. All AFRTS systems use Commercial-Off-the-Shelf (COTS) equipment. Naval Media Center<br />

(NAVMEDIACEN) Fleet Support Detachments (FSDs) are the Installing agents for these systems. Each system installation is made based on ship availability and coordinated through<br />

the TYCOM's. The AFRTS program consists of the following systems:<br />

(a) SITE CCTV - 2000/500: This SITE system is designed for aircraft carriers (CV/CVN). It is used to playback videocassettes and compact discs distributed by AFRTS and NMPS<br />

over four channels on a cable distribution system. This system also allows for the production of training tapes and command information programs. Systems are designed to interface<br />

with pierside cable systems where available. Requires manpower of two dedicated technicians and three operators. A total of seven systems required at an estimated unit cost of<br />

$398.8K. Four units were procured in FY02 and prior. The remaining three (3) units will be procured in FY03 through FY 05. Each system requires three to ten months lead time to<br />

procure and install. SITE 2000/500 includes Television Direct-to-Sailor (TV-DTS) below decks equipment used to receive and distribute satelite programming onboard U.S. Navy ships.<br />

TV-DTS is a joint effort with SPAWAR. SPAWAR is procuring the above decks equipment (satelite dishes) and NAVMEDIACEN is responsible for bringing the signal from the satelite<br />

receiver and distributing it throughout the ship.<br />

SITE CCTV - Digital/500: is the next generation of the SITE 2000/500 project beginning in FY 2006. A total of seven (7) SITE CCTV - Digital/500 units will be procured.<br />

(b) SITE 2000/400 - This SITE system is designed for large amphibious and auxiliary ship classes (AGF/AOE/AS/LCC/LHA/LHD/LPD/LSD). Same as SITE 2000/500 system, with the<br />

exception of studio production capability and lesser editing capability. Requires manpower of one dedicated technician and operator. A total of 30 systems are required at an estimated<br />

unit cost of $227.1K. Twenty one units were procured in FY02 and prior. The remaining nine (9) units will be procured in FY03 through FY 05. Each system requires two to eight<br />

months lead time to be procured and installed. SITE 2000/400 includes Television Direct-to-Sailor (TV-DTS) below decks equipment used to receive and distribute satelite<br />

programming onboard U.S. Navy ships. TV-DTS is a joint effort with SPAWAR. SPAWAR is procuring the above decks equipment (satelite dishes) and NAVMEDIACEN is responsible<br />

for bring the signal from the satelite receiver and distributing it throughout the ship.<br />

SITE CCTV - Digital/400 is the next generation of the SITE 2000/400 project beginning in FY 2006. A total of twenty-eight (28) SITE CCTV - Digital/400 units will be procured.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 53 PAGE NO. 1<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 CONTINUATION February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA-2 Communications and Electronic Equipment Armed Forces Radio and TV Service/BLI: 266600 - Subhead 82K0<br />

(c) SITE 2000/300 - This SITE system is designed for smaller combatants ship classes (CG/DD/DDG/FFG). This system is used primarily for playback of AFRTS and NMPS cassettes over two<br />

channels. Capable of producing simple local programs for training and command information. Requires manpower of one dedicated technician who also serves as operator. A total of 106 systems are<br />

required at an estimated unit cost of $91.8K. Fifty seven units were procured in FY02 and prior. The remaining 49 units will be procured in FY03 through FY 06. Each system requires two to eight<br />

months<br />

lead time to procure and install. SITE 2000/300 includes Television Direct-to-Sailor (TV-DTS) below decks equipment used to receive and distribute satelite programming onboard U.S. Navy ships. TV-<br />

DTS is a joint effort with SPAWAR. SPAWAR is procuring the above decks equipment (satelite dishes) and NAVMEDIACEN is responsible for bring the signal from the satelite receiver and distributing it<br />

throughout the ship.<br />

SITE CCTV - Digital/300 is the next generation of the SITE 2000/300 project beginning in FY 2006. A total of (83) SITE CCTV - Digital/300 units will be procured.<br />

(d) SITE 2000/200 - Compact system used to playback AFRTS and NMPS cassettes over two channels on submarines (SSN/SSBN). Capable of making simple recordings for training and command<br />

information. Requires no dedicated technician or operator. A total of 50 systems are required at an estimated unit cost of $60.9K. Twenty nine units were procured in FY02 and prior. The remaining<br />

twenty one units will be procured in FY03 through FY05. Each system requires two to eight months lead time to procure and install.<br />

SITE CCTV - Digital/200 is the next generation of the SITE 2000/200 project beginning in FY 2006. A total of (42) SITE CCTV - Digital/200 units will be procured.<br />

(f) Integrated Radio Frequency Distribution System (IRFDS - Circuit 27TV): provides ship-wide transmission of news, command information, training and entertainment programming to sailors while at<br />

sea. The IRFDS receives audio and video signals from the SITE and TV-DTS systems and distributes the signals to all installed shipboard receivers. The IRFDS brings together the various independent<br />

distribution systems and integrates them onto a single transport medium for distribution throughout the ship This system replaces the unsupportable Circuit 14TV. IRFDS is a COTS system. IRFDS<br />

procurement also includes the purchase of equipment to integrate all television displays onto one distribution system. Total of 106 systems are required. An average unit cost to engineer, furnish and<br />

install is $286.7K. Four units will be procured in FY 03. Each system requires a three to ten months lead time to be procured and installed. The following ship classes require the total of 106 IRFDS<br />

units: CG, CV/CVN, DD, DDG, FFG.<br />

PUC K0INS: This funding supports the installation of SITE, TV-DTS, and IRFDS systems onboard Navy ships. Installations are performed by Naval Media Center Fleet Support Detachments and are<br />

based on TYCOM nominations.<br />

PUC K0002: SPAWAR Program - Television Direct-to-Sailors (TV-DTS) provides a receive-only television capability to 170 ships in the Fleet. This capability features two full-time news and<br />

entertainment television channels as well as two stereo audio music channels, one monographic audio radio news and sports channel, one 128Kbps data channel, and an electronic program guide.<br />

AFRTS provides the programming. Satellite transponders, ground-based earth stations and leases for terrestrial connectivity are provided by SPAWAR (via O&MN funding). Each ship will be outfitted<br />

with COTS 1.3 meter C-band satellite stabilized antenna terminal for reception of the television signal.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 53 PAGE NO. 2<br />

UNCLASSIFIED


[SMTP:sherry.oneal@dla.mil]<br />

CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy<br />

BA-2 Communications and Electronic Equipment Armed Forces Radio and TV Service/82K0 - Subhead 82K0<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID Prior FY 2003 FY 2004 FY 2005<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

SUBMARINES (N77)<br />

K0001 SITE CCTV - 2000/200 A 1631.8 7 59.6 417.3 7 60.9 426.1 7 62.0 434<br />

SURFACE SHIPS (N76)<br />

K0001 SITE CCTV - 2000/300 A 5264.6 15 86.6 1,299.3 15 89.8 1,347.2 14 93.6 1,310.3<br />

K0001 SITE CCTV - 2000/400 A 4329.0 3 222.5 667.4 3 227.1 681.2 3 229.6 688.7<br />

K0001 IRFDS - (Circuit 27TV) A 4471.6 4 280.5 1,122.0 4 286.7 1,146.7 4 291.8 1,167.2<br />

AIRCRAFT CARRIERS (N78)<br />

K0001 SITE CCTV - 2000/500 A 1466.9 1 391.0 391.0 1 398.8 398.8 1 406.8 406.8<br />

KOINS Equipment Installations (NON-FMP) A 807.0 159 163 163<br />

Total NAVSEA (AFRTS) 17,970.9 4,056.0 4,163.0 4,170.0<br />

NAVY SPACE SYSTEM DIVISON (N63)<br />

K0002 TV-DTS (SPAWAR) A<br />

KuFeedhorn ECP<br />

PRODUCTION SUPPORT<br />

K0002 EQUIPMENT INSTALLATION (SPAWAR) A<br />

DSA<br />

TOTAL SPAWAR<br />

4,056.0 4,163.0 4,170.0<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 53 3<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy Armed Forces Radio & TV Service (AFRTS) 82K0<br />

BA-2 Communications and Electronic Equipment<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

FY 03<br />

SITE CCTV - 2000/200 7 59.6 T-ASA/Navmediacen MIPR/RCP Various 12/02 1/03 YES<br />

SITE CCTV - 2000/300 15 86.6 T-ASA/Navmediacen MIPR/RCP Various 12/02 1/03 YES<br />

SITE CCTV - 2000/400 3 222.5 T-ASA/Navmediacen MIPR/RCP Various 12/02 1/03 YES<br />

SITE CCTV - 2000/500 1 391.0 T-ASA/Navmediacen MIPR/RCP Various 12/02 2/03 YES<br />

IRFDS - (Circuit 27TV) 4 280.5 T-ASA/Navmediacen MIPR/RCP Various 12/02 2/03 YES<br />

FY 04<br />

SITE CCTV - 2000/200 7 60.9 T-ASA/Navmediacen MIPR/RCP Various 12/03 1/04 YES<br />

SITE CCTV - 2000/300 15 89.8 T-ASA/Navmediacen MIPR/RCP Various 12/03 1/04 YES<br />

SITE CCTV - 2000/400 3 227.1 T-ASA/Navmediacen MIPR/RCP Various 12/03 1/04 YES<br />

SITE CCTV - 2000/500 1 398.8 T-ASA/Navmediacen MIPR/RCP Various 12/03 2/04 YES<br />

IRFDS - (Circuit 27TV) 4 286.7 T-ASA/Navmediacen MIPR/RCP Various 12/03 2/04 YES<br />

FY 05<br />

SITE CCTV - 2000/200 7 62.0 T-ASA/Navmediacen MIPR/RCP Various 12/04 1/05 YES<br />

SITE CCTV - 2000/300 14 93.6 T-ASA/Navmediacen MIPR/RCP Various 12/04 1/05 YES<br />

SITE CCTV - 2000/400 3 229.6 T-ASA/Navmediacen MIPR/RCP Various 12/04 1/05 YES<br />

SITE CCTV - 2000/500 1 406.8 T-ASA/Navmediacen MIPR/RCP Various 12/04 2/05 YES<br />

IRFDS - (Circuit 27TV) 4 291.8 T-ASA/Navmediacen MIPR/RCP Various 12/04 2/05 YES<br />

D. REMARKS<br />

(1) In addition to hardware, SITE CCTV total cost includes production engineering and integration.<br />

(2) Unit Cost varies due to the ratio of single and dual antennas. Contract expires in March 2003.<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 53 Classification:<br />

PAGE NO. 4 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

TIME PHASED REQUIREMENT SCHEDULE A. APPROPRIATION/BUDGET ACTIVITY B. P-1 ITEM NOMENCLATURE C. DATE<br />

P-23 Other Procurement, Navy SITE CCTV-2000 / K0001<br />

BA-2 February 2004<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 LATER<br />

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

ACTIVE FORCE INVENTORY (P) 6 8 8 8 7 7 7 6 5 7 7 6 6 7 7 6 5 5<br />

SCHOOLS/OTHER TRAINING<br />

OTHER<br />

TOTAL PHASED REQ 6 14 22 30 37 44 51 57 62 69 76 82 88 95 102 108 113 118 118 118 118 118 118 118 118 118 118 118 118<br />

ASSETS ON HAND (P) 6<br />

DELIVERY FY 01 & PRIOR<br />

FY 01 & PRIOR<br />

FY 02 (C) 8 8 15<br />

FY 03 (C) 7 7 11<br />

FY 04 (C) 7 7 12<br />

FY 05 (C) 7 7 11<br />

FY 06 (C) 5<br />

FY 07 (C)<br />

FY 08 (C)<br />

To Complete (C)<br />

TOTAL ASSETS (C) 6 14 22 37 37 44 51 62 62 69 76 88 88 95 102 113 113 118 118 118 118 118 118 118 118 118 118 118 118<br />

QTY OVER (+) OR SHORT (-) 0 0 0 7 0 0 0 5 0 0 0 6 0 0 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

D. REMARKS E. RQMT (QTY) 192 TOTAL RQMT 192 INSTALLED ON HAND 0 FY 01 & PRIOR 0 UNFUNDED 0<br />

Installations determined by TYCOM Nominations 74 UNDELIVERED<br />

1. APPN -<br />

2. APPN -<br />

3. PROCUREMENT LEADTIME ADMIN INITIAL ORDER REORDER<br />

2 Months 1 Month 1 Month<br />

DD for 2447, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO 53 PAGE NO 5<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

TIME PHASED REQUIREMENTS SCHEDULE P-1 ITEM NOMENCLATURE/PROJECT UNIT DATE<br />

(SUPPLEMENT SHEET-INSTALLATION DATA)<br />

P-23A SITE CCTV-2000 / K0001<br />

APPROPRIATION/BUDGET ACTIVITY Installing Agent<br />

Other Procurement, Navy N/A<br />

BA-2 Communications and Electronic Equipment<br />

1ST QTR 2ND QTR 3RD QTR 4TH QTR 1ST QTR 2ND QTR 3RD QTR 4TH QTR<br />

E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY<br />

FY 2002 FY 2003<br />

AGF 11 1 CG 49 1 CG 48 1 CVN 71 1 CG 54 1 AS 39 1 CG 63 1 CG 52 1<br />

CG 50 1 CG 61 1 CG 53 1 DD 988 1 CG 65 1 CG 64 1 CG 51 1 CG 62 1<br />

DD 987 1 DD 989 1 CG 55 1 DDG 66 1 CG 68 1 CG 66 1 CG 73 1 CVN 70 1<br />

DDG 67 1 DD 985 1 DDG 55 1 FFG 50 1 DDG 53 1 CG 71 1 DDG 52 1 DDG 60 1<br />

LPD 10 1 LCC 20 1 DDG 62 1 LHA 3 1 LPD 15 1 LHD 6 1 DDG 69 1 SSN 706 1<br />

LSD 39 1 SSN 709 1 LPD 8 1 LPD 7 1 SSN 751 1 SSN 762 1 LSD 50 1 SSN 765 1<br />

SSN 719 1 SSN 725 1 SSN 761 1 SSN 757 1 SSN 764 1 SSN 763 1<br />

SSN 720 1 SSN 769 1 SSN 768 1<br />

FY 2004 FY 2005<br />

February 2004<br />

CG 59 1 CG 58 1 CG 69 1 CG 56 1 CG 70 1 DDG 59 1 DDG 76 1 CVN 75 1<br />

CG 72 1 CG 60 1 DDG 54 1 CG 67 1 DDG 57 1 DDG 68 1 DDG 78 1 DDG 73 1<br />

DDG 51 1 DDG 58 1 DDG 64 1 CVN 72 1 DDG 72 1 DDG 75 1 DDG 79 1 DDG 80 1<br />

LSD 52 1 DDG 61 1 DDG 65 1 DDG 56 1 DDG 74 1 DDG 77 1 DDG 81 1 LHD 5 1<br />

SSN 690 1 LHA 1 1 LHA 4 1 SSN 723 1 LSD 46 1 DDG 84 1 LSD 52 1 SSN 755 1<br />

SSN 721 1 SSN 722 1 SSN 752 1 SSN 759 1 SSN 717 1 SSN 760 1 SSN 705 1<br />

SSN 724 1 SSN 754 1 SSN 773 1 SSN 771 1<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 53 PAGE NO. 6<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

TIME PHASED REQUIREMENTS SCHEDULE P-1 ITEM NOMENCLATURE/PROJECT UNIT DATE<br />

(SUPPLEMENT SHEET-INSTALLATION DATA)<br />

P-23A SITE CCTV-2000 / K0001<br />

APPROPRIATION/BUDGET ACTIVITY Installing Agent<br />

Other Procurement, Navy N/A<br />

BA-2 Communications and Electronic Equipment<br />

1ST QTR 2ND QTR 3RD QTR 4TH QTR 1ST QTR 2ND QTR 3RD QTR 4TH QTR<br />

E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY<br />

DDG 63 1 DDG 86 1<br />

DDG 83 1 DDG 87 1<br />

DDG 85 1 LPD 17 1<br />

LSD 44 1 LSD 45 1<br />

SSN 708 1 SSN 701 1<br />

FY 2006 FY 2007<br />

FY 2008 FY 2009<br />

February 2004<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 53 PAGE NO. 7<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

TIME PHASED REQUIREMENT SCHEDULE A. APPROPRIATION/BUDGET ACTIVITY B. P-1 ITEM NOMENCLATURE C. DATE<br />

P-23 Other Procurement, Navy SITE CCTV - Digital / K0001<br />

BA-2 February 2004<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 LATER<br />

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

ACTIVE FORCE INVENTORY (P) 6 5 5 6 5 5 5 6 5 5 107<br />

SCHOOLS/OTHER TRAINING<br />

OTHER<br />

TOTAL PHASED REQ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 11 16 22 27 32 37 43 48 53 160<br />

ASSETS ON HAND (P)<br />

DELIVERY FY 01 & PRIOR<br />

FY 01 & PRIOR<br />

FY 02 (C)<br />

FY 03 (C)<br />

FY 04 (C)<br />

FY 05 (C)<br />

FY 06 (C) 6 10<br />

FY 07 (C) 6 5 10<br />

FY 08 (C) 6 5 10<br />

To Complete (C) 102<br />

TOTAL ASSETS (C) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 16 16 22 27 37 37 43 48 58 160<br />

QTY OVER (+) OR SHORT (-) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 0 0 5 0 0 0 5 0<br />

D. REMARKS E. RQMT (QTY) 0 TOTAL RQMT 160 INSTALLED ON HAND 0 FY 01 & PRIOR 0 UNFUNDED 0<br />

Installations determined by TYCOM Nominations 0 UNDELIVERED<br />

1. APPN -<br />

2. APPN -<br />

3. PROCUREMENT LEADTIME ADMIN INITIAL ORDER REORDER<br />

2 Months 1 Month 1 Month<br />

DD for 2447, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO 53 PAGE NO 8<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

TIME PHASED REQUIREMENTS SCHEDULE P-1 ITEM NOMENCLATURE/PROJECT UNIT DATE<br />

(SUPPLEMENT SHEET-INSTALLATION DATA)<br />

P-23A SITE CCTV - Digital/ K0001<br />

APPROPRIATION/BUDGET ACTIVITY Installing Agent<br />

Other Procurement, Navy N/A<br />

BA-2 Communications and Electronic Equipment<br />

1ST QTR 2ND QTR 3RD QTR 4TH QTR 1ST QTR 2ND QTR 3RD QTR 4TH QTR<br />

E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY<br />

FY 2006 FY 2007<br />

AOE 1 1 CVN 73 1 DDG 94 1 AOE 3 1 CG 57 1 CVN 76 1<br />

DDG 90 1 ARS 53 1 DDG 95 1 DDG 93 1 DDG 70 1 DDG 96 1<br />

DDG 71 1 DDG 92 1 DDG 91 1 DDG 99 1 DDG 98 1 DDG 97 1<br />

LHD 2 1 LHA 5 1 LHD 1 1 LSD 48 1 LHD 4 1 SSN 716 1<br />

SSN 715 1 SSN 21 1 SSN 750 1 SSN 766 1 SSN 770 1 SSN 718 1<br />

SSN 758 1 SSN 772 1<br />

FY 2008 FY 2009<br />

February 2004<br />

ARS 52 1 AOE 4 1 ARS 50 1 CVN 68 1 CG 61 1 CG 55 1 CG 53 1 CG 54 1<br />

CG 52 1 CG 64 1 CG 66 1 CG 65 1 CG 71 1 CG 63 1 DDG 88 1 CVN 69 1<br />

DDG 60 1 DDG 62 1 DDG 53 1 CG 68 1 DDG 55 1 CG 73 1 DDG 89 1 LHD 7 1<br />

DDG 67 1 DDG 66 1 LSD 49 1 LSD 43 1 LSD 49 1 LHA 3 1 LSD 42 1 SSN 725 1<br />

SSN 767 1 LHD 3 1 SSN 753 1 SSN 756 1 SSN 761 1 SSN 720 1 SSN 22 1 SSN 764 1<br />

SSN 768 1 SSN 769 1<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 53 PAGE NO. 9<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

TIME PHASED REQUIREMENT SCHEDULE A. APPROPRIATION/BUDGET ACTIVITY B. P-1 ITEM NOMENCLATURE C. DATE<br />

P-23 Other Procurement, Navy IRFDS (Circuit 27TV) - K0001<br />

BA-2 February 2004<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 LATER<br />

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

ACTIVE FORCE INVENTORY (P) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 57<br />

SCHOOLS/OTHER TRAINING<br />

OTHER<br />

TOTAL PHASED REQ 1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 84<br />

ASSETS ON HAND 1<br />

DELIVERY FY 01 & PRIOR<br />

FY 01 & PRIOR<br />

FY 02 (C) 1 1 1<br />

FY 03 (C) 1 1 2<br />

FY 04 (C) 1 1 2<br />

FY 05 (C) 1 1 2<br />

FY 06 (C) 1 1 2<br />

FY 07 (C) 1 1 2<br />

FY 08 (C) 1 1 2<br />

To Complete (C) 56<br />

TOTAL ASSETS 1 2 3 4 4 5 6 8 8 9 10 12 12 13 14 16 16 17 18 20 20 21 22 24 24 25 26 28 84<br />

QTY OVER (+) OR SHORT (-) 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 1 0 0 0 1 0 0 0 1 0 0 0 1 0<br />

D. REMARKS E. RQMT (QTY) 106 TOTAL RQMT 106 INSTALLED22 ON HAND 0 FY 00 & PRIOR 0 UNFUNDED 0<br />

UNDELIVERED<br />

Installations determined by TYCOM Nominations 1. APPN -<br />

2. APPN -<br />

3. PROCUREMENT LEADTIME ADMIN INITIAL ORDER REORDER<br />

2 Months 2 Months 1 Month<br />

DD for 2447, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO 53 PAGE NO 10<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

TIME PHASED REQUIREMENTS SCHEDULE P-1 ITEM NOMENCLATURE/PROJECT UNIT DATE<br />

(SUPPLEMENT SHEET-INSTALLATION DATA)<br />

P-23A IRFDS (Circuit 27TV) / K0001 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY Installing Agent<br />

Other Procurement, Navy N/A<br />

BA-2 Communications and Electronic Equipment<br />

1ST QTR 2ND QTR 3RD QTR 4TH QTR 1ST QTR 2ND QTR 3RD QTR 4TH QTR<br />

E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY<br />

FY 2002 FY 2003<br />

DD 991 1 CG 55 1 CG 57 1 CG 53 1 CG 61 1 CG 68 1 CG 52 1<br />

FY 2004 FY 2005<br />

CG 57 1 CG 71 1 DDG 66 1 DDG 73 1 DDG 76 1 DDG 72 1 DDG 54 1 DDG 51 1<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 53 PAGE NO. 11<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

TIME PHASED REQUIREMENTS SCHEDULE P-1 ITEM NOMENCLATURE/PROJECT UNIT DATE<br />

(SUPPLEMENT SHEET-INSTALLATION DATA)<br />

P-23A IRFDS (Circuit 27TV) / K0001 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY Installing Agent<br />

Other Procurement, Navy N/A<br />

BA-2 Communications and Electronic Equipment<br />

1ST QTR 2ND QTR 3RD QTR 4TH QTR 1ST QTR 2ND QTR 3RD QTR 4TH QTR<br />

E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY<br />

FY 2006 FY 2007<br />

DDG 57 1 DDG 77 1 DDG 59 1 DDG 53 1 DDG 55 1 DDG 58 1 DDG 62 1 DDG 56 1<br />

FY 2008 FY 2009<br />

DDG 79 1 DDG 63 1 DDG 65 1 DDG 70 1 DDG 67 1 DDG 64 1 DDG 61 1 DDG 52 1<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 53 PAGE NO. 12<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: TV-DTS TYPE MODIFICATION: MODIFICATION TITLE: TV-DTS<br />

DESCRIPTION/JUSTIFICATION:<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2000 & Prior FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 0 0.0<br />

PROCUREMENT 129 9.0 14 1.0 27 2.0 178 12.0<br />

INSTALLATION KITS<br />

INSTALLATION KITS - UNIT COST<br />

INSTALLATION KITS NONRECURRING<br />

EQUIPMENT<br />

EQUIPMENT NONRECURRING<br />

ENGINEERING CHANGE ORDERS<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

OTHER<br />

OTHER<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 112 15.3 20 3.0 38 6.9 178 25.4<br />

TOTAL PROCUREMENT 24.3 4.0 9.4 37.7<br />

ITEM 53 PAGE 13 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: TV-DTS MODIFICATION TITLE: TV-DTS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: 1 Month PRODUCTION LEADTIME: 3 Months<br />

CONTRACT DATES: FY 2000: Mar-00 FY 2001: Mar-01 FY 2002: Oct-01<br />

DELIVERY DATE: FY 2000: Jun-00 FY 2001: Jun-01 FY 2002: Jan-02<br />

Cost: FY 2000 & Prior<br />

FY 2001 FY 2002<br />

($ in Millions)<br />

FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total<br />

Qty $<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 0 0.0<br />

FY 1998 EQUIPMENT 112<br />

15.3 8 1.2 120 16.5<br />

FY 1999 EQUIPMENT 5 0.7 5 0.7<br />

FY 2000 EQUIPMENT 4 0.6 4 0.6<br />

FY 2001 EQUIPMENT 3 0.5 11 1.7 14 2.2<br />

FY 2002 EQUIPMENT 27 5.2 27 5.2<br />

FY 2003 EQUIPMENT 0 0.0<br />

FY 2004 EQUIPMENT 0 0.0<br />

FY 2005 EQUIPMENT 0 0.0<br />

TO COMPLETE 0 0.0<br />

INSTALLATION SCHEDULE:<br />

FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 112 6 6 5 3 11 19 15 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 178<br />

Out 112 3 6 8 3 11 19 15 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 178<br />

P-3A<br />

ITEM NO. 53 PAGE 14 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

FY 2005 BUDGET PRODUCTION SCHEDULE, P-21 DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY Weapon System P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA2 TV-DTS<br />

Production Rate Procurement Lead-times<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of Initial Reorder Unit of<br />

Item Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure Mfg PLT Mfg PLT Total Measure<br />

FISCAL YEAR 2002 FISCAL YEAR 2003 FISCAL YEAR 2004<br />

ITEM / MANUFACTURER F S Q D B 2001 CALENDAR YEAR 2002 CALENDAR YEAR 2003 CALENDAR YEAR 2004<br />

Y V<br />

C<br />

TV-DTS (SPAWAR)/MTN 98 120 120 0<br />

TV-DTS (SPAWAR)/MTN 99 5 5 0<br />

TV-DTS (SPAWAR)/MTN 00 4 4 0<br />

TV-DTS (SPAWAR)/MTN 01 14 14 0<br />

TV-DTS (SPAWAR)/MTN 02 35 27 A 15 11 1<br />

Remarks:<br />

ITEM / MANUFACTURER F S Q D B<br />

Y V<br />

C<br />

T<br />

Y<br />

T<br />

Y<br />

E<br />

L<br />

E<br />

L<br />

A<br />

L<br />

A<br />

L<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

DD Form 2445, JUL 87 Previous editions are obsolete P-1 SHOPPING LIST CLASSIFICATION: UNCLASSIFIED<br />

311 / 244 ITEM NO 53 PAGE 15 Exhibit P-21 Production Schedule<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L<br />

B<br />

A<br />

L<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L<br />

B<br />

A<br />

L


CLASSIFICATION:<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY - (BA-2) P-1 ITEM NOMENCLATURE<br />

Communications & Electronics Equipment Strategic Platform Support Equipment/#267600/#267606<br />

Program Element for Code B Items: Other Related Program Elements<br />

Prior ID To<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions) A $17.6 $8.5 $5.3 $3.4 $4.0 $4.1 $4.2 $47.0<br />

SPARES COST<br />

(In Millions) $0.0<br />

PROGRAM DESCRIPTION/JUSTIFICATION:<br />

Funding in this P-1 line provides Non-Propulsion Electronics equipment that will be installed aboard TRIDENT Class submarines as part of the Obsolete Equipment Replacement (OER)<br />

Program.<br />

The OBSOLETE EQUIPMENT REPLACEMENT (OER) Program is the replacement of existing hardware/software that, though functional, has become operationally obsolete, is no longer<br />

in production or supportable with spare parts, has a high failure rate, or is no longer cost effective to maintain. OER hardware/software changes are expected to provide significant cost<br />

savings in reduced maintenance costs and use Commercial-Off-The-Shelf (COTS) technology where ever possible as long as all technical requirements are met.<br />

This funding line provides funding to perform fully integrated system level testing and certification of changes to the TRIDENT Combat systems prior to installation of the changes on the<br />

ship. Integrated testing and certification provides assurance that when the changes are installed in the ship, the TRIDENT Combat system will operate as designed, allowing the ships to<br />

maintain their operational schedules and capabilities.<br />

INSTALLATION (ELECTRONICS) - Provides funding for electronic equipment installation resulting from the OER Program.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 54 PAGE NO. 1<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy<br />

BA-2: Communications & Electronics Equipment A Strategic Platform Support Equipment/82P1<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID Prior FY 2003 FY 2004 FY 2005<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

N872<br />

P1221 Equipment OER A 14,425 6,236 5,265<br />

P1INS Installation A 3,126 2,260 0<br />

17,551 8,496 5,265<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 54 PAGE NO. 2<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy Strategic Platform Support Equipment 82P1<br />

BA-2: Communications & Electronic Equipment P1221 Obsolete Equipment Replacement<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

Fiscal Year (03)<br />

CCS Rev. 7.3 (ARCI/ECP-4) ShipAlt Development PY * $2,000.00 NAVSEA N/A CPFF EB Corp., Groton, CT 2/03 8/04 Yes<br />

CCS Rev. 6.4 (BPS-15J VMS)PY SHIPALT Dev (734) * $120.00 NAVSEA N/A CPFF EB Corp., Groton, CT 3/03 6/04 Yes<br />

CCS Rev. 6.4 (BPS-15J VMS) Cert/Test (734) * $348.40 NAVSEA N/A WR NUWC Newport, RI 1/03 6/04 Yes<br />

CCS Rev. 6.4 (BPS-16(FC-1) VMS)PY ShipAlt Dev. * $120.00 NAVSEA N/A CPFF EB Corp., Groton, CT 3/03 6/04 Yes<br />

CCS Rev. 6.4 (BPS-16(FC-1) VMS) Cert/Test (741-743) * $348.40 NAVSEA N/A WR NUWC Newport, RI 1/03 6/04 Yes<br />

ARCI Phase II MPP & TARPU 2 $699.10 NAVSEA N/A CPFF DSR, Fairfax, VA 6/03 8/04 Yes<br />

Command Upgrade 1 $693.30 NAVSEA N/A WR NUWC Newport, RI 4/03 8/04 Yes<br />

Command Upgrade (Review TSS Drawings) 1 $8.00 NAVSEA N/A CPFF EB Corp., Groton, CT 3/03 6/04 Yes<br />

TRIDENT Rev. 7.3 System Level Support 1 $860.00 NAVSEA N/A WR NUWC Newport, RI 6/03 8/04 Yes<br />

DPS Rev. 7.3 1 $545.00 NAVSEA N/A WR NUWC Newport, RI 6/03 8/04 Yes<br />

MCW Procurement for SSBN 736 (Grade A Upgrd.) 1 $360.00 NAVSEA N/A WR NUWC Newport, RI 6/03 8/04 Yes<br />

TRIDENT DWS MK2 Mod 3 Block 1C Rev. 7.3 Devel. 1 $365.20 NAVSEA N/A WR NUWC Newport, RI 6/03 8/04 Yes<br />

MS CCS Rev. 7.3 Content 1 $75.00 NAVSEA N/A WR NSWC CD, Bethesda, MD 6/03 8/04 Yes<br />

MS CCS Rev. 6.4 Content 1 $45.50 NAVSEA N/A WR NSWC CD, Bethesda, MD 3/03 8/04 Yes<br />

CCS Rev. 6.4 Monitoring Workstation Tech. Refr. 1 $16.00 NAVSEA N/A CPFF EB Corp., Groton, CT 3/03 6/04 Yes<br />

ARCI Phase II Install Test Procedures * $92.00 NAVSEA N/A CPFF FTSCLANT, Norfolk, VA 6/03 6/04 Yes<br />

ARCI Phase II SIU, PCU, PreCable Kit, AOBT * $1,885.20 NAVSEA N/A CPFF LM Manassas, VA 8/03 6/04 Yes<br />

ARCI Phase II IETM * $17.00 NAVSEA N/A WR NSWC Crane, 6/03 6/04 Yes<br />

ARCI Phase II Testing * $115.00 NAVSEA N/A WR NUWC Newport, RI 6/03 6/04 Yes<br />

CSA MK2 Mod 0 6" EXCM (SSBN 733, 732) 2 $199.60 NAVSEA N/A CPFF EB Corp., Groton, CT 6/03 6/04 Yes<br />

ARCI Phase II System Support * $350.00 NAVSEA N/A CPFF LM Manassas, VA 8/03 8/04 Yes<br />

ARCI Phase II MPP & TARPU * $674.00 NAVSEA N/A CPFF LM Manassas, VA 6/03 6/04 Yes<br />

SSGN Sail HF Array Installation Planning * $25.00 NAVSEA N/A CPFF EB Corp., Groton, CT 6/03 6/04 Yes<br />

Deliver Unit 13 Modules 1 $8.00 NAVSEA N/A WX NUWC Keyport, WA 6/03 6/04 Yes<br />

CSA MK2 6" EXCM Tiger Team Inst. 731 1 $987.00 NAVSEA N/A CPFF EB Corp., Groton, CT 8/03 6/04 Yes<br />

Rev. 5.6 (AN/BPS-15J w/VMS)HM&E Matl. 1 $190.00 NAVSEA N/A CPFF EB Corp., Groton, CT 8/03 6/04 Yes<br />

Rev. 5.6 (AN/BPS-15J w/VMS) Installation 1 $589.00 NAVSEA N/A CPFF EB Corp., Groton, CT 8/03 6/04 Yes<br />

Rev. 6.4 (741-743) HM&E Material 1 $1,000.00 NAVSEA N/A CPFF EB Corp., Groton, CT 8/03 6/04 Yes<br />

AN/UNQ-9 EMI Fixes and Faceplate 1 $379.90 NAVSEA N/A WX NSWC CD, Bethesda, MD 8/03 6/04 Yes<br />

Replace SC Station Obsolete Equip. Upgrade 1 $263.00 NAVSEA N/A CPFF EB Corp., Groton, CT 4/04 6/04 Yes<br />

ARCI Phase II Units (SIU,PCU,PreCable) 1 $148.20 NAVSEA N/A CPFF Lockheed Martin, Manassas 4/04 6/04 Yes<br />

D. REMARKS<br />

* ARCI Phase (I/II) TA & HA MPP will support commonality, COTS equipment, and open system architecture. Unit costs are based on phased engineering change processes (ShipAlt Development and Certification), prototype and<br />

hardware procurements, and Training Unique Equipment costs to support shore based installations and can not be level funded.<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Classification:<br />

ITEM NO. 54 PAGE NO. 3 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy Strategic Platform Support Equipment 82P1<br />

BA-2: Communications & Electronic Equipment P1221 Obsolete Equipment Replacement<br />

Cost Element/<br />

FISCAL YEAR<br />

QUANTITY UNIT<br />

COST<br />

(000)<br />

LOCATION<br />

OF PCO<br />

RFP ISSUE<br />

DATE<br />

CONTRACT<br />

METHOD<br />

& TYPE<br />

CONTRACTOR<br />

AND LOCATION<br />

AWARD<br />

DATE<br />

DATE OF<br />

FIRST<br />

DELIVERY<br />

SPECS<br />

AVAILABLE<br />

NOW<br />

DATE<br />

REVISIONS<br />

AVAILABLE<br />

Fiscal Year (04)<br />

CCS Revision Engineering Cert/Test * $1,651.40 NAVSEA N/A WR NUWC Newport, RI 6/04 6/05 Yes<br />

CCS Rev. 7.3 (ARCI//AN/BYG-1) SHIPALT Development * $2,081.00 NAVSEA N/A CPFF EB Corp., Groton, CT 6/04 6/05 Yes<br />

CCS Rev. 7.3 * $1,332.60 NAVSEA N/A WX NUWC Newport, RI 2/04 6/05 Yes<br />

MCW/RM * $360.00 NAVSEA N/A CPFF LM Manassas, VA 6/04 6/05 Yes<br />

DPS Modification in Spt. Of Rev. 7.3 * $389.00 NAVSEA N/A WX NUWC Newport, RI 2/04 6/05 Yes<br />

Alteration Installation Team * $250.00 NAVSEA N/A WX NUWC Newport, RI 2/04 6/05 Yes<br />

CCS Revision Engineering * $172.00 NAVSEA N/A WX NUWC Newport, RI 6/04 6/05 Yes<br />

Fiscal Year (05)<br />

Rev. 8.0 (ARCI//AN/BYG-1) PY SHIPALT Development * $544.00 NAVSEA N/A CPFF EB Corp., Groton, CT 3/05 6/06 Yes<br />

CCS Revision Engineering Cert/Test * $3,327.00 NAVSEA N/A WR NUWC Newport, RI 3/05 6/06 Yes<br />

Rev. 9.0 (ARCI PhIII) ShipAlt Development * $1,394.00 NAVSEA N/A CPFF EB Corp., Groton, CT 3/05 6/06 Yes<br />

D. REMARKS<br />

* ARCI Phase (I/II) TA & HA MPP will support commonality, COTS equipment, and open system architecture. Unit costs are based on phased engineering change processes (ShipAlt Development and Certification), prototype and<br />

hardware procurements, and Training Unique Equipment costs to support shore based installations and can not be level funded.<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Classification:<br />

ITEM NO. 54 PAGE NO. 4 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy Strategic Platform Support Equipment 82P1<br />

BA-2: Communications & Electronic Equipment P1INS Installation<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

Fiscal Year (03)<br />

CSA MK2 6 Inch External CM Install (732, 733) 2 $749.00 NAVSEA N/A CPFF EB Corp., Groton, CT 6/03 8/04 Yes<br />

CCS Rev. 5.6(15J VMS) HM&E Mtrl. (Non-QE2) 730,731 2 $225.00 NAVSEA N/A CPFF EB Corp., Groton, CT 6/03 8/04 Yes<br />

CCS Rev. 5.6(15J VMS) Install (Non-QE2) 730,731 2 $454.00 NAVSEA N/A CPFF EB Corp., Groton, CT 6/03 8/04 Yes<br />

Rev. 5.6 (AN/BPS-15J w/VMS Install 1 $270.00 NAVSEA N/A WX NUWC Dets 2/04 8/04 Yes<br />

Fiscal Year (04)<br />

Rev. 5.6 (AN/BPS-15J w/VMS) Installation (SSBN 736) 1 $82.00 NAVSEA N/A WR TRF, Kings Bay 4/04 6/05 Yes<br />

Rev. 5.6 (AN/BPS-15J w/VMS) Installation (SSBN 736) 1 $268.00 NAVSEA N/A CPFF EB Corp., Groton, CT 4/04 6/05 Yes<br />

Rev. 5.6 (AN/BPS-15J w/VMS) HM&E Material (736) 1 $190.00 NAVSEA N/A CPFF EB Corp., Groton, CT 4/04 6/05 Yes<br />

CSA MK2 Mod 0 6" EXCM Install (SSBN 730) 1 $829.00 NAVSEA N/A CPFF EB Corp., Groton, CT 4/04 6/05 Yes<br />

Rev. 6.4 AN/BPS-16 FC1 (SSBN 741-743) Installation 3 $276.33 NAVSEA N/A CPFF EB Corp., Groton, CT 4/04 6/05 Yes<br />

CCS Revision Engineering 1 $62.00 NAVSEA N/A WX NUWC Neport, RI 4/04 6/05 Yes<br />

Fiscal Year (05)<br />

NONE<br />

D. REMARKS<br />

* ARCI Phase (I/II) TA & HA MPP will support commonality, COTS equipment, and open system architecture. Unit costs are based on phased engineering change processes (ShipAlt Development and Certification), prototype and<br />

hardware procurements, and Training Unique Equipment costs to support shore based installations and can not be level funded.<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Classification:<br />

ITEM NO. 54 PAGE NO. 5 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

Trident Sonar (Replaces AN/BQQ-5E(V)// Acoustic Rapid COTS Insertion (ARCI<br />

MODELS OF SYSTEM AFFECTED: AN/BQQ-6 Towed Array PTYPE MODIFICATION: Obsolete Equipment Replacement MODIFICATION TITLE: Phase I/II Multi-Purpose Processor (MPP)<br />

DESCRIPTION/JUSTIFICATION:<br />

Acoustic Rapid COTS Insertion (ARCI) (Phase I/II) Multi Purpose Processor (MPP) replaces obsolete AN/BQQ5E(V)//AN/BQQ-6 Sonar Towed and Hull array processing equipment with a COTS based<br />

open system architecture with increased acoustic advantage.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTOOPEVAL = 12/97<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 5.1 0 5.1<br />

PROCUREMENT<br />

INSTALLATION KITS 0.0<br />

INSTALLATION KITS - UNIT COST<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 3 8.70 2 4.7 5 13.4<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 1 0.1 1 0.1<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER ARCI PHASE I & II (TA&HA) 3.97 4.0<br />

OTHER 0.0<br />

OTHER 0.0<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST 2 1.60 2 1.60<br />

TOTAL PROCUREMENT 4 14.32 2 4.70 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 6 19.02<br />

ITEM 54 PAGE 6 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

Trident Sonar (Replaces AN/BQQ-5E(V)//<br />

MODELS OF SYSTEMS AFFECTED: AN/BQQ-6 Towed Array Processing) MODIFICATION TITLE: Acoustic Rapid COTS Insertion (ARCI) Phase I/II Multi-Purpose Processor (MPP)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: Engineered Overhauls/ERPs/Refits<br />

ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME: 12 Months - 18 Months<br />

CONTRACT DATES: FY 2003: 12/02 FY 2004: FY 2005:<br />

DELIVERY DATE: FY 2003: 12/03 FY 2004: FY 2005:<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 1 0.8<br />

FY 2000 EQUIPMENT 1 1 0.8<br />

FY 2001 EQUIPMENT 0 0.0<br />

FY 2002 EQUIPMENT 0 0.0<br />

FY 2003 EQUIPMENT ** 0 0.0<br />

FY 2004 EQUIPMENT 0 0.0<br />

FY 2005 EQUIPMENT 0 0.0<br />

FY 2006 EQUIPMENT 0 0.0<br />

FY 2007 EQUIPMENT 0 0.0<br />

TO COMPLETE 0 0.0<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2<br />

Out 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2<br />

P-3A<br />

ITEM 54 PAGE 7 CLASSIFICATION: UNCLASSIFIED<br />

Note **: Installation funds reside in PMS425 based on POM-04 sponsor control adjustments, (FY04-09).


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: CSA MK2 MOD 0 TYPE MODIFICATION: Obsolete Equipment Replacement MODIFICATION TITLE: Six Inch External Countermeasures<br />

DESCRIPTION/JUSTIFICATION:<br />

Replaces the CSA MK1 5 Inch External Countermeasure System with the CSA MK2 MOD 6 Inch External Countermeasure System on SSBNs 730-733, 735-740.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 0 0.0<br />

PROCUREMENT<br />

INSTALLATION KITS 0 0.0<br />

INSTALLATION KITS - UNIT COST<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 10 * 10 0.0<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 0.0<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER 0.0<br />

OTHER (SSBN 736, 738, 739, 731) 1.686 0.99 2.7<br />

OTHER (SSBN 732, 733) 0.39 0.4<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST (SSBN 732, 733, 730) 2 1.50 1 0.83 3 2.33<br />

TOTAL PROCUREMENT 10 1.686 0 2.88 0 0.83 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 10 5.4<br />

ITEM 54 PAGE 8 CLASSIFICATION: UNCLASSIFIED<br />

* Countermeasures procurements of HM&E Material and Fabrication funded under BA4 (535500).


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: CSA MK2 MOD 0 MODIFICATION TITLE: Six Inch External Countermeasures<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: Three phased refit/pierside installation<br />

ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME: 12 Months / 9 Months for kits<br />

CONTRACT DATES: FY 2003: 10/02 FY 2004: 10/03 FY 2005:<br />

DELIVERY DATE: FY 2003: 7/03 FY 2004: 7/04 FY 2005:<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 0 0.0<br />

FY 2000 EQUIPMENT 0 0.0<br />

FY 2001 EQUIPMENT 0 0.0<br />

FY 2002 EQUIPMENT 2 1.50 2 1.50<br />

FY 2003 EQUIPMENT 1 0.83 1 0.83<br />

FY 2004 EQUIPMENT 0 0.0<br />

FY 2005 EQUIPMENT 0 0.0<br />

FY 2006 EQUIPMENT 0 0.0<br />

FY 2007 EQUIPMENT<br />

TO COMPLETE<br />

0 0.0<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3<br />

Out 0 0 0 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3<br />

P-3A<br />

ITEM 54 PAGE 9 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION Installation of OER and Common<br />

Capabilities (SSN (SSBN) Modernizations on<br />

MODELS OF SYSTEM AFFECTED: Various TYPE MODIFICATION: Obsolete Equipment Replacement MODIFICATION TITLE: OHIO Class Submarine<br />

DESCRIPTION/JUSTIFICATION:<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 0.0<br />

PROCUREMENT<br />

INSTALLATION KITS 0.0<br />

INSTALLATION KITS - UNIT COST<br />

INSTALLATION KITS NONRECURRING 0.0<br />

EQUIPMENT 0.0<br />

EQUIPMENT NONRECURRING 0.0<br />

ENGINEERING CHANGE ORDERS 0.0<br />

DATA 0.0<br />

TRAINING EQUIPMENT 0.0<br />

SUPPORT EQUIPMENT 0.0<br />

OTHER 0.0<br />

OTHER 0.0<br />

OTHER * 4.34 * 8.35 * 6.24 * 5.27 * 3.42 * 4.01 * 4.08 * 4.16 39.87<br />

INTERIM CONTRACTOR SUPPORT 0.0<br />

INSTALL COST * 8.15 * 1.63 * 1.43 11.21<br />

TOTAL PROCUREMENT 0 12.49 0 9.98 0 7.67 0 5.27 0 3.42 0 4.01 0 4.08 0 4.16 0 0.00 0 51.08<br />

ITEM 54 PAGE 10 CLASSIFICATION: UNCLASSIFIED<br />

Covers the procurement and installation requirements for the SSBN program minus ARCI and Six Inch Countermeasures.<br />

* CCS Revisions 5.6/6.4/7.0/8.0/9.0 Planning Yard and other OER material.


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: Various MODIFICATION TITLE: Installation of TRIDENT OER Modifications on OHIO Class Submarine<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: Various<br />

ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME: Various<br />

CONTRACT DATES: FY 2003: FY 2004: FY 2005:<br />

DELIVERY DATE: FY 2003: FY 2004: FY 2005:<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 0.0<br />

FY 2000 EQUIPMENT * 5.34 5.34<br />

FY 2001 EQUIPMENT * 2.8 2.81<br />

FY 2002 EQUIPMENT * 1.63 1.63<br />

FY 2003 EQUIPMENT * 1.43 1.43<br />

FY 2004 EQUIPMENT 0.0<br />

FY 2005 EQUIPMENT 0.0<br />

FY 2006 EQUIPMENT 0.0<br />

FY 2007 EQUIPMENT<br />

TO COMPLETE<br />

0.0<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

P-3A<br />

ITEM 54 PAGE 11 CLASSIFICATION: UNCLASSIFIED


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI: 2760 OTHER SPAWAR TRNG. EQUIP. 52DF<br />

QUANTITY<br />

COST<br />

(in millions)<br />

PY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TO COMP TOTAL<br />

1.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0<br />

PROGRAM COVERAGE/JUSTIFICATION FOR BUDGET YEAR REQUIREMENTS: By PDM1, 12 Dec 02, OSD deleted funds from JSIMS-M for the period FY04-FY09, directing services to support JSIMS 1.0<br />

validation activities in FY03, and directing the conduct of an Analysis of Alternatives in FY03. Navy program sponsor (N00T), with FMB concurrence, directed application of funds to modernization of legacy system<br />

(ENWGS).<br />

The mission of The Joint Simulation System (JSIMS) is to provide a readily available, operationally valid synthetic environment for the Commanders-in-Chief (CINCs), their components, other Joint organizations<br />

and the Services to: jointly train, educate, develop doctrine and tactics, formulate and assess operational plans, assess warfighting situations, define operational requirements, and provide operational inputs to the<br />

acquisition process. In short, JSIMS will provide not only an improved certified capability for inter-Service operability but also an enhanced Joint Battle Staff training capability for the warfighting CINCs. All service<br />

Executive Agents (EAs) and Development Agents (DAs) are required to contribute to the initial population of the JSIMS architecture with facilities, services and tools. In keeping with the premise that the<br />

Services/components are best able to define their own capabilities and functionality, the JSIMS Alliance Executive Office (AEO) is working in concert with the Services to import Service-provided functionality such<br />

as land, air, naval and littoral warfare to JSIMS. The AEO will integrate these functionalities for use in Joint Army/Marine/Navy/Air Force exercises. JSIMS development is incremental. In June 1994 the Services<br />

and Director Joint Program Office signed a Memorandum of Agreement (MOA) to establish JSIMS; a critical next-generation Modeling and Simulation (M&S) system. The long-term goal of the agreement is to<br />

integrate the range of missions of the Armed Forces within a common framework. That framework provides a balanced melding of live, virtual and constructive M&S representations, with Command, Control,<br />

Communications, Computers and Intelligence (C4I) fully supported, and interfaces using real-world equipment. As the Maritime Warfare EA, OPNAV N7, on 29 August 1995, assigned NAVSEA as the JSIMS<br />

Maritime Development Agent (DA). The objective of the JSIMS Maritime portion of the JSIMS Program is to enable training at all levels of command, in all warfare areas, including Joint and Service-specific<br />

training. JSIMS Maritime is developing the Maritime Mission Space Objects for the JSIMS Program, as well as selected common components and services. Program was transferred from NAVSEA to SPAWAR<br />

PD-13 at the beginning of FY99. Due to a reorganization at SPAWAR, the JSIMS-M Program now resides in PD15. On 16 December 1999, USD (AT&L) published a memorandum directing that JSIMS be<br />

reorganized per the recommendations made by the JSIMS Senior Review Board. These recommendations were detailed in a 19 November 1999 Senior Review Board memorandum. Specifically, JSIMS was<br />

directed to convert system architecture to the High-Level Architecture (HLA) standard, establish a JSIMS Alliance Executive Office, develop a new Acquisition Program Baseline (APB), and transfer Program<br />

Executive Office (PEO) responsibilities from Air Force to Army. USD (AT&L) has also designated JSIMS as an ACAT-1D program. This BLI procures the Contractor-Off-the-Shelf equipment on which the Navy<br />

JSIMS simulations will run in support of fleet wide training.<br />

FY03 Budget Procurement: Applied funds to modernization of legacy system (ENWGS) at all Navy sites.<br />

FY04 Budget Procurement: None. PDM1, 12 Dec 02, deleted JSIMS-M funding for FY04-09.<br />

FY05 Budget Procurement: None. PDM1, 12 Dec 02, deleted JSIMS-M funding for FY04-09.<br />

P-1 Shopping List<br />

Item No. 55-1 of 55-4<br />

Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE<br />

COST ANALYSIS<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE<br />

February 2004<br />

SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT BLI 2760 OTHER SPAWAR TRAINING EQUIPMENT<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

52DF<br />

FY 2003 FY 2004<br />

FY 2005<br />

COST UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST QTY COST COST QTY COST COST QTY COST COST<br />

DF001 JSIMS-MARITIME 5** 825 0 0<br />

DF776 JSIMS-MARITIME NON-FMP INSTALLATION 142 0 0<br />

TOTAL CONTROL 967 0 0<br />

Remarks: *QTY Column reflects number of shore sites receiving various quantities of computer and network hardware in the given years. UNIT COST varies with<br />

configuration.<br />

**FY03 OPN funds applied to legacy system (ENWGS) with concurrence of Navy FMB.<br />

P-1 Shopping List<br />

Item No 55-2 of 55-4<br />

Exhibit P-5, Cost Analysis<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

PROCUREMENT HISTORY AND PLANNING<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI 2760 OTHER SPAWAR TRNG EQUIP 52DF<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE DELIVERY COST NOW AVAILABLE<br />

DF001 JSIMS MARITIME 03 VARIOUS C-FP SSCSD Jun-03 Aug-03 Dec-03 5** Yes N/A<br />

Remarks: *QTY Column reflects number of shore sites receiving various quantities of computer and network hardware in the given years. UNIT COST<br />

varies with configuration.<br />

**FY03 OPN funds applied to legacy system (ENWGS) with concurrence of Navy FMB.<br />

DD FORM 2446, JUN 87<br />

P-1 Shopping List<br />

Item No 55-3 of 55-4<br />

A. DATE<br />

February 2004<br />

Exhibit P-5A, Procurement History and Planning<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Other SPAWAR Training Equipment<br />

February 2004<br />

COST CODE DF001, DF776<br />

MODELS OF SYSTEMS AFFECTED: Various<br />

DESCRIPTION/JUSTIFICATION: The Joint Simulation System (JSIMS) was to provide a readily available, operationally valid synthetic environment for the Commanders-in-Chief (CINCS), their components, other Joint organizations<br />

and the Services to jointly train, educate, develop doctrine and tactics, formulate and assess operational plans, assess warfighting situations, define operational requirements and provide operational<br />

inputs to the acquisition process. As Development Agent (DA), SPAWAR was to acquire, deploy and maintain the equipment and associated applications software necessary to run the.<br />

Navy's JSIMS sites. Program was terminated for Service participation in FY2003<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: Program assumed spiral development strategy. Development Blocks are equivalent to engineering software releases. Joint IOC--Q4 FY03.<br />

JSIMS Maritime funding deleted after FY03.<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty* $ Qty* $ Qty* $ Qty* $ Qty* $ Qty* $ Qty* $ Qty* $ Qty* $ Qty* $ Qty* $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

COTS Equipment 3 1.0 2 1.4 5 0.8 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 N/A N/A 10 3.2<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 2.6 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 N/A N/A 0 2.9<br />

Other - (DSA)<br />

Interm Contractor Support<br />

Installation of Hardware 3 0.4 2 0.2 5 0.1 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 N/A N/A 7 0.7<br />

PRIOR YR EQUIP 0.4 0 0.4<br />

FY 02 EQUIP 2 0.2 2 0.2<br />

FY 03 EQUIP 5 0.1 5 0.1<br />

FY 04 EQUIP 0 0.0 0 0.0<br />

FY 05 EQUIP 0 0.0 0 0.0<br />

FY 06 EQUIP 0 0.0 0 0.0<br />

FY 07 EQUIP 0 0.0 0 0.0<br />

FY 08 EQUIP 0 0.0 0 0.0<br />

FY 09 EQUIP 0 0.0 0 0.0<br />

FY TC EQUIP<br />

TOTAL INSTALLATION COST 3 0.4 2 0.2 5 0.1 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 N/A 7 0.7<br />

TOTAL PROCUREMENT COST 4.0 1.8 1.0 0.0 0.0 0.0 0.0 0.0 0.0 6.8<br />

METHOD OF IMPLEMENTATION: SPAWAR Sys Center Install ADMINISTRATIVE LEADTIME: 2 Mos PRODUCTION LEADTIME: 2 Mos<br />

CONTRACT DATES: FY 2003: Aug-03 FY 2004: FY 2005:<br />

DELIVERY DATES: FY 2003: Dec-03 FY 2004: FY 2005:<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT** 5 1 3 1<br />

OUTPUT** 5 1 1 2 1<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 10<br />

OUTPUT 10<br />

Notes/Comments: *Quantities are Shore Sites, which vary in size, equipment contained and configuration of the sites and their equipment.<br />

**Sites at Tactical Training Group, Atlantic and at the Naval War College contain a two-phased procurement and installation.<br />

P-1 Shopping LIst<br />

Item No. 55-4 of 55-4<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA-2 Communications and Electronic Equipment OTHER TRAINING EQUIPMENT/BLI: 2762<br />

Program Element for Code B Items: Other Related Program Elements<br />

Prior ID To<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY N/A N/A N/A N/A N/A N/A N/A N/A<br />

COST<br />

(In Millions) 244.6 21.5 52.1 42.9 18.9 8.6 6.2 7.5 402.3<br />

SPARES COST<br />

(In Millions) 0.0<br />

The equipment procured under the Other Training Equipment for NAVSEA line supports various types of Communication and Electronic training requirements: Procures sustaining and training<br />

equipment/systems, training aids and logistic support equipment to support Fleet training requirements.<br />

(MB032) SUSTAINING TECHNICAL TRAINING EQUIPMENT<br />

Funds procure Communication and Electronic Technical Training Equipment (TTE) identified by the Chief of Naval Education and Training (CNET) and the Surface Warfare Training Requirements<br />

Review (SWTRR) process, as approved by CNO. This TTE sustains a better quality of training and/or replaces equipment beyond economical repair.<br />

(MB040) BATTLE FORCE TACTICAL TRAINING (BFTT)<br />

Funds will procure equipment/systems to support the Battle Force Tactical Training (BFTT) Program, which will provide the capability for coordinated shipboard combat system team and Battle<br />

Group/Battle Force (BG/BF) training in port. BFTT will provide realistic joint warfare training across the spectrum of armed conflict, realistic unit level team training in all warfare areas, a means to link<br />

ships together which are in different homeports for coordinated training, external stimulation of shipboard training systems and simulation of non-shipboard forces such as friendly, neutral, and enemy<br />

ships, aircraft and submarines. BFTT will use a distributed architecture in order to integrate existing on-board/embedded trainers, and will utilize Distributed Interactive Simulation (DIS) protocols to<br />

provide Battle Group/Force Commanders with the ability to conduct coordinated, realistic, high stress, interactive combat system training.<br />

In FY 03 the projected Baseline Procurement consists of one full BFTT system for (1) CV/CVN Class, (3) CG Class, (3) DDG 51 Class ships, and ILS/Spares.<br />

In FY 04 the projected Baseline Procurement consists of one full BFTT system for (1) CV/CVN Class, (3) CG 47 Class, (1) LHD Class, (2) LHA 1 Class, and (3) DDG 51 Class ships. One<br />

BFTT/TSSS/BEWT/ATC OBT/Link System for the CVN 76, (7) BFTT/TSSS Systems for the FFG 7 Class.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 56 PAGE NO. 1<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 CONTINUATION FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA-2 Communications and Electronic Equipment OTHER TRAINING EQUIPMENT/BLI: 2762<br />

In FY 05 the projected Baseline Procurement consists of one full BFTT system for (6) CG 47 Class, (1) LHD Class, and (1) LHA Class ship, (5) BFTT/TSSS Systems for the FFG 7 Class, ILS/Spares/<br />

acceleration, and (11) Trainer Stimulator-Simulator System (TSSS) units.<br />

(MB044) TRAINING SUPPORT EQUIPMENT/SUB<br />

This line procures submarine Fleet and team trainers sustaining equipment and systems which emulate ship characteristic/models as approved by the CNO. Representative training systems include,<br />

but are not limited to: Acoustic Analysis Trainers (AAT), the Virtual Environment Submarine (VESUB), Submarine Piloting and Navigation Trainers (SPAN) and Reconfigurable SPAN identified by the<br />

Submarine Learning Center (SLC) for training activities, which are approved by the CNO. Supports training support equipment requirements identified by the Submarine Learning Center (SLC)/CNO<br />

for training activities.<br />

(MB050) SUBMARINE SONAR EMPLOYMENT TRAINER (SET)<br />

The SET provides acoustic operator employment Fleet and team training for submarine sonar systems. It uses entirely commercial components to contain contact and environment models,<br />

simulations of the sensors and signal processing, simulated operator consoles, and an instructional subsystem including an instructor's console. FY00 procured a SET system for the Naval Submarine<br />

School at Groton, CT. The SET will support Sensor/Combat Systems programs of all currently deployed submarine classes, and will be a critical part of the training plans of the new SSN, Virginia,<br />

class in the future. The SET will be an essential component of an emerging shore based training system that will support the projected technology in the Fleet systems that are designed to meet<br />

current and future threats: the Acoustics, Rapid Commercial-Off-The-Shelf (COTS) Insertion (A-RCI) and C3I. The design concept for SET is based on the widely recognized and proven successful<br />

Interactive Multisensor Acoustic Trainer (IMAT) visualization and simulation technologies.<br />

The SET will be part of the solution to a deficiency in operator competence and data recognition due to a lack of employment training by its use of 3-D graphics, animation, audio, and scientific<br />

visualization methods to illustrate highly complex displays and concepts of oceanographic physics. The demands of curriculum and student throughput at the primary submarine training site at<br />

NAVSUBSCOL, Groton dictates the number and configuration of trainers provided by the N77 budgets, including the SET.<br />

FY05 Procures technical insertion of hardware to accommodate the latest deployed version of the Combat System or Acoustic Advanced Processing Build (APB).<br />

(MB054) RADAR/ECS TRAINERS/EQUIPMENT<br />

This line procures electronics trainers for SSNs such as radar, and exterior communictions (ECS).<br />

(MB056) SUBMARINE MULTI RECONFIGURABLE TRAINING SYSTEM / GENERAL SKILLS TRAINING (SEA 08)<br />

This line procures Electronic Classrooms (ECR) to support general skills training.<br />

NAVY SMART TARGET PROGRAM (FY 04 NAVAIR Congressional Add $1.6M):<br />

Congress provided funding for Navy Smart Targets to provide a realistic visual, infrared and radio frequency simulation of threat systems. Smart Targets are used to provide training for the operators<br />

of airborne and ship board weapon systems. Smart Target Threats provide the diversity of threats required to accomplish the realistic integrated air defense training that is planned for Southern<br />

California Off Shore Range's (SCORE's) Sam Clemente Island (Adversary Island). This funding provides three (3) Smart Target systems.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 56 PAGE NO. 2<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy<br />

BA-2 Communications and Electronic Equipment Other Training Equipment/A2MB<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID Prior FY2003 FY 2004 FY 2005<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

EXPEDITIONARY WARFARE (N75)<br />

MB040 Battle Force Tactical Training (BFTT) 9,480 1,078 0 0<br />

BFTT Air Traffic Control (ATC) Upgrades 2,800<br />

MB040 AIR WARFARE (N78)<br />

SURFACE WARFARE (N76)<br />

0 4,255 0<br />

MB032 Surface Sustaining/TTE 519 57 45 59<br />

MB040 Battle Force Tactical Training (BFTT) 198,614 14,635 39,244 35,789<br />

Tactical Communication On-Board Trainer<br />

SUBMARINE WARFARE (N77)<br />

4,500<br />

MB041 Submarine Synthetic Warfare, CTTM,EC 4,128<br />

MB044 Training Support Equipment / Sub 13,700 5,694 5,196 2,457<br />

Minor Training Support Equipment (242) (1731) (760)<br />

VESUB 2 583 (1166) 1 620 (620) (0)<br />

SPAN 2 1,063 (2126) 2 950 (1900) 1 1,000 (1000)<br />

Reconfigurable SPAN 1 1,200 (1200) (0)<br />

IUSS Maintenance Trainer 1 250 (250)<br />

Acoustic Analysis Trainer 2 480 (960) 1 695 (695) 1 697 (697)<br />

MB050 SUBMARINE SONAR EMPLOYMENT<br />

TRAINER (SET) 9,292 0 1,773<br />

MB054 Radar/ECS Training 1,554 0 68<br />

MB056 MRTS/ Gen Skills Trng (SEA 08) 0 1,802 2,767<br />

MB058 AIR WARFARE (N78) 0 0 0<br />

Subtotal (N75/N76) 215,913 15,770 39,289 35,848<br />

Subtotal (N77) 28,674 5,694 6,998 7,065<br />

Subtotal (N78) 0 0 4,255 0<br />

244,587 21,464 50,542 42,913<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 56 PAGE NO. 3<br />

UNCLASSIFIED


WEAPONS SYSTEM COST ANALYSIS WEAPONS SYSTEM DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy 42MB<br />

BA-2 Communications and Electronic Equipment OTHER TRAINING EQUIPMENT<br />

COST ELEMENT OF COST ID Prior FY 2002 FY 2003 FY2004 FY2005<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

SC704<br />

CONGRESSIONAL ADDS<br />

NAVY SMART TARGET 3 536.3 1,609<br />

SC831 PRODUCTION ENGINEERING, OTHER N/A 0 0<br />

SC860 ACCEPTANCE TEST & EVALUATION N/A 0 0<br />

SC900 INSTALLATION OF EQUIP-NON FMP N/A 0 0<br />

SC971 ILS, OTHER RANGES N/A 0 0<br />

SCVAR VARIOUS 1/ 0 0<br />

TRS funding in FY 2003 totals $32.138M.<br />

0 0 0 1,609 0<br />

P-1 SHOPPING LIST<br />

ITEM NO. 56 PAGE NO. 4 `


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

FEBRUARY 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy A2MB<br />

BA-2 Communications and Electronic Equipment Other Training Equipment<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

FY 2003<br />

MB040<br />

ILS/SPARES MULTIPLE 72 GOVWORKS VARIOUS VARIOUS VARIOUS 11/02 02/03 YES<br />

CV/CVN CLASS P/I/T/T/D 1 2366 GOVWORKS VARIOUS VARIOUS VARIOUS 02/03 05/03 YES<br />

DDG 51 CLASS P/I/T/T/D 3 2248 GOVWORKS VARIOUS VARIOUS VARIOUS 02/03 05/03 YES<br />

CG 47 CLASS P/I/T/T/D 3 2177 GOVWORKS VARIOUS VARIOUS VARIOUS 02/03 04/03 YES<br />

MB044<br />

TSE MULTIPLE VARIOUS NAWC/TSD VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS YES<br />

VESUB 2 583 NAWC/TSD 9/16/98 C/FFP RDR, INC. 02/03 09/03 YES<br />

SPAN 2 1063 NAWC/TSD N/A WX NAWC/TSD 02/03 08/04 YES<br />

Reconfigurable SPAN 1 1200 NAWC/TSD N/A WX NAWC/TSD 02/03 04/04 NO 08/02<br />

Acoustic Analysis Trnr 2 480 NSWC/CD 08/00 WX/RX NSWC/CD 02/03 06/04 YES<br />

D. REMARKS<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Classification:<br />

ITEM NO. 56 PAGE NO. 5 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

FEBRUARY 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy A2MB<br />

BA-2 Communications and Electronic Equipment Other Training Equipment<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

FY 2004<br />

MB040<br />

CG 47 CLASS P/I/T/T/D 3 2187 GOVWORKS VARIOUS VARIOUS VARIOUS 02/04 05/04 YES<br />

DDG 51 CLASS P/I/T/T/D 3 2300 GOVWORKS VARIOUS VARIOUS VARIOUS 02/04 05/04 YES<br />

LHD 1 CLASS P/I/T/T/D 1 2142 GOVWORKS VARIOUS VARIOUS VARIOUS 02/04 05/04 YES<br />

CV/CVN CLASS P/I/T/T/D 1 2400 GOVWORKS VARIOUS VARIOUS VARIOUS 02/04 05/04 YES<br />

LHA 1 CLASS P/I/T/T/D 2 2686 GOVWORKS VARIOUS VARIOUS VARIOUS 02/04 05/04 YES<br />

FFG 7 CLASS BFTT/TSSS 7 2267 GOVWORKS VARIOUS VARIOUS VARIOUS 02/04 05/04 YES<br />

CVN 76 BFTT/TSSS/BEWT/<br />

ATC OBT/LINK 1 4255 GOVWORKS VARIOUS VARIOUS VARIOUS 02/04 05/04 YES<br />

MB044<br />

TSE MULTIPLE VARIOUS NAWC/TSD VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS YES<br />

VESUB 1 620 NAWC/TSD VARIOUS VARIOUS VARIOUS 11/03 09/05 YES<br />

SPAN 2 950 NAWC/TSD N/A WX NAWC/TSD 11/03 08/04 YES<br />

IUSS Maintenance 1 250 NAWC/TSD N/A WX NAWC/TSD 11/03 02/05 NO TBD<br />

Acoustic Analysis Trnr 1 695 NSWC/CD N/A WX NSWC/CD 11/03 11/04 YES<br />

MB056<br />

MRTS 1 1802 NAWC/TSD N/A WX NAWC/TSD 11/03 08/05<br />

D. REMARKS<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Classification:<br />

ITEM NO. 56 PAGE NO. 6 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

FEBRUARY 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy A2MB<br />

BA-2 Communications and Electronic Equipment Other Training Equipment<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

FY 2005<br />

MB040<br />

CG 47 CLASS P/I/T/T/D 6 2265 GOVWORKS VARIOUS VARIOUS VARIOUS 02/05 05/05 YES<br />

LHA CLASS P/I/T/T/D 1 2781 GOVWORKS VARIOUS VARIOUS VARIOUS 02/05 05/05 YES<br />

LHD 1 CLASS P/I/T/T/D 1 2210 GOVWORKS VARIOUS VARIOUS VARIOUS 02/05 05/05 YES<br />

FFG 7 CLASS BFTT/TSSS 5 2267 GOVWORKS VARIOUS VARIOUS VARIOUS 02/05 05/05 YES<br />

ILS/Spares/Acceleration MULTIPLE 98 GOVWORKS VARIOUS VARIOUS VARIOUS 11/04 02/05 YES<br />

STIM/SIM 11 525 GOVWORKS VARIOUS VARIOUS VARIOUS 03/05 06/05 YES<br />

MB044<br />

TSE MULTIPLE NAWC/TSD VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS YES<br />

SPAN 1 1000 NAWC/TSD N/A WX NAWC/TSD 02/05 04/06 YES<br />

Acoustic Analysis Trnr 1 697 NSWC/CD N/A WX NSWC/CD 02/05 06/06 YES<br />

MB056<br />

MRTS 2 725 NAWC/TSD N/A WX NAWC/TSD 02/05 11/05 YES<br />

SEA 08 ECRs 1 1317 NAVSEA N/A SS/CPF GD/EB, Groton CT 12/04 05/05 YES<br />

D. REMARKS<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Classification:<br />

ITEM NO. 56 PAGE NO. 7 UNCLASSIFIED


BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) WEAPON SYSTEM A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy<br />

BA-2 COMMUNICATIONS AND ELECTRONICS EQUIPMENT OTHER TRAINING EQUIPMENT 42MB<br />

CONTRACT DATE OF SPECS IF NO<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE WHEN<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

CONGRESSIONAL ADDS<br />

SC704 NAVY SMART TARGET<br />

2004 3 536.3K GSA- San Diego 11/3 FFP SenSyTech, CA 3/04 1/05 YES NA<br />

P-1 SHOPPING LIST<br />

ITEM NO. 56 PAGE NO. 8


CLASSIFICATION: UNCLASSIFIED<br />

TIME PHASED REQUIREMENT SCHEDULE A. APPROPRIATION/BUDGET ACTIVITY B. P-1 ITEM NOMENCLATURE C. DATE<br />

P-23 Other Procurement, Navy AN/USQ-T46 BFTT<br />

BA-2 Feb-04<br />

FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 LATER<br />

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

ACTIVE FORCE INVENTORY (P)<br />

(P)<br />

68 0 3 4 0 4 5 9 0 4 4 5 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

SCHOOLS/OTHER TRAINING (P) 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

OTHER (P)<br />

TOTAL PHASED REQ (C) 79 79 82 86 86 90 95 104 104 108 112 117 117 117 118 118 118 118 118 118 118 118 118 118 118 118 118 118 118<br />

ASSETS ON HAND (BP) 0<br />

DELIVERY FY 02 & PRIOR (P) 79<br />

FY 03 (P) 0 0 3 4<br />

FY 04 (P) 0 4 5 9<br />

FY 05 (P) 0 4 4 5<br />

FY 06 (P) 0 0 1 0<br />

FY 07 (P) 0 0 0 0<br />

FY 08 (P) 0 0 0 0<br />

To Complete (P) 0 0 0 0 0<br />

TOTAL ASSETS (C) 79 79 82 86 86 90 95 104 104 108 112 117 117 117 118 118 118 118 118 118 118 118 118 118 118 118 118 118 118<br />

QTY OVER (+) OR SHORT (-) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

D. REMARKS E. RQMT (QTY) TOTAL RQMT INSTALLED ON HAND FY 99 & PRIOR UNFUNDED<br />

AS OF 7/1/03 UNDELIVERED<br />

1. APPN - OPN 123 123 79 7 0 0<br />

2. APPN -<br />

3. PROCUREMENT LEADTIME ADMIN INITIAL ORDER REORDER<br />

N/A 6 Mont 6 Mont 6 Months<br />

DD for 2447, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO 56 PAGE NO 9<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

TIME PHASED REQUIREMENTS SCHEDULE P-1 ITEM NOMENCLATURE/PROJECT UNIT DATE<br />

(SUPPLEMENT SHEET-INSTALLATION DATA)<br />

P-23A AN/USQ-T46 BFTT Feb-04<br />

APPROPRIATION/BUDGET ACTIVITY Installing Agent<br />

Other Procurement, Navy N/A<br />

BA-2 Communications and Electronic Equipment<br />

1ST QTR 2ND QTR 3RD QTR 4TH QTR 1ST QTR 2ND QTR 3RD QTR 4TH QTR<br />

E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY<br />

FY 2003 FY 2004<br />

3 4 4 5 9<br />

FY 2005 FY 2006<br />

4 4 5 0 1 0<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 56 PAGE NO. 10<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

TIME PHASED REQUIREMENTS SCHEDULE P-1 ITEM NOMENCLATURE/PROJECT UNIT DATE<br />

(SUPPLEMENT SHEET-INSTALLATION DATA)<br />

P-23A AN/USQ-T46 BFTT Feb-04<br />

APPROPRIATION/BUDGET ACTIVITY Installing Agent<br />

Other Procurement, Navy N/A<br />

BA-2 Communications and Electronic Equipment<br />

1ST QTR 2ND QTR 3RD QTR 4TH QTR 1ST QTR 2ND QTR 3RD QTR 4TH QTR<br />

E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY E.I./L QTY<br />

FY 2007 FY 2008<br />

FY 2009<br />

0 0<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 56 PAGE NO. 11<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY BA-2 Communications and Electronic P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY Equipment MARINE AIR TRAFFIC CONTROL & LANDING SYSTEMS 42MJ<br />

Program Element for Code B Items: Other Related Program Elements BLI#281500<br />

NOT APPLICABLE 0604504N<br />

Prior ID To<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions) $54.2 A $7.6 $4.1 $15.6 $19.6 $20.2 $19.7 $17.2 Cont Cont<br />

DESCRIPTION:<br />

Marine Air Traffic Control & Landing System (MATCALS) is a fully automated all weather expeditionary terminal Air Traffic Control System that provides arrival/departure and enroute surveillance control, automated precision approach and landing control, or Ground Controlled<br />

Approach (GCA). MATCALS satisfies the operational requirements set forth by Specific Operational Requirements (SOR): MATCALS SOR 34-22 of 12 July 1973,<br />

Marine Remote Area Approach and Landing System SOR 34-26 of 30 Apr 1975, and Remote Landing Site Tower (RLST) Operational Requirements Document (ORD) 341-88-93 of 25 Jul 1997.<br />

MATCALS, with other Marine Air Command and Control Systems and federal agencies, provides the ability to project air combat power in the Amphibious Operations Area (AOA) without regard to weather. Air traffic control and landing automation reduces air traffic controllers'<br />

traffic handling and management time, allowing more time for mission response and task accomplishment. It supports a required increase in aircraft sortie rates and contributes to extended time on target. The system provides for integration of Air Traffic Control (ATC) into the<br />

total Marine Air Command and Control System (MACCS).<br />

MATCALS has three primary subsystems: (1) Air Traffic Control Subsystem (ATCS) consisting of an AN/TPS-73 Airport Surveillance Radar and various peripheral equipment; (2) All-Weather Landing Subsystem (ALS) consisting of an AN/TPN-22 Precision Approach Landing<br />

Radar, AN/UYK-44 computer and peripheral equipment; and (3) the Control and Communications Subsystem (CCS) (AN/TSQ-131(V)) with a Communications Control Group (CCG), radios, computer software, multi mode displays and peripherals. Other Fleet Marine Force<br />

ATC equipment supported by the funding line MATCALS are the AN/TSQ-120 Tower, AN/TRN-44 TACAN, AN/TPN-30 Marine Remote Area Approach & Landing Set (MRAALS), the AN/TSQ-216 Remote Landing Site Tower (RLST), the AN/TSM-170 Maintenance Shelters<br />

and various support items. Total requirement is for 13 subsystems: 9 for the Marine Air Traffic Control Detachments (MATCD); 1 for the Aviation Ground Support Element at 29 Palms, CA; 1 for operational contingencies/ISEA Test Bed at San Diego, CA and 2 for the Naval<br />

Air Technical Training Center (NATTC) in Pensacola, FL.<br />

A portion of the current MATCALS is being transitioned to the Air Surveillance and Precision Approach Radar Control System (ASPARCS) (ORD 518-88-99 of 12 May 99). ASPARCS will consist of the AN/TPS-79 an Air Surveillance Radar, which will replace the AN/TPS-73;<br />

the AN/TPN-32 a Precision Approach Radar, which will replace the AN/TPN-22; and the AN/TSQ-230 an Operations/Communications Subsystem, which will replace the AN/TSQ-131. ASPARCS will provide greater mobility, transportability, reliability, maintainability, and<br />

interoperability with Marine Corps/Navy Command and Control Systems than the current MATCALS. Total OPN requirement for ASPARCS is 11 units: 9 for the Marine Air Traffic Control Detachments (MATCD's) and 2 for the Naval Air Technical Training Center (NATTC) in<br />

Pensacola, FL.<br />

FY05 funding procures 18 MATCALS Radio ASPARCS ARC-210s (MJ431), 8 MATCALS Radio ASPARCS PRC-117F (MJ433), 2 ASPARCS Systems (MJ434), 6 Logistics Support Vehicles (MJ441), and various maintainability improvements and related installations.<br />

INSTALLATION AGENT: SPAWARSYSCEN, SD and NAWCAD, St. Inigoes: Facilities that are to receive the equipment: Marine Corps air traffic control facilities, expeditionary airfields, and remote landing sites.<br />

DD Form 2454, JUN 86 ITEM NO. 57 PAGE NO. 1<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS DATE:<br />

P-40a February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY BA-2 MARINE AIR TRAFFIC CONTROL & LANDING SYSTEMS 42MJ<br />

ID Prior To<br />

Procurement Items Code Years FY 2003 FY 2004 FY 2005 Complete Total<br />

MJ413 AN/TPN-30 MOD A<br />

QTY 75 75<br />

FUNDING 5.479 5.479<br />

MJ429 AN/TSQ-216 (RLST) A<br />

QTY 13 13<br />

FUNDING 14.917 14.917<br />

MJ430 MATCALS<br />

RADIO ARC-210 A<br />

QTY 146 22 168<br />

FUNDING 8.073 1.077 9.150<br />

MJ431 MATCALS RADIO<br />

ASPARCS ARC-210 B<br />

QTY 18 Continuing Continuing<br />

FUNDING 0.972 Continuing Continuing<br />

MJ432 MANPACK RADIOS A<br />

QTY 29 18 16 63<br />

FUNDING 1.199 0.666 0.351 2.216<br />

MJ433 MATCALS RADIO<br />

ASPARCS PRC-117F B<br />

QTY 8 Continuing Continuing<br />

FUNDING 0.248 Continuing Continuing<br />

MJ434 ASPARCS SYSTEMS B<br />

QTY 2 Continuing Continuing<br />

FUNDING 11.754 Continuing Continuing<br />

MJ437 AN/UYQ-42 UPGRADE A<br />

QTY 34 34<br />

FUNDING 1.466 1.466<br />

MJ439 AN/TSQ-120 UPRGRADE A<br />

QTY 6 1 2 9<br />

FUNDING 2.726 0.610 1.046 4.382<br />

MJ425 AN/TPN-20 SSM A<br />

QTY 17 17<br />

FUNDING 8.115 8.115<br />

MJ440 DAME A<br />

QTY 13 14 27<br />

FUNDING 0.729 0.630 1.359<br />

MJ441 LOG SPT VEHICLE A<br />

QTY 4 6 Continuing Continuing<br />

FUNDING 1.000 1.539 Continuing Continuing<br />

MJ442 ASPARCS PHASE II B<br />

QTY Continuing Continuing<br />

FUNDING Continuing Continuing<br />

OTHER COSTS 12.249 4.519 1.063 1.101 CONT CONT<br />

TOTAL FUNDING 54.224 7.601 4.090 15.614 CONT CONT<br />

DD Form 2454, JUN 86 ITEM NO. 57 PAGE NO. 2<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy BA-2 COMMUNICATIONS AND<br />

ELECTRONIC EQUIPMENT MARINE AIR TRAFFIC CONTROL & LANDING SYSTEMS 42MJ<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID Prior FY 2003 FY 2004 FY 2005<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

MJ413 AN/TPN-30 MOD A 5,479<br />

MJ425 AN/TPN-22 SOLID STATE MODULATOR A 8,115<br />

MJ427 MAINT/RELIABILITY IMPROVEMENT A 4,068 VAR 3,593 VAR 837 VAR 831<br />

MJ429 AN/TSQ-216 (RLST) A 14,917<br />

MJ430 MATCALS RADIO ARC-210 A 8,073 22 51 1,077<br />

MJ431 MATCALS RADIO ASPARCS ARC-210 B 18 54 972<br />

MJ432 MANPACK RADIOS A 1,199 18 37 666 16 22 351<br />

MJ433 MATCALS RADIO ASPARCS PRC-117F B 8 31 248<br />

MJ434 ASPARCS SYSTEMS B 2 5,877 11,754<br />

MJ437 AN/UYQ-42 UPGRADE A 1,466<br />

MJ439 AN/TSQ-120 UPGRADE A 2,726 1 610 610 2 523 1,046<br />

MJ440 DAME A 13 56 729 14 45 630<br />

MJ441 LOGISTICS SUPPORT VEHICLE A 4 250 1,000 6 257 1,539<br />

MJ442 ASPARCS PHASE II B<br />

MJ800 INTEGRATED LOGISTICS SUPPORT N/A 1,216 292 63 81<br />

MJ830 PRODUCTION ENGINEERING N/A 3,263 144 33 76<br />

MJ831 PRODUCTION SUPPORT N/A 618 33<br />

MJ860 ACCEPTANCE TEST & EVALUATION N/A 695 86 13 15<br />

MJ900 NON-FMP INSTALLATION N/A 2,117 379 64 74<br />

MJ990 INITIAL TRAINING N/A 272 25 20 24<br />

54,224 7,601 4,090 15,614<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 57 PAGE NO. 3<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy BA2 - Communications and MARINE AIR TRAFFIC CONTROL & LANDING 42MJ<br />

Electronic Equipment SYSTEM<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

MJ431 MATCALS RADIO<br />

ASPARCS ARC-210<br />

FY - 05 18 54.0 NAVAIR Nov-04 SS/OPTION CEDAR RAPIDS, IA Dec-04 Dec-05 YES<br />

MJ433 MATCALS RADIO<br />

ASPARCS PRC-117F<br />

FY - 05 8 31.0 NAVAIR Nov-04 SS/OPTION CEDAR RAPIDS, IA Dec-04 Apr-05 YES<br />

MJ434 ASPARCS<br />

SYSTEMS<br />

FY - 05 2 5877.0 NAVAIR Nov-99 FFP/OPTION SYRACUSE, NY Nov-04 Feb-06 YES<br />

MJ441 LOG SUPPORT<br />

VEHICLE<br />

FY - 04 4 250.0 NAVAIR N/A WX ST. INIGOES, MD Dec-03 Dec-04 YES<br />

FY - 05 6 257.0 NAVAIR N/A WX ST. INIGOES, MD Dec-04 Dec-05 YES<br />

D. REMARKS<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 57 Classification:<br />

PAGE NO. 4 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

Exhibit P-20, Requirements Study APPROPRIATION/BUDGET ACTIVITY BA-2 COMMUNICATIONS & Date:<br />

Other Procurement, Navy ELECTRONIC EQUIPMENT February 2004<br />

P-1 ITEM NOMENCLATURE Admin Leadtime (after Oct 1): Production Leadtime:<br />

MJ434 ASPARCS SYSTEMS 2 Months 16 Months<br />

FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009<br />

Buy Summary 2 2 2 2 1<br />

Unit Cost 5.877 7.850 8.046 8.248 8.450<br />

Total Cost 11.754 15.700 16.092 16.496 8.450<br />

Asset Dynamics<br />

Beginning Asset Position 2 4 6<br />

Deliveries from all prior year funding<br />

Deliveries from FY 2003 funding<br />

Deliveries from FY 2004 funding<br />

Deliveries from FY 2005 funding 2<br />

Deliveries from subsequent years' funding 2 2 2<br />

Other Gains<br />

Combat Losses/Usage<br />

Training Losses/Usage<br />

Test Losses/Usage<br />

Other Losses/Usage<br />

Disposals/Retirements/Attritions/etc.<br />

End of Year Asset Position 2 4 6 8<br />

Inventory Objective or Current Authorized Allowance 11 11 11 11 11 11 11<br />

Inventory Objective Actual Training Other than Training Disposals Vehicles Eligible for Aircraft:<br />

11 Expenditures Usage (Vehicles/Other) FY 2004 Replacement: TOAI:<br />

Assets Rqd For Combat FY 2003 thru FY 2003 thru FY 2003 thru Vehicles Eligible for PAA:<br />

Loads: 31 Jul 03 31 Jul 03 31 Jul 03 FY 2005 Replacement: TAI<br />

WRM Rqmt: FY 2002: FY 2002: FY 2002: Vehicle Augment: Attrition Res:<br />

Pipeline: FY 2001: FY 2001: FY 2001: BAI<br />

Other: FY 2000: FY 2000: FY 2000: Inactive Inv:<br />

TOTAL: Storage:<br />

Remarks:<br />

DD Form 2454, JUN 86 ITEM NO. 57 PAGE NO. 5<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

UNCLASSIFIED


FY 2005 PRESIDENT'S BUDGET PRODUCTION SCHEDULE, P-21<br />

DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY Weapon System P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY MARINE AIR TRAFFIC CONTROL & LANDING SYSTEMS 42MJ<br />

Production Rate Procurement Leadtimes<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

Item Name and Location MSR ECON MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

MJ434 ASPARCS SYSTEMS Lockheed Martin 1 4 6 2 16 18 NONE<br />

AN-TPY-1<br />

ITEM / MANUFACTURER F S Q D B<br />

FISCAL YEAR 2003<br />

CALENDAR YEAR 2003<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

FISCAL YEAR 2004 FISCAL YEAR 2005<br />

ITEM / MANUFACTURER F S Q D B 2003 CALENDAR YEAR 2004 CALENDAR YEAR 2005<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

MJ434 ASPARCS SYSTEMS<br />

AN-TPY-1 05 N 2 0 2 A 2<br />

Remarks:<br />

DD Form 2445, JUL 87 Previous editions are obsolete P-1 SHOPPING LIST<br />

311 / 244 ITEM NO. 57 PAGE NO. 6 Exhibit P-21 Production Schedule<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L<br />

B<br />

A<br />

L


FY 2005 PRESIDENT'S BUDGET PRODUCTION SCHEDULE, P-21 DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY Weapon System P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY MARINE AIR TRAFFIC CONTROL & LANDING SYSTEMS 42MJ<br />

Production Rate Procurement Leadtimes<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

Item Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

AN/TPY-1 Lockheed Martin 1 4 6 2 16 18 NONE<br />

FISCAL YEAR 2006 FISCAL YEAR 2007<br />

ITEM / MANUFACTURER F S Q D B 2005 CALENDAR YEAR 2006 CALENDAR YEAR 2007<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

MJ434 ASPARCS SYSTEMS 05 N 2 0 2 2 0<br />

AN-TPY-1 06 N 2 0 2 A 2 0<br />

Remarks:<br />

FISCAL YEAR 2008 FISCAL YEAR 2009<br />

ITEM / MANUFACTURER F S Q D B 2007 CALENDAR YEAR 2008<br />

CALENDAR YEAR 2009<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Outyear deliveries not displayed.<br />

DD Form 2445, JUL 87 Previous editions are obsolete P-1 SHOPPING LIST<br />

311 / 244 ITEM NO. 57 PAGE NO. 7 Exhibit P-21 Production Schedule<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L<br />

B<br />

A<br />

L


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY BA-2 COMMUNICATIONS & P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY ELECTRONICS EQUIPMENT Shipboard Air Traffic Control (42MP) BLI #283100<br />

Program Element for Code B Items: Other Related Program Elements<br />

Not Applicable 0604504N<br />

Prior ID To<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions) $106.0 N/A $8.1 $7.8 $7.7 $8.0 $8.2 $8.4 $8.5 CONT CONT<br />

DESCRIPTION: Shipboard Air Traffic Control (SATC) systems are responsible for safe and expeditious control of air traffic within 50 Nautical Miles of a ship. SATC systems include the air<br />

traffic surveillance radar, AN/SPN-43, and the air traffic central tracking and control system, AN/TPX-42, which has two major configurations: Carrier Air Traffic Control Center-Direct Altitude<br />

and Identity Readout (CATCC-DAIR) and Amphibious Air Traffic Control-Direct Altitude and Identity Readout (AATC-DAIR). Both DAIR systems use AN/SPN-43 and Identification Friend or<br />

Foe (IFF) inputs to track and control aircraft. Obsolescence problems are being addressed through various upgrades in a phased approach. The major upgrades include AN/SPN-43C,<br />

CATCC-to-AATC field change, and AN/TPX-42(V) Advanced Display System (ADS) upgrade, and a series of AN/TPX-42 modification kits requiring various combinations of AN/UYK-44<br />

processor rehost, track processor upgrade, AN/UYQ-70 console, flat panel display, and other components to bring the predecessor system to AN/TPX-42A(V)14 with field changes 1 and 2<br />

configuration.<br />

FY 2005 funds the procurement of one AN/TPX-42A(V)14 Upgrade A kit and two AN/TPX-42A(V)14 Upgrade C kits. It also funds the installation of one AN/TPX-42A(V)14 Upgrade A kit,<br />

three AN/TPX-42A(V)14 Upgrade C kits, and various AN/SPN-43 modification kits.<br />

Installing Agent: Shipyards and Alteration Installation Teams<br />

When installation to be made: ROH/SRA/RAV<br />

Ships or facilities to receive the equipment: CV/CVNs, LHD/LHAs, Software Support Activity (NAWCAD, St Inigoes), Integrated Combat System Test Facility (San Diego), Landing Systems<br />

Test Facility (NAWCAD, Patuxent River), and training sites.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 58 PAGE NO. 1<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS DATE:<br />

P-40a February 2004<br />

APPROPRIATION/BUDGET ACTIVITY BA-2 COMMUNICATIONS & P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY ELECTRONICS EQUIPMENT Shipboard Air Traffic Control (42MP)<br />

ID Prior<br />

Procurement Items Code Years FY 2003 FY 2004 FY 2005 Total<br />

MP042<br />

CATCC to AATC F/C KIT N/A<br />

QTY 13 13<br />

FUNDING 26.326 26.326<br />

MP043<br />

AN/TPX-42 ADS UPG N/A<br />

QTY 1 1<br />

FUNDING 0.860 0.860<br />

MP044 1/<br />

AN/TPX-42 UPG A KIT N/A<br />

QTY 2 2 1 5<br />

FUNDING 3.020 2.968 1.553 7.541<br />

MP046<br />

AN/TPX-42 UPG C KIT N/A<br />

QTY 1 2 3<br />

FUNDING 0.815 2.276 3.091<br />

MP047<br />

AN/TPX-42 UPG D KIT N/A<br />

QTY 3 3<br />

FUNDING 1.582 1.582<br />

MP048<br />

AN/TPX-42 UPG E KIT N/A<br />

QTY 0<br />

FUNDING 0.000<br />

OTHER COST N/A 78.857 5.089 2.437 3.866 CONT<br />

TOTAL P-1 FUNDING 106.043 8.109 7.802 7.695 CONT<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 58 PAGE NO. 2<br />

UNCLASSIFIED<br />

1/ As design for the AN/TPX-42A(V)14 with field changes 1 and 2 reached completion, it was found that more functionality could be transferred into the upgraded digital and signal processors.<br />

The originally conceived product line of A, B, C, and D kits were meant to convert various configurations of AN/TPX-42A(V) to the AN/TPX-42A(V)14 with field change 1 and 2 configuration.<br />

The current submission reflects consolidation of the A, B, C and D product lines into two product lines (A and C), which adequately convert all existing configurations.


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy<br />

BA-2 COMMUNICATIONS & ELECTRONICS EQUIP A Shipboard Air Traffic Control 42MP<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID Prior FY 2003 FY 2004 FY 2005<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

MP023 AN/SPN-43 MOD KITS N/A 1,027 Var. 1,517 Var. 63<br />

MP042 CATCC TO AATC F/C KITS N/A 26,326<br />

MP043 AN/TPX-42 ADS UPGRADE N/A 860<br />

MP044 AN/TPX-42A(V)14 UPG A KIT 1/ N/A 2 1,510 3,020 2 1484 2,968 1 1553 1,553<br />

MP046 AN/TPX-42A(V)14 UPG C KIT N/A 1 815 815 2 1138 2,276<br />

MP047 AN/TPX-42A(V)14 UPG D KIT N/A 3 527 1,582<br />

MP048 AN/TPX-42A(V)14 UPG E KIT N/A<br />

MP800 INTEGRATED LOGISTICS SUPPORT N/A 888 245 246 319<br />

MP830 PRODUCTION ENGINEERING SPT N/A 1,774 775 250 248<br />

MP840 QUALITY ASSURANCE N/A 343 97 98 120<br />

MP860 ACCEPTANCE TEST & EVALUATION N/A 456 170<br />

MP900 NON-FMP INSTALLATION N/A 3,168 309 438 305<br />

MP910 FMP INSTALLATION N/A 31,516 1,976 1405 2,811<br />

VARIOUS 2/ N/A 39,685<br />

1/ As design for the AN/TPX-42A(V)14 with field changes 1 and 2<br />

reached completion, it was found that more functionality could<br />

be transferred into the upgraded digital and signal processors.<br />

The originally conceived product line of A, B, C, and D kits were<br />

meant to convert various configurations of AN/TPX-42A(V) to<br />

the AN/TPX-42A(V)14 with field change 1 and 2 configuration.<br />

The current submission reflects consolidation of the A, B, C and<br />

D product lines into two product lines (A and C), which adequately<br />

convert all existing configurations.<br />

2/ The amount identified against this cost element reflects total<br />

prior year funding associated with cost elements no longer<br />

financed in FY 2002 and beyond.<br />

106,043 8,109 7,802 7,695<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 58 PAGE NO. 3<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy BA2-Communications and Electronics<br />

Equipment Shipboard Air Traffic Control (SATC) 42MP<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

MP042 CATTC to<br />

AATC-DAIR F/C Kits<br />

FY02 2 $2,617 NAVAIR N/A PO NAWCAD St. Inigoes 3/02 9/03 YES<br />

MP044 AN/TPX-42A(V)14<br />

UPG A KIT<br />

FY03 2 $1,510 NAVAIR N/A PO NAWCAD St. Inigoes 12/02 10/03 YES<br />

FY04 2 $1,484 NAVAIR N/A PO NAWCAD St. Inigoes 12/03 10/04 YES<br />

FY05 1 $1,553 NAVAIR N/A PO NAWCAD St. Inigoes 12/04 10/05 YES<br />

MP046 AN/TPX-42A(V)14<br />

UPG C KIT<br />

FY04 1 $815 NAVAIR N/A PO NAWCAD St. Inigoes 12/03 10/04 YES<br />

FY05 2 $1,138 NAVAIR N/A PO NAWCAD St. Inigoes 12/04 10/05 YES<br />

MP047 AN/TPX-42A(V)14<br />

UPG D KIT<br />

FY04 3 $527 NAVAIR N/A PO NAWCAD St. Inigoes 3/04 3/05 YES<br />

D. REMARKS<br />

1. System integration and assembly will be accomplished by the field activity, NAWCAD, after procuring individual components through existing contractual vehicles.<br />

2. Due to maturing design of the AN/TPX-42A(V)14 with Field Changes 1 and 2, the B Kit and D Kit have become identical with the C Kit. All three requirements<br />

have now been merged under the C Kit's Cost Code, beginning in FY 2005.<br />

3. Lead times for the A Kit and C Kit have decreased due to learning curve efficiencies and a change of contract for one of the major components.<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 58 Classification:<br />

PAGE NO. 4 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: CVs/CVNs, L-class, TYPE MODIFICATION: Flight Safety MODIFICATION TITLE: SATC Modification Kit Summary<br />

DESCRIPTION/JUSTIFICATION:<br />

selected shore sites. (MP023, MP043, MP047, MP048)<br />

SATC MODIFICATION KIT SUMMARY This exhibit summarizes procurement and installation for project unit MP023, MP043 and MP048.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS NRE<br />

INSTALLATION KITS<br />

EQUIPMENT NRE<br />

EQUIPMENT Var. 1.027 CONT CONT<br />

Equipment "B"<br />

TPX-42 Upg. D Kit 3 1.582 3 1.582<br />

TPX-42 Upg. E Kit 7 3.921 24 13.686 31 17.607<br />

TPX-42 ADS Upg. 1 0.860 1 0.860<br />

SPN-43 Pitch/Roll Servo 28 1.514 28 1.514<br />

SPN-43 Tilt Meter 13 0.003 15 0.004 28 0.007<br />

SPN-43 STALO Repl. 6 0.063 6 0.063 9 0.112 5 0.061 2 0.026 28 0.325<br />

SPN-43 Pedestal Upg. 2 0.312 6 1.048 1 0.165 19 3.543 28 5.068<br />

SPN-43C Repl. 1 1.941 27 53.365 28 55.306<br />

INTEGRATED LOGISTICS SUPPORT 0.027 0.074 0.049 0.020 0.032 0.014 0.039 0.171 CONT CONT<br />

PRODUCTION ENGINEERING 0.037 0.096 0.050 0.022 0.034 0.015 0.041 0.164 CONT CONT<br />

QUALITY ASSURANCE 0.014 0.041 0.021 0.008 0.013 0.006 0.016 0.075 CONT CONT<br />

ACCEPTANCE TEST & EVALUATION 0.170 CONT CONT<br />

INSTALL COST 1.728 0.827 0.117 0.305 0.258 0.094 0.104 0.011 CONT CONT<br />

OTHER 70.919 70.919<br />

TOTAL PROCUREMENT 74.612 2.725 1.819 0.418 0.712 1.289 0.426 6.283 CONT CONT<br />

Exhibit P-3A (Individual Modification)CLASSIFICATION:<br />

ITEM NO. 58 PAGE NO. 5<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: CVs, CVNs, LHDs, LHAs, and selected MODIFICATION TITLE: SATC Modification Kit Summary (MP023, MP043, MP048)<br />

shore sites.<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: Field Change Install Team<br />

ADMINISTRATIVE LEADTIME: Var. PRODUCTION LEADTIME: Var.<br />

CONTRACT DATES: FY 2003: Var. FY 2004: Var. FY 2005: Var.<br />

DELIVERY DATE: FY 2003: Var. FY 2004: Var. FY 2005: Var.<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 1.728 1.728<br />

FY 2003 EQUIPMENT 0.827 0.827<br />

FY 2004 EQUIPMENT 0.117<br />

0.117<br />

FY 2005 EQUIPMENT 0.305 0.305<br />

FY 2006 EQUIPMENT 0.258 0.258<br />

FY 2007 EQUIPMENT 0.094 0.094<br />

FY 2008 EQUIPMENT 0.104 0.104<br />

FY 2009 EQUIPMENT 0.011 0.011<br />

TO COMPLETE Var. CONT CONT<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 58 PAGE NO. 5A CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED:<br />

DESCRIPTION/JUSTIFICATION:<br />

CVs/CVNs, L-class,<br />

selected shore sites.<br />

TYPE MODIFICATION: Flight Safety MODIFICATION TITLE: CATCC to AATC F/C Kits (MP042)<br />

This kit retrofits CV/CVNs with improvements from the AATC-DAIR system configuration.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONE Production ECP 1/97 (configuration with ADS)<br />

FINANCIAL PLAN (IN MILLIONS)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS NRE<br />

INSTALLATION KITS<br />

EQUIPMENT NRE<br />

EQUIPMENT 13 26.326 13 26.326<br />

Equipment "B"<br />

ECP 1 Grp "B"<br />

ECP 2 Grp "B"<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

INTEGRATED LOGISTICS SUPPORT 0.167 0.167<br />

PRODUCTION ENGINEERING 0.228 0.228<br />

QUALITY ASSURANCE 0.084 0.084<br />

ACCEPTANCE, TEST & EVALUATION<br />

INITIAL TRAINING<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 9 4.625 2 1.393 2 0.800 13 6.818<br />

TOTAL PROCUREMENT 31.430 1.393 0.800 33.623<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

ITEM NO. 58 PAGE NO. 5B<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: CVs, CVNs, LHDs, LHAs, MODIFICATION TITLE: CATCC to AATC F/C Kits (MP042)<br />

and selected shore sites.<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: 6 Months PRODUCTION LEADTIME: 18 Months<br />

CONTRACT DATES: FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATE: FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

FY 2006 EQUIPMENT<br />

FY 2007 EQUIPMENT<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

9 4.625 2 1.393 2 0.800<br />

13 6.818<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 10 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13<br />

Out 9 1 0 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 58 PAGE NO. 5C CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: CVs/CVNs, L-class, TYPE MODIFICATION: Flight Safety MODIFICATION TITLE: AN/TPX-42A(V)14 Upgrade A Kit<br />

DESCRIPTION/JUSTIFICATION:<br />

selected shore sites. (MP044)<br />

This upgrade converts AN/TPX-42A(V)12 to AN/TPX-42A(V)14 with Field Changes 1 and 2.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTON ECP 12/01<br />

FINANCIAL PLAN (IN MILLIONS)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS NRE<br />

INSTALLATION KITS<br />

EQUIPMENT NRE<br />

EQUIPMENT 2 3.020 2 2.968 1 1.553 1 1.579 1 1.607 2 3.271 9 13.998<br />

Equipment "B"<br />

ECP 1 Grp "B"<br />

ECP 2 Grp "B"<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

INTEGRATED LOGISTICS SUPPORT 0.171 0.098 0.095 0.091 0.092 0.094 0.641<br />

PRODUCTION ENGINEERING 0.679 0.077 0.076 0.072 0.075 0.079 1.058<br />

QUALITY ASSURANCE 0.056 0.031 0.037 0.036 0.037 0.039 0.236<br />

ACCEPTANCE, TEST & EVALUATION<br />

INITIAL TRAINING<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST AP 0.065 2 0.732 1 0.703 1 0.781 2 1.319 AP 0.138 2 0.448 1 0.227 9 4.413<br />

TOTAL PROCUREMENT 3.991 3.906 2.464 2.559 3.130 3.621 0.448 0.227 20.346<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

NOTE: AP is advance planning for installation. ITEM NO. 58 PAGE NO. 5D<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: CVs, CVNs, LHDs, LHAs, and selected MODIFICATION TITLE: AN/TPX-42A(V)14 Upgrade A Kit (MP044)<br />

shore sites.<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: 2 Months PRODUCTION LEADTIME: 10 Months<br />

CONTRACT DATES: FY 2003: 12/02 FY 2004: 12/03 FY 2005: 12/04<br />

DELIVERY DATE: FY 2003: 10/03 FY 2004: 10/04 FY 2005: 10/05<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005<br />

($ in Millions)<br />

FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT AP 0.065<br />

2 0.667 2 0.732<br />

FY 2004 EQUIPMENT AP 0.065 1 0.703 1 0.648 2 1.416<br />

FY 2005 EQUIPMENT AP 0.067 1 0.660 1 0.727<br />

FY 2006 EQUIPMENT AP 0.066 1 0.659 1 0.725<br />

FY 2007 EQUIPMENT AP 0.069 1 0.224 1 0.293<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

AP 0.069 1 0.224 1 0.227 2 0.520<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 1 1 0 0 1 1 0 0 1 0 0 0 1 0 0 0 1 0 0 0 1 1 0 0 0 9<br />

Out 0 0 0 0 0 0 0 1 1 1 0 0 0 1 0 0 0 1 0 0 1 0 0 0 0 1 0 1 0 1 9<br />

*NOTE: The system integrator, NAWCAD, has reduced total lead time to 12 months for all builds. This has been achieved by aggressively pursuing learning curve improvements.<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 58 PAGE NO. 5E CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: CVs/CVNs, L-class, TYPE MODIFICATION: Flight Safety MODIFICATION TITLE: AN/TPX-42A(V)14 Upgrade C Kit<br />

DESCRIPTION/JUSTIFICATION:<br />

selected shore sites. (MP046)<br />

This upgrade converts AN/TPX-42A(V)13 and 14 to AN/TPX-42A(V)14 with Field Changes 1 and 2.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONESECP 12/01<br />

FINANCIAL PLAN (IN MILLIONS)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS NRE<br />

INSTALLATION KITS<br />

EQUIPMENT NRE<br />

EQUIPMENT 1 0.815 2 2.276 2 2.314 2 2.355 2 2.398 6 7.454 15 17.612<br />

Equipment "B"<br />

ECP 1 Grp "B"<br />

ECP 2 Grp "B"<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

INTEGRATED LOGISTICS SUPPORT 0.099 0.204 0.195 0.195 0.204 0.111 1.008<br />

PRODUCTION ENGINEERING 0.123 0.150 0.143 0.148 0.159 0.170 0.893<br />

QUALITY ASSURANCE 0.046 0.075 0.072 0.075 0.079 0.084 0.431<br />

ACCEPTANCE, TEST & EVALUATION<br />

INITIAL TRAINING<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 0.194 1 2.108 2 2.053 2 1.011 2 1.480 2 1.436 6 3.080 15 11.362<br />

TOTAL PROCUREMENT 1.277 4.813 4.777 3.784 4.320 1.801 10.534 31.306<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

ITEM NO. 58 PAGE NO. 5F<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: CVs, CVNs, LHDs, LHAs, MODIFICATION TITLE: AN/TPX-42A(V)14 Upgrade C Kit (MP046)<br />

and selected shore sites.<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: 2 Months PRODUCTION LEADTIME: 10 Months<br />

CONTRACT DATES: FY 2003: N/A FY 2004: 12/03 FY 2005: 12/04<br />

DELIVERY DATE: FY 2003: N/A FY 2004: 10/04 FY 2005: 10/05<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT AP 0.194 1 1.911<br />

1 2.105<br />

FY 2005 EQUIPMENT AP 0.197 2 1.944<br />

2 2.141<br />

FY 2006 EQUIPMENT AP 0.109 2 0.875<br />

2 0.984<br />

FY 2007 EQUIPMENT AP 0.136 2 1.342<br />

2 1.478<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

AP 0.138 2 1.366<br />

2 1.504<br />

TO COMPLETE AP 0.070 6 3.080 6 3.150<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 0 0 1 1 0 0 1 1 0 0 1 1 0 0 6 15<br />

Out 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 1 0 1 0 1 0 0 1 1 0 1 0 1 0 6 15<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 58 PAGE NO. 5G CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40<br />

February 2004<br />

APPROPRIATION/BUDGET ACTIVITY BA-2 COMMUNICATIONS & P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY ELECTRONICS EQUIPMENT Automatic Carrier Landing System (42PN) BLI# 283200<br />

Program Element for Code B Items: Other Related Program Elements<br />

Not Applicable 0604504N<br />

Prior ID To<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions) $228.0 A 11.5 17.4 12.5 17.9 18.5 18.9 19.3 CONT CONT<br />

The Automatic Carrier Landing System (ACLS) provides the primary precision electronic guidance for landing aircraft under all weather conditions on CVs, CVNs, LHAs, LHDs and at<br />

selected Naval Air Stations. Many of the components in the system have been in service for more than twenty years. This program funds maintainability, reliability and supportability<br />

improvements to existing equipment components that can no longer be maintained and supported, as well as items providing upgraded operational capability. A major effort involves a<br />

group of technology-refresh upgrades to extend the AN/SPN-46(V) service life until 2020. A new Cost Code for AN/SPN-46(V) Life Cycle Extension, PN410, will cover the costs of this set<br />

of related modifications, which includes the Unit 19 modification identified in previous budgets. In addition to Radar Control Group (Unit 19), modification kits will be acquired for an<br />

Enhanced GPS/Inertial unit to replace an older INS unit, for modification of Radar Set Groups (Units 24 and 25), for replacement of the AN/AYK-14 with a state-of-the-art processor<br />

group, replacement of operator and maintenance consoles and peripheral displays.<br />

Due to supportability deficiencies, and length of time in service, the AN/SPN-46(V)1 landing system is being upgraded to AN/SPN-46(V)3 on CVs and CVNs.<br />

FY 2005 - Procures two AN/SPN-35C Upgrades, various miscellaneous ACLS Modification Kits, and associated installation efforts.<br />

Installing Agent: Shipyards and Alteration Installation Teams (AITs).<br />

Ships or facilities to receive equipment: CV/CVNs, LHAs, LHDs, selected LPHs, the In-Service Engineering Agent (ISEA-NAWCAD, St. Inigoes), selected shore sites and the training site.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 59 PAGE NO. 1<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY<br />

Other Procurement, Navy<br />

ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

BA-2 COMMUNICATIONS & ELECTRONICS EQUIPMENT A Automatic Carrier Landing System (ACLS) 42PN<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID Prior FY 2003 FY 2004 FY 2005<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

PN404 AN/SPN-41 Ind. Landing Monitor (ILM) /1 A 34,009 1 1,500 1,500<br />

PN408 ACLS Mod Kits 2/ N/A 30,276 VAR 369 VAR 2,127 VAR 2,945<br />

PN409 AN/SPN-35C Modification N/A 5,641 VAR 273 VAR 2,104 VAR 2,959<br />

PN410 AN/SPN-46(V) LCE Mod Kits N/A VAR 574<br />

PN800 Integrated Logistics Support N/A 2,267 610 1,858 650<br />

PN830 Production Engineering Support N/A 4,931 1,582 4,846 701<br />

PN840 Quality Assurance N/A 1,088 70 714 436<br />

PN860 Acceptance Test and Evaluation N/A 4,988 222 4<br />

PN900 Non-FMP Installation N/A 2,094 266 440<br />

PN910 FMP Installation N/A 59,993 6,533 5,711 3,810<br />

PN990 Initial Training N/A 7 25<br />

Various 3/ 82,780<br />

1/ FY 2003 unit price reduction due to reuse of some decommissioned components.<br />

2/ ACLS Mod Kits include kits for the following equipment: AN/SPN-35, AN/SPN-41, AN-SPN-42, AN-SPN-46, and AN/TRN-28<br />

3/ The amount identified in this line reflects total prior year funding associated with cost elements no longer financed in FY 2002 and beyond.<br />

228,074 11,450 17,364 12,515<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 59 PAGE NO. 2<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy<br />

BA-2 COMMUNICATIONS AND ELECTRONICS EQUIPMENT Automatic Carrier Landing Systems (ACLS) 42PN<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

PN404 AN/SPN-41 ILM<br />

FY03 1 $1,500 NAVAIR N/A PO NAWCAD St. Inigoes 11/02 1/04 YES<br />

PN409 AN/SPN-35C<br />

FY04 1 $1,382 NAVAIR N/A PO NAWCAD St. Inigoes 3/04 8/05 YES<br />

FY05 2 $1,389 NAVAIR N/A PO NAWCAD St. Inigoes 12/04 5/06 YES<br />

D. REMARKS<br />

System integration and assembly will be accomplished by the field activity, NAWCAD, after procuring individual components through various contractual vehicles.<br />

FY 2003 unit pricing for AN/SPN-41 reflects reuse of decommissioned components, refurbished and modified by NAWCAD.<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 59 Classification:<br />

PAGE NO. 3 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED:<br />

DESCRIPTION/JUSTIFICATION:<br />

CVs/CVNs, L-class,<br />

selected shore sites.<br />

Flight Safety MODIFICATION TITLE: AN/SPN-41 (PN404)<br />

AN/SPN-41 provides independent landing monitor capability for carriers and certain amphibious classes (LHA, LHD). The total inventory objective for this item is twenty-seven, of which twentyone<br />

are OPN funded and six SCN funded. The end-item is an in-house build by NAWCAD St. Inigoes, MD.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: IOC 1994<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS NRE<br />

INSTALLATION KITS<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

Equipment "B"<br />

ECP 1 Grp "B"<br />

ECP 2 Grp "B"<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

20 34.009 1 1.500 21 35.509<br />

INTEGRATED LOGISTICS SUPPORT 0.033 0.033<br />

PRODUCTION ENGINEERING 0.048 0.048<br />

QUALITY ASSURANCE<br />

ACCEPTANCE, TEST & EVALUATION<br />

INITIAL TRAINING<br />

0.003 0.003<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

39.725 39.725<br />

INSTALL COST 18 21.632 1 2.468 2 2.312 21 26.412<br />

TOTAL PROCUREMENT 95.447 3.971 2.312 101.730<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

ITEM NO. 59 PAGE NO. 4<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: CVs/CVNs, LHAs, LHDs and MODIFICATION TITLE: AN/SPN-41 (PN404)<br />

selected shore sites.<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: Alteration Installation Team<br />

ADMINISTRATIVE LEADTIME: 2 Months PRODUCTION LEADTIME: 14 Months<br />

CONTRACT DATES: FY 2003: 11-02 FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATE: FY 2003: 1-04 FY 2004: N/A FY 2005: N/A<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 18 21.632<br />

1 2.468 1 1.156<br />

20 25.256<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

FY 2006 EQUIPMENT<br />

FY 2007 EQUIPMENT<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

1 1.156<br />

1 1.156<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 19 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

Out 18 0 1 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 59 PAGE NO. 4A CLASSIFICATION: UNCLASSIFIED<br />

TC<br />

0<br />

0<br />

TOTAL<br />

21<br />

21


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED:<br />

DESCRIPTION/JUSTIFICATION:<br />

CVs/CVNs, L-class,<br />

selected shore sites.<br />

Flight Safety MODIFICATION TITLE: ACLS Mod Kits Summary (PN408)<br />

The equipment and installation costs on this P-3a are for individual modification programs that do not exceed $5 million in either budget year or $10 million in all years.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: Various Configuration Control Board approvals<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS NRE<br />

INSTALLATION KITS<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

Equipment "B"<br />

Var. 3.977 CONT. CONT.<br />

SPN-46 RDVP Mod 6 2.496 3 1.594 9 4.090<br />

Upgrade of RDVP EDM 1 0.042 1 0.042<br />

SPN-46/BFTT Interface 10 0.268 4 0.110 14 0.378<br />

SPN-46 Power Monitor (see NOTE) 1 0.086 1 0.086<br />

SPN-46 LSO Waveoff 2 0.015 6 0.045 8 0.060<br />

SPN-46 Ka Receiver 32 0.060 32 0.060<br />

DAIR/NTDS End-around (see NOTE) 15 0.026 15 0.026<br />

SPN-46 Booster Amp 2 0.030 6 0.091 8 0.121<br />

SPN-46 Spin Motor 15 0.012 15 0.012<br />

SPN-41 ARA-63 Repl. 5 0.533 5 0.533<br />

SPN-41 Xmtr Mod 1 0.354 1 0.354<br />

SPN-35 Shock Mod 4 1.203 4 1.224 3 0.934 1 0.323 1 0.328 13 4.012<br />

SPN-35 Antenna Stabilization 4 1.120 3 0.854 4 1.159 1 0.300 1 0.306 13 3.739<br />

SPN-35 UPS Mod 1 0.281 1 0.281<br />

SPN-35 Power Supply Mod 1 0.205 1 0.205<br />

INTEGRATED LOGISTICS SUPPORT 0.050 0.123 0.136 0.129 0.075 0.075 0.548 0.230 CONT. CONT.<br />

PRODUCTION ENGINEERING 0.169 0.208 0.145 0.083 0.025 0.193 0.847 0.227 CONT. CONT.<br />

QUALITY ASSURANCE 0.017 0.093 0.049 0.010 0.109 0.300 0.135 CONT. CONT.<br />

ACCEPTANCE, TEST & EVALUATION 0.150 0.002 0.152<br />

DISCONTINUED COST ELEMENTS 82.780 82.780<br />

INSTALL COST 3 2.433 51 0.266 1 0.095 36 0.440 12 0.193 7 0.125 1 0.033 10 0.165 121 3.750<br />

TOTAL PROCUREMENT 92.335 0.983 2.596 3.646 2.381 2.951 1.695 1.248 CONT. CONT.<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

NOTE: Items not requiring installation. ITEM NO. 59 PAGE NO. 4B<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: CVs/CVNs, LHAs, LHDs and MODIFICATION TITLE: ACLS Mod Kits Summary (PN408)<br />

selected shore sites.<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: Alteration Installation Team<br />

ADMINISTRATIVE LEADTIME: Var. PRODUCTION LEADTIME: Var.<br />

CONTRACT DATES: FY 2003: Var. FY 2004: Var. FY 2005: Var.<br />

DELIVERY DATE: FY 2003: Var. FY 2004: Var. FY 2005: Var.<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 3 2.433 14 0.251 1 0.095 12 0.060 1 0.059<br />

31 2.898<br />

FY 2003 EQUIPMENT 37 0.015<br />

4 0.010<br />

41 0.025<br />

FY 2004 EQUIPMENT 8 0.142<br />

8 0.142<br />

FY 2005 EQUIPMENT 12 0.228 10 0.114<br />

22 0.342<br />

FY 2006 EQUIPMENT 1 0.020 6 0.124<br />

7 0.144<br />

FY 2007 EQUIPMENT<br />

FY 2008 EQUIPMENT<br />

1 0.001 1 0.033 6 0.104 8 0.138<br />

FY 2009 EQUIPMENT 2 0.043 2 0.043<br />

TO COMPLETE 2 0.018 2 0.018<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 11 1 16 33 4 0 2 2 0 12 6 5 0 9 1 0 1 6 0 0 1 0 4 3 0 0 0 0 0<br />

Out 3 9 14 17 11 0 1 0 0 7 10 10 9 0 7 3 2 0 3 3 1 0 0 0 0 1 0 0 0<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 59 PAGE NO. 4C CLASSIFICATION: UNCLASSIFIED<br />

TC<br />

4<br />

10<br />

TOTAL<br />

121<br />

121


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED:<br />

DESCRIPTION/JUSTIFICATION:<br />

CV/CVN and selected<br />

shore sites.<br />

Flight Safety MODIFICATION TITLE: AN/SPN-46(V)3 PIP Mod Kit (PN408)<br />

This modification corrects parts obsolescence problems and enhances maintainability. The inventory objective for this item is thirteen, of which eleven are OPN-funded and two SCN-funded.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: Production ECP approved 9/96<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS NRE<br />

INSTALLATION KITS<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

Equipment "B"<br />

ECP 1 Grp "B"<br />

ECP 2 Grp "B"<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

11 23.523 11 23.523<br />

INTEGRATED LOGISTICS SUPPORT 0.050 0.050<br />

PRODUCTION ENGINEERING 0.200 0.073 0.273<br />

QUALITY ASSURANCE<br />

ACCEPTANCE, TEST & EVALUATION<br />

0.020 0.050 0.070<br />

INITIAL TRAINING<br />

INTERIM CONTRACTOR SUPPORT<br />

0.003 0.003<br />

INSTALL COST 5 5.789 3 3.071 1 1.122 1 1.391 1 1.132 11 12.505<br />

TOTAL PROCUREMENT 29.585 3.194 1.122 1.391 1.132 36.424<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

ITEM NO. 59 PAGE NO. 4D<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: CV/CVN and selected shore sites. MODIFICATION TITLE: AN/SPN-46(V)3 PIP Mod Kit (PN408)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: Alteration Installation Team<br />

ADMINISTRATIVE LEADTIME: 4 Months PRODUCTION LEADTIME: 16 Months<br />

CONTRACT DATES: FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATE: FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

FY 2006 EQUIPMENT<br />

FY 2007 EQUIPMENT<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

5 5.789<br />

3 3.071 1 1.122 1 1.391 1 1.132<br />

11 12.505<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 9 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

Out 5 1 0 1 1 0 0 1 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 59 PAGE NO. 4E CLASSIFICATION: UNCLASSIFIED<br />

TC<br />

0<br />

0<br />

TOTAL<br />

11<br />

11


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED:<br />

DESCRIPTION/JUSTIFICATION:<br />

LHA, LHD, MCS-12 and<br />

selected shore sites.<br />

Flight Safety MODIFICATION TITLE: AN/SPN-35C Upgrade (PN409)<br />

This modification improves reliability and maintainability of an aging system baseline. The inventory objective for this item is thirteen, of which twelve are OPN-funded and one SCN-funded. The<br />

end-item is an in-house build by NAWCAD St. Inigoes, MD.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: LRIP Decision 12/99<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS NRE<br />

INSTALLATION KITS<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

Equipment "B"<br />

3 4.584 1 1.382 2 2.777 2 2.824 2 2.873 1 1.489 1 1.516 12 17.445<br />

Antenna Pedestal Mod Kit 1/ 3 0.722 2 0.182 2 0.185 2 0.188 1 0.097 2 0.182 12 1.556<br />

LRIP Upgrade /2<br />

DATA<br />

1 0.273 1 0.273<br />

TRAINING EQUIPMENT 3/<br />

SUPPORT EQUIPMENT<br />

Var. 1.057 1.057<br />

INTEGRATED LOGISTICS SUPPORT 0.899 0.300 0.574 0.521 0.579 0.278 0.070 0.148 3.369<br />

PRODUCTION ENGINEERING 1.328 0.711 0.262 0.528 0.549 0.553 0.296 4.227<br />

QUALITY ASSURANCE 0.005 0.206 0.387 0.378 0.049 0.050 1.075<br />

ACCEPTANCE, TEST & EVALUATION 1.920 0.222 0.004 2.146<br />

INITIAL TRAINING<br />

INTERIM CONTRACTOR SUPPORT<br />

0.025 0.025<br />

INSTALL COST 0.814 1 0.994 3 2.182 2 2.325 5 7.094 4 4.645 4 3.622 0.280 5 5.078 24 27.034<br />

TOTAL PROCUREMENT 10.607 2.525 5.332 6.720 11.609 8.586 3.742 2.310 6.776 58.207<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

ITEM NO. 59 PAGE NO. 4F<br />

1/ The Antenna Pedestal Mod Kit includes a yoke modification and radome replacement. These will install concurrently with the main EQUIPMENT units, except for one retrofit to cover<br />

the previous FY 2003 EQUIPMENT installation.<br />

2/ LRIP Upgrade is required to bring an LRIP unit up to the production baseline. This upgrade to an in-production unit has no installation requirement.<br />

3/ Equipment is a set of Pre-Faulted Modules.<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: LHA, LHD, MCS-12 and MODIFICATION TITLE: AN/SPN-35C Upgrade (PN409)<br />

selected shore sites.<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: Alteration Installation Team<br />

ADMINISTRATIVE LEADTIME: 2 Months PRODUCTION LEADTIME: 18 ** Months<br />

CONTRACT DATES: FY 2003: N/A FY 2004: 3/04 FY 2005: 12/04<br />

DELIVERY DATE: FY 2003: N/A FY 2004: 8/05 FY 2005: 5/06<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

AP 0.814 1 0.994 1 1.949<br />

1 2.364<br />

3 6.121<br />

FY 2004 EQUIPMENT 2 0.233 2 2.325<br />

4 2.558<br />

FY 2005 EQUIPMENT 4 4.730<br />

4 4.730<br />

FY 2006 EQUIPMENT 4 4.645<br />

4 4.645<br />

FY 2007 EQUIPMENT<br />

FY 2008 EQUIPMENT<br />

4 3.622<br />

4 3.622<br />

FY 2009 EQUIPMENT AP 0.28 2 2.414 2 2.694<br />

TO COMPLETE 3 2.664 3 2.664<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 1 0 0 1 0 2 1 0 0 1 1 0 4 0 0 0 4 0 0 0 4 0 0 0 0 0<br />

Out 0 0 0 1 0 0 0 0 3 0 0 1 1 1 0 4 0 0 0 4 0 0 0 2 2 0 0 0 0<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 59 PAGE NO. 4G CLASSIFICATION: UNCLASSIFIED<br />

** Production lead time is 18 months, beginning with the FY 2004 purchase.<br />

TC<br />

5<br />

5<br />

TOTAL<br />

24<br />

24


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: CV/CVN and Flight Safety MODIFICATION TITLE: AN/SPN-46(V)3 Life Cycle Extension Summary<br />

DESCRIPTION/JUSTIFICATION:<br />

selected shore sites. Mod Kits (PN410)<br />

The equipment and installation costs on this P-3a are for individual modification programs that do not exceed $5 million in either budget year or $10 million in all years.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: Various Configuration Control Board approvals<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS NRE<br />

INSTALLATION KITS<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

Equipment "B"<br />

SPN-46 Radar Control Unit (Unit 19) 2 2.307 2 2.348 3 3.586 5 6.084 12 14.325<br />

SPN-46 EGI 2 0.212 6 0.660 6 0.672 16 1.825 30 3.369<br />

SPN-46 Computer Group 1 1.120 14 15.967 15 17.087<br />

SPN-46 Radar Set Group (Unit 24/25) 1 0.404 1 0.411 4 1.673 4 1.703 20 8.668 30 12.859<br />

SPN-46 Peripheral Display 6 0.574 9 0.669 9 0.681 9 0.693 9 0.706 3 0.238 45 3.561<br />

SPN-46 Common Console 9 1.546 9 1.576 6 1.070 21 3.811 45 8.003<br />

INTEGRATED LOGISTICS SUPPORT 0.187 1.148 0.280 0.472 0.931 0.503 CONT. CONT.<br />

PRODUCTION ENGINEERING 0.100 0.590 4.439 0.090 0.949 0.714 1.495 0.934 CONT. CONT.<br />

QUALITY ASSURANCE 0.415 0.105 0.102 0.405 0.157 CONT. CONT.<br />

ACCEPTANCE, TEST & EVALUATION 0.000<br />

INITIAL TRAINING 0.000<br />

INSTALL COST 3 0.094 6 0.193 12 0.753 21 3.692 30 5.279 108 34.050 180 44.061<br />

TOTAL PROCUREMENT 0.100 0.777 6.002 0.758 2.812 6.986 13.473 15.730 CONT. CONT.<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

ITEM NO. 59 PAGE NO. 4H<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: CV/CVN and MODIFICATION TITLE: AN/SPN-46(V)3 Life Cycle Extension Summary<br />

selected shore sites. Mod Kits (PN410)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: Alteration Installation Team<br />

ADMINISTRATIVE LEADTIME: Var. PRODUCTION LEADTIME: Var.<br />

CONTRACT DATES: FY 2003: N/A FY 2004: Var. FY 2005: Var.<br />

DELIVERY DATE: FY 2003: N/A FY 2004: Var. FY 2005: Var.<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT 3 0.094<br />

3 0.094<br />

FY 2005 EQUIPMENT 6 0.193<br />

6 0.193<br />

FY 2006 EQUIPMENT 12 0.753<br />

12 0.753<br />

FY 2007 EQUIPMENT 21 3.692<br />

21 3.692<br />

FY 2008 EQUIPMENT 30 5.279<br />

30 5.279<br />

FY 2009 EQUIPMENT 29 7.325 29 7.325<br />

TO COMPLETE 79 26.725 79 26.725<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007<br />

FY 2008 FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 0 0 1 1 1 0 2 2 2 0 4 4 2 2 7 6 4 4 10 8 6 6<br />

Out 0 0 0 0 0 0 0 0 0 1 1 1 0 1 1 2 2 2 5 3 2 4 7 5 5 8 8 8 6<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 59 PAGE NO. 4I CLASSIFICATION: UNCLASSIFIED<br />

TC<br />

108<br />

108<br />

TOTAL<br />

180<br />

180


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE BLI# 284000<br />

OTHER PROCUREMENT, NAVY/BA2 - COMMUNICATIONS AND ELECTRONICS EQUIPMENT NATIONAL AIRSPACE SYSTEM (NAS) (42CB)<br />

Program Element for Code B Items: Other Related Program Elements<br />

0204696N 0604504N<br />

Prior ID<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions) $92.4 B $7.0 $15.9 $16.1 $31.3 $27.8 $28.4 $28.9 CONT CONT<br />

DESCRIPTION:<br />

The Joint Department of Defense (DOD)/Federal Aviation Administration (FAA) National Airspace System (NAS) modernization program upgrades the DOD Air Traffic Control systems at<br />

Approach Control Facilities in concert with the Federal Aviation Administration's (FAA) upgrade of the National Air Traffic Control System. Since existing DOD Air Traffic Control facilities<br />

interface with the FAA's facilities, the military must maintain interoperability and retain vital special-use airspace for combat readiness training. These funds will procure Air Traffic Control<br />

hardware for the Navy/Marine Air Traffic Control facilities.<br />

The Air Force is the DoD lead activity for the Joint Acquisition Program. The Joint Program Office (JPO) is located at Hanscom AFB, MA.<br />

FY 05 provides funding to procure: 3 DAAS; 1 DASR; and 4 Tower Automation Systems.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 60 PAGE NO. 1<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS DATE:<br />

P-40a February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA2 - COMMUNICATIONS AND ELECTRONICS EQUIPMENT NATIONAL AIRSPACE SYSTEM (NAS) (42CB)<br />

ID Prior To<br />

Procurement Items Code Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

CB010 DOD ADVANCED B<br />

AUTOMATION SYS<br />

QTY 16 1 3 9 29<br />

FUNDING 17.207 1.036 6.038 11.929 36.210<br />

CB020 MILITARY AIR SPACE B<br />

MANAGEMENT SYS<br />

QTY 60 60<br />

FUNDING 0.948 0.948<br />

CB030 RADAR (DASR) B<br />

QTY 11 1 1 13 26<br />

FUNDING 26.866 3.486 3.037 38.466 71.855<br />

CB040 TOWER AUTOMATION B<br />

QTY 22 1 4 12 39<br />

FUNDING 5.203 0.677 1.251 1.961 9.092<br />

OTHER COSTS 42.161 7.018 10.736 5.796 CONT CONT<br />

TOTAL FUNDING 92.385 7.018 15.935 16.122 CONT CONT<br />

P-1 SHOPPING LIST CLASSIFICATION: UNCLASSIFIED<br />

DD Form 2454, JUN 86 ITEM NO. 60 PAGE NO. 2


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

OTHER PROCUREMENT, NAVY BA2 - COMMUNICATIONS AND<br />

ELECTRONICS EQUIPMENT B NATIONAL AIRSPACE SYSTEM (NAS) (42CB)<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID Prior<br />

FY 2003 FY 2004 FY 2005<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

CB010 DOD ADVANCED AUTOMATION SYS B 17,207 1 1,036 1,036 3 2,013 6,038<br />

CB020 MAMS B 948<br />

CB030 RADAR (DASR) B 26,866 1 3,486 3,486 1 3,037 3,037<br />

CB040 TOWER AUTOMATION B 5,203 1 677 677 4 313 1,251<br />

CB800 INTEGRATED LOGISTICS SUPPORT N/A 3,319 733 845 514<br />

CB830 PRODUCTION ENGINEERING N/A 17,774 3,009 5,185 2,701<br />

CB900 INSTALLATION (NON-FMP) N/A 20,813 3,276 4,706 2,581<br />

CB990 INITIAL TRAINING N/A 255<br />

* Configuration and resulting unit costs vary by site size and usage requirements. Unit cost shown represents average cost.<br />

92,385 7,018 15,935 16,122<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION: UNCLASSIFIED<br />

ITEM NO. 60 PAGE NO. 3


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OTHER PROCUREMENT, NAVY BA2 - COMMUNICATIONS AND NATIONAL AIRSPACE SYSTEM (NAS) (42CB)<br />

ELECTRONICS EQUIPMENT<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST<br />

(000)<br />

OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

CB010 DOD ADVANCED<br />

AUTOMATION SYSTEM<br />

1/<br />

FY04 1 1036 FAA, WASH DC 03/96 IPR/OPTION RAYTHEON, MA 02/04 01/05 YES<br />

FY05 3 2013 FAA, WASH DC 03/96 IPR/OPTION RAYTHEON, MA 01/05 01/06 YES<br />

CB030 RADAR (DASR)<br />

2/<br />

FY04 1 3486 USAF,Hanscom, MA 02/96 MIPR/OPTION RAYTHEON, CA 04/04 01/06 YES<br />

FY05 1 3037 USAF,Hanscom, MA 02/96 MIPR/OPTION RAYTHEON, CA 01/05 01/07 YES<br />

CB040 TOWER<br />

AUTOMATION<br />

3/<br />

FY04 1 677 SPAWAR, CHASN N/A PO/ D.O. PEN-TECH CHASN, SC 04/04 01/05 YES<br />

FY05 4 313 SPAWAR, CHASN N/A PO/ D.O. PEN-TECH CHASN, SC 01/05 01/06 YES<br />

D. REMARKS<br />

1/ DOD Advanced Automation System (DAAS) unit costs vary per site. P-5 page unit cost is only average of sites each year. Delivery dates are for Navy DAAS.<br />

2/ RADAR is Digital Airport Surveillance Radar (DASR).<br />

3/ Tower Automation is a Government proprietary system and unit costs vary per site.<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 60 Classification:<br />

PAGE NO. 4 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED:<br />

DESCRIPTION/JUSTIFICATION:<br />

NAS TYPE MODIFICATION: SAFETY MODIFICATION TITLE: DOD ADVANCED AUTOMATION<br />

SYSTEMS (CB010)<br />

The DOD Advanced Automation System (DAAS) is being developed as part of a joint DOD/FAA program to modernize and standardize Air Traffic Control equipment in the National Air Traffic Control System.<br />

The systems will be installed at Navy Air Traffic Control facilities to replace aging, obsolete equipment and comply with the joint DOD/FAA modernization program agreements. DAAS provides for processors<br />

and displays for tower and approach controls.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: MILESTONE III (March 2004)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

Equipment "A"<br />

Equipment "B"<br />

16 17.207 1 1.036 3 6.038 9 11.929 47 36.210<br />

ECP 1 Grp "A"<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

CONT CONT<br />

PE 5.552 0.720 1.654 1.236 CONT CONT<br />

ILS 1.177 0.231 0.343 0.202 CONT CONT<br />

TRAINING<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

0.255 0.255<br />

INSTALL COST 12 14.975 AP 0.273 4 1.809 1 1.464 12 10.077 47 28.598<br />

TOTAL PROCUREMENT 39.166 1.224 4.842 8.940 CONT CONT<br />

CLASSIFICATION:<br />

ITEM NO. 60 PAGE NO. 5 Exhibit P-3A (Individual Modification)<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: NAS MODIFICATION TITLE: DOD ADVANCED AUTOMATION SYSTEMS (CB010)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: 3 months<br />

PRODUCTION LEADTIME: 12 months<br />

CONTRACT DATES: FY 2003: N/A FY 2004: 1/04 FY 2005: 1/05<br />

DELIVERY DATE: FY 2003: N/A FY 2004: 1/05 FY 2005: 1/06<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005<br />

($ in Millions)<br />

FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

12 14.975 AP 0.273 4 1.809<br />

16 17.057<br />

FY 2004 EQUIPMENT 1 1.464<br />

2 1.464<br />

FY 2005 EQUIPMENT 3 3.288<br />

3 3.288<br />

FY 2006 EQUIPMENT 6 4.257<br />

6 4.257<br />

FY 2007 EQUIPMENT 6<br />

3.215<br />

6 3.215<br />

FY 2008 EQUIPMENT 3 2.270<br />

3 2.270<br />

FY 2009 EQUIPMENT 3 3.166 3 3.166<br />

TO COMPLETE 9 6.911 9 6.911<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007<br />

FY 2008<br />

FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 9 0 2 1 0 0 2 1 1 0 1 0 0 0 2 1 0 0 2 2 2 0 2 2 2 0 2 1 0<br />

Out 9 0 0 1 2 0 0 2 2 0 0 0 1 0 0 2 1 0 2 2 2 0 2 2 2 0 0 2 1<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 60 PAGE NO. 5A CLASSIFICATION: UNCLASSIFIED<br />

TC<br />

12<br />

12<br />

TOTAL<br />

47<br />

47


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: NAS TYPE MODIFICATION: SAFETY MODIFICATION TITLE: RADAR (DASR) (CB030)<br />

DESCRIPTION/JUSTIFICATION:<br />

The Digital Airport Surveillance Radar (DASR) is being developed as part of a joint DOD/FAA program to modernize and standardize air traffic control equipment in the National Air Traffic Control System. The DASR<br />

will be installed at Navy air traffic control facilities to replace aging, obsolete approach control radars and comply with the joint DOD/FAA modernization program agreements.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: MILESTONE III (November 2004)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

Equipment "A"<br />

Equipment "B"<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

11 26.866 1 3.486 1 3.037 13 38.466 26 71.855<br />

PE 5.331 0.610 0.741 0.658 CONT CONT<br />

ILS<br />

TRAINING<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

1.134 0.294 0.315 0.181 CONT CONT<br />

INSTALL COST 2 4.700 4 2.180 3 2.053 0 0.742 21 12.533 30 22.208<br />

TOTAL PROCUREMENT 38.031 3.084 6.595 4.618 CONT CONT<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

ITEM NO. 60 PAGE NO. 5B<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: NAS MODIFICATION TITLE: RADAR (DASR) (CB030)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION:<br />

ADMINISTRATIVE LEADTIME:<br />

AIT<br />

3 Months PRODUCTION LEADTIME: 24 Months<br />

CONTRACT DATES: FY 2003: N/A FY 2004: 1/04 FY 2005: 1/05<br />

DELIVERY DATE: FY 2003: N/A FY 2004: 1/06 FY 2005: 1/07<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

2 4.700 4 2.180 3 2.053<br />

9 8.933<br />

FY 2004 EQUIPMENT<br />

AP 0.742<br />

1 0.400<br />

1 1.142<br />

FY 2005 EQUIPMENT<br />

AP 0.111 1 0.812<br />

1 0.923<br />

FY 2006 EQUIPMENT<br />

AP 0.824 4 1.087<br />

4 1.911<br />

FY 2007 EQUIPMENT<br />

AP 0.841 2 0.822<br />

2 1.663<br />

FY 2008 EQUIPMENT<br />

AP 1.718 4 3.263 4 4.981<br />

FY 2009 EQUIPMENT<br />

4 2.497 4 2.497<br />

TO COMPLETE<br />

13 6.773 13 6.773<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007<br />

FY 2008<br />

FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 9 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 2 2 0 0 2 0 0<br />

Out 2 0 1 2 1 0 1 1 1 0 0 0 0 0 0 1 0 0 0 1 0 0 0 2 2 0 0 2 0<br />

USN Radar deliveries included in waterfall with USAF, USA, and FAA deliveries.<br />

Navy delivery dates will vary within FY depending on inter-service agency priorities. FY01 radars are joint-use radars installed by the Federal Aviation Administration; as a result, inventory objective and<br />

installation quantities are 40 and 38 respectively.<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 60 PAGE NO. 5C CLASSIFICATION: UNCLASSIFIED<br />

TC<br />

21<br />

21<br />

TOTAL<br />

38<br />

38


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: NAS TYPE MODIFICATION: SAFETY MODIFICATION TITLE: TOWER AUTOMATION (CB040)<br />

DESCRIPTION/JUSTIFICATION:<br />

The Tower Automation is being developed as part of a joint DOD/FAA program to modernize and standardize air traffic control equipment in the National Air Traffic Control System. The Tower Automation will be<br />

installed at Navy air traffic control facilities to replace aging, obsolete equipment and comply with the joint DOD/FAA modernization program agreements.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: AAP PRODUCTION DECISION (September 2002)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

Equipment "A"<br />

Equipment "B"<br />

22 5.203 1 0.677 4 1.251 12 1.961 39 9.092<br />

ECP 1 Grp "A"<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

CONT CONT<br />

PE 6.891 1.679 2.790 0.807 CONT CONT<br />

ILS<br />

TRAINING<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

1.008 0.208 0.187 0.131 CONT CONT<br />

INSTALL COST 5 1.138 8 0.823 9 0.844 1 0.375 15 1.485 38 4.665<br />

TOTAL PROCUREMENT 14.240 2.710 4.498 2.564 CONT CONT<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

ITEM NO. 60 PAGE NO. 5D<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: NAS MODIFICATION TITLE: TOWER AUTOMATION (CB040)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION:<br />

AIT<br />

ADMINISTRATIVE LEADTIME: 3 Months PRODUCTION LEADTIME: 12 Months*<br />

CONTRACT DATES: FY 2003: 1/03 FY 2004: 1/04<br />

FY 2005: 1/05<br />

DELIVERY DATE: FY 2003: 1/04 FY 2004: 1/05 FY 2005: 1/06<br />

Cost: Prior Years FY 2003 FY 2004<br />

($ in Millions)<br />

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

5 1.138 8 0.823 9 0.844<br />

22 2.805<br />

FY 2004 EQUIPMENT<br />

1 0.375<br />

1 0.375<br />

FY 2005 EQUIPMENT<br />

4 0.521<br />

4 0.521<br />

FY 2006 EQUIPMENT<br />

7 0.888<br />

7<br />

0.888<br />

FY 2007 EQUIPMENT<br />

5 0.651<br />

5 0.651<br />

FY 2008 EQUIPMENT<br />

4 0.531<br />

4 0.531<br />

FY 2009 EQUIPMENT<br />

3 0.404 3 0.404<br />

TO COMPLETE<br />

12 1.081 12 1.081<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007<br />

FY 2008<br />

FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 5 0 3 3 3 3 3 2 0 0 1 0 0 0 2 2 0 0 3 2 2 0 2 3 0 0 2 2 0<br />

Out 5 0 3 2 3 0 3 3 3 0 0 1 0 0 0 2 2 0 1 4 2 0 0 2 3 0 0 2 2<br />

*Production Leadtime varies per site. Using 12 months as an average.<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 60 PAGE NO. 5E CLASSIFICATION: UNCLASSIFIED<br />

TC<br />

15<br />

15<br />

TOTAL<br />

58<br />

58


CLASSIFICATION: UNCLASSIFIED<br />

APPROPRIATION/BUDGET ACTIVITY<br />

BUDGET ITEM JUSTIFICATION SHEET<br />

P-40<br />

OTHER PROCUREMENT, NAVY/ BA2-COMMUNICATIONS AND ELECTRONIC EQUIPMENT<br />

Program Element for Code B Items:<br />

Not Applicable<br />

QUANTITY<br />

Prior Years ID Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

(In Millions)<br />

DESCRIPTION:<br />

$127.9 N/A $6.8 $7.5 $3.6 $0.0 $0.0 $0.0 $0.0<br />

CONT<br />

DD Form 2454, JUN 86 ITEM NO. 61 PAGE NO. 1<br />

DATE:<br />

February 2004<br />

P-1 ITEM NOMENCLATURE: BLI 284500<br />

AIR STATION ATC EQUIPMENT* (42MR)<br />

Other Related Program Elements<br />

0204696N<br />

The Chief of Naval Operations (CNO) tasked the Naval Air Systems Command (NAVAIR) with the requirement to provide shore based Air Traffic Control (ATC) terminal facilities and equipment<br />

that is required in joint efforts to efficiently and safely monitor and direct military and commercial air traffic in national and international air space. Many of these systems are required to interface<br />

through automated means with Federal Aviation Administration (FAA). Additionally, NAVAIR has material support responsibility for Air Navigation Aid Systems, Mobile ATC Equipment, Special<br />

Instrumentation Systems, and Ancillary Equipment used at Navy and Marine Corps Aviation Shore activities in the continental United States and overseas.<br />

(1) Communications Systems Upgrade Program - This program procures and installs advanced, commercial state-of-the-art, ATC voice switching and recording/reproduction equipment which will<br />

be used to replace aging AN/FSA-52/58 and OJ-314 voice communication switching systems and the RD-379/379A/390 and RP-214 recorder/reproducers. Existing equipment use 1950's toggle<br />

switch & 1960's push-button analog technology that is becoming logistically unsupportable.<br />

(2) UHF/VHF Radio Replacement Program - This program modernizes unsupportable Navy and Marine Corps UHF/VHF voice communication transmitter and receiver equipment. This equipment<br />

is the central core of all critical Air Traffic Control communications. This program is replacing the aging AN/GRT-21/22 VHF/UHF (10 watt) transmitters, AM-6154/GRT-21 & AM-6155/GRT-22<br />

VHF/UHF (50 watt) Linear Power Amplifiers, and AN/GRR-23/24 VHF/UHF receivers. Replacement of these radios is the number one ATC priority of both the Fleet and OPNAV Sponsor. This is a<br />

safety-of-flight issue.<br />

(3) Engineering Change Proposal (ECP)/Operational Capability Improvement Request (OCIR) modernization: The ECP/OCIR program provides for the procurement, and or modification, of<br />

critically needed communications, radar, displays, data processors, and other electronic systems/equipment needed at Navy/Marine Corps Air Traffic Control facilities worldwide. ECP/OCIR<br />

procurements replace and modernize costly-to-maintain systems and equipment in order to increase Air Traffic Control efficiency and safety, improve affordable readiness, and reduce total<br />

ownership costs.<br />

FY 05 funds will procure: 428 UHF/VHF Radio Replacements (MR407).<br />

*Note: P-1 item nomenclature changed to Air Station ATC Equipment, formerly Air Station Support Equipment.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

UNCLASSIFIED<br />

CONT


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS<br />

P-40a<br />

APPROPRIATION/BUDGET ACTIVITY<br />

OTHER PROCUREMENT, NAVY/ BA2-COMMUNICATIONS AND ELECTRONIC EQUIPMENT<br />

Procurement Items<br />

ID CODE Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007<br />

MR069 ECP/OCIR N/A<br />

QTY 166 1 CONT<br />

FUNDING 5.979 0.078 CONT<br />

MR407 UFH/VHF RADIO N/A<br />

REPLACEMENT<br />

QTY 2312 343 342 428<br />

FUNDING 11.565 1.202 1.781 2.269<br />

MR408 COMMUNICATION N/A<br />

SYSTEM UPGRADE<br />

QTY 34 6 9<br />

FUNDING 9.719 1.958 2.066<br />

MR430 FIBER OPTIC N/A<br />

INTERSITE UPGRADE<br />

QTY 1 7<br />

FUNDING 0.150 1.176<br />

MR440 UHF/VHF N/A<br />

TRANSCEIVER REPLACEMENT<br />

QTY 340<br />

FUNDING 5.610<br />

OTHER COST N/A 100.669 3.676 3.468 1.371 CONT<br />

TOTAL FUNDING N/A 127.932 6.836 7.543 3.640 CONT<br />

P-1 SHOPPING LIST<br />

DD Form 2454, JUN 86 ITEM NO. 61 PAGE NO. 2<br />

DATE:<br />

February 2004<br />

P-1 ITEM NOMENCLATURE: BLI 284500<br />

AIR STATION ATC EQUIPMENT (42MR)<br />

FY 2008<br />

UNCLASSIFIED<br />

FY 2009 To Complete<br />

Total<br />

CONT<br />

CONT<br />

3425<br />

16.817<br />

49<br />

13.743<br />

8<br />

1.326<br />

340<br />

5.61<br />

CONT<br />

CONT


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System<br />

P-5<br />

APPROPRIATION/BUDGET ACTIVITY ID Code<br />

OTHER PROCUREMENT, NAVY BA2 - COMMUNICATIONS AND<br />

ELECTRONICS EQUIPMENT N/A AIR STATION ATC EQUIPMENT (42MR)<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID<br />

CODE Code<br />

MR069 ECP/OCIR N/A 5,979 1 78 78<br />

MR407 UHF/VHF RADIO REPLACEMENT N/A 11,565 343 4 1,202 342 5 1,781 428 5 2,269<br />

MR408 COMMUNICATION SYSTEM UPGRADE N/A 9,719 6 326 1,958 9 230 2,066<br />

MR430 FIBER OPTIC INTERSITE UPGRADE 1 150 150<br />

MR435 NEXT GENERATION COMMUNICATION<br />

SYSTEM UPGRADE<br />

MR440 UHF/VHF TRANSCEIVER REPLACEMENT N/A<br />

MR800 INTEGRATED LOGISTICS SUPPORT N/A 5,546 377 330 194<br />

MR830 PRODUCTION ENGINEERING N/A 14,440 675 571 232<br />

MR900 INSTALLATION OF EQUIPMENT N/A 29,123 2,455 2,338 822<br />

(NON-FMP)<br />

MR990 INITIAL TRAINING N/A 1,240 169 229 123<br />

VARIOUS 1/ 50,320<br />

1/ The amount identified against this cost<br />

element reflects total prior year funding<br />

associated with cost elements no longer<br />

financed in FY 2002 and beyond<br />

Prior Years<br />

Total Cost<br />

Quantity<br />

DATE:<br />

February 2004<br />

P-1 ITEM NOMENCLATURE/SUBHEAD: BLI 284500<br />

Quantity Unit Cost Total Cost<br />

127,932 6,836 7,543 3,640<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION: UNCLASSIFIED<br />

ITEM NO. 61 PAGE NO. 3<br />

FY 2003<br />

Unit Cost Total Cost<br />

FY 2004<br />

FY 2005<br />

Quantity Unit Cost Total Cost


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OTHER PROCUREMENT, NAVY BA2 - COMMUNICATIONS AND<br />

ELECTRONICS EQUIPMENT AIR STATION ATC EQUIPMENT (42MR)<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

MR407 UHF/VHF RADIO<br />

REPLACEMENT<br />

MR408 COMM SYSTEM<br />

UPGRADE<br />

D. REMARKS<br />

FY04 342 5 SSC, CHASN, SC 06/03 FFP GENERAL DYNAMICS, SCOTTSDALE AZ* 1/04 05/04 YES<br />

FY05 428 5 SSC, CHASN, SC 06/03 FFP/OPTION GENERAL DYNAMICS, SCOTTSDALE AZ` 12/04 05/05 YES<br />

FY04 9 230 FAA, WASH.,D.C. 02/95 FFP/OPTION DENRO, GAITHERSBURG, MD 1/04 06/04 YES<br />

MR408 - Communication System Upgrade requirements vary from site to site, which causes equipment size and costs to vary from site to site, average unit costs are shown.<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 61 PAGE NO. 4 Classification:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AIR STATION TYPE MODIFICATION: CAPABILITY IMPROVEMENT<br />

MODIFICATION TITLE:<br />

DESCRIPTION/JUSTIFICATION:<br />

The ECP/OCIR program (MR069) provides for the procurement, and or modification, of critically needed communications, radar, displays, data processors, and other electronic systems/equipment needed at Navy/Marine Corps Air Traffic Control<br />

facilities worldwide. ECP/OCIR procurements replace and modernize costly-to-maintain systems and equipments in order to increase Air Traffic Control efficiency and safety, improve affordable readiness, and reduce total ownership costs.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: N/A<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

ECP 1 Grp "A" 166 5.979 1 0.078 CONT CONT CONT CONT<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

PE 0.040 0.025 0.026 0.091<br />

ILS 0.040 0.040 0.026 0.106<br />

INITIAL TRAINING<br />

OTHER 79.870 79.870<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 166 10.164 1 0.042 CONT CONT<br />

TOTAL PROCUREMENT 96.093 0.065 0.172 CONT CONT<br />

ITEM NO. 61 PAGE 5 CLASSIFICATION: UNCLASSIFIED<br />

NOTE: * The equipment and installation costs represented on this P-3A are for individual modification programs that do not exceed $5 Million in either budget year or $10 Million in all years.<br />

MR069 ECP/OCIR


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AIR STATION MODIFICATION TITLE: ECP/OCIR (MR069)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: MONTHS (Various) PRODUCTION LEADTIME: MONTHS (Various)<br />

CONTRACT DATES: FY 2003: N/A FY 2004: N/A<br />

FY 2005: N/A<br />

DELIVERY DATE: FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

Cost:<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

FY 2006 EQUIPMENT<br />

FY 2007 EQUIPMENT<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

Qty<br />

Prior Years<br />

$<br />

166 10.164<br />

FY 2003 FY 2004 FY 2005<br />

($ in Millions)<br />

FY 2006 FY 2007<br />

FY 2008 FY 2009 TO COMPLETE<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty<br />

$<br />

1<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 166 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

Out 166 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

0.042<br />

TC TOTAL<br />

NOTE: * The equipment and installation costs represented on this P-3A are for individual modification programs that do not exceed $5 Million in either budget year or $10 Million in all yea<br />

ITEM NO. 61 PAGE 5A<br />

P-3A<br />

CLASSIFICATION: UNCLASSIFIED<br />

CONT<br />

CONT<br />

CONT<br />

CONT<br />

CONT CONT<br />

TOTAL<br />

Qty $<br />

166 10.164<br />

1<br />

0.042<br />

CONT CONT


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AIR STATION TYPE MODIFICATION: MODERNIZATION<br />

MODIFICATION TITLE: UHF/VHF Radio Replacement<br />

(MR407)<br />

DESCRIPTION/JUSTIFICATION:<br />

Replacement Program - This program modernizes aging Navy and Marine Corps UHF/VHF transmitter and receiver equipment that is the central core of all critical Air Traffic Control communications. This<br />

program is procuring Non-Developmental Items (NDIs) previously developed by Motorola for the FAA as form, fit, and function replacements of the aging AN/GRT-21/22 VHF/UHF (10 watt) transmitters,<br />

AM-6154/GRT-21 & AM-6155/GRT-22 VHF/UHF (50 watt) Linear Power Amplifiers, and AN/GRR-23/24 VHF/UHF receivers that are the same as those used by the Navy and Marine Corps. The UHF/VHF<br />

radio replacement program replaces existing radios that use 1960's analog technology, vacuum tubes and other out-of-production components that cause numerous casualty reports (CASREPs) and<br />

logistics supportability problems due to equipment and parts obsolescence.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: NDI<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

2312 11.565 343 1.202 342 1.781 428 2.269 3425 16.817<br />

PE 0.560 0.193 0.091 0.100 0.944<br />

ILS<br />

TRAINING<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

0.280 0.050 0.042 0.045 0.417<br />

INSTALL COST 2312 1.340 343 0.275 342 0.210 428 0.284 3425 2.109<br />

TOTAL PROCUREMENT 13.745 1.720 2.124 2.698 20.287<br />

ITEM NO. 61 PAGE 5B CLASSIFICATION: UNCLASSIFIED<br />

*Prior Year costs and quantities not provided


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AIR STATION MODIFICATION TITLE: UHF/VHF RADIO REPLACEMENT (MR407)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: 2 MONTHS PRODUCTION LEADTIME:<br />

5 MONTHS<br />

CONTRACT DATES: FY 2003: 12/02<br />

FY 2004: 1/04<br />

FY 2005:<br />

DELIVERY DATE: FY 2003: 4/03<br />

FY 2004: 4/04<br />

FY 2005:<br />

Cost:<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

FY 2006 EQUIPMENT<br />

FY 2007 EQUIPMENT<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

Prior Years<br />

Qty $<br />

2312 1.340<br />

FY 2003 FY 2004<br />

FY 2005<br />

($ in Millions)<br />

FY 2006 FY 2007<br />

Qty $ Qty $ Qty $ Qty $ Qty $<br />

343<br />

0.275<br />

342<br />

0.210<br />

428<br />

0.284<br />

521<br />

INSTALLATION SCHEDULE:<br />

FY 2002<br />

& Prior 1<br />

FY 2003<br />

2 3 4 1<br />

FY 2004<br />

2 3 4 1<br />

FY 2005<br />

2 3 4 1<br />

FY 2006<br />

2 3 4 1<br />

FY 2007<br />

2 3 4 1<br />

FY 2008<br />

2 3 4 1<br />

FY 2009<br />

2 3 4<br />

TC TOTAL<br />

In 2312 0 0 343 0 0 0 342 0 0 0 428 0 0 0 521 0 0 0 194 0 0 0 0 0 0 0 0 0 0 4140<br />

Out 2312 0 0 0 343 0 0 0 342 0 0 0 428 0 0 0 521 0 0 0 194 0 0 0 0 0 0 0 0 0 4140<br />

0.328<br />

194<br />

0.132<br />

FY 2008<br />

FY 2009<br />

Qty $ Qty $<br />

12/04<br />

4/05<br />

To Complete Total<br />

Qty $ Qty $<br />

2312 1.340<br />

343 0.275<br />

342 0.210<br />

428 0.284<br />

521 0.328<br />

194 0.132<br />

P-3A<br />

ITEM NO. 61 PAGE 5C CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AIR STATION TYPE MODIFICATION: MODERNIZATION MODIFICATION TITLE: COMMUNICATION SYSTEM UPGRADE (MR408)<br />

Communications Systems Upgrade - Advanced commercial state-of-the-art ATC voice switching and recording/reproduction equipment which will be used to replace existing AN/FSA-52/58 and OJ-314 voice communications switching<br />

systems and the RD-379/379A/390 and RP-214 recorder/reproducers. Existing systems and equipment use 1950's toggle switch & 1960's push-button analog technology, are no longer in production, and causing numerous casualty reports<br />

(CASREPs) and logistics supportability problems due to system and parts obsolescence. The voice switching system selected for use by the Navy is a Non-Developmental Item, developed by the FAA via a, full and open competition,<br />

contract which was awarded by the FAA to Denro, Inc. The recorder/reproducer system selected for use by the Navy is a commercial item produced by Advanced Integrated Recorders, Inc. and are obtained through a contract awarded to<br />

AIR, Inc. by our coordinating field activity, SPAWAR Charleston, SC. The existing equipment is obsolete and becoming logistically unsupportable. Note - New recorder/reproducers will be procured and installed at all Navy/Marine Corps<br />

Air Stations with up to two new recorder/reproducers systems needed per each communications system upgrade shown below.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: NDI<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

34 9.719 6 1.958 9 2.066 49 13.743<br />

PE 1.273 0.457 0.268 0.132 2.130<br />

ILS 0.237 0.287 0.192 0.149 0.865<br />

TRAINING<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

0.401 0.169 0.179 0.123 0.872<br />

INSTALL COST 29 6.464 8 2.180 8 1.991 4 0.538 49 11.173<br />

TOTAL PROCUREMENT 18.094 5.051 4.696 0.942 28.783<br />

ITEM NO. 61 PAGE 5D CLASSIFICATION: UNCLASSIFIED<br />

MR408 Equipment size and cost will vary from site to site,applicable installation costs will vary based on equipment size and location of installation, average costs are shown for budgeting and planning purposes.


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AIR STATION MODIFICATION TITLE: COMMUNICATION SYSTEM UPGRADE (MR408)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: 3 MONTHS<br />

PRODUCTION LEADTIME:<br />

6 MONTHS<br />

CONTRACT DATES: FY 2003: 12/02<br />

FY 2004: 01/04<br />

FY 2005:<br />

DELIVERY DATE: FY 2003: 6/03 FY 2004: 6/04<br />

FY 2005:<br />

Cost:<br />

Prior Years<br />

FY 2003<br />

FY 2004<br />

FY 2005<br />

($ in Millions)<br />

FY 2006 FY 2007<br />

FY 2008 FY 2009 To Complete<br />

Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

29 6.464 5 1.363<br />

34 7.827<br />

FY 2003 EQUIPMENT<br />

3 0.817 3 0.720<br />

6 1.537<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

FY 2006 EQUIPMENT<br />

FY 2007 EQUIPMENT<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

5 1.271 4 0.538<br />

9 1.809<br />

INSTALLATION SCHEDULE:<br />

FY 2002<br />

& Prior 1<br />

FY 2003<br />

2 3 4 1<br />

FY 2004<br />

2 3 4 1<br />

FY 2005<br />

2 3 4 1<br />

FY 2006<br />

2 3 4 1<br />

FY 2007<br />

2 3 4 1<br />

FY 2008<br />

2 3 4 1<br />

FY 2009<br />

2 3<br />

TCTOTAL<br />

4<br />

In 29 2 2 2 2 2 1 3 2 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 49<br />

Out 29 2 2 2 2 2 1 3 2 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 49<br />

ITEM NO. 61 PAGE 5E CLASSIFICATION: UNCLASSIFIED<br />

P-3A


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AN/FAC-6(V)1/4 FOIS TYPE MODIFICATION: MODERNIZATION MODIFICATION TITLE: FIBER OPTIC INTERSITE UPGRADE (MR430)<br />

DESCRIPTION/JUSTIFICATION:<br />

This effort will upgrade and replace obsolete and unsupportable components and assemblies being used in the AN/FAC-6(V)1 Fiber Optic Intersite System (FOIS) required for Precision Approach Radar (PAR) operations and<br />

the AN/FAC-6(V)4 FOIS required for ATC voice communications at Naval and Marine Corps Air Station (NAS/MCAS) facilities worldwide. This FOIS equipment has substantially increased the operational availability (Ao) of<br />

the applicable PAR and ATC voice communication systems by eliminating equipment damage and failures to these critical ATC systems that were previously caused by lightning and other sources of high power electromagnetic<br />

interference (EMI) and radio frequency interference (RFI). The original equipment manufacturer (OEM-FIBERCOM) of this AN/FAC-6(V)1/4 FOIS equipment has filed for bankruptcy and has not produced any<br />

replacement parts for these systems over the past five years. Stock inventories of repair parts for these systems are being rapidly exhausted. This program provides for future logistics support and continued capability<br />

sustainment of these critical ATC systems. This upgraded FOIS equipment will be installed at all NAS/MCAS facilities worldwide. All applicable ECP and CCB documentation will be prepared, submitted and approved in<br />

accordance with current NAVAIR policies and procedures.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

Modified Commercial-Off-The-Shelf (COTS)<br />

Prior Years<br />

FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

1 0.150 7 1.176 8 1.326<br />

PE 0.186 0.186<br />

ILS 0.070 0.070<br />

TRAINING<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

0.050 0.050<br />

INSTALL COST 1 0.095 7 0.693 8 0.788<br />

TOTAL PROCUREMENT 0.551 1.869 2.420<br />

ITEM NO. 61 PAGE 5F CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AN/FAC-6(V)1/4 FOIS MODIFICATION TITLE: FIBER OPTIC INTERSITE UPGRADE (INSTALLATION) (MR430)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION:<br />

Alteration Installation Team (AIT)<br />

ADMINISTRATIVE LEADTIME: 3 Months<br />

PRODUCTION LEADTIME: 4 Months<br />

CONTRACT DATES: FY 2003: FY 2004: 1/04<br />

FY 2005:<br />

DELIVERY DATE: FY 2003: FY 2004: 04/04<br />

FY 2005:<br />

Cost: Prior Years<br />

FY 2003 FY 2004 FY 2005<br />

($ in Millions)<br />

FY 2006 FY 2007 FY 2008 FY 2009 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

FY 2006 EQUIPMENT<br />

1 0.095<br />

1 0.095<br />

FY 2007 EQUIPMENT<br />

9 0.845<br />

9 0.845<br />

FY 2008 EQUIPMENT<br />

9 0.855<br />

9 0.855<br />

FY 2009 EQUIPMENT<br />

9 0.875<br />

9 0.875<br />

TO COMPLETE<br />

7 0.693 7 0.693<br />

INSTALLATION SCHEDULE:<br />

FY2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008<br />

FY 2009<br />

TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 9 0 0 0 9 0 0 0 9 0 7<br />

Out 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 9 0 0 0 0 9 0 0 0 9 7<br />

TOTAL<br />

35<br />

35<br />

ITEM NO. 61 PAGE 5G<br />

P-3A<br />

CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AIR STATION TYPE MODIFICATION: MODERNIZATION MODIFICATION TITLE: UFH/VHF TRANSCEIVER REPLACEMENT (MR440)<br />

This DESCRIPTION/JUSTIFICATION:<br />

program modernizes aging Navy and Mariner Corps UFH/VHF Transceivers that are the central core of all Air Traffic Control emergency communications. The program will procure Non-Development Items<br />

(NDIs) developed by General Dynamics Decision Systems for the FAA as form, fit and function replacements of the aging AN/GRC-171/211 UFH/VHF Transceivers.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

NDI<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

340 5.610 340 5.610<br />

PE 0.188 0.188<br />

ILS<br />

TRAINING<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

0.000<br />

INSTALL COST 340 0.585 340 0.585<br />

TOTAL PROCUREMENT 6.383 6.383<br />

ITEM NO. 61 Page 5H CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AIR STATION MODIFICATION TITLE: UFH/VHF TRANSCEIVER REPLACEMENT (MR440)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: Alteration Installation Team (AIT)<br />

ADMINISTRATIVE LEADTIME: 2 Months<br />

PRODUCTION LEADTIME: 5 months<br />

CONTRACT DATES: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

DELIVERY DATE: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006<br />

($ in Millions)<br />

FY 2007 FY 2008 FY 2009 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

FY 2006 EQUIPMENT<br />

FY 2007 EQUIPMENT<br />

FY 2008 EQUIPMENT<br />

0 0.000<br />

FY 2009 EQUIPMENT<br />

0 0.000<br />

TO COMPLETE 340 0.585 340 0.585<br />

INSTALLATION SCHEDULE:<br />

FY2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008<br />

FY 2009<br />

TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 68 0 0 0 68 0 340<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 34 34 0 0 34 34 340<br />

TOTAL<br />

476<br />

476<br />

ITEM NO. 61 Page 5I<br />

P-3A<br />

CLASSIFICATION: UNCLASSIFIED<br />

N/A<br />

N/A


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/ BA2-COMMUNICATIONS AND ELECTRONIC EQUIPMENT LANDING SYSTEMS (LS) (42X1) BLI#284600<br />

Program Element for Code B Items: Other Related Program Elements<br />

Not Applicable Not Applicable<br />

Prior ID To<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions) $38.3 N/A $0.0 $0.0 $7.2 $7.7 $9.0 $9.1 $10.0 $21.5 $102.9<br />

DESCRIPTION:<br />

The Chief of Naval Operations (CNO) tasked Naval Air Systems Command (NAVAIR) with the requirement to provide shore based Air Traffic Control (ATC) terminal facilities<br />

and equipment that is required in joint efforts to efficiently and safely monitor and direct military and commercial air traffic in national and international air space. Many of<br />

these systems are required to interface through automated means with Federal Aviation Administration (FAA). Additionally, NAVAIR has material support responsibility for Air<br />

Navigation Aid Systems, Mobile ATC Equipment, Special Instrumentation Systems, and Ancillary Equipment used for ATC&LS by the Navy and<br />

Marine Corps. This Landing Systems (LS) 42X1 program, in conjunction with the other three programs (Air Station Support Equipment 42MR, Fleet Area Control and<br />

Surveillance Facility (FACSFAC) 42TT, and the National Airspace System Modernization 42CB) which make up program element 0204696N, provide the four pillars by which<br />

NAVAIR supports and meets established requirements to modernize and ensure reliable, safe and effective operations of ATC&LS used at Navy and Marine Corps air<br />

stations and ATC facilities worldwide.<br />

This Landing Systems (LS) budget provides funding to modernize and ensure the reliability and safety of Precision Approach Radars (PAR), Tactical Air Navigation<br />

(TACAN) systems, Instrument Landing Systems (ILS), and other aircraft navigation aids used by the Navy and Marine Corps. This program also ensures that all interservice<br />

interoperability requirements identified in the National Airspace System Plan (NASP), the Federal Radio Navigation Plan (FRNP), and the Joint Chiefs of Staff (JCS) master<br />

navigation plan are fulfilled.<br />

The Precision Approach Radar (PAR) Upgrade consists of the Modulator Board Upgrade ECP, the Antenna Upgrade ECP, the Configuration Upgrade ECP, the Turntable Upgrade<br />

ECP, the Fiber Optic Intersite System (FOIS) ECP, and the Angle Voltage Generator (AVG) Upgrade ECP. The Tactical Air Navigation (TACAN) Sustainment consists of the<br />

Antenna Upgrade ECP, the Shelter Upgrade ECP, and the Lightning Protection ECP.<br />

Funding in FY05 will provide 13 PAR Modulator Board Upgrade ECPs, 6 PAR Antenna Upgrade ECPs, 4 PAR Configuration Upgrade ECPs, 4 PAR Turntable Upgrade ECPs, 2<br />

PAR Fiber Optic Intersite System (FOIS) ECPs, 8 PAR Angle Voltage Generator (AVG) Upgrade ECPs, 6 TACAN Antenna Upgrade ECPs, and 2 TACAN Shelter Upgrade ECPs.<br />

DD Form 2454, JUN 86 ITEM NO. 62 PAGE NO. 1<br />

CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS DATE:<br />

P-40a February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/ BA-2 COMMUNICATIONS AND ELECTRONICS EQUIP LANDING SYSTEMS (LS) (42X1)<br />

ID Prior To<br />

Procurement Items Code Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

X1017 ECP/OCIR VAR 0<br />

5.607 5.607<br />

X1018 PRECISION 37 146 183<br />

APPROACH RADAR 4.050 23.759 27.809<br />

X1019 TACAN 8 63 71<br />

0.880 17.286 18.166<br />

X1020 ENVIRONMENTAL N/A<br />

SHELTERS<br />

QTY 42 42<br />

FUNDING 5.787 5.787<br />

X1102 INSTRUMENT N/A<br />

LANDING SYSTEM<br />

QTY 14 14<br />

FUNDING 3.633 3.633<br />

OTHER COSTS N/A 23.264 2.302 16.289 41.855<br />

TOTAL FUNDING N/A 38.291 7.232 57.334 102.857<br />

DD Form 2454, JUN 86 ITEM NO. 62 PAGE NO. 2<br />

CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy/ BA-2 COMMUNICATIONS AND ELECTRONICS<br />

EQUIPMENT N/A LANDING SYSTEMS (LS) (42X1)<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

February 2004<br />

COST ELEMENT OF COST ID Prior FY 2003<br />

FY 2004<br />

FY 2005<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

X1017 ECP/OCIR N/A 5,607<br />

X1018 PRECISION APPROACH RADAR N/A 37 110 4,050<br />

X1019 TACAN N/A 8 110 880<br />

X1020 ENVIRONMENTAL SHELTERS N/A 5,787<br />

X1102 INSTRUMENT LANDING SYSTEM N/A 3,633<br />

X1800 INTEGRATED LOGISTICS SUPPORT N/A 2,209 538<br />

X1830 PRODUCTION ENGINEERING N/A 3,169 970<br />

X1840 QUALITY ASSURANCE N/A 320 114<br />

X1860 ACCEPTANCE, TEST & EVALUATION N/A<br />

X1900 INSTALLATION (NON-FMP) N/A 15,244 680<br />

**VARIOUS N/A 2,322<br />

38,291 0 0 7,232<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 62 PAGE NO. 3<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy/ BA-2 COMMUNICATIONS AND<br />

ELECTRONICS EQUIPMENT LANDING SYSTEMS (LS) 42X1<br />

CONTRACT DATE OF TECH DATA DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW ? AVAILABLE<br />

(000)<br />

See Remark.<br />

D. REMARKS<br />

ECPs will be assembled using components procured via various Purchase Orders.<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Classification:<br />

ITEM NO. 62 PAGE NO. 4 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AN/FPN-63 PAR TYPE MODIFICATION:<br />

MODERNIZATION MODIFICATION TITLE: ECP/OCIR X1018 AVG UPGRADE<br />

DESCRIPTION/JUSTIFICATION:<br />

This ECP will replace two obsolete analog Angle Voltage Generators (AVGs) with one digital state-of-the-art AVG with optical encoder antenna input position sensors and provide digital data outputs that will be required for the<br />

PAR Display Replacement ECP. These known obsolete high failure AVG components and assemblies will be upgraded or replaced using state-of-the-art commercially available items to maintain reliability, availability and<br />

maintainability of the PAR. This ECP will improve the reliability, availability and supportability of AN/FPN-63 PAR by correcting Mean Time Between Failure (MTBF) problems being caused by high electronic failure rates of the<br />

obsolete AVG assemblies in the AN/FPN-63 PAR and therefore improve overall Operational Availability (Ao) . This ECP is required to modernize the AN/FPN -63 PAR to ensure reliable, safe and effective Landing System<br />

operations at Naval Air Station (NAS) and Marine Corps Air Stations (MCAS) facilities worldwide.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

Non-Developmental Item (NDI)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

ECP - Angle Voltage Generator Upgrade<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

8 1.544<br />

PRODUCTION ENGINEERING 0.092<br />

INTEGRATED LOGISTICS SUPPORT 0.046<br />

QUALITY ASSURANCE<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST<br />

0.012<br />

TOTAL PROCUREMENT 1.694<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 62 PAGE NO. 5A


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: FPN-63 PAR MODIFICATION TITLE: ECP/OCIR X1018 AVG UPGRADE<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION:<br />

AIT<br />

ADMINISTRATIVE LEADTIME: 2 Months PRODUCTION LEADTIME: 6 Months<br />

CONTRACT DATES: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

DELIVERY DATE: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

8 0.397<br />

8 0.397<br />

FY 2006 EQUIPMENT<br />

9 0.457<br />

9 0.457<br />

FY 2007 EQUIPMENT<br />

9 0.468<br />

9 0.468<br />

FY 2008 EQUIPMENT<br />

9 0.480<br />

9 0.480<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

9 0.487 9 0.487<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008<br />

FY 2009<br />

TC TOTAL<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 0 0 0 0 8 0 0 0 9 0 0 0 9 0 0 0 9 0 0 0 9 0 0 44<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 3 3 0 3 3 3 0 3 3 3 0 3 3 3 9<br />

44<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 62 PAGE NO. 5B CLASSIFICATION: UNCLASSIFIED<br />

N/A<br />

N/A


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AN/FPN-63 PAR TYPE MODIFICATION:<br />

MODERNIZATION MODIFICATION TITLE: ECP/OCIR X1018 FOIS<br />

DESCRIPTION/JUSTIFICATION:<br />

This ECP will improve the reliability, availability and supportability of the existing AN/FPN-63 Precision Approach Radar (PAR) system via an upgrade and replacement of its intersite copper-cabling with state-of-the-art<br />

AN/FAC-6(V)1 fiber optic intersite systems (FOIS). The use of AN/FAC-6(V)1 FOIS equipment with existing AN/FPN-63 PAR systems has provided substantially increased PAR operational availability (Ao) by<br />

eliminating equipment damage and failures caused by lightning and other sources of high power electro-magnetic interference (EMI) or radio frequency interference (RFI). This ECP is required to modernize the<br />

AN/FPN -63 PAR to ensure reliable, safe and effective PAR Landing System operations at all Naval Air Station (NAS) and Marine Corps Air Stations (MCAS) facilities worldwide.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

Non-Developmental Item (NDI)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

ECP - Fiber Optic Intersite System<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

2 0.169 3 0.255 3 0.255 3 0.265 3 0.275 14 1.219<br />

PRODUCTION ENGINEERING 0.031 0.032 0.033 0.034 0.034 0.053 0.217<br />

INTEGRATED LOGISTICS SUPPORT 0.016 0.017 0.018 0.019 0.019 0.027 0.116<br />

QUALITY ASSURANCE<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

0.006 0.006 0.006 0.006 0.006 0.030<br />

INSTALL COST 2 0.100 3 0.153 3 0.156 3 0.159 3 0.162 14 0.730<br />

TOTAL PROCUREMENT 0.222 0.410 0.465 0.480 0.493 0.242 2.312<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

ITEM NO. 62 PAGE NO. 5C<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: FPN-63 PAR MODIFICATION TITLE: ECP/OCIR X1018 FOIS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION:<br />

AIT<br />

ADMINISTRATIVE LEADTIME: 2 Months PRODUCTION LEADTIME: 6 Months<br />

CONTRACT DATES: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

DELIVERY DATE: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

2 0.100<br />

2 0.100<br />

FY 2006 EQUIPMENT<br />

3 0.153<br />

3 0.153<br />

FY 2007 EQUIPMENT<br />

3 0.156<br />

3 0.156<br />

FY 2008 EQUIPMENT<br />

3 0.159<br />

3 0.159<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

3 0.162 3 0.162<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009<br />

TC TOTAL<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 3 0 0 0 3 0 0 0 3 0 0 0 3 0 0 14<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 1 1 1 0 1 1 1 0 1 1 1 3<br />

14<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 62 PAGE NO. 5D CLASSIFICATION: UNCLASSIFIED<br />

N/A<br />

N/A


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AN/FPN-63 PAR TYPE MODIFICATION:<br />

MODERNIZATION MODIFICATION TITLE: ECP/OCIR X1018 TURNTABLE UPGRADE<br />

DESCRIPTION/JUSTIFICATION:<br />

Due to exposure to the environment, corrosion and other aging problems, the AN/FPN-63 turn-tables must be replaced. These turn-tables are used to rotate the entire AN/FPN-63 PAR equipment shelter in the proper<br />

positions required for multiple runway coverage at various air stations. Current turn-table assemblies were fielded in the early 1960s with the AN/FPN-52 PAR and have been in-service for 40 years. This ECP will<br />

improve the reliability, availability and supportability of AN/FPN-63 PAR by correcting Mean Time Between Failure (MTBF) problems being caused by high electrical and mechanical failure rates of the PAR turn-tables<br />

and therefore improve the overall Operational Availability (Ao) of the AN/FPN-63 PAR. This ECP is required to modernize the AN/FPN -63 PAR to ensure reliable, safe and effective Landing System operations at Naval<br />

Air Station (NAS) and Marine Corps Air Stations (MCAS) facilities worldwide.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

Non-Developmental Item (NDI)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

ECP - Turntable Upgrade<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

4 1.172 13 4.855 17 6.027<br />

PRODUCTION ENGINEERING 0.180 0.487 0.667<br />

INTEGRATED LOGISTICS SUPPORT 0.046 0.219 0.265<br />

QUALITY ASSURANCE<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

0.012 0.012 0.024<br />

INSTALL COST 4 0.229 13 0.769 17 0.998<br />

TOTAL PROCUREMENT 1.639 6.342 7.981<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION: UNCLASSIFIED<br />

ITEM NO. 62 PAGE NO. 5E


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: FPN-63 PAR MODIFICATION TITLE: ECP/OCIR X1018 TURNTABLE UPGRADE<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION:<br />

AIT<br />

ADMINISTRATIVE LEADTIME: 1 Month PRODUCTION LEADTIME: 2 Months<br />

CONTRACT DATES: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

DELIVERY DATE: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

Cost: Prior Years FY 2003 FY 2004<br />

($ in Millions)<br />

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

4 0.229<br />

4 0.229<br />

FY 2006 EQUIPMENT<br />

4 0.184<br />

4 0.184<br />

FY 2007 EQUIPMENT<br />

4 0.188<br />

4 0.188<br />

FY 2008 EQUIPMENT<br />

4 0.192<br />

4 0.192<br />

FY 2009 EQUIPMENT<br />

4 0.196<br />

4 0.196<br />

TO COMPLETE<br />

13 0.769 13 0.769<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008<br />

FY 2009<br />

TC TOTAL<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 0 0 0 4 0 0 0 4 0 0 0 4 0 0 0 4 0 0 0 4 0 0 13 33<br />

Out 0 0 0 0 0 0 0 0 0 0 1 1 2 0 1 1 2 0 1 1 2 0 1 1 2 0 1 1 2 13<br />

33<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 62 PAGE NO. 5F CLASSIFICATION: UNCLASSIFIED<br />

N/A<br />

N/A


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AN/FPN-63 PAR TYPE MODIFICATION: MODERNIZATION MODIFICATION TITLE ECP/OCIR X1018 CONFIGURATION UPGRADE<br />

DESCRIPTION/JUSTIFICATION:<br />

This ECP will address several maintenance and operator problems with the current PAR configuration. Human factors problems that have been identified with the current FPN-63 PAR will be corrected. Known<br />

obsolete high failure components and assemblies will be upgraded or replaced using state-of-the-art commercially available items to maintain reliability, availability and maintainability of the PAR. This ECP will<br />

improve the reliability, availability and supportability of AN/FPN-63 PAR by correcting Mean Time Between Failure (MTBF) problems being caused by high electronic failure rates of obsolete power supplies, circuit<br />

cards and other assemblies in the AN/FPN-63 PAR and therefore improve overall Operational Availability (Ao). This ECP is required to modernize the AN/FPN -63 PAR to ensure reliable, safe and effective Landing<br />

System operations at Naval Air Station (NAS) and Marine Corps Air Stations (MCAS) facilities worldwide.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

Non-Developmental Item (NDI)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

ECP - Configuration Upgrade<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

4 0.347 4 0.354 5 0.445 5 0.471 5 0.493 20 2.312 43 4.422<br />

PRODUCTION ENGINEERING 0.072 0.065 0.067 0.069 0.043 0.452 0.768<br />

INTEGRATED LOGISTICS SUPPORT 0.046 0.047 0.048 0.049 0.030 0.178 0.398<br />

QUALITY ASSURANCE<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

0.021 0.015 0.015 0.015 0.015 0.063 0.144<br />

INSTALL COST 4 0.170 4 0.152 5 0.195 5 0.200 5 0.205 20 0.861 43 1.783<br />

TOTAL PROCUREMENT 0.656 0.633 0.770 0.804 0.786 3.866 7.515<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

ITEM NO. 62 PAGE NO. 5G<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: FPN-63 PAR MODIFICATION TITLE: ECP/OCIR X1018 CONFIGURATION UPGRADE<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION:<br />

AIT<br />

ADMINISTRATIVE LEADTIME: 1 Month PRODUCTION LEADTIME: 2 Months<br />

CONTRACT DATES: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

DELIVERY DATE: FY2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

Cost: Prior Years FY 2003 FY 2004<br />

($ in Millions)<br />

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

4 0.170<br />

4 0.170<br />

FY 2006 EQUIPMENT<br />

4 0.152<br />

4 0.152<br />

FY 2007 EQUIPMENT<br />

5 0.195<br />

5 0.195<br />

FY 2008 EQUIPMENT<br />

5 0.200<br />

5 0.200<br />

FY 2009 EQUIPMENT<br />

5 0.205<br />

5 0.205<br />

TO COMPLETE<br />

20 0.861 20 0.861<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 0 0 0 4 0 0 0 4 0 0 0 5 0 0 0 5 0 0 0 5 0 0 20 43<br />

Out 0 0 0 0 0 0 0 0 0 0 1 1 2 0 1 1 2 0 1 2 2 0 1 2 2 0 1 2 2 20<br />

43<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 62 PAGE NO. 5H CLASSIFICATION: UNCLASSIFIED<br />

N/A<br />

N/A


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AN/FPN-63 PAR TYPE MODIFICATION: MODERNIZATION MODIFICATION TITLE: ECP/OCIR X1018 ANTENNA UPGRADE<br />

DESCRIPTION/JUSTIFICATION:<br />

This ECP will improve the reliability, availability and supportability of existing Antennas via the installation of state-of-the-art bearings and precision mating brackets and surfaces to correct Mean Time Between Failure (MTBF)<br />

problems being caused by high mechanical failure rates of the antennas and therefore improve the overall Operational Availability (Ao) of the AN/FPN-63 PAR. This ECP is required modernize the AN/FPN -63 PAR to ensure reliable,<br />

safe and effective Landing System operations at Naval Air Station (NAS) and Marine Corps Air Stations (MCAS) facilities worldwide.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

Non-Developmental Item (NDI)<br />

Prior Years<br />

FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

ECP - Antenna Upgrade<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

6 0.379 6 0.383 6 0.382 5 0.334 23 1.478<br />

PRODUCTION ENGINEERING 0.200 0.050 0.202 0.056 0.508<br />

INTEGRATED LOGISTICS SUPPORT 0.192 0.052 0.123 0.054 0.421<br />

QUALITY ASSURANCE<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

0.027 0.022 0.012 0.010 0.071<br />

INSTALL COST 6 0.114 6 0.120 6 0.126 5 0.110 23 0.470<br />

TOTAL PROCUREMENT 0.912 0.627 0.845 0.564 2.948<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

ITEM NO. 62 PAGE NO. 5I<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: FPN-63 PAR MODIFICATION TITLE: ECP/OCIR X1018ANTENNA UPGRADE<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION:<br />

AIT<br />

ADMINISTRATIVE LEADTIME: 1 Month PRODUCTION LEADTIME: 2 Months<br />

CONTRACT DATES: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

DELIVERY DATE: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

Cost: Prior Years FY 2003 FY 2004<br />

($ in Millions)<br />

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

6 0.114<br />

6 0.114<br />

FY 2006 EQUIPMENT<br />

6 0.120<br />

6 0.120<br />

FY 2007 EQUIPMENT<br />

6 0.126<br />

6 0.126<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

5 0.110<br />

5 0.110<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 0 0 0 2 2 2 0 2 2 2 0 2 2 2 0 2 2 1 0 0 0 0 0 23<br />

Out 0 0 0 0 0 0 0 0 0 0 2 2 2 0 2 2 2 0 2 2 2 0 2 2 1 0 0 0 0 0<br />

23<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 62 PAGE NO. 5J CLASSIFICATION: UNCLASSIFIED<br />

N/A<br />

N/A


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AN/FPN-63 PAR TYPE MODIFICATION: MODERNIZATION MODIFICATION TITLE: ECP/OCIR X1018 MODULATOR<br />

DESCRIPTION/JUSTIFICATION:<br />

This ECP will improve the reliability, availability and supportability of the existing modulator assembly via the replacement of its obsolete Silicon Controrred Rectifier (SCR) modulator driver circuit card with a state-ofthe-art<br />

Isolated Bipolar Gated Transitor (IBGT) modulator driver circuit card. This ECP will correct Mean Time Between Failure (MTBF) problems being caused by high failure rates of the SCR modulator driver circuit<br />

cards. This ECP will therefore improve the overall Operational Availability (Ao) of the AN/FPN-63 PAR. This ECP is required to modernize the AN/FPN -63 PAR and help ensure reliable, safe and effective Landing<br />

System operations at Naval Air Station (NAS) and Marine Corps Air Stations (MCAS) facilities worldwide. This is a critically required ECP since the SCRs presently in use are out of production and stock levels will be<br />

exausted before required funding can be obtained for this effort.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

Non-Developmental Item (NDI)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

ECP - Modulator Board Upgrade<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

13 0.439 13 0.451 26 0.890<br />

PRODUCTION ENGINEERING 0.061 0.062 0.123<br />

INTEGRATED LOGISTICS SUPPORT 0.050 0.051 0.101<br />

QUALITY ASSURANCE<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

0.013 0.013 0.026<br />

INSTALL COST 13 0.065 13 0.065 26 0.130<br />

TOTAL PROCUREMENT 0.628 0.642 1.270<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

ITEM NO. 62 PAGE NO. 5K<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: FPN-63 PAR MODIFICATION TITLE: ECP/OCIR X1018 MODULATOR<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION:<br />

AIT<br />

ADMINISTRATIVE LEADTIME: 1 Month PRODUCTION LEADTIME: 2 Months<br />

CONTRACT DATES: FY 2003: N/A<br />

FY 2004: N/A FY 2005:<br />

DELIVERY DATE: FY 2003: N/A<br />

FY 2004: N/A FY 2005:<br />

Cost: Prior Years FY 2003 FY 2004<br />

($ in Millions)<br />

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

13 0.065<br />

13 0.065<br />

FY 2006 EQUIPMENT<br />

FY 2007 EQUIPMENT<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

13 0.065<br />

13 0.065<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 0 0 0 13 0 0 0 13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 26<br />

Out 0 0 0 0 0 0 0 0 0 0 3 5 5 0 3 5 5 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

26<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 62 PAGE NO. 5L CLASSIFICATION: UNCLASSIFIED<br />

N/A<br />

N/A


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTE AN/FRN-42, AN/URN-25,<br />

OE-258A/URN<br />

DESCRIPTION/JUSTIFICATION:<br />

TYPE MODIFICATION: MODERNIZATION<br />

MODIFICATION TITLE: X1019 ECP/OCIR TACAN SHELTER & BEACON UPGRADES<br />

Shore Station TACAN system upgrade ECPs will include replacement of 15 severely deteriorated shelters, and employ COTS upgrade to Beacon.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

Non-Developmental Item (NDI)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008<br />

FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

ECP BEACON 16 1.600 16 1.600 30 3.000 42 4.410 104 10.610<br />

ECP SHELTER UPGRADE<br />

ECP 4<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

2 0.550 2 0.560 2 0.570 2 0.580 2 0.590 5 1.520 15 4.370<br />

ILS 0.055 0.056 0.132 0.046 0.047 0.151 0.487<br />

PE 0.295 0.314 0.072 0.066 0.067 0.211 1.025<br />

QA 0.015 0.029 0.042 0.021 0.022 0.069 0.198<br />

ATE<br />

INTERIM CONTRACTOR SUPPORT<br />

0.013 0.025 0.038<br />

INSTALL COST 2 0.116 2 0.118 18 0.376 18 0.382 79 1.682 119 2.674<br />

TOTAL PROCUREMENT 0.915 1.088 2.559 2.689 4.108 8.043 19.402<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

ITEM NO. 62 PAGE NO. 5M<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AN/FRN-42, AN/URN-25,<br />

OE-258A/URN<br />

INSTALLATION INFORMATION:<br />

TYPE MODIFICATION: MODERNIZATION MODIFICATION TITLE: ECP/OCIR X1019 TACAN SHELTER & BEACON UPGRADES<br />

METHOD OF IMPLEMENTATION:<br />

AIT<br />

ADMINISTRATIVE LEADTIME: 6 MONTHS<br />

PRODUCTION LEADTIME:<br />

6 MONTHS<br />

CONTRACT DATES: FY 2003: N/A<br />

FY 2004: N/A FY 2005:<br />

DELIVERY DATE: FY 2003: N/A<br />

FY 2004: N/A FY 2005:<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

2 0.116<br />

2 0.116<br />

FY 2006 EQUIPMENT<br />

2 0.118<br />

2 0.118<br />

FY 2007 EQUIPMENT<br />

18 0.376<br />

18 0.376<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

18 0.382<br />

18 0.382<br />

TO COMPLETE<br />

79 #### 79 1.682<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009<br />

TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 7 11 0 0 7 11 0 0 79<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 2 0 8 8 2 0 8 8 2 79<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 62 PAGE NO. 5N CLASSIFICATION: UNCLASSIFIED<br />

N/A<br />

N/A<br />

TOTAL<br />

119<br />

119


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AN/FRN-42, AN/URN-25,<br />

OE-258A/URN<br />

DESCRIPTION/JUSTIFICATION:<br />

Shore Station TACAN Antenna Upgrade ECP will improve antenna lightning protection.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

TYPE MODIFICATION: MODERNIZATION<br />

Non-Developmental Item (NDI)<br />

MODIFICATION TITLE: ECP/OCIR X1019 TACAN ANTENNA UPGRADE<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008<br />

FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

ECP ANTENNA UPGRADE<br />

ECP 4<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

6 0.330 24 1.476 30 1.806<br />

ILS 0.087 0.138 0.225<br />

PE 0.039 0.138 0.177<br />

QA 0.008 0.052 0.060<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 6 0.102 24 0.564 30 0.666<br />

TOTAL PROCUREMENT 0.566 2.368 2.934<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

ITEM NO. 62 PAGE NO. 5O<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AN/FRN-42, AN/URN-25,<br />

OE-258A/URN<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION:<br />

AIT<br />

ADMINISTRATIVE LEADTIME: 2 MONTHS<br />

PRODUCTION LEADTIME:<br />

TYPE MODIFICATION: MODERNIZATION<br />

3 MONTHS<br />

CONTRACT DATES: FY 2003: N/A FY 2004: N/A FY 2005:<br />

DELIVERY DATE: FY 2003: N/A FY 2004: N/A FY 2005:<br />

MODIFICATION TITLE: ECP/OCIR X1019 TACAN ANTENNA UPGRADE<br />

Cost: Prior Years FY 2003 FY 2004<br />

($ in Millions)<br />

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT 6 0.102<br />

6 0.102<br />

FY 2006 EQUIPMENT<br />

6 0.108<br />

6 0.108<br />

FY 2007 EQUIPMENT<br />

6 0.114<br />

6 0.114<br />

FY 2008 EQUIPMENT<br />

6 0.120<br />

6 0.120<br />

FY 2009 EQUIPMENT<br />

6 0.126<br />

6 0.126<br />

TO COMPLETE 24 0.564 24 0.564<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007<br />

FY 2008 FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 0 0 0 6 0 0 0 6 0 0 0 6 0 0 0 6 0 0 0 6 0 0<br />

Out 0 0 0 0 0 0 0 0 0 0 2 2 2 0 3 3 0 0 3 3 0 0 3 3 0 0 3 3 0<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 62 PAGE NO. 5P CLASSIFICATION: UNCLASSIFIED<br />

N/A<br />

N/A<br />

TC<br />

24<br />

24<br />

TOTAL<br />

54<br />

54


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE BLI # 284700<br />

OTHER PROCUREMENT, NAVY/ BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT Fleet Area Control and Surveillance Facility (FACSFAC) ( 42TT)<br />

Program Element for Code B Items: Other Related Program Elements<br />

Not Applicable Not Applicable<br />

Prior ID To<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions) $149.5 N/A 4.221 4.305 3.712 3.885 4.012 4.061 4.157 CONT CONT<br />

DESCRIPTION:<br />

Fleet Area Control and Surveillance Facilities (FACSFAC) are established to provide multi-mission Air Traffic Control and training area management services to the fleet. This service<br />

includes scheduling of surface, subsurface, and air operations in off-shore operating areas, surveillance control of air operations and related training evolutions such as Ground Control<br />

Intercept and Air Combat Maneuvers. The basic purpose of FACSFAC is to prevent mid-air collisions between military and civilian aircraft and to be responsible for the management and<br />

protection of Navy training airspace.<br />

Eight FACSFAC system supported sites have been established as follows: FACSFAC Virginia Capes VA, FACSFAC Jacksonville FL, FACSFAC Caribbean (Key West FL), FACSFAC<br />

Pensacola FL, FACSFAC San Diego CA, FACSFAC Pearl Harbor HI, NAS Fallon NV and NAWCAD St. Inigoes MD. It is critical to replace FACSFAC equipment in a planned manner to<br />

maintain interoperability within the National Airspace System (NAS) and replace unsupportable obsolescent equipment. The FAA and DoD will transition to space-based Air Traffic<br />

Management and Digital Communications.<br />

Funding in FY 05 provides for procurement and installation of the following:<br />

FY 05: 1 Mode S interface (TT171); 1 Communication System Upgrade, (TT180); 5 Flight Planning System Upgrades (TT181); and 8 (ECPs/OCIRs) (TT145).<br />

DD Form 2454, JUN 86 ITEM NO. 63 PAGE NO. 1<br />

CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS<br />

P-40a<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA2-COMMUNICATIONS AND ELECTRONICS EQUIPMENT<br />

ID Prior<br />

Procurement Items Code Years FY2003 FY2004 FY2005 Total<br />

TT171 MODE S N/A<br />

INTERFACE<br />

QTY 1 1<br />

FUNDING 0.480 0.48<br />

TT176 DISPLAY N/A<br />

REPLACEMENTS<br />

QTY 73 73<br />

FUNDING 7.553 7.553<br />

TT177 FACTS 3200 N/A<br />

RADAR INPUT<br />

CAPACITY UPGRADE<br />

QTY 5 3 8<br />

FUNDING 0.960 2.583 1.491 5.034<br />

TT179 AUTOMATIC N/A<br />

DEPENDENT<br />

SURVEILLANCE (ADS)<br />

QTY 2 2<br />

FUNDING 0.384 0.384<br />

TT180 COMMUNICATION N/A<br />

SYSTEM UPGRADE<br />

QTY 1 1<br />

FUNDING 0.333 0.333<br />

TT181 FLIGHT PLANNING N/A<br />

SYSTEM UPGRADE<br />

QTY 5 5<br />

FUNDING 0.574 0.574<br />

TT 184 APPROACH CONTROL<br />

INTERFACE UPGRADE<br />

N/A<br />

QTY 0<br />

FUNDING 0.000<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 63 PAGE NO. 2<br />

DATE:<br />

Fleet Area Control and Surveillance Facility (FACSFAC) (42TT)<br />

UNCLASSIFIED<br />

February 2004


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS DATE:<br />

P-40a February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA2-COMMUNICATIONS AND ELECTRONICS EQUIPMENT Fleet Area Control and Surveillance Facility (FACSFAC) (42TT)<br />

ID Prior<br />

Procurement Items Code Years FY 2003 FY 2004 FY 2005 Total<br />

TT185 DAAS<br />

CONVERSION<br />

QTY 0<br />

FUNDING 0.000<br />

TT145 ECPs/OCIRs<br />

QTY VAR VAR 6 8 CONT.<br />

FUNDING 12.365 0.330 0.320 0.238 CONT.<br />

VARIOUS N/A 104.728 104.728<br />

OTHER COSTS N/A 23.957 1.308 2.110 2.087 CONT.<br />

TOTAL FUNDING 149.563 CONT.<br />

4.221 4.305 3.712<br />

CONT.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 63 PAGE NO. 3 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System<br />

P-5<br />

APPROPRIATION/BUDGET ACTIVITY ID Code<br />

OTHER PROCUREMENT, NAVY/BA2-COMMUNICATIONS AND ELECTRONICS<br />

EQUIPMENT N/A Fleet Area Control and Surveillance Facility (FACSFAC) (42TT)<br />

COST<br />

CODE<br />

ELEMENT OF COST ID<br />

Code<br />

Prior<br />

Years<br />

FY 2003 FY 2004<br />

FY2005<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

TT145 FACSFAC ECPs/OCIRs N/A 12,365 VAR 330 6 53 320 8 30 238<br />

TT171 MODE S INTERFACE N/A 1 480 480<br />

TT176 DISPLAY REPLACEMENTS N/A 7,553<br />

TT177* FACTS 3200 RADAR INPUT N/A 960 5 517 2,583 3 497 1,491<br />

CAPACITY UPGRADE<br />

TT179 AUTOMATIC DEPENDENT N/A 2 192 384<br />

SURVEILLANCE (ADS) 2/<br />

TT180 COMMUNICATION SYSTEM UPGRADE N/A 1 333 333<br />

TT181 FLIGHT PLANNING SYS UPGRADE N/A 5 115 574<br />

TT184 APPROACH CONTROL INTERFACE UPGRADE N/A<br />

TT185 DAAS CONVERSION N/A<br />

TT800 INTEGRATED LOGISTICS SUPPORT N/A 3,847 410 350 408<br />

TT830 PRODUCTION ENGINEERING N/A 9,502 510 571 548<br />

TT900 INSTALLATION (NON-FMP) N/A 10,483 388 1,189 1,131<br />

TT990 INITIAL TRAINING N/A 125<br />

VARIOUS 1/ N/A 104,728<br />

1/ The amount identified against this cost element reflects total prior year funding associated with cost elements no longer financed in FY 2002 and beyond<br />

2/ TT179 Title changed from Global Positioning System to Automatic Dependent Surveillance (ADS) to comply with Federal Aviation Administration (FAA) terminology<br />

DATE:<br />

February 2004<br />

149,563 4,221 4,305 3,712<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 63 PAGE NO. 4 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OTHER PROCUREMENT, NAVY/BA2-COMMUNICATIONS AND ELECTRONICS<br />

N/A<br />

EQUIPMENT<br />

Fleet Area Control and Surveillance Facility 42TT<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

D. REMARKS<br />

(000)<br />

A. DATE<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 63 Classification:<br />

PAGE 5 UNCLASSIFIED<br />

No contract awards planned<br />

February 2004


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: FACSFAC TYPE MODIFICATION: MODERNIZATION MODIFICATION TITLE:<br />

DESCRIPTION/JUSTIFICATION:<br />

The ECP/OCIR program (TT145) provides for the procurement, and or modification, of critically needed electronic systems/equipment needed at Fleet Area Control and Surveillance Facilities<br />

(FACSFACs). ECP/OCIR procurements replace and modernize costly-to-maintain systems and equipments in order to increase Air Traffic Control efficiency and safety, improve affordable readiness, and<br />

reduce total ownership costs.The following planned ECPs/OCIRs include but are not limited to: FACSFAC San Diego Radio Remote Control OCIR/ ECP for Display Technology Refresh , and<br />

NAVSKED OCIR for all FACSFACs.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES<br />

FINANCIAL PLAN (IN MILLIONS)<br />

Non-Developmental Item (NDI)<br />

TT145 ECPs/OCIRs<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT<br />

ECP VAR 12.365 VAR 0.330 6 0.320 8 0.238 8 0.243 8 0.125 8 0.128 8 0.128 CONT CONT CONT CONT<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

PRODUCTION ENGINEERING 0.086 0.270 0.146 0.266 0.151 0.079 0.187 0.092 CONT CONT CONT CONT<br />

INTEGRATED LOGISTICS SUPPORT 0.070 0.229 0.225 0.139 0.050 0.201 0.051 CONT CONT CONT CONT<br />

INITIAL TRAINING CONT CONT CONT CONT<br />

OTHER 131.516 131.516<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST VAR 4.066 VAR 0.388 6 0.459 8 0.315 8 0.093 8 0.097 8 0.383 8 0.314 CONT CONT CONT CONT<br />

TOTAL PROCUREMENT 148.103 1.217 0.925 1.044 0.626 0.351 0.899 0.585 CONT CONT<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

ITEM NO. 63 PAGE NO. 6<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: FACSFAC MODIFICATION TITLE:<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION:<br />

AIT<br />

TT145 ECPs/OCIRs<br />

ADMINISTRATIVE LEADTIME: 2 Months PRODUCTION LEADTIME: 4 Months<br />

CONTRACT DATES: FY 2003:<br />

N/A<br />

FY 2004: N/A<br />

FY 2005<br />

DELIVERY DATE: FY 2003:<br />

N/A<br />

FY 2004: N/A<br />

FY 2005<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005<br />

($ in Millions)<br />

FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $<br />

$ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

VAR 4.066<br />

VAR 4.066<br />

FY 2003 EQUIPMENT<br />

VAR 0.388 VAR 0.388<br />

FY 2004 EQUIPMENT<br />

6 0.459<br />

6 0.459<br />

FY 2005 EQUIPMENT<br />

8 0.315 8 0.315<br />

FY 2006 EQUIPMENT<br />

8 0.093<br />

8 0.093<br />

FY 2007 EQUIPMENT<br />

8 0.097 8 0.097<br />

FY 2008 EQUIPMENT<br />

8 0.383<br />

8 0.383<br />

FY 2009 EQUIPMENT<br />

8 0.314<br />

8 0.314<br />

TO COMPLETE<br />

CONT CONT CONT CONT<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007<br />

FY 2008<br />

FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 6 0 0 0 8 0 0 0 8 0 0 0 8 0 0 0 8 0 0 0 8 0<br />

Out 0 0 0 0 0 0 0 0 6 0 0 0 8 0 0 0 8 0 0 0 8 0 0 0 8 0 0 0 8<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 63 PAGE NO. 7 CLASSIFICATION: UNCLASSIFIED<br />

N/A<br />

N/A<br />

TC<br />

CONT<br />

CONT<br />

TOTAL<br />

CONT<br />

CONT


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: FACSFAC TYPE MODIFICATION: MODERNIZATION MODIFICATION TITLE: TT171 MODE S INTERFACE<br />

DESCRIPTION/JUSTIFICATION:<br />

Upgrade the AN/FYK-17 FACSFAC System to meet requirements of FAA Mode “S” Program. Mode “S” is an enhanced aircraft transponder system with message data link capability. The FAA is<br />

implementing Mode “S” to reduce the requirement for ground-to-air voice communications. In accordance with DoD Directive 5030.19, “DoD Responsibilities on Federal Aviation and National Airspace System<br />

Matters” (June 15,1997), the DoD must cooperate with the FAA for the effective and efficient management of the National Airspace System (NAS), and ensure operational and equipment interoperability<br />

between the Department of Defense and FAA.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES<br />

FINANCIAL PLAN (IN MILLIONS)<br />

Non-Developmental Item (NDI)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT 1 0.480 1 0.490 1 0.500 2 1.154 3 1.821 8 4.445<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

PRODUCTION ENGINEERING 0.020 0.020 0.019 0.129 0.203 0.391<br />

INTEGRATED LOGISTICS SUPPORT 0.020 0.026 0.030 0.110 0.170 0.356<br />

INITIAL TRAINING<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 1 0.138 1 0.141 3 0.432 3 0.447 8 1.158<br />

TOTAL PROCUREMENT 0.520 0.674 0.690 1.825 2.641 6.350<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 63 PAGE NO. 8 CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: FACSFAC MODIFICATION TITLE: TT171 MODE S INTERFACE<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION:<br />

AIT<br />

ADMINISTRATIVE LEADTIME: 2 Months PRODUCTION LEADTIME: 4 Months<br />

CONTRACT DATES: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

DELIVERY DATE: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

1 0.138<br />

1 0.138<br />

FY 2006 EQUIPMENT<br />

1 0.141<br />

1 0.141<br />

FY 2007 EQUIPMENT<br />

1 0.144<br />

1 0.144<br />

FY 2008 EQUIPMENT<br />

2 0.288<br />

2 0.288<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

3 0.447<br />

3 0.447<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 1 0 0 0 1 1 0 1 1 1 0 8<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 1 0 1 1 0 1 1 1 0<br />

8<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 63 PAGE NO. 9 CLASSIFICATION: UNCLASSIFIED<br />

N/A<br />

N/A


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: FACSFAC TYPE MODIFICATION: MODERNIZATION MODIFICATION TITLE: TT177 RADAR INPUT CAPACITY UPGRADE<br />

DESCRIPTION/JUSTIFICATION:<br />

Increases input sensors processed to 15. Encompasses replacement of main processors and re-host of system software. The number of sensors available as data sources for FACSFAC has increased and will<br />

continue to increase as the result of several FAA Programs. In order to maintain situational awareness and control of the FACSFAC airspace and adjoining airspaces, the information available from all sources<br />

must be presented to the FACSFAC Controllers.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES<br />

FINANCIAL PLAN (IN MILLIONS)<br />

Non-Developmental Item (NDI)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT 0.960 5 2.583 3 1.491 8 5.034<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

PRODUCTION ENGINEERING 0.400 0.240 0.350 0.163 1.153<br />

INTEGRATED LOGISTICS SUPPORT 0.100 0.181 0.300 0.110 0.691<br />

INITIAL TRAINING<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 4 0.470 4 0.480 8 0.950<br />

TOTAL PROCUREMENT 1.460 3.004 2.611 0.753 7.828<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

ITEM NO. 63 PAGE NO. 10<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: FACSFAC MODIFICATION TITLE: TT177 RADAR INPUT CAPACITY UPGRADE<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION:<br />

AIT<br />

ADMINISTRATIVE LEADTIME: Various PRODUCTION LEADTIME: Various<br />

CONTRACT DATES: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

DELIVERY DATE: FY 2003:<br />

N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

4 0.470 1 0.120 5 0.590<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

FY 2006 EQUIPMENT<br />

FY 2007 EQUIPMENT<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

3 0.360 3 0.360<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 1 1 1 1 1 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

Out 0 0 0 0 0 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 63 PAGE NO. 5E CLASSIFICATION: UNCLASSIFIED<br />

N/A<br />

N/A<br />

TC<br />

0<br />

0<br />

TOTAL<br />

8<br />

8


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: FACSFAC TYPE MODIFICATION: MODERNIZATION MODIFICATION TITLE: TT179 AUTOMATIC DEPENDENT SURVEILLANCE<br />

DESCRIPTION/JUSTIFICATION:<br />

Provide Automatic Dependent Broadcast (ADS) capability to FACSFACs to meet requirements of FAA Free Flight Program. ADS is an enabler for the FAA’s Free Flight Program which will increase capacity<br />

and efficiency of the National Airspace System (NAS). Using the 1090 MHz Extended Squitter, Universal Asynchronous Transmitter (UAT), and satelite data link, aircraft in OCEANIC (ADS-A) and CONUS<br />

(ADS-B) areas will broadcast their position to ATC Facilities and other ADS-equipped aircraft allowing Controllers and Pilots to allow reduction of aircraft separation and improve approach capability. ADS will<br />

also provide increased situational awareness to Controllers abd Pilots thus providing increased safety.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES<br />

FINANCIAL PLAN (IN MILLIONS)<br />

Non-Developmental Item (NDI)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT 2 0.384 2 0.384 2 0.392 2 0.400 8 1.560<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

PRODUCTION ENGINEERING 0.075 0.068 0.066 0.106 0.315<br />

INTEGRATED LOGISTICS SUPPORT 0.050 0.050 0.060 0.080 0.240<br />

INITIAL TRAINING<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 2 0.260 2 0.260 2 0.280 2 0.300 8 1.100<br />

TOTAL PROCUREMENT 0.769 0.762 0.798 0.886 3.215<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

ITEM NO. 63 PAGE NO. 5F<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: FACSFAC MODIFICATION TITLE: TT179 AUTOMATIC DEPENDENT SURVEILLANCE<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION:<br />

AIT<br />

ADMINISTRATIVE LEADTIME: 2 Months PRODUCTION LEADTIME: 4 Months<br />

CONTRACT DATES: FY 2003 N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

DELIVERY DATE: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

2 0.260<br />

2 0.260<br />

FY 2006 EQUIPMENT<br />

2 0.260<br />

2 0.260<br />

FY 2007 EQUIPMENT<br />

2 0.280<br />

2 0.280<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

2 0.300<br />

2 0.300<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 1 1 0 0 1 1 0 0 1 1 0 0 0 0 0 8<br />

Out 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 1 1 0 0 1 1 0 0 1 1 0 0 0 0 0 8<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 63 PAGE NO. 5G CLASSIFICATION: UNCLASSIFIED<br />

N/A<br />

N/A


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: FACSFAC TYPE MODIFICATION: MODERNIZATION MODIFICATION TITLE: TT180 COMMUNICATION SYSTEM UPGRADE<br />

DESCRIPTION/JUSTIFICATION:<br />

Upgrade the FACSFAC Operational Communications System to meet the requirements of the FAA Next Generation Communication (NEXCOM) Program, Existing FACSFAC UHF/VHF Radios will be<br />

replaced by the Multimode Digital Radio (MDR) and CM-300 UHF Radio. New VHF Data Link 3 (VDL-3) equipment will be installed. Voice switches/recorders/antennas will be replaced/upgraded. In order to<br />

resolve the frequency spectrum over crowding problem, the FAA is transitioning the NAS to Digital VHF Communications via the MDR. The FAA is also changing to a Next Generation Analog UHF Radio (CM-<br />

300). In accordance with DoD Directive 5030.19, “DoD Responsibilities on Federal Aviation and National Airspace System Matters” (June 15,1997), the DoD must cooperate with the FAA for the effective and<br />

efficient management of the National Airspace System (NAS), and ensure operational and equipment interoperability between the Department of Defense and FAA,<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES<br />

FINANCIAL PLAN (IN MILLIONS)<br />

Non-Developmental Item (NDI)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE 1 0.333 2 0.714 4 1.508 1 0.397 8 2.952<br />

EQUIPMENT<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

PRODUCTION ENGINEERING 0.006 0.006 0.006 0.006 0.024<br />

INTEGRATED LOGISTICS SUPPORT<br />

INITIAL TRAINING<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 1 0.038 2 0.104 4 0.180 1 0.048 8 0.370<br />

TOTAL PROCUREMENT 0.377 0.824 1.694 0.451 3.346<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

ITEM NO. 63 PAGE NO. 5H<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: FACSFAC MODIFICATION TITLE: TT180 COMMUNICATION SYSTEM UPGRADE<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION:<br />

AIT<br />

ADMINISTRATIVE LEADTIME: 2 Months PRODUCTION LEADTIME: 4 Months<br />

CONTRACT DATES: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

DELIVERY DATE: FY 2003:<br />

N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

1 0.038 1 0.038<br />

FY 2006 EQUIPMENT<br />

2 0.104 2 0.104<br />

FY 2007 EQUIPMENT<br />

4 0.180<br />

4 0.180<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

1 0.048 1 0.048<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 0 0 2 2 0 0 1 0 0 0 0 0<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 0 0 2 2 0 0 1 0 0 0 0 0<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 63 PAGE NO. 5I CLASSIFICATION: UNCLASSIFIED<br />

N/A<br />

N/A<br />

TC<br />

0<br />

0<br />

TOTAL<br />

8<br />

8


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: FACSFAC TYPE MODIFICATION: MODERNIZATION MODIFICATION TITLE: TT181 FLIGHT PLANNING SYSTEM UPGRADE<br />

DESCRIPTION/JUSTIFICATION:<br />

Obsolete Flight Data Input/Output (FDIO) equipment that is no longer logistically supported by the FAA will be replaced. The FACSFAC processing equipment will be directly interfaced with the FAA Flight Plan<br />

Transmission Network. Flight Plan data will be presented to the FACSFAC Controllers on their Display Consoles, eliminating the need for paper flight strips.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

Non-Developmental Item (NDI)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT 5 0.574 2 0.246 1 0.131 8 0.951<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

PRODUCTION ENGINEERING 0.093 0.133 0.018 0.244<br />

INTEGRATED LOGISTICS SUPPORT 0.053 0.056 0.010 0.119<br />

INITIAL TRAINING<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 2 0.298 4 0.564 2 0.320 8 1.182<br />

TOTAL PROCUREMENT 1.018 0.999 0.479 2.496<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

ITEM NO. 63 PAGE NO. 5J<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: FACSFAC MODIFICATION TITLE: TT181 FLIGHT PLANNING SYSTEM UPGRADE<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION:<br />

AIT<br />

ADMINISTRATIVE LEADTIME: 2 Months PRODUCTION LEADTIME: 4 Months<br />

CONTRACT DATES: FY 2003:<br />

N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

DELIVERY DATE: FY 2003:<br />

N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

2 0.298 3 0.423<br />

5 0.721<br />

FY 2006 EQUIPMENT<br />

1 0.141 1 0.160<br />

2 0.301<br />

FY 2007 EQUIPMENT<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

1 0.160<br />

1 0.160<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 8<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 8<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 63 PAGE NO. 5K CLASSIFICATION: UNCLASSIFIED<br />

N/A<br />

N/A


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: FACSFAC TYPE MODIFICATION: MODERNIZATION MODIFICATION TITLE: TT184 APPROACH CONT. INTERFACE UPGRADE<br />

DESCRIPTION/JUSTIFICATION:<br />

Provide an interface between FACSFACs and their respective FAA (Civilian) and Military Approach Facilities. Advancing technology in aircraft design and an increasing volume of air traffic is resulting in the<br />

need for more responsive air traffic control service. The requirement for rapid communications and inter-operability between air traffic control facilities is becoming a critical safety factor. This interface will<br />

allow the FACSFAC controllers to exchange information more efficiently with their counterparts in the local Approach Control Facilities. This will keep both facilities informed as to all aspects of the local air<br />

traffic situation which will enhance traffic management efficiency and flight safety. It will also facilitate unimpeded transit for Navy aircraft utilizing FACSFAC controlled airspace.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

Non-Developmental Item (NDI)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT 2 0.520 6 1.620 8 2.140<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

PRODUCTION ENGINEERING 0.086 0.312 0.398<br />

INTEGRATED LOGISTICS SUPPORT 0.075 0.234 0.309<br />

INITIAL TRAINING<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 1 0.250 7 1.820 8 2.070<br />

TOTAL PROCUREMENT 0.931 3.986 4.917<br />

Exhibit P-3A (Individual Modification) CLASSIFICATION:<br />

ITEM NO. 63 PAGE NO. 5L<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: FACSFAC MODIFICATION TITLE: TT184 APPROACH CONTROL INTERFACE UPGRADE<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION:<br />

AIT<br />

ADMINISTRATIVE LEADTIME: 2 Months PRODUCTION LEADTIME: 4 Months<br />

CONTRACT DATES: FY 2003:<br />

N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

DELIVERY DATE: FY 2003:<br />

N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

FY 2006 EQUIPMENT<br />

FY 2007 EQUIPMENT<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

1 0.250 1 0.255 2 0.505<br />

TO COMPLETE<br />

6 1.565 6 1.565<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 63 PAGE NO. 5M CLASSIFICATION: UNCLASSIFIED<br />

N/A<br />

N/A<br />

TC<br />

6<br />

7<br />

TOTAL<br />

8<br />

8


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY BA-2 COMMUNICATION AND P-1 ITEM NOMENCLATURE BLI 285100<br />

OTHER PROCUREMENT, NAVY ELECTRONIC EQUIPMENT IDENTIFICATION SYSTEMS NAVAIRSYSCOM (42MT)<br />

Program Element for Code B Items: Other Related Program Elements<br />

0204228N NOT APPLICABLE<br />

Prior ID To<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions) 167.8 A $29.7 $21.7 $18.3 $0.0 $0.0 $0.0 $0.0 Cont Cont<br />

DESCRIPTION: The Identification Systems program funds the following procurements: AN/UPX-37 Digital Interrogator (DI), Common Digital Transponder AN/APX-118, AN/UPX-29(V) ,<br />

SARTIS and MK XIIA Mode 5.<br />

The Air Traffic Control Radio Beacon System, Identification Friend or Foe, MK XII System (AIMS) is a DOD directed tri-service program designed to provide a universal air traffic control radar<br />

beacon system compatible with the National Airspace System Program. It provides a secure identification system for military use on all combatant ships, selected auxiliaries, patrol craft, and<br />

selected Coast Guard ships by allowing all friendly forces to identify each other and neutral forces. The Mark XII system supports several missions such as anti-airwarfare, aerial bombardment,<br />

and naval attack.<br />

The purpose of the AN/UPX-37 Digital Interrogator (DI), and Common Digital Transponder (CXP), is to replace 20-25 year old equipment with a reliability and maintenance enhancement<br />

through the use of COTS/NDI form/fit/function equipment. These new systems will be enhanced with state-of-the-art technology and open systems architecture, and will be purchased with<br />

existing MK XII Improvements funding. Growth capability to incorporate Mode 5 and Mode S functionality is incorporated in equipment design.<br />

The AN/UPX-24(V) Field Change 5 provides open systems architecture for increased expansion capability. The AN/UPX-24(V) Mode S provides improved shipboard combat identification and<br />

increases the probability of identification of commercial and neutral aircraft.<br />

The Interrogator System AN/UPX-29(V) is deployed on high capability, state of the art surface platforms that require Identification Friend or Foe (IFF) operational performance beyond that<br />

provided by a standard Mark XII system for combat identification.<br />

SARTIS provides a Non-Cooperative Target Identification capability for surface platforms. SARTIS I is installed on CG47-CG51, SARTIS II is a COTS/NDI improvement to be installed on CG52<br />

CG73.<br />

FY05 funds the procurement of 30 AN/UPX-37 Digital Interrogators, 26 AN/APX-118 Common Digital Transponders, and 12 AN/UPX-24(V) FC 5s.<br />

Installing Agent: Shipyard, Alteration Teams (AIT). When installation to be made: ROH/RAV/SRA.<br />

Type ship to receive equipment: An IFF system is on every ship in the fleet. SARTIS is being installed on CG47 class.<br />

DD Form 2454, JUN 86 ITEM NO. 64 PAGE NO. 1<br />

CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS DATE:<br />

P-40a February 2004<br />

APPROPRIATION/BUDGET ACTIVITY BA-2 COMMUNICATION AND P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY ELECTRONIC EQUIPMENT IDENTIFICATION SYSTEMS NAVAIRSYSCOM (42MT)<br />

ID Prior<br />

Procurement Items Code Years FY 2003 FY 2004 FY 2005 Total<br />

MT031 AN/UPX-37 DIGITAL A<br />

INTERROGATOR (DI)<br />

QTY 232 88 61 30 411<br />

FUNDING 19.599 7.970 5.775 2.891 36.235<br />

MT032 MK XII AN/APX-118 (CXP) A<br />

COMMON DIGITAL TRANSPONDER<br />

QTY 46 73 58 26 203<br />

FUNDING 3.315 2.025 1.798 1.222 8.36<br />

MT034 AN/UPX-24(V) FC5 A<br />

QTY 10 7 8 12 37<br />

FUNDING 2.758 2.340 2.912 4.464 12.474<br />

MT035 AN/UPX-24(V) MODE S A<br />

QTY 0<br />

FUNDING 0.000<br />

MT036 AN/UPX-29 (V) A<br />

INTERROGATOR SYSTEM<br />

QTY 2 2<br />

FUNDING 6.500 6.500<br />

MT037 MK XIIA MODE 5 B<br />

QTY 0<br />

FUNDING 0<br />

MT038 TACAN A<br />

QTY 0<br />

FUNDING 0.000<br />

VARIOUS 76.646 76.646<br />

OTHER COSTS 65.451 10.833 11.183 9.719 CONT<br />

TOTAL FUNDING 167.769 29.668 21.668 18.296 CONT<br />

CLASSIFICATION:<br />

ITEM NO. 64 PAGE NO. 2<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy BA-2 COMMUNICATION AND<br />

ELECTRONIC EQUIPMENT A IDENTIFICATION SYSTEMS NAVAIRSYSCOM (42MT)<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

February 2004<br />

COST ELEMENT OF COST ID Prior FY 2003<br />

FY 2004<br />

FY 2005<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

MT031 MK XII DIGITAL INTERROGATOR A 19,599 88 91 7,970 61 95 5,775 30 96 2,891<br />

MT032 MK XII COMMON DIGITAL TRANSPONDER A 3,315 73 28 2,025 58 31 1,798 26 47 1,222<br />

MT034 AN/UPX-24(V) FC5 A 2,758 7 334 2,340 8 364 2,912 12 372 4,464<br />

MT035 AN/UPX-24(V) MODE S A<br />

MT036 AN/UPX-29 INTERROGATOR SYSTEM A 2 3250 6,500<br />

MT037 MK XIIA MODE 5 B<br />

MT038 TACAN B<br />

MT110 SARTIS A 7,173<br />

MT700 AN/UPX-29(V) IMPROVEMENTS (N76) A 17,619<br />

MT800 INTEGRATED LOGISTICS SUPPORT N/A 11,537 1,178 1,548 1,194<br />

MT830 PRODUCTION ENGINEERING N/A 26,130 3,012 4,601 2,160<br />

MT840 QUALITY ASSURANCE N/A 60<br />

MT850 PRODUCT IMPROVEMENT N/A 4,973 3,364 1,051 218<br />

MT860 ACCEPTANCE TEST & EVALUATION N/A 7,435 558 1,078 469<br />

MT870 DEPOT N/A 663 155 286<br />

MT900 INSTALLATION OF EQUIPMENT (NON-FMP) N/A 10,465 574 357 416<br />

MT910 INSTALLATION OF EQUIPMENT (FMP) N/A 2,754 1,757 2,228 5,045<br />

MT990 INITIAL TRAINING N/A 1,434 235 34 217<br />

VARIOUS 1/ 51,854<br />

167,769 29,668 21,668 18,296<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 64 PAGE NO. 3<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy BA-2 COMMUNICATION AND<br />

ELECTRONIC EQUIPMENT A IDENTIFICATION SYSTEMS NAVAIRSYSCOM (42MT)<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST Total<br />

CODE<br />

Quantity Cost<br />

MT031 MK XII DIGITAL INTERROGATOR 179 36,235<br />

MT032 MK XII COMMON DIGITAL TRANSPONDER 157 8,360<br />

MT034 AN/UPX-24(V) FC5 27 12,474<br />

MT035 AN/UPX-24(V) MODE S 0 0<br />

MT036 AN/UPX-29 INTERROGATOR SYSTEM 2 6,500<br />

MT037 MK XIIA MODE 5 0 0<br />

MT038 TACAN 0 0<br />

MT110 SARTIS 0 7,173<br />

MT700 AN/UPX-29(V) IMPROVEMENTS (N76) 17,619<br />

MT800 INTEGRATED LOGISTICS SUPPORT CONT<br />

MT830 PRODUCTION ENGINEERING CONT<br />

MT840 QUALITY ASSURANCE CONT<br />

MT850 PRODUCT IMPROVEMENT CONT<br />

MT860 ACCEPTANCE TEST & EVALUATION CONT<br />

MT870 DEPOT CONT<br />

MT900 INSTALLATION OF EQUIPMENT (NON-FMP) CONT<br />

MT910 INSTALLATION OF EQUIPMENT (FMP) CONT<br />

MT990 INITIAL TRAINING CONT<br />

VARIOUS 1/<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 64 PAGE NO. 3A<br />

UNCLASSIFIED<br />

February 2004<br />

CONT


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy BA-2 COMMUNICATION AND IDENTIFICATION SYSTEMS 42MT<br />

ELECTRONIC EQUIPMENT NAVAIRSYSCOM (42MT)<br />

CONTRACT DATE OF TECH DATA DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW ? AVAILABLE<br />

(000)<br />

MT031 MK XII DI<br />

FY-03 88 91.0 NAVAIR SS/FP Option BAE, GREENLAWN, NY Dec-02 Oct-03 YES<br />

FY-04 61 94.7 NAVAIR SS/FP Option BAE, GREENLAWN, NY Dec-03 Dec-04 YES<br />

FY-05 30 96.4 NAVAIR SS/FP Option BAE, GREENLAWN, NY Oct-04 Oct-05 YES<br />

MT032 MK XII CXP<br />

FY-03 73 27.6 NAVAIR Oct-02 C/FP BAE, GREENLAWN, NY May-03 Mar-04 YES<br />

FY-04 58 31.0 NAVAIR C/FP Option BAE, GREENLAWN, NY Mar-04 Mar-05 YES<br />

FY-05 26 47.0 NAVAIR C/FP Option BAE, GREENLAWN, NY Mar-05 Mar-06 YES<br />

MT034 AN/UPX-24(V) FC5<br />

FY-03 7 334.3 NAVAIR Jul-02 FFP LITTON, VAN NUYS, CA Sep-03 Sep-04 YES<br />

FY-04 8 364.0 NAVAIR C/FP Option LITTON, VAN NUYS, CA Mar-04 Mar-05 YES<br />

FY-05 12 372.0 NAVAIR C/FP Option LITTON, VAN NUYS, CA Mar-05 Mar-06 YES<br />

MT036 AN/UPX-29<br />

FY-03 2 3,250.0 NAVAIR Mar-02 C/FP Option BAE, NASHUA, NH Mar-03 Jan-05 YES<br />

D. REMARKS<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Classification:<br />

ITEM NO. 64 PAGE NO. 4 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: UPX-34 TYPE MODIFICATION: N/A MODIFICATION TITLE: SARTIS (MT110)<br />

DESCRIPTION/JUSTIFICATION:<br />

SARTIS provides unique non-cooperative ship-to-air target recognition.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: Fielded<br />

FINANCIAL PLAN (IN MILLIONS)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT 25 7.173 25 7.173<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

ILS 0.180 0.180<br />

PE 3.533 3.533<br />

QUALITY ASSURANCE 0.060 0.060<br />

ACCEPTANCE, TEST & EVALUATION 0.959 0.959<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 10 1.455 15 3.000 25 4.455<br />

TOTAL PROCUREMENT 13.360 3.000 16.360<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 64 PAGE NO. 5 CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: SARTIS MODIFICATION TITLE: SARTIS (MT110)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: N/A PRODUCTION LEADTIME: N/A<br />

CONTRACT DATES: FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATE: FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

FY 2006 EQUIPMENT<br />

FY 2007 EQUIPMENT<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

10 1.455<br />

15 3.000 25 4.455<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

Out 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 64 PAGE NO. 5A CLASSIFICATION: UNCLASSIFIED<br />

TC<br />

15<br />

15<br />

TOTAL<br />

25<br />

25


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AN/UPX-27 TYPE MODIFICATION: Reliability MODIFICATION TITLE: AN/UPX-37 DIGITAL INTERROGATOR (MT031)<br />

DESCRIPTION/JUSTIFICATION:<br />

Current AN/UPX-27 is late 60's technology and no longer meets operational availability requirements due to use beyond its intended life cycle. High cost of ownership due to frequent labor<br />

intensive alignments and poor reliability continue to be problems associated with the current system. Further, the current system suffers upgrade integration problems due to its dated architecture<br />

and offers no growth capabilities. The Navy requires UPX-37 to provide a more reliable system with the same functionality and growth capability including Mode 5 and Mode S.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: Milestone III decision June 1998.<br />

FINANCIAL PLAN (IN MILLIONS)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT (*note FY03 QTY) 232 19.599 88 7.970 61 5.775 30 2.891 66 6.636 33 3.440 42 4.606 58 6.487 610 57.404<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

ILS 2.086 0.526 0.816 0.320 0.358 0.384 0.538 0.558 CONT CONT<br />

PE 2.040 1.317 1.689 0.282 0.443 0.243 0.431 0.436 CONT CONT<br />

PRODUCT IMPROVEMENT 0.263 0.455 0.883 0.066 0.201 0.358 0.365 CONT CONT<br />

ACCEPTANCE, TEST & EVALUATION 1.396 0.182 0.858 0.429 0.549 0.576 0.636 0.708 CONT CONT<br />

INITIAL TRAINING 0.075 0.035 0.034 0.036 0.036 0.055 0.056 0.057 CONT CONT<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 185 1.617 47 0.332 79 0.632 61 0.491 30 0.240 66 0.526 33 0.262 42 0.341 67 0.544 610 4.985<br />

TOTAL PROCUREMENT 27.076 10.817 10.687 4.449 8.328 5.425 6.887 8.952 CONT CONT<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 64 PAGE NO. 5B CLASSIFICATION:<br />

NOTE: FY03 - 9 ADDITIONAL UNITS PURCHASED TO PROVIDE TO THE MODE 5 PROGRAM CONTRACTOR AS GFE. UNITS WILL BE USED FY04-FY08 FOR MODE 5 DT/OT.<br />

UPON COMPLETION OF TESTING, UNITS WILL BE RETURNING TO INVENTORY FOR FIELDING TO FLEET. UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AN/UPX-27 MODIFICATION TITLE: AN/UPX-37 DIGITAL INTERROGATOR (MT031)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: 1 Month PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2003: Dec-02<br />

FY 2004: Dec-03<br />

FY 2005:<br />

DELIVERY DATE: FY 2003: Oct-03<br />

FY 2004: Dec-04<br />

FY 2005:<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 185 1.617 47 0.332<br />

232 1.949<br />

FY 2003 EQUIPMENT<br />

79 0.632<br />

9 0.008 88 0.640<br />

FY 2004 EQUIPMENT<br />

61 0.491<br />

61 0.491<br />

FY 2005 EQUIPMENT<br />

30 0.240<br />

30 0.240<br />

FY 2006 EQUIPMENT<br />

66 0.526<br />

66 0.526<br />

FY 2007 EQUIPMENT<br />

33 0.262<br />

33 0.262<br />

FY 2008 EQUIPMENT<br />

42 0.341<br />

42 0.341<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

58 0.536 58 0.536<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 185 0 14 16 17 20 20 20 19 15 15 15 16 7 7 8 8 16 16 17 17 8 8 8 9 10 10 11 11<br />

Out 185 0 14 16 17 20 20 20 19 15 15 15 16 7 7 8 8 16 16 17 17 8 8 8 9 10 10 11 11<br />

Oct-04<br />

Oct-05<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 64 PAGE NO. 5C CLASSIFICATION: UNCLASSIFIED<br />

TC<br />

67<br />

67<br />

TOTAL<br />

610<br />

610


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED:<br />

DESCRIPTION/JUSTIFICATION:<br />

IDENTIFICATION SYS. TYPE MODIFICATION: Maintainability/Reliability MODIFICATION TITLE: MK XII COMMON DIGITAL TRANSPONDER (CXP)<br />

(MT032)<br />

Current MK-XII transponder systems no longer meet operational Reliability and Maintainability (R&M) requirements due to use beyond their intended life cycle and suffer high cost of ownership due<br />

to parts obsolescence. Current surface ship MK-XII transponders will be replaced to continue incremental digital and R&M upgrades to the MK-XII IFF System. The common digital transponder will<br />

use an open systems architecture to allow future growth, including Mode 5 and Mode S which will be incorporated into the production line beginning with the FY05 procurement.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: Milestone III decision July 2002.<br />

FINANCIAL PLAN (IN MILLIONS)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT (*note FY03 & FY04 QTY) 46 3.315 73 2.025 58 1.798 26 1.222 44 2.112 26 1.274 26 1.300 26 1.326 92 5.83 417 20.204<br />

Equipment "A"<br />

ECP 1 Grp "Software Version Description" 0.020 0.020<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

ILS 1.160 0.215 0.400 0.297 0.328 0.404 0.542 0.509 CONT CONT<br />

PE 2.981 0.430 1.317 0.180 0.308 0.325 0.491 0.501 CONT CONT<br />

PRODUCT IMPROVEMENT<br />

ACCEPTANCE, TEST & EVALUATION 0.715 0.131 0.140 0.010 0.273 0.300 0.300 0.306 CONT CONT<br />

INITIAL TRAINING 0.441 0.200 0.641<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 46 0.212 0.639 62 0.996 58 0.754 26 0.338 44 0.616 26 0.364 26 0.390 129 1.935 417 6.244<br />

TOTAL PROCUREMENT 8.844 3.640 4.651 2.463 3.359 2.919 2.997 3.032 CONT CONT<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 64 PAGE NO. 5D CLASSIFICATION:<br />

UNCLASSIFIED<br />

* NOTE: FY03 - 11 ADDITIONAL UNITS PURCHASED TO PROVIDE TO THE MODE 5 PROGRAM CONTRACTOR AS GFE. UNITS WILL BE USED FY04-FY08 FOR MODE 5 DT/OT.<br />

UPON COMPLETION OF TESTING, UNITS WILL BE RETURNED TO INVENTORY FOR FIELDING TO FLEET.<br />

**NOTE: FY04 - 16 ADDITIONAL UNITS PURCHASED AS PARTIAL BUYBACK OF UNITS THAT WERE PUSHED INTO THE OUTYEARS AS A RESULT OF PR03 REDUCTIONS.


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: IDENTIFICATION SYSTEMS MODIFICATION TITLE: MK XII COMMON DIGITAL TRANSPONDER (CXP) (MT032)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: 6 Months PRODUCTION LEADTIME: 11 Months<br />

CONTRACT DATES: FY 2003: May-03<br />

FY 2004: Mar-04<br />

FY 2005:<br />

DELIVERY DATE: FY 2003: Mar-04<br />

FY 2004: Mar-05<br />

FY 2005:<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 46 0.212 AP 0.439<br />

46 0.651<br />

FY 2003 EQUIPMENT AP 0.200 62 0.806<br />

11 0.165 73 1.171<br />

FY 2004 EQUIPMENT<br />

AP<br />

0.190 58 0.754<br />

58 0.944<br />

FY 2005 EQUIPMENT<br />

26 0.338<br />

26 0.338<br />

FY 2006 EQUIPMENT<br />

44 0.616<br />

44 0.616<br />

FY 2007 EQUIPMENT<br />

26 0.364<br />

26 0.364<br />

FY 2008 EQUIPMENT<br />

26 0.390<br />

26 0.390<br />

FY 2009 EQUIPMENT<br />

26 0.390 26 0.390<br />

TO COMPLETE<br />

92 1.380 92 1.380<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 46 0 0 0 0 0 21 21 20 0 19 19 20 0 8 9 9 0 14 15 15 0 8 9 9 0 8 9 9<br />

Out 46 0 0 0 0 0 21 21 20 0 19 19 20 0 8 9 9 0 14 15 15 0 8 9 9 0 8 9 9<br />

Mar-05<br />

Mar-06<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 64 PAGE NO. 5E CLASSIFICATION: UNCLASSIFIED<br />

TC<br />

129<br />

129<br />

TOTAL<br />

417<br />

417


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: IDENTIFICATION SYSTEMS TYPE MODIFICATION: Maintenance/Reliability MODIFICATION TITLE: AN/.UPX-24(V) FC5 (MT034)<br />

DESCRIPTION/JUSTIFICATION:<br />

Provides interrogator set AN/UPX-24(V) with an open architecture configuration providing the capability for future operational enhancements, in particular Mode S and Mode 5. This configuration<br />

will provide increased interface capabilities in a fully redundant system with a significantly reduced number of line replaceable units.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: ECP DNS 001 approved 9/99<br />

FINANCIAL PLAN (IN MILLIONS)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT 10 2.758 7 2.340 8 2.912 12 4.464 14 5.320 13 5.200 14 5.600 78 28.594<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

ILS 0.322 0.437 0.332 0.218 0.237 0.280 0.322 0.370 2.518<br />

PE 0.488 0.500 0.454 0.305 0.246 0.249 0.429 0.266 2.937<br />

PRODUCT IMPROVEMENT 0.283 0.172 0.168 0.088 0.126 0.126 0.050 0.050 1.063<br />

ACCEPTANCE, TEST & EVALUATION 0.568 0.100 0.080 0.030 0.025 0.025 0.030 0.030 0.888<br />

DEPOT 0.030 0.155 0.286 0.471<br />

INITIAL TRAINING<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 10 0.560 7 0.357 8 0.416 12 0.636 14 0.756 13 0.715 14 0.784 78 4.224<br />

TOTAL PROCUREMENT 4.449 4.264 4.589 5.521 6.590 6.636 7.146 1.500 40.695<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 64 PAGE NO. 5F CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: IDENTIFICATION SYSTEMS MODIFICATION TITLE: AN/UPX-24(V) FC5 (MT034)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: 6 Months PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2003: Sep-03<br />

FY 2004: Mar-04<br />

FY 2005:<br />

DELIVERY DATE: FY 2003: Sep-04<br />

FY 2004: Mar-05<br />

FY 2005:<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 10 0.560<br />

10 0.560<br />

FY 2003 EQUIPMENT<br />

7<br />

0.357<br />

7 0.357<br />

FY 2004 EQUIPMENT<br />

8 0.416<br />

8 0.416<br />

FY 2005 EQUIPMENT<br />

12 0.636<br />

12 0.636<br />

FY 2006 EQUIPMENT<br />

14 0.756<br />

14 0.756<br />

FY 2007 EQUIPMENT<br />

13 0.715<br />

13 0.715<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

14 0.784<br />

14 0.784<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 4 4 2 0 0 7 0 2 3 3 0 2 5 5 0 4 5 5 0 4 4 5 0 4 5 5<br />

Out 0 0 0 4 4 0 2 0 7 0 2 3 3 0 2 5 5 0 4 5 5 0 4 4 5 0 4 5 5<br />

Mar-05<br />

Mar-06<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 64 PAGE NO. 5G CLASSIFICATION: UNCLASSIFIED<br />

TC<br />

0<br />

0<br />

TOTAL<br />

78<br />

78


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: IDENTIFICATION SYSTEMS TYPE MODIFICATION: Maintenance/Reliability MODIFICATION TITLE: AN/.UPX-24(V) MODE S (MT035)<br />

DESCRIPTION/JUSTIFICATION:<br />

Incorporation of a Mode S capability in the AN/UPX-24(V) to include an interface with ship's Combat Systems.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: Milestone III decision July 2002.<br />

FINANCIAL PLAN (IN MILLIONS)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT 3 0.300 4 0.412 15 1.590 102 11.118 124 13.420<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

ILS 0.150 0.150 0.300 CONT CONT<br />

PE 0.100 0.100 0.635 CONT CONT<br />

PRODUCT IMPROVEMENT 0.904 2.737 3.750 1.954 0.853 1.385 CONT CONT<br />

ACCEPTANCE, TEST & EVALUATION 0.145 0.150 0.150 0.250 CONT CONT<br />

DEPOT 0.150 0.150 0.300 CONT CONT<br />

INITIAL TRAINING 0.100 0.100 0.300 CONT CONT<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 3 0.165 4 0.224 117 6.669 124 7.058<br />

TOTAL PROCUREMENT 0.904 2.882 3.750 2.904 2.080 4.984 CONT CONT<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 64 PAGE NO. 5H CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: IDENTIFICATION SYSTEMS MODIFICATION TITLE: AN/UPX-24 MODE S (MT035)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: TBD PRODUCTION LEADTIME: TBD<br />

CONTRACT DATES: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

DELIVERY DATE: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

FY 2006 EQUIPMENT<br />

FY 2007 EQUIPMENT<br />

3 0.165<br />

3 0.165<br />

FY 2008 EQUIPMENT<br />

4 0.224<br />

4 0.224<br />

FY 2009 EQUIPMENT<br />

15 0.855 15 0.855<br />

TO COMPLETE<br />

102 5.814 102 5.814<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 64 PAGE NO. 5I CLASSIFICATION: UNCLASSIFIED<br />

N/A<br />

N/A<br />

TC<br />

117<br />

117<br />

TOTAL<br />

124<br />

124


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: IDENTIFICATION SYSTEMS TYPE MODIFICATION: Maintenance/Reliability MODIFICATION TITLE: AN/UPX-29(V) INTERROGATOR SYSTEM (MT036)<br />

DESCRIPTION/JUSTIFICATION:<br />

The Interrogator System AN/UPX-29(V) is deployed on high capability, state of the art surface platforms that require Identification Friend or Foe (IFF) operational performance beyond that provided<br />

by a standard Mark XII system for combat identification. These requirements include increased speed of identification, increased Probability of Identification (PID), and high confidence true<br />

FRIEND evaluation. Major system components include Antenna Group OE-120/UPX or OE-120A/UPX and the Interrogator Set AN/UPX-24(V), which can include up to 22 operator Control<br />

Indicators C-10064/UPX-24(V).<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: N/A<br />

FINANCIAL PLAN (IN MILLIONS)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT 2 6.500 2 6.500<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

ILS<br />

PE 0.765 1.141 1.906<br />

PRODUCT IMPROVEMENT<br />

ACCEPTANCE, TEST & EVALUATION<br />

DEPOT<br />

INITIAL TRAINING<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 0.800 0.600 2 3.800 2 5.200<br />

TOTAL PROCUREMENT 8.065 1.741 3.800 13.606<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 64 PAGE NO. 5J CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: IDENTIFICATION SYSTEMS MODIFICATION TITLE: AN/UPX-29(V) INTERROGATOR SYSTEM (MT036)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: 8 Months PRODUCTION LEADTIME: 21 Months<br />

CONTRACT DATES: FY 2003: May-03<br />

FY 2004: N/A<br />

FY 2005:<br />

DELIVERY DATE: FY 2003: Jan-05<br />

FY 2004: N/A<br />

FY 2005:<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

FY 2006 EQUIPMENT<br />

FY 2007 EQUIPMENT<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

AP 0.800 AP<br />

0.600 2 3.800<br />

2 5.200<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

Out 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 64 PAGE NO. 5K CLASSIFICATION: UNCLASSIFIED<br />

N/A<br />

N/A<br />

TC<br />

0<br />

0<br />

TOTAL<br />

2<br />

2


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: IDENTIFICATION SYSTEMS TYPE MODIFICATION: Maintenance/Reliability MODIFICATION TITLE: MK XII MODE 5 (MT037)<br />

DESCRIPTION/JUSTIFICATION:<br />

MK XII MODE 5 provides improved secure cooperative combat identification throught IFF. MODE 5 is a product improvement which is designed to be installed through engineering changes to digital<br />

MK XII interrogators and transponders including the APX-117, APX-118, UPX-37, APX-111, and RT-1832.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: ECP DNS 001 approved 9/99<br />

FINANCIAL PLAN (IN MILLIONS)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT 28 0.924 63 2.119 123 3.141 135 3.248 1425 25.865 1774 35.297<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

ILS 0.296 0.345 0.992 1.012 1.032 CONT CONT<br />

PE 0.736 1.733 5.313 2.989 3.536 CONT CONT<br />

PRODUCT IMPROVEMENT 0.130 0.148 0.460 0.469 0.594 CONT CONT<br />

ACCEPTANCE, TEST & EVALUATION<br />

DEPOT<br />

INITIAL TRAINING 0.181 0.220 0.247 0.252 0.257 CONT 1.157<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 28 0.146 63 0.378 123 0.740 1560 9.356 1774 10.620<br />

TOTAL PROCUREMENT 1.343 3.370 9.277 8.241 9.407 CONT CONT<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 64 PAGE NO. 5L CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: IDENTIFICATION SYSTEMS MODIFICATION TITLE: MK XII MODE 5 (MT037)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: TBD PRODUCTION LEADTIME: TBD<br />

CONTRACT DATES: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

DELIVERY DATE: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

FY 2006 EQUIPMENT<br />

28 0.146<br />

28 0.146<br />

FY 2007 EQUIPMENT<br />

63 0.378<br />

63 0.378<br />

FY 2008 EQUIPMENT<br />

123 0.740<br />

123 0.740<br />

FY 2009 EQUIPMENT<br />

135 0.810 135 0.810<br />

TO COMPLETE<br />

1425 8.546 1425 8.546<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007<br />

FY 2008<br />

FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 7 7 7 15 16 16 16 30 31 31 31<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 7 7 7 15 16 16 16 30 31 31 31<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 64 PAGE NO. 5M CLASSIFICATION: UNCLASSIFIED<br />

N/A<br />

N/A<br />

TC<br />

1560<br />

1560<br />

TOTAL<br />

1774<br />

1774


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: AN/URN-25 TYPE MODIFICATION: Field Change MODIFICATION TITLE: TACAN SYSTEM UPGRADE (MT038)<br />

DESCRIPTION/JUSTIFICATION:<br />

Ship Tactical Air Navigation (TACAN) system upgrade. Upgrades will include digital/COTS upgrade to 1970's technology TACAN beacon and reduce parts obsolescence.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: N/A<br />

FINANCIAL PLAN (IN MILLIONS)<br />

Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS NRE<br />

EQUIPMENT NRE<br />

EQUIPMENT 28 2.800 28 2.800 30 3.000 190 20.210 276 28.810<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

ILS 0.063 0.071 0.268 0.033 0.033 0.117 0.585<br />

PE 0.657 0.703 0.058 0.033 0.036 0.220 1.707<br />

PRODUCT IMPROVEMENT 0.033 0.067 0.006 0.006 0.041 0.153<br />

ACCEPTANCE, TEST & EVALUATION 0.033 0.067 0.100<br />

DEPOT<br />

INITIAL TRAINING<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 28 0.448 28 0.455 220 3.974 276 4.877<br />

TOTAL PROCUREMENT 0.720 0.840 3.260 3.320 3.530 24.562 36.232<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 64 PAGE NO. 5N CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AN/FRN-42, AN/URN-25, OE-258A/URN MODIFICATION TITLE: TACAN SYSTEM UPGRADE (MT038)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: 1 Month PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

DELIVERY DATE: FY 2003: N/A<br />

FY 2004: N/A<br />

FY 2005:<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

FY 2006 EQUIPMENT<br />

FY 2007 EQUIPMENT<br />

28 0.448<br />

28 0.448<br />

FY 2008 EQUIPMENT<br />

28 0.455<br />

28 0.455<br />

FY 2009 EQUIPMENT<br />

30 1.806 30 1.806<br />

TO COMPLETE<br />

190 2.168 190 2.168<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 12 4 0 12 12 4 0<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 12 4 0 12 12 4 0<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 64 PAGE NO. 5O CLASSIFICATION: UNCLASSIFIED<br />

N/A<br />

N/A<br />

TC<br />

220<br />

220<br />

TOTAL<br />

276<br />

276


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE BLI 287600<br />

OTHER PROCUREMENT, NAVY Naval Mission Planning Systems (NavMPS) formerly<br />

BA-2; Communications and Electronics Equipment Tactical Automated Mission Planning System (TAMPS)<br />

Program Element for Code B Items: Other Related Program Elements<br />

Prior ID To<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions) $148.0 A $6.8 $8.6 $9.1 $7.5 $8.1 $8.2 $8.6 Cont Cont<br />

Naval Mission Planning System (NavMPS)<br />

This line item provides funding to procure NavMPS for USN/USNR/USMC/USMCR. Program cost is not directly related to FY hardware quantity; software is a cost factor independent of FY<br />

hardware quantity and cost. Installations are planned for aviation capable ships, air stations, aviation training/support facilities and deployed aviation units. Items to be funded in this line<br />

include:<br />

Work Station Components - NavMPS procures tactical computer hardware through the non-developmental item acquisition strategy. Tactical computer equipment is used to plan and<br />

analyze aircraft routes under various mission configurations and operational threat environments. Primary output is route plans and mission essential data loads for mission execution. New<br />

workstations consist of the components to make a complete workstation.<br />

Production Support Services - Cost element includes production support services, engineering support services, independent verification and validation test and acceptance, site activation,<br />

quality assurance efforts, etc.<br />

Software Releases - NavMPS produces software releases via an evolutionary acquisition process. These releases contain enhancements based on fleet inputs and emerging technology.<br />

They also contain changes required to retain compatibility with supported platforms, associated weapons, and threat and imagery data bases providing input to NavMPS. Software releases<br />

are independent of hardware buys.<br />

PMA-233 will provide installed Mission Planning hardware, planning stations, on a 3 year replacement cycle. Mission Planning servers will be replaced on a 5 year cycle.<br />

DD Form 2454, JUN 86 ITEM NO. 65 PAGE NO. 1<br />

CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS DATE:<br />

P-40a February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE BLI 287600<br />

Naval Mission Planning System (NavMPS) formerly<br />

OTHER PROCUREMENT, NAVY, BA-2; Communications and Electronics Equipment Tactical Automated Mission Planning System (TAMPS)<br />

ID Prior To<br />

Procurement Items Code Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY Complete Total<br />

New Workstations A<br />

Quantity 318<br />

Funding 18.5<br />

Server Suite A<br />

Quantity 11 4 6 6<br />

Funding 2.7 1.0 1.6 1.6<br />

Combat Planning Seat A<br />

Quantity 403<br />

Funding 14.3<br />

Flight Planning Seat A<br />

Quantity 1935 444 600 410<br />

Funding 10.7 2.2 3.2 2.3<br />

Force Planning Seat A<br />

Quantity 69 100<br />

Funding 4.0 0.5<br />

Trusted System A<br />

Quantity 115<br />

Funding 3.8<br />

Other Costs 93.9 3.6 3.8 4.7<br />

Total P-1 Funding ** 147.9 6.8 8.6 9.1<br />

** Numbers may not add due to rounding. CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 65 PAGE NO. 2<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy A Naval Mission Planning Systems (NavMPS) formerly<br />

BA-2; Communications and Electronics Equipment Tactical Automated Mission Planning System (TAMPS) BLI 287600<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID Prior FY 2003 FY 2004 FY 2005 FY 2006<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

S7400 New Work Stations A 18,479<br />

S7401 Server Suite A 2,701 4 258 1,030 6 267 1,600 6 271 1,626<br />

S7402 Combat Planning Seat A 14,323<br />

S7403 Flight Planning Seat A 10,705 444 5 2,217 600 5 3,200 410 5 2,250<br />

S7406 Force Planning Seat A 3,986 100 5 500<br />

S7407 Trusted System A 3,812<br />

S7410 Software Release 54,081 978 1,188 2,039<br />

S7430 Production Support 32,834 1,731 1,728 2,028<br />

S7900 Non-FMP Installation 6,220 851 835 655<br />

S7910 FMP Installation 743<br />

Total ** 147,884 448 6,807 606 8,551 516 9,098<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

** Numbers may not add due to rounding. ITEM NO. 65 PAGE NO. 3<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy Naval Mission Planning Systems (NavMPS) formerly J2S7<br />

BA-2; Communications and Electronics Equipment Tactical Automated Mission Planning System (TAMPS) BLI 287600<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

FY03 SPAWAR 1/ N/A C/FP Dell/ 01/03 3/03 Yes<br />

Phil, PA Phil, PA<br />

Server Suite 4 258<br />

Flight Planning Seat 444 5<br />

FY04 SPAWAR 1/ N/A C/FP Dell/ 01/04 3/04 Yes<br />

Phil, PA Phil, PA<br />

Server Suite 6 267<br />

Flight Planning Seat 600 5<br />

FY05 SPAWAR 1/ N/A C/FP TBD 01/05 3/05 Yes<br />

Phil, PA<br />

Server Suite 6 271<br />

Flight Planning Seat 410 5<br />

Force Planning Seat 100 5<br />

D. REMARKS 1/ Streamlined acquisition process. Contracts are coordinated through SPAWAR SSC C4I Programs Office, Philadelphia. Contracts are awarded for COTS<br />

hardware on a best value basis. The existing NAVAIR CAD2 contract with Intergraph Corp. will be utilized if it meets requirements and provides best cost.<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 65 Classification:<br />

PAGE NO. 4 UNCLASSIFIED


February 2004<br />

CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

Aviation Capable Ships, Air Stations<br />

Aviation Units, Aviation Training Naval Mission Planning Systems (NavMPS) formerly<br />

MODELS OF SYSTEM AFFECTED: Support Facilities TYPE MODIFICATION: Added Capability MODIFICATION TITLE: Tactical Automated Mission Planning System (TAMPS) BLI 28760<br />

DESCRIPTION/JUSTIFICATION:<br />

NavMPS provides USN and USMC planners a common automated system for rapidly processing large quantities of digitized terrain, threat and environmental data, and aircraft and weapon system<br />

parameters.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: NavMPS is post milestone III<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E 0604231N<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS - UNIT COST<br />

INSTALLATION KITS NONRECURRING<br />

65.0 24.1 25.0 11.0<br />

EQUIPMENT<br />

EQUIPMENT NONRECURRING<br />

ENGINEERING CHANGE ORDERS<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

2851 54.0 448 3.2 606 4.8 516 4.4<br />

OTHER-SOFTWARE RELEASE 54.1 1.0 1.2 2.0<br />

OTHER-PRODUCTION SUPPORT<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

32.8 1.7 1.7 2.0<br />

INSTALL COST 2851 7.0 448 0.9 606 0.8 516 0.7<br />

TOTAL PROCUREMENT ** 147.9 6.8 8.6 9.1<br />

**Numbers may not add due to rounding. ITEM NO. 65 PAGE 5 CLASSIFICATION: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

Aviation Capable Ships, Air Stations<br />

Aviation Units, Aviation Training Naval Mission Planning Systems (NavMPS) formerly<br />

MODELS OF SYSTEMS AFFECTED: Support Facilities MODIFICATION TITLE: Tactical Automated Mission Planning System (TAMPS) BLI 287600<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: Field Installation Team<br />

ADMINISTRATIVE LEADTIME: 3 to 4 Months PRODUCTION LEADTIME: 2 Months<br />

CONTRACT DATES: FY 2003: Jan-03 FY 2004: Jan-04 FY 2005: Jan-05<br />

DELIVERY DATE: FY 2003: Mar-03 FY 2004: Mar-04 FY 2005: Mar-05<br />

February 2004<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY FY To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 2851 7.0 2851 6.2<br />

FY 2003 EQUIPMENT 448 0.9 448 0.9<br />

FY 2004 EQUIPMENT 606 0.8 606 0.8<br />

FY 2005 EQUIPMENT 516 0.7 516 0.7<br />

FY 2006 EQUIPMENT<br />

FY 2007 EQUIPMENT<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 2851 448 606 516<br />

Out 2851 224 224 303 303 282 234<br />

P-3A<br />

ITEM NO. 65 PAGE 6 CLASSIFICATION: UNCLASSIFIED<br />

0.8


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT DJC2 (#2804) 52JH<br />

QUANTITY<br />

PY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TO COMP TOTAL<br />

COST<br />

(in millions) $51.7 $32.5 $27.9 $58.8 CONT. CONT.<br />

Narrative Description/Justification:<br />

(U) Deployable Joint Command and Control (DJC2) is a SecDef and CJCS priority DoD transformation initiative that provides the a deployable, materiel solution scalable to and Standing tailorable Joint headquarters Force Headquarters command and<br />

(SJFHQs), control (C2) a capability new capability for each to be Regional implemented Combatant at each Commander Regional Combatant (RCC), and Command one maritime starting variant. in FY05. It is the DJC2 materiel will ensure solution that to Joint Standing Force Joint Commanders Force Headquarters (JFC) are equipped, (SJFHQs), as a new well capability as trained to<br />

and be implemented organized, to at carry each out RCC their starting C2 responsibilities. in FY05. DJC2 will SecDef ensure direction that Joint for the Force DJC2 Commanders program is (JFC) contained are equipped, in Defense as Planning well as trained Guidance and (DPG organized, 03-07 and to carry updated out their in DPG C2 04-09) responsibilities. The DJC2<br />

program SecDef direction addresses for both the DJC2 the Quadrennial program is contained Defense Review in Defense (QDR) Planning finding that Guidance a joint (DPG command 03-07 and control updated architecture in DPG 04-09). needs The to DJC2 be developed program addresses for standing both JTFs the at Quadrennial each of the Regional Defense Review<br />

Combatant (QDR) finding Commanders that a joint command and the need and for control a deployable architecture Joint needs Command to be and developed Control for System standing described JTFs at in each the Transformation of the RCCs and Study the need Report for presented a deployable to the Joint Secretary Command of Defense, and Control April, System 2001. It<br />

integrates described in the the requirements Transformation for and Study lessons Report learned presented from to U.S. the Central Secretary Command’s of Defense, deployable April, 2001. headquarters It integrates funded the requirements from the FY for 2001 and Emergency lessons learned Supplemental from U.S. Act Central for Recovery Command’s from deployable<br />

and<br />

Response headquarters to Terrorist funded from Attacks the FY on 2001 the United Emergency States. Supplemental DJC2 is supported Act for by Recovery SECDEF from and and CJCS. Response The JCS/Joint to Terrorist Requirement Attacks on Oversight the United Council States. (JROC), DJC2 approved is supported the DJC2 by SECDEF Mission and Needs CJCS. The<br />

Statement JCS/Joint Requirement (MNS) and directed Oversight that Council an Operational (JROC) Requirements has approved the Document DJC2 Mission (ORD) be Needs produced Statement in 2003. (MNS) and directed that an Operational Requirements Document (ORD) be produced in 2003.<br />

DJC2 seeks to provide standing, and standardized, joint C2 systems that can be deployed by RCCs Regional or JTFs, Combatant remedying Commanders the current (RCCs) unproductive or JTFs, remedying practice of the relying current on ad unproductive hoc, unresourced, practice and of<br />

relying stove-piped on ad capabilities hoc, unresourced, cobbled and together stove-piped at the last capabilities minute during cobbled a crisis. together It will at the support last minute the new during SJFHQ a crisis. concept It will and support doctrine new being standing developed JTF by headquarter Joint Forces concepts Command and in doctrine coordination being with<br />

developed other RCCs by and Joint the Forces Joint Staff, Command as tasked in coordination by DPG. RCC with and other JTF Combatant commanders Commanders will use a deployable and the Joint joint Staff, command as tasked and control by DPG. capability RCC and for JTF day-to-day commanders operations will use (including a deployable peacetime), joint command as wel<br />

and as when control deployed capability for training for day-to-day or contingency operations operations. (including The peacetime), capability as is well intended as when for deployed all levels for of conflict training and or contingency will be reconfigurable operations. to The meet capability specific RCC is intended and JTF for mission all levels requirements. of conflict and This<br />

will capability be reconfigurable must be interoperable to meet specific with higher unified and CINC adjacent and JTF echelons mission of requirements. command (to include This capability coalition must allies) be as interoperable well as with with supporting higher and elements adjacent to include echelons joint of command forces. (to include coalition<br />

allies) as well as with supporting elements to include joint forces. Note that DJC2 is not a follow-on or replacement system for either the joint Global Command and Control System (GCCS) or<br />

GCCS-Maritime; DJC2 site and unit rather, descriptions DJC2 will are utilize as follows: GCCS in 4 DJC2 its core systems suite of garrisoned applications, at PACOM ensuring Camp interoperability H.M. Smith, with HI; SOUTHCOM the worldwide-installed Miami, FL; CENTCOM base of GCCS-J/GCCS-M.<br />

MacDill AFB, FL; and EUCOM Stuttgart, Germany<br />

There is also one Maritime Unit to be procurred in FY08. Beginning in FY05, the JFCOM experimentation unit procured with RDT&E will become a production representative POR site and will be<br />

upgraded accordingly.<br />

Note that DJC2 is not a follow-on or replacement system for either the joint Global Command and Control System (GCCS) or GCCS-Maritime; rather, DJC2 will utilize GCCS in its core suite of<br />

INSTALLATION applications, ensuring DATA: interoperability 4 DJC2 systems with garrisoned the worldwide-installed at PACOM Camp base H.M. of Smith, GCCS-J/GCCS-M.<br />

HI, SOUTHCOM Miami, FL, CENTCOM MacDill AFB, FL, and EUCOM Stuttgart, Germany.<br />

P-1 Shopping List No. 66-1 of 66-4<br />

Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE<br />

COST ANALYSIS February 2004<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT DJC2 (#2804) 52JH<br />

PY FY 2002 FY 2003 FY 2004 FY 2005<br />

COST ID TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE COST QTY COST COST QTY COST COST QTY COST COST QTY COST COST<br />

JH100 Deployable Joint Command and Control B 2 23,083 46,165 1 23,933 23,933<br />

JH200 DJC2 Upgrades A 2 4,268 8,536<br />

JH300 Congressional Add: Site Preparations 5,520<br />

TOTAL CONTROL 51,685 32,469<br />

DD FORM 2446, JUN 86 P-1 Shopping List No. 66-2 of 66-4 Exhibit P-5


UNCLASSIFIED<br />

CLASSIFICATION<br />

PROCUREMENT HISTORY AND PLANNING February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT DJC2 (#2804) 52JH<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE DELIVERY COST NOW AVAILABLE<br />

JH100 DJC2 04 NSWC CSS, Panama City WX Panama City, FL N/A Feb-04 Feb-05 2 23,083 NO N/A<br />

05 TBD TBD Panama City, FL Oct-04 Dec-04 Dec-05 1 23,933 NO N/A<br />

JH200 DJC2 Upgrades 05 TBD TBD Panama City, FL Oct-04 Dec-04 Apr-05 2 4,268 NO N/A<br />

JH300 Congressional Add: Site Preps 04 NSWC CSS, Panama City WX Panama City, FL TBD TDB N/A 5,520 NO N/A<br />

D. REMARKS<br />

A. DATE<br />

Exhibit P-5A, Procurement History and Planning<br />

P-1 Shopping List-Item No 66-3 of 66-4 Unclassifed<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE<br />

PRODUCTION SCHEDULE February 2004<br />

(DOD EXHIBIT P-21)<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD NO.<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT DJC2 (#2804) 52JH<br />

S ACCEP BAL FISCAL YEAR 04 FISCAL YEAR 05 FY06<br />

COST ITEM/MANUFACTURER E PROC PRIOR DUE CY 03 CALENDAR YEAR 04 CALENDAR YEAR 05<br />

CODE R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D<br />

V 30-Sep 30-Sep C O E A E A P A U U U E C O E A E A P A U U U E C O E<br />

FY T V C N B R R Y N L G P T V C N B R R Y N L G P T V C<br />

JH100 DJC2 04 2 0 2 A 1 1<br />

05 1 0 1 A 1<br />

JH200 DJC2 Upgrades 04 0 0 0<br />

05 2 0 2 A 1 1<br />

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC<br />

PRODUCTION RATE PROCUREMENT LEADTIMES<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

ITEM Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

DJC2 TBD 1<br />

11<br />

12 mo.<br />

DJC2 Upgrades TBD 1<br />

3<br />

4 mo.<br />

P-1 Shopping List-Item No 66-4 of 66-4 Exhibit P-21 Production Schedule<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI 2901 NAVAL SPACE SURVEILLANCE SYSTEM (NSSS) 52WV<br />

QUANTITY<br />

PY FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TO COMP TOTAL<br />

COST<br />

(in millions) $2.0 $0 $0 $0 $0 $0 $0 $0 $2.0<br />

Effective FY 2004, The NSSS Program transfers to the Air Force.<br />

The Naval Network and Space Command (NNSOC), headquartered at Dahlgren, Virginia, has operated the Naval Space Surveillance System (NSSS), since 1961. The components<br />

of NSSS, also known as "the Fence", are the Sensor and associated mission processing systems which are a critical part of the overall national space surveillance network. The only<br />

dedicated, uncued sensor in the world, NSSS provides satellite position information to the United States Naval Fleet as well as satellite manueuver detection and collision avoidance<br />

data to the Department of Defense (DoD) National Aeronautics and Space Administration (NASA) and the International Space Station for launch protection and orbit analysis. NSSS<br />

also serves as the Alternate Space Control Center (ASCC) to Space Control Center in Cheyenne Mountain, Colorado. Obsolete and aging components impact the ability to maintain a<br />

constant surveillance (catalog). Procurement of computer system hardware and software is necessary to adequately manage catalog growth and increased workload caused by lack<br />

of ephemerides. Ephemerides are computerized listings of tracks and predictions of locations of both space debris (older orbital objects and other national launches which failed to<br />

properly return from orbit) and current active in-use satellites. The ongoing Service Life Extension Program (SLEP) of the NSSS is necessary to ensure continued operation of the<br />

nation's only unalerted space sensor.<br />

The surveillance mission is accomplished by sub-systems performing four operational functions as follows:<br />

1. Sensor: Data acquisition of satellites "radar" signals is performed by a network of three transmitting and six receiving stations located along a great circle arc across the southern<br />

United States.<br />

2. C2 Connectivity: Each receiver station is connected to Dahlgren by a dedicated network of phone lines for data transfer. The network also links all field stations and Dahlgren for<br />

network operational and administrative coordination.<br />

3. Command Center: Satellite detection and correlation with predictions is performed at the Dahlgren Center.<br />

4. Processing: Storage, retrieval, and updating of orbital elements of past, present, and future paths of all known orbital objects are performed at Dahlgren.<br />

Notes:<br />

The NSSS program maximizes the use of Commercial off the Shelf (COTS) software and hardware.<br />

P-1 Shopping List - Item No. 67-1 of 67-2<br />

Exhibit P-40, Budget Item Justification<br />

UNCLASSIFIED<br />

CLASSIFICATION


UNCLASSIFIED<br />

CLASSIFICATION<br />

COST ANALYSIS<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT BLI 2901 Naval Space Surveillance System (NSSS) 52WV<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

FY 2002 FY 2003 FY 2004 FY 2005<br />

COST ID UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE QTY COST COST QTY COST COST QTY COST COST QTY COST COST<br />

WV006 LIFE EXTENSION A 1,992 0 0<br />

C2 Connectivity - Hardware & Software VAR N/A 0<br />

Command Center - Hardware & Software VAR N/A 0<br />

Mission Processing - Hardware & Software VAR N/A 0<br />

Sensor - Hardware & Software VAR N/A 1,992<br />

WV555 PRODUCTION SUPPORT 0 0 0<br />

TOTAL 1,992 0 0<br />

DD FORM 2446, JUN 86 P-1 Shopping List - Item No. 67-2 of 67-2 Exhibit P-5, Cost Analysis<br />

DATE<br />

February 2004<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI 2905 Defense Integrated Military Human Resources System (DIMHRS) 52NQ<br />

QUANTITY<br />

PY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TO COMP TOTAL<br />

COST<br />

(in millions) 0 0.0 5.7 0 0 0 0 0 0 5.7<br />

PROGRAM COVERAGE/JUSTIFICATION FOR BUDGET YEAR REQUIREMENTS:<br />

The Defense Integrated Military Human Resources System (DIMHRS)(Pers/Pay) will be a single integrated, all Service, all Component military personnel and pay management<br />

and information system, supporting the complete military personnel life cycle through the full spectrum of military operations. The core will consist of common functions and<br />

appropriate interfaces to support Component/Service-unique functions. Military personnel functions support Active Duty, Retired, and Reserve Component personnel (and their<br />

families) throughout their entire military careers. Additionally, these functions support DoD-sponsored personnel during contingency and wartime operations. Individual Service<br />

business policies, practices, and processes will be examined and re-engineered, or combined with "best practice" solutions to satisfy DIMHRS (Pers/Pay) core functional<br />

requirements. These core functions address the personnel communities' support to: 1) meet the operator's mission requirements across the full spectrum of force mobilization<br />

and employment from peacetime to war, and 2) eliminate business policies and practices that create inequities among the Services and complicate processing. These core<br />

functions, while macro in nature, will be continuously validated to ensure the Program remains aligned with DoD and Joint warfighting strategies, objectives, and goals.<br />

DIMHRS is to be delivered in increasing capability increments, and as such, the hardware and software purchases are needed to support incremental deployment activities of its<br />

useful assets. Evolutionary acquisition is supported, as some useful assets will be deployed sequentially with other segments in the development phase. This approach matches<br />

the DIMHRS acquisition strategy to improve the delivery of military personnel and pay services and to enrich current readiness, contingency, and peacekeeping operations. Othe<br />

procurement costs for the DIMHRS FY 2003-2004 are required to cover COTS hardware and software purchases for acquisition activities related to deployment of useful assets.<br />

FY2004 Plan: ($5.700M)<br />

Continue procurement of various hardware and software applications to support the DIMHRS acquisition strategy as related to the deployment of Useful Assets (UAs).<br />

FY2005 Plan: N/A<br />

DD FORM 2446, JUN 86 P-1 Shopping List-Item No 68 Page 1 of 3 Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

COST ANALYSIS<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT BLI 2905 Defense Integrated Military Human Resources System (DIMHRS)<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

52NQ<br />

PY<br />

FY 2002<br />

FY 2003<br />

FY 2004 FY 2005<br />

COST ID TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE COST QTY COST COST QTY COST COST QTY COST COST QTY COST COST<br />

NQ001 Hardware/Software (Various) B Var 10 10 Var 5,700 5,700<br />

Remarks:<br />

TOTAL CONTROL 0 10 5,700 0<br />

DD FORM 2446, JUN 86 P-1 Shopping List-Item No 68 Page 2 of 3 Exhibit P-5, Budget Item Justification<br />

Unclassified<br />

Classification<br />

DATE<br />

February 2004


UNCLASSIFIED<br />

CLASSIFICATION<br />

A. DATE<br />

PROCUREMENT HISTORY AND PLANNING February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI 2905 Defense Integrated Military Human Resources System (DIMHRS 52NQ<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE DELIVERY COST NOW AVAILABLE<br />

NQ001 Hardware/Software 04 Various C/FP HQ SPAWAR various Apr-04 Var 5.700 Yes N/A<br />

D. Remarks:<br />

"Various" quantities represent system and subsystem upgrades of various hardware/software configurations that are dependent upon the type of site or platform.<br />

DD FORM 2446, JUN 86 P-1 Shopping List-Item No 68 Page 3 of 3 Exhibit Extended P-5A, Procurement History and Planning<br />

Unclassified<br />

Classification


CLASSIFICATION:<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

Other Procurement, Navy<br />

BA 2/Common Imagery Ground/Surface System<br />

Common Imagery Ground Surface Systems (CIGSS) BLI: 291400<br />

Program Element for Code B Items: Other Related Program Elements<br />

0305208N<br />

Prior ID To<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions) 208.5 51.2 40.3 53.2 16.1 74.3 117.3 61.8 Cont. Cont.<br />

*Note: All previous procurement budgets for this item were submitted in the procurement, Defense-Wide appropriation as Distributed Common Ground Systems<br />

(DCGS), P.E. 0305208D8Z.<br />

The Joint Services Imagery Processing System – Navy (JSIPS-N) is the Navy’s portion of an OSD/Defense Airborne Reconnaissance Office (DARO) effort<br />

entitled Distributed Common Ground System (DCGS). DCGS is a cooperative effort between the services, agencies, and DoD to provide systems capable of<br />

receiving, processing, exploiting, and disseminating data from airborne and national reconnaissance platforms. DCGS is further subdivided into systems which<br />

process, exploit, and disseminate Measurements Analysis and Signatures Intelligence (MASINT) data, Signals Intelligence (SIGINT) data, Multi-Intelligence<br />

Reconnaissance data, and Imagery data. Cooperative imagery processing systems are collectively identified under the general heading of Common Imagery<br />

Ground/Surface Systems (CIGSS). JSIPS-N is the Navy CIGSS component.<br />

JSIPS-N has the capability to receive, process, exploit, store, and disseminate imagery, imagery-derived products, and Imagery Intelligence (IMINT) reports<br />

based on multiple inputs from multiple sources. The primary mission of JSIPS-N is to assist strike planners, tactical aviators, and Marine Corps amphibious<br />

planners in the delivery of precision ordnance (including Tomahawk Cruise Missiles) on target.<br />

JSIPS-N includes three major components:<br />

Softcopy Exploitation Segment (SES) - consisting of the Digital Imagery Workstation Suite Afloat (DIWSA), Strike Planning Archive (SPA) and the Precision<br />

Targeting Workstation (PTW).<br />

National Input Segment (NIS) - equipment which processes imagery from national sensors<br />

Tactical Input Segment (TIS) - equipment which processes imagery from tactical sensors.<br />

JSIPS-N is onboard aircraft carriers (CV/CVN), amphibious assault ships (LHA/LHD), select fleet flag ships (AGF/LCC) and shore sites.<br />

Secondary missions of the system are to provide near-real-time imagery and support to fleet intelligence assets, Special Operations Forces, and to support<br />

primary exploitation and dissemination of tactical organic and theater IMINT products.<br />

DD Form 2454, JUN 86 ITEM NO. 69 PAGE NO. 1<br />

CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy<br />

BA 2/Common Imagery Ground/Surface System Common Imagery Ground Surface Systems (CIGSS) BLI: 291400<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID Prior FY 2003<br />

FY 2004<br />

FY 2005<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

01000 Tactical Input Segment (TIS) 44,400 6 2,578 15,468 6 2,689 16,134<br />

01500 TIS Retrofit 4,000 0 0 0 0 0 0 0<br />

02000 SPA/PTW 17,209 8 455 3,640 4 464 1,856<br />

03000 Procurement Support 40,968 3,542 3,880 3,880<br />

04000 Product Improvements 46,955 14,072 15,361 16,183<br />

05000 Battle Group H/W and S/W Integration 31,801 9,198 12,791 10,876<br />

06000 Equipment Support 23,202 5,237 6,400 6,100<br />

TOTAL 208,535 51,157 40,288 53,173<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST PAGE NO. 2 CLASSIFICATION:<br />

ITEM NO. 69<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy<br />

BA 2/Common Imagery Ground/Surface System<br />

J25EJ25E<br />

CONTRACT DATE OF TECH DATA DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW ? AVAILABLE<br />

(000)<br />

JSIPS-N Components<br />

01000 TIS<br />

02000 SPA/PTW<br />

D. REMARKS<br />

FY 2003 6 $ 2,578 ESC Hanscom AFB,<br />

MA<br />

FY 2004 0 $ -<br />

FY 2005 6 $ 2,689 ESC Hanscom AFB,<br />

MA<br />

FY 2003 8 $ 455 SPAWAR, San Diego,<br />

CA<br />

FY 2004 4 $ 464 SPAWAR, San Diego,<br />

CA<br />

FY 2005 0 $ -<br />

Common Imagery Ground Surface Systems<br />

(CIGSS) BLI: 291400<br />

N/A SS/FFP Lockheed Martin<br />

Gaithersburg, MD<br />

N/A SS/FFP Lockheed Martin<br />

Gaithersburg, MD<br />

May 03 Nov 03 Yes N/A<br />

Jan 05 Jul 05 Yes N/A<br />

N/A SS/FFP Various Feb 03 May 03 Yes N/A<br />

N/A SS/FFP Various Feb 04 May 04 Yes N/A<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Classification:<br />

ITEM NO. 69 PAGE NO. 3 UNCLASSIFIED


FY 2005 BUDGET PRODUCTION SCHEDULE, P-21 DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY<br />

Other Procurement, Navy<br />

Weapon System P-1 ITEM NOMENCLATURE<br />

Common Imagery Ground Surface Systems<br />

BA 2/Common Imagery Ground/Surface System<br />

(CIGSS) BLI: 291400<br />

Production Rate<br />

Procurement Leadtimes<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

Item Name and Location MSR ECON MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

Tactical Input Segment (TIS) Lockheed Martin<br />

Gaithersburg, MD<br />

N/A N/A N/A 0 7 6 6 13 LOC<br />

Precision Targeting<br />

Workstation (PTW)<br />

Various N/A N/A N/A 0 4 3 3 7 LOC<br />

FISCAL YEAR 2002 FISCAL YEAR 2003<br />

ITEM / MANUFACTURER F S Q D B 2001 CALENDAR YEAR 2002 CALENDAR YEAR 2003<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L<br />

TIS - Lockheed, Gaithersburg, MD 03 N 6 0 6 A 6<br />

PTW - Various 03 N 8 0 8 A 8 0<br />

FISCAL YEAR 2004 FISCAL YEAR 2005<br />

ITEM / MANUFACTURER F S Q D B 2003 CALENDAR YEAR 2004 CALENDAR YEAR 2005<br />

Y V<br />

C<br />

T<br />

Y<br />

E<br />

L<br />

A<br />

L<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

B<br />

A<br />

L<br />

TIS - Lockheed, Gaithersburg, MD 03 N 6 0 6 2 2 2 0<br />

PTW - Various 04 N 4 0 4 A 4 0<br />

TIS - Lockheed, Gaithersburg, MD 05 N 6 0 6 A 2 2 2 0<br />

PTW - 05 N 0 0 0 0<br />

Remarks:<br />

DD Form 2445, JUL 87 Previous editions are obsolete P-1 SHOPPING LIST<br />

311 / 244 ITEM NO. 69 PAGE NO. 4 Exhibit P-21 Production Schedule


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA-2 Communications and Electronics RADIAC BLI: 292000 SBHD: 82M2<br />

Program Element for Code B Items: Other Related Program Elements<br />

Prior ID To<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions) $8.2 $8.5 $9.1 $8.6 $9.4 $9.5 $9.1 N/A $62.4<br />

SPARES COST<br />

(In Millions)<br />

The Radiation Detection, Indication and Computation (RADIAC) Program is responsible for providing radiation monitoring instruments that detect and measure radiation in accordance with the<br />

provisions of Title 10 of the Code of Federal Regulations (10CFR). These instruments are used on all vessels afloat and at every shore installation in order to ensure the safety of personnel and the<br />

environment. RADIACs are also required after an act of terrorism or war that involves nuclear material in order to enable continuing warfighting ability.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 70 PAGE NO. 1<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD SUBHEAD:<br />

Other Procurement, Navy<br />

BA-2 Communications and Electronics Equipment RADIAC BLI: 292000 82M2<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID FY 2003 FY 2004 FY 2005<br />

CODE Code<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

M2100 MULTIFUNCTION RADIAC<br />

CONTROL UNIT A 40 1.338 54 500 1.363 682 549 1.389 763<br />

NEUTRON INTERFACE A 0 5 5.424 27 123 5.527 680<br />

IM-260 EXTENDER A 0 0 0<br />

DIR. GAMMA INTERFACE A 0 0 0<br />

ALPHA PROBE A 736 3.888 2,862 464 3.981 1,847 342 4.391 1,502<br />

CHECKSOURCE KITS A 49 1.083 53 5 1.102 6 106 1.123 119<br />

FRISKER STATION A 20 2.040 41 490 3.461 1,696 243 2.116 514<br />

M2200 DOSIMETRY SYSTEM<br />

CP-1112 UPGRADES 14 7.992 112 15 8.136 122 23 8.290 191<br />

DOSIMETERS 29,225 0.027 799 0 0<br />

SHIPBOARD READER 0 0.000 0 8 28.689 230 23 29.234 672<br />

SHOREBASED READER 6 152.400 914 4 155.143 621 9 158.091 1,423<br />

DOSIMETER IRRADIATOR 27 7.992 216 28 8.136 228 27 8.290 224<br />

DOSIMETRY AREA MONITOR 50 4.064 203 50 4.137 207<br />

DOSIMETER CTR EQUIPMENT 128<br />

M2400 OTHER RADIAC<br />

ACCEPTANCE TESTING A 903 909 999<br />

ITEMS UNDER 200K A 221 218 236<br />

FIELD CHANGES 102 100 100<br />

APD ENHANCEMENTS 519 523 526<br />

M2830 PRODUCTION SUPPORT A 1,046 1,109 1,138<br />

8,173 8,525 9,087<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 70 PAGE NO. 2<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

FEBRUARY 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy<br />

BA-2 Communications and Electronics Equipment RADIAC BLI: 292000 82M2<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

FY 2003<br />

MFR CONTROL UNIT 40 1.338 SPAWARSYSCEN 10/02 C/FP SAIC/SAN DIEGO 1/03 10/03 YES<br />

ALPHA PROBE 736 3.888 SPAWARSYSCEN 11/00 OPT TBD 1/03 10/03 YES<br />

MFR CHECKSOURCE KITS 49 1.083 SPAWARSYSCEN 7/02 C/FP TBD 1/03 10/03 YES<br />

FRISKER STATION 20 2.040 SPAWARSYSCEN 9/02 C/FP TBD 1/03 10/03 YES<br />

CP-1112 UPGRADES 14 7.992 SPAWARSYSCEN NA NA LANTORDCOM YORKTOWN 1/03 10/03 YES<br />

DOSIMETERS 29,225 0.027 SPAWARSYSCEN 4/02 OPT BICRON/ST. GOBAIN, OH 1/03 10/03 YES<br />

SHOREBASED READER 6 152.400 SPAWARSYSCEN 4/02 OPT BICRON/ST. GOBAIN, OH 1/03 10/03 YES<br />

DOSIMETER IRRADIATOR 27 7.992 SPAWARSYSCEN 4/02 OPT BICRON/ST. GOBAIN, OH 1/03 10/03 YES<br />

DOSIMETER AREA MONITOR 50 4.064 SPAWARSYSCEN NA C/FP NSWC CARDEROCK 1/03 10/03 YES<br />

D. REMARKS<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Classification:<br />

ITEM NO. 70 PAGE NO. 3 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

FEBRUARY 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy<br />

BA-2 Communications and Electronics Equipment RADIAC BLI: 292000 82M2<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

FY 2004<br />

MFR CONTROL UNIT 500 1.363 SPAWARSYSCEN 10/02 OPT SAIC/SAN DIEGO 1/04 10/04 YES<br />

NEUTRON INTERFACE 5 5.424 SPAWARSYSCEN 11/03 C/FP TBD 4/04 1/05 YES<br />

ALPHA PROBE 464 3.981 SPAWARSYSCEN 11/00 OPT TBD 1/04 10/04 YES<br />

MFR CHECKSOURCE KITS 5 1.102 SPAWARSYSCEN 7/02 OPT TBD 1/04 10/04 YES<br />

FRISKER STATION 490 2.077 SPAWARSYSCEN 9/02 C/FP TBD 1/04 10/04 YES<br />

CP-1112 UPGRADES 15 8.136 SPAWARSYSCEN NA NA LANTORDCOM YORKTOWN 1/04 10/04 YES<br />

SHIPBOARD READER 8 28.689 SPAWARSYSCEN 4/02 OPT TBD 1/04 10/04 YES<br />

SHOREBASED READER 4 155.143 SPAWARSYSCEN 4/02 OPT TBD 1/04 10/04 YES<br />

DOSIMETER IRRADIATOR 28 8.136 SPAWARSYSCEN 4/02 OPT TBD 1/04 10/04 YES<br />

DOSIMETER AREA MONITOR 50 4.137 SPAWARSYSCEN NA C/FP NSWC CARDEROCK 1/04 10/04 YES<br />

D. REMARKS<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Classification:<br />

ITEM NO. 70 PAGE NO. 4 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

FEBRUARY 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy<br />

BA-2 Communications and Electronics Equipment RADIAC BLI: 292000 82M2<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

FY 2005<br />

MFR CONTROL UNIT 549 1.389 SPAWARSYSCEN 10/02 OPT SAIC/SAN DIEGO 1/04 10/04 YES<br />

NEUTRON INTERFACE 123 5.527 SPAWARSYSCEN 11/03 C/FP TBD 4/04 1/05 YES<br />

ALPHA PROBE 342 4.391 SPAWARSYSCEN 11/00 OPT TBD 1/04 10/04 YES<br />

MFR CHECKSOURCE KITS 106 1.123 SPAWARSYSCEN 7/02 OPT TBD 1/04 10/04 YES<br />

FRISKER STATION 243 2.116 SPAWARSYSCEN 9/02 C/FP TBD 1/04 10/04 YES<br />

CP-1112 UPGRADES 23 8.290 SPAWARSYSCEN NA NA LANTORDCOM YORKTOWN 1/04 10/04 YES<br />

SHIPBOARD READER 23 29.234 SPAWARSYSCEN 4/02 OPT TBD 1/04 10/04 YES<br />

SHOREBASED READER 9 158.091 SPAWARSYSCEN 4/02 OPT TBD 1/04 10/04 YES<br />

DOSIMETER IRRADIATOR 27 8.290 SPAWARSYSCEN 4/02 OPT TBD 1/04 10/04 YES<br />

YES<br />

D. REMARKS<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Classification:<br />

ITEM NO. 70 PAGE NO. 5 UNCLASSIFIED


CLASSIFICATION:<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY, BA2 General Purpose Electronic Test Equipment GPETE)/2940<br />

Program Element for Code B Items: Other Related Program Elements<br />

ID Prior To<br />

Code Year FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions) $11.9 $6.5 $9.9 $7.0 $7.2 $7.3 $7.4 $7.5 $45.3<br />

SPARES COST<br />

(In Millions) $0.0<br />

This program provides for the initial procurement and distribution of General Purpose Electronic Test Equipment (GPETE). This equipment is essential to the operational readiness of the Navy for<br />

repair, installation, and maintenance (preventive and routine) of electronic systems and equipments, both afloat and ashore. The GPETE procured must meet rigid technical requirements, be cost<br />

effective and satisfy valid deficiencies in authorized allowance. FY04 funding includes funds placed in this account by N87 to pay for the replacement of Air Traffic Control and Landing Systems<br />

obsolete non-multifunctional Test, Measurement and Diagnostic Equipment (TMDE). This effort is scheduled to be completed during FY04.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 071 PAGE NO. 1<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy, BA2 General Purpose Electronic Test Equipment (GPETE)/2940<br />

COST ELEMENT OF COST ID Prior Year FY 2003 FY 2004 FY 2005<br />

CODE Code<br />

Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

M6000<br />

N091 TEST AND EVAL<br />

FIBER OPTICS AND DATA COMM A<br />

M6001 SIGNAL GENERATORS & ANALYZERS A 116 2.336 271 56 2.321 130 69 2.145 148 65 2.108 137<br />

M6002 OSCILLSCPS, METERS & COUNTERS A<br />

M6003 PROC ENGR AND DOCUMENTATION A 30 14 16 15<br />

N096 OCEANOGRAPHY<br />

M6000 FIBER OPTICS AND DATA COMM A<br />

M6001 SIGNAL GENERATORS & ANALYZERS A 343 2.076 712 28 17.357 486 24 18.250 438<br />

M6002 OSCILLSCPS, METERS & COUNTERS A 20 5.700 114 24 17.542 421<br />

M6003 PROC ENGR AND DOCUMENTATION A 92 47 54 49<br />

M6000<br />

N61 SEW & C4<br />

FIBER OPTICS AND DATA COMM A 66 5.652 373 122 3.541 432 132 3.568 471 134 3.530 473<br />

M6001 SIGNAL GENERATORS & ANALYZERS A 1,019 1.289 1,313 374 0.722 270 461 0.794 366 348 0.822 286<br />

M6002 OSCILLSCPS, METERS & COUNTERS A<br />

M6003 PROC ENGR AND DOCUMENTATION A 188 78 93 84<br />

N76- SURFACE WARFARE<br />

M6000 FIBER OPTICS AND DATA COMM A 75 3.733 280 41 3.537 145 37 3.541 131<br />

M6001 SIGNAL GENERATORS & ANALYZERS A 1,256 1.662 2,087 1,035 1.750 1,811 1,200 2.183 2,619 1104 1.860 2,053<br />

M6002 OSCILLSCPS, METERS & COUNTERS A 110 6.000 660<br />

M6003 PROC ENGR AND DOCUMENTATION A 305 232 307 243<br />

6,145 3,715 4,705 3,909<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 071 PAGE NO. 2<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy, BA2 General Purpose Electronic Test Equipment (GPETE)/2940<br />

COST ELEMENT OF COST ID Prior Year FY 2003 FY 2004 FY 2005<br />

CODE Code<br />

Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

Cont'd from P5 PG-1 6,145 3,715 4,705 3,909<br />

N77 -SUBMARINE WARFARE<br />

M6000 FIBER OPTICS AND DATA COMM A 41 5.707 234 40 3.475 139 29 3.448 100 25 6,960 174<br />

M6001 SIGNAL GENERATORS & ANALYZERS A 718 2.006 1,440 407 2.007 817 467 2.146 1,002 420 2,186 918<br />

M6002 OSCILLSCPS, METERS & COUNTERS A 46 6.022 277<br />

M6003 PROC ENGR AND DOCUMENTATION A 217 106 122 121<br />

N78 AIR WARFARE<br />

M6000 AIR TRAFFIC CONTROL & LANDING SYS A 284 7.035 1,998<br />

M6001 SIGNAL GENERATORS & ANALYZERS A 1,502 1.750 2,628 91 17.637 1,605 85 19,988 1,699<br />

M6002 OSCILLSCPS, METERS & COUNTERS A 96 6.042 580 83 18.590 1,543<br />

M6003 PROC ENGR AND DOCUMENTATION A 356 172 400 189<br />

11,877 6,492 9,932 7,010<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 071 PAGE NO. 3<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

FEBRUARY 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy, BA2 General Purpose Electronic 82M6<br />

Test Equipment (GPETE)/2940<br />

FY-03<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST<br />

(000)<br />

OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

M6000 237 SEE NOTE 1 SEAL BEACH N/A WX SEAL BEACH 11/02 3/03 YES<br />

M6001 1,872 SEE NOTE 2 SEAL BEACH N/A WX SEAL BEACH 11/02 3/03 YES<br />

M6002 107 SEE NOTE 3 SEAL BEACH N/A WX SEAL BEACH 11/02 3/03 YES<br />

FY-04<br />

M6000 202 SEE NOTE 4 SEAL BEACH N/A WX SEAL BEACH 11/03 3/04 YES<br />

M6000 (FY04 only) 284 SEE NOTE 5 EARLE N/A WX EARLE 11/03 10/04 YES<br />

M6001 2,136 SEE NOTE 6 SEAL BEACH N/A WX SEAL BEACH 11/03 3/04 YES<br />

M6002<br />

FY-05<br />

N/A - - - - - - - -<br />

M6000 196 SEE NOTE 7 SEAL BEACH N/A WX SEAL BEACH 11/04 3/05 YES<br />

M6001 2,046 SEE NOTE 8 SEAL BEACH N/A WX SEAL BEACH 11/04 3/05 YES<br />

M6002 N/A - - - - - - - -<br />

D. REMARKS<br />

NOTE 1: Unit costs are 3541/3733/3475 respectively for Resource Sponsors N61, N76, N77<br />

NOTE 2: Unit costs are 2321/722/1750/2007 respectively for Resource Sponsors N091, N61, N76, N77<br />

NOTE 3: Unit costs are 17,542/18,590 respectively for Resource Sponsors N096, N78<br />

NOTE 4: Unit costs are 3568/3537/3448 respectively for Resource Sponsors N61, N76, N77 FIBER OPTICS & DATA COMMUNICATORS<br />

NOTE 5: Unit cost is 7035 for Resource Sponsor N78 (FY04 only) AIR TRAFFIC CONTROL & LANDING SYSTEMS<br />

NOTE 6: Unit costs are 2145/17,357/794/2183/2146/17,637 respectively for Resource Sponsors N091, N096, N61, N76, N77, N78<br />

NOTE 7: Unit costs are 3530/3541/6960 respectively for Resource Sponsors N61, N76, N77<br />

NOTE 8: Unit costs are 2108/18,250/822/1860/2186/19,988 respectively for Resource Sponsors N091, N093, N61, N76, N77, N78<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Classification:<br />

ITEM NO. 071 PAGE NO. 4 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004 .<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE INTEGRATED COMBAT SYSTEMS TEST<br />

OTHER PROCUREMENT, NAVY BA-2: Communication and Electronic Equipment FACILITY (ICSTF)/DISTRIBUTED ENGINEERING PLANT (DEP) - 296000<br />

Program Element for Code B Items: Other Related Program Elements<br />

Prior ID To<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions) $12.8 $7.7 $8.7 $4.7 $4.4 $4.5 $4.5 $4.6 Cont. $39.1<br />

SPARES COST<br />

(In Millions) $0.7 $0.7 $0.7 $3.3 $1.6 $1.2 $1.1 $0.2 Cont. $8.8<br />

PROGRAM DESCRIPTION/JUSTIFICATION<br />

Naval Surface Warfare Center, Port Hueneme Division Detachment, San Diego (NSWC PHD DET SD) is a Navy owned and operated combat system integration test site and is located in San Diego,<br />

California at the SPAWAR Systems Center. NSWC PHD DET SD's mission is to perform certification testing of computer programs prior to delivery to the Fleet. CINCLANTFLT/CINCPACFLT Instruction<br />

4720.3A (Fleet Response Plan (FRP)) stated that all platforms must be certified through Combat System Integration Testing (CSIT), which occurs for non-AEGIS platforms at this facility. NSWC PHD DET SD<br />

is the only permanent Navy facility responsible for fleet delivery readiness certification of CV/CVN, LHD and LPD-17 ship class combat system computer networks. NSWC PHD DET SD also provides combat<br />

system in-service engineering support for Fleet identified problems. NSWC PHD DET SD has been used efficiently to detect combat system computer program problems and enable their correction prior to<br />

delivery to the Fleet. This has significantly reduced the cost of corrective action and increased ship operation days. NSWC PHD DET SD is a key member of the Navy's Distributed Engineering Plant (DEP)<br />

Alliance, which performs Strike Force Interoperability Testing (SFIT) and Collaborative System Testing (CST) for Strike Groups.<br />

As existing COTS combat subsystems are continuously Technically Refreshed and/or Technical Insertion is .performed, and/or new COTS subsystems are introduced into the Fleet, NSWC PHD DET SD must<br />

develop the test beds that functionally represent these combat systems to support the conduct of CSIT of the lead ship of the class as part of the Fleet Response Plan (FRP). NSWC PHD DET SD must also<br />

develop the test beds to support CSIT for new ships/ship classes (CVX class, LPD-21 class, LHD-8 and LHA-R) that are introduced into the Fleet with new combat subsystems.<br />

The basic procurement program outlined herein is directed at expanding NSWC PHD DET SD's capability to support CSIT. Procurement requirements are directly tied to the CSIT testing schedule.<br />

Procurements are required to build the necessary test beds and for laboratory support equipment. The laboratory support equipment, requires frequent upgrades in order to support the new tactical<br />

subsystems that use COTS equipment. FY 2004 funding is available to replace a main component of lab support equipment, the High Speed Digital Switch (HSDS), representing 20+ year old technology,<br />

with the Digital Tactical Switching System (DTSS) to ensure NSWC PHD DET SD's ability to provide uninterupted support of testing requirements.<br />

In addition, the basic program provides for equipment/upgrades for the Navy's Distributed Engineering Plant (DEP) needed to conduct Strike Force Interoperability Testing SFIT). The DEP consists of 13 land<br />

based sites networked to certify computer programs prior to their delivery to the Fleet. SFIT is required for all deploying Strike Groups per the Joint Fleet instruction.<br />

All procurements will be received and installed by NSWC PHD DET SD. Major equipment is procured from Raytheon in San Diego, CA, CCT in Anaheim, CA and DRS Technologies, which is located in<br />

Johnstown, PA. Installations are based on CSIT and SFIT schedules.<br />

DD Form 2454, JUN 86 ITEM NO.72 PAGE NO.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

1 UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 CONTINUATION February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE 37288 INTEGRATED COMBAT SYSTEMS<br />

OTHER PROCUREMENT, NAVY/BA-2 Communications and Electronic Equipment TEST FACILITY(ICSTF)/DISTRIBUTED ENGINEERING PLANTS (DEP) - 296000<br />

The Shipboard Electronics Systems Evaluation Facilities (SESEF) are Navy-owned and operated test ranges capable of action as the partner in two party operational performance testing of systems<br />

currently in the Fleet (i.e., AIMS MK XII IFF (all modes)), TACAN, conventional radars (both search and fire control), communication systems secure voice and LINK 11/4A). The SESEF provides<br />

ship Captains and Type Commanders the capability of measuring and testing a ship's condition of material readiness at the completion of construction, industrial availabilty, during routine ship<br />

operations and prior to deployment.<br />

Consistent with the CNO's approval for modernization of SESEFs, OPN funds have been provided to procure equipment to upgrade the capabilities for Ft. Story, VA., San Diego, CA., Puget Sound,<br />

WA., Pearl Harbor, HI., Yokosuka, Japan, and Mayport, FL. This equipment will provide two party capabilities to test the new and more complex ship board electronic systems (i.e., SLQ-32, AN/SPY-1,<br />

etc.) and perform antenna radiation pattern measurements.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 72 PAGE NO. 2<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy Integrated Combat Systems Test Facility (ICSTF)<br />

BA-2: COMMUNICATION AND ELECTRONIC EQUIPMENT Distributed Engineering Plants (DEP) - 296000<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID Prior FY 2003 FY 2004 FY 2005<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

SURFACE SHIPS (N76)<br />

M8100 COMBAT SYSTEM EQUIPMENT A 6,230 2,236 3,074<br />

CV/CVN Test Bed 615 2,236 1,010<br />

LPD-17 to 20 Test Bed 2,195 0 0<br />

LHD Test Bed 839<br />

LPD-21 Test Bed 56<br />

Legacy Ships Test Bed 100<br />

Test Bed Displays<br />

BF Capability Upgrades<br />

3,320 1,169<br />

M8200 SUPPORT EQUIPMENT A 537 5,153 46<br />

Test Tools (4L42 SEATASK) 50 0 46<br />

DTSS (64X64) Matrix 350 4,333<br />

Simulation 37 775<br />

Lab Upgrade 100 45<br />

M8300 CS Simulation A<br />

M8400 SESEF Elect. Equip A 785 742 780<br />

M8500 DEP Equipment A 250 250<br />

M861N Equipment Installation A 136 280 512<br />

7,688 8,661 4,662<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO.72 PAGE NO.<br />

3


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY BA-2 COMMUNICATIONS AND ELECTRONICS EQUIP EMI CONTROL INSTRUMENTATION LI: 297000 82MA<br />

Program Element for Code B Items: Other Related Program Elements<br />

FY 2002 ID To<br />

and Prior Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions) $56.3 $5.2 $6.4 $5.9 $6.0 $6.1 $6.2 $6.3 $42.1<br />

SPARES COST<br />

(In Millions)<br />

Funds will be used to procure emergency field change kits, hardware devices and sensor kits to solve Electromagnetic Interference (EMI) problems in electronic systems/equipments throughout the<br />

surface ship Navy. The fixes which include various types of filters, limiters, blankers and shielding will be installed by fleet support and maintenance personnel to eliminate EMI where it is causing<br />

unacceptable degradation in the operational performance of mission-essential systems. EMI Control Instrumentation will be procured for use in identifying the sources of EMI and determining the<br />

extent of EMI so that effective corrective measures can be applied. Better definition of the problems will also provide data which will be used by designers to reduce EMI problems in future systems<br />

and equipments. The instrumentation procured will include automated and special EMI test equipment (e.g. spectrum analysis, field intensity meters, AN/PSM-40 series test sets, etc.).<br />

Instrumentation, hardware and software will also be procured to upgrade the Frequency Assignment Computer Terminal Systems (FACTS) and to provide remote access capability to the<br />

Communications Area Master Station (CAMS) and other high-density users.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 73 PAGE NO. 1<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy<br />

BA-2 Communications and Electronic Equipment EMI CONTROL INSTRUMENTATION LI: 297000 82MA<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID FY 2002 FY 2003 FY 2004 FY 2005 FY<br />

CODE Code and Prior<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

ELECTRONICS SUPPORT (OP-N6)<br />

MA001 EMERG FIELD CHANGE KITS A 10,120 0 0 0<br />

MA004 EMI FIXES & SENSOR KITS A 27,694 3,722 4,643 4,094<br />

MA104 EMI CONTROL INSTRUMENTATION A 17,401 1,365 1,623 1,628<br />

MA107 FACTS INSTRUMENTATION A 1,063 155 155 150<br />

56,278 5,242 6,421 5,872 0<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 73 PAGE NO. 2<br />

UNCLASSIFIED


CLASSIFICATION:<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA-2 Items under $5M (298000)<br />

Program Element for Code B Items: Other Related Program Elements<br />

Prior ID To<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY2008 FY2009 Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions) $12.1 $15.3 $12.1 $5.7 $5.1 $5.2 $5.0 $60.5<br />

SPARES COST<br />

(In Millions) $0.0<br />

THIS IS A CONSOLIDATED OPN BUDGET FOR THE FOLLOWING ITEMS:<br />

ADVANCED SENSOR DISTRIBUTION SYSTEM (ASDS)<br />

ASDS is a radar distribution system which converts naval surface and air search radar information into a standard digital format, which distributes this data to radar navigation and tactical<br />

displays throughout the platform. The ASDS SB-4229A(V)/SP radar signal distribution switchboard is designed for fast, effective switching of all naval radar video, IFF and MIL-STD-751<br />

digital data to all combat system display consoles throughout the platform. The ASDS CV-3989(V)/SP dual signal data converter accepts standard radar positional interfaces and receives<br />

inputs from shipboard navigational sensors. The AN/SPA-25G provides for improvements which will increase operational capability, accuracy and reliability.<br />

SHORE ELECTRONIC ITEMS (TECR):<br />

The Tactical Embedded Computer Resources (TECR) reutilization program - refurbishes, reconfigures and tests TECR assets made available through decommissionings and other<br />

downsizing efforts and provides these assets to satisfy current tactical systems requirements. TECR depot and diminishing manufacturing resources capability - includes procurement of test<br />

equipment and potentially obsolete parts to maintain both organic and original equipment manufacturer depots for out-of-production equipment which will remain in the fleet well past FY<br />

2010. Additional funds were provided in FY 99 to upgrade and test the display consoles and associated equipment on older U. S. navy ships and test sites, replacing them with emulators,<br />

AN/UYQ-70 displays and associated peripheral equipment. These displays and associated equipment would be tested to assess improvements in the man/system interfaces which control<br />

the command/control/weapons/combat systems required for the mission of these Navy surface combatants.<br />

COMPUTER AIDED DEAD RECKONING TRACER (CADRT)<br />

Provides automated family of plotter/tracer replacements to display navigation and all warfare tactical plots which can overlay on digital nautical charts with complete connectivity.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 74 PAGE NO. 1<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY Items under $5M (298000)<br />

CALIBRATION STANDARDS:<br />

These funds procure calibration equipment for intermediate and organizational maintenance levels. Test And Monitoring Systems (TAMS), which include test equipment and gauges, must be<br />

calibrated to ensure the equipment is operational, accurate and precise. Funds are used to procure Calibration Standards. Calibration Standards are equipments which ensure the accuracy of test<br />

equipment used to install, align, and maintain all navy weapons systems shore and afloat. IMA mechanical standards programs provide various new and replacement calibration equipment for<br />

instrument repair and calibration shops aboard tenders and shore based intermediate maintenance activities. The shipboard gage calibration program provides the organization maintenance level<br />

aboard ship with portable calibration equipment to provide calibration support in only specific areas of measurement. Integrated Condition Assessment System (ICAS) is an NDI (cots equipment)<br />

computer based system that provides real-time, on-line machinery condition monitoring and failure detection, diagnosis, trending for failure prognosis and expert troubleshooting capability. ICAS is<br />

linked through data networks to other critical ship systems, such as machinery control, damage control and bridge systems to receive necessary sensory information.<br />

NAVY SIGNAL PROCESSORS:<br />

Procures support and materials incident to safety and reliability modifications for AN/UYS-2A equipment; procurement of COTS hardware to support modernization/replacement of AN/UYS-2A<br />

equipment; procurement/direct support costs to support modernization activities.<br />

RADAR SUPPORT:<br />

AN/SPS-73(V) radar - provides replacement radar for AN/SPS-64 radar on all ship classes and replacement for AN/SPS-55 radar on various class ships<br />

IN SERVICE RADARS:<br />

This program addresses TMA/TMI issues raised by the fleet for the AN/SPS-48E 3D air search radar and the AN/SPS-49(V) 2D air search radar. Funding for the AN/SPS-48 radar will procure a<br />

course re-write to address field changes made to the radar and not taught as part of the training curriculum which is required in order to help maintenance technicians who have difficulty in<br />

diagnosing faults. Funding will also be used to procure a significant upgrade of the receiver cabinet. Funding for the AN/SPS-49 radar will procure solid state modulator field change kits. This<br />

modulator will replace the current modulator which has a high failure rate and utilizes outdated glass tube technology manufactured by a single off-shore vendor.<br />

RADAR AUGMENTATION FOR PERISCOPE IDENTIFICATION (RAPID): This radar improves an existing search radar to provide periscope detection & discrimination while conducting surface<br />

search functions, such as navigation and piloting, surface target detection (masts, buoys, boats, floating mines). The concept is to field a new capability without having to procure and qualify a new<br />

radar.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 74 PAGE NO. 2<br />

UNCLASSIFIED


CLASSIFICATION:<br />

UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy<br />

ITEMS UNDER $5M (298000)<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID Prior FY 2003 FY 2004 FY2005<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

DC001 RADAR SUPPORT- N76 16 140 2,240 19 146 2,774<br />

DC002 SHORE ELECTRONICS - TECR - N6 1,803 904 575 656<br />

DC003 NAVY SIGNAL PROCESSORS - N61 1,262 325 355<br />

DC004 CALIBRATION STANDARDS - N4 1,594 1,489 1,564 1,559<br />

DC006 ASDS-N76 15 151 2,263 13 218 2,820 10 153 1,530<br />

DC007 TC-RCI-AN/BPS 15/16-N77 169<br />

DC008 ICAS 2,600<br />

DC009 IN SERVICE RADARS (AN/SPS-48)- N76 1,716 25 65 2,498<br />

DC010 IN SERVICE RADARS(AN/SPS-49)- N76 3,287 14 100 1,400<br />

DC011 Q-70 CADRT-N76 3,400<br />

DC012 PERISCOPE DETECTION RADAR - N76<br />

DCINS EQUIPMENT INSTALLATION- N76 111 1,622 2,244 4,060<br />

12,087 15,305 12,058<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 74 PAGE NO. 3<br />

UNCLASSIFIED


CLASSIFICATION:<br />

UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE: February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy N/BA-2 Items Under $5M 82DC<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

FY 03<br />

Washington Raytheon<br />

DC001 AN/SPS-73 RADAR 16 140 Navy Yard MIPR Portsmouth RI Jan 03 Sep 03 YES<br />

Washington Frontier<br />

DC006 ASDS 15 151 Navy Yard MIPR Stillwater OK Nov 02 May 03 YES<br />

FY 04<br />

Washington Raytheon<br />

DC001 AN/SPS-73 RADAR 19 146 Navy Yard MIPR Sudberry MA. Jan 04 Apr 04 YES<br />

Washington Frontier<br />

DC006 ASDS 13 218 Navy Yard MIPR Stillwater OK Nov 03 May 04 YES<br />

FY 05<br />

Washington Frontier<br />

DC006 ASDS 10 153 Navy Yard MIPR Stillwater OK Nov 04 May 05 YES<br />

Washington ITT Gilfillan<br />

DC009 AN/SPS-48 25 65 Navy Yard MIPR VanNuys CA Jan 05 Jan 06 YES<br />

Washington Raytheon<br />

DC010 AN/SPS-49 14 100 Navy Yard MIPR Sudberry MA Jan 05 Jan 06 YES<br />

D. REMARKS<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST Classification:<br />

ITEM NO. 74 PAGE NO. 4<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

UNCLASSIFIED<br />

MODELS OF SYSTEM AFFECTED: Items Under $5M (298000) TYPE MODIFICATION: N/A MODIFICATION TITLE: AN/SPS-73(V) RADAR (N76)<br />

DESCRIPTION/JUSTIFICATION:<br />

PROVIDE REPLACEMENT RADARS FOR LN-66, AN/SPS-64(V)9, AND AN/SPS-55.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS - UNIT COST<br />

INSTALLATION KITS NONRECURRING<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY2010 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

EQUIPMENT 10 0.4 16 2.2 0 26 2.60<br />

EQUIPMENT NONRECURRING<br />

ENGINEERING CHANGE ORDERS<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

OTHER (Production Engineering)<br />

OTHER (Consulting Services)<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 10 0.4 16 0.9 5 0.90 31 2.20<br />

TOTAL PROCUREMENT 0.8 3.1 0.90 4.80<br />

ITEM NO. 74 PAGE 5 CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION:<br />

P3A (Continued)<br />

UNCLASSIFIED<br />

MODELS OF SYSTEMS AFFECTED: MODIFICATION TITLE: AN/SPS-73(V) RADAR (N76)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME: 9 Months<br />

CONTRACT DATES: FY 2002: FY 2003: Jan 03 FY 2004: Jan 04 FY2005: Jan-05<br />

DELIVERY DATE: FY 2002: FY 2003: Sep 03 FY 2004: Sep 04 FY2005: Sep 05<br />

($ in Millions)<br />

Cost: FY2002 & Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty Qty $<br />

PRIOR YEARS<br />

FY 2002 EQUIPMENT 10 0 0.4 10 0.40<br />

FY 2003 EQUIPMENT 16 0.90 16 0.90<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

FY 2006 EQUIPMENT<br />

FY 2007 EQUIPMENT<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

19 0.90 19 0.90<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 10 0 0 8 8 0 0 10 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

Out 10 0 0 8 8 0 0 10 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

P-3A<br />

*SPS/73 radars are funded in BLI 204000 ITEM NO. 74 PAGE 6 CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION:<br />

P3A INDIVIDUAL MODIFICATION<br />

UNCLASSIFIED<br />

MODELS OF SYSTEM AFFECTED: RADDS SYSTEMS TYPE MODIFICATION: N/A MODIFICATION TITLE: ASDS<br />

DESCRIPTION/JUSTIFICATION:<br />

ASDS IS A RADAR DISTRIBUTION SYSTEM WHICH CONVERTS NAVAL SURFACE AND AIR SEARCH RADAR INFORMATION INTO A STANDARD DIGITAL FORMAT, WHICH DISTRIBUTES THIS DATA TO<br />

RADAR NAVIGATION ANDTACTICAL DISPLAYS THROUGHOUT VARIOUS PLATFORMS.<br />

.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY2010 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS - UNIT COST<br />

INSTALLATION KITS NONRECURRING<br />

EQUIPMENT<br />

EQUIPMENT NONRECURRING<br />

ENGINEERING CHANGE ORDERS<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

OTHER (Production Engineering)<br />

OTHER (Consulting Services)<br />

OTHER<br />

INTERIM CONTRACTOR SUPPORT<br />

15 2.3 13 2.82 10 1.530 38 6.7<br />

INSTALL COST AP 0.1 10.0 0.7 13.0 1.3 15.0 2.3 38.0 4.4<br />

TOTAL PROCUREMENT 0.1 3.0 4.1 3.8 11.1<br />

ITEM NO. 74 PAGE 7 CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION:<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: MODIFICATION TITLE: ASDS<br />

UNCLASSIFIED<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME: 6 Months<br />

CONTRACT DATES: FY 2002: FY 2003: Nov-02 FY 2004: Nov 03 FY2005: Nov-04<br />

DELIVERY DATE: FY 2002: FY 2003: May 03 FY 2004: May 04 FY2005: May-05<br />

($ in Millions)<br />

Cost: FY2002 & Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2002 EQUIPMENT<br />

0.1 0.1<br />

FY 2003 EQUIPMENT 10 0.7 5 0.6 15 1.3<br />

FY 2004 EQUIPMENT 8 0.7 5 0.5 13 1.2<br />

FY 2005 EQUIPMENT<br />

FY 2006 EQUIPMENT<br />

FY 2007 EQUIPMENT<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

10 1.8 10 1.8<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 4 1 2 3 4 TOTAL<br />

In 0 0 0 10 3 2 4 4 3 2 5 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 38<br />

Out 0 0 0 10 3 2 4 4 3 2 5 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 38<br />

P-3A<br />

ITEM NO. 74 PAGE 8 CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION:<br />

P3A INDIVIDUAL MODIFICATION<br />

UNCLASSIFIED<br />

MODELS OF SYSTEM AFFECTED: Items Under $5M (298000) TYPE MODIFICATION: N/A MODIFICATION TITLE: IN SERVICE RADARS (AN/SPS-48)<br />

DESCRIPTION/JUSTIFICATION:<br />

PROGRAM ADDRESS TMA/TMI ISSUES RAISED BY THE FLEET FOR THE AN/SPS-48E 3D AIR SEARCH RADAR.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS - UNIT COST<br />

INSTALLATION KITS NONRECURRING<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY2010 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

EQUIPMENT 25 1.625 25 1.63<br />

EQUIPMENT NONRECURRING 1.121 0.479 0.030 1.63<br />

ENGINEERING CHANGE ORDERS<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

OTHER (Production Engineering)<br />

OTHER (Consulting Services)<br />

OTHER (TRAINING) 0.6 0.4 0.99<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 4 0.080 11 0.220 10 0.200 25 0.50<br />

TOTAL PROCUREMENT 1.7 2.5 0.1 0.2 0.2 4.75<br />

ITEM NO. 74 PAGE 9 CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION:<br />

P3A (Continued)<br />

UNCLASSIFIED<br />

MODELS OF SYSTEMS AFFECTED: MODIFICATION TITLE: IN SERVICE RADARS (AN/SPS48E 3D)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: FY 2003: FY 2004: FY 2005: Jan-05<br />

DELIVERY DATE: FY 2002: FY 2003: FY 2004: FY 2005: Jan-06<br />

($ in Millions)<br />

Cost: FY2002 & Prior Years FY 2003 FY 2004 FY 2005 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ $<br />

PRIOR YEARS<br />

FY 2002 EQUIPMENT<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT<br />

FY 2006 EQUIPMENT 4 0.08<br />

FY 2007 EQUIPMENT 11 0.22<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

10 0.20<br />

TO COMPLETE 25 0.50<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 2 1 1 3 3 3 2 3 1 5 1 0 0 0 0 25<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 2 1 1 3 3 3 2 3 1 5 1 0 0 0 0 25<br />

ITEM NO. 74 PAGE 10 CLASSIFICATION:<br />

UNCLASSIFIED<br />

P-3A


CLASSIFICATION:<br />

P3A INDIVIDUAL MODIFICATION<br />

UNCLASSIFIED<br />

MODELS OF SYSTEM AFFECTED: Items Under $5M (298000) TYPE MODIFICATION: N/A MODIFICATION TITLE: IN SERVICE RADARS (AN/SPS-49)<br />

DESCRIPTION/JUSTIFICATION:<br />

PROGRAM ADDRESS TMA/TMI ISSUES RAISED BY THE FLEET FOR THE AN/SPS-49(V)2D AIR SEARCH RADAR.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

RDT&E<br />

PROCUREMENT<br />

INSTALLATION KITS<br />

INSTALLATION KITS - UNIT COST<br />

INSTALLATION KITS NONRECURRING<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY2010 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

EQUIPMENT 14 1.4 15 1.5 14 1.4 15 1.5 14 1.4 72 7.20<br />

EQUIPMENT NONRECURRING<br />

ENGINEERING CHANGE ORDERS<br />

DATA<br />

TRAINING EQUIPMENT<br />

SUPPORT EQUIPMENT<br />

OTHER (Production Engineering) 3.287 3.29<br />

OTHER (Consulting Services)<br />

OTHER (TRAINING)<br />

INTERIM CONTRACTOR SUPPORT<br />

INSTALL COST 16 0.27 14 0.24 15 0.26 18 0.31 9 72 1.07<br />

TOTAL PROCUREMENT 3.29 1.40 1.77 1.64 1.76 1.71 11.56<br />

ITEM NO. 74 PAGE 11 CLASSIFICATION:<br />

UNCLASSIFIED


CLASSIFICATION:<br />

P3A (Continued)<br />

UNCLASSIFIED<br />

MODELS OF SYSTEMS AFFECTED: MODIFICATION TITLE: IN SERVICE RADAR (AN/SPS-49(V) 2D)<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: FY 2003: FY 2004: FY 2005: Jan-05<br />

DELIVERY DATE: FY 2002: FY 2003: FY 2004: FY 2005: Jan-06<br />

($ in Millions)<br />

Cost: FY2002 & Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty Qty $<br />

PRIOR YEARS<br />

FY 2002 EQUIPMENT<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT<br />

FY 2005 EQUIPMENT 14 0.238 14 0.27<br />

FY 2006 EQUIPMENT 2 0.034 13 0.221 15 0.26<br />

FY 2007 EQUIPMENT 1 0.017 13 0.221 14 0.26<br />

FY 2008 EQUIPMENT 2 0.034 13 0.221 15 0.25<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

5 0.085 5 0.05<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 5 5 6 4 4 4 2 3 4 4 4 5 5 5 3 3 3 3 72<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 5 5 6 4 4 4 2 3 4 4 4 5 5 5 3 3 3 3 72<br />

P-3A<br />

ITEM NO. 74 PAGE 12 CLASSIFICATION:<br />

UNCLASSIFIED


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI: 3010 SHIP TACTICAL COMMUNICATIONS 52DN<br />

QUANTITY<br />

FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TO COMP TOTAL<br />

COST<br />

(in millions) $40.0 $14.1 $5.9 $5.2 $102.9 $137.2<br />

JUSTIFICATION OF BUDGET YEAR REQUIREMENTS: Beginning in FY04, HFRG, HF Tilt Mechanisms and Joint Tactical Radios System will transfer from BLI 3057 Comm Items Under $5M and BLI 3215<br />

Satellite Communications respectively to BLI 3010 Ship Tactical Communications.<br />

HF TILT MECHANISMS - Devices to enable vertical whip antenna to be lowered to a horizontal position during flight operations.<br />

HIGH FREQUENCY RADIO GROUP (HFRG) BROADBAND - Will allow fully automated operation of the HF communications system. The system will reduce the number of topside antennas used, reduce<br />

electromagnetic interference and reduce manning requirements.<br />

JTRS: The Joint Tactical Radio System-Maritime and Fixed Station (JTRS-M/F) provides tactical Joint interoperable communications. JTRS-M/F replaces all non-compliant, mostly 1970's design radios and<br />

multiplexers, with a software programmable radio that can meet present and future requirements in a cost effective and forward thinking manner. JTRS-M/F initial baseline provides the framework for meeting the<br />

planned future SATCOM, Line of Sight (LOS) and Beyond LOS communications requirements in the 2 MHz to 2 GHz spectrum. Additionally, JTRS-M/F provides advanced higher data rate and capacity waveforms in<br />

the UHF spectrum critical to supporting the Navy IT-21 Network Centric strategy and Joint Vision 2010 and provides the radio for incorporation of the developing Advanced Narrowband System (ANS) waveform, the<br />

next generation UHF follow-on satellite constellation. The Maritime and Fixed Station JTRS (JTRS-M/F) will be evolutionary in development. FY03 and prior is implemented under the Digital Modular Radio (DMR)<br />

Program as JTRS-M/F Block 0. JTRS-M/F Block I will consist of a modification of the DMR to JTRS software compliance and will meet narrowband requirements of the Navy tactical communications. JTRS-M/F<br />

Block II will be a newly developed radio system that will meet both narrowband and wideband requirements in the 2 MHz to 2 GHz frequency spectrum. The new system will replace a multitude of systems (HFRG,<br />

DWTS, UHF SATCOM, etc.). NOTE: In November 2003, USD (ATL) directed the merge of Clusters 3 &4 (Navy & Air Force) to establish a combined JTRS Cluster, to be renamed AMF JTRS, Airborne<br />

Maritime/Fixed JTRS. Funding represents Navy's portion of AMF JTRS.<br />

DMR: The Digital Modular Radio (DMR) provides improvements for fleet radio requirements in the HF, VHF, and UHF frequency band. The DMR replaces and will be interoperable and backwards compatible with<br />

legacy systems. The DMR is a digital, modular, software programmable, multi-channel, multi-function and multi-band (2MHz-2 GHz) radio system.<br />

P-1 Shopping List - Item No 75 - 1 of 7<br />

Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

COST ANALYSIS<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT BLI: 3010 SHIP TACTICAL COMMUNICATIONS 52DN<br />

FY 2003 FY 2004 FY 2005<br />

COST ID UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE QTY COST COST QTY COST COST QTY COST COST<br />

DN013 HF Tilt Mechanism A 18 135 2,421 10 136 1,355<br />

NU013 HF Tilt Mechanism*<br />

DN016 HFRG Broadband A 4 4,436 17,745<br />

NU016 HFRG Broadband* [1] [4491] [4491]<br />

DN105 DMR B 9 1,025 9,227 0 0<br />

DN555 Production Support 2,922 1,309<br />

HF Tilt [310] 428 439<br />

HFRG [780] 1,900 672<br />

DMR [1087] 594 198<br />

INSTALLATION 7,721 11,413<br />

DN777 FMP 4,719 10,777<br />

HF Tilt 736 822<br />

HFRG [210] 2,022 8,900<br />

DMR 1,961 1,055<br />

DN777 DSA 3,002 636<br />

HF Tilt 82 92<br />

HFRG [255] 2,800 247<br />

DMR 120 297<br />

Total SPAWAR CONTROL 40,036 14,077<br />

FY03 and Prior: HF Tilt and HFRG budget is included under BLI 3057 Comm Items Under $5M. Provided for informational purposes only<br />

FY03 and Prior: DMR reflected in BLI 321500. Provided for informational purposes only<br />

DATE<br />

February 2004<br />

FY04 HFRG buy includes 2 procurements plus an Engineering Change Order to upgrade a 12kw HFRG system (Bellewood LHA-3) into two HFRG (8kw & 4kw) systems for the<br />

CVN67 and the CG-60.<br />

FY04 Unit cost includes 3 HF ALE upgrades and 16 VRC-104<br />

P-1 Shopping List - Item No 75 - 2 of 7<br />

Exhibit P-5, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

PROCUREMENT HISTORY AND PLANNING February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI: 3010 SHIP TACTICAL COMMUNICATIONS 52DN<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE Delevery COST NOW AVAILABLE<br />

DN013 HF Tilt Mechanism 04 El Dyne FFP/O SPAWAR Jan-04 Jan-05 18 135 YES<br />

DN013 HF Tilt Mechanism 05 El Dyne FFP/O SPAWAR Jan-05 Jan-06 10 136 YES<br />

D. REMARKS<br />

DN016 HFRG Broadband 04 HARRIS Corp, Rochester NY FFP/O SPAWAR Oct-03 Oct-04 4 4,436 YES<br />

DN105 Digital Modular Radio (DMR)<br />

A. DATE<br />

04 General Dynamics Decision<br />

Systems (formerly Motorola) CPIF SPAWAR N/A Jul-04 Jul-05 9 1,025 YES<br />

P-1 Shopping List - Item No 75 - 3 of 7<br />

Exhibit P-5, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: SHIP TACTICAL COMMUNICATIONS February 2004<br />

COST CODE DN013<br />

MODELS OF SYSTEMS AFFECTED: HF TILT MECHANISMS<br />

DESCRIPTION/JUSTIFICATION: Installation on ships to allow vertical whip antennas to be lowered to a horizontal position during flight operations.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring\<br />

Engineering Change Order<br />

Data<br />

Training Equipment<br />

[27] [2.7] [2] [0.3] [0] [0.0] 18 2.4 10 1.4 18 2.2 14 1.7 0 0.0 0 0.0 231 34.2 291 41.9<br />

Production Support [1.1] [0.6] [0.3] 0.4 0.4 0.5 0.5 0.2 1.2 3.3<br />

Other (DSA)<br />

Interm Contractor Support<br />

[0.0] [0.0] 0.1 0.1 0.1 0.2 0.1 2.1 2.5<br />

Installation of Hardware [13] [1.2] [0] [0.0] [0] [0.0] 16 0.7 18 0.8 10 0.5 18 0.9 14 0.7 0 0.0 231 11.6 307 15.3<br />

PRIOR YR EQUIP [13] [1.2] 14 0.6 14 0.6<br />

FY 02 EQUIP 2 0.1 2 0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 18 0.8 18 0.8<br />

FY 05 EQUIP 10 0.5 10 0.5<br />

FY 06 EQUIP 18 0.9 18 0.9<br />

FY 07 EQUIP 14 0.7 14 0.7<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 231 11.6 231 11.6<br />

TOTAL INSTALLATION COST [1.2] [0.0] [0.0] 0.7 0.8 0.5 0.9 0.7 0.0 11.6 15.3<br />

TOTAL PROCUREMENT COST [5.0] [0.9] [0.3] 3.7 2.7 3.3 3.3 1.0 0.0 49.1 62.9<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 5 mos PRODUCTION LEADTIME: 12 mos<br />

CONTRACT DATES: FY 2002: May-02 FY 2003: N/A FY 2004: Jan-04 FY 2005: Jan-05<br />

DELIVERY DATES: FY 2002: May-03 FY 2003: N/A FY 2004: Jan-05 FY 2005: Jan-06<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT [13] 3 4 6 3 6 6 6 7 3<br />

OUTPUT [13] 3 4 6 3 6 6 6 7 3<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 6 8 4 7 7 231 307<br />

OUTPUT 6 8 4 7 7 231 307<br />

Notes/Comments<br />

FY03 and Prior: HF Tilt budget is included under BLI 3057 Comm Items Under $5M. Provided for informational purposes only<br />

Total inventory objective is 320 units. 29 units procured under BLI 3057. 291 will be procured under BLI 3010.<br />

P-1 Shopping List - Item No 75 - 4 of 7<br />

Exhibit P-5, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: SHIP TACTICAL COMMUNICATIONS February 2004<br />

COST CODE DN016/NU016<br />

MODELS OF SYSTEMS AFFECTED: HIGH FREQUENCY RADIO GROUP<br />

DESCRIPTION/JUSTIFICATION: Provides for fully automated operation of the High Frequency Communications System.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07<br />

FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment [33] [41.5] [0] [0.0] [1] [3.5] 2 6.4 0 0.0 2 6.4<br />

Equipment Nonrecurring - HF ALE (URC 109) [0.5] 0.0<br />

Equipment Nonrecurring - HF ALE (VRC104) [0.6] 8.6<br />

ECO-Upgrade CV-67 ad CG-60<br />

Data<br />

Training Equipment<br />

2 2.7 2 2.7<br />

Production Support [1.4] [1.3] [0.8] 1.9 0.7 2.6<br />

Other (DSA)<br />

Interm Contractor Support<br />

[0.7] [0.5] [0.3] 2.8 0.2 3.0<br />

Installation of Hardware [31] [41.6] [1] [2.2] [0] [0.2] 1 2.0 4 8.9 0 0.0 0 0.0 0 0.0 0 0.0 5 10.9<br />

PRIOR YR EQUIP [31] [41.6] [1] [2.2] 0 0.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP [0] [0.2] 1 2.0 1 2.0<br />

FY 04 EQUIP 4 8.9 4 8.9<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST [41.6] [2.2] [0.2] 2.0 8.9 0.0 0.0 0.0 0.0 0.0 10.9<br />

TOTAL PROCUREMENT COST [85.2] [4.0] [5.7] 24.5 9.8 0.0 0.0 0.0 0.0 0.0 34.3<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 mos PRODUCTION LEADTIME: 12 mos<br />

CONTRACT DATES: FY 2002: N/A FY 2003: Sep-03 FY 2004: Jan-04 FY 2005: N/A<br />

DELIVERY DATES: FY 2002: N/A FY 2003: Nov-04 FY 2004: Mar-05 FY 2005: N/A<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT [32] 1 2 2<br />

OUTPUT [32] 1 2 2<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 5<br />

OUTPUT 5<br />

Notes/Comments<br />

1/ FY03 and Prior: The HFRG budget was included under BLI 3057 Comm Items Under $5M. Provided for informational purposes only. Total inventory objective is 36 units. 34 units procured under BLI 3057. 2 units will be procured under BLI 3010.<br />

2/ The installation of the FY01 procurement of a 12 KW system was cancelled due to ship being decommissioned (LHA-3). This asset is being converted into<br />

two HFRG (8kw & 4kw) systems in FY04 via an Engineering Change Order for the CV-67 and the CG-60.<br />

3/ FY03 install includes installation of the HF ALE upgrades.<br />

4/ FY04 production support increases due to new version of system requiring additional initial ILS documentation.<br />

6/ FY05 install includes the FY04 HFALE procurements<br />

7/ FY04 Procurements includes 47 VRC104s<br />

P-1 Shopping List - Item No 75 - 5 of 7<br />

Exhibit P-5, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: SHIP TACTICAL COMMUNICATIONS<br />

COST CODE DN105/NR105<br />

MODELS OF SYSTEMS AFFECTEDMR<br />

DESCRIPTION/JUSTIFICATION: Provides four channel SATCOM terminal built to open systems architecture maximizing COTS/ND with the ability to evolve as commercial technology advances and supports future proofing.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08<br />

FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment [41] [26.2] [Var] [.3] [0] [0] 9 9.2 0 0.0 0 0.0 9 9.2<br />

Equipment Nonrecurring (Racks) [58] [3.3]<br />

Engineering Nonrecurring [1.087]<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

(See Note 6)<br />

Production Support [12.6] [2.3] [0] 0.6 0.2 0.4 0.0 1.2<br />

Other (DSA)<br />

Interim Contractor Support<br />

[1.8] [0] [0] 0.1 0.3 0.5 0.4 1.3<br />

Installation of Hardware* 0 0.000 [4] [0] [1] [0] 12 2.0 5 1.1 8 1.7 7 1.5 32 6.2<br />

PRIOR YR EQUIP [4] [0] [1] [0] 12 2.0 4 0.8 7 1.5 23 4.3<br />

FY 00 EQUIP<br />

FY 01 EQUIP<br />

FY 02 EQUIP<br />

FY 03 EQUIP<br />

[See Note 4] [See Note 4]<br />

FY 04 EQUIP<br />

FY 05 EQUIP<br />

FY 06 EQUIP<br />

FY 07 EQUIP<br />

FY 08 EQUIP<br />

FY09 EQUIP<br />

FY TC EQUIP<br />

5 1.1 4 0.8 9 1.9<br />

TOTAL INSTALLATION COST 0.0 [0] [0] 2.0 1.1 1.7 1.5 6.2<br />

TOTAL PROCUREMENT [43.90] [2.60] [1.10] 11.9020 1.5500 2.609 1.8840 17.9<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME2 Months PRODUCTION LEAD-TIME: 12 months<br />

CONTRACT DATES: FY 2002: NA FY 2003: NA FY 2004: Jul-04 FY 2005: NA<br />

DELIVERY DATES: FY 2002: NA FY 2003: NA FY 2004: Jul-05 FY 2005: NA<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 0 4 4 4 5 4 4<br />

OUTPUT 0 4 4 4 5 4 4<br />

FY07 FY 08<br />

FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 6 1 32<br />

OUTPUT 6 1 32<br />

Notes/Comments<br />

Note 1: DMR unit includes four channels per box.<br />

Note 2: DMR racks included under Equipment Non-Recurring line.<br />

Note 3: FY03 and Prior: DMR reflected in BLI 321500. Provided for information purposes only. Total inventory objective is 61 units: BLI 3215 and BLI 3010.<br />

Note 4: Due to results of Navy Audit, 24 Military Sealift Command (MSC) assets directed to higher priority platforms: 4 to be installed in FY06, 7 assets in FY07, 13 remaining assets for SCN requirements. 2 (PY) DMR units provided<br />

to SSC-SD lab, 2 (PY) DMR units provided to SSC-CH lab. No installation cost to SPAWAR.<br />

Note 5: FY02 procurements consist of ancillary equipment for the SSN 21 and SSN 23 (each kit includes one 500 watt HF power amplifier and one Sunair 9000 HF transceiver, SSN 21 receives one set SSN23 receives two sets.<br />

Note 6: FY03 Pentagon DMR unit installed at no cost to SPAWAR.<br />

Note 7: FY04: New sole source contract requires non-recurring engineering support as part of production start-up.<br />

P-1 Shopping List - Item No 75 - 6 of 7<br />

February 2004<br />

Exhibit P-3a, Individual Modification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE<br />

PRODUCTION SCHEDULE February 2004<br />

(DOD EXHIBIT P-21)<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD NO.<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI: 3010 SHIP TACTICAL COMMUNICATIONS 52DN<br />

S ACCEP BAL FISCAL YEAR 03 FISCAL YEAR 04 FISCAL YEAR 05 FISCAL YEAR 06<br />

COST ITEM/MANUFACTURER E PROC PRIOR DUE 02 CALENDAR YEAR 03 CY 03 CALENDAR YEAR 04 CALENDAR YEAR 05 CALENDAR YEAR 06<br />

CODE R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S<br />

V 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E<br />

FY T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P<br />

DN013 HF Tilt Mechanism 04 18 18 A 5 5 5 3<br />

DN013 HF Tilt Mechanism 05 10 10 A 5 5<br />

DN016 HFRG Broadband 04 4 4 A 1 1 1 1<br />

DN105 DMR 04 9 9 A 2 2 1 2 2<br />

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP<br />

PRODUCTION RATE PROCUREMENT LEADTIMES<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

ITEM Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

HF Tilt mechanism TBD 3/mo 6/mo 10/mo 30 30 360 360 420 Days<br />

HFRG Broadband Harris 1/mo 2/mo 3/mo 30 30 360 360 420 Days<br />

DMR General Dynamics Decision Systems 1/mo 51/mo 240/mo 30 30 240 N/A 300 Days<br />

P-1 Shopping List - Item No 75 - 7 of 7<br />

Exhibit P-5, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI: 3050 SHIP COMMUNICATION AUTOMATION 52PQ<br />

QUANTITY<br />

FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TO COMP TOTAL<br />

COST<br />

(in millions) $158.8 $180.9 $159.7 $297.6 $117.8 $138.9 $183.2 Continuing Continuing<br />

PROGRAM COVERAGE/JUSTIFICATION OF BUDGET YEAR REQUIREMENTS:<br />

Tactical Messaging (PQ065) (formerly know as Naval Modular Automated Communication System II (NAVMACS II)/Single Message Solution<br />

(SMS): Tactical Messaging automates and increases the speed and efficiency of handling organizational message traffic aboard ships. The program<br />

continues to satisfy the same requirements and implements products that are developed with an open system architecture, and are conducive to<br />

technological upgrades. Tactical Messaging products are being procured to host tactical (afloat) DMS and replace the older NAVMACS systems which<br />

lack the speed and capacity to handle current message traffic loads during periods of accelerated combat operations. Tactical DMS satisfies<br />

Multicommand Requirements of Operational Capability (MROC) requirements to transition to IP based organizational messaging. Phased implementation<br />

reduces procurement and installation cost in out years by reusing hardware assets installed FY-00 and out. Phase 1: NAVMACS II capability with DMS<br />

H/W infrastructure. Phase 2: Add DMS GENSER capability. Phase 3: Add SCI DMS capability.<br />

Special Intelligence Communications (SI COMMS): Sensitive Compartmented Information (SCI) Networks (formerly SCI ADNS) (PQ068):<br />

SCI Networks has been designated as an evolutionary program allowing for continued growth and expansion paralleling technology changes. The SI<br />

COMMS and TACINTEL programs were combined into the SI COMMS architecture to replace the outdated TACINTEL system developed in the early<br />

1970s. It provides the mechanism for phased implementation of both planned improvements and those which surface through advancing technology.<br />

SCI Networks provides for the real-time exchange of SCI COMMS data to Afloat operational commanders. The cornerstone of this program is the<br />

versatility and growth potential of the processing and networking equipment which will provide the network centric communications for the SI community.<br />

The premise of using Commercial off-the-shelf (COTS), Government off-the-shelf (GOTS), non developmental items (NDI) and existing systems to meet<br />

the requirements for Special Intelligence Communications will continue to be followed. To realize the SCI Networks architecture, funds will procure the<br />

equipment necessary to implement the IT-21 architecture to provide SI Communications to the Fleet. Impact of no ship SCI COMMS is that the ability to<br />

detect, identify and prosecute hostile threats and provide warnings of grave danger to U.S. interests will be lost.<br />

The shore terminal interface for Sensitive Compartmented Information (SCI) Networks/Tactical Intelligence Information Exchange (TACINTEL II+) will use<br />

commercial off-the-shelf (COTS), Government off-the-shelf (GOTS), Non-developmental items (NDI) and existing systems to meet the requirements for SI<br />

COMMS. The SI COMMS and TACINTEL programs were combined into the SI COMMS architecture to replace the outdated TACINTEL system<br />

developed in the early 1970s. The equipment also began the realization of the SCI Networks architecture. Funds will continue to procure the SCI<br />

Networks equipment necessary to implement the IT-21 architecture to provide SI COMMS to the Fleet. SCI Networks provides for a real-time exchange of<br />

Tactical SCI COMMS to afloat operational commanders. Impact of no shore SCI Networks is that ships cannot attain their network services.<br />

The Trident program will enable OHIO Class (TRIDENT) submarines to participate in Demand Assigned Multiple Access (DAMA) communications over<br />

the UHF band and to receive and distribute message traffic in an Internet Protocol format. This program is applicable to 14 ships (SSBN 730-743). The<br />

implementation of Trident is required for completion of the Navy's migration from a message broadcast based on the Information Exchange System (IXS)<br />

to a broad cast based on Internet Protocol (IP). Trident IP is the implementation path that provides SCI functionality in the form of security enclaves above<br />

the secret level to OHIO class submarines.<br />

P-1 SHOPPING LIST Exhibit P-40<br />

ITEM NO.<br />

76<br />

1 of 22


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI: 3050 SHIP COMMUNICATION AUTOMATION 52PQ<br />

Automated Digital Network System (ADNS) (PQ069): Provides procurement and technology enhancements for automated routing and switching of Tactical<br />

and Strategic C4I voice, video and data via Transmission Control Protocol/Internet Protocol (TCP/IP) networks. Links deployed Battle Group units with each<br />

other and with the Defense Information Systems Network (DISN) ashore via multiple Radio Frequency (RF) paths and pier connectivity. Consists of Commercial<br />

Off-The-Shelf (COTS) non-developmental Joint Tactical Architecture (JTA) compliant hardware (routers, processors, switches) and commercial software<br />

(network management) in a standardized, scalable shock qualified rack design. Merges multiple redundant stove pipe communications circuits and efficiently<br />

manages and shares the bandwidth among multiple shipboard enclaves resulting in better throughput.<br />

Line includes Fleet Network Operation Centers (NOCs) Afloat which function as Internet Service Providers (ISP) for naval operating forces worldwide. Four<br />

regional NOCs located at Wahiawa, Hawaii; Norfolk, Virginia; Naples, Italy; and Bahrain are geographically located to ensure global access. NOCs provide IP<br />

traffic and load monitoring, managed interface to NIPRNET, SIPRNET and JWICS (where there are consolidated SCI/GENSER NOCs), domain name service<br />

(DNS) for ship connections, E-mail store and forward, dial-in services, web caching and Exchange services. In the near term, the network management system<br />

and metrics gathering/reporting methods will be upgraded so the operators can anticipate and prevent network outages and provide fleet users specific loading<br />

metrics. NOCs also provide security policy management, network intrusion detection and protection, firewalls, and virus scanning. Each NOC is required to<br />

provide this level of services to support all BGs in its AOR, underway or in port, and some NOC restoral.<br />

The Trident program will enable OHIO Class (TRIDENT) submarines to participate in Demand Assigned Multiple Access (DAMA) communications over the<br />

UHF band and to receive and distribute message traffic in an Internet Protocol format. This program is applicable to 14 ships (SSBN 730-743). The<br />

implementation of Trident is required for completion of the Navy's migration from a message broadcast based on the Information Exchange System (IXS) to a<br />

broad cast based on Internet Protocol (IP). Trident IP is the implementation path to bring ADNS Routers and functionality to OHIO Class submarines.<br />

Tactical Switching (PQ070): Provides the switching and bandwidth management components of high capacity interoperable communications, as the number<br />

one fleet CINC requirement in the Navy Wide C4 and Information Warfare (IW) Joint Mission Area (JMA) assessment. Provides for the shore segment<br />

interconnect of an end-to-end dynamic bandwidth management, Internet Protocol, and Channel Access Protocol capability to deploying Battle<br />

Groups/Amphibious Ready Groups and other support units. Automates the major shore nodes which allow network centric and lights-out operations. Provides<br />

afloat interoperability of tactical and strategic C4I circuits with Marine Corps Ground Mobile Forces (GMF) . Tactical Switching (which includes GMF<br />

interoperability , Automated Network Control Center (ANCC), Automated Technical Control (ATC) and the Automated Digital Multiplexer System (ADMS)) is the<br />

key enabling mechanism for the execution of the Automated Digital Network System (ADNS) strategy which is essential to meeting the Information Technology<br />

for the 21st Century (IT21) vision. Tactical Switching system capabilities allow flexible, secure and reliable communications for voice, video, and data<br />

applications for Navy terrestrial RF links and pierside connectivity. Funding also provides for the Shore Infrastructure Modernization (SIM) technology which<br />

supports a robust and flexible networking environment while utilizing COTS/GOTS equipment and network protocols.<br />

P-1 SHOPPING LIST - Item No Exhibit P-40<br />

ITEM NO.<br />

76<br />

2 of 22


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI: 3050 SHIP COMMUNICATION AUTOMATION 52PQ<br />

Integrated Shipboard Network Systems (ISNS) (PQ007): The Integrated Shipboard Network System (ISNS) program provides every Navy ship, including<br />

submarines, with a reliable, high-speed Local Area Network (LAN) that will provide LAN and Wide Area Network (WAN) access to the DISN WAN (Secure and<br />

Nonsecure Internet Protocol Router Network -SIPRNet and NIPRNet). It provides real-time information exchange between afloat units, Component<br />

Commanders, numbered Fleet Commanders and Fleet CINCs through the migration of existing legacy systems into the IT-21 strategy and is a key factor in the<br />

implementation of the Navy’s portion of Joint Vision 2010. Under the Navy’s information modernization strategy, full synchronization of shipboard networks,<br />

mission and information applications and Radio/Satellite communications and shore data dissemination infrastructure, installations are necessary to ensure endto-end<br />

mission capability. The ISNS program maximizes the use of both COTS software and hardware resulting in dependence on commercially supported<br />

hardware and software. Engineering and technical support is provided so that existing systems will be upgraded/modified to keep pace with hardware and<br />

software that is supported commercially.<br />

Joint Network Management System (JNMS) (PQ021): The Joint Network Management System (JNMS) is a CINC and Commander, Joint Forces (CJF), joint<br />

communications planning and management system. It provides communication planners with the capabilities to conduct high level planning (war planning);<br />

detailed planning and engineering; monitoring; control and reconfiguration; spectrum planning and management; and security of systems and networks<br />

supporting joint operations. The benefits provided by these increased capabilities include: enhanced force-level situational awareness (shared view of the<br />

network); enhanced flexibility to support the commander's intent; better utilization of scarce spectrum resources; and increased security of critical systems and<br />

networks. As an enabler for information superiority as-well-as command and control, the JNMS serves as the commander's "brain center" for the systems and<br />

networks supporting his forces. It ensures C4I unity of effort, exploitation of Total Force capabilities, proper positioning of critical information and allows for its<br />

fusion.<br />

Afloat PCs (PQ085, PQ086, PQ088): Funds procurement of PCs, web enabling equipment and afloat network upgrades for Amphibious Ships, Surface<br />

Combatants, and Aircraft Carriers/Squadrons respectively.<br />

Congressional Adds - FY02-03 (PQ455 Naval Air Warfare Center Aircraft Division Modeling and Simulation Technical Information Center (NAWCAD<br />

MSTIC) Equipment Upgrades & PQ456 Programmable Integrated Computer Terminals (ICT) Engineering Modifications).<br />

P-1 SHOPPING LIST - Item No Exhibit P-40<br />

ITEM NO.<br />

76<br />

3 of 22


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE<br />

COST ANALYSIS February 2004<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT BLI: 3050 SHIP COMMUNICATION AUTOMATION<br />

TOTAL COSTS IN THOUSANDS OF DOLLARS<br />

52PQ<br />

FY 2003 FY 2004<br />

FY 2005<br />

COST ID UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE QTY COST COST QTY COST COST QTY COST COST<br />

PQ065 Tactical Messaging A 10 528.20 5,282 8 600.00 4,800 22 317.73 6,990<br />

PQ068 SCI Networks A 9,040 3,281 449<br />

SCI Networks Afloat 52 126.21 6,563 7 311.71 2,182 8 43.88 351<br />

SCI Networks Ashore 2 465.00 930 3 366.33 1,099 4 24.50 98<br />

SCI Networks Trident IP 14 110.50 1,547 0 0.00 0 0 0.00 0<br />

PQ069 ADNS A 27,979 7,898 26,583<br />

ADNS Afloat 54 278.39 15,033 28 282.07 7,898 47 374.96 17,623<br />

ADNS Ashore 6 1,478.17 8,869 0 0.00 0 9 995.56 8,960<br />

ADNS Trident IP 14 291.21 4,077 0 0.00 0 0 0.00 0<br />

PQ069/PQ071 Fleet NOC 4 847.00 3,388 4 129.75 519 1 41.00 41<br />

PQ070 TACTICAL SWITCHING A 8,579 8,035 12,797<br />

ANCC Ashore 1 1,139.00 1,139 5 584.20 2,921 5 487.40 2,437<br />

ADMS Ashore 5 1,488.00 7,440 5 1,022.80 5,114 0 0.00 0<br />

ADMS Afloat 0 0.00 0 0 0.00 0 46 225.22 10,360<br />

PQ007 ISNS A 41 743.49 30,483 64 1,203.48 77,023 30 1,135.03 34,051<br />

PQ021 JNMS B 0 0.00 0 6 837.67 5,026 1 1,272.00 1,272<br />

PQ555 Production Support 5,725 7,771 4,183<br />

PQ085 Amphibious Ship PCs 2,608 1,871 1,809<br />

PQ086 Surface Combatants PCs 4,725 3,196 5,588<br />

PQ088 Aircraft Carrier PCs 10,025 9,026 8,720<br />

PQ455 NAWCAD MSTIC Equipment Upgrades 2,400<br />

PQ456 Programmable ICT Engineering Modifications<br />

Procurement Total 110,234 128,446 102,483<br />

1/ Tactical Messaging, SCI Networks, ADNS and ISNS unit cost are based on average cost of all units. Variances are due to the diverse types of ship sets being procured.<br />

2/ ANCC and ADMS quantities represent no. of sites. FY03 procures upgrades. Unit cost increases are<br />

a result of complete system replacement rather than replacing components.<br />

3/ EMS unit cost includes nonrecurring system eng costs and procurement of software packages.<br />

4/ Trident unique ship alteration development performed at NUWC Exhibit P-5<br />

P-1 SHOPPING LIST - Item No<br />

ITEM NO.<br />

76<br />

4 of 22


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE<br />

COST ANALYSIS February 2004<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT BLI: 3050 SHIP COMMUNICATION AUTOMATION 52PQ<br />

FY2003 FY2004<br />

FY2005<br />

COST ID UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE QTY COST COST QTY COST COST QTY COST COST<br />

PQ777 INSTALLATION 48,603 52,424 57,235<br />

FMP Install 37,063 46,053 48,683<br />

DSA Install 5,237 5,075 3,892<br />

Non-FMP Install 6,303 1,296 4,660<br />

BUDGET EXHIBIT TOTAL 158,837 180,870 159,718<br />

P-1 SHOPPING LIST - Item No Exhibit P-5<br />

ITEM NO.<br />

76<br />

5 of 22


UNCLASSIFIED<br />

CLASSIFICATION<br />

PROCUREMENT HISTORY AND PLANNING February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI: 3050 SHIP COMMUNICATION AUTOMATION 52PQ<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE DELIVERY COST NOW AVAILABLE<br />

PQ065 Tactical Messaging 04 SSC CHARLESTON WX SPAWAR Oct-03 Nov-03 Mar-04 8 600.0 YES N/A<br />

05 SSC CHARLESTON WX SPAWAR Oct-04 Nov-04 Mar-05 22 317.7 YES N/A<br />

PQ068 SCI Networks Afloat 04 Various IDIQ SPAWAR Nov-03 Dec-03 Mar-04 7 311.7 YES N/A<br />

05 Various IDIQ SPAWAR Nov-04 Dec-04 Mar-05 8 43.9 YES N/A<br />

PQ068 SCI Networks Ashore 04 Various WX SPAWAR Nov-03 Dec-03 Mar-04 3 366.3 YES N/A<br />

05 Various WX SPAWAR Nov-04 Dec-04 Mar-05 4 24.5 YES N/A<br />

PQ069 ADNS Afloat 04 Various IDIQ SPAWAR N/A Nov-03 Apr-04 28 282.1 YES N/A<br />

05 Various IDIQ SPAWAR N/A Nov-04 Apr-05 47 375.0 YES N/A<br />

PQ069 ADNS Ashore 05 Various IDIQ SPAWAR N/A Nov-04 Apr-05 9 995.6 YES N/A<br />

PQ069 Fleet NOC 04 Various IDIQ SPAWAR Jun-03 Oct-03 Jan-04 4 129.8 YES N/A<br />

05 Various IDIQ SPAWAR Jun-03 Oct-04 Jan-05 1 41.0 YES N/A<br />

D. REMARKS<br />

Note: Tactical Messaging, SCI Networks, ADNS and ISNS unit cost are based on average cost of all units.<br />

Variances are due to the diverse types of ship sets being procured relative to standard fleet support provided year to year.<br />

DD FORM 2446, JUN 87 P-1 SHOPPING LIST<br />

ITEM NO.<br />

76<br />

Exhibit P-5A<br />

6 of 22<br />

A. DATE


UNCLASSIFIED<br />

CLASSIFICATION<br />

PROCUREMENT HISTORY AND PLANNING February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI: 3050 SHIP COMMUNICATION AUTOMATION 52PQ<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE DELIVERY COST NOW AVAILABLE<br />

PQ070 ANCC Ashore 04 SSC CHARLESTON WX SPAWAR N/A Apr-04 Aug-04 5 584.2 YES N/A<br />

05 SSC CHARLESTON WX SPAWAR N/A Feb-05 Jun-05 5 487.4 YES N/A<br />

PQ070 ADMS Ashore 04 SSC SAN DIEGO WX SPAWAR N/A Dec-03 Apr-04 5 1,022.8 YES N/A<br />

PQ070 ADMS Afloat 05 SSC SAN DIEGO WX SPAWAR N/A Dec-04 Apr-05 46 225.2 YES N/A<br />

PQ007 ISNS 04 Various IDIQ SPAWAR Sep-03 Nov-03 Jan-04 64 1,203.5 YES N/A<br />

05 Various IDIQ SPAWAR Sep-04 Nov-04 Jan-05 30 1,135.0 YES N/A<br />

PQ021 JNMS 04 SAIC Option CECOM Dec-03 Apr-04 Jun-04 6 837.7 YES FY03<br />

05 SAIC Option CECOM Sep-04 Nov-04 Jan-05 1 1,272.0 YES FY04<br />

D. REMARKS<br />

Note: Between years, the composition of ISNS ships change, i.e., one year may have more larger ships such as CVs while another year may consist mainly of SSNs. As a result, the<br />

per unit costs are different. Additionally, different ships require different peripherals, which leads to per unit cost differences.<br />

DD FORM 2446, JUN 87 P-1 SHOPPING LIST Exhibit P-5A<br />

ITEM NO.<br />

76<br />

7 of 22<br />

A. DATE


UNCLASSIFIED<br />

MODIFICATION TITLE: Tactical Messaging<br />

COST CODE PQ065/PQ777<br />

MODELS OF SYSTEMS AFFECTED: Tactical Messaging<br />

DESCRIPTION/JUSTIFICATION: The Tactical Messaging program will automate and increase the efficiency of message handling aboard ships and provide Tactical DMS capability as required by DMS Milestone III decision 1 July 2002.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07<br />

FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

128 60.011 20 6.267 10 5.282 8 4.800 22 6.990 18 5.990 2 1.000 2 2.158 3 2.220 Cont. Cont. 213 94.7<br />

Production Support 1.652 2.043 1.720 0.715 0.515 0.577 0.053 0.136 0.150 Cont. 7.561<br />

Other (DSA)<br />

Interm Contractor Support<br />

2.631 0.642 0.292 0.056 0.681 0.774 0.000 0.076 0.115 Cont. 5.267<br />

Installation of Hardware* 116 17.551 27 4.991 10 1.954 9 1.659 12 2.333 27 4.493 0 0.000 2 0.349 3 0.523 Cont. Cont. 206 33.9<br />

PRIOR YR EQUIP 116 17.551 116 17.6<br />

FY 00 EQUIP 0 0.0<br />

FY 01 EQUIP 12 2.493 12 2.5<br />

FY 02 EQUIP 15 2.498 5 0.910 20 3.4<br />

FY 03 EQUIP 5 1.044 5 1.003 10 2.0<br />

FY 04 EQUIP 4 0.656 4 0.778 8 1.4<br />

FY 05 EQUIP 8 1.555 14 2.327 22 3.9<br />

FY 06 EQUIP 13 2.166 13 2.2<br />

FY 07 EQUIP 0 0.000 0 0.0<br />

FY 08 EQUIP 2 0.349 2 0.3<br />

FY 09 EQUIP 3 0.523 3 0.5<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 17.551 4.991 1.954 1.659 2.333 4.493 0.000 0.349 0.523 Cont. 206 33.9<br />

TOTAL PROCUREMENT COST 81.845 13.943 9.248 7.230 10.519 11.834 1.053 2.719 3.008 Cont. 141.4<br />

METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: 1 month PRODUCTION LEADTIME: 4 months<br />

CONTRACT DATES: FY2003: Nov-02 FY2004: Nov-03 FY2005: Nov-04<br />

DELIVERY DATES: FY2003: Mar-03 FY2004: Mar-04 FY2005: Mar-05<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 153 5 2 2 0 4 4 4 0 8 10 9 0<br />

OUTPUT 153 0 5 2 2 0 4 4 4 0 8 10 9<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL 1/<br />

INPUT 0 0 0 0 0 2 0 0 0 3 0 0 Cont. 206<br />

OUTPUT 0 0 0 0 0 0 2 0 0 0 3 0 Cont. 206<br />

Notes/Comments<br />

1/ Tactical Messaging was formerly known as NAVMACS II/SMS (Naval Modular Automated Communications Systems)<br />

2/ Total Quantity listed on this P-3A represent systems procured and installed, including refresh equipment, and is not an Inventory Objective. Program Continues Beyond FYDP.<br />

3/ Tactical Messaging (Ashore) dollars and quantities, previously accounted for on a separate P-3A, are reflected in the above figures (Training/testing units).<br />

4/ In FY06, 5 remaining procurements represent VME cards purchased for submarine platforms. In FY07, 2 remaining procurements repesent the same. P-3A Exhibit<br />

VME card integration and installation will be covered under the Common Submarine Radio Room (CSRR). P-1 SHOPPING LIST<br />

ITEM NO.<br />

8 of 22<br />

February 2004


UNCLASSIFIED<br />

MODIFICATION TITLE: SCI Networks (Afloat)<br />

COST CODE PQ068<br />

MODELS OF SYSTEMS AFFECTED: SCI Networks Build Two & Three / Carry On Build Two (AFLOAT)<br />

DESCRIPTION/JUSTIFICATION: Provides Shipboard reception and transmission of multi-functional data using various data networks linking battlegroup commanders with intelligence databases.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05<br />

FY 06 FY 07<br />

FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

87 3.917 52 6.563 7 2.182 8 0.351 7 2.941 7 2.942 7 2.860 7 2.910 Cont. Cont. 285 36.6<br />

Data<br />

Training Equipment<br />

See Note 1<br />

Production Support 1.198 0.391 0.104 0.028 0.145 0.147 0.143 0.148 Cont. 2.789<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.319 0.115 0.042 0.000 0.119 0.126 0.133 0.126 Cont. 2.814<br />

Installation of Hardware* 78 2.445 60 5.657 14 1595 8 0.225 7 0.980 7 0.994 7 1.001 7 1.008 Cont. Cont. 254 17.0<br />

PRIOR YR EQUIP 66 5.1<br />

FY 00 EQUIP 0 0.0<br />

FY 01 EQUIP 6 0.188 6 0.2<br />

FY 02 EQUIP 72 2.257 15 1.010 87 3.3<br />

FY 03 EQUIP 45 4.647 7 0.797 52 5.4<br />

FY 04 EQUIP 7 0.798 7 0.8<br />

FY 05 EQUIP 8 0.225 8 0.2<br />

FY 06 EQUIP 7 0.980 7 1.0<br />

FY 07 EQUIP 7 0.994 7 1.0<br />

FY 08 EQUIP 7 1.001 7 1.0<br />

FY 09 EQUIP 7 1.008 7 1.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 2.445 5.657 1.595 0.225 0.980 0.994 1.001 1.008 Cont. 254 19.0<br />

TOTAL PROCUREMENT 7.879 12.726 3.923 0.604 4.185 4.209 4.137 4.192 Cont. 59.2<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 Month PRODUCTION LEADTIME: 3 Months<br />

CONTRACT DATES: FY 2003: Dec-02 FY2004: Dec-03 FY2005: Dec-04<br />

DELIVERY DATES: FY 2003: Mar-03 FY2004: Mar-04 FY2005: Mar-05<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 211 4 3 0 4 4 3 2 2<br />

OUTPUT 204 7 4 3 0 4 4 3 2<br />

FY 07<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 3 2 2 3 2 2 3 2 2 Cont. 254<br />

OUTPUT 2 3 2 2 3 2 2 3 4 Cont. 254<br />

Notes/Comments<br />

1/ SCI ADNS has a carry-on variant that requires no installation. Therefore, the variation between the number of procurements vs. the number of installations.<br />

(FY00 = 24, FY01 = 7, fully funded Carry-on's for a total of 31, which is the difference between P & I qtys on this page)<br />

2/ Total Quantity listed on this P-3A represent systems procured and installed, including refresh equipment, and is not an Inventory Objective. Program Continues Beyond FYDP.<br />

3/ Quantity listed for FY02-06 includes Security Backfits required per ONI.<br />

P-1 SHOPPING LIST P-3A Exhibit<br />

ITEM NO.<br />

76<br />

9 of 22<br />

February 2004


UNCLASSIFIED<br />

MODIFICATION TITLE: SCI Networks (Ashore)<br />

COST CODE PQ068<br />

MODELS OF SYSTEMS AFFECTED: SI-COMMS - SCI Networks Build 2 and Build 3 (ASHORE)<br />

DESCRIPTION/JUSTIFICATION: Provides shore based reception and transmission of multi-functional data using various data networks linking battle group commanders with intelligence databases.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05<br />

FY 06 FY 07 FY 08<br />

FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

4 0.172 2 0.930 3 1.099 4 0.098 4 0.140 4 0.174 4 0.193 4 0.200 Cont. Cont. 60 4.9<br />

Data<br />

Training Equipment<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

<br />

Installation of Hardware* 4 0.457 2 0.257 3 0.324 4 0.112 4 0.171 4 0.201 4 0.200 4 0.215 Cont. Cont. 60 3.2<br />

PRIOR YR EQUIP 27 1.2<br />

FY 00 EQUIP 0 0.0<br />

FY 01 EQUIP 4 0.1<br />

FY 02 EQUIP 4 0.457 4 0.5<br />

FY 03 EQUIP 2 0.257 2 0.3<br />

FY 04 EQUIP 3 0.324 3 0.3<br />

FY 05 EQUIP 4 0.112 4 0.1<br />

FY 06 EQUIP 4 0.171 4 0.2<br />

FY 07 EQUIP 4 0.201 4 0.2<br />

FY 08 EQUIP 4 0.200 4 0.2<br />

FY 09 EQUIP 4 0.215 4 0.2<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.457 0.257 0.324 0.112 0.171 0.201 0.200 0.215 Cont. 60 3.2<br />

TOTAL PROCUREMENT 0.629 1.187 1.423 0.210 0.311 0.375 0.393 0.415 Cont. 8.1<br />

METHOD OF IMPLEMENTATION:<br />

METHOD OF IMPLEMENTATION:<br />

1 Month PRODUCTION LEADTIME: 3 Months<br />

FY 2003: Dec-02 FY2004: Dec-03 FY2005: Dec-04<br />

CONTRACT DATES:<br />

FY 2003: Mar-03 FY2004: Mar-04 FY2005: Mar-05<br />

DELIVERY DATES:<br />

FY 04 FY 05 FY 06<br />

PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INSTALLATION SCHEDULE:<br />

37 1 2 2 2 2 2<br />

INPUT<br />

37 1 2 2 2 2 2<br />

OUTPUT<br />

FY 07<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 2 2 2 2 2 2 Cont. 60<br />

OUTPUT 2 2 2 2 2 2 Cont. 60<br />

Notes/Comments<br />

1/ Total Quantity listed on this P-3A represent systems procured and installed, including refresh equipment, and is not an Inventory Objective. Program Continues Beyond FYDP.<br />

P-1 SHOPPING LIST P-3A Exhibit<br />

ITEM NO.<br />

76<br />

10 of 22<br />

February 2004


UNCLASSIFIED<br />

MODIFICATION TITLE: SCI Networks - Trident IP<br />

COST CODE PQ068<br />

MODELS OF SYSTEMS AFFECTED: SSBN<br />

DESCRIPTION/JUSTIFICATION: Procurement of Routers for Trident<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05<br />

FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT: 0 0.0<br />

Kit Quantity 0 0.0<br />

Installation Kits 0 0.0<br />

Installation Kits Nonrecurring 0 0.0<br />

Equipment 2 0.078 14 0.546 16 0.6<br />

Equipment Nonrecurring 2 0.647 14 1.001 16 1.6<br />

Engineering Change Orders 0 0.0<br />

Data 0 0.0<br />

Training Equipment 0 0.0<br />

Production Support 0.076 0 0.1<br />

Other (DSA) 0 0.0<br />

Interm Contractor Support 0 0.0<br />

Installation of Hardware* 0 0.0<br />

PRIOR YR EQUIP 0 0.0<br />

FY 00 EQUIP 0 0.0<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.000 0.000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0<br />

TOTAL PROCUREMENT 0.725 1.623 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.3<br />

METHOD OF IMPLEMENTATION: 1 Month PRODUCTION LEADTIME: 3 Months<br />

CONTRACT DATES: FY 2003: Feb-03 FY2004: FY2005:<br />

DELIVERY DATES: FY 2003: Apr-03 FY2004: FY2005:<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT<br />

OUTPUT<br />

FY 07<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT Cont. 0<br />

OUTPUT Cont. 0<br />

Notes/Comments<br />

1/ Shore assets are turnkey installations provided by NUWC, Newport.<br />

2/ Trident Refit Facilities are mission funded NAVSEA activities providing SSBN support. Installations provided by TRF.<br />

P-1 SHOPPING LIST P-3A Exhibit<br />

ITEM NO.<br />

76<br />

11 of 22<br />

February 2004


UNCLASSIFIED<br />

MODIFICATION TITLE: Automated Digital Network System (ADNS)<br />

COST CODE PQ069/PQ777<br />

MODELS OF SYSTEMS AFFECTED: Automated Digital Network System (ADNS) Afloat.<br />

DESCRIPTION/JUSTIFICATION: Automated Digital Network System (ADNS) implements ATM multiplexing technology, and JDIICS-D compliant Integrated Network Management tools.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07<br />

FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 171 44.087 42 11.423 54 15.033 28 7.898 47 17.623 48 18.647 46 19.341 40 19.727 39 22.021 Cont. Cont. 515 175.8<br />

Equipment Nonrecurring 0 0.0<br />

Engineering Change Orders 0 0.0<br />

Data 0 0.0<br />

Training Equipment 0 0.0<br />

Production Support 5.548 4.816 0.812 0.686 0.776 0.657 0.773 0.801 0.995 Cont. 0 15.9<br />

Other (DSA) 4.860 0.399 0.696 0.877 1.166 1.196 1.143 0.996 0.975 Cont. 0 12.3<br />

Interm Contractor Support 0 0.0<br />

Installation of Hardware* 157 41.075 42 4.121 45 11.679 38 6.282 47 8.161 48 8.475 46 8.599 40 7.822 39 7.970 13 Cont. 515 104.2<br />

PRIOR YR EQUIP 157 41.075 157 41.1<br />

FY 00 EQUIP 0 0.0<br />

FY 01 EQUIP 14 1.374 14 1.4<br />

FY 02 EQUIP 28 2.747 14 3.633 42 6.4<br />

FY 03 EQUIP 31 8.046 23 3.802 54 11.8<br />

FY 04 EQUIP 15 2.480 13 2.257 28 4.7<br />

FY 05 EQUIP 34 5.904 13 2.295 47 8.2<br />

FY 06 EQUIP 35 6.180 13 2.430 48 8.6<br />

FY 07 EQUIP 33 6.169 13 2.542 46 8.7<br />

FY 08 EQUIP 27 5.280 13 2.657 40 7.9<br />

FY 09 EQUIP 26 5.313 13 2.7 39 5.3<br />

FY TC EQUIP Cont. 0 0.0<br />

TOTAL INSTALLATION COST 41.075 4.121 11.679 6.282 8.161 8.475 8.599 7.822 7.970 Cont. 515 104.2<br />

TOTAL PROCUREMENT COST 95.570 20.759 28.220 15.743 27.726 28.975 29.856 29.346 31.961 Cont. 308.2<br />

METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: 1 month PRODUCTION LEADTIME: 5 month<br />

CONTRACT DATES: FY2003: Nov-02 FY2004: Nov-03 FY2005: Nov-04<br />

DELIVERY DATES: FY2003: Apr-03 FY2004: Apr-04 FY2005: Apr-05<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 244 23 7 8 13 22 12 13 20 15<br />

OUTPUT 244 23 7 8 13 22 12 13 20 15<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 13 20 13 13 14 13 13 13 13 13 515<br />

OUTPUT 13 20 13 13 14 13 13 13 13 13 515<br />

Notes/Comments<br />

1/ Total Quantity listed on this P-3A represent systems procured and installed, including refresh equipment, and is not an Inventory Objective. Program Continues Beyond FYDP.<br />

FY 07<br />

P-1 SHOPPING LIST<br />

ITEM NO.<br />

P-3A Exhibit<br />

76<br />

12 of 22<br />

February 2004


UNCLASSIFIED<br />

MODIFICATION TITLE: Automated Digital Network System (ADNS). 1/<br />

COST CODE PQ0069/PQ776<br />

MODELS OF SYSTEMS AFFECTED: Automated Digital Network System (ADNS) Ashore / Network Operations Center (NOC).<br />

DESCRIPTION/JUSTIFICATION: Automated Digital Network System (ADNS) implements ATM multiplexing technology, and JDIICS-D compliant Integrated Network Management tools. It adds SCI ADNS Architecture, Integrated Network Management<br />

Architecture, and supports legacy system programs. FY02 and prior includes Fleet Network Operation Centers (NOCs) Ashore.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07<br />

FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 23 12.961 7 4.098 6 8.869 9 8.960 9 7.579 9 3.863 9 2.497 9 1.241 Cont. Cont. 81 50.1<br />

Equipment Nonrecurring 0 0.0<br />

Engineering Change Orders 0 0.0<br />

Data 0 0.0<br />

Training Equipment 0 0.0<br />

Production Support 0.426 0.000 0.325 0.350 0.175 0.100 0.060 0 1.4<br />

Other (DSA) 0 0.0<br />

Interm Contractor Support 0 0.0<br />

Installation of Hardware* 23 7.002 7 1.711 6 1.450 0 0.000 9 4.464 9 4.088 9 1.887 9 0.997 9 0.700 Cont. Cont. 81 22.3<br />

PRIOR YR EQUIP 23 7.002 23 7.0<br />

FY 00 EQUIP 0 0.0<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 7 1.711 7 1.7<br />

FY 03 EQUIP 6 1.450 6 1.5<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 9 4.483 9 4.5<br />

FY 06 EQUIP 9 4.094 9 4.1<br />

FY 07 EQUIP 9 1.890 9 1.9<br />

FY 08 EQUIP 9 0.997 9 1.0<br />

FY 09 EQUIP 9 0.698 9 0.7<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 7.002 1.711 1.450 0.000 4.464 4.088 1.887 0.997 0.700 Cont. 81 22.3<br />

TOTAL PROCUREMENT COST 19.963 5.809 10.745 0.000 13.749 12.017 5.925 3.594 2.001 Cont. 73.8<br />

METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: 1 month PRODUCTION LEADTIME: 5 months<br />

CONTRACT DATES: FY2003: Dec-02 FY2004: FY2005: Nov-04<br />

DELIVERY DATES: FY2003: Apr-03 FY2004: FY2005: Apr-05<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 36 9 9<br />

OUTPUT 36 9 9<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 9 9 9 Cont. 81<br />

OUTPUT 9 9 9 Cont. 81<br />

Notes/Comments<br />

1/ Total Quantity listed on this P-3A represent systems procured and installed, including refresh equipment, and is not an Inventory Objective. Program Continues Beyond FYDP.<br />

13 of 22<br />

P-1 SHOPPING LIST<br />

ITEM NO.<br />

76<br />

P-3A Exhibit<br />

February 2004


UNCLASSIFIED<br />

MODIFICATION TITLE: Network Operations Center (NOC) Afloat shore sites.<br />

COST CODE PQ0069/PQ071/PQ777<br />

MODELS OF SYSTEMS AFFECTED: Network Operations Center (NOC) Afloat shore sites.<br />

DESCRIPTION/JUSTIFICATION: The Fleet Network Operations Centers (NOCs) function as Internet Service Providers (ISP) for naval afloat operating forces worldwide.<br />

The four regional NOCs are located at Wahiawa, Hawaii; Norfolk, Virginia; Naples, Italy; and Bahrain.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07<br />

FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 4 3.388 4 0.519 1 0.041 2 0.182 2 0.212 4 0.449 4 0.448 Cont. Cont. 21 5.2<br />

Equipment Nonrecurring 0 0.0<br />

Engineering Change Orders 0 0.0<br />

Data 0 0.0<br />

Training Equipment 0 0.0<br />

Production Support 0.143 0.012 0.003 0.010 0.011 0.025 0.033 Cont. 0 0.2<br />

Other (DSA) 0 0.0<br />

Interm Contractor Support 0 0.0<br />

Installation of Hardware* 4 1.320 4 0.098 1 0.013 2 0.062 2 0.072 4 0.150 4 0.160 Cont. Cont. 21 1.9<br />

PRIOR YR EQUIP 0 0.0<br />

FY 00 EQUIP 0 0.0<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 4 1.320 4 1.3<br />

FY 04 EQUIP 4 0.098 4 0.1<br />

FY 05 EQUIP 1 0.013 1 0.0<br />

FY 06 EQUIP 2 0.062 2 0.1<br />

FY 07 EQUIP 2 0.072 2 0.1<br />

FY 08 EQUIP 4 0.150 4 0.2<br />

FY 09 EQUIP 4 0.160 4 0.2<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 1.320 0.098 0.013 0.062 0.072 0.150 0.160 Cont. 21 1.9<br />

TOTAL PROCUREMENT COST 4.851 0.629 0.057 0.254 0.295 0.624 0.641 Cont. 7.4<br />

METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: 3 months PRODUCTION LEADTIME: 4 months<br />

CONTRACT DATES: FY2003: Oct-02 FY2004: Oct-03 FY2005: Oct-04<br />

DELIVERY DATES: FY2003: Jan-03 FY2004: Jan-04 FY2005: Jan-05<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 4 4 1 2<br />

OUTPUT 4 4 1 2<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 2 4 4 Cont. 21<br />

OUTPUT 2 4 4 Cont. 21<br />

Notes/Comments<br />

1 / Quantites reflect upgrades at each of the four sites to maintain connectivity and compatability with respect to the current ISNS afloat networks<br />

2/ NOCs were previously rolled-up within the ADNS Ashore program within PQ069<br />

14 of 22<br />

3/ Cost increases in FY03 only are a result of the addition of Shore Integrated Master Plan (SIMP) P-1 SHOPPING LIST P-3A Exhibit<br />

funding requirements. ITEM NO.<br />

76<br />

February 2004


UNCLASSIFIED<br />

MODIFICATION TITLE: ADNS - Trident IP<br />

COST CODE PQ069<br />

MODELS OF SYSTEMS AFFECTED: SSBN<br />

DESCRIPTION/JUSTIFICATION: Procurement of Routers for Trident<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05<br />

FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT: 0 0.0<br />

Kit Quantity 0 0.0<br />

Installation Kits 0 0.0<br />

Installation Kits Nonrecurring 0 0.0<br />

Equipment 2 0.061 14 0.658 16 0.7<br />

Equipment Nonrecurring 2 1.705 14 3.419 16 5.1<br />

Engineering Change Orders 0 0.0<br />

Data 0 0.0<br />

Training Equipment 0 0.0<br />

Production Support 0.059 0.849 0 0.9<br />

Other (DSA) 0.580 0 0.6<br />

Interim Contractor Support 0 0.0<br />

Installation of Hardware* 16 2.316 16 2.3<br />

PRIOR YR EQUIP 0 0.0<br />

FY 00 EQUIP 0 0.0<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 16 2.316 16 2.3<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.000 0.000 2.316 0.0 0.0 0.0 0.0 0.0 0.0 16 2.3<br />

TOTAL PROCUREMENT 1.766 4.716 3.165 0.0 0.0 0.0 0.0 0.0 0.0 9.6<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 Month PRODUCTION LEADTIME: 3 Months<br />

CONTRACT DATES: FY 2003: Feb-03 FY2004: FY2005:<br />

DELIVERY DATES: FY 2003: Apr-03 FY2004: FY2005:<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 0 6 8 2<br />

OUTPUT 0 6 8 2<br />

FY 07<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT Cont. 16<br />

OUTPUT Cont. 16<br />

Notes/Comments<br />

1/ Trident Refit Facilities are mission funded NAVSEA activities providing SSBN support.<br />

2/ Production support funding includes acceptance testing.<br />

3/ $2.325 be will used for installation of eight (8) units at Bangor, remaining installations to be performed at P-1 SHOPPING LIST P-3A Exhibit<br />

Kings Bay at no cost to SPAWAR/PEO C4I. ITEM NO.<br />

76<br />

15 of 22<br />

February 2004


UNCLASSIFIED<br />

MODIFICATION TITLE: Tactical Switching 1/<br />

COST CODE PQ070/PQ777<br />

MODELS OF SYSTEMS AFFECTED: Automated Network Control Center (ANCC)<br />

DESCRIPTION/JUSTIFICATION: Modifications to operational ADNS/ANCC/ATCs to maintain current technology, modernization of manual patch and test facilities.<br />

Quantities reflect the following five communication nodes: Med, Lant, Eastpac, Westpac and Eurcent. Costs vary by site requirements and configuration.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07<br />

FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 15 21.651 0 0.000 1 1.139 5 2.921 5 2.437 5 2.402 5 2.298 5 1.602 5 1.927 Cont. Cont. 46 36.4<br />

Equipment Nonrecurring 0 0.0<br />

Engineering Change Orders 0 0.0<br />

Data 0 0.0<br />

Training Equipment 0 0.0<br />

Production Support 0.125 0.000 0.063 0.175 0.120 0.114 0.113 0.066 0.102 Cont. 0 0.9<br />

Other (DSA) Cont. 0 0.0<br />

Interm Contractor Support 0 0.0<br />

Installation of Hardware* 15 4.407 0 0.000 0 0.000 6 1.000 5 0.841 5 0.832 5 0.735 5 1.100 5 1.300 Cont. Cont. 46 10.2<br />

PRIOR YR EQUIP 15 4.407 15 4.4<br />

FY 00 EQUIP 0 0.0<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.000 0 0.0<br />

FY 03 EQUIP 0 0.000 1 0.260 1 0.3<br />

FY 04 EQUIP 5 0.740 5 0.7<br />

FY 05 EQUIP 5 0.841 5 0.8<br />

FY 06 EQUIP 5 0.834 5 0.8<br />

FY 07 EQUIP 5 0.736 5 0.7<br />

FY 08 EQUIP 5 1.100 5 1.1<br />

FY 09 EQUIP 5 1.300 5 1.3<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 4.407 0.000 0.000 1.000 0.841 0.832 0.735 1.100 1.300 Cont. 46 10.2<br />

TOTAL PROCUREMENT COST 26.183 0.000 1.202 4.096 3.398 3.348 3.146 2.768 3.329 Cont. 47.5<br />

METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: 3 months PRODUCTION LEADTIME: 4 months<br />

CONTRACT DATES: FY2003: Apr-03 FY2004: Apr-04 FY2005: Feb-05<br />

DELIVERY DATES: FY2003: Nov-03 FY2004: Aug-04 FY2005: Jun-05<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 15 1 5 5 5<br />

OUTPUT 15 1 5 5<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL 2/<br />

INPUT 5 5 5 Cont. 46<br />

OUTPUT 5 5 5 5 Con.t 46<br />

Notes/Comments<br />

1/ Quantity is representative of the number of communication nodes visited, not the total number of visits to each site. Unit cost varies depending on site and amount of work done at each site.<br />

2/ There is no defined ANCC Inventory Objective. The ANCC Strategy is a continual expansion of switching capabilities at 5 major communication nodes to meet the afloat termination requirements.<br />

3/ For FY03 - FY09, upgrades require an expansion and partial replacement of the ANCC equipment.<br />

4. Funding provided to include support for Shore Infrastructure Modernization (SIM).<br />

P-1 SHOPPING LIST P-3A Exhibit<br />

ITEM NO.<br />

16 of 22<br />

76<br />

February 2004


UNCLASSIFIED<br />

MODIFICATION TITLE: Tactical Switching 1/<br />

COST CODE PQ070/PQ776<br />

MODELS OF SYSTEMS AFFECTED: Automated Digital Multiplexer System (ADMS) - Ashore<br />

DESCRIPTION/JUSTIFICATION: Automated Network management capability which is fully compatible with switching technologies and in compliance with national and international standards.<br />

Quantities reflect the units at various sites within the following areas of coverage: Med, Lant, Eastpac, and Westpac. Costs vary by site size, requirements and configuration.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07<br />

FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 90 7.320 3 0.499 5 7.440 5 5.114 0 0.000 0 0.000 0 0.000 5 2.149 5 2.622 Cont. Cont. 113 25.1<br />

Equipment Nonrecurring 0 0.0<br />

Engineering Change Orders 0 0.0<br />

Data 0 0.0<br />

Training Equipment 0 0.0<br />

Production Support 0.108 0.021 0.337 0.594 0.000 0.000 0.000 0.108 0.125 Cont. 0 1.3<br />

Other (DSA) 0 0.0<br />

Interm Contractor Support 0 0.0<br />

Installation of Hardware* 90 2.910 2 0.178 5 3.276 5 0.551 0 0.000 0 0.000 0 0.000 5 1.439 5 1.871 Cont. Cont. 112 10.2<br />

PRIOR YR EQUIP 90 2.910 90 2.9<br />

FY 00 EQUIP 0 0.0<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 2 0.178 2 0.2<br />

FY 03 EQUIP 5 3.276 5 3.3<br />

FY 04 EQUIP 5 0.551 5 0.6<br />

FY 05 EQUIP 0 0.000 0 0.0<br />

FY 06 EQUIP 0 0.000 0 0.0<br />

FY 07 EQUIP 0.0 0.000 0 0.0<br />

FY 08 EQUIP 5 1.439 5 1.4<br />

FY 09 EQUIP 5 1.871 5 1.9<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 2.910 0.178 3.276 0.551 0.000 0.000 0.000 1.439 1.871 Cont. 112 10.2<br />

TOTAL PROCUREMENT COST 10.338 0.698 11.053 6.259 0.000 0.000 0.000 3.696 4.618 Cont. 36.7<br />

METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: 3 months PRODUCTION LEADTIME: 4 months<br />

CONTRACT DATES: FY2003: Jun-03 FY2004: Dec-03 FY2005:<br />

DELIVERY DATES: FY2003: Sep-03 FY2004: Apr-04 FY2005:<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 97 5<br />

OUTPUT 97 5<br />

FY 07<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 5 5 Cont. 112<br />

OUTPUT 5 5 Cont. 112<br />

Notes/Comments<br />

1/ There is no inventory objective for ADMS Ashore. There are 5 major nodes (Hawaii, San Diego, Norfolk, Naples, and Bahrain) which are continually revisited to satisfy new fleet requirements<br />

2/ 1 procurement in FY02 is a training unit.<br />

3/ By end of FY04, ADMS Shore Infrastructure has been prepared for Shipboard integration into network. In FY05-FY07, shift to ADMS Afloat to transition ships to new shore infrastructure<br />

network. In FY08-09, continue shore capacity upgrades to meet emerging requirements.<br />

17 of 22<br />

4. Funding provided to include support for Shore Infrastructure Modernization (SIM). P-1 SHOPPING LIST P-3A Exhibit<br />

ITEM NO.<br />

76<br />

February 2004


UNCLASSIFIED<br />

MODIFICATION TITLE: Tactical Switching 1/<br />

COST CODE PQ070/PQ776<br />

MODELS OF SYSTEMS AFFECTED: Automated Digital Multiplexer System (ADMS) - Afloat<br />

DESCRIPTION/JUSTIFICATION: Automated Network management capability which is fully compatible with switching technologies and in compliance with national and international standards.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07<br />

FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 0.000 0 0.000 0 0.000 0 0.000 46 10.360 43 10.227 41 9.763 Cont. 130 30.4<br />

Equipment Nonrecurring 0 0.0<br />

Engineering Change Orders 0 0.0<br />

Data 0 0.0<br />

Training Equipment 0 0.0<br />

Production Support 0.000 0.000 0.000 0.000 0.532 0.499 0.509 Cont. 0 1.5<br />

Other (DSA) 0.245 0.237 0.207 0 0.7<br />

Interm Contractor Support 0 0.0<br />

Installation of Hardware* 0 0.000 0 0.000 0 0.000 0 0.000 46 3.338 43 3.311 41 2.924 0 0.0 0 0.0 Cont. 130 9.6<br />

PRIOR YR EQUIP 0 0.000 0 0.0<br />

FY 00 EQUIP 0 0.0<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.000 0 0.0<br />

FY 03 EQUIP 0 0.000 0 0.0<br />

FY 04 EQUIP 0 0.000 0 0.0<br />

FY 05 EQUIP 46 3.338 46 3.3<br />

FY 06 EQUIP 43 3.316 43 3.3<br />

FY 07 EQUIP 41 2.929 41 2.9<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.000 0.000 0.000 0.000 3.338 3.311 2.924 0.0 0.0 Cont. 130 9.6<br />

TOTAL PROCUREMENT COST 0.000 0.000 0.000 0.000 14.475 14.274 13.403 0.0 0.0 Cont. 42.2<br />

METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: 3 months PRODUCTION LEADTIME: 4 months<br />

CONTRACT DATES: FY2003: FY2004: FY2005: Dec-04<br />

DELIVERY DATES: FY2003: FY2004: FY2005: Apr-05<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 0 25 21 22 21<br />

OUTPUT 0 25 21 22<br />

FY 07<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 21 20 0 130<br />

OUTPUT 21 21 20 0 130<br />

Notes/Comments<br />

1/ For FY05 - FY07, ADMS Afloat equipment will be replaced to satisfy increased IT-21 information transfer needs<br />

18 of 22<br />

P-1 SHOPPING LIST P-3A Exhibit<br />

ITEM NO.<br />

76<br />

February 2004


UNCLASSIFIED<br />

MODIFICATION TITLE: Shore Remote Control Systems (SRCS)/Element Management System -Ashore (EMS) 1/<br />

COST CODE PQ075/PQ776<br />

MODELS OF SYSTEMS AFFECTED: Various transmission media.<br />

DESCRIPTION/JUSTIFICATION: Automates and remotely controls communications switching and RF equipment which eliminates manual operations.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07<br />

FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 33 12.334 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.0 33 12.3<br />

Equipment Nonrecurring 0 0.0<br />

Engineering Change Orders 0 0.0<br />

Data 0 0.0<br />

Training Equipment 0 0.0<br />

Production Support 0.280 0.226 0.000 0.000 0.000 0.000 0.000 0.0 0 0.5<br />

Other (DSA) 0 0.0<br />

Interm Contractor Support 0 0.0<br />

Installation of Hardware* 33 5.987 0 0.000 0 0.045 0 0.000 0 0.000 0 0.000 0 0.000 0 0.0 0 0.0 0 0.0 33 6.0<br />

PRIOR YR EQUIP 33 5.987 33 6.0<br />

FY 00 EQUIP 0 0.0<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.000 0 0.0<br />

FY 03 EQUIP 0 0.045 0 0.0<br />

FY 04 EQUIP 0 0.000 0 0.0<br />

FY 05 EQUIP 0 0.000 0 0.0<br />

FY 06 EQUIP 0 0.000 0 0.0<br />

FY 07 EQUIP 0 0.000 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0 0 0.0<br />

TOTAL INSTALLATION COST 5.987 0.000 0.045 0.000 0.000 0.000 0.000 0.0 0.0 0.0 33 6.0<br />

TOTAL PROCUREMENT COST 18.601 0.226 0.045 0.000 0.000 0.000 0.000 0.0 0.0 0.0 18.9<br />

METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: 3 months PRODUCTION LEADTIME: 4 months<br />

CONTRACT DATES: FY2003: N/A FY2004: FY2005:<br />

DELIVERY DATES: FY2003: N/A FY2004: FY2005:<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 33<br />

OUTPUT 33<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL 2/<br />

INPUT 0 33<br />

OUTPUT 0 33<br />

Notes/Comments<br />

1/ Production support in FY02 includes transition of formal training to CNET, closing out production and transitioning assets to ISEA and completing remaining logistics documentation for turn over to ISEA<br />

2/ As a result of Navy decisions, this program will cease in FY02.<br />

3/ Prior year quantity includes 16 SRCS units.<br />

P-1 SHOPPING LIST<br />

ITEM NO.<br />

76<br />

19 of 22<br />

P-3A Exhibit<br />

February 2004


UNCLASSIFIED<br />

MODIFICATION TITLE: ISNS<br />

COST CODE PQ007/PQ777<br />

MODELS OF SYSTEMS AFFECTED: Integrated Shipboard Network System (ISNS)<br />

DESCRIPTION/JUSTIFICATION: Provides modern, centrally managed, network systems to replace aging LAN systems for Battle Group (BG) and non-BG ships, submarines and embarking Marine Corp units.<br />

Application subsystems include/financial/inventory management, organizational and surface maintenance management, and administrative information systems support.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06<br />

FY 07<br />

FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 207 131.9 39 26.172 41 30.483 64 77.023 30 34.051 100 117.377 20 23.367 35 41.663 55 62.217 Cont. Cont. 591 544.2<br />

Equipment Nonrecurring 0 0.0<br />

Engineering Change Orders 0 0.0<br />

Data 0 0.0<br />

Training Equipment 0 0.0<br />

Production Support 5.568 2.821 1.774 4.307 1.833 6.394 2.087 2.172 3.272 Cont. 0 30.2<br />

Other (DSA) 22.287 1.448 3.554 4.100 1.800 6.287 1.200 2.200 5.458 Cont. 0 48.3<br />

Interm Contractor Support 0 0.0<br />

Installation of Hardware* 199 149.6 43 23.767 38 17.763 50 33.201 51 33.787 100 73.765 20 15.088 35 27.311 55 43.537 Cont. Cont. 591 417.9<br />

PRIOR YR EQUIP 199 149.6 199 149.6<br />

FY 00 EQUIP 0 0.0<br />

FY 01 EQUIP 8 4.422 8 4.4<br />

FY 02 EQUIP 35 19.345 4 4.669 39 24.0<br />

FY 03 EQUIP 34 13.094 7 4.648 41 17.7<br />

FY 04 EQUIP 43 28.553 21 13.912 64 42.5<br />

FY 05 EQUIP 30 19.875 30 19.9<br />

FY 06 EQUIP 100 73.765 100 73.8<br />

FY 07 EQUIP 20 15.088 20 15.1<br />

FY 08 EQUIP 35 27.311 35 27.3<br />

FY 09 EQUIP 55 43.537 55 43.5<br />

FY TC EQUIP Cont. Cont. 0 0.0<br />

TOTAL INSTALLATION COST 149.6 23.8 17.8 33.2 33.8 73.8 15.1 27.3 43.5 Cont. 591 417.9<br />

TOTAL PROCUREMENT COST 309.3 54.2 53.6 118.6 71.5 203.8 41.7 73.3 114.5 Cont. 1040.6<br />

METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: 2 months PRODUCTION LEADTIME: 2 months<br />

CONTRACT DATES: FY2003: Nov-02 FY2004: Nov-03 FY2005: Nov-04<br />

DELIVERY DATES: FY2003: Jan-03 FY2004: Jan-04 FY2005: Jan-05<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 280 7 15 15 13 6 15 15 15 40 30 30<br />

OUTPUT 280 15 15 20 17 17 17 30 35 35<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 7 7 6 15 10 10 20 20 15 Cont. 591<br />

OUTPUT 5 7 8 10 15 10 15 20 20 Cont. 591<br />

Notes/Comments<br />

1/ Total Quantity listed on this P-3A represent systems procured and installed, including refresh equipment, and is not an Inventory Objective. Program Continues Beyond FYDP.<br />

2/ Unit Costs increase substantially in FY04 and beyond due to the introduction of the A(V)1, A(V)2, and A(V)3 configurations, which provide more capability then previous ISNS systems. P-3A Exhibit<br />

P-1 SHOPPING LIST<br />

ITEM NO.<br />

20 of 22<br />

76<br />

February 2004


UNCLASSIFIED<br />

Joint Network Management System (JNMS)<br />

COST CODE PQ021/PQ777<br />

MODELS OF SYSTEMS AFFECTED: Joint Network Management System (JNMS)<br />

DESCRIPTION/JUSTIFICATION: The Joint Network Management System (JNMS) is a COM, Commander, Joint Forces (CIF) joint communications planning and management system<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06<br />

FY 07<br />

FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 0 0.000 0 0.000 6 5.026 1 1.272 1 1.430 2 1.703 2 1.859 2 1.882 Cont. Cont. 14 13.2<br />

Equipment Nonrecurring 0 0.0<br />

Engineering Change Orders 0 0.0<br />

Data 0 0.0<br />

Training Equipment 0 0.0<br />

Production Support 0.002 0.000 0.333 0.051 0.094 0.052 0.062 0.082 Cont. 0 0.7<br />

Other (DSA) 0 0.0<br />

Interm Contractor Support 0 0.0<br />

Installation of Hardware* 0 0.000 0 0.000 6 0.323 1 0.072 1 0.163 2 0.176 2 0.197 2 0.206 Cont. Cont. 14 1.1<br />

PRIOR YR EQUIP 0 0.0<br />

FY 00 EQUIP 0 0.0<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.000 0 0.0<br />

FY 03 EQUIP 0 0.000 0 0.0<br />

FY 04 EQUIP 6 0.323 6 0.3<br />

FY 05 EQUIP 1 0.072 1 0.1<br />

FY 06 EQUIP 1 0.163 1 0.2<br />

FY 07 EQUIP 2 0.176 2 0.2<br />

FY 08 EQUIP 2 0.197 2 0.2<br />

FY 09 EQUIP 2 0.206 2 0.2<br />

FY TC EQUIP Cont. Cont. 0 0.0<br />

TOTAL INSTALLATION COST 0.000 0.000 0.323 0.072 0.163 0.176 0.197 0.206 Cont. 14 1.1<br />

TOTAL PROCUREMENT COST 0.002 0.000 5.682 1.395 1.687 1.931 2.056 2.088 Cont. 15.0<br />

METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: 2 months PRODUCTION LEADTIME: 2 months<br />

CONTRACT DATES: FY2003: N/A FY2004: Apr-04 FY2005: Nov-04<br />

DELIVERY DATES: FY2003: N/A FY2004: Jun-04 FY2005: Jan-05<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 0 6 1 1<br />

OUTPUT 0 6 1 1<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 1 1 1 1 1 1 Cont. 14<br />

OUTPUT 1 1 1 1 1 1 Cont. 14<br />

Notes/Comments<br />

P-1 SHOPPING LIST<br />

ITEM NO.<br />

76<br />

21 of 22<br />

P-3A Exhibit<br />

February 2004


UNCLASSIFIED<br />

CLASSIFICATION<br />

PRODUCTION SCHEDULE February 2004<br />

(DOD EXHIBIT P-21A)<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD NO.<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI: 3050 SHIP COMMUNICATION AUTOMATION 52PQ<br />

S ACCEP BAL FISCAL YEAR 03 FISCAL YEAR 04 FISCAL YEAR 05<br />

COST ITEM/MANUFACTURER/ E PROC PRIOR DUE CY02 CALENDAR YEAR 03 CALENDAR YEAR 04 CALENDAR YEAR 05<br />

CODE PROCUREMENT YEAR R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S<br />

V 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E<br />

FY T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P<br />

PQ065 Tactical Messaging 04 8 8 A 3 3 2<br />

05 22 22 A 4 4 4 4 3 3<br />

SCI Networks Afloat 04 7 7 A 4 2 1<br />

05 8 8 A 4 3 1<br />

PQ068 SCI Networks Ashore 04 3 3 A 1 1 1<br />

05 4 4 A 1<br />

PQ069 ADNS Afloat 04 28 28 A 11 10 4 3<br />

05 47 47 A 9 9 8 7 7 7<br />

PQ069 ADNS Ashore 05 9 9 A 3 3 3<br />

PQ069 Fleet NOC 04 4 4 A 1 1 1 1<br />

05 1 1 A 1<br />

PQ070 ANCC Ashore 04 5 5 A 5<br />

05 5 5 A 5<br />

PQ070 ADMS Ashore 04 5 5 A 3 2<br />

PQ070 ADMS Afloat 05 46 46 A 9 9 9 9 10<br />

PQ007 ISNS 04 64 64 A 8 8 8 7 7 7 7 6 6<br />

05 30 30 A 4 4 4 4 4 4 2 2 2<br />

PQ021 JNMS 04 6 6 A 2 2 2<br />

05 1 1 A 1<br />

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP<br />

PRODUCTION RATE PROCUREMENT LEADTIMES<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

ITEM<br />

Procurements are made from COTS inventories.<br />

Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

ISNS Various Various<br />

NAVMAT FORM 7110/4 (REVISED 11/77) P-1 SHOPPING LIST P-21A Exhibit<br />

ITEM NO.<br />

76<br />

22 of 22<br />

DATE


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI: 3057 Communication Items Under $5M 52NU<br />

QUANTITY<br />

PY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TO COMP TOTAL<br />

COST<br />

(in millions) $36.5 $29.3 $11.9 $35.8 $22.7 $22.2 $20.8<br />

JUSTIFICATION OF BUDGET YEAR REQUIREMENTS:<br />

HF TILT MECHANISMS - Devices to enable vertical whip antenna to be lowered to a horizontal position during flight operations. Beginning in FY04, this program transfers to BLI 3010 (Joint Tactical Radio<br />

System)<br />

HIGH FREQUENCY RADIO GROUP (HFRG) BROADBAND - Will allow fully automated operation of the HF communications system. The system will reduce the number of topside antennas used, reduce<br />

electromagnetic interference and reduce manning requirements. Beginning in FY04, this program transfers to BLI 3010 (Joint Tactical Radio System)<br />

DIGITAL WIDEBAND TRANSMISSION SYSTEM (DWTS) - UHF line of sight radio system, ship-to-ship and ship-to-shore communications required to support landing force systems. The current program<br />

procures DWTS for amphibious and flag ships only. LRIP procurements of low data rate DWTS (DWTS LDR) began in FY00.<br />

INSTALLING AGENTS: Installation will be accomplished by alteration installation teams (AIT) from SPAWAR field activities.<br />

EPLRS - Provides ship-to-shore line-of-sight communications backbone for digital comms supporting Marine or Army landing forces in a network in the UHF frequency band. Supports landing force<br />

command elements at Marine regiment or MEU to company, and Army brigade to company. Provides automated position reporting and movement control of both landing force and assault craft elements.<br />

BATTLE FORCE EMAIL 66 - BFEM 66 provides a basic SMPT/POP3 data transfer capability between Allied/NATO/Coalition Afloat forces utilizing the HF Spectrum.<br />

VIXS: Video Information Exchange System (VIXS) provides the Fleet with tactical video teleconferencing. The system provides multipoint secure Video Teleconferencing (VTC) between deployed<br />

carriers/large deck amphibs, Fleet Commander-in-Chief (CINCs), Chief of Naval Operations (CNO) and select Department of Defense (DOD) commands. Shipboard systems also provide connectivity to<br />

the Joint Worldwide Intelligence Communications System (JWICS) VTC system.<br />

TMIP: Theater Medical Information Program - Maritime (TMIP-M) program is charged with deployment of both infrastructure and the software to support the theater requirements for healthcare and<br />

command and control (C2) activities: clinical, resources, logistics, decision support, etc. The development and release of TMIP software will be conducted incrementally and it will be based on GOTS<br />

medical software that is currently available in the military inventory. Software components selected for TMIP are: MAT, CHCS, DBSS, DMLSS, TRAC2ES, and other developed software meets the<br />

functionality of SAMS. Meanwhile, until TMIP is fully deployed in the fleet (est. FOC FY08), SAMS will be concurrently supported. Subsequent TMIP Block releases will follow. The TMIP-M will leverage IT-<br />

21 and NTCSS infrastructure components, Horizontal Integration efforts, as well as installation, logistics, and fleet support components.<br />

P-1 Shopping List - Item No 77 Page 1 of 20<br />

Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

DGET ITEM JUSTIFICATION SHEET (Continued) DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI: 3057 Communication Items Under $5M 52NU<br />

PORTABLE RADIOS: Procures MultiBand Inter/Intra Team Radios (MBITR) for deploying ships and Navy Ground Forces (Naval Construction Forces, Naval Coastal Warfare Group elements, Naval Beach Groups, Navy<br />

Cargo-Handling and Port Operations Group, and others). No installation funding required. Procurement is needed to support Force Protection operations, especially with Joint forces.<br />

COMBAT SURVIVOR EVADER LOCATOR (CSEL) : The Combat Survivor Evader Locator (CSEL) Radio system provides U.S. combat forces with secure, encrypted, low probability of detection, two-way, over the<br />

horizon, near real time databurst communications with integral precise geopositioning; and non-secure, unencrypted line-of-site voice and beacon capability to support survival, evasion, and personnel recovery operation<br />

This is a joint Program with the Air Force as lead. The User segment of the CSEL system is composed of a battery operated hand held radio (HHR) (AN/PRQ-7), a radio set adapter (RSA) (J-6431/PRQ-7), a GPS<br />

antenna and coupler, and a laptop CPU with software for loading the HHR (CSEL Planning Computer (CPC)). The HHR will weigh 32 ounces and is of comparable size to other portable SATCOM radios (8x3.5x1.75").<br />

CSEL will require a key fill device and will have improved jam and spoofing resistance by incorporating the next-generation Selective Availability Anti-Spoofing Module (SAASM) GPS module. The HHR requires the "CSEL<br />

infrastructure" to be operational, including the Ground segment's Joint Search and Rescue Center (JSRC) workstation/software and the Over-The-Horizon (OTH) segment's UHF Base Station (UBS). This funding line<br />

procures CSEL user equipment for Navy special forces; funding for Navy/USMC aircrews is provided via a separate (NAVAIR) program. The production contract is issued as a joint, single lot/option procurements, with all<br />

services funding applied to the lot/option.<br />

AN/SRC-55 HYDRA: Replaces all stovepipe wireless shipboard systems (DC WIFCOM, MOMCOM, PVPCS, FDCS) with an integrated system on all ship classes. It is a wireless digital voice and data communications<br />

system using COTS trunking technology and is capable of interfacing with PBX, Cellular and other RF systems. The system procurement and installation costs vary with ship class based on the number of channels and<br />

radios in the system. Installations are performed by AITs during pierside availabilities. The total number of HYDRA ships (187) is based on N6 POM 04 fielding plan initiatives. Funding for the HYDRA Program<br />

transitioned to NAVSEA from SPAWAR in FY00. HYDRA is zeroed in FY03-05 due to vertical program cuts implemented by N61 in support of emergent CINC requirements for IT-21 systems. The HYDRA ORD still<br />

applies as Navy requirement. Program remains executable due to simultaneous forward fit procurements and installations. Out year funding is critical in implementing National Telecommunications and Information<br />

Administration (NTIA) mandated changes to Navy Shipboard LMR systems by FY2008.<br />

DDG 51 Class Force Protection equipment for Shipboard Wireless Communication System Enhancement, Land Mobile Radios and Emergency SATCOM Secure Radios: this provides DDGs 89-106 the NTIA approved<br />

DoD frequencies and narrow banding requirements directed by: DDG 51 Flight IIA Operational Requirement Document (ORD) - Secure communications capability; Navy decision coordination paper - NDCP S-0812-SL<br />

(Confidential), dtd 2/23/83; DEPSECDEF memo dtd 01 Aug 2001 directed LMRs to operate in the US military band of 380-399MHz; and USS COLE lessons learned.<br />

FY03 Congressional Add:<br />

NU247: AN/UYQ-70 ILS for Network based ship Interior Secure Voice system (NAVSEA)<br />

FY04 Congressional Adds:<br />

NIU244: Integrated Communication System for Aircraft Carrier Carriers and Command Ships: Funding will further integrate the USS Lincoln’s command & control communication system and assess requirements of<br />

adding an Integrated Communication System on Aircraft Carriers and Command Ships ($1.5M).<br />

NU247: AN/UYQ-70 Secure Voice System (SVS) for Aircraft Carriers: Funding will enable procurement and installation of SVS parts and material to raise previously delivered pre-production units to the production level<br />

for carrier demonstrations ($1.7M).<br />

NU249: Shipboard Communication Upgrades: Funding will provide software/hardware upgrades to approximately 15 large Navy ships to improve security for Shipboard Systems in order to comply with certification<br />

requirements and ultimately, readiness ($3M).<br />

P-1 Shopping List - Item No 77 Page 2 of 20<br />

Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

COST ANALYSIS<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT BLI: 3057 Communication Items Under $5M 52NU<br />

PY<br />

FY 2003 FY 2004 FY 2005<br />

COST ID TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE QTY COST QTY COST COST QTY COST COST QTY COST COST<br />

NU013 HF Tilt Mechanism A 29 2,998<br />

NU016 HFRG Broadband A 33 41,478 1 4,555.0 4,555<br />

NU019 DWTS Block Upgrade (Block Bravo in FY02) B 66 4,194<br />

NU019 EPLRS B 9 200.7 1,806 13 286.1 3,719<br />

NU022 Battle Force Email 66 A 145 4,043 13 42.5 553 5 47.4 237 0<br />

NU022 BFEM 19.2 Kpbs Modem upgrade A 29 18.5 537 4 20.0 80<br />

NU237 Portable Radios -Gen Purpose Handheld Radios 55 1,917 44 6.3 277 246 13.0 3,204 56 14.6 817<br />

NU250 CSEL B 162 11.3 1,828 352 10.3 3,622<br />

NU239 VIXS A 9 1666 3 82.7 248 8 90.5 724<br />

VIXS SHIP 7 665 3 248 4 396<br />

VIXS SHORE 2 1001 0 4 328<br />

NU240 TMIP (SAMS NT Upgrade) A 535 1922 14 69.1 968<br />

NU240 TMIP A 6 166.5 999 9 134.9 1,214<br />

NU950 AN/UYQ-70 for IT21 * 3 7,585 26 310 8,049<br />

NU555 Production Support 4,532 2,410 2,005<br />

EPLRS: FY04 unit cost increases due to increase in initial ILS and 11.X upgrade requirements<br />

BFEM: FY04-06 includes procurement of 19.2 Kbps modem upgrade to existing systems.<br />

Portable Radios: Various types of radios are procured. Unit cost depends on configuration of radio. Unit cost is an average.<br />

CSEL: The Unit Cost is NOT the actual individual cost of a single CSEL HHR - it is the total hardware cost computed by dividing the total yearly hardware cost by the number of radios procured.<br />

TMIP: Unit Cost for TMIP is an average cost for the year of total costs divided by number of ships deploying TMIP. Actual unit costs vary by ship class.<br />

P-1 Shopping List - Item No 77 Page 3 of 20<br />

DATE<br />

February 2004<br />

Exhibit P-5, Budget Item Justification<br />

Unclassified


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE<br />

COST ANALYSIS Feb-04<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT BLI: 3057 Communication Items Under $5M 52NU<br />

PY<br />

FY 2003 FY 2004 FY 2005<br />

COST ID TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE QTY COST QTY COST COST QTY COST COST QTY COST COST<br />

INSTALLATION 76,488 10,986 3,286 1,557<br />

NU777 FMP 69,681 9,382 2,459 1,427<br />

NU777 DSA 5322 1508 614 130<br />

NU777 NON-FMP 1,486 96 213 0<br />

Total SPAWAR CONTROL 31,974 16,944 9,295<br />

NU244* Integrated Communication System<br />

NU246* COTS Software for ON-201 Secure Voice System 3,400<br />

NU247* AN/UYQ-70 ILS for ship Secure Voice System 8,500 1,500<br />

NU249* Shipboard Communications Upgrade 4,500 1,700<br />

3,000<br />

NU245 HYDRA - NAVSEA<br />

NU245 HYDRA 2,460 0 0 0 0 0 0 0 0 0<br />

FMP Installation 1,319 0 0 0<br />

NU248 DDG 51 Class Force Protection<br />

NU248 DDG 51 Class Force Protection 7 240 1,681 3 249 748<br />

FMP Installation 4,510 1,878<br />

Total NAVSEA CONTROL 4,500 12,391 2,626<br />

CONSOLIDATED CONTROL 36,474 29,335 11,921<br />

* Congressional add Exhibit P-5, Budget Item Justification<br />

Unclassified<br />

P-1 Shopping List - Item No 77 Page 4 of 20


UNCLASSIFIED<br />

CLASSIFICATION<br />

PROCUREMENT HISTORY AND PLANNING Feb-04<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI: 3057 Communication Items Under $5M 52NU<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE Delevery COST NOW AVAILABLE<br />

NU016 HFRG Broadband 03 HARRIS Corp, Rochester NY FFP/O SPAWAR N/A Sep-03 Nov-04 1 4,555.0 YES<br />

NU019 EPLRS 04 Various IDIQ SSC CHASN N/A Jan-04 Jun-04 13 286.1 YES<br />

NU022 Battle Force Email 04 DTDI / Rockwell / Harris FFP/O SPAWAR N/A Dec-03 Jan-04 5 47.4 YES<br />

NU022 BFEM 19.2 Kpbs Modem upgrade 04 DTDI / Rockwell / Harris FFP/O SPAWAR N/A Dec-03 Jan-04 29 18.5 YES<br />

NU022 BFEM 19.2 Kpbs Modem upgrade 05 DTDI / Rockwell / Harris FFP/O SPAWAR N/A Nov-04 Dec-04 4 20.0 YES<br />

NU237 Portable Radios - General Purpose Handheld Radios / 3<br />

NU237 Portable Radios - General Purpose Handheld Radios / 3<br />

NU237 Portable Radios - General Purpose Handheld Radios / 3<br />

NU250 CSEL / 2<br />

NU250 CSEL / 2<br />

A. DATE<br />

03 HARRIS Corp, Rochester NY FFP SPAWAR N/A Apr-04 May-04 44 6.3 YES<br />

04 HARRIS Corp, Rochester NY FFP SPAWAR N/A Apr-04 May-04 246 13.0 YES<br />

05 HARRIS Corp, Rochester NY FFP SPAWAR N/A Nov-04 Dec-04 56 14.6 YES<br />

04 Boeing Company, The FFP AFMS/SMC N/A Mar-04 Dec-04 162 11.3 YES<br />

05 Boeing Company, The FFP AFMS/SMC N/A Dec-04 Sep-05 352 10.3 YES<br />

NU239 VIXS 04 SSC CHS WX SPAWAR N/A Dec-03 Mar-04 8 90.5 YES<br />

NU240 TMIP / 1<br />

NU240 TMIP / 1<br />

04 SSC CHS/CHAR WX SSC CHS/CHAR N/A Nov-03 Jan-04 6 166.5 YES<br />

05 SSC CHS/CHAR WX SSC CHS/CHAR N/A Nov-04 Jan-05 9 134.9 YES<br />

NU244 Integrated Communication System 04 L3 Communciations FFP SSC Charleston Jun-04 Sep-04 1 1,500 YES<br />

NU247 AN/UYQ-70 for Secure Voice System 03 Lockheed-Martin, Eagan, Minnesota FFP Wash DC Aug-03 Feb-04 4 Var<br />

NU247 AN/UYQ-70 for Secure Voice System 04 Lockheed-Martin, Eagan, Minnesota FFP Wash DC Mar-04 Sep-04 1 Var<br />

NU249 Shipboard Communications Upgrade 04 Avaya FFP SSC Charleston Mar-04 Mar-04 15 200 YES<br />

NU248 DDG 51 Class Force Protection 04 Motorolla - Sphaumberg, Illinois GSA NSWC Crane N/A Oct-03 Jan-04 7 240.1 YES<br />

NU248 DDG 51 Class Force Protection 05 Motorolla - Sphaumberg, Illinois GSA NSWC Crane N/A Oct-04 Jan-05 3 249.3 YES<br />

D. REMARKS<br />

1/ TMIP: Unit Cost for TMIP is an average cost for the year of total costs divided by number of ships deploying TMIP. Actual unit costs vary by ship class.<br />

2/ CSEL: The Unit Cost is NOT the actual individual cost of a single CSEL HHR - it is the total hardware cost computed by dividing the total yearly hardware cost by the number of radios procured.<br />

3/ Portable Radios: Various types of radios are procured. Unit cost depends on configuration of radio. Unit cost is an average.<br />

4/ Portable Radios: FY03 and FY04 procurements pending approval of JTRS waiver<br />

P-1 Shopping List - Item No 77 Page 5 of 20<br />

Exhibit P-5a, Procurement History and Planning<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: SHIP TACTICAL COMMUNICATIONS Feb-04<br />

COST CODE NU013<br />

MODELS OF SYSTEMS AFFECTED: HF TILT MECHANISMS<br />

DESCRIPTION/JUSTIFICATION: Installation on ships to allow vertical whip antennas to be lowered to a horizontal position during flight operations.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

27 2.7 2 0.3 0 0.0 29 3.0<br />

Production Support 1.1 0.6 0.3 2.0<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.0 0.0 0.0<br />

Installation of Hardware 13 1.2 0 0.0 0 0.0 16 See Note 13 1.2<br />

PRIOR YR EQUIP 13 1.2 14 See Note 13 1.2<br />

FY 02 EQUIP 2 See Note 2 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 1.2 0.0 0.0 See Note 0.0 0.0 0.0 0.0 0.0 0.0 1.2<br />

TOTAL PROCUREMENT COST 5.0 0.9 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.2<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 5 mos PRODUCTION LEADTIME: 12 mos<br />

CONTRACT DATES: FY 2002: N/A FY 2003: N/A FY 2004: FY 2005:<br />

DELIVERY DATES: FY 2002: N/A FY 2003: N/A FY 2004: FY 2005:<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 13 See Note<br />

OUTPUT 13<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 13<br />

OUTPUT 13<br />

Notes/Comments<br />

1/ Beginning in FY04, HF Tilt program transferrs to BLI 3010 (Ship Tact Comm). FY04 install funding reflected under BLI 3010. Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification<br />

P-1 Shopping List - Item No 77 Page 6 of 20


UNCLASSIFIED<br />

MODIFICATION TITLE: SHIP TACTICAL COMMUNICATIONS Feb-04<br />

COST CODE NU016<br />

MODELS OF SYSTEMS AFFECTED: HIGH FREQUENCY RADIO GROUP<br />

DESCRIPTION/JUSTIFICATION: Provides for fully automated operation of the High Frequency Communications System.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 33 41.5 0 0.0 1 3.5 34 45.0<br />

Equipment Nonrecurring - HF ALE upgrade 0.5 0.5<br />

Equipment Nonrecurring - VRC--104<br />

Data<br />

Training Equipment<br />

0.6 0.6<br />

Production Support 1.4 1.3 0.8 3.5<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.7 0.5 0.3 1.5<br />

Installation of Hardware 31 41.6 1 2.2 0 0.2 1 Note 1 33 44.0<br />

PRIOR YR EQUIP<br />

FY 02 EQUIP<br />

31 41.6 1 2.2 32 43.8<br />

FY 03 EQUIP<br />

FY 04 EQUIP<br />

FY 05 EQUIP<br />

FY 06 EQUIP<br />

FY 07 EQUIP<br />

FY 08 EQUIP<br />

FY 09 EQUIP<br />

FY TC EQUIP<br />

0 0.2 1 Note 1 0.2<br />

TOTAL INSTALLATION COST 41.6 2.2 0.2 Note 1 0 0 0 0 0 0.0 44.0<br />

TOTAL PROCUREMENT COST 85.2 4.0 5.8 0 0 0 0 0 0 0.0 94.9<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 mos PRODUCTION LEADTIME: 12 mos<br />

CONTRACT DATES: FY 2002: N/A FY 2003: Sep-03 FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATES: FY 2002: N/A FY 2003: Nov-04 FY 2004: N/A FY 2005: N/A<br />

FY 04 FY 05<br />

FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4<br />

See Note<br />

1 2 3 4 1 2 3 4<br />

INPUT 32<br />

OUTPUT 32<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 32<br />

OUTPUT 32<br />

Notes/Comments<br />

1/ Beginning in FY04, HFRG program transfers to BLI 3010 (JTRS). Installation of FY03 procurements are budgeted under BLI 3010 (Ship Tact Comm)<br />

2/ The installation of the FY01 procurement of a 12 KW system was cancelled due to ship being decommissioned. This asset is being converted into<br />

two HFRG (8kw & 4kw) systems in FY04 and is reflected under BLI 3010.<br />

3/ FY03 procures one (4 kw) system which requires a 12-16 month production leadtime. Installation is reflected under BLI 3010 (Ship Tact Comm).<br />

4/ FY03 install includes installation of the HF ALE upgrades. Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification<br />

P-1 Shopping List - Item No 77 Page 7 of 20


UNCLASSIFIED<br />

MODIFICATION TITLE: SHIP TACTICAL COMMUNICATIONS Feb-04<br />

COST CODE NU019<br />

MODELS OF SYSTEMS AFFECTED: DWTS BLOCK UPGRADE<br />

DESCRIPTION/JUSTIFICATION: UHF Line-Of-Sight radio system, ship to ship and ship to shore communications.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

39 3.5 27 0.7 0 0.0 15 0.8 81 5.0<br />

Production Support 1.8 1.2 0.7 0.5 4.2<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.3 0.5 0.3 0.1 1.1<br />

Installation of Hardware 35 2.5 11 0.9 20 3.6 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 15 0.5 81 5.0<br />

PRIOR YR EQUIP 35 2.5 4 0.1 39 2.6<br />

FY 02 EQUIP 7 0.8 20 3.6 27 4.5<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 15 0.5 15 0.5<br />

TOTAL INSTALLATION COST Note 1 0.9 3.6 0.0 0.0 0.0 0.0 0.0 0.0 0.5 5.0<br />

TOTAL PROCUREMENT COST 5.6 3.2 4.6 0.0 0.0 0.0 0.0 0.0 0.0 1.8 15.3<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 mos PRODUCTION LEADTIME: 9 mos<br />

CONTRACT DATES: FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATES: FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 66<br />

OUTPUT 66<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 15 81<br />

OUTPUT 15 81<br />

Notes/Comments<br />

P-1 Shopping List - Item No 77 Page 8 of 20<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: SHIP TACTICAL COMMUNICATIONS Feb-04<br />

COST CODE NU019<br />

MODELS OF SYSTEMS AFFECTED: EPLRS<br />

DESCRIPTION/JUSTIFICATION: UHF Line-Of-Sight radio system, ship to ship and ship to shore communications.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

EPLRS RACKS<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

9 1.8 13 3.7 8 2.0 30 7.5<br />

Production Support 1.2 0.9 0.9 1.0 3.9<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.2 0.4 0.0 0.1 0.7<br />

Installation of Hardware 0 0.0 0 0.0 6 1.0 9 1.6 7 1.0 8 1.9 30 5.5<br />

PRIOR YR EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 6 1.0 3 0.5 9 1.5<br />

FY 04 EQUIP 6 1.0 7 1.0 13 2.1<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 8 1.9 8 1.9<br />

TOTAL INSTALLATION COST 0.0 0.0 1.0 1.6 1.0 0.0 0.0 0.0 0.0 1.9 5.5<br />

TOTAL PROCUREMENT COST 0.0 0.0 4.2 6.5 1.9 0.0 0.0 0.0 0.0 5.0 17.6<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 mos PRODUCTION LEADTIME: 3-9 mos<br />

CONTRACT DATES: FY 2002: N/A FY 2003: Jan-03 FY 2004: Jan-04 FY 2005: N/A<br />

DELIVERY DATES: FY 2002: N/A FY 2003: Jul-03 FY 2004: Jun-04 FY 2005: N/A<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 6 3 6 7<br />

OUTPUT 6 3 6 7<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 8 30<br />

OUTPUT 8 30<br />

Notes/Comments<br />

FY04 unit cost increases due to increase in initial ILS and 11.X upgrade requirements Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification<br />

P-1 Shopping List - Item No 77 Page 9 of 20


UNCLASSIFIED<br />

MODIFICATION TITLE: Battle Force Email 66 Feb-04<br />

COST CODE NU022<br />

MODELS OF SYSTEMS AFFECTED: BFEM<br />

DESCRIPTION/JUSTIFICATION: BFEM 66 provides a basic SMPT/POP3 data transfer capability between<br />

Allied/NATO/Coalition Afloat forces utilizing the HF Spectrum.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08<br />

FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

117 3.0 28 1.1 13 0.6 5 0.2 200 9.1 363 14.0<br />

Engineering Change Orders- BFEM 19.2 Kpbs Modem upgrade<br />

Data<br />

Training Equipment<br />

29 0.5 4 0.1 45 0.9 282 5.6 360 7.1<br />

Production Support 1.4 0.7 0.7 0.5 0.2 0.4 3.9 0 7.9<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.8 0.4 0.3 0.1 3.0 0 4.6<br />

Installation of Hardware 114 3.5 31 1.4 13 0.9 5 0.2 200 10.6 363 16.6<br />

PRIOR YR EQUIP 114 3.5 3 0.2 117 3.7<br />

FY 02 EQUIP 28 1.2 28 1.2<br />

FY 03 EQUIP 13 0.9 13 0.9<br />

FY 04 EQUIP 5 0.2 5 0.2<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 200 10.6 200 10.6<br />

TOTAL INSTALLATION COST 3.5 1.4 0.9 0.2 0.0 0.0 0.0 0.0 0.0 10.6 16.6<br />

TOTAL PROCUREMENT COST 8.6 3.7 2.5 1.5 0.3 1.2 0.0 0.0 0.0 32.3 50.2<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 mos PRODUCTION LEADTIME: 2 mos<br />

CONTRACT DATES: FY 2002: Nov-01 FY 2003: Oct-02 FY 2004: Dec-03 FY 2005: Nov-04<br />

DELIVERY DATES: FY 2002: Dec-01 FY 2003: Dec-02 FY 2004: Jan-04 FY 2005: Dec-04<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 158 5<br />

OUTPUT 158 5<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 200 363<br />

OUTPUT 200 363<br />

Notes/Comments<br />

Beginning in FY04, procurements will include ECPs to upgrade the existing systems to 19.2 Kbps. Unit price includes installation. Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification<br />

P-1 Shopping List - Item No 77 Page 10 of 20


UNCLASSIFIED<br />

MODIFICATION TITLE: VIXS (Video Information Exchange System)-SHIP INSTALLATION Feb-04<br />

COST CODE NU239<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: Provides multifunctional information exchange systems capable of interactive imagery and video teleconferencing.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08<br />

FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

53 2.5 7 0.7 3 0.2 4 0.4 4 0.3 cont. 71 4.1<br />

Production Support 0.2 0.5 0.4 0.1 0.1 1.3<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.4 0.1 0.1 0.1 0.1 0.7<br />

Installation of Hardware 49 2.4 9 0.4 5 0.5 4 0.3 4 0.4 cont. 71 3.9<br />

PRIOR YR EQUIP 49 2.4 4 0.2 53 2.5<br />

FY 02 EQUIP 5 0.2 2 0.2 7 0.4<br />

FY 03 EQUIP 3 0.3 3 0.3<br />

FY 04 EQUIP 4 0.3 4 0.3<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 4 0.4 4 0.4<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP cont. 0 0.0<br />

TOTAL INSTALLATION COST 2.4 0.4 0.5 0.3 0 0.4 0 0 0 0 3.9<br />

TOTAL PROCUREMENT COST 5.5 1.6 1.1 1.0 0.0 0.9 0 0 0 0 10.1<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 mos PRODUCTION LEADTIME: 3 mos<br />

CONTRACT DATES: FY 2002: Dec-01 FY 2003: Dec-02 FY 2004: Dec-03 FY 2005: N/A<br />

DELIVERY DATES: FY 2002: Mar-02 FY 2003: Mar-03 FY 2004: Mar-04 FY 2005: N/A<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 63 2 2 2 2<br />

OUTPUT 63 2 2 2 2<br />

INSTALLATION SCHEDULE: FY 07 FY 08 FY 09<br />

1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT<br />

cont. 71<br />

OUTPUT<br />

cont. 71<br />

Notes/Comments<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification<br />

P-1 Shopping List - Item No 77 Page 11 of 20


UNCLASSIFIED<br />

MODIFICATION TITLE: VIXS (Video Information Exchange System)-SHORE INSTALLATION Feb-04<br />

COST CODE NU239<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: Provides multifunctional information exchange systems capable of interactive imagery and video teleconferencing.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

14 1.5 2 1.0 0 0.0 4 0.3 0 0.0 1 0.2 cont. 21 3.0<br />

Installation of Hardware 14 1.4 1 0.05 1 0.1 4 0.2 0 0.0 1 0.1 cont. 21 1.9<br />

PRIOR YR EQUIP 14 1.4 14 1.4<br />

FY 02 EQUIP 1 0.05 1 0.1 2 0.1<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 4 0.2 4 0.2<br />

FY 05 EQUIP 0 0.0 0 0.0<br />

FY 06 EQUIP 1 0.1 1 0.1<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP cont. 0 0.0<br />

TOTAL INSTALLATION COST 1.4 0.05 0.1 0.2 0.0 0.1 0.0 0.0 0.0 0.0 1.9<br />

TOTAL PROCUREMENT COST 1.4 1.1 0.1 0.5 0.0 0.3 0.0 0.0 0.0 0.0 4.9<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 mos PRODUCTION LEADTIME: 3 mos<br />

CONTRACT DATES: FY 2002: Dec-01 FY 2003: N/A FY 2004: Dec-03 FY 2005: N/A<br />

DELIVERY DATES: FY 2002: Mar-02 FY 2003: N/A FY 2004: Mar-04 FY 2005: N/A<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 16 2 2 1<br />

OUTPUT 16 2 2 1<br />

INSTALLATION SCHEDULE: FY 07 FY 08 FY 09<br />

1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT<br />

cont 21<br />

OUTPUT<br />

cont 21<br />

Notes/Comments<br />

FY02 Shore cost increase due to the one-time purchase of VTC equipment for the Pentagon Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification<br />

P-1 Shopping List - Item No 77 Page 12 of 20


UNCLASSIFIED<br />

MODIFICATION TITLE: TMIP<br />

COST CODE NU240 Feb-04<br />

MODELS OF SYSTEMS AFFECTED: TMIP<br />

DESCRIPTION/JUSTIFICATION: TMIP is the infrastructure and software to support Navy and Marine Corps requirements for healthcare and C2 activities:<br />

clinical resources, logistics, decision support, etc.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring Note 1<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

532 1.3 3 0.7 14 1.0 6 1.0 9 1.2 9 1.2 5 1.0 5 1.0 5 1.0 240 42.0 828 51.3<br />

Production Support 0.1 0.0 0.1 0.1 0.1 0.1 0.1 0.1 2.9 3.5<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.1 0.1 0.1 0.0 0.0 0.0 2.4 2.8<br />

Installation of Hardware 532 0.6 3 0.2 14 1.1 6 0.3 9 0.4 9 0.4 5 0.3 5 0.3 5 0.3 240 13.4 828 17.4<br />

PRIOR YR EQUIP 532 0.6 532 0.6<br />

FY 02 EQUIP 3 0.2 3 0.2<br />

FY 03 EQUIP 14 1.1 14 1.1<br />

FY 04 EQUIP 6 0.3 6 0.3<br />

FY 05 EQUIP 9 0.4 9 0.4<br />

FY 06 EQUIP 9 0.4 9 0.4<br />

FY 07 EQUIP 5 0.3 5 0.3<br />

FY 08 EQUIP 5 0.3 5 0.3<br />

FY 09 EQUIP 5 0.3 5 0.3<br />

FY TC EQUIP 240 13.4 240 13.4<br />

TOTAL INSTALLATION COST 0.6 0.2 1.1 0.3 0.4 0.4 0.3 0.3 0.3 13.4 17.4<br />

TOTAL PROCUREMENT COST 1.8 0.9 2.1 1.4 1.8 1.7 1.5 1.5 1.5 60.8 74.9<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 mos PRODUCTION LEADTIME: 2 mos<br />

CONTRACT DATES: FY 2002: Nov-01 FY 2003: Feb-03 FY 2004: Nov-03 FY 2005: Nov-04<br />

DELIVERY DATES: FY 2002: Jan-02 FY 2003: Apr-03 FY 2004: Jan-04 FY 2005: Jan-05<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 549 2 2 2 3 3 3 3 3 3<br />

OUTPUT 549 2 2 2 3 3 3 3 3 3<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 1 2 2 1 2 2 1 2 2 240 828<br />

OUTPUT 1 2 2 1 2 2 1 2 2 240 828<br />

Notes/Comments<br />

The Inventory Objective for TMIP-M is 296. In FY00 and FY01, quantities reflect procurement of 532 SAMS-NT hardware/software<br />

upgrades to the legacy system. None of these units are part of the Inventory Objective for TMIP-M.<br />

For FY02 and out, quantities reflect number of Inventory Objective ships receiving TMIP. Therefore, Total SAMS-NT units = 532; Exhibit P-3a, Individual Modification Program<br />

Total TMIP units = 296. Unclassified<br />

Unit cost for TMIP is computed by dividing total by number of ships deploying TMIP. Classification<br />

P-1 Shopping List - Item No 77 Page 13 of 20


UNCLASSIFIED<br />

MODIFICATION TITLE: AN/UYQ-70 for IT21<br />

COST CODE NU950 Feb-04<br />

MODELS OF SYSTEMS AFFECTED: IT21 C4ISR Equipment<br />

DESCRIPTION/JUSTIFICATION: AN/UYQ-70 for IT-21 Block 1 Upgrade C4ISR Computing Equipment Procurement (SPAWAR)<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

3 7.6 26 8.0 29 15.6<br />

Production Support 0.0 0.0<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.3 0.3<br />

Installation of Hardware 3 0.0 26 0.5 29 0.5<br />

PRIOR YR EQUIP 0 0.0<br />

FY 02 EQUIP 3 See Note 3 0.0<br />

FY 03 EQUIP 26 0.5 26 0.5<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5<br />

TOTAL PROCUREMENT COST 0.0 7.6 8.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 16.1<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 mos PRODUCTION LEADTIME: 2 mos<br />

CONTRACT DATES: FY 2002: Nov-01 FY 2003: May-03 FY 2004: FY 2005:<br />

DELIVERY DATES: FY 2002: Jan-02 FY 2003: Jul-03 FY 2004: FY 2005:<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 29<br />

OUTPUT 29<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 29<br />

OUTPUT 0 29<br />

Notes/Comments<br />

FY02 Congressional Language provided for procurement of Q-70 systems. Installations were funded with other program dollars.<br />

P-1 Shopping List - Item No 77 Page 14 of 20<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: HYDRA (NAVSEA) Feb-04<br />

COST CODE NU245<br />

MODELS OF SYSTEMS AFFECTED: AN/SRC-55<br />

DESCRIPTION/JUSTIFICATION: HYDRA is a wireless digital voice and data communications system using COTS trunking technology.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment*<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

14 21.2 0 0.0 0 0.0 0 0.0 8 18.4 4 5.6 5 7.7 7 7.8 149 343.7 187 404.4<br />

Installation of Hardware 14 5.1 0 0.0 0 0.0 0 0.0 5 4.3 6 5.3 5 3.4 8 3.6 149 111.0 187 132.8<br />

PRIOR YR EQUIP 12 4.4 12 4.4<br />

FY 02 EQUIP 2 0.7 2 0.7<br />

FY 03 EQUIP 0 0.0 0 0.0<br />

FY 04 EQUIP 0 0.0 0 0.0<br />

FY 05 EQUIP 0 0.0 0 0.0<br />

FY 06 EQUIP 5 4.3 3 2.7 8 7.0<br />

FY 07 EQUIP 3 2.7 1 0.5 4 3.2<br />

FY 08 EQUIP 4 2.9 1 0.5 5 3.4<br />

FY 09 EQUIP 7 3.1 7 3.1<br />

FY TC EQUIP 149 111.0 149 111.0<br />

TOTAL INSTALLATION COST 5.1 0.0 0.0 0.0 4.3 5.3 3.4 3.6 111.0 132.8<br />

TOTAL PROCUREMENT COST 26.3 0.0 0.0 0.0 22.7 10.9 11.2 11.4 454.7 537.2<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 Months PRODUCTION LEADTIME: 4 Months<br />

CONTRACT DATES: FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATES: FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 14 3 2<br />

OUTPUT 14 2 3<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 3 3 1 2 2 1 5 2 149 187<br />

OUTPUT 3 2 1 1 2 2 1 4 3 149 187<br />

Notes/Comments<br />

P-1 Shopping List - Item No 77 Page 15 of 20<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: DDG 51 Class Force Protection Shipboard Wireless Communications System (NAVSEA) Feb-04<br />

COST CODE NU248<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: DDG 51 Class Force Protection Equipment/Shipboard Wireless Comms enhancement, LMR and emergency SATCOM Secure Radios<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment*<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

0 0.0 0 0.0 7 1.7 3 0.7 3 0.8 3 0.8 2 0.5 0 0.0 0 0.0 18 4.4<br />

Installation of Hardware 0 0.0 0 0.0 7 4.5 3 1.9 3 1.9 3 1.9 2 1.3 0 0.0 0 0.0 18 11.5<br />

PRIOR YR EQUIP 0 0.0 0 0.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0 0 0.0<br />

FY 04 EQUIP 7 4.5 7 4.5<br />

FY 05 EQUIP 3 1.9 3 1.9<br />

FY 06 EQUIP 3 1.9 3 1.9<br />

FY 07 EQUIP 3 1.9 3 1.9<br />

FY 08 EQUIP 2 1.3 2 1.3<br />

FY 09 EQUIP 0 0.0 0 0.0<br />

FY TC EQUIP 0 0.0 0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.0 4.5 1.9 1.9 1.9 1.3 0.0 0.0 11.5<br />

TOTAL PROCUREMENT COST 0.0 0.0 6.2 2.6 2.7 2.7 1.8 0.0 0.0 16.0<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 Month PRODUCTION LEADTIME: 1 Month<br />

CONTRACT DATES: FY 2003: N/A FY 2004: Oct-03<br />

FY 2005:<br />

DELIVERY DATES: FY 2003: N/A FY 2004: Jan-04 FY 2005: Jan-05<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 0 7 3 3<br />

OUTPUT 0 3 2 2 3 3<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 3 2 18<br />

OUTPUT 3 1 1 18<br />

Notes/Comments<br />

P-1 Shopping List - Item No 77 Page 16 of 20<br />

Oct-04<br />

Exhibit P-3a, Individual Modification Program<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: SINCGARS TD-1456 Feb-04<br />

COST CODE NU247<br />

MODELS OF SYSTEMS AFFECTED: Antenna Multiplexer TD-1456<br />

DESCRIPTION/JUSTIFICATION: Provides ships engaged in amphibious operations and naval gunfire support missions the capability to communicate with<br />

ground forces in a VHF-FM anti-jam mode.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

159 11.3 159 11.3<br />

Installation of Hardware 94 Note 1. 39 Note 1. 26 Note 1. 159 Note 1<br />

PRIOR YR EQUIP 94 Note 1. 39 Note 1. 26 Note 1. 159 Note 1<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST Note 1. Note 1. Note 1. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Note 1<br />

TOTAL PROCUREMENT COST 11.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11.3<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 6 mos PRODUCTION LEADTIME: 18 mos<br />

CONTRACT DATES: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATES: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 159<br />

OUTPUT 159<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 159<br />

OUTPUT 159<br />

Notes/Comments<br />

Note 1. Installation costs are included in the costs to install AN/SRC-54A/B (D5009/NG250). Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification<br />

P-1 Shopping List - Item No 77 Page 17 of 20


UNCLASSIFIED<br />

MODIFICATION TITLE: SINCGARS AN-SRC-54B Feb-04<br />

COST CODE Install Only<br />

MODELS OF SYSTEMS AFFECTED: SINCGARS Ship System AN/SRC-54B<br />

DESCRIPTION/JUSTIFICATION: Provides ships engaged in amphibious operations and naval gunfire support missions the capability to communicate with ground<br />

forces in a VHF-FM anti-jam mode.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

311 11.7 311 11.7 Note 1<br />

Production Support 3.9 0.9 0.3 5.1<br />

Other (DSA)<br />

Interm Contractor Support<br />

1.1 0.5 0.1 1.8<br />

Installation of Hardware 243 11.9 116 3.5 62 1.6 421 17.0<br />

PRIOR YR EQUIP 243 11.9 116 3.5 62 1.6 421 17.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 11.9 3.5 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 17.0<br />

TOTAL PROCUREMENT COST 28.7 5.0 1.955 0.0 0.0 0.0 0.0 0.0 0.0 0.0 35.6<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 6 mos PRODUCTION LEADTIME: 18 mos<br />

CONTRACT DATES: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005 N/A<br />

DELIVERY DATES: FY 2002: N/A FY 2003: N/A FY 2004: N/A FY 2005 N/A<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 421<br />

OUTPUT 421<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 421<br />

OUTPUT 421<br />

Notes/Comments<br />

Note 1: The installation of the 110 units of upgrades AN/SRC-54 radios procured under cost code D5001 are installed as follows: FY98: 21 units; FY99 33 units; FY00 56 units. TOTAL 110 units<br />

The installation of the 311 units of AN/SRC-54B radios procured under cost code D5009 are installed as follows: FY99: 61 units; FY00: 9 units; FY01: 136 units; FY02: 54 units and FY03: 51 units. TOTAL 311 units.<br />

Note 2: The FY01 installation will be accomplished with equipment that was procured in FY99, but modified for shipboard use in FY01<br />

Note 3: Installation schedule changed IAW installation policy June 2000 directing installs to occur during CNO availaibities.<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification<br />

P-1 Shopping List - Item No 77 Page 18 of 20


UNCLASSIFIED<br />

CLASSIFICATION<br />

PRODUCTION SCHEDULE February 2004<br />

(DOD EXHIBIT P-21)<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD NO.<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI: 3057 Communication Items Under $5M 52NU<br />

S ACCEP BAL FISCAL YEAR 03 FISCAL YEAR 04 FISCAL YEAR 05<br />

COST ITEM/MANUFACTURER E PROC PRIOR DUE 02 CALENDAR YEAR 03 CY 03 CALENDAR YEAR 04 CALENDAR YEAR 05<br />

CODE R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S<br />

V 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E<br />

FY T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P<br />

NU016 HFRG Broadband 03 1 1 A 1<br />

NU019 EPLRS (DWTS transition) 04 13 13 A 13<br />

NU022 Battle Force Email 04 5 5 A 2 3<br />

NU022 BFEM HF messenger 3.X Upgrade 04 29 29 A 5 5 5 5 5 4<br />

NU022 BFEM HF messenger 3.X Upgrade 05 4 4 A 4<br />

NU237 Portable Radios 03 44 44 A 44<br />

NU237 Portable Radios 04 246 246 A 246<br />

NU237 Portable Radios 05 56 56 A 56<br />

NU250 CSEL 04 162 372 A 18 18 18 18 18 18 18 18 18<br />

NU250 CSEL 05 352 28 324 A 28<br />

NU239 VIXS 04 8 8 A 4 4<br />

NU240 TMIP 04 6 6 A 1 1 1 1 1 1<br />

NU241 TMIP 05 9 9 A 1 1 1 1 1 1 1 1 1<br />

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP<br />

PRODUCTION RATE PROCUREMENT LEADTIMES<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

ITEM Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

HF Tilt mechanism TBD 3/mo 6/mo 10/mo 30 30 360 360 780 Days<br />

HFRG Broadband Harris 1/mo 2/mo 3/mo 30 30 360 360 780 Days<br />

COTS Hardware and Software N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A<br />

CSEL Boeing Company/SST, Palmdale CA<br />

150* 300* 500* 2 2 10 10 Months<br />

Exhibit P-21 Production Schedule<br />

Unclassified<br />

Note: CSEL production contract will be awarded jointly, thus monthly production rate shown is not what each Service will be allocated. Classification<br />

P-1 Shopping List - Item No 77 Page 19 of 20<br />

DATE


UNCLASSIFIED<br />

CLASSIFICATION<br />

PRODUCTION SCHEDULE (Continued) February 2004<br />

(DOD EXHIBIT P-21)<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD NO.<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI: 3057 Communication Items Under $5M 52NU<br />

S ACCEP BAL FISCAL YEAR 06 FISCAL YEAR 07 FISCAL YEAR 08<br />

COST ITEM/MANUFACTURER E PROC PRIOR DUE CALENDAR YEAR 06 CALENDAR YEAR 07 CALENDAR YEAR 08<br />

CODE R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S<br />

V 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E<br />

FY T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P<br />

NU250 CSEL 05 352 28 324 28 28 28 30 30 30 30 30 30 30 30<br />

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP<br />

PRODUCTION RATE PROCUREMENT LEADTIMES<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

ITEM Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

HF Tilt mechanism TBD 3/mo 6/mo 10/mo 30 30 360 360 780 Days<br />

HFRG Broadband Harris 1/mo 2/mo 3/mo 30 30 360 360 780 Days<br />

CSEL Boeing Company/SST, Palmdale CA<br />

Exhibit P-21 Production Schedule<br />

Note: CSEL production contract will be awarded jointly, thus monthly production rate shown is not what each Service will be allocated. Unclassified<br />

P-1 Shopping List - Item No 77 Page 20 of 20<br />

150* 300* 500* 2 2 10 10 Months<br />

DATE


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT 310700 Submarine Broadcast Support 52W4<br />

QUANTITY<br />

FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TO COMP TOTAL<br />

COST<br />

(in millions) $3.7 $16.4 $17.8 $13.2 $13.3 $18.5 $18.7 Continuing Continuing<br />

The Submarine Broadcast Support program was established to improve the reliability, efficiency and performance of the Extremely Low Frequency (ELF), Very Low Frequency (VLF), and Low<br />

Frequency (LF) submarine broadcast systems. These transmission mediums (ELF/VLF/LF) comprise the primary line of Fleet Ballistic Missile Command, Control and Communications<br />

(FBMC3). Two (2) ELF, four (4) VLF and five (5) LF shorebased transmitter sites are Emergency Action Message (EAM) relay points providing primary connectivity between Secretary of<br />

Defense and SSBNs. Tasks are planned/ongoing to improve performance of ELF/VLF/LF broadcast capabilities consistent with changing operational requirements and upgrades to shore<br />

infrastructure including integrating Internet Protocol (IP) capability in Broadcast Control Authorities (BCA). The Submarine LF/VLF VMEbus Receiver (SLVR) system replaces antiquated and<br />

limited capability LF/VLF receivers on SSBNs (Ohio Class) and SSNs (Los Angeles/Seawolf/Virginia Class) submarines and at selected shore sites. It provides flexibility for technology<br />

upgrades through the use of Pre-Planned Product Improvements (P3I). SLVR provides significant reductions in space and weight. The ELF Communications Ashore Robustness Program<br />

(ECARP) will provide upgrades to existing ELF transmitter systems by replacing degraded, obsolete and high maintenance items that could preclude reliable operation well into the future.<br />

JUSTIFICATION OF BUDGET YEAR REQUIREMENTS:<br />

(1) Submarine Broadcast Upgrades: (W4008) Modernizes the Fixed Submarine Broadcast System (FSBS) by upgrading VLF/LF transmitters to maintain current fleet readiness. The<br />

upgrades are necessary to replace obsolete or degraded equipment, which will have an adverse impact to the mission. VLF/LF transmission systems will incorporate new technologies based<br />

on government and commercial best practices to make this medium of communication more efficient. Upgrades will also be accomplished to the broadcast generation subsystems at the<br />

Broadcast Control Authorities (BCA) and Broadcast Keying Sites (BKS). The Clarinet Merlin Receivers will be replaced with a modern day equivalent as they have reached the end of service<br />

life and their performance is threatened by obsolescence. The vacuum-tube AN/FRT-72 low frequency transmitters will be replaced with solid state equivalent to ensure reliable operation with<br />

reduced life cycle cost. Composite bushings will replace the expensive and highly unique ceramic bushings used at the VLF/LF transmitter sites which are deteriorating and threaten the<br />

availability of submarine broadcasts. The Submarine Operating Authority (SUBOPAUTH) provides consolidation and replication technologies used to unify and provide Continuity of Operations<br />

(COOP) for the shore architecture of broadcast generation systems. The site upgrades will facilitate the commonality among the SUBOPAUTHs, reduce workload by automating processes,<br />

drive to common operating procedures and augment the Submarine Community transition to IP based broadcasts. A new transmit terminal replaces legacy Integrated VERDIN Transmit<br />

Terminal (IVTT) and KG-34 systems used for VLF/LF experiencing supportability and obsolesence issues. The addition of the new transmit terminal will provide logistical commonality with the<br />

airborne counter part and flexible technology resulting in reduced total ownership costs. This technology is essential to the DoD Crypto Modernization Program, since it integrates a<br />

replacement crypto device and allows removal of the aging KG-30 series crypto family.<br />

(2) ECARP (Extremely Low Frequency (ELF) Communications Ashore Robustness Program): (W4013) Provides upgrades to existing ELF transmitter systems by replacing degraded,<br />

obsolete and high maintenance items that could preclude reliable operation well into the future.<br />

(3) NON-Fleet Modernization Program Equipment Installation and Fleet Modernization Program (FMP) Installation: (W4777) .<br />

P-1 Shopping List-Item No - 78 - 1 of 13<br />

Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

ASSIFICATION<br />

DATE<br />

COST ANALYSIS February 2004<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT 310700 Submarine Broadcast Support 52W4<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

PY FY 2003 FY 2004 FY 2005<br />

COST ID TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE COST QTY COST COST QTY COST COST QTY COST COST QTY COST COST<br />

Submarine Broadcast Systems<br />

W4008 Submarine Broadcast Upgrades A 2 925.0 17 15,293 7 4,470<br />

MERLIN** 2 462.5 925.0 4 498.8 1,995<br />

AN/FRT-72's 4 1,525.0 6,100<br />

Bushings** 2 1,450.0 2,900<br />

SUBOPAUTH** 7 614.0 4,298 7 638.6 4,470<br />

W4012 VALUE** A 1 2,017 2,017<br />

W4013 ECARP** A 1 12,295 12,295<br />

Submarine LF/VLF VME Receiver<br />

W4001 Submarine LF/VLF VME Receiver A 467 0<br />

Submarine LF/VLF VME Receiver 0<br />

Prefaulted Modules/Upgrade Kits 2 233.5 467<br />

W4555 Production Support A 115 874 602<br />

W4777 Installation A 163 282 435<br />

Non FMP Installation Shore 163 282 435<br />

FMP Installation Ships 0 0 0<br />

DSA 0 0 0<br />

Remarks: ** Unit cost varies by site due to differing<br />

equipment configurations at each location.<br />

5 3,687 17 16,449 8 17,802<br />

P-1 Shopping List-Item No 78 - 2 of 13<br />

DD FORM 2446, JUN 86 Exhibit P-5, Budget Item Justification<br />

Unclassified


UNCLASSIFIED<br />

CLASSIFICATION<br />

PROCUREMENT HISTORY AND PLANNING February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT 310700 Submarine Broadcast Support 52W4<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE Delivery COST NOW AVAILABLE<br />

W4012 VALUE** 03 Continental Elec, Dallas TX C/CPIF SSC CHSN Option Apr-03 Jun-05 1 2,017.0 Yes<br />

W4008 Submarine Broadcast Upgrade<br />

MERLIN 03 Long Wave, Dallas,TX C/FFP SPAWAR Jan-03 Jun-03 Sep-04 2 462.5 Yes<br />

MERLIN 04 Long Wave, Dallas,TX OPTION SPAWAR Option Dec-03 Dec-04 4 498.8 Yes<br />

AN/FRT-72's 04 Veridian, San Diego, CA C/CPFF SSC CHSN N/A Feb-04 Feb-06 4 1,525.0 Yes<br />

Bushings 04 SSC CHSN, SC<br />

Brandywine, Santa Ana, CA &<br />

C/FFP SSC CHSN N/A Jan-04 Jan-05 2 1,450.0 Yes<br />

SUBOPAUTH** 04 Titan, San Diego, CA C/FFP SSC SD N/A Jan-04 Jul-04 7 614.0 Yes<br />

SUBOPAUTH** 05 Titan, San Diego, CA C/FFP SSC SD N/A Dec-04 Jun-05 7 638.6 Yes<br />

W4013 ECARP 05 TBD TBD SSC CHSN Aug-04 Feb-05 Jul-07 1 12,295.0 No<br />

D. REMARKS<br />

**Unit cost varies by site due to differing equipment configurations at each location.<br />

P-1 Shopping List-Item No 78-3 of 13<br />

A. DATE<br />

Exhibit P-5a, Procurement History and Planning<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: VALUE February 2004<br />

COST CODE W4012<br />

MODELS OF SYSTEMS AFFECTED: VLF/LF Transmitter Systems<br />

DESCRIPTION/JUSTIFICATION: Corrects deficiencies in material condition and logistics support of existing VLF/LF shore transmitter systems<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 3 35.91 1 12.71 1 2.02 5 50.64<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

Other - Production Support 1.83 0.22 0.05 5 2.10<br />

Interm Contractor Support<br />

Installation of Hardware 1 0.12 1 0.12 1 0.16 1 0.09 1 0.10 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.47<br />

PRIOR YR EQUIP 1 0.12 1 0.12 1 0.12<br />

FY 01 EQUIP 1 0.16 1 0.16<br />

FY 02 EQUIP 1 0.09 1 0.09<br />

FY 03 EQUIP 1 0.10 1 0.10<br />

FY 04 EQUIP 0 0.00<br />

FY 05 EQUIP 0 0.00<br />

FY 06 EQUIP 0 0.00<br />

FY 07 EQUIP 0 0.00<br />

FY 08 EQUIP 0 0.00<br />

FY 09 EQUIP 0 0.00<br />

FY TC EQUIP<br />

TOTAL INSTALLATION COST 0.12 0.12 0.16 0.09 0.10 0.00 0.00 0.00 0.00 0.00 0.47<br />

TOTAL PROCUREMENT COST 37.85 13.05 2.23 0.09 0.10 0.00 0.00 0.00 0.00 0.00 51.11<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 8 Months PRODUCTION LEADTIME: Varies See Note<br />

CONTRACT DATES: FY 2002 Feb-02 FY 2003 Apr-03 FY 2004: FY 2005:<br />

DELIVERY DATES: FY 2002 Jun-04 FY 2003 Jun-05 FY 2004: FY 2005:<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 2 1 1 1<br />

1 1 1<br />

OUTPUT 1 1<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 5<br />

5<br />

OUTPUT<br />

Exhibit P-3a, Individual Modification Program<br />

Notes/Comments: Unclassified<br />

*Production lead time varies by site<br />

due to differing equipment<br />

configurations at each location. P-1 Shopping List-Item No 78-4 of 13 Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: SLVR (W4001) February 2004<br />

COST CODE W4777<br />

MODELS OF SYSTEMS AFFECTED: FMP Ship Installations<br />

DESCRIPTION/JUSTIFICATION: Replace the legacy shipboard VLF/LF systems<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 100 33.51 100 33.51<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment 0.24 0.24<br />

Support Equipment 0.86 0.86<br />

Other - Production Support 1.66 1.66<br />

DSA 0.23 0.08 0.31<br />

Installation of Hardware 69 1.99 31 1.01 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 100 2.99<br />

PRIOR YR EQUIP 69 1.99 69 1.99<br />

FY 01 EQUIP 31 1.01 31 1.01<br />

FY 02 EQUIP 0 0.00<br />

FY 03 EQUIP 0 0.00<br />

FY 04 EQUIP 0 0.00<br />

FY 05 EQUIP 0 0.00<br />

FY 06 EQUIP 0 0.00<br />

FY 07 EQUIP 0 0.00<br />

FY 08 EQUIP 0 0.00<br />

FY 09 EQUIP 0 0.00<br />

FY TC EQUIP 0 0.00<br />

TOTAL INSTALLATION COST 1.99 1.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.99<br />

TOTAL PROCUREMENT COST 38.48 1.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.56<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 Months PRODUCTION LEADTIME: 6 Months<br />

CONTRACT DATES: FY 2002 FY 2003 FY 2004: FY 2005:<br />

DELIVERY DATES: FY 2002 FY 2003 FY 2004: FY 2005:<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 90 3 3 4<br />

OUTPUT 90 3 3 4<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 100<br />

OUTPUT 100<br />

Notes/Comments Exhibit P-3a, Individual Modification Program<br />

Installation delays due to ship availability Unclassified<br />

P-1 Shopping List-Item No 78-5 of 13 Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: SLVR (W4001) February 2004<br />

COST CODE W4776<br />

MODELS OF SYSTEMS AFFECTED: NON-FMP Shore Installations<br />

DESCRIPTION/JUSTIFICATION: Replaces legacy VLF/LF receive systems<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 50 19.02 50 19.02<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

Other - Production Support 0.54 0 0.54<br />

Interm Contractor Support<br />

Installation of Hardware 37 2.64 13 0.48 0 0.0 0 0.0 0 0 0 0 0 0 0 0 0 0 0 0 50 3.12<br />

PRIOR YR EQUIP 37 2.64 37 2.64<br />

FY 01 EQUIP 13 0.48 13 0.48<br />

FY 02 EQUIP 0 0.00<br />

FY 03 EQUIP 0 0.00<br />

FY 04 EQUIP 0 0.00<br />

FY 05 EQUIP 0 0.00<br />

FY 06 EQUIP 0 0.00<br />

FY 07 EQUIP 0 0.00<br />

FY 08 EQUIP 0 0.00<br />

FY 09 EQUIP 0 0.00<br />

FY TC EQUIP 0 0.00<br />

TOTAL INSTALLATION COST 2.64 0.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.12<br />

TOTAL PROCUREMENT COST 21.66 0.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.14<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 Months PRODUCTION LEADTIME: 6 Months<br />

CONTRACT DATES: FY 2002 FY 2003: FY 2004: FY 2005:<br />

DELIVERY DATES: FY 2002 FY 2003: FY 2004: FY 2005:<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 50<br />

OUTPUT 50<br />

FY 07 FY 08 FY 08<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 50<br />

OUTPUT 50<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

P-1 Shopping List-Item No 78-6 of 13 Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Submarine Broadcast Upgrade February 2004<br />

COST CODE W4008<br />

MODELS OF SYSTEMS AFFECTED: MERLIN<br />

DESCRIPTION/JUSTIFICATION: Upgrades and replaces submarine broadcast equipment and antenna components worldwide<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring 6 2.92<br />

Equipment 2 0.93 4 2.00<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

Other - Production Support 0.05 0.08 0.13<br />

Interm Contractor Support<br />

Installation of Hardware 0 0.00 0 0.00 2 0.03 4 0.07 0 0.00 0 0.00 0 0.00 0 0.00 6 0.10<br />

PRIOR YR EQUIP 0 0.00<br />

FY 01 EQUIP 0 0.00<br />

FY 02 EQUIP 0 0.00<br />

FY 03 EQUIP 2 0.03 2 0.03<br />

FY 04 EQUIP 4 0.07 4 0.07<br />

FY 05 EQUIP 0 0.00<br />

FY 06 EQUIP 0 0.00<br />

FY 07 EQUIP 0 0.00<br />

FY 08 EQUIP 0 0.00<br />

FY 09 EQUIP 0 0.00<br />

FY TC EQUIP 0 0.00<br />

TOTAL INSTALLATION COST 0.00 0.00 0.00 0.03 0.07 0.00 0.00 0.00 0.00 0.00 0.10<br />

TOTAL PROCUREMENT COST 0.00 0.00 0.97 2.11 0.07 0.00 0.00 0.00 0.00 0.00 3.14<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 6 Months PRODUCTION LEADTIME: 12 -15 Months<br />

CONTRACT DATES: FY 2003 Jun-03 FY 2004 Dec-03 FY 2005 FY 2006:<br />

DELIVERY DATES: FY 2004 Sep-04 FY 2005 Dec-04 FY 2006 FY 2007:<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 1 1 2 2<br />

OUTPUT 1 1 2 2<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 6<br />

OUTPUT 6<br />

Notes/Comments Exhibit P-3a, Individual Modification Program<br />

*Production Lead Time varies due to differing equipment at each location Unclassified<br />

P-1 Shopping List-Item No 78-7 of 13 Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Submarine Broadcast Upgrade February 2004<br />

COST CODE W4008<br />

MODELS OF SYSTEMS AFFECTED: AN/FRT-72's<br />

DESCRIPTION/JUSTIFICATION: Upgrades and replaces submarine broadcast equipment worldwide<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring 4 6.10<br />

Equipment 4 6.10<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

Other - Production Support 0.18 0.18<br />

Interm Contractor Support<br />

Installation of Hardware 0 0.00 0 0.00 0 0.00 4 0.05 0 0.00 0 0.00 0 0.00 4 0.05<br />

PRIOR YR EQUIP 0 0.00<br />

FY 01 EQUIP 0 0.00<br />

FY 02 EQUIP 0 0.00<br />

FY 03 EQUIP 0 0.00<br />

FY 04 EQUIP 4 0.05 4 0.05<br />

FY 05 EQUIP 0 0.00<br />

FY 06 EQUIP 0 0.00<br />

FY 07 EQUIP 0 0.00<br />

FY 08 EQUIP 0 0.00<br />

FY 09 EQUIP 0 0.00<br />

FY TC EQUIP 0 0.00<br />

TOTAL INSTALLATION COST 0.00 0.00 0.00 0.00 0.00 0.05 0.00 0.00 0.00 0.00 0.05<br />

TOTAL PROCUREMENT COST 0.00 0.00 0.00 6.28 0.00 0.05 0.00 0.00 0.00 0.00 6.33<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 7 Months PRODUCTION LEADTIME: 24 Months<br />

CONTRACT DATES: FY 2002 FY 2003 FY 2004 Feb-04 FY 2005:<br />

DELIVERY DATES: FY 2002 FY 2003 FY 2004 Feb-06 FY 2005:<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 2 2<br />

OUTPUT 2 2<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 4<br />

OUTPUT 4<br />

Notes/Comments Exhibit P-3a, Individual Modification Program<br />

*Production Lead Time varies due to differing equipment at each location Unclassified<br />

P-1 Shopping List-Item No 78-8 of 13 Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Submarine Broadcast Upgrade February 2004<br />

COST CODE W4008<br />

MODELS OF SYSTEMS AFFECTED: BUSHINGS<br />

DESCRIPTION/JUSTIFICATION: Upgrades and replaces submarine broadcast equipment and antenna components worldwide<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 2 2.90 3 3.14 3 3.26 3 3.26 11 12.56<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

Other - Production Support 0.15 0.18 0.16 0.14 0.64<br />

Interm Contractor Support<br />

Installation of Hardware 0 0.00 0 0.00 2 0.02 0 0.00 0 0.00 3 0.03 3 0.03 3 0.03 11 0.12<br />

PRIOR YR EQUIP 0 0.00<br />

FY 01 EQUIP 0 0.00<br />

FY 02 EQUIP 0 0.00<br />

FY 03 EQUIP 0 0.00<br />

FY 04 EQUIP 2 0.02 2 0.02<br />

FY 05 EQUIP 0 0.00<br />

FY 06 EQUIP 0 0.00<br />

FY 07 EQUIP 3 0.03 3 0.03<br />

FY 08 EQUIP 3 0.03 3 0.03<br />

FY 09 EQUIP 3 0.03 3 0.03<br />

FY TC EQUIP 0 0.00<br />

TOTAL INSTALLATION COST 0.00 0.00 0.00 0.00 0.02 0.00 0.00 0.03 0.03 0.03 0.12<br />

TOTAL PROCUREMENT COST 0.00 0.00 0.00 3.05 0.02 0.00 3.32 3.46 3.44 0.00 13.3<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 6 Months PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002 FY 2003 FY 2004 Jan-04 FY 2005:<br />

DELIVERY DATES: FY 2002 FY 2003 FY 2004 Jan-05 FY 2005:<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 1 1<br />

OUTPUT 1 1<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 1 1 1 1 1 1 3 11<br />

OUTPUT 1 1 1 1 1 4 11<br />

Notes/Comments Exhibit P-3a, Individual Modification Program<br />

*Production Lead Time varies due to differing equipment at each location Unclassified<br />

P-1 Shopping List-Item No 78-9 of 13 Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Submarine Broadcast Upgrade February 2004<br />

COST CODE W4008<br />

MODELS OF SYSTEMS AFFECTED: SUBOPAUTH<br />

DESCRIPTION/JUSTIFICATION: Upgrades and replaces submarine broadcast equipment at shore sites worldwide<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 7 4.30 7 4.47 2 1.43 4 2.81 20 13.00<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

Other - Production Support 0.47 0.26 0.03 0.22 0.97<br />

Interm Contractor Support<br />

Installation of Hardware 0 0.00 4 0.16 10 0.25 2 0.10 0 0.00 0 0.00 4 0.21 20 0.71<br />

PRIOR YR EQUIP 0 0.00<br />

FY 01 EQUIP 0 0.00<br />

FY 02 EQUIP 0 0.00<br />

FY 03 EQUIP 0 0.00<br />

FY 04 EQUIP 4 0.16 3 0.08 7 0.24<br />

FY 05 EQUIP 7 0.16 7 0.16<br />

FY 06 EQUIP 2 0.10 2 0.10<br />

FY 07 EQUIP 0 0.00<br />

FY 08 EQUIP 4 0.21 4 0.21<br />

FY 09 EQUIP 0 0.00<br />

FY TC EQUIP 0 0.00<br />

TOTAL INSTALLATION COST 0.00 0.00 0.00 0.16 0.25 0.10 0.00 0.00 0.21 0.00 0.71<br />

TOTAL PROCUREMENT COST 0.00 0.00 0.00 4.92 4.97 1.56 0.00 3.03 0.21 0.00 14.68<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 Months PRODUCTION LEADTIME: 6 Months<br />

CONTRACT DATES: FY 2002 FY 2003 FY 2004 Jan-04 FY 2005: Dec-04<br />

DELIVERY DATES: FY 2002 FY 2003 FY 2004 Jul-04 FY 2005: Jun-05<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 4 1 2 3 4 2<br />

OUTPUT 4 1 2 3 4 2<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 2 2 0 20<br />

OUTPUT 2 2 0 20<br />

Notes/Comments Exhibit P-3a, Individual Modification Program<br />

*Production Lead Time varies due to differing equipment at each location Unclassified<br />

P-1 Shopping List-Item No 78-10 of 13 Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Extremely Low Frequency (ELF) Communications Ashore Robustness Program - ECARP February 2004<br />

COST CODE W4013<br />

MODELS OF SYSTEMS AFFECTED: VARIOUS<br />

DESCRIPTION/JUSTIFICATION: Upgrades and replaces submarine broadcast equipment and antenna components worldwide<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 0 0.00 1 12.30 1 11.24 2 23.53<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

Other - Production Support 0.35 0.36 0 0.71<br />

Interm Contractor Support<br />

Installation of Hardware 0 0.00 0 0.00 0 0.00 1 0.12 1 0.11 0 0.00 2 0.23<br />

PRIOR YR EQUIP 0 0.00<br />

FY 01 EQUIP 0 0.00<br />

FY 02 EQUIP 0 0.00<br />

FY 03 EQUIP 0 0.00<br />

FY 04 EQUIP 0 0.00<br />

FY 05 EQUIP 1 0.12 1 0.12<br />

FY 06 EQUIP 1 0.11 1 0.11<br />

FY 07 EQUIP 0 0.00<br />

FY 08 EQUIP 0 0.00<br />

FY 09 EQUIP 0 0.00<br />

FY TC EQUIP 0 0.00<br />

TOTAL INSTALLATION COST 0.00 0.00 0.00 0.00 0.00 0.00 0.12 0.11 0.00 0.00 0.23<br />

TOTAL PROCUREMENT COST 0.00 0.00 0.00 0.00 12.64 11.60 0.12 0.11 0.00 0.00 24.47<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 6 Months PRODUCTION LEADTIME: 30 Months<br />

CONTRACT DATES: FY 2003 FY 2004 FY 2005 Feb-05 FY 2006: Jan-07<br />

DELIVERY DATES: FY 2003 FY 2004 FY 2005 Jul-07 FY 2006: Jul-09<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 0<br />

OUTPUT 0<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 1 1 2<br />

OUTPUT 1 1 2<br />

Notes/Comments Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

P-1 Shopping List-Item No 78-11 of 13 Classification


Unclassified<br />

CLASSIFICATION<br />

PRODUCTION SCHEDULE February 2004<br />

(DOD EXHIBIT P-21A)<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD NO.<br />

*310700 Submarine Broadcast Support 52W4<br />

S ACCEP BAL FISCAL YEAR 03 FISCAL YEAR 04 FISCAL YEAR 05<br />

COST ITEM/MANUFACTURER E PROC PRIOR DUE 02 CALENDAR YEAR 03 CALENDAR YEAR 04 CALENDAR YEAR 05<br />

CODE R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S<br />

V 30-Sep 30-Sep C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E<br />

FY T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P<br />

W4012 VALUE* 02 1 1 1<br />

03 1 1 A 1<br />

W4008 Submarine Broadcast Upgrade<br />

MERLIN* 03 2 A 1 1<br />

MERLIN* 04 4 A 2 1 1<br />

AN/FRT-72's 04 4 A<br />

BUSHINGS 04 2 A 2<br />

SUBOPAUTH* 04 7 A 2 1 1 1 2<br />

SUBOPAUTH* 05 7 A 3 1 2 1<br />

W4013 ECARP* 05 1 A<br />

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP<br />

PRODUCTION SCHEDULE REACHED W4012 - PROCUREMENT LEAD TIME W4008 - PROCUREMENT LEAD TIME W4013 - PROCUREMENT LEAD TIME<br />

MANUFACTURER'S NAME & LOCATION MINIMUM 1 & 5 MAX. D+ ADMIN MANUFAC- ADMIN MANUFAC- ADMIN MANUFAC-<br />

SUST. LEAD TIME TURING TOTAL LEAD TIME TURING TOTAL LEAD TIME TURING TOTAL<br />

W4012 - Continental Electronics Corp, Dallas, TX 1 1 PRIOR AFTER TIME AFTER 1 PRIOR AFTER TIME AFTER 1 PRIOR AFTER TIME AFTER 1<br />

30-Sep 30-Sep OCT 30-Sep 30-Sep OCT 30-Sep 30-Sep OCT<br />

15<br />

7 *6-24<br />

W4008 - Various 1 7 INITIAL Mo 24 Mon INITIAL MO MO INITIAL 6 MO 30 MO<br />

W4013 - TBD 1 2 REORDER<br />

8<br />

Mo REORDER 7 MO<br />

DATE<br />

*6-24<br />

MO REORDER<br />

NAVMAT FORM 7110/4 (REVISED 11/77) P-1 SHOPPING LIST<br />

ITEM NO. 78 PAGE NO. 12 of 13 Unclassified<br />

REMARKS: * Quantity varies by site due to differing equipment configurations. CLASSIFICATION


Unclassified<br />

CLASSIFICATION<br />

PRODUCTION SCHEDULE February 2004<br />

(DOD EXHIBIT P-21A)<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD NO.<br />

310700 Submarine Broadcast Support 52W4<br />

FISCAL YEAR 06 FISCAL YEAR 07 FISCAL YEAR 08 L<br />

COST ITEM/MANUFACTURER/ FISCAL CARRY CY05 CALENDAR YEAR 06 CALENDAR YEAR 07 CALENDAR YEAR 08 A<br />

CODE PROCUREMENTY YEAR YEAR OVER O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S T<br />

C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E E<br />

T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P R<br />

W4008 Submarine Broadcast Upgrade<br />

AN/FRT-72's 04 2 2<br />

W4013 ECARP* 05 1<br />

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP<br />

PRODUCTION SCHEDULE REACHED W4008 - PROCUREMENT LEAD TIME REMARKS<br />

MANUFACTURER'S NAME & LOCATION MINIMUM 1 & 5 MAX. D+ ADMIN MANUFAC-<br />

SUST. LEAD TIME TURING TOTAL<br />

W4008 - Various 1 4 PRIOR AFTER TIME AFTER 1<br />

W4013 - TBD 1 2 30-Sep 30-Sep OCT<br />

7 24<br />

INITIAL MO MO<br />

7 24<br />

REORDER MO MO<br />

NAVMAT FORM 7110/4 (REVISED 11/77) P-1 SHOPPING LIST Unclassified<br />

REMARKS: * Quantity varies by site due to differing equipment configurations. ITEM NO. 78 PAGE NO 13 of 13 CLASSIFICATION<br />

DATE


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT 313000 Submarine Communications<br />

QUANTITY<br />

PY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TO COMP TOTAL<br />

COST<br />

(in millions) $121.417 $109.529 $94.533 $91.359 $104.333 $143.315 $154.029 Cont. Cont.<br />

PROGRAM COVERAGE: The Submarine Communications Program mission is to create a common, automated, open system architecture radio room for all submarine classes. The program provides for the procurement and<br />

installation of systems incorporating the technical advances of network centric warfare to allow the submarine force to communicate as part of the Battle Group. The program addresses the unique demands of submarine<br />

communications, obsolescence issues and higher data rate requirements.<br />

ANTENNA MODIFICATIONS (L0035) - Modifications to antenna and ancilliary legacy systems in order to provide engineering changes. These modifications address Very Low Frequency (VLF) performance, Mid<br />

Frequency/High Frequency (MF/HF) efficiency, UHF antenna efficiency and increased data rate capability with the UHF multifunction mast upgrade, increased reliability and maintainability, decrease vulnerability, and cost<br />

effective technology insertion. Modifications are applicable to all SSN/SSBN classes and are implemented on a Fleet priority basis. RDT&E (N) Program Element - PE 0604503N pertains.<br />

TIME and FREQUENCY DISTRIBUTION SYSTEM (TFDS)/BSQ-9 (V) (L0078) - The TFDS/BSQ-9 (V) provides precision frequency and Precision Time and Time Interval (PTTI) signals that are synchronized to Universal<br />

Coordinated Time (UTC) via the Global Positioning System (GPS). The TFDS/BSQ-9 (V) amplifies and distributes external precision source signals to communications, navigation, electronic warfare, combat, and ship control<br />

systems onboard all classes of submarines. The TFDS/BSQ-9 (V) provides improved reliability and lower life cycle cost over the older Cesium Standards. Shore site variants are funded by N6. This procurement supports<br />

SSN688, SSN21, and SSBN 726 (OHIO) class submarines.<br />

OE-538/BRC ANTENNA GROUP (IMPROVED AN/BRA-34) (L0080) - The OE-538/BRC antenna group provides an improved multifunctional combined communications, navigation, and Identification Friend or Foe (IFF) mast<br />

mounted antenna group and replaces the AN/BRA-34 and OE-207/BRC antennas. It provides the SSN688, SSN21, and OHIO class (SSBN) submarines with a mast mounted, multifunction antenna with greater reliability than<br />

the current AN/BRA-34 and OE-207/BRC antennas and supports the additional capabilities of high frequency broadband, Demand Assigned Multiple Access (DAMA) operation, and Advanced Digital Waveform (ADW). The<br />

Radio Frequency Distribution and Control System (RFDACS) technology update brings COTS functionality and supportability to the OE-538/BRC system. The RFDACS Network Centric Architecture enables the radio room<br />

control LAN to remotely interface with the functions necessary for the user to operate the OE-538/BRC antenna group. RDT&E (N) Program Element - PE 0604503N pertains.<br />

P-1 Shopping List-Item No - 79 - 1 of 15 Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification<br />

52L0


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET (Continued) DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT 313000 Submarine Communications<br />

SUBMARINE COMMUNICATIONS SUPPORT SYSTEM RADIO ROOM/ COMMON SUBMARINE RADIO ROOM (SCSS/CSRR) (L0084) - The SCSS/CSRR will consist of an open system, multimedia, circuit sharing<br />

architecture that will serve as the shipboard automated communications control system. The CSRR will leverage investment in VIRGINIA External Communication System (ECS)(SCN funded) to modernize/update all<br />

submarine radio rooms to a common functional baseline. Procurement in this line is for the radio room workstations, chassis, common power supplies, power distribution units, cabling, mounting kits and ancillary<br />

components required to integrate submarine communication equipment. This procurement supports SSN688, SSN21, and OHIO class submarines. RDT&E (N) Program Element - PE 0604503N pertains.<br />

SUBMARINE HIGH DATA RATE (HDR) SATELLITE COMMUNICATIONS ANTENNAS (L0087) - The Submarine HDR antenna provides submarines with antennas that have the bandwidth, gain, and<br />

flexibility to meet the stated COMSUBLANT/COMSUBPAC requirements for HDR communications in the SHF and EHF frequency spectrums. RDT&E (N) Program Element - PE 0604503N pertains.<br />

SUBMARINE TACTICAL INTEGRATED DIGITAL SYSTEM (SubLAN) (L0097) - Funds a robust shipboard backbone IT network with multiple classification enclaves that, along with the SubHDR antenna and ADNS,<br />

provides end-to-end wideband connectivity to the global DISN networks (SIPRNet and NIPRNet). SubLAN is designed in accordance with the IT for the 21st Century (IT21) fleet initiative, and thus SubLAN will support<br />

greatly improved connectivity to, and interoperability with, the carrier battlegroup (CVBG) commander--thereby achieving Network-Centric Warfare--and with shore commands. The SubLAN network is enhanced for<br />

mission-critical tactical applications, and as such SubLAN forms the medium that will interconnect Sonar, Combat, ESM, Radio, etc. and permit the seamless exchange of warfighting tactical data between these systems<br />

and with the CVBG commander. The SubLAN tactical backbone replicates the functionality of the USS Virginia class Architecture network, allowing backfit of Virginia class tactical subsystem modernization into existing<br />

submarines. The SubLAN shipboard IT infrastructure is being designed as an all-COTS, open-system architecture such that it will permit other electronic subsystem programs to rely on SubLAN for subsystem<br />

interconnectivity (rather than having each subsystem install its own IT network); the revolutionary approach of treating the shipboard network as a basic utility (like water, power and lighting) will support the efficient and<br />

economic modernization of the various electronic subsystems.<br />

SUBMARINE TACTICAL LAN (L00XX - NAVSEA)- The Submarine Tactical Integrated Digital System (TIDS) is a phased evolutionary shipboard Information Technology backbone network providing End to End wideband<br />

connectivity to the global DISN networks. As part of this phased acquisition approach and implementation of Open Architecture systems concepts in the submarine fleet, the TIDS architecture is being federated into two<br />

linked subsystems, a Submarine (SubLAN) and a Tactical (TacLAN). TacLAN is supported within the framework of this budget exhibit. TacLAN provides common interfaces for data sharing between onboard subsystems<br />

as well as the interconnectivity between Tactical Systems of Sonar, Combat Control, ESM which permits the exchange of this Tactical information off hull. TacLAN is being implemented within the context of the overall<br />

AN/BYG-1 program and being delivered as part of the Tactical Control System. Once installation of TacLAN and SubLAN is completed the requirements for TIDS 3 will be satisfied.<br />

SUBMARINE SHIP PC UPGRADE (L0094) - Funds the initial procurement of PCs, software, printers and scanners in concert with the fielding of the Tactical Integrated Digital System (TIDS) shipboard Information<br />

Technology (IT) network (L0097).<br />

DESIGN SERVICES ALLOCATION (DSA) (L0777) - Design work and engineering associated with ship alterations.<br />

Exhibit P-40, Budget Item Justification<br />

P-1 Shopping List-Item No - 79 - 2 of 15 Unclassified<br />

52L0<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE<br />

COST ANALYSIS February 2004<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT 313000 Submarine Communications<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

52L0<br />

PY FY 2002 FY 2003 FY 2004 FY 2005<br />

COST ID TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE COST QTY COST COST QTY COST COST QTY COST COST QTY COST COST<br />

L0035 ANTENNA MODIFICATIONS A VAR 2,911 VAR 2,561 VAR 3,250<br />

L0078 TFDS/BSQ-9 (V) A 2 433.5 867 8 199.3 1,594 5 326.2 1,631<br />

L0080 OE-538/BRC/RFDACS (1) A 7 1,102.6 7,718 8 1,086.1 8,689 22 834.6 18,362<br />

L0084 SCSS/CSRR RADIO ROOM 22,346 21,379 27,104<br />

CSRR-SSN 21 (2) B 1 13,066.0 13,066 3,150 0 0<br />

CSRR-SSBN 726 (OHIO) (3) B 1 9,280.0 9,280 2 9,114.5 18,229 4 5,435.8 21,743<br />

SCSS/CSRR-SSN 688 (4) B 0 0 0 0 2,376<br />

SCSS/CSRR-Non-Class Specific Test A 0 0 0 0 0 2,985<br />

and Production Facilities (5)<br />

L0087 HIGH DATA RATE ANTENNA A 21,855 20,413 22,376<br />

High Data Rate Antenna A 10 2,185.5 21,855 6 3,402.2 20,413 6 3,729.3 22,376<br />

L0094 SUB SHIP PC UPGRADE A VAR 355<br />

L0097 SubLAN (6, 7, 8) A 12,380 11,549 4,383<br />

Equipment 35 31.4 1,100 51 187.0 9,538 19 142.4 2,705<br />

ShipALT 11,280 2,011 1,678<br />

L0555 PRODUCTION SUPPORT 4,137 3,963 5,120<br />

L0777 INSTALLATION EQUIPMENT 16,336 16,933 12,307<br />

FMP INSTALL VAR 13,694 VAR 15,973 VAR 11,073<br />

DSA VAR 2,642 VAR 960 VAR 1,234<br />

Remarks:<br />

TOTAL SPAWAR CONTROL 88,905 87,081 94,533<br />

TOTAL NAVSEA CONTROL 32,512 22,448<br />

Consolidated Control 121,417 109,529<br />

1) OE-538 Unit cost variance due to mix of OE-538 and RFDACs being procured, and inclusion of Antenna Control Unit (ACU) Variant.<br />

2) FY 03 CSRR SSN 21 cost includes Engineering Change Proposal (ECP) for HF COTS/UHF Advanced Digital Waveform (ADW).<br />

3) CSRR SSBN FY03 unit cost reflects funding for one (1) TTF, TRID and Production Facility Start up.<br />

4) SCSS/CSRR SSN 688 FY05 funding for Production Start up and ShipALT.<br />

5) SCSS/CSRR Non-Class Specific FY05 funding for Engineering Change Proposal (ECP) to incorporate full DMR functionality .<br />

6) SubLAN unit price reflects different configuration of submarines.<br />

7) FY03 unit price reflects PC augment only.<br />

8) FY04 unit price includes PC augment. FY05-FY09 reflects SubLAN units.<br />

P-1 Shopping List-Item No 79 - 3 of 15<br />

Exhibit P-5, Budget Item Justification<br />

DD FORM 2446, JUN 86 Unclassified


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE<br />

COST ANALYSIS February 2004<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT TacLAN<br />

52L0<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

PY FY 2002 FY 2003 FY 2004 FY 2005<br />

COST NAVSEA ID TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE COST QTY COST COST QTY COST COST QTY COST COST QTY COST COST<br />

L00xx TacLAN 0 0 7 16,164<br />

SEAWOLF Class (SSN21) A 1 2,309.0 2,309<br />

Trident Class (SSBN) B 0 0<br />

Trident Class (SSGN) B 1 2,309.0 2,309<br />

Los Angeles Class (SSN688) A 5 2,309.2 11,546<br />

L0555 PRODUCTION SUPPORT 32,512 5,017<br />

Shipboard Design NRE 25,531 1,117<br />

Information Assurance 2,881 849<br />

Tech Refresh NRE 0 0<br />

SHIPALT Production 4,100 3,051<br />

L0777 INSTALLATION EQUIPMENT 0 1,267<br />

Remarks:<br />

FMP INSTALL 0 0 0 1 1,267<br />

DSA<br />

TOTAL NAVSEA CONTROL 0.0 32,512 22,448<br />

P-1 Shopping List-Item No 79 - 4 of 15<br />

Exhibit P-5, Budget Item Justification<br />

DD FORM 2446, JUN 86 Unclassified


UNCLASSIFIED<br />

CLASSIFICATION<br />

PROCUREMENT HISTORY AND PLANNING February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT 313000 Submarine Communications<br />

52L0<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE Delivery COST NOW AVAILABLE<br />

L0078 TFDS/BSQ-9 (V) (1) 03 Brandywine Com, CA C/FFP/OPT SSC-SD May-03 Feb-04 2 433.5 YES N/A<br />

04 TBD C/FFP SSC-SD Oct-03 Feb-04 Nov-04 8 199.3 YES N/A<br />

05 TBD C/FFP/OPT SSC-SD Jan-05 Oct-05 5 326.2 YES N/A<br />

L0080 OE-538/BRC/RFDAC (2) 03 Sippican/GSM, MA C/FFP/OPT NUWC Feb-03 Feb-04 7 1,102.6 YES N/A<br />

04 TBD C/FFP NUWC Jan-03 Feb-04 Feb-05 8 1,086.1 YES N/A<br />

05 TBD C/FFP/OPT NUWC Jan-05 Jan-06 22 834.6 YES N/A<br />

L0087 HIGH DATA RATE ANTENNA 03 Raytheon, MA C/FFP/OPT SPAWAR Dec-02 Mar-04 10 2,185.5 YES N/A<br />

04 Raytheon, MA SS/FFP SPAWAR Jul-03 Feb-04 May-05 6 3,402.2 YES N/A<br />

05 Raytheon, MA SS/FFP/OPT SPAWAR Jan-05 Apr-06 6 3,729.3 YES N/A<br />

L0097 SUBMARINE TACTICAL INTEGRATED DIGITAL SYSTEM 03 SSC Chasn Code J634 WX SSC Chasn Dec-02 Mar-03 35 31.4 YES N/A<br />

(SubLAN) 04 SSC Chasn Code J634 WX SSC Chasn Dec-03 Mar-04 51 187.0 YES N/A<br />

05 SSC Chasn Code J634 WX SSC Chasn Dec-04 Mar-05 19 142.4 YES N/A<br />

D. REMARKS<br />

1.) TFDS - FY02 was first procurement for OHIO Class submarines. FY02 cost reflects updates to ILS, testing and Land Based Evaluation Facility (LBEF) costs associated<br />

with the first two procurements years of BSQ-9(V) for the OHIO class. FY 03 cost includes Trident Class Ship Alt.<br />

2) OE-538 FY04 contract award on existing contract; RFP for follow-on contract to be issued Jan 04.<br />

P-1 Shopping List-Item No 79 - 5 of 15<br />

A. DATE<br />

Exhibit P-5a, Procurement History and Planning<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Time & Frequency Distribution System (TFDS)<br />

COST CODE L0078<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: Installation of Time & Frequency Distribution System (TFDS)<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

54 8.8 1 0.7 2 0.9 8 1.6 5 1.6 6 1.3 2 0.9 0 0.1 0 0.0 78 15.8<br />

Installation Kits 48 0.4 6 0.1 1 0.0 2 0.1 8 0.2 5 0.2 5 0.2 2 0.1 0 0.0 77 1.1<br />

Installation Kits Nonrecurring (See Note 1)<br />

Equipment 54 8.4 1 0.3 2 0.8 8 1.5 5 0.9 6 1.1 2 0.7 0 0.0 0 0.0 78 14.0<br />

Equipment Nonrecurring 0.3 0.3<br />

Engineering Change Orders (See Note 2)<br />

0.5 0.5<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

(See Note 4)<br />

Production Support<br />

Interm Contractor Support<br />

0.1 0.2 0.2 0.2 0.2 0.2 0.0 0.1 0.0 1.0<br />

Other (DSA) 0.0 0.0 0.1 0.1<br />

Installation of Hardware 48 1.7 6 0.3 1 0.0 2 0.0 8 0.2 5 0.0 6 0.0 2 0.0 0 0.0 78 2.2<br />

PRIOR YR EQUIP 48 1.7 48 1.7<br />

FY 01 EQUIP 6 0.3 6 0.3<br />

FY 02 EQUIP 1 0.0 1 0.0<br />

FY 03 EQUIP (See Note 3) 2 0.0 2 0.0<br />

FY 04 EQUIP (See Note 3) 8 0.2 8 0.2<br />

FY 05 EQUIP (See Note 3) 5 0.0 5 0.0<br />

FY 06 EQUIP (See Note 3) 6 0.0 6 0.0<br />

FY 07 EQUIP (See Note 3) 2 0.0 2 0.0<br />

FY 08 EQUIP (See Note 3)<br />

0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 1.7 0.3 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.0 78 2.3<br />

TOTAL PROCUREMENT COST 10.6 1.1 1.1 1.7 2.1 1.4 0.9 0.2 0.0 0.0 78 19.1<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 months PRODUCTION LEADTIME: 9 months<br />

CONTRACT DATES: FY 2002: Aug-02 FY 2003: May-03 FY 2004: Feb-04 FY 2005: Jan-05<br />

DELIVERY DATES: FY 2003: May-03 FY 2004: Feb-04 FY 2005: Nov-04 FY 2006: Oct-05<br />

FY 04 FY 05<br />

FY 06<br />

FY 07<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 55 2 3 3 2 3 2 3 3<br />

OUTPUT 55 1 1 3 3 2 3 2 3 3<br />

February 2004<br />

FY 08<br />

FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 2 78<br />

OUTPUT<br />

Notes/Comments:<br />

2 78<br />

1.) 26 installation kits for years prior to FY00 were funded via the installation line and are not accounted for separately.<br />

2.) TFDS FY02 cost reflects updates to ILS for the OHIO class.<br />

3.) TFDS procured in FY03-08 are installed by CSRR Radio Room (Cost Code L0777) with the exception of 4 units procured in FY04.<br />

4) FY05 Engineering Change Proposal (ECP) for Ethernet Connectivity.<br />

P-1 Shopping List-Item No 79 - 6 of 15<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: OE-538/BRC/RFDACS<br />

COST CODE L0080<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: Installation of OE-538/BRC<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E 0.9 0.4 1.2<br />

PROCUREMENT:<br />

Kit Quantity<br />

24 33.4 6 4.3 7 6.0 8 5.9 22 13.4 18 8.6 15 7.6 0 0.0 0 0.0 2 7.0 102 86.1<br />

Installation Kits 11 0.4 4 0.2 6 0.2 2 0.1 11 0.4 0 0.0 0 0.0 0 0.0 0 0.0 34 1.3<br />

Installation Kits Nonrecurring<br />

(See Note 3)<br />

Equipment 24 33.4 6 4.2 7 5.7 8 5.8 22 13.0 18 8.6 15 7.6 0 0.0 0 0.0 2 7.0 102 85.2<br />

Equipment Nonrecurring<br />

(See Note 5)<br />

Engineering Change Orders 3.7 2.3 6.0<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

(See Note 6) (See Note 6)<br />

Production Support 0.4 0.3 0.6 0.6 1.2 1.2 1.3 1.0 1.1 0.0 7.6<br />

Other (See Note 2) 1 0.6 2 1.2 2 1.8 3 2.8 4 5.0 11 11.1 14 13.4 16 15.5 14 14.6 9 16.8 76 82.7<br />

Other (DSA) 0.1 0.1 0.4 0.2 0.5 0.9 0.9 0.5 0.0 0.0 3.6<br />

Installation of Hardware (See Note 1) 17 2.9 6 1.2 6 0.9 6 0.9 8 1.0 21 2.9 16 2.2 11 1.6 0.0 0.0 2 0.2 93 13.8<br />

PRIOR YR EQUIP 17 2.9 17 2.9<br />

FY 01 EQUIP 6 1.2 6 1.2<br />

FY 02 EQUIP 6 0.9 6 0.9<br />

FY 03 EQUIP 6 0.9 6 0.9<br />

FY 04 EQUIP 8 1.0 8 1.0<br />

FY 05 EQUIP 21 2.9 21 2.9<br />

FY 06 EQUIP 16 2.2 16 2.2<br />

FY 07 EQUIP 11 1.6 11 1.6<br />

FY 08 EQUIP 0 0.0 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 2 0.2 2 0.2<br />

TOTAL INSTALLATION COST 3.0 1.2 1.3 1.2 1.5 3.9 3.1 2.1 0.0 0.2 93 17.4<br />

TOTAL PROCUREMENT COST 37.8 7.1 9.5 10.4 21.0 24.8 25.5 22.3 17.9 24.0 102 200.3<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 months PRODUCTION LEADTIME: 12 months<br />

CONTRACT DATES: FY 2002: May-02 FY 2003: Feb-03 FY 2004: Feb-04 FY 2005: Jan-05<br />

DELIVERY DATES: FY 2003: May-03 FY 2004: Feb-04 FY 2005: Feb-05 FY 2006: Jan-06<br />

FY 04 FY 05 FY 06<br />

FY 07<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 27 2 1 3 2 1 3 3 1 2 6 6 6 3 6 6 2<br />

OUTPUT 26 3 3 3 1 3 3 1 2 6 6 6 3 6 6 2<br />

February 2004<br />

FY 08<br />

FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 1 5 4 1 2 93<br />

OUTPUT<br />

Notes/Comments:<br />

1 5 4 1 2 93<br />

1) Nine (9) OE-538/BRC units are assigned to a rotatable pool to accommodate equipment refurbishment and do not require installation kits or funding. Pool assets were procured as follows:<br />

one in FY00, one in FY03, one in FY05, two in FY06 and four in FY 07.<br />

2) RFDAC Procurements<br />

3) ACU install kits complete in FY 05; FY 06-FY 09 install kits included in RFDAC procurement.<br />

4) FY05 thru FY 09 costs reflect cancellation of iUHF Upgrade Program (PR-05).<br />

5) FY06 unit cost variance due to mix of OE-538 and RFDAC units being procured without inclusion of ACU variant.<br />

6) FY 08 and 09 Engineering Change Proposal (ECP) for GPS Anti-Jam Upgrade .<br />

7) Unit cost variance due to increased number of masts with ACU.<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

P-1 Shopping List-Item No 79 - 7 of 15 Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: CSRR-SSN 21, SSN 22<br />

COST CODE L0084<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: Installation of CSRR on SSN 21, SSN22<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E 0.0<br />

PROCUREMENT:<br />

Kit Quantity<br />

VAR 2.6 1 5.2 1 13.1 3.2 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 2 24.0<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

0 0.0<br />

Equipment<br />

Equipment Nonrecurring<br />

VAR 2.6 1 5.2 1 11.6 3.2 2 22.5<br />

Engineering Change Orders 2 1.5 2 1.5<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

Production Support<br />

Interm Contractor Support<br />

Other (DSA)<br />

(See Note 1)<br />

Installation of Hardware 0 0.0 0 0.0 1 0.0 1 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 2 0.0<br />

PRIOR YR EQUIP (See Note 2) (See Note 2)<br />

0 0.0<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 1 0.0 1 0.0<br />

FY 03 EQUIP 1 0.0 1 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2 0.0<br />

TOTAL PROCUREMENT COST 2.6 5.2 13.1 3.2 0.0 0.0 0.0 0.0 0.0 0.0 2 24.0<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 months PRODUCTION LEADTIME: 12 months<br />

CONTRACT DATES: FY 2002: FY 2003: FY 2004: FY 2005:<br />

DELIVERY DATES: FY 2002: FY 2003: FY 2004: FY 2005:<br />

FY 04 FY 05 FY 06 FY 07<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 1 1<br />

OUTPUT 0 1 1<br />

February 2004<br />

FY 08<br />

FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 2<br />

OUTPUT<br />

Notes/Comments:<br />

2<br />

1) FY 03 Engineering Change Proposal (ECP) for HF COTS/UHF Advanced Digital Waveform (ADW). Exhibit P-3a, Individual Modification Program<br />

2) FY 02 and FY 03 units were turnkey procurements requiring no installation costs. Unclassified<br />

P-1 Shopping List-Item No 79- 8 of 15 Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: CSRR-SSBN 726 (OHIO)<br />

COST CODE L0084<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: Installation of CSRR on SSBN 726 (OHIO) Class submarines<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E 1.2 1.2<br />

PROCUREMENT: 0 0.0 0 0.0 1 9.3 2 18.2 4 21.7 5 24.6 2 10.2 2 10.4 0 0.0 2 12.0 18 106.4<br />

Kit Quantity<br />

(See Note 3 ) (See Note 3 ) (See Note 3 ) (See Note 3 ) (See Note 3 )<br />

Installation Kits (Note 5)<br />

Installation Kits Nonrecurring<br />

0 0.0 0 0.0<br />

Equipment 1 4.0 2 18.2 4 21.7 5 24.6 2 10.2 2 10.4 0 0.0 2 12.0 18 101.1<br />

Equipment Nonrecurring 2.1 (See Note 2)<br />

0.0 2.1<br />

Production Faciility Establishment 1.5 (See Note 3)<br />

1.5<br />

TRID (ShipALT) 1.7 1.7<br />

Engineering Change Orders<br />

(See Note 1)<br />

Data<br />

(See Note 2)<br />

Training Equipment<br />

Support Equipment<br />

(See Note 3)<br />

Production Support 1.1 1.1 2.2<br />

Interm Contractor Support<br />

(See Note 4) (See Note 4)<br />

Other (DSA) 0.0 0.2 0.4 0.5 0.2 0.2 0.0 1.6<br />

Installation of Hardware 0 0.0 0 0.0 0 0.0 1 1.8 2 2.4 4 5.2 5 6.6 2 2.7 2 2.8 2 8.0 18 29.5<br />

PRIOR YR EQUIP 0 0.0<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 1 1.8 1 1.8<br />

FY 04 EQUIP 2 2.4 2 2.4<br />

FY 05 EQUIP 4 5.2 4 5.2<br />

FY 06 EQUIP 5 6.6 5 6.6<br />

FY 07 EQUIP 2 2.7 2 2.7<br />

FY 08 EQUIP 2 2.8 2 2.8<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 1 4.0 1 4.0<br />

TOTAL INSTALLATION COST 0.0 0.0 0.0 1.8 2.6 5.6 7.2 2.9 3.0 8.0 18 31.1<br />

TOTAL PROCUREMENT COST 0.0 0.0 10.4 21.1 24.3 30.3 17.3 13.3 3.0 20.0 18 139.7<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 months PRODUCTION LEADTIME: 12 months<br />

(See Note 6) CONTRACT DATES: FY 2002: FY 2003: VAR FY 2004: VAR FY 2005: VAR<br />

DELIVERY DATES: FY 2002: FY 2003: VAR FY 2004: VAR FY 2005: VAR<br />

FY 04 FY 05 FY 06<br />

FY 07<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 1 2 2 1 1 2 1 2<br />

OUTPUT 1 1 1 1 2 1 1 2 1<br />

February 2004<br />

FY 08<br />

FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 2 2 1 17<br />

OUTPUT<br />

Notes/Comments:<br />

1 1 1 1 1 1 17<br />

1) FY03 Procurement requires the purchase of "swing racks" to aide in the integration and installation of the CSRR equipment. These are reusable racks that will be rotated with future procurements and installations.<br />

2) FY03 and FY 04 procurement also includes one (1) Trident Training Facility (TTF) equipment set. Higher cost in FY 03 due to production facility start up and TRID.<br />

3) Each equipment set includes: (2) Q-70 workstations, routers, cables, cable retractors, power distribution panels, cable harnesses, hubs, laptops and human machine interfaces.<br />

4) FY03 and FY04 production support funding supports OHIO class hardware procurements and TRID (ShipALT).<br />

5) Installation Kit costs included as prime mission hardware procurement.<br />

6) CSRR equipment and integration efforts are procured under various contracts.<br />

Unclassified<br />

P-1 Shopping List-Item No 79- 9 of 15 Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: SCSS/CSRR-SSN 688<br />

COST CODE L0084<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: Installation of SCSS/CSRR on SSN 688 Class submarines<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E 11.5 1.0 0.4 12.9<br />

PROCUREMENT:<br />

Kit Quantity<br />

VAR 11.9 0 0.0 0 0.0 0 0.0 0 2.4 6 10.2 12 22.6 14 26.4 14 27.0 8 15.8 54 116.3<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

0 0.0<br />

Equipment VAR 11.9 6 10.2 12 22.6 14 26.4 14 27.0 8 15.8 54 114.0<br />

Equipment Nonrecurring 2.4 2.4<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

(See Note 1) (See Note 2)<br />

Production Support 1.5 1.8 1.6 4.9<br />

Interm Contractor Support<br />

(See Note 3) (See Note 3)<br />

(See Note 3)<br />

Other (DSA) 0.0 0.6 1.3 1.3 3.3<br />

Installation of Hardware 0 1.1 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 6 5.6 12 11.4 14 13.7 22 22.1 54 53.9<br />

PRIOR YR EQUIP 0 1.1 0 1.1<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 6 5.6 6 5.6<br />

FY 07 EQUIP 12 11.4 12 11.4<br />

FY 08 EQUIP 14 13.7 14 13.7<br />

FY 09 EQUIP 14 13.9 14 13.9<br />

FY TC EQUIP 8 8.1 8 8.1<br />

TOTAL INSTALLATION COST 1.1 0.0 0.0 0.0 0.0 0.0 6.2 12.8 15.0 22.1 54 57.2<br />

TOTAL PROCUREMENT COST 13.0 0.0 0.0 0.0 3.9 11.9 30.5 39.2 42.0 37.9 54 178.4<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 months PRODUCTION LEADTIME: 12 months<br />

(See Note 4) CONTRACT DATES: FY 2002: FY 2003: FY 2004 FY 2005: VAR<br />

DELIVERY DATES: FY 2002: FY 2003: FY 2004: FY 2005: VAR<br />

FY 04 FY 05 FY 06<br />

FY 07<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 3 3<br />

OUTPUT 2 3 1<br />

February 2004<br />

FY 08<br />

FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 3 4 4 1 4 4 5 23 54<br />

OUTPUT<br />

Notes/Comments:<br />

1) FY05 - Production Start up and ShipALT funding.<br />

2 4 3 3 2 5 4 25 54<br />

2) FY06 - TC hardware shipset procurement includes: Q-70 workstation, cable, cable harnesses, routers, hubs, and printers.<br />

Less new hardware and cable fabrication is required for SSN 688 class (vice OHIO class) as Wideband (WMP) and Narrowband (NMP) equipment requirements will have been installed.<br />

3) Production support funding supports 688 class hardware procurements and SHIP ALT.<br />

4) CSRR equipment and integration efforts are procured under various contracts. P-1 Shopping List-Item No 79 - 10 of 15 Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: SCSS/CSRR-Non-Class Specific Test and Production Facilities<br />

COST CODE L0084<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: Installation of SCSS/CSRR<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E 0.8 0.8<br />

PROCUREMENT:<br />

Kit Quantity<br />

0 0.0 1 6.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 15 8.8 30 16.8 Cont. Cont.<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

0 0.0 0 0.0<br />

Equipment 1 6.0 0 0.0 0 0.0 0.0 0.0 15 8.8 30 16.8 Cont. Cont.<br />

Equipment Nonrecurring (See Note 1)<br />

0.0 0.0<br />

Engineering Change Orders 3.0 3.0<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

(See Note 2)<br />

Production Support<br />

Interm Contractor Support<br />

0.3 0.4 0.0 0.0 0.0 0.0 0.0 1.6 1.8 Cont.<br />

Other (DSA) 0.0 0.0<br />

Installation of Hardware 0 0.0 0 0.0 1 0.6 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 15 4.7 Cont. Cont.<br />

PRIOR YR EQUIP 0 0.0<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 1 0.6 1 0.6<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 15 4.7 15 4.7<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.0 4.7 Cont. Cont. Cont.<br />

TOTAL PROCUREMENT COST 0.3 6.4 0.6 0.0 3.0 0.0 0.0 10.4 23.2 Cont. Cont. Cont.<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME:<br />

(See Note 3) CONTRACT DATES: FY 2002: FY 2003: FY 2004: FY 2005:<br />

DELIVERY DATES: FY 2002: FY 2003: FY 2004: FY 2005:<br />

FY 04 FY 05<br />

FY 06<br />

FY 07<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 1<br />

OUTPUT 1<br />

FY 08<br />

FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT Cont Cont<br />

OUTPUT<br />

Notes/Comments:<br />

Cont Cont<br />

1) FY02 funded for procurement of (GOTS and COTS) equipment (terminals, workstations, cable, routers, cable harnesses) for CSRR Integration and Test Facility.<br />

2) FY 05 ECP to incorporate full Digital Modular Radio (DMR) functionality including HF and UHF Advanced Digital Waveform (ADW).<br />

3) CSRR equipment and integration efforts are procured under various contracts.<br />

4) FY 08/09 reflects Tech Refresh with no associated input/output.<br />

February 2004<br />

P-1 Shopping List-Item No 79- 11 of 15 Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: High Data Rate Antenna (Sub HDR)<br />

COST CODE L0087<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: Installation of High Data Rate Antenna (Sub HDR)<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E 24.7 24.7<br />

PROCUREMENT: 31 100.0 12 27.8 10 21.9 6 20.4 6 21.3 0 0.0 0 0.0 0 0.0 0 0.0 3 10.2 68 201.7<br />

Kit Quantity<br />

(See Note 4) (See Note 4)<br />

(See Note 2,3)<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

31 4.3 10 2.5 7 1.2 3 0.5 2 0.3 0 0.0 0 0.0 0 0.0 0 0.0 53 8.8<br />

Equipment 31 95.7 12 25.3 10 20.6 6 20.0 6 21.0 0 0.0 0 0.0 0 0.0 0 0.0 3 10.2 68 192.9<br />

Equipment Nonrecurring<br />

(See Note 5) (See Note 5)<br />

Engineering Change Orders 1.1 57 3.4 0.0 0.0 4.5<br />

Data<br />

Training Equipment<br />

(See Note 8) (See Note 6)<br />

Support Equipment 1 4.3 1 4.3<br />

Production Support<br />

Interm Contractor Support<br />

(See note 1)<br />

1.2 1.2 1.1 1.2 0.1 0.1 0.0 4.9<br />

Other (DSA) 0.4 0.6 2.2 0.7 0.5 0.4 4.8<br />

Installation of Hardware 13 14.1 8 8.0 11 12.2 11 12.9 6 6.9 6 7.0 0 0.0 0 0.0 0 0.0 2 3.2 57 64.3<br />

PRIOR YR EQUIP 13 14.1 6 6.0 19 20.0<br />

FY 01 EQUIP 2 2.0 7 7.8 9 9.8<br />

FY 02 EQUIP 4 4.5 7 8.2 11 12.7<br />

FY 03 EQUIP 4 4.7 3 3.4 7 8.1<br />

FY 04 EQUIP 3 3.4 1 1.2 4 4.6<br />

FY 05 EQUIP (See Note 7) 5 5.8 5 5.8<br />

FY 06 EQUIP (See Note 7)<br />

0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 2 3.2 2 3.2<br />

TOTAL INSTALLATION COST 14.4 8.5 14.5 13.6 7.3 7.4 0.0 0.0 0.0 3.2 57 69.1<br />

TOTAL PROCUREMENT COST 114.5 37.6 37.5 35.2 31.0 11.0 0.0 4.3 0.0 13.5 68 284.4<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 months PRODUCTION LEADTIME: 15 months<br />

Plus one month acceptance testing<br />

CONTRACT DATES: FY 2002: Mar-02 FY 2003: Dec-02 FY 2004: Feb-04 FY 2005: Jan-05<br />

DELIVERY DATES: FY 2003: Jun-03 FY 2004: Mar-04 FY 2005: May-05 FY 2006: Apr-06<br />

FY 04 FY 05 FY 06 FY 07<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 31 2 3 4 3 2 1 2 2 2 3<br />

OUTPUT 30 2 3 3 4 2 2 1 3 1 3 1<br />

February 2004<br />

FY 08<br />

FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 2 57<br />

OUTPUT<br />

Notes/Comments:<br />

2 57<br />

1) Production support costs were not separated in PY and are included in equipment totals<br />

2) Eight (6) HDR units are assigned to a rotatable pool to accommodate equipment refurbishment and do not require installation funding. Pool assets are procured as follows:<br />

one (1) in FY00, three (3) in FY03, two (2) in FY04, one (1) in FY05, and one (1) in TC<br />

3) Three (3) Land Based System assets are procured as follows: One (1) in FY98, one (1) in FY01 and one (1) in FY02. These do not require installation funding and are not included on the P-3A installation breako<br />

4) Installation kits are procured one year in advance of the installs due to Long Lead Material (LLM) requirements<br />

5) Unit cost assumes SSGN procurements in FY 04 and FY 05<br />

6) FY06 Engineering Change Proposal (ECP) for Simultaneous GBS and EHF<br />

Exhibit P-3a, Individual Modification Program<br />

7) Four (4) SSGN installs (2 in FY 05 and 2 in FY06) do not require install kits<br />

8) FY05 Engineering Change Proposal (ECP) for SSBN Mast Mechanical Group (MMG) modifications<br />

Unclassified<br />

P-1 Shopping List-Item No 79- 12 of 15 Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: SUBMARINE TACTICAL INTEGRATED DIGITAL SYSTEM (TIDS) (SubLAN)<br />

COST CODE<br />

MODELS OF SYSTEMS AFFECTED:<br />

L0097<br />

DESCRIPTION/JUSTIFICATION: Installation of TIDS<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT: 4 18.5 5 11.9 35 12.4 51 11.5 19 4.4 25 5.2 31 5.2 27 5.2 23 3.6 Cont Cont 220 77.8<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

(See Note 1)<br />

(See Note 4) (See Note 4) (See Note 4)<br />

(See Note 5)<br />

Equipment - TIDS 4 18.5 5 11.9 Cont.<br />

Equipment - SubLAN PCs<br />

Equipment Nonrecurring<br />

15 2.1 19 2.7 23 3.3 26 3.9 25 3.8 23 3.6 Cont Cont 131 19.3<br />

SSN688 GFI/ShipALT Production 6.4 1.0 0.0 0 7.4<br />

SSN21 GFI/ShipALT Production 3.2 0.2 1.8 1.4 0 6.5<br />

SSBN726 GFI/ShipALT Production 1.4 0 1.4<br />

SSGN GFI/ShipALT Production 0.3 0.8 1.6 1.3 0 4.1<br />

SSB774 GFI/ShipALT Production 0 0.0<br />

Other Equipment - PC Augment 35 1.1 35 1.1<br />

Other Equipment - ER Drop Augment<br />

Other Equipment - ER Server Augment<br />

2 0.0 5 0.0 2 0.0 9 0.1<br />

Other Equipment<br />

Training Equipment<br />

6.0<br />

Support Equipment - EDM 1.0 0.3<br />

Production Support<br />

Interm Contractor Support<br />

Other (DSA)<br />

1.0 0.9 1.5 1.3 1.1 1.9 1.3 1.0 1.9 Cont Cont 0 11.8<br />

Installation of Hardware 2 5.0 6 13.2 1 0.0 10 0.3 16 0.6 28 1.2 29 1.6 25 1.1 27 1.0 Cont Cont 144 24.0<br />

PRIOR YR EQUIP 0 0.0<br />

FY 01 EQUIP 2 5.0 2 13.2 4 18.2<br />

FY 02 EQUIP 4 0.0 1 0.0 5 0.0<br />

FY 03 EQUIP (See Note 2) (See Note 2)<br />

0 0.0<br />

FY 04 EQUIP 10 0.3 5 0.2 15 0.5<br />

FY 05 EQUIP 11 0.4 8 0.3 19 0.7<br />

FY 06 EQUIP 20 0.9 5 0.3 25 1.1<br />

FY 07 EQUIP 24 1.3 7 0.3 31 1.6<br />

FY 08 EQUIP 18 0.8 9 0.3 27 1.2<br />

FY 09 EQUIP 18 0.7 1 2.5 18 0.7<br />

FY TC EQUIP Cont. 0 0.0<br />

TOTAL INSTALLATION COST 5.0 13.2 0.0 0.3 0.6 1.2 1.6 1.1 1.0 Cont Cont. Cont.<br />

TOTAL PROCUREMENT COST 24.4 26.0 13.9 13.1 6.0 8.2 8.1 7.3 6.5 Cont 113.6<br />

NAVSEA Control 32.5 22.4<br />

Consolidated Control 46.4 35.5<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 months PRODUCTION LEADTIME: 6 months<br />

CONTRACT DATES: FY 2002: Dec-01 FY 2003: Dec-02 FY 2004: Dec-03 FY 2005: Dec-04<br />

DELIVERY DATES: FY 2002: Jun-02 FY 2003: Mar-03 FY 2004: Mar-04 FY 2005: Mar-05<br />

FY 04 FY 05<br />

FY 06 FY 07<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 9 5 5 5 5 5 1 8 6 7 7 5 8 8 8<br />

OUTPUT 9 5 5 5 5 5 1 8 6 7 7 5 8 8 8<br />

FY 08<br />

FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 7 6 6 6 9 6 6 6 Cont. 144<br />

OUTPUT 7 6 6 6 9 6 6 6 Cont. 144<br />

February 2004<br />

Notes/Comments:<br />

1) FY 02 includes a one time SSN 21 class SHIP ALT development charge of $3.0M for TIDS Phase 2<br />

2) FY02 5 units: 4 units transferred to the SSGN program - no install costs required by 52L0, 1 unit transferred to the Land Based Test Facility (LBTF) - no install costs required by 5<br />

3) FY03 and FY04 includes class ShipALT production charge for SSN 688, SSN21, SSBN726, SSGN726 and SSN774 for SubLA<br />

4) Quantities refer to unit level submarines. Currently, there are 77 unit level submarines scheduled to receive SubLAN. Shifted 11 ship set procurements to 35 PC Augment shipsets. Requires no install c<br />

5) Sub Ship PC Upgrades (L0094) has been included in L0097 in FY 04 and beyond. PCs are part of the ship set and not procured separate Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

P-1 Shopping List-Item No 79 - 13 of 15 Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: TacLAN (SUBMARINE TACTICAL INTEGRATED DIGITAL SYSTEM (TIDS))<br />

COST CODE L00xx (NAVSEA)<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: Installation of TacLAN<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 01 FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT: 0 0.0 0 0.0 0 0.0 0 32.5 7 21.2 7 53.7<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 7 16.2 7 16.2<br />

Equipment Nonrecurring<br />

NRE-SSN688 ShipAlt Production 1.9 0.3<br />

NRE-SSN21ShipAlt Production 1.5 0.8<br />

NRE-SSBN726 ShipAlt Production 0.8 1.4<br />

NRE-SSGN ShipAlt Production 0.0 0.7<br />

NRE-SSN774 ShipAlt Production<br />

Shipboard Design NRE 25.5 1.1<br />

Information Assurance 2.9 0.8<br />

Tech Refresh NRE<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

Production Support<br />

Interm Contractor Support<br />

Other (DSA)<br />

Installation of Hardware 0 0.0 0 0.0 0 0.0 0 0.0 1 1.3 1 1.3<br />

PRIOR YR EQUIP<br />

FY 01 EQUIP<br />

FY 02 EQUIP<br />

FY 03 EQUIP<br />

FY 04 EQUIP 1 1.3 1 1.3<br />

FY 05 EQUIP<br />

FY 06 EQUIP<br />

FY 07 EQUIP<br />

FY 08 EQUIP<br />

FY 09 EQUIP<br />

FY TC EQUIP<br />

TOTAL INSTALLATION COST 0.0 0.0 0.0 0.0 1.3 7 1.3<br />

TOTAL PROCUREMENT COST 0.0 0.0 0.0 32.5 22.4 1 55.0<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME: 10 Months<br />

CONTRACT DATES: FY 2002: FY 2003: FY 2004: Nov-03 FY 2005: Nov-04<br />

DELIVERY DATES: FY 2002: FY 2003: FY 2004: Sep-04 FY 2005: Sep-05<br />

FY 03 FY 04<br />

FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 2 1 4<br />

OUTPUT 1 2 4<br />

February 2004<br />

FY 07<br />

FY 08<br />

FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 7<br />

OUTPUT<br />

Notes/Comments:<br />

7<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

P-1 Shopping List-Item No 79- 14 of 15 Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

PRODUCTION SCHEDULE February 2004<br />

(DOD EXHIBIT P-21)<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD NO.<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT 313000 Submarine Communications 52L0<br />

S ACCEP BAL FISCAL YEAR 03 FISCAL YEAR 04 FISCAL YEAR 05<br />

COST ITEM/MANUFACTURER E PROC PRIOR DUE CY 02 CALENDAR YEAR 03 CALENDAR YEAR 04 CALENDAR YEAR 05<br />

CODE R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S<br />

V 2-Oct 2-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E<br />

FY T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P<br />

L0078 TFDS/BSQ-9 02 1 1 1<br />

03 2 2 A 1 1<br />

04 8 8 A 1 1 1 1 1 1 1 1<br />

05 5 5 A<br />

L0080 OE-538/BRC 02 6 6 1 1 1 1 1 1<br />

03 7 7 A 1 1 1 1 1 1 1<br />

04 8 8 A 1 1 1 1 1 1 1 1<br />

05 22 22 A<br />

L0087 HIGH DATA RATE ANTENNA 02 12 12 1 1 1 1 1 1 1 1 1 1 1 1<br />

03 10 10 A 1 1 1 1 1 1 1 1 1 1<br />

04 6 6 A 1 1 1 1 1<br />

05 6 6 A<br />

L0097 SubLAN 03 35 0 A 10 10 10 5<br />

04 51 51 A 15 15 15 6<br />

05 19 19 A 5 5 5 4<br />

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAU JUN JUL AUG SEP<br />

PRODUCTION RATE PROCUREMENT LEADTIMES<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

ITEM Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

L0078- TFDS/BSQ-9 Brandywine Com, CA<br />

L0080- OE-538/BRC Sippican/GSM, MA<br />

L0087- High Data Rate Antenna Raytheon, MA<br />

L0097- SubLAN Various<br />

1 10 15 9 months 3 months 9 months 3 months 78<br />

6 12 24 12 months 6 months 12 months 3 months 102<br />

1<br />

13 28 12 months 2 months 15 months 2 months 68<br />

VAR VAR VAR VAR<br />

VAR<br />

VAR VAR<br />

VAR<br />

P-1 Shopping List-Item No 79- 15 of 15 Exhibit P-21 Production Schedule<br />

Unclassified<br />

Classification<br />

DATE


UNCLASSIFIED<br />

CLASSIFICATION<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Satellite Communications Systems 321500 52NR<br />

QUANTITY<br />

DATE February, 2004<br />

FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TO COMP TOTAL<br />

COST<br />

(in millions) 158.898 234.836 130.564 108.223 57.955 142.197 219.327 Continuing Continuing<br />

PROGRAM COVERAGE: The Satellite Communications (SATCOM) Systems P-1 line provides funds for procurement of shipboard terminal equipment for ship-to-ship, ship-toshore<br />

and ship-to-aircraft tactical communications via earth orbiting relay satellites in the ultra high frequency (UHF), super high frequency (SHF), and extremely high frequency<br />

(EHF) bands. This includes radio frequency (RF) equipment and baseband equipment assembled and grouped into systems and subsystems structured to address specific naval<br />

communications requirements. These systems provide processors and peripheral equipment that control the RF links for message traffic, direct data transfer and secure voice<br />

communications. They are selected and oriented by communications traffic levels, types of communications and operational missions. These procurements are scheduled to<br />

meet the satellite communications requirements established by the Chief of Naval Operations (CNO) in the Fleet Communications Planning and Programming documents. The<br />

Navy SATCOM Program provides a communications architecture for seamless, rapid and reliable switching and transfer of large volumes of information (voice, video, data or<br />

imagery), including Next Generation Network (NGN) requirements both Afloat and Ashore.<br />

JUSTIFICATION OF BUDGET YEAR REQUIREMENTS:<br />

SHF SYSTEMS: The Navy has been expanding its use of SHF for communications in support of Navy Tactical and Joint Task Force (JTF) Operating Forces Afloat through a<br />

phased implementation plan. In FY01, AN/WSC-6(V)2 and AN/WSC-6(V)4 were modified to a standard AN/WSC-6(V)5 configuration to provide dual RF channel capability to flag<br />

capable platforms and large combatants. In FY02-03, legacy (V) 4 antennas have been replaced to provide enhanced capability and logistical support. AN/WSC-6(V)7 and<br />

AN/WSC-6(V)9 will be utilized to accommodate expanding SHF SATCOM capability to other combatants, combat logistics force ships, and mine countermeasure support ships.<br />

Under the Submarine High Data Rate (SUB HDR) program, the Navy is exploring the technical feasibility of Defense Satellite Communications Systems (DSCS) support of<br />

wideband capabilities for attack submarines. This line also provides SHF shore based modem equipment for high data rate communications with Fleet units via the DSCS. Shore<br />

based terminals have an operational requirement to support joint, theater and Navy unique command, control, communications, support and intelligence circuits for voice, data,<br />

video and imagery to the extent they are required on SHF platforms. FY03 funds procured and installed N-STEP/TELEPORT modems to provide shore side compatibility with<br />

SHF equipped ships and to support fleet and Battle Group capacity requirements. Funding will also support ancillary hardware related to Automated Digital Multiplexing System<br />

(ADMS). The AN/WSC-6(V)7 and (V)9 contracts expire in FY04 and FY05 respectively. The AN/WSC-6(V)10 terminal will be a follow-on to these contracts to complete the<br />

required terminal fielding and will meet all the requirements of the current WSC-6 and WSC-8 terminals and the Wideband Gapfiller Satellite System.<br />

P-1 Shopping List - Item No 80 - 1 of 54<br />

Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET (Continuation) DATE February, 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Satellite Communications Systems 321500 52NR<br />

EHF TERMINALS: This program provides for the acquisition of the Navy’s EHF Satellite Communications Program (NESP) terminals in four semi-concurrent phases.<br />

Phase I of the NESP program procures Low Data Rate (LDR) jam resistant, low probability of intercept EHF SATCOM terminals along with required baseband equipment,<br />

modification kits and other ancillary equipment for submarines, surface ships and shore stations. This equipment is required to meet the electromagnetic threat environment<br />

projected for the next decade. This requirement is contained in the NESP NDCP dated Apr 89 and the JROC validated Milstar ORD of Jun 92.<br />

Phase II of the NESP program procures Navy EHF Communications Controllers (NECCs) which provides for the exchange of computer-to-computer tactical communications<br />

over the survivable EHF satellite links. NECC provides network management; multiplexing and channel sharing; resource management; communications<br />

management/planning; network control/monitoring; and communications protocols such as circuit switching and packet switching. NECC requirements are outlined in the<br />

NESP NDCP dated Apr 89 and must be fully fielded with deploying battle groups and shore sites to support tactical information exchange over EHF SATCOM. Phase III of<br />

the NESP program procures Full MILSTAR LDR Operational Capabilities (FMLOC). FMLOC efforts include Agile Beam Management (ABM), Over-the-Air-Rekey (OTAR),<br />

and In-Band Control (IBC) capabilities required by the JROC validated Milstar ORD. Additionally, the Processor Upgrade Program (PUP) must be implemented to support<br />

terminal throughput and memory requirements of Phase III capabilities. Phase III efforts will provide essential EHF operational communications capabilities with the current<br />

MILSTAR satellites. Similarly, IBCs will provide interoperable voice communications on all EHF satellites (MILSTAR, UHF Follow-On (UFO), and FLTSAT EHF Package<br />

(FEP)). Phase III also includes procurement of Interim Polar modification kits. An EHF polar communications capability is available using an EHF package on a classified<br />

host in the Molniya orbit. To use this polar capability, terminals will require minor modifications. In addition, shore gateways are necessary to provide connectivity from the<br />

Interim Polar satellite to other EHF satellite constellations. Phase IV of the NESP program consists of a Medium Data Rate (MDR) capability which will provide the only<br />

protected (jam resistant and low probability of intercept/detection) MDR communications from 4.8 kilobits per second (Kbps) to 1.544 megabits per second (Mbps) to all<br />

major fleet combatants with MILSTAR Satellites 4-6. To meet initial MDR capability requirements for the fleet, the Navy procured MDR appliqués which is retrofitted into<br />

existing legacy LDR terminals. The requirement for MDR is outlined in the JROC validated Milstar ORD. Prior to receiving the MDR appliqué, existing legacy LDR<br />

terminals must have Phase III upgrades due to processing throughput and memory requirements of MDR. Remaining MDR requirements will be satisfied through<br />

procurement of the LDR/MDR Follow-On Terminal (FOT) which incorporates LDR/MDR capabilities into a consolidated terminal that provides the same EHF functionality as<br />

a legacy LDR terminal with an MDR appliqué. The LDR/MDR FOT will have Phase III FMLOC capabilities incorporated into their baseline. The LDR/MDR FOT Antenna<br />

Group includes procurement of Radar Cross Section (RCS) modification kits to meet Navy Passive Counter Measure Ships (PCMS) RCS Specifications. During Phase IV,<br />

a Time Division Multiple Access (TDMA) Interface Processor (TIP) will be procured and integrated into the NECC. The purpose of TIP is to provide near real-time data<br />

transfer between Tactical Data Processors (TDP) together with support for ADNS data exchange using a common suite of EHF Services. This capability is necessary for<br />

effective utilization of the anti-jam/low probability of intercept (AJ/LPI) and survivable capabilities of the EHF LDR/MDR system.<br />

P-1 Shopping List - Item No 80 - 2 of 54<br />

Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET (Continuation) DATE February, 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Satellite Communications Systems 321500 52NR<br />

COMMERCIAL SATELLITES: Lessons learned from Desert Storm documented the necessity of an alternate commercial communications service for logistics and<br />

operational support requirements to reduce saturation of communications on military tactical satellites. ASD(C3I) in a letter of 8 Nov 1993, directed the use of<br />

commercial satellite (COMMERSAT) to augment current and future Military Satellite Communications (MILSATCOM) systems. This relieved the congestion on military<br />

tactical satellite communications systems while enhancing the overall Navy tactical communications capacity and reducing competition with tactical data on limited<br />

tactical satellite assets. The COMMERSAT program uses commercial off-the-shelf (COTS)/non-developmental item (NDI) equipment, software, and service with<br />

minimal adaptation for the naval environment. Variants of commercially available International Maritime Satellite (INMARSAT) terminals will be procured in the next few<br />

years. Various types are required to satisfy different requirements on flagships, aircraft carriers, amphib ships, combatants and auxiliary ships. The COMMERSAT<br />

Operational Requirements Document (ORD) mandates INMARSAT M terminals on Mine Counter-Measures ships. Since INMARSAT M terminals are no longer in<br />

production, INMARSAT B terminals will be procured and installed for Mine Counter-Measure ships. Earlier INMARSAT A installations will be upgraded to INMARSAT B,<br />

B HSD or dual B systems. There will also be procurement of additional shore equipment, and modifications to established INMARSAT systems for 128 kbps wideband<br />

capability, thus providing greater capability to the Fleet. The AN/WSC-8 capability aboard surface combatants will be implemented using the SHF AN/WSC-6(V)9 suite<br />

of equipment.<br />

GLOBAL BROADCAST SERVICE (GBS): GBS is the Navy portion of a joint program with the Air Force as Executive Service. GBS augments other (MILSATCOM)<br />

systems and provides a continuous, high speed, one way information flow of high volume data to units ashore, afloat and special operations. GBS supports routine<br />

operations, training and military exercises, special activities, crises, situational awareness, weapons targeting, reconnaissance and transition to and conduct of opposed<br />

operations short of nuclear war. GBS provides the capability to quickly disseminate large information products to various joint, small combat and combat support<br />

elements. FY04 and FY05 funds procure and install receiving equipment in various configurations customized to each type of ship for Phase II of the GBS program in<br />

support of UHF follow-on (UFO) satellite flights 8, 9, and 10. For ship and submarine receive suites, antennas and ancillary equipment such as Asynchronous Transfer<br />

Mode (ATM) in-line encryptors will be procured. Shipboard and submarine receive broadcast manager (RBM) equipment will be procured through the GBS Systems<br />

Contract executed by the Air Force. FY04 and FY05 continues procurement and installation of shore terminals to support ship, submarine, and shore training and<br />

integration facilities. For shore receive suites, all components including antennas and RBMs will be procured through the GBS Systems (Air Force) contract . A Mission<br />

Need Statement for GBS was signed, 3 AUG 1995, and an Operational Requirements Document (ORD) was signed on 30 April 97 and was updated with revised Navy<br />

Force Structure by JROC on 23 May 01.<br />

P-1 Shopping List - Item No 80 - 3 of 54<br />

Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET (Continuation) DATE February, 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Satellite Communications Syste 321500 52NR<br />

JMINI Control System: The Joint UHF Military Satellite Communications Network Integrated Control System (JMINI) is a joint interest program with the Navy designated as the lead<br />

service as directed by the Military Communications Electronics Board (MCEB). The JMINI Control System will provide dynamic centralized control of joint 5-kHz and 25-kHz UHF<br />

MILSATCOM voice and data resources (channels and Time Division Multiple Access (TDMA) time slots) via a globally integrated system of four control stations to be located at each<br />

of the three Naval Computer and Telecommunications Area Master Station (NCTAMS) sites plus Naval Computer and Telecommunications Station (NCTS) Guam. The globally<br />

integrated system consists of two major subsystems. The first subsystem provides communications resource planning and management via secure Wide Area Network (WAN)<br />

connections between the control stations and remote users and is known as the Network Management System (NMS). Based on a revised ORD, 64 NMS units are required; one at<br />

each control station plus 60 remote units to be installed at ORD-defined locations. The second subsystem provides the RF connectivity (modems, radios, antennas) between the<br />

NMS and the UHF MILSATCOM user terminals worldwide and is known as the Channel Controller. There are 56 channel controllers required per control station. Funds in FY04-<br />

FY05 continue the hardware procurement and installation for the four control stations and the remote NMS units.<br />

P-1 Shopping List - Item No 80 - 4 of 54<br />

Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

COST ANALYSIS DATE February, 2004<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT Satellite Communications Systems 321500 52NR<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

FY 2003 FY 2004 FY 2005<br />

COST ID UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE QTY COST COST QTY COST COST QTY COST COST<br />

NR101 MINI DAMA 4,600 0 0<br />

NR101 MINI DAMA Field Change Upgrade Kits A 4,600 0<br />

NR105 5/25 KHz SATCOM 7,947 0 0<br />

NR105 5/25 KHz SATCOM--UHF Modems A 18 116.4 2,096<br />

NR105 5/25 KHz SATCOM--DMR B (Transferred to BLI 3010 beginning FY04)<br />

NR105 TRIDENT - MD-1324A Modem 14 90.4 1,265<br />

NR105 TRIDENT - MD-1324A Modem Ship Alt kits 14 327.6 4,586<br />

NR106 SHF SATCOM 15,586 72,997 7,782<br />

NR106 SHF Terminals--AN/WSC-6(V)5 Mod kits - Ship Upgrades A Var Var. 285 Var Var. 1,385<br />

NR106 SHF Terminals-- AN/WSC-6 7 Ft Antenna - Ship A 10 216.3 2,163 9 306.2 2,756<br />

NR106 SHF Terminals--AN/WSC-6(V)7 - Ship A 6 1,308.0 7,848 16 921.3 14,741<br />

NR106 SHF Terminals--AN/WSC-6(V)7 - Ship Upgrades A Var. Var. 5,526<br />

NR106 SHF Terminals--AN/WSC-6(V)7 - Ship (Backfits) A 6 83.3 500 12 88.0 1,056<br />

NR106 SHF Terminals --AN/WSC-6(V)7 - Shore A 1 80.0 80<br />

NR106 SHF Terminals--AN/WSC-6(V)9 - Ship B 3 1,277.0 3,831 20 1,637.0 32,739<br />

NR106 SHF Terminals -- AN/WSC-6(V)7 Modems A 36 15.1 543<br />

NR106 SHF Terminals -- AN/WSC-6(V)9 Modems - Shore A 20 20.8 416<br />

NR106 SHF Terminals -- EBEM Modems - Ship A 119 10.1 1,200 1 10.0 10<br />

NR106 SHF Terminals -- EBEM Modems - Shore A 106 14.2 1,510 60 11.3 676<br />

NR106 SHF Terminals--AN/WSC-6(V)10 Ship B 4 2,434.5 9,738 1 2,440.0 2,440<br />

NR106 SHF Terminals--AN/WSC-6(V)10 - Ship Upgrades B 1 2,266.0 2,266 2 2,328.0 4,656<br />

Remarks:<br />

MINI DAMA<br />

FY03 Congressional Plus-up.<br />

All US MINI DAMA units receive this software upgrade<br />

5/25KHz<br />

Beginning in FY04, DMR transfers to BLI 3010 and transitions to Joint Tactical Radio System M/F.<br />

SHF SATCOM<br />

AN/WSC-6(V)10 Ship Upgrades were formerly identified as AN/WSC-6(V)9 Ship (Backfits)<br />

DD FORM 2446, JUN 86<br />

P-1 Shopping List - Item No 80 - 5 of 54<br />

Exhibit P-5, Cost Analysis Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

COST ANALYSIS DATE February, 2004<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT Satellite Communications Systems<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

321500 52NR<br />

PY<br />

FY 2003 FY 2004 FY 2005<br />

COST ID TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE QTY COST QTY COST COST QTY COST COST QTY COST COST<br />

NR107 EHF SATCOM 652,352 18,331 33,927 8,028<br />

NR107 EHF Terminals--AN/USC-38(V) FOT - Ship A 275 467,033 11 1,287.2 14,160 39 752.4 29,343 Var. 1,894<br />

NR107 EHF Terminals --AN/USC-38(V) FOT - Shore A 70 105,247 Var. 773<br />

NR107 EHF Terminals--NECC - Ship A 225 28,697 12 232.3 2,788 21 180.3 3,786 10 543.6 5,437<br />

NR107 EHF Terminals --NECC - Shore A 57 6,447 Var. 550 6 133.0 798 3 232.4 697<br />

NR107 EHF Terminals--MDR Appliques - Ship A 61 35,725 60<br />

NR107 EHF Terminals --Interim Polar Gateway - Shore A 2 5,703<br />

NR107 EHF Terminals --Polar Equipment 3,500<br />

NR112 Commercial Satellite 2,874 2,059 3,022 3,309<br />

NR112 Comm. Satellite--INMARSAT B (Ship) A 1 96 9 63.4 571<br />

NR112 Comm. Satellite--INMARSAT B (Ship) Equip. Upgrade - Handover A 17 559 1 37.0 37<br />

NR112 Comm. Satellite--INMARSAT B (Ship) Equip. Upgrade - 128Kbps Wideband A 20 46.1 921 80 28.8 2,302 86 29.2 2,514<br />

NR112 Comm. Satellite--INMARSAT B (Shore) 4 308<br />

NR112 Comm. Satellite--INMARSAT B HSD KITS A 8 144 4 18.0 72 8 17.9 143<br />

NR112 Comm. Satellite--C band/CWSP (Ship) A Var. 458<br />

NR112 Comm. Satellite--C band/CWSP (Shore) A 9 1,767 Var. 577 Var. 795<br />

NR117 Global Broadcast Service (GBS) 31,775 8,569 22,753 9,162<br />

NR117 Global Broadcast Service-- Single (Receive Suite) B 17 9,146<br />

NR117 Global Broadcast Service--Dual (Receive Suite) B 13 8,204<br />

NR117 Global Broadcast Service - Conversion Kits/Backfits/Upgrades B 6 2,623 0 8,569 Var. 19,980 15 610.8 9,162<br />

NR117 Global Broadcast Service--Subs (Receive Suite) B 32 9,429<br />

NR117 Global Broadcast Service - Shore B 15 2,373 7 396.1 2,773<br />

NR118 JMINI Control System 12,624 3,954 7,659 6,245<br />

NR118 JMINI Control System - NMS A 22 12,624 7 564.9 3,954 12 638.3 7,659 10 624.5 6,245<br />

Remarks:<br />

EHF Terminals<br />

Fluctuations in unit price are a result of the mix between Ship, Shore and Sub procurements. Unit costs include necessary RCS radome kits, field change kits and ancillary equipment.<br />

AN/USC-38 (V) FOT Quantities of "Var." in FY03 and FY05 reflect procurement of supporting ancillary equipment.<br />

NECC FY03 and out includes MDR (TIP) capability.<br />

FY05 NECC unit cost increase due to procurement of TIP card for integration into NECC chassis<br />

MDR PY-FY03 procurements include field change kits and ancillary equipment required for installations.<br />

INMARSAT<br />

INMARSAT B Equipment upgrades - The antenna handover upgrade will modify the dual antenna system to include handover capability. The 128 Kbps wideband upgrade will increase the modems channel throughput capability from 64Kbps to 128Kbps.<br />

FY03 - INMARSAT B Equipment upgrades (128 Kbps) unit cost includes $300K NRE<br />

CWSP<br />

FY04 - Procurement quantities consist of PAC transponder and gateway equipment, Norfolk/Martelsham T-3 equipment, second Hawaii gateway hardware, modems and infrastructure upgrades.<br />

FY05- Procurement quantities consist of European gateway equipment and modems<br />

GBS<br />

PY - GBS Unit costs vary due to mix of Ship, Submarine and Shore terminal configurations and to quantity discounts afforded by other Services buys per year.<br />

GBS - Conversion Kits/ Backfits/ Upgrades. Six equipment conversion kits purchased in FY02 to convert twelve (12) PY single antenna assets to six (6) dual antenna configurations. In FY03-04, Ship and Shore "various" backfit and upgrade kits will be purchased and installed<br />

GBS - FY05 quantity is IP backfits only. 17 sub backfits and 4 dual antenna system backfits.<br />

DD FORM 2446, JUN 86<br />

P-1 Shopping List - Item No 80 - 6 of 54<br />

Exhibit P-5, Cost Analysis Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

COST ANALYSIS DATE February, 2004<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT Satellite Communications Systems<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

321500 52NR<br />

PY<br />

FY 2003 FY 2004 FY 2005<br />

COST ID TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE QTY COST QTY COST COST QTY COST COST QTY COST COST<br />

NR555 PRODUCTION SUPPORT 106,984 11,436 17,415 13,308<br />

NR777 INSTALLATION 534,052 72,721 77,062 82,730<br />

FMP Installation 469,969 68,390 66,472 74,638<br />

FMP DSA - SATCOM Ship 24,233 7,518 12,808 6,498<br />

Non-FMP Installation 64,083 4,331 10,590 8,092<br />

TOTAL BLI 3215 1,346,184 145,203 234,836 130,564<br />

DD FORM 2446, JUN 86<br />

PBD 172 Deferral 13,695<br />

SPAWAR TOTAL 1,346,184 158,898 234,836 130,564<br />

NFN Shore Comm Equip and Fly Away Terminals - DERF 11,459<br />

P-1 Shopping List - Item No 80 - 7 of 54<br />

Exhibit P-5, Cost Analysis Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

PROCUREMENT HISTORY AND PLANNING A. DATE February, 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Satellite Communications Systems 321500 52NR<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE DELIVERY COST NOW AVAILABLE<br />

NR101 MINI DAMA Field Change Upgrade Kits 03 Titan, CA FFP SPAWAR Jun-04 Jun-05 YES N/A<br />

NR105 5/25 KHz SATCOM--UHF Modems 03 Viasat, CA IDIQ SPAWAR Nov-02 Jul-03 18 116.4 YES N/A<br />

D. REMARKS<br />

FY03 - MINI DAMA contract award pending JTRS waiver<br />

DD FORM 2446, JUN 87<br />

P-1 Shopping List - Item No 80 - 8 of 54<br />

Exhibit P-5a, Procurement History and Planning<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

PROCUREMENT HISTORY AND PLANNING A. DATE February, 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Satellite Communications Systems 321500 52NR<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE DELIVERY COST NOW AVAILABLE<br />

NR106 SHF Terminals-- AN/WSC-6 7 Ft Antenna - Ship 03 Raytheon, Boston, MA C/FFP (OPT) SPAWAR May-03 Feb-04 10 216.3 YES N/A<br />

NR106 SHF Terminals-- AN/WSC-6 7 Ft Antenna - Ship 04 Raytheon, Boston, MA C/FFP (OPT) SPAWAR Feb-04 Nov-04 9 306.2 YES N/A<br />

NR106 SHF Terminals--AN/WSC-6(V)7 - Ship 03 Raytheon, Boston, MA C/FFP (OPT) SPAWAR May-03 May-04 6 1308.0 YES N/A<br />

NR106 SHF Terminals--AN/WSC-6(V)7 - Ship 04 Raytheon, Boston, MA C/FFP (OPT) SPAWAR Feb-04 Feb-05 16 921.3 YES N/A<br />

NR106 SHF Terminals--AN/WSC-6(V)7 - Ship (Backfits) 03 Raytheon, Boston, MA C/FFP (OPT) SPAWAR May-03 May-04 6 83.3 YES N/A<br />

NR106 SHF Terminals--AN/WSC-6(V)7 - Ship (Backfits) 04 Raytheon, Boston, MA C/FFP (OPT) SPAWAR Feb-04 Dec-04 12 88.0 YES N/A<br />

NR106 SHF Terminals --AN/WSC-6(V)7 - Shore 04 Raytheon, Boston, MA C/FFP (OPT) SPAWAR Feb-04 Feb-05 1 80.0 YES N/A<br />

D. REMARKS<br />

FY03 - Increased unit cost to the (V)7 terminal price is due to the inclusion of the NRE for the Dual Channel (V) 7 ECP and (V) 7 Dual channel terminals<br />

FY04 - Increased unit cost to the 7 ft antenna is due to the Sole Source modification to the contract.<br />

DD FORM 2446, JUN 87<br />

P-1 Shopping List - Item No 80 - 9 of 54<br />

Exhibit P-5a, Procurement History and Planning<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

PROCUREMENT HISTORY AND PLANNING A. DATE February, 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Satellite Communications Systems 321500 52NR<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE DELIVERY COST NOW AVAILABLE<br />

NR106 SHF Terminals--AN/WSC-6(V)9 - Ship 03 Harris Corp, Melbourne, FL C/FFP (OPT) SPAWAR Jun-03 Apr-04 3 1,277.0 YES N/A<br />

NR106 SHF Terminals--AN/WSC-6(V)9 - Ship 04 Harris Corp, Melbourne, FL C/FFP (OPT) SPAWAR Feb-04 Jun-05 20 1,637.0 YES N/A<br />

NR106 SHF Terminals -- AN/WSC-6(V)7 Modems 03 Raytheon, MA C/FFP (OPT) SPAWAR May-03 May-04 36 15.1 YES N/A<br />

NR106 SHF Terminals -- AN/WSC-6(V)9 Modems - Shore 03 Harris Corp, Melbourne, FL C/FFP (OPT) SPAWAR Aug-03 Aug-04 20 20.8 YES N/A<br />

NR106 SHF Terminals -- EBEM Modems - Ship 02 VIASAT, Carlsbad, CA C/FFP (OPT) CECOM Jul-02 Mar-04 10 139.0 YES N/A<br />

NR106 SHF Terminals -- EBEM Modems - Ship 04 VIASAT, Carlsbad, CA C/FFP (OPT) CECOM Apr-04 Oct-04 119 10.1 YES N/A<br />

NR106 SHF Terminals -- EBEM Modems - Ship 05 VIASAT, Carlsbad, CA C/FFP (OPT) CECOM Dec-04 Jun-05 1 10.0 YES N/A<br />

NR106 SHF Terminals -- EBEM Modems - Shore 04 VIASAT, Carlsbad, CA C/FFP (OPT) CECOM Apr-04 Oct-04 106 14.2 YES N/A<br />

NR106 SHF Terminals -- EBEM Modems - Shore 05 VIASAT, Carlsbad, CA C/FFP (OPT) CECOM Nov-04 May-05 60 11.3 YES N/A<br />

NR106 SHF Terminals--AN/WSC-6(V)10 Ship 04 Harris Corp, Melbourne, FL C/FFP (OPT) SPAWAR Feb-04 Jun-05 4 2,434.5 YES N/A<br />

NR106 SHF Terminals--AN/WSC-6(V)10 Ship 05 Harris Corp, Melbourne, FL C/FFP (OPT) SPAWAR Dec-04 Dec-05 1 2,440.0 YES N/A<br />

NR106 SHF Terminals--AN/WSC-6(V)10 - Ship Upgrades 04 Harris Corp, Melbourne, FL C/FFP (OPT) SPAWAR Feb-04 Jun-05 1 2,266.0 YES N/A<br />

NR106 SHF Terminals--AN/WSC-6(V)10 - Ship Upgrades 05 Harris Corp, Melbourne, FL C/FFP (OPT) SPAWAR Dec-04 Dec-05 2 2,328.0 YES N/A<br />

D. REMARKS<br />

FY02 - Unit cost of the EBEM Modems - Ship includes NRE.<br />

FY04 - Increased unit cost to the (V)9 terminal price is due to the inclusion of Ka-Ready capability.<br />

DD FORM 2446, JUN 87<br />

P-1 Shopping List - Item No 80 - 10 of 54<br />

Exhibit P-5a, Procurement History and Planning<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

PROCUREMENT HISTORY AND PLANNING A. DATE February, 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Satellite Communications Systems 321500 52NR<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE DELIVERY COST NOW AVAILABLE<br />

NR107 EHF Terminals--AN/USC-38(V) FOT - Ship 02 Raytheon, Marlborough, MA C/FFP (OPT) SPAWAR Jan-02 Jul-03 22 1029.0 YES N/A<br />

NR107 EHF Terminals--AN/USC-38(V) FOT - Ship 03 Raytheon, Marlborough, MA C/FFP (OPT) SPAWAR Dec-02 Jun-04 11 1287.2 YES N/A<br />

NR107 EHF Terminals--AN/USC-38(V) FOT - Ship 04 Raytheon, Marlborough, MA C/FFP (OPT) SPAWAR Mar-04 Sep-05 39 752.4 YES N/A<br />

NR107 EHF Terminals --AN/USC-38(V) FOT - Shore 02 Raytheon, Marlborough, MA C/FFP (OPT) SPAWAR Jan-02 Mar-04 1 1852.0 YES N/A<br />

NR107 EHF Terminals--NECC - Ship 04 SPAWAR System Center Work Request SPAWAR Nov-03 Mar-04 21 180.3 YES N/A<br />

NR107 EHF Terminals--NECC - Ship 05 SPAWAR System Center Work Request SPAWAR Nov-04 Mar-05 10 543.6 YES N/A<br />

NR107 EHF Terminals --NECC - Shore 04 SPAWAR System Center Work Request SPAWAR Nov-03 Mar-04 6 133.0 YES N/A<br />

NR107 EHF Terminals --NECC - Shore 05 SPAWAR System Center Work Request SPAWAR Nov-04 Mar-05 3 232.4 YES N/A<br />

D. REMARKS<br />

FY02 EHF terminal AN/USC-38(V) Ship and Shore are on the same contract and have 12 months from the date of first delivery to complete the contract. The shore procurement will be delivered last.<br />

DD FORM 2446, JUN 87<br />

P-1 Shopping List - Item No 80 - 11 of 54<br />

Exhibit P-5a, Procurement History and Planning<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

PROCUREMENT HISTORY AND PLANNING A. DATE February, 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Satellite Communications Systems 321500 52NR<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE DELIVERY COST NOW AVAILABLE<br />

NR112 Comm. Satellite--INMARSAT B (Ship) Equip. Upgrade - 128Kbps Wideband 04 Mackay Comm Edison, NJ C/FP (OPT) SSC/SD Nov-03 Feb-04 80 28.8 YES N/A<br />

NR112 Comm. Satellite--INMARSAT B (Ship) Equip. Upgrade - 128Kbps Wideband 05 Mackay Comm Edison, NJ C/FP (OPT) SSC/SD Nov-04 Feb-05 86 29.2 YES N/A<br />

NR112 Comm. Satellite--INMARSAT B HSD KITS 04 D&E Tech Wallingford, CT C/FP (OPT) SSC/CHS Nov-03 Feb-04 8 17.9 YES N/A<br />

NR117 Global Broadcast Service - Backfits/Upgrades 04 Raytheon, Marlborough, MA & Reston, VA CPAF/(OPT) USAF Feb-04 Aug-04 Var. YES N/A<br />

NR117 Global Broadcast Service - Backfits 05 Raytheon, Marlborough, MA & Reston, VA CPAF/(OPT) USAF Feb-05 Aug-05 15 610.8 YES N/A<br />

NR117 Global Broadcast Service - Shore 04 Raytheon, Marlborough, MA & Reston, VA CPAF/(OPT) USAF Feb-04 Oct-04 7 396.1 YES N/A<br />

NR118 JMINI Control System - NMS 04 SAIC, San Diego, CA CPFF SSC-SD Dec-03 Jul-04 12 638.3 Yes N/A<br />

NR118 JMINI Control System - NMS 05 SAIC, San Diego, CA CPFF SSC-SD Oct-04 Jul-05 10 624.5 Yes N/A<br />

D. REMARKS:<br />

P-1 Shopping List - Item No 80 - 12 of 54<br />

Exhibit P-5a, Procurement History and Planning<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR101<br />

MODELS OF SYSTEMS AFFECTED: MINI DAMA<br />

DESCRIPTION/JUSTIFICATION: Provides 5KHz and 25KHz UHF Communications capability for submarines and other disadvantaged users.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 77 22.7 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 77 22.7<br />

Equipment Nonrecurring<br />

Field Change Upgrade Kits 150 10.0 2.5 1.8 150 14.3<br />

Engineering Change Orders 3.6 2.8 6.4<br />

Data<br />

Training Equipment<br />

Production Support 0.5 0.0 0.5<br />

Other (DSA) 0.0<br />

Interim Contractor Support<br />

Installation of Hardware* 77 10.2 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 77 10.2<br />

PRIOR YR EQUIP 77 10.2 77 10.2<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 10.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10.2<br />

TOTAL PROCUREMENT 42.9 6.6 4.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 54.1<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: PRODUCTION LEAD-TIME: 12 Months<br />

CONTRACT DATES: FY 2003: Jun-04 FY 2004: NA FY 2005: NA FY 2006: NA<br />

DELIVERY DATES: FY 2003: Jun-05 FY 2004: NA FY 2005: NA FY 2006: NA<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 77<br />

OUTPUT 77<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 77<br />

OUTPUT 0 77<br />

Notes/Comments<br />

PY - No installation required for upgrade kits.<br />

FY02 and FY03 - Congressional Plus-up. Field Change Upgrade kits do not require installation.<br />

All MINI DAMA units will receive software upgrade kits.<br />

FY 07<br />

P-1 Shopping List - Item No 80 - 13 of 54<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR105<br />

MODELS OF SYSTEMS AFFECTED: 5/25 KHz SATCOM--UHF Modems<br />

DESCRIPTION/JUSTIFICATION: Provides the modulation demodulation capability at 5 KHz bandwidth in the UHF spectrum<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 410 17.3 1 0.1 18 2.1 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 429 19.5<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment 2 0.2 2 0.2<br />

Production Support 1.8 0.8 0.1 2.6<br />

Other (DSA) 0.9 0.2 0.1 1.2<br />

Interim Contractor Support<br />

Installation of Hardware* 404 12.7 7 1.6 18 0.7 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 429 15.0<br />

PRIOR YR EQUIP 404 12.7 6 1.3 410 14.0<br />

FY 02 EQUIP 1 0.2 1 0.2<br />

FY 03 EQUIP 18 0.7 18 0.7<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 12.7 1.6 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0<br />

TOTAL PROCUREMENT 32.6 2.9 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 38.5<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 6 Months PRODUCTION LEAD-TIME: 8 Months<br />

CONTRACT DATES: FY 2003: Nov-02 FY 2004: NA FY 2005: NA FY 2006:<br />

DELIVERY DATES: FY 2003: Jul-03 FY 2004: NA FY 2005: NA FY 2006:<br />

FY 04<br />

FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 429<br />

OUTPUT 429<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 429<br />

OUTPUT 0 429<br />

Notes:<br />

FY02: Two (2) units procured as training equipment do not require SPAWAR install funds<br />

FY 07<br />

P-1 Shopping List - Item No 80 - 14 of 54<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR105<br />

MODELS OF SYSTEMS AFFECTED: 5/25 KHz SATCOM--DMR<br />

DESCRIPTION/JUSTIFICATION: Provides 5KHz and 25 KHz UHF bandwidth capability and provides the framework for meeting the current and future SATCOM and Line of Sight (LOS) communications requirements in the 20MHz to 2 GHz spectrum.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 41 26.2 Var 0.3 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 41 26.5<br />

Equipment Nonrecurring (Racks) 58 3.3 58 3.3<br />

Engineering Change Orders (TRANSFERRED TO BLI 3010 BEGINNING FY04)<br />

Data<br />

Training Equipment<br />

Production Support 12.6 2.3 14.9<br />

Other (DSA) 1.8 0.0 1.8<br />

Interim Contractor Support<br />

Installation of Hardware* 0 0.0 28 0.0 1 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 29 0.0<br />

PRIOR YR EQUIP 28 0.0 1 0.0 29 0.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0<br />

TOTAL PROCUREMENT 43.9 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 46.5<br />

METHOD OF IMPLEMENTATION ADMINISTRATIVE LEAD-TIME: 2 Months PRODUCTION LEAD-TIME: 8 Months<br />

CONTRACT DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006:<br />

DELIVERY DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006:<br />

FY 04<br />

FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 29<br />

OUTPUT 29<br />

FY 07<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 29<br />

OUTPUT 0 29<br />

Notes/Comments<br />

Note 1: DMR unit includes four channels per box.<br />

Note 2: DMR racks included under Equipment Non-Recurring line.<br />

FY02 procurements consist of ancillary equipment for the SSN 21 and SSN 23 (each kit includes one 500 watt HF power amplifier and one Sunair 9000 HF transceiver), SSN 21 receives one set and SSN23 receives two sets.<br />

FY02: 24 DMRs provided to Military Sealift Command (MSC), 2 DMR units provided to SSC-SD lab, 2 DMR units provided to SSC-CH lab. No installation cost to SPAWAR.<br />

FY03 and prior implemented under the Digital Modular Radio Program as JTRS-M/F Block 0.<br />

FY03 - Pentagon DMR unit installed at no cost to SPAWAR<br />

FY04 - Balance of DMR installations transitioned to BLI 3010 (JTRS-M/F) in FY04<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification<br />

P-1 Shopping List - Item No 80 - 15 of 54


UNCLASSIFIED<br />

MODIFICATION TITLE: MD-1324A Modem (Trident IP) 321500<br />

COST CODE NR105<br />

MODELS OF SYSTEMS AFFECTED: TRIDENT - MD-1324A Modem<br />

DESCRIPTION/JUSTIFICATION: Procurement of Modems for Trident IP<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 1 0.1 2 0.1 14 1.3 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 17 1.5<br />

Equipment/Ship Alt Kits 2 0.9 14 4.6 16 5.5<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

Production Support 0.1 0.3 0.0 0.3<br />

DSA 1.3 1.3<br />

Installation of Hardware 1 0.0 2 0.0 14 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 17 0.0<br />

PRIOR YR EQUIP 1 0.0 1 0.0<br />

FY 02 EQUIP 2 0.0 2 0.0<br />

FY 03 EQUIP 14 0.0 14 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0<br />

TOTAL PROCUREMENT COST 1.4 1.3 5.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.5<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: PRODUCTION LEAD-TIME: 6 months<br />

CONTRACT DATES: FY 2003: Feb-03 FY 2004: NA FY 2005: NA FY 2006:<br />

DELIVERY DATES: FY 2003: Aug-03 FY 2004: NA FY 2005: NA FY 2006:<br />

FY 04<br />

FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 17<br />

OUTPUT 17<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 17<br />

OUTPUT 0 17<br />

Notes/Comments:<br />

FY02: Shore assets are turnkey installations provided by NUWC, Newport.<br />

PY-FY03: Trident Refit Facilities (TRF) are fully funded NAVSEA activities providing SSBN support. Installations provided by TRF.<br />

FY 07<br />

P-1 Shopping List - Item No 80 - 16 of 54<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification<br />

February, 2004


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR106<br />

MODELS OF SYSTEMS AFFECTED: SHF Terminals-- AN/WSC-6(V)5 Mod Kits - Ship<br />

DESCRIPTION/JUSTIFICATION: High data rate SHF satellite communications for intra and inter service message, data, voice and video transmission and reception.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 23 27.4 23 27.4<br />

Terminal Upgrades Var. 0.3 Var. 1.4 1.7<br />

Production Support 3.7 0.0 0.1 3.8<br />

Other (DSA) 1.0 0.0 0.0 0.0 0.3 0.2 1.5<br />

Interim Contractor Support<br />

Installation of Hardware* 17 9.6 2 1.0 0 0.0 0 0.0 0 0.9 0 0.8 0 0.0 0 0.0 0 0.0 0 0.0 19 12.2<br />

PRIOR YR EQUIP 17 9.6 2 1.0 19 10.6<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP Var. 0.9 Var. 0.8 0 1.7<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 9.6 1.0 0.0 0.0 0.9 0.8 0.0 0.0 0.0 0.0 12.2<br />

TOTAL PROCUREMENT 41.6 1.0 0.3 1.4 1.2 1.0 0.0 0.0 0.0 0.0 46.6<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 Month PRODUCTION LEAD-TIME: 12 Months<br />

CONTRACT DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: NA<br />

DELIVERY DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: NA<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 19<br />

OUTPUT 19<br />

FY 07<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 19<br />

OUTPUT 0 19<br />

Notes/Comments<br />

PY Procurements- 3 mod kits were procured but not installed. One destroyed on pier, one will remain as an Engineering Model at Contractor Facility, one install canceled per Fleet request, ship will now receive dual channel (V)7 vice aging (V)5.<br />

FY02 - 1 FY00 Procurement was installed in FY02 at Shore Training Facility (FTC Norfolk) in FY02<br />

FY03- Terminal Upgrades include NAVSSI interface cards (no installation funds requred) and 1 Electromagnetic Interface (EMI) kit to remain at Original Equipment Manufacturer (OEM) for integration testing.<br />

FY04: Terminal Upgrades include NAVSSI interface cards/production backfits and shock and vibration upgrades.<br />

P-1 Shopping List - Item No 80 - 17 of 54<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR106<br />

MODELS OF SYSTEMS AFFECTED: SHF Terminals-- AN/WSC-6(V)5 Mod Kits - Shore<br />

DESCRIPTION/JUSTIFICATION: AN/WSC-6(V)5 terminals provide training and technical support for high data rate SHF satellite communications for inter and intra service message, data, voice and video transmission.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 1 0.4 1 0.4<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 0.5 0.0 0.5<br />

Other (DSA) 0.0<br />

Interim Contractor Support<br />

Installation of Hardware* 1 0.8 1 0.5 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 2 1.3<br />

PRIOR YR EQUIP 1 0.8 1 0.5 2 1.3<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.8 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3<br />

TOTAL PROCUREMENT 1.7 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.2<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 Month PRODUCTION LEAD-TIME: 12 Months<br />

CONTRACT DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: NA<br />

DELIVERY DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: NA<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 2<br />

OUTPUT 2<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 2<br />

OUTPUT 0 2<br />

Notes/Comments<br />

FY02 Installation from FY00 Ship Procurement (Trainer).<br />

FY 07 FY 08 FY 09<br />

P-1 Shopping List - Item No 80 - 18 of 54<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR106<br />

MODELS OF SYSTEMS AFFECTED: SHF Terminals-- AN/WSC-6 7 Ft Antenna - Ship<br />

DESCRIPTION/JUSTIFICATION: High data rate SHF satellite communications for intra and inter service message, data, voice and video transmission and reception.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 12 3.2 5 0.7 10 2.2 9 2.8 85 21.3 121 30.1<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 0.7 0.0 0.0 0.0 2.6 3.3<br />

Other (DSA) 0.5 0.2 0.5 0.6 0.3 6.4 8.5<br />

Interim Contractor Support<br />

Installation of Hardware* 12 4.4 0 0.0 4 1.2 10 4.0 8 5.9 0 0.0 0 0.0 0 0.0 0 0.0 85 35.6 119 51.1<br />

PRIOR YR EQUIP 12 4.4 12 4.4<br />

FY 02 EQUIP 4 1.2 4 1.2<br />

FY 03 EQUIP 10 4.0 10 4.0<br />

FY 04 EQUIP 8 5.9 8 5.9<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 85 35.6 85 35.6<br />

TOTAL INSTALLATION COST 4.4 0.0 1.2 4.0 5.9 0.0 0.0 0.0 0.0 35.6 51.1<br />

TOTAL PROCUREMENT 8.8 0.9 3.9 7.4 6.2 0.0 0.0 0.0 0.0 65.8 92.9<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 Month PRODUCTION LEAD-TIME: 9 Months<br />

CONTRACT DATES: FY 2003: May-03 FY 2004: Feb-04 FY 2005: NA FY 2006: NA<br />

DELIVERY DATES: FY 2003: Feb-04 FY 2004: Nov-04 FY 2005: NA FY 2006: NA<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 16 4 6 4 4<br />

OUTPUT 16 4 6 4 4<br />

FY07 FY 08<br />

FY09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 85 119<br />

OUTPUT 85 119<br />

Notes/Comments<br />

FY02 - One Unit reassigned to AIRLANT.<br />

FY04 - One Unit to remain at Original Equipment Manufacturer (OEM) for integration testing<br />

FY05 - Install unit cost increase due to platform specific requirements such as single vs dual antenna configuration.<br />

P-1 Shopping List - Item No 80 - 19 of 54<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR106<br />

MODELS OF SYSTEMS AFFECTED: SHF Terminals--AN/WSC-6(V)7 - Ship<br />

DESCRIPTION/JUSTIFICATION: Provides high data rate SHF satellite communications for intra and inter service message, data, voice and video transmission and reception.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment - Single Channel (V)7 24 20.9 3 4.1 4 5.9 12 12.0 43 42.9<br />

NRE 1.0 1.0<br />

Equipment - Dual Channel V(7) 2 2.0 4 2.7 6 4.7<br />

Terminal upgrades 5.5 5.5<br />

Production Support 7.8 4.0 1.1 1.9 14.8<br />

Other (DSA) 1.0 1.6 0.6 1.4 0.8 0.5 6.0<br />

Interim Contractor Support<br />

Installation of Hardware* 14 22.5 4 6.9 7 11.8 7 9.4 9 13.6 6 9.9 0 0.0 0 0.0 47 74.1<br />

PRIOR YR EQUIP 14 22.5 4 6.9 5 7.7 23 37.2<br />

FY 02 EQUIP 2 4.0 1 1.3 3 5.4<br />

FY 03 EQUIP 6 8.1 6 8.1<br />

FY 04 EQUIP 9 13.6 6 9.9 15 23.4<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 22.5 6.9 11.8 9.4 13.6 9.9 0.0 0.0 0.0 0.0 74.1<br />

TOTAL PROCUREMENT 52.3 17.7 21.3 33.0 14.4 10.4 0.0 0.0 0.0 0.0 149.0<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 Month PRODUCTION LEAD-TIME: 12 Months<br />

CONTRACT DATES: FY 2003: May-03 FY 2004: Feb-04 FY 2005: NA FY 2006: NA<br />

DELIVERY DATES: FY 2003: May-04 FY 2004: Feb-05 FY 2005: NA FY 2006: NA<br />

FY04 FY05<br />

FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 25 4 3 4 5 4 2<br />

OUTPUT 25 4 3 4 5 4 2<br />

FY 07 FY 08<br />

FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 47<br />

OUTPUT 0 47<br />

Notes/Comments<br />

PY - One (1) unit procured with FY99 Shore funds installed FY00 Ship, Two (2) of the FY00 procurements will be installed at shore sites, one (1) in FY01 and one (1) in FY02.<br />

FY04 - One dual channel terminal will remain at the Original Equipment Manufacturer (OEM) for integration testing.<br />

FY04 - FY04 is the last year to procure on this contract, however, there are no install availabilities for the last six ships until FY06.<br />

P-1 Shopping List - Item No 80 - 20 of 54<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR106<br />

MODELS OF SYSTEMS AFFECTED: SHF Terminals--AN/WSC-6(V)7 - Ship (Backfits)<br />

DESCRIPTION/JUSTIFICATION: Equipment to modify installed AN/WSC-6 (V) 7 system to meet Radar Cross Section reduction specifications.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits - RCS Backfit 4 0.4 8 0.6 6 0.5 12 1.1 30 2.6<br />

Installation Kits - WGS Backfits 0 0.0<br />

Equipment Nonrecurring - RCS Backfit 0.9 0.9<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 0.2 0.2 0.4<br />

Other (DSA) 0.1 0.2 0.2 0.0 0.4<br />

Interim Contractor Support<br />

Installation of Hardware* 4 0.4 4 0.4 10 1.3 8 0.9 4 0.4 0 0.0 0 0.0 0 0.0 0 0.0 30 3.5<br />

PRIOR YR EQUIP 4 0.4 4 0.4<br />

FY 02 EQUIP 4 0.4 4 0.5 8 1.0<br />

FY 03 EQUIP 6 0.8 6 0.8<br />

FY 04 EQUIP 8 0.9 4 0.4 12 1.3<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.4 0.4 1.3 0.9 0.4 0.0 0.0 0.0 0.0 3.5<br />

TOTAL PROCUREMENT 1.3 1.2 1.0 2.8 1.1 0.4 0.0 0.0 0.0 0.0 7.8<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 Month PRODUCTION LEAD-TIME: 10 Months RCS<br />

CONTRACT DATES: FY 2003: May-03 FY 2004: Feb-04 FY 2005: NA FY 2006: NA<br />

DELIVERY DATES: FY 2003: May-04 FY 2004: Dec-04 FY 2005: NA FY 2006: NA<br />

FY04 FY 05<br />

FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 8 4 3 3 6 2 2 2<br />

OUTPUT 8 4 3 3 6 2 2 2<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 30<br />

OUTPUT 0 30<br />

Notes/Comments<br />

FY 07 FY 08 FY 09<br />

FY04 - FY04 is the last year to procure on this contract, however, there are no install availabilities for the last four ships until FY06.<br />

P-1 Shopping List - Item No 80 - 21 of 54<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR106<br />

MODELS OF SYSTEMS AFFECTED: SHF Terminals --AN/WSC-6(V)7 - Shore<br />

DESCRIPTION/JUSTIFICATION: AN/WSC-6(V)7 terminals provide training and technical support for high data rate SHF satellite communications for inter and intra service message, data, voice and video transmission.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 2 1.5 0 0.2 2 1.7<br />

Equipment-WGS Backfits 0 0.0<br />

Equipment- Dual Channel Backfits 1 0.1 1 0.1<br />

Data 0.0<br />

Training Equipment 0.0<br />

Production Support 1.8 0.1 1.8<br />

Other (DSA) 0.0<br />

Interim Contractor Support 0.0<br />

Installation of Hardware* 1 0.8 2 1.2 0 0.0 0 0.0 1 0.2 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 4 2.2<br />

PRIOR YR EQUIP 1 0.8 2 1.2 3 2.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 1 0.2 1 0.2<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.8 1.2 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 2.2<br />

TOTAL PROCUREMENT 4.1 1.4 0.0 0.1 0.2 0.0 0.0 0.0 0.0 0.0 5.8<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 Month PRODUCTION LEAD-TIME: 12 Months<br />

CONTRACT DATES: FY 2003: NA FY 2004: Feb-04 FY 2005: NA FY 2006:<br />

DELIVERY DATES: FY 2003: NA FY 2004: Feb-05 FY 2005: NA FY 2006:<br />

FY04 FY05<br />

FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 3 1<br />

OUTPUT 3 1<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 4<br />

OUTPUT 0 4<br />

Notes/Comments<br />

PY: FY99 Unit installed on Ship, FY01- One (1) install routed from FY00 Ship Procurement .<br />

FY02 - Zero (0) quantity is ancillary baseband equipment<br />

FY02 - One (1) install routed from FY00 Ship Procurement<br />

FY07 FY08<br />

P-1 Shopping List - Item No 80 - 22 of 54<br />

FY 09<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR106<br />

MODELS OF SYSTEMS AFFECTED: SHF Terminals--AN/WSC-6(V)9 - Ship<br />

DESCRIPTION/JUSTIFICATION: Provides high data rate SHF satellite communications for intra and inter service message, data, voice and video transmission and reception.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment - C/X Terminal 5 6.7 5 4.9 3 3.8 ___________(FY04 through FY09 procurements transferred to (V)10 Ship)___________ 13 15.4<br />

Equipment-C/X/Ka Ready Terminal 20 31.3 20 31.3<br />

Terminal Upgrades var 1.5 1.5<br />

Data 0.0<br />

Training Equipment 0.0<br />

Production Support 5.6 4.0 2.2 2.6 14.4<br />

Other (DSA) 0.6 0.6 0.8 3.3 0.4 0.6 6.3<br />

Interim Contractor Support 0.0<br />

Installation of Hardware* 1 1.9 1 1.7 3 4.6 6 9.0 8 12.1 12 17.7 0 0.0 0 0.0 0 0.0 0 0.0 31 47.0<br />

PRIOR YR EQUIP 1 1.9 1 1.7 1 1.5 3 5.1<br />

FY 02 EQUIP 2 3.1 3 4.5 5 7.6<br />

FY 03 EQUIP 3 4.5 3 4.5<br />

FY 04 EQUIP 8 12.1 12 17.7 20 29.8<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 1.9 1.7 4.6 9.0 12.1 17.7 0.0 0.0 0.0 0.0 47.0<br />

TOTAL PROCUREMENT 14.8 11.2 11.5 47.6 12.5 18.3 0.0 0.0 0.0 0.0 115.9<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 Month PRODUCTION LEAD-TIME: 10 Months/16 months<br />

CONTRACT DATES: FY 2003: Jun-03 FY 2004: Feb-04 FY 2005: NA FY 2006: NA<br />

DELIVERY DATES: FY 2003: Apr-04 FY 2004: Jun-05 FY 2005: NA FY 2006: NA<br />

FY04 FY05<br />

FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 5 3 3 3 5 7 5<br />

OUTPUT 5 3 3 3 5 7 5<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 31<br />

OUTPUT 0 31<br />

Notes/Comments<br />

Two (2) FY00 C/X terminal procurements will be installed at shore sites, one (1) in FY01 and one (1) in FY02.<br />

(V)9 C/X/Ka Ready Terminal is equal to (V)10 terminal without Ka-specific hardware and software components. With addition of (V)10 upgrade, C/X/Ka Ready (V)9 will be converted to (V)10 terminal.<br />

FY04 - Terminal upgrades are various procurements of C-Band EMI mitigation kits.<br />

P-1 Shopping List - Item No 80 - 23 of 54<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR106<br />

MODELS OF SYSTEMS AFFECTED: SHF Terminals--AN/WSC-6(V)9 - Shore<br />

DESCRIPTION/JUSTIFICATION: Provides high data rate SHF satellite communications for intra and inter service message, data, voice and video transmission and reception.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment-WGS Backfit 0 0.0<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 0.0<br />

Other (DSA)<br />

Interim Contractor Support<br />

Installation of Hardware* 1 0.4 1 0.5 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 2 0.8<br />

Installation of Modems 0.0<br />

PRIOR YR EQUIP 1 0.4 1 0.5 2 0.8<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.4 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8<br />

TOTAL PROCUREMENT 0.4 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 Month PRODUCTION LEAD-TIME: 12 Months<br />

CONTRACT DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: NA<br />

DELIVERY DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: NA<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 2<br />

OUTPUT 2<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 2<br />

OUTPUT 0 2<br />

Notes/Comments<br />

PY install is from FY00 Ship Procurement. FY02 Installation from FY00 Ship procurement (trainer).<br />

FY07<br />

FY08<br />

P-1 Shopping List - Item No 80 - 24 of 54<br />

FY 09<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR106<br />

MODELS OF SYSTEMS AFFECTED: SHF Terminals -- SUBHDR SHF Mod Kit<br />

DESCRIPTION/JUSTIFICATION: Provides high data rate SHF satellite communications for intra and inter service message, data, voice and video transmission and reception for submarines.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 7 0.6 12 4.2 48 16.8 67 21.6<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 0.0<br />

Other (DSA) 0.0<br />

Interim Contractor Support<br />

Installation of Hardware* 7 0.2 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 12 0.4 0 0.0 0 0.0 48 1.4 67 2.0<br />

PRIOR YR EQUIP 7 0.2 7 0.2<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 12 0.4 12 0.4<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 48 1.4 48 1.4<br />

TOTAL INSTALLATION COST 0.2 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 1.4 2.0<br />

TOTAL PROCUREMENT 0.8 0.0 0.0 0.0 0.0 4.2 0.4 0.0 0.0 18.2 23.6<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 Month PRODUCTION LEAD-TIME: 15 Months<br />

CONTRACT DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: Nov-05<br />

DELIVERY DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: Feb-07<br />

FY 04<br />

FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 7<br />

OUTPUT 7<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 8 4 48 67<br />

OUTPUT 8 4 48 67<br />

Notes/Comments<br />

FY 07 FY 08 FY 09<br />

P-1 Shopping List - Item No 80 - 25 of 54<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR106<br />

MODELS OF SYSTEMS AFFECTED: SHF Terminals -- AN/WSC-6(V)7 Modems<br />

DESCRIPTION/JUSTIFICATION: Shore side modems for compatibility with the AN/WSC-6(V)7 terminals to support increased SHF capacity.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 68 2.2 36 0.5 104 2.8<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 3.1 0.0 0.0 3.2<br />

Other (DSA)<br />

Interim Contractor Support<br />

Installation of Hardware* 62 3.8 6 0.4 0 0.0 36 1.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 104 5.2<br />

PRIOR YR EQUIP 62 3.8 6 0.4 68 4.2<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 36 1.0 36 1.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 3.8 0.4 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 5.2<br />

TOTAL PROCUREMENT 9.2 0.4 0.6 1.0 0.0 0.0 0.0 0.0 0.0 0.0 11.2<br />

METHOD OF IMPLEMENTATION ADMINISTRATIVE LEAD-TIME: 1 Month PRODUCTION LEAD-TIME: 12 Months<br />

CONTRACT DATES: FY 2003: May-03 FY 2004: NA FY 2005: N/A FY 2006: N/A<br />

DELIVERY DATES: FY 2003: May-04 FY 2004: NA FY 2005: N/A FY 2006: N/A<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 68 18 18<br />

OUTPUT 68 18 18<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 104<br />

OUTPUT 0 104<br />

Notes/Comments<br />

FY04 FY05 FY06<br />

P-1 Shopping List - Item No 80 - 26 of 54<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR106<br />

MODELS OF SYSTEMS AFFECTED: SHF Terminals -- AN/WSC-6(V)9 Modems - Shore<br />

DESCRIPTION/JUSTIFICATION: Shore side modems for compatibility with the AN/WSC-6(V)9 terminals to support increased SHF capacity.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 12 0.2 20 0.4 32 0.6<br />

Advanced MODEM NRE<br />

Data<br />

Training Equipment<br />

Production Support 1.3 0.0 0.0 1.4<br />

Other (DSA) 0.0<br />

Interim Contractor Support<br />

Installation of Hardware* 8 0.2 4 0.2 0 0.0 20 0.6 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 32 1.0<br />

PRIOR YR EQUIP 8 0.2 4 0.2 12 0.4<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 20 0.6 20 0.6<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.2 0.2 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 1.0<br />

TOTAL PROCUREMENT 1.7 0.2 0.4 0.6 0.0 0.0 0.0 0.0 0.0 0.0 3.0<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 Month PRODUCTION LEAD-TIME: 12 Months<br />

CONTRACT DATES: FY 2003: Aug-03 FY 2004: NA FY 2005: NA FY 2006: NA<br />

DELIVERY DATES: FY 2003: Aug-04 FY 2004: NA FY 2005: NA FY 2006: NA<br />

FY04 FY05<br />

FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 12 20<br />

OUTPUT 12 20<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 32<br />

OUTPUT 0 32<br />

Notes/Comments<br />

FY 07<br />

P-1 Shopping List - Item No 80 - 27 of 54<br />

FY08 FY 09<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR106<br />

MODELS OF SYSTEMS AFFECTED: SHF Terminals -- EBEM Modems - Ship<br />

DESCRIPTION/JUSTIFICATION: Shore side modems for compatibility with the AN/WSC-6(V)9 terminals to support increased SHF capacity.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 10 0.4 119 1.2 1 0.0 57 0.6 10 0.1 16 0.2 213 2.4<br />

Advanced MODEM NRE 1.0<br />

Data<br />

Training Equipment<br />

Production Support 0.3 0.3<br />

Other (DSA) 1.4 0.6 0.8 0.0 0.1 0.0 0.2 3.2<br />

Interim Contractor Support<br />

Installation of Hardware* 0 0.0 0 0.0 0 0.0 0 0.0 118 2.5 46 0.9 12 0.2 0 0.0 10 0.2 16 0.3 202 4.1<br />

PRIOR YR EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 118 2.5 118 2.5<br />

FY 05 EQUIP 1 0.0 1 0.0<br />

FY 06 EQUIP 45 0.9 12 0.2 57 1.1<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 10 0.2 10 0.2<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 16 0.3 16 0.3<br />

TOTAL INSTALLATION COST 0.0 0.0 0.0 0.0 2.5 0.9 0.2 0.0 0.2 0.3 4.1<br />

TOTAL PROCUREMENT 0.0 1.4 0.0 2.9 3.1 2.3 0.3 0.2 0.2 0.7 11.1<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 MONTH PRODUCTION LEAD-TIME: 6 MONTHS<br />

CONTRACT DATES: FY 2003: NA FY 2004: Apr-04 FY 2005: Dec-04 FY 2006: Nov-05<br />

DELIVERY DATES: FY 2003: NA FY 2004: Oct-04 FY 2005: Jun-05 FY 2006: May-06<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 0 48 48 22 1 22 23<br />

OUTPUT 0 48 48 22 1 22 23<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 6 6 5 5 16 202<br />

OUTPUT 6 6 5 5 16 202<br />

Notes/Comments<br />

FY02: Ten (10) MODEMs required for production acceptance testing, no installation required.<br />

FY04 - One (1) EBEM (Enhanced Bandwidth Efficient Modem) will remain at Original Equipment Manufacturer (OEM) for integration testing.<br />

P-1 Shopping List - Item No 80 - 28 of 54<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR106<br />

MODELS OF SYSTEMS AFFECTED: SHF Terminals -- EBEM Modems - Shore<br />

DESCRIPTION/JUSTIFICATION: Provides High Data Rate SHF Satellite Comunications for the Intra and Inter service message, data, voice and video Transmission and reception.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 106 1.5 60 0.7 166 2.2<br />

Equipment 0 0.0<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support<br />

Other (DSA)<br />

Interim Contractor Support<br />

Installation of Hardware* 0 0.0 0 0.0 0 0.0 0 0.0 166 2.6 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 166 2.6<br />

Installation of Modems 0 0.0<br />

PRIOR YR EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 106 1.7 106 1.7<br />

FY 05 EQUIP 60 0.9 60 0.9<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.0 0.0 0.0 2.6 0.0 0.0 0.0 0.0 0.0 2.6<br />

TOTAL PROCUREMENT 0.0 0.0 0.0 1.5 3.3 0.0 0.0 0.0 0.0 0.0 4.8<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 Month PRODUCTION LEAD-TIME: 6 Months<br />

CONTRACT DATES: FY 2003: NA FY 2004: Apr-04 FY 2005: Nov-04 FY 2006: NA<br />

DELIVERY DATES: FY 2003: NA FY 2004: Oct-04 FY 2005: May-05 FY 2006: NA<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 0 53 53 30 30<br />

OUTPUT 0 53 53 30 30<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 166<br />

OUTPUT 0 166<br />

Notes/Comments<br />

FY07<br />

FY08<br />

P-1 Shopping List - Item No 80 - 29 of 54<br />

FY 09<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR106<br />

MODELS OF SYSTEMS AFFECTED: SHF Terminals--AN/WSC-6(V)10 Ship<br />

DESCRIPTION/JUSTIFICATION: Provides High Data Rate SHF Satellite Comunications for the Intra and Inter service message, data, voice and video Transmission and reception.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 4 9.7 1 2.4 12 21.4 10 19.4 16 29.1 43 82.2<br />

Data 0.0<br />

Training Equipment 0.0<br />

Production Support 2.6 2.2 3.5 1.5 2.9 1.3 2.6 16.6<br />

Other (DSA) 0.4 0.4 1.4 0.5 1.2 0.4 2.4 6.6<br />

Interim Contractor Support 1.5 1.5<br />

Installation of Hardware* 0 0.0 0 0.0 0 0.0 0 0.0 3 4.5 1 1.6 12 17.7 0 0.0 10 14.7 16 23.5 42 62.0<br />

PRIOR YR EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 3 4.5 3 4.5<br />

FY 05 EQUIP 1 1.6 1 1.6<br />

FY 06 EQUIP 12 17.7 12 17.7<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 10 14.7 10 14.7<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 16 23.5 16 23.5<br />

TOTAL INSTALLATION COST 0.0 0.0 0.0 0.0 4.5 1.6 17.7 0.0 14.7 23.5 62.0<br />

TOTAL PROCUREMENT 0.0 0.0 0.0 12.7 11.0 28.0 19.6 23.5 16.4 57.7 168.8<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 Month PRODUCTION LEAD-TIME: FY04: 16 Months<br />

FY05 and out: 12 Months<br />

CONTRACT DATES: FY 2003: NA FY 2004: Feb-04 FY 2005: Dec-04 FY 2006: Dec-05<br />

DELIVERY DATES: FY 2003: NA FY 2004: Jun-05 FY 2005: Dec-05 FY 2006: Dec-06<br />

FY 04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 0 2 1 1<br />

OUTPUT 0 2 1 1<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 5 5 2 5 5 16 42<br />

OUTPUT 5 5 2 5 5 16 42<br />

Notes/Comments<br />

FY04 - One (V)10 terminal will remain at the Original Equipment Manufacturer (OEM) for integration testing.<br />

P-1 Shopping List - Item No 80 - 30 of 54<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR106<br />

MODELS OF SYSTEMS AFFECTED: SHF Terminals--AN/WSC-6(V)10 - Ship Upgrades<br />

DESCRIPTION/JUSTIFICATION: Equipment to convert installed AN/WSC-6 (V)9 system to (V)10 system.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment - Upgrade the (V)9 C/X to (V)10 1 2.3 2 4.7 5 9.2 1 2.7 3 5.8 12<br />

Equipment - Upgrade (V)9 C/X/Ka Ready to (V)10 12 3.6 8 2.6 20 6.2<br />

Data<br />

Training Equipment<br />

Production Support 0.8 1.3 1.0 1.5 2.9 7.4<br />

Other (DSA) 0.2 0.5 0.1 0.1 0.0 1.0<br />

Interim Contractor Support<br />

Installation of Hardware* 0 0.0 0 0.0 0 0.0 0 0.0 1 0.4 14 3.9 13 8.0 1 0.4 3 1.2 0 0.0 32 13.9<br />

PRIOR YR EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 1 0.4 1 0.4<br />

FY 05 EQUIP 2 3.0 2 3.0<br />

FY 06 EQUIP 12 0.9 5 7.4 17 8.3<br />

FY 07 EQUIP 8 0.6 1 0.4 9 1.0<br />

FY 08 EQUIP 3 1.2 3 1.2<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.0 0.0 0.0 0.4 3.9 8.0 0.4 1.2 0.0 13.9<br />

TOTAL PROCUREMENT 0.0 0.0 0.0 3.1 6.6 18.2 14.9 9.2 1.2 0.0 53.2<br />

METHOD OF IMPLEMENTATION ADMINISTRATIVE LEAD-TIME: 1 Month PRODUCTION LEAD-TIME: 16/12 Months<br />

Ka Ready 6 Months<br />

CONTRACT DATES: FY 2003: NA FY 2004: Feb-04 FY 2005: Dec-04 FY 2006: Dec-05<br />

DELIVERY DATES: FY 2003: NA FY 2004: Jun-05 FY 2005: Dec-05 FY 2006: Dec-06<br />

FY 04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 0 1 2 4 8<br />

OUTPUT 0 1 6 8<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 5 6 7 8 9 10 11 12 TC TOTAL<br />

INPUT 2 7 4 1 3 0 32<br />

OUTPUT 6 7 1 3 0 32<br />

Notes/Comments<br />

AN/WSC-6(V)10 Ship Upgrades were formerly identified as AN/WSC-6(V)9 Ship (Backfits)<br />

(V)9 C/X/Ka Ready Terminal is equal to (V)10 terminal without Ka-specific hardware and software components. With addition of (V)10 upgrade, C/X/Ka Ready (V)9 will be converted to (V)10 terminal.<br />

FY04/05/06 - Upgrades to the (V)9 C/X terminals have higher unit cost due to initial 5 ship units are produced as complete terminals to begin the backfit process and the remaining units are solely backfits<br />

P-1 Shopping List - Item No 80 - 31 of 54<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR106<br />

MODELS OF SYSTEMS AFFECTED: SHF Terminals--AN/WSC-6(V)10 Shore<br />

DESCRIPTION/JUSTIFICATION: Provides High Data Rate SHF Satellite Comunications for the Intra and Inter service message, data, voice and video Transmission and reception.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment - (V)10 Upgrade to the (V)9 C/X 1 1.8 1 1.8<br />

Data 0.0<br />

Training Equipment 0.0<br />

Production Support 0.0<br />

Other (DSA) 0.0<br />

Interim Contractor Support 0.0<br />

Installation of Hardware* 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 1 0.3 0 0.0 0 0.0 0 0.0 1 0.3<br />

PRIOR YR EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 1 0.3 1 0.3<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.0 0.3<br />

TOTAL PROCUREMENT 0.0 0.0 0.0 0.0 0.0 1.8 0.3 0.0 0.0 0.0 2.1<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 Month PRODUCTION LEAD-TIME: 12 Months<br />

CONTRACT DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: Dec-05<br />

DELIVERY DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: Dec-06<br />

FY 04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 0<br />

OUTPUT 0<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 1 1<br />

OUTPUT 1 1<br />

Notes/Comments<br />

P-1 Shopping List - Item No 80 - 32 of 54<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR107<br />

MODELS OF SYSTEMS AFFECTED: EHF Terminals--AN/USC-38(V) FOT - Ship<br />

DESCRIPTION/JUSTIFICATION: Provides jam resistant, low probability of intercept satellite communications and Full Milstar LDR Operational Capabilities (FMLOC) for shore stations, submarines and surface ships in an electromagnetic threat.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

253 444.4 22 22.6 11 14.2 39 29.3 Var. 1.9 Var. 1.4 0 0.0 0 0.0 0 0.0 11 16.6 336 530.5<br />

Production Support 9.4 4.4 1.9 2.4 3.9 1.2 1.1 24.3<br />

Other (DSA)<br />

Interim Contractor Support<br />

2.4 1.3 2.9 1.6 1.0 0.3 1.1 10.6<br />

Installation of Hardware* 203 224.0 22 18.8 24 19.0 28 18.7 15 10.8 11 8.8 0 0.0 0 0.0 0 0.0 11 9.0 314 309.1<br />

PRIOR YR EQUIP 203 224.0 22 18.8 24 19.0 5 3.3 254 265.1<br />

FY 02 EQUIP 22 14.7 22 14.7<br />

FY 03 EQUIP 1 0.6 10 7.2 11 7.9<br />

FY 04 EQUIP 5 3.6 11 8.8 16 12.4<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 11 9.0 11 9.0<br />

TOTAL INSTALLATION COST 224.0 18.8 19.0 18.7 10.8 8.8 0.0 0.0 0.0 9.0 309.1<br />

TOTAL PROCUREMENT 680.1 47.2 38.0 52.0 17.7 11.7 0.0 0.0 0.0 27.6 874.4<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 Month PRODUCTION LEAD-TIME: 18 Months<br />

CONTRACT DATES: FY 2003: Dec-02 FY 2004: Mar-04 FY 2005: NA FY 2006: NA<br />

DELIVERY DATES: FY 2003: Jun-04 FY 2004: Sep-05 FY 2005: NA FY 2006: NA<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 249 5 10 10 3 5 4 0 6 5 3 3 0<br />

OUTPUT 245 4 5 10 10 3 5 4 0 6 5 3 3<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 11 314<br />

OUTPUT 11 314<br />

Notes/Comments<br />

Unit cost varies based on ship/sub configuration of procurement.<br />

Production Support is required for AN-USC 38V terminal ongoing deliveries for production monitoring, acceptance testing and initial system familiarization.<br />

PY Delta between procured and installed is due to: One (1) Production Representative Model (FY98) will be used as a Test Asset, the addition of two (2) ship configured terminals procured with FY00 shore funds.<br />

FY04 is 18 SSBN/GN terminals for Submarine Warfare Division (N77). No SPAWAR installation funds required. Five (5) submarine Test and Training Equipment do not require installation.<br />

FY05/FY06 quantity of "Var." reflects procurement of ancillary equipment.<br />

P-1 Shopping List - Item No 80 - 33 of 54<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR107<br />

MODELS OF SYSTEMS AFFECTED: EHF Terminals --AN/USC-38(V) FOT - Shore<br />

DESCRIPTION/JUSTIFICATION: Provides jam resistant, low probability of intercept satellite communications and Full Milstar LDR Operational Capabilities (FMLOC) for shore stations, submarines and surface ships in an electromagnetic threat.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 56 97.1 1 1.9 Var. 0.8 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 7 11.0 64 110.7<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Other - Equipment not requiring installation 13 6.3 13 6.3<br />

Production Support 4.4 0.5 0.4 0.4 0.7 6.3<br />

Other (DSA)<br />

Interim Contractor Support<br />

Installation of Hardware* 39 45.0 0 0.0 1 1.7 6 5.6 4 3.8 5 4.9 0 0.0 0 0.0 0 0.0 7 7.4 62 68.3<br />

PRIOR YR EQUIP 39 45.0 0 0.0 1 1.7 6 5.6 4 3.8 4 3.9 54 59.9<br />

FY 02 EQUIP 1 1.0 1 1.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 7 7.4 7 7.4<br />

TOTAL INSTALLATION COST 45.0 0.0 1.7 5.6 3.8 4.9 0.0 0.0 0.0 7.4 68.3<br />

TOTAL PROCUREMENT 152.8 2.3 2.9 6.0 3.8 4.9 0.0 0.0 0.0 19.0 191.6<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 Month PRODUCTION LEAD-TIME: 18 Months<br />

CONTRACT DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: NA<br />

DELIVERY DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: NA<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 40 2 2 1 1 2 1 1 2 1 2<br />

OUTPUT 39 1 2 2 1 1 2 1 1 2 1 2<br />

FY 07 FY 08<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 7 62<br />

OUTPUT 7 62<br />

Notes/Comments<br />

PY delta between procurement and installation reflects 2 Ship configured FOTs originally procured for training sites, transferred to Ship installations.<br />

PY cost reflect procurement of 13 Single Channel Anti-Jam Man Portables (SCAMPS). Units do not require installation.<br />

FY04: Production Support is required for AN-USC 38V terminal ongoing deliveries and installations for production monitoring, acceptance testing and initial system familiarization.<br />

P-1 Shopping List - Item No 80 - 34 of 54<br />

FY 09<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR107<br />

MODELS OF SYSTEMS AFFECTED: EHF Terminals--NECC - Ship<br />

DESCRIPTION/JUSTIFICATION: Provides for satellite communications connectivity between shore stations, submarines, and surface ships. Includes network management; multiplexing and channel sharing; resource management; communications<br />

management/planning; network control/monitoring; circuit switching and packet switching.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 182 23.6 39 4.5 12 2.8 21 3.8 10 5.4 8 1.6 0 0.0 0 0.0 0 0.0 11 1.9 283 43.6<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Other (Test Units) 4 0.6 4 0.6<br />

Training Equipment<br />

Production Support 2.4 0.7 0.2 0.5 0.4 0.3 0.1 4.6<br />

Other (DSA) 0.2 0.2 1.2 2.2 1.4 0.3 0.5 5.9<br />

Interim Contractor Support<br />

Installation of Hardware* 172 12.8 34 4.0 27 3.9 17 7.7 13 8.8 9 3.5 0 0.0 0 0.0 0 0.0 11 2.9 283 43.7<br />

PRIOR YR EQUIP 172 12.8 10 1.2 182 14.0<br />

FY 02 EQUIP 24 2.9 15 2.2 39 5.1<br />

FY 03 EQUIP 12 1.8 12 1.8<br />

FY 04 EQUIP 17 7.7 4 2.7 21 10.4<br />

FY 05 EQUIP 9 6.1 1 0.4 10 6.4<br />

FY 06 EQUIP 8 3.2 8 3.2<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 11 2.9 11 2.9<br />

TOTAL INSTALLATION COST 12.8 4.0 3.9 7.7 8.8 3.5 0.0 0.0 0.0 2.9 43.7<br />

TOTAL PROCUREMENT 39.7 9.4 8.2 14.1 16.0 5.7 0.0 0.0 0.0 5.4 98.4<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 Month PRODUCTION LEAD-TIME: 4 Months<br />

CONTRACT DATES: FY 2003: Feb-03 FY 2004: Nov-03 FY 2005: Nov-04 FY 2006: Nov-05<br />

DELIVERY DATES: FY 2003: Jun-03 FY 2004: Mar-04 FY 2005: Mar-05 FY 2006: Mar-06<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 233 0 4 8 5 4 4 3 2 1 2 3 3<br />

OUTPUT 233 0 4 8 5 4 4 3 2 1 2 3 3<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 11 283<br />

OUTPUT 11 283<br />

Notes/Comments<br />

PY - Four test units procured in FY99. No install required.<br />

NECC cost includes addition of MDR (TIP) capability and backfit phase-in beginning in FY02. MDR (TIP) capability is integrated into NECC Chassis.<br />

FY07<br />

FY08<br />

P-1 Shopping List - Item No 80 - 35 of 54<br />

FY 09<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR107<br />

MODELS OF SYSTEMS AFFECTED: EHF Terminals --NECC - Shore<br />

DESCRIPTION/JUSTIFICATION: Provides for satellite communications connectivity between shore stations, submarines, and surface ships; includes network management, multiplexing and channel sharing, resource management, communications<br />

management/planning; network control/monitoring; circuit switching and packet switching.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 46 4.9 9 1.2 Var. 0.6 6 0.8 3 0.7 3 0.7 0 0.0 0 0.0 0 0.0 67 8.9<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 1.0 0.2 0.1 0.1 1.4<br />

Other (DSA)<br />

Other (Test Units) 2 0.3 2 0.3<br />

Interim Contractor Support<br />

Installation of Hardware* 46 3.0 9 2.3 Var. 0.3 6 1.9 3 0.7 3 0.7 0 0.0 0 0.0 0 0.0 0 0.0 67 8.9<br />

PRIOR YR EQUIP 46 3.0 46 3.0<br />

FY 02 EQUIP 9 2.3 9 2.3<br />

FY 03 EQUIP Var. 0.3 ####### 0.3<br />

FY 04 EQUIP 6 1.9 6 1.9<br />

FY 05 EQUIP 3 0.7 3 0.7<br />

FY 06 EQUIP 3 0.7 3 0.7<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 3.0 2.3 0.3 1.9 0.7 0.7 0.0 0.0 0.0 0.0 8.9<br />

TOTAL PROCUREMENT 9.2 3.8 0.8 2.8 1.4 1.4 0.0 0.0 0.0 0.1 19.5<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 Months PRODUCTION LEAD-TIME: 4 Months<br />

CONTRACT DATES: FY 2003: NA FY 2004: Nov-03 FY 2005: Nov-04 FY 2006:<br />

DELIVERY DATES: FY 2003: NA FY 2004: Mar-04 FY 2005: Mar-05 FY 2006:<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 55 2 2 2 1 1 1 1 1 1<br />

OUTPUT 55 2 2 2 1 1 1 1 1 1<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 67<br />

OUTPUT 0 67<br />

Notes/Comments<br />

PY - Two test units procured in PY will not be installed.<br />

FY02 - NECC cost includes MDR (TIP) capability integrated into NECC Chassis.<br />

FY03 - In FY03, funds are used to procure and install TIP cards, not NECC quantities.<br />

FY07<br />

FY08<br />

P-1 Shopping List - Item No 80 - 36 of 54<br />

FY 09<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR107<br />

MODELS OF SYSTEMS AFFECTED: EHF Terminals--MDR Appliques - Ship<br />

DESCRIPTION/JUSTIFICATION: Provides for Applique and Antenna upgrades to the existing AN/USC-38 Low Data Rate (LDR) terminal to enable Medium Data Rate (MDR) communications capability.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 61 27.1 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 61 27.1<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support<br />

Other (DSA) 2.9 0.1 0.1 3.1<br />

Other 8.4 0.2 0.1 8.7<br />

Interim Contractor Support<br />

Installation of Hardware* 45 12.3 2 0.9 1 0.8 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 48 14.1<br />

PRIOR YR EQUIP 45 12.3 2 0.9 1 0.8 48 14.1<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 12.3 0.9 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 14.1<br />

TOTAL PROCUREMENT 50.8 1.2 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 52.9<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: PRODUCTION LEAD-TIME: 15 Months<br />

CONTRACT DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: NA<br />

DELIVERY DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2003: NA<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 48<br />

OUTPUT 48<br />

INSTALLATION SCHEDULE:<br />

INPUT<br />

OUTPUT<br />

Notes/Comments<br />

MDR Applique installation plan reflects ten (10) transferred to shore and installed in PY. Three tests assets required no install.<br />

MDR Functionality incorporated in to AN/USC-38(V) Terminal.<br />

FY07<br />

FY08<br />

1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

P-1 Shopping List - Item No 80 - 37 of 54<br />

FY 09<br />

0 48<br />

0 48<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR112<br />

MODELS OF SYSTEMS AFFECTED: Comm. Satellite--INMARSAT B (Ship)<br />

DESCRIPTION/JUSTIFICATION: Provides upgrade to the older INMARSAT A terminals giving ships the capability for Official phones, STU III, Debit Card Crew Phones, Internet, E-Mail, PC to PC, Video Teleconferencing and Facsimile.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 232 11.1 1 0.1 9 0.6 242 11.8<br />

Equipment Upgrade 0 0.0<br />

Equipment Nonrecurring 0 0.0<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 8.5 3.4 0.7 12.6<br />

Other (DSA) 2.1 0.8 0.3 3.2<br />

Interim Contractor Support<br />

Installation of Hardware* 212 20.0 20 5.0 9 3.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 241 28.0<br />

PRIOR YR EQUIP 212 20.0 20 5.0 232 25.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 9 3.0 9 3.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0.0 0 0.0<br />

TOTAL INSTALLATION COST 20.0 5.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 28.0<br />

TOTAL PROCUREMENT 41.8 9.3 4.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 55.7<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 3 Months PRODUCTION LEAD-TIME: 3 Months<br />

CONTRACT DATES: FY 2003: Nov-02 FY 2004: NA FY 2005: NA FY 2006: NA<br />

DELIVERY DATES: FY 2003: Feb-03 FY 2004: NA FY 2005: NA FY 2006: NA<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 241<br />

OUTPUT 241<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 241<br />

OUTPUT 0 241<br />

Notes/Comments<br />

PY install unit cost due to primarily single antenna systems, FY02-FY03 install unit cost primarily due to dual antenna systems<br />

FY02 procured one INMARSAT B terminal for Shock testing. No install funds required.<br />

FY07<br />

FY08<br />

P-1 Shopping List - Item No 80 - 38 of 54<br />

FY 09<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR112<br />

MODELS OF SYSTEMS AFFECTED: Comm. Satellite--INMARSAT B (Ship) Equip. Upgrade - Handover<br />

DESCRIPTION/JUSTIFICATION: Provides automatic handover to "dual" configured INMARSAT B ships. Provides enhanced voice capability and increased blockage profile.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 4 0.1 17 0.6 1 0.04 22 0.7<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 0.0<br />

Other (DSA) 0.0<br />

Interim Contractor Support<br />

Installation of Hardware* 0 0.0 0 0.0 14 1.1 1 0.1 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 15 1.2<br />

PRIOR YR EQUIP 1 0.1 1 0.1<br />

FY 02 EQUIP 13 1.0 13 1.0<br />

FY 03 EQUIP 1 0.1 1 0.1<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0.0 0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.0 1.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 1.2<br />

TOTAL PROCUREMENT 0.1 0.6 1.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 1.9<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 3 Months PRODUCTION LEAD-TIME: 3 Months<br />

CONTRACT DATES: FY 2003: Nov-02 FY 2004: NA FY 2005: NA FY 2006: NA<br />

DELIVERY DATES: FY 2003: Feb-03 FY 2004: NA FY 2005: NA FY 2006: NA<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 14 1<br />

OUTPUT 14 1<br />

FY07<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 15<br />

OUTPUT 0 15<br />

Notes/Comments<br />

PY - 3 test/lab units do not require installation<br />

FY02 - 4 antenna handover units to be TYCOM assets. Do not require install funds.<br />

FY03 - One installation delayed until FY04 due to ship availability.<br />

FY08<br />

P-1 Shopping List - Item No 80 - 39 of 54<br />

FY 09<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR112<br />

MODELS OF SYSTEMS AFFECTED: Comm. Satellite--INMARSAT B (Ship) Equip. Upgrade - 128Kbps Wideband<br />

DESCRIPTION/JUSTIFICATION: Provides increased bandwidth (upto 128kbps) to the existing INMARSAT B (64 kbps) hardware<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 20 0.6 80 2.3 86 2.5 186 5.4<br />

Equipment Nonrecurring 0.3 0 0.3<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 0.0 1.7 1.7 3.4<br />

Other (DSA) 0.0<br />

Interim Contractor Support<br />

Installation of Hardware* 0 0.0 0 0.0 8 0.3 84 1.7 92 1.8 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 184 3.8<br />

PRIOR YR EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 8 0.3 10 0.2 18 0.5<br />

FY 04 EQUIP 74 1.5 6 0.1 80 1.6<br />

FY 05 EQUIP 86 1.7 86 1.7<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0.0 0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.0 0.3 1.7 1.8 0.0 0.0 0.0 0.0 0.0 3.8<br />

TOTAL PROCUREMENT 0.0 0.0 1.2 5.7 6.0 0.0 0.0 0.0 0.0 0.0 13.0<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 3 Months PRODUCTION LEAD-TIME: 3 Months<br />

CONTRACT DATES: FY 2003: Mar-03 FY 2004: Nov-03 FY 2005: Nov-04 FY 2006: NA<br />

DELIVERY DATES: FY 2003: Jun-03 FY 2004: Feb-04 FY 2005: Feb-05 FY 2006: NA<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 8 16 38 30 6 28 29 29<br />

OUTPUT 0 24 18 25 25 6 28 29 29<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 184<br />

OUTPUT 184<br />

Notes/Comments<br />

FY03 includes $300K NRE<br />

FY03 - 2 units are test terminals. No install required.<br />

FY07<br />

FY08<br />

P-1 Shopping List - Item No 80 - 40 of 54<br />

FY 09<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR112<br />

MODELS OF SYSTEMS AFFECTED: Comm. Satellite--INMARSAT B (Shore)<br />

DESCRIPTION/JUSTIFICATION: Provides upgrade to the older INMARSAT A terminals providing the capability for Official phones, STU III, Debit Card Crew Phones, Internet, E-Mail, PC to PC, Video Teleconferencing and Facsimile.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 4 0.3 4 0.3<br />

Equipment Upgrade<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support<br />

Other (DSA)<br />

Interim Contractor Support<br />

Installation of Hardware* 0 0.0 4 0.2 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 4 0.2<br />

PRIOR YR EQUIP 0 0.0<br />

FY 02 EQUIP 4 0.2 4 0.2<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0 0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2<br />

TOTAL PROCUREMENT 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 3 Months PRODUCTION LEAD-TIME: 3 Months<br />

CONTRACT DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: NA<br />

DELIVERY DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: NA<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 4<br />

OUTPUT 4<br />

FY07<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 4<br />

OUTPUT 0 4<br />

FY08<br />

P-1 Shopping List - Item No 80 - 41 of 54<br />

FY09<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR112<br />

MODELS OF SYSTEMS AFFECTED: Comm. Satellite--INMARSAT B HSD KITS<br />

DESCRIPTION/JUSTIFICATION: Provides upgrade to the INMARSAT B terminals giving ships the capability for simultaneous official phones, STU III, debit card crew phones, internet, e-mail, PC to PC, video teleconferencing and facsimile over a<br />

64 kpbs channel.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 152 5.1 8 0.1 4 0.1 8 0.1 172 5.4<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 0.4 0.4 0.1 0.3 1.2<br />

Other (DSA) 0.2 0.1 0.0 0.0 0.4<br />

Interim Contractor Support<br />

Installation of Hardware* 150 8.9 10 0.7 4 0.4 8 0.5 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 172 10.5<br />

PRIOR YR EQUIP 150 8.9 2 0.1 152 9.0<br />

FY 02 EQUIP 8 0.6 8 0.6<br />

FY 03 EQUIP 4 0.4 4 0.4<br />

FY 04 EQUIP 8 0.5 8 0.5<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 8.9 0.7 0.4 0.5 0.0 0.0 0.0 0.0 0.0 0.0 10.5<br />

TOTAL PROCUREMENT 14.6 1.4 0.6 1.0 0.0 0.0 0.0 0.0 0.0 0.0 17.5<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 3 Months PRODUCTION LEAD-TIME: 3 Months<br />

CONTRACT DATES: FY 2003: Nov-02 FY 2004: Nov-03 FY 2005: NA FY 2006: NA<br />

DELIVERY DATES: FY 2003: Feb-03 FY 2004: Feb-04 FY 2005: NA FY 2006: NA<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 164 4 4<br />

OUTPUT 164 4 4<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 172<br />

OUTPUT 0 172<br />

Notes/Comments<br />

FY07<br />

FY08<br />

P-1 Shopping List - Item No 80 - 42 of 54<br />

FY 09<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR112<br />

MODELS OF SYSTEMS AFFECTED: Comm. Satellite--C band/CWSP (Ship)<br />

DESCRIPTION/JUSTIFICATION: Provides C and Ku wide band SATCOM terminals supporting capabilities such as Automated Digital Multiplexing System (ADMS), telemedicine, official and unofficial phones, public affairs officer information, imagery,<br />

Meteorology and Oceanography Command (METOC).<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 31 27.6 0 0.0 0 0.0 0.0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 31 27.6<br />

Equipment ( Upgrade) 8 3.9 Var. 0.5 var 4.4<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment 2 2.6 2 2.6<br />

Production Support 3.7 0.8 0.4 5.0<br />

Other (DSA) 0.6 0.3 0.2 0.2 1.4<br />

Interim Contractor Support<br />

Installation of Hardware 27 30.5 1 1.6 2 1.5 1 1.2 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 31 34.8<br />

Installation of Hardware(Upgrade) 8 4.2 8 4.2<br />

PRIOR YR EQUIP 27 30.5 1 1.6 2 1.5 1 1.2 31 34.8<br />

PRIOR YR EQUIP (Upgrade) 8 4.2 8 4.2<br />

FY 02 EQUIP 0 0.0<br />

FY 02 EQUIP (Upgrade) 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 34.7 1.6 1.5 1.2 0.0 0.0 0.0 0.0 0.0 0.0 39.0<br />

TOTAL PROCUREMENT 73.3 2.7 2.6 1.4 0.0 0.0 0.0 0.0 0.0 0.0 79.9<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 3 Months PRODUCTION LEAD-TIME: 6-9 Months ( 4 months for upgrades)<br />

CONTRACT DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: NA<br />

DELIVERY DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: NA<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 38 1<br />

OUTPUT 38 1<br />

FY04 FY05 FY06<br />

FY07<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 39<br />

OUTPUT 0 39<br />

Notes/Comments<br />

PY: No install funds required for training equipment.<br />

FY03 : Procure Commercial SATCOM antenna feedhorn equipment for upgrade from C-band to Ku-band capability. Installation will be performed by shipboard personnel.<br />

FY03 :Install costs less than other years due to hull type (MHC).<br />

FY04 : Install cost increase due to requirement for a sponson.<br />

FY08<br />

P-1 Shopping List - Item No 80 - 43 of 54<br />

FY 09<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR112<br />

MODELS OF SYSTEMS AFFECTED: Comm. Satellite--C band/CWSP (Shore)<br />

DESCRIPTION/JUSTIFICATION: Provides C and Ku wide band SATCOM terminals supporting capabilities such as Automated Digital Multiplexing System (ADMS). Telemedicine, official and unofficial phones, public affairs officer information, imagery,<br />

Meteorology and Oceanography Command (METOC).<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 9 1.8 0 0.0 Var. 0.6 Var. 0.8 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 Var. 3.1<br />

Equipment ( Upgrade)<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 0.5 0.0 0.3 0.1 0 1.0<br />

Other (DSA)<br />

Interim Contractor Support<br />

Installation of Hardware* 5 0.8 4 1.1 Var. 0.3 Var. 0.2 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 Var. 2.5<br />

Installation of Hardware(Upgrade)* 0 0.0<br />

PRIOR YR EQUIP 0 0.0<br />

PRIOR YR EQUIP (Upgrade) 0 0.0<br />

FY 02 EQUIP 5 0.8 4 1.1 9 1.9<br />

FY 02 EQUIP (Upgrade) 0 0.0<br />

FY 03 EQUIP Var. 0.0<br />

FY 04 EQUIP Var. 0.3 Var. 0.3<br />

FY 05 EQUIP Var. 0.2 Var. 0.2<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.8 1.1 0.3 0.2 0.0 0.0 0.0 0.0 0.0 2.5<br />

TOTAL PROCUREMENT 0.0 3.1 1.1 1.2 1.2 0.0 0.0 0.0 0.0 0.0 6.6<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 Month PRODUCTION LEAD-TIME: 6 Months<br />

CONTRACT DATES: FY 2003: FY 2004: FY 2005: FY 2006:<br />

DELIVERY DATES: FY 2003: FY 2004: FY 2005: FY 2006:<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 9 Various Various<br />

OUTPUT 9<br />

FY07<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 Var.<br />

OUTPUT 0 Var.<br />

Notes/Comments<br />

FY04 - Procurement quantities consist of PAC transponder and gateway equipment, Norfolk/Martelsham T-3 equipment, second Hawaii gateway hardware, modems<br />

and infrastructure upgrades.<br />

FY05- Procurement quantities consist of European gateway equipment and modems.<br />

FY08<br />

P-1 Shopping List - Item No 80 - 44 of 54<br />

FY 09<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR117<br />

MODELS OF SYSTEMS AFFECTED: Global Broadcast Service-- Single (Receive Suite)<br />

DESCRIPTION/JUSTIFICATION: GBS with single antenna configuration: Commercial off the shelf (COTS) receive only satellite communications terminals with a single antenna, modems and ancillary hardware and processing equipment.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 17 8.3 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 34 26.9 51 35.2<br />

Equipment Backfit/Upgrade Kit 0.0<br />

IP Backfit 7 4.1 7 4.1<br />

Engineering Change Orders<br />

Other 0.8 0.8<br />

Training Equipment<br />

Production Support 1.6 1.6<br />

Other (DSA) 0.1 0.0 0.2 0.0 0.0 0.0 2.5 2.8<br />

Interim Contractor Support<br />

Installation of Hardware* 0 0.0 0 0.0 5 5.6 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 41 17.5 46 23.1<br />

PRIOR YR EQUIP 5 5.6 5 5.6<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 34 17.5 34 17.5<br />

FY TC EQUIP - IP Backfit 7 0.7 7 0.7<br />

TOTAL INSTALLATION COST 0.0 0.0 5.6 0.0 0.0 0.0 0.0 0.0 0.0 17.5 23.1<br />

TOTAL PROCUREMENT 10.9 0.0 5.8 0.0 0.0 0.0 0.0 0.0 0.0 51.0 67.7<br />

METHOD OF IMPLEMENTATION ADMINISTRATIVE LEAD-TIME: NA PRODUCTION LEAD-TIME: NA<br />

CONTRACT DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: NA<br />

DELIVERY DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: NA<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 5<br />

OUTPUT 5<br />

FY07<br />

FY08<br />

FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 41 46<br />

OUTPUT 41 46<br />

Notes/Comments<br />

PY - Unit cost varies due to mix of Ship, Shore, and quantity discounts afforded by other Services buys per year.<br />

FY03 - twelve (12) PY assets are being converted to six (6) dual antenna configurations<br />

P-1 Shopping List - Item No 80 - 45 of 54<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR117<br />

MODELS OF SYSTEMS AFFECTED: Global Broadcast Service--Dual (Receive Suite)<br />

DESCRIPTION/JUSTIFICATION: GBS with dual antenna configuration: Commercial off the shelf (COTS) receive only satellite communications terminals with a single antenna, modems and ancillary hardware and processing equipment.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit - Equipment Conversion 6 2.6 Var. 1.5 6 4.1<br />

Installation Kits<br />

Equipment 13 7.5 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 23 22.8 36 30.3<br />

IP Backfit NRE 8.6 8.6<br />

IP Backfit Kit - Production Articles 14 7.1 6 4.2 6 4.2 26 15.5<br />

KA 1Ghz LNB - ECP 73 1.2 73 1.2<br />

Ku Backfit - ECP 12 1.3 12 1.3<br />

Other 0.7 0.7<br />

Training Equipment 0 0.0<br />

Production Support 1.6 1.8 1.2 1.2 1.0 6.8<br />

Other (DSA) 0.7 1.1 0.0 0.4 0.4 1.9 4.4<br />

Interim Contractor Support<br />

Installation of Hardware* 8 2.6 5 2.7 5 3.5 0 0.0 12 3.0 0 0.0 0 0.0 0 0.0 0 0.0 30 16.7 60 28.5<br />

PRIOR YR EQUIP 8 2.6 5 2.7 13 5.3<br />

FY 02 EQUIP 5 3.5 1 0.8 6 4.3<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP - IP/Ku Backfits 6 1.5 6 1.5<br />

FY 05 EQUIP - IP/Ku Backfits 6 1.5 6 1.5<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 23 14.4 23 14.4<br />

FY TC EQUIP - IP Backfit 6 1.5 6 1.5<br />

TOTAL INSTALLATION COST 2.6 2.7 3.5 0.0 3.0 0.0 0.0 0.0 0.0 16.7 28.5<br />

TOTAL PROCUREMENT 13.1 8.3 13.3 12.6 8.6 0.0 0.0 0.0 0.0 45.5 101.3<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 2 Months PRODUCTION LEAD-TIME: 6 Months<br />

CONTRACT DATES: FY 2003: NA FY 2004: Feb-04 FY 2005: Feb-05 FY 2006: NA<br />

DELIVERY DATES: FY 2003: NA FY 2004: Aug-04 FY 2005: Aug-05 FY 2006: NA<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 18 3 3 6<br />

OUTPUT 18 3 3 6<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 30 60<br />

OUTPUT 30 60<br />

Notes/Comments<br />

FY07<br />

PY - Unit cost varies due to mix of Ship, Shore, and quantity discounts afforded by other Services buys per year.<br />

FY02 - Six equipment conversion kits purchased to convert twelve (12) PY single antenna assets to six (6) dual antenna configurations.<br />

FY04 Various: Procurement of Sub components to complete IP Conversion and PITCO of IP Backfit Kits<br />

FY04 - 8 IP Back Fit Kit Production Articles are C4I lab assets and do not require installation.<br />

FY04 - KA 1Ghz LNB is LRU and does not require installation funds<br />

FY04 10 Ku Backfit Kits are installed in FY05 in conjunction with the 10 IP Backfit Kit installations. The other 2 Ku Backfit Kits are trainers and do not require install.<br />

FY08<br />

P-1 Shopping List - Item No 80 - 46 of 54<br />

FY09<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR117<br />

MODELS OF SYSTEMS AFFECTED: Global Broadcast Service--Subs (Receive Suite)<br />

DESCRIPTION/JUSTIFICATION: GBS with submarine configuration: Commercial off the shelf (COTS) receive only satellite communications terminals with a SubHdr antenna modification, modems and ancillary hardware and processing equipment.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 22 6.5 10 2.9 0 0.0 0 0.0 0 0.0 0 0.0 0.0 0 0.0 0 0.0 34 20.1 66 29.5<br />

Equipment Nonrecurring<br />

IP Backfit 21 7.4 9 4.9 30 12.3<br />

Data<br />

Training Equipment<br />

Production Support 4.6 1.8 1.7 0.5 0.6 9.2<br />

Other (DSA) 1.1 0.2 0.4 1.3 0.5 2.3 5.8<br />

Interim Contractor Support<br />

Installation of Hardware* 13 1.6 10 1.5 6 0.9 0 0.0 30 3.0 0 0.0 0 0.0 0 0.0 0 0.0 34 5.1 93 12.1<br />

PRIOR YR EQUIP 13 1.6 6 0.9 19 2.5<br />

FY 02 EQUIP 4 0.6 6 0.9 10 1.5<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 21 2.1 21 2.1<br />

FY 05 EQUIP 9 0.9 9 0.9<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 34 5.1 34 5.1<br />

FY TC EQUIP - IP Backfit 0 0.0<br />

TOTAL INSTALLATION COST 1.6 1.5 0.9 0.0 3.0 0.0 0.0 0.0 0.0 5.1 12.1<br />

TOTAL PROCUREMENT 13.8 6.4 3.0 9.1 9.1 0.0 0.0 0.0 0.0 27.5 68.9<br />

METHOD OF IMPLEMENTATION ADMINISTRATIVE LEAD-TIME: 2 Months PRODUCTION LEAD-TIME: 6 Months<br />

CONTRACT DATES: FY 2003: Jan-03 FY 2004: Feb-04 FY 2005: Feb-05 FY 2006:<br />

DELIVERY DATES: FY 2003: Jul-03 FY 2004: Aug-04 FY 2005: Aug-05 FY 2006:<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 29 7 6 10 7<br />

OUTPUT 29 7 6 10 7<br />

FY07<br />

FY08<br />

FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 34 93<br />

OUTPUT 34 93<br />

Notes/Comments<br />

PY - Unit costs vary due to mix of Ship, Submarine and Shore terminal configurations and to quantity discounts afforded by other Services buys per year.<br />

FY01 - (3) sub-surface receive suites (SSRS) to be used as training equipment at SubSchool Groton were installed with shore funds.<br />

FY 02 procurement cost include enclosure fabrication, performance of integration testing and PITCO.<br />

P-1 Shopping List - Item No 80 - 47 of 54<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR117<br />

MODELS OF SYSTEMS AFFECTED: Global Broadcast Service - Shore<br />

DESCRIPTION/JUSTIFICATION: Global Broadcast Service, commercial off-the-shelf (COTS) receive only satellite communications terminals with antennas, modems, and ancillary hardware and processing equipment<br />

Navy portion of joint services program to deliver continuous, high speed, one way information flow of high volume data to ship and shore units and special operations.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 15 2.4 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 12 2.3 27 4.7<br />

Equipment Backfit - IP Backfit 12 1.5 12 1.5<br />

Engineering Change Orders<br />

Data<br />

Training Equipment - Backfit kits 0.2 7 2.8 7 3.0<br />

Production Support 0.3 0.0 0.0 0.5 0.0 0.8<br />

Other (DSA) 0.4 0.4<br />

Interim Contractor Support<br />

Installation of Hardware* 7 1.2 11 1.9 0 0.0 0 0.0 19 0.4 0 0.0 0 0.0 0 0.0 0 0.0 12 0.2 49 3.7<br />

PRIOR YR EQUIP 7 1.2 11 1.9 18 3.1<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 19 0.4 19 0.4<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 12 0.2 12 0.2<br />

TOTAL INSTALLATION COST 1.2 1.9 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.2 3.7<br />

TOTAL PROCUREMENT 4.1 1.9 0.0 5.3 0.4 0.0 0.0 0.0 0.0 2.6 14.2<br />

METHOD OF IMPLEMENTATION ADMINISTRATIVE LEAD-TIME: 2 Months PRODUCTION LEAD-TIME: 6 Months backfits, 8 Months trainers<br />

CONTRACT DATES: FY 2003: Mar-03 FY 2004: Feb-04 FY 2005: NA FY 2006: NA<br />

DELIVERY DATES: FY 2003: Sep-03 FY 2004: Oct-04 FY 2005: NA FY 2006: NA<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 18 6 6 4 3<br />

OUTPUT 18 6 6 4 3<br />

FY07<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 12 49<br />

OUTPUT 12 49<br />

Notes/Comments<br />

PY - GBS procurement funds procured (3) sub-surface receive suites (SSRS) to be installed as training equipment at SubSchool Groton.<br />

FY 04 - GBS training equipment includes 3 Sub IP Backfit for TTF, 2 trainers for sub-school (Groton), and 2 Dual antenna systems for FTC San Diego and FTC Norfolk<br />

FY08<br />

P-1 Shopping List - Item No 80 - 48 of 54<br />

FY09<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR118<br />

MODELS OF SYSTEMS AFFECTED: JMINI Control System - NMS<br />

DESCRIPTION/JUSTIFICATION: The Network Management System (NMS) component of the JMINI Control System provides communications resource planning and management via secure WAN connections between the control stations and remote<br />

user. Will provide dynamic centralized control of joint operable 5 KHz and 25 KHz ultra high frequency military satellite communications.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 13 32.5 22 12.6 7 4.0 12 7.7 10 6.2 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 64 63.0<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 0.7 2.6 0.2 1.0 0.6 5.2<br />

Other (DSA)<br />

Interim Contractor Support<br />

Installation of Hardware* 8 1.4 9 0.5 20 1.2 17 0.7 10 0.2 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 64 3.9<br />

PRIOR YR EQUIP 8 1.4 5 0.3 13 1.6<br />

FY 02 EQUIP 4 0.2 18 1.1 22 1.3<br />

FY 03 EQUIP 2 0.1 5 0.2 7 0.3<br />

FY 04 EQUIP 12 0.5 12 0.5<br />

FY 05 EQUIP 10 0.2 10 0.2<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 1.4 0.5 1.2 0.7 0.2 0.0 0.0 0.0 0.0 0.0 3.9<br />

TOTAL PROCUREMENT 34.6 15.6 5.4 9.4 7.1 0.0 0.0 0.0 0.0 0.0 72.1<br />

METHOD OF IMPLEMENTATION ADMINISTRATIVE LEAD-TIME: 1 Month PRODUCTION LEAD-TIME: 6 Months<br />

CONTRACT DATES: FY 2003: Dec-02 FY 2004: Dec-03 FY 2005: Oct-04 FY 2006:<br />

DELIVERY DATES: FY 2003: Jul-03 FY 2004: Jul-04 FY 2005: Jul-05 FY 2006:<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 37 5 12 10<br />

OUTPUT 37 5 12 10<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 64<br />

OUTPUT 0 64<br />

Notes/Comments<br />

FY07<br />

FY08<br />

P-1 Shopping List - Item No 80 - 49 of 54<br />

FY09<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR118<br />

MODELS OF SYSTEMS AFFECTED: JMINI Control System - DMR<br />

DESCRIPTION/JUSTIFICATION: Channel controller hardware (radio/modem/antenna) to meet ORD-mandated satellite channel access requirement. Will provide dynamic centralized control of joint operable 5 KHz and 25 KHz ultra high frequency<br />

military satellite communications<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 248 31.8 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 248 31.8<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 2.7 0 2.7<br />

Other (DSA)<br />

Interim Contractor Support<br />

Installation of Hardware* 236 2.7 12 0.1 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 248 2.7<br />

PRIOR YR EQUIP 236 2.7 12 0.1 248 2.7<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 2.7 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.7<br />

TOTAL PROCUREMENT 37.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 37.3<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 2 Months PRODUCTION LEAD-TIME: 8 Months<br />

CONTRACT DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: NA<br />

DELIVERY DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: NA<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 248<br />

OUTPUT 248<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 248<br />

OUTPUT 0 248<br />

Notes/Comments<br />

Note 1: Based on revised ORD, DMR channels procured in FY00 and prior years meet current JMINI requirements<br />

FY07<br />

FY08<br />

P-1 Shopping List - Item No 80 - 50 of 54<br />

FY09<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

PRODUCTION SCHEDULE DATE<br />

(DOD EXHIBIT P-21A) February, 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD NO.<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Satellite Communications Systems 321500 52NR<br />

S ACCEPT BAL FISCAL YEAR 04 FISCAL YEAR 05 FISCAL YEAR 06<br />

COST ITEM/MANUFACTURER E PROC PRIOR DUE 03 CALENDAR YEAR 04 CALENDAR YEAR 05 CALENDAR YEAR 06<br />

CODE R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S<br />

V 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E<br />

FY T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P<br />

NR105 5/25 KHz SATCOM--UHF Modems 03 18 12 6 3 3<br />

NR106 SHF Terminals-- AN/WSC-6 7 Ft Antenna - Ship 03 10 10 2 2 2 2 2<br />

NR106 SHF Terminals-- AN/WSC-6 7 Ft Antenna - Ship 04 9 9 A 2 2 2 2 1<br />

NR106 SHF Terminals--AN/WSC-6(V)7 - Ship 03 6 6 2 2 2<br />

NR106 SHF Terminals--AN/WSC-6(V)7 - Ship 04 16 16 A 2 2 2 2 2 2 2 2<br />

NR106 SHF Terminals--AN/WSC-6(V)7 - Ship (Backfits) 03 6 6 2 2 2<br />

NR106 SHF Terminals--AN/WSC-6(V)7 - Ship (Backfits) 04 12 12 A 2 2 2 2 2 2<br />

NR106 SHF Terminals--AN/WSC-6(V)7 - Shore 04 1 1 A 1<br />

SHF Terminals<br />

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP<br />

PRODUCTION RATE PROCUREMENT LEAD-TIMES<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

ITEM Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

UHF Modems Via Sat 1 34 400 30 30 180 N/A 240 Days<br />

321500 SHF Terminals--AN/WSC-6(V)5 Mod kits - Ship<br />

Raytheon, Boston, MA 0 3 36<br />

1 mo. 1 mo. 12 mo. 12 mo.<br />

39<br />

321500 SHF Terminals--AN/WSC-6(V)7 - Ship<br />

Raytheon, Boston, MA 0 3 33 1 mo. 1 mo. 12 mo. 12 mo.<br />

48<br />

321500 SHF Terminals --AN/WSC-6(V)7 - Shore<br />

Raytheon, Boston, MA 0 3 3 1 mo. 1 mo. 12 mo. 12 mo.<br />

3<br />

NAVMAT FORM 7110/4 (REVISED 11/77)<br />

P-1 Shopping List - Item No 80 - 51 of 54<br />

Exhibit P-21, Production Schedule<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

PRODUCTION SCHEDULE DATE<br />

(DOD EXHIBIT P-21A) February, 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD NO.<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Satellite Communications Systems 321500 52NR<br />

S ACCEPT BAL FISCAL YEAR 04 FISCAL YEAR 05 FISCAL YEAR 06<br />

COST ITEM/MANUFACTURER E PROC PRIOR DUE 03 CALENDAR YEAR 04 CALENDAR YEAR 05 05 CALENDAR YEAR 06<br />

CODE R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S<br />

V 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E<br />

FY T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P<br />

NR106 SHF Terminals--AN/WSC-6(V)9 - Ship 03 3 3 3<br />

NR106 SHF Terminals--AN/WSC-6(V)9 - Ship 04 20 20 A 3 3 3 3 3 3 2<br />

NR106 SHF Terminals -- AN/WSC-6(V)7 Modems 03 36 36 36<br />

NR106 SHF Terminals -- AN/WSC-6(V)9 Modems - Shore 03 20 20 20<br />

NR106 SHF Terminals -- EBEM Modems - Ship 02 10 10 10<br />

NR106 SHF Terminals -- EBEM Modems - Ship 04 119 119 A 100 19<br />

NR106 SHF Terminals -- EBEM Modems - Ship 05 1 1 A 1<br />

NR106 SHF Terminals -- EBEM Modems - Shore 04 106 106 A 106<br />

NR106 SHF Terminals -- EBEM Modems - Shore 05 60 60 A 60<br />

NR106 SHF Terminals--AN/WSC-6(V)10 Ship 04 4 4 A 3 1<br />

NR106 SHF Terminals--AN/WSC-6(V)10 Ship 05 1 1 A 1<br />

NR106 SHF Terminals--AN/WSC-6(V)10 - Ship Upgrades 04 1 1 A 1<br />

NR106 SHF Terminals--AN/WSC-6(V)10 - Ship Upgrades 05 2 2 A 2<br />

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP<br />

PRODUCTION RATE PROCUREMENT LEAD-TIMES<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

ITEM Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

321500 SHF Terminals--AN/WSC-6(V)9 - Ship<br />

Harris, Melbourne, FL 3 3 24<br />

1 mo. 1 mo. 10 mo. 10 mo.<br />

47<br />

321500 SHF Terminals -- SUBHDR SHF Mod Kit<br />

Raytheon, MA & Harris, FL 0 7 84<br />

1 mo. 1 mo. 15 mo. 15 mo. 190<br />

321500 SHF Terminals -- (V)7 & (V)9 Modems<br />

Raytheon, MA & Harris, FL 0 6 72 1 mo. 1 mo. 12 mo. 12 mo. 190<br />

NAVMAT FORM 7110/4 (REVISED 11/77)<br />

P-1 Shopping List - Item No 80 - 52 of 54<br />

Exhibit P-21, Production Schedule<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

PRODUCTION SCHEDULE DATE<br />

(DOD EXHIBIT P-21A) February, 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD NO.<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Satellite Communications Systems 321500 52NR<br />

S ACCEPT BAL FISCAL YEAR 04 FISCAL YEAR 05 FISCAL YEAR 06<br />

COST ITEM/MANUFACTURER E PROC PRIOR DUE 03 CALENDAR YEAR 04 CALENDAR YEAR 05 CALENDAR YEAR 06<br />

CODE R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S<br />

V 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E<br />

FY T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P<br />

NR107 EHF Terminals--AN/USC-38(V) FOT - Ship 02 22 10 12 2 3 2 3 2<br />

NR107 EHF Terminals--AN/USC-38(V) FOT - Ship 03 11 11 2 1 1 1 2 1 1 1 1<br />

NR107 EHF Terminals--AN/USC-38(V) FOT - Ship 04 39 39 A 6 3 3 3 3 3 3 3 3 3 3 3<br />

NR107 EHF Terminals --AN/USC-38(V) FOT - Shore 02 1 1 1<br />

NR107 EHF Terminals--NECC - Ship 04 21 21 A 4 4 4 5 4<br />

NR107 EHF Terminals--NECC - Ship 05 10 10 A 4 4 2<br />

NR107 EHF Terminals --NECC - Shore 04 6 6 A 2 2 2<br />

NR107 EHF Terminals --NECC - Shore 05 3 3 A 1 1 1<br />

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP<br />

PRODUCTION RATE PROCUREMENT LEAD-TIMES<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

ITEM Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

NN107/NP109 - EHF Terminals--AN/USC-38(V) Raytheon, Marlborough, MA 7 7 84 1 1 18 18 20 EA<br />

NN107/NP109 - EHF Terminals - NECC AP Labs, Texas 10 EA<br />

NAVMAT FORM 7110/4 (REVISED 11/77)<br />

P-1 Shopping List - Item No 80 - 53 of 54<br />

Exhibit P-21, Production Schedule<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

PRODUCTION SCHEDULE DATE<br />

(DOD EXHIBIT P-21A) February, 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD NO.<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT Satellite Communications Systems 321500 52NR<br />

S ACCEPT BAL FISCAL YEAR 04 FISCAL YEAR 05 FISCAL YEAR 06<br />

COST ITEM/MANUFACTURER E PROC PRIOR DUE 03 CALENDAR YEAR 04 CALENDAR YEAR 05 CALENDAR YEAR 06<br />

CODE R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S<br />

V 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E<br />

FY T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P<br />

NR112 Comm. Satellite--INMARSAT B (Ship) Eq Upgd - 128 Kb 04 80 80 A 12 12 10 10 10 10 10 6<br />

NR112 Comm. Satellite--INMARSAT B (Ship) Eq Upgd - 128 Kb 05 86 86 A 14 14 10 10 9 10 10 9<br />

NR112 Comm. Satellite--INMARSAT B HSD KITS 04 8 8 A 4 4<br />

NR117 Global Broadcast Service - Backfits/Upgrades 04 Var. 132 A 10 10 10 10 10 10 10 10 12 12 14 14<br />

NR117 Global Broadcast Service - Backfits 05 15 15 A 7 8<br />

NR117 Global Broadcast Service - Shore 04 7 7 A 4 3<br />

NR118 JMINI Control System - NMS 04 12 12 A 6 6<br />

NR118 JMINI Control System - NMS 05 10 10 A 5 5<br />

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP<br />

PRODUCTION RATE PROCUREMENT LEAD-TIMES<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

ITEM Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

321500 Commercial SATCOM- INMARSAT B<br />

Mackay Communications, Edison, NJ 1 mo. 1 mo. 3 mo. 3 mo.<br />

EA<br />

321500 Commercial SATCOM- INMARSAT B Upgrades - Handover<br />

Mackay Communications, Edison, NJ<br />

1 mo. 1 mo. 3 mo. 3 mo.<br />

EA<br />

321500 Commercial SATCOM- INMARSAT B Upgrades - 128 Kbps<br />

Mackay Communications, Edison, NJ 1 mo. 1 mo. 3 mo. 3 mo. EA<br />

321500 Commercial SATCOM- INMARSAT B HSD Kits DNE Technologies, Wallingford, CT<br />

1 mo. 1 mo. 3 mo. 3 mo.<br />

EA<br />

321500 Global Broadcast Service-- Single (Receive Suite)<br />

Raytheon, Marlborough, MA & Reston, VA 6 12 96 3 mo. 3 mo. 8 mo. 8 mo. 22<br />

321500 Global Broadcast Service--Dual (Receive Suite)<br />

Raytheon, Marlborough, MA & Reston, VA 6 12 96 3 mo. 3 mo. 8 mo. 8 mo. 29<br />

321500 Global Broadcast Service --Subs (Receive Suite)<br />

Raytheon, Reston, VA 1 1 12 3 mo. 3 mo. 6 mo. 6 mo. 70<br />

321500 Global Broadcast Service - Shore<br />

Raytheon, Reston, VA 1 10 120 3 mo. 3 mo. 8 mo. 8 mo. 54<br />

JMINI NMS SAIC<br />

1 10 20 30 30 300 N/A 360 Days<br />

P-1 Shopping List - Item No 80 - 54 of 54<br />

Exhibit P-21, Production Schedule<br />

Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUI Joint Communications Support Element (JCSE) 330200 52L4<br />

QUANTITY<br />

FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TO COMP TOTAL<br />

COST<br />

(in millions) $4.1 $3.9 $3.0 $3.0 $3.0 $3.1 $3.1 Cont Cont<br />

PROGRAM COVERAGE:<br />

This line represents the Navy's share of the Joint Communications Support Element (JCSE) Program. This program is jointly funded by Army, Navy, Marine Corps and Air Force. Funds<br />

procure various communications equipment including the following: Extremely High Frequency (EHF) Secure, Mobile, Antijam, Reliable Tactical Terminals (SMART-T), COTS Hub Triband<br />

Wide-band High Data Rate Satellite Terminals, Ultra High Frequency (UHF) next generation satellite systems, C4 Extension Package upgrades, PROMINA Smart Multiplexer<br />

upgrades, Defense Message System (DMS) Tactical, Joint Worldwide Intelligence Communication System (JWICS), Communications Security (COMSEC) Secure Telephone Equipment<br />

(STE), Network COMSEC KG-175, KIV-7 & 19, Omega, GRC-235 NES and Sectera Type I, Joint Network Management System (JNMS), Personal Communications Systems (PCS) to<br />

provide seamless integration of commercial cellular service to the tactical network, manpack multi-mode multi-band radios (JTRS) for the quick reaction element, 16 foot Light Weight High<br />

Gain Antenna (LHGXAs), cellular phone systems serving between 300-400 subscribers, Contractor Off the Shelf (COTS) TDC switch upgrades, WAN Access for Global Information Grid<br />

(GIG) next generation multi-media, Broad Band Campus with Information Assurance (IA) suites, GBS TIP, GBS receive suite upgrades, VTC upgrades and assorted network servers,<br />

routers, hubs, transit cases, and multiplexers.<br />

JUSTIFICATION OF BUDGET YEAR REQUIREMENTS:<br />

SPACE AND NAVAL WARFARE SYSTEMS COMMAND, SAN DIEGO, CA will act as JCSE's Executive Agent for distribution of funds.<br />

INSTALLATION AGENT:<br />

N/A<br />

Exhibit P-40, Budget Item Justification<br />

P-1 Shopping List-Item No -81 - 1 of 2 Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE<br />

COST ANALYSIS February 2004<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENJoint Communications Support Element (JCSE) 330200 52L4<br />

FY 2003 FY 2004 FY 2005<br />

COST ID UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE QTY COST COST QTY COST COST QTY COST COST<br />

L4001 JCSE Modernization A 1 4,133 4,133 1 3,892 3,892 1 3,023 3,023<br />

Remarks:<br />

TOTAL CONTROL 4,133 3,892 3,023<br />

P-1 Shopping List-Item No -81 - 2 of 2<br />

Exhibit P-5, Cost Analysis<br />

Unclassified<br />

DD FORM 2446, JUN 86 Classification


FY2005 President's Budget Submission<br />

Commander, U. S. Atlantic Fleet<br />

Department of the Navy<br />

Other Procurement, Navy<br />

Budget Item Justification Sheet<br />

Exhibit P-40<br />

February 2004<br />

Line Item P-1 Item Nomenclature 82<br />

Communications & ElectronicEquipment BA 2 3303 Electrical Power Systems<br />

Quantity FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009<br />

Cost (in Millions) 1.243 1.426 1.291 1.264 1.231 1.256 1.281<br />

Electrical Power Systems:<br />

The Electrical Power Program is designed to provide highly reliable, continuous, high quality power subsystems to support Naval Network<br />

and Space Operations Command. Basic deficiencies in current power sources, couple with recent telecommunication system trends toward<br />

sophisticated, highly reliable, high speed, continuous accurate systems (e.g., various High Frequency, Low Frequency, Very Low Frequency<br />

Facilities), necessitate a continuing program to upgrade power systems. The Naval Network and Space Operations Command Electrical<br />

Power Plan provides the necessary requirements. In CONUS and overseas, where commercial power is available in sufficient quantity, it is<br />

utilized as the base system, even though its overall quality may be poor. Because these commercial systems are continually susceptible to<br />

blackout and various other types of power perturbations, suitable quick-start emergency power generators must be available to support<br />

operational loads. Some of the operational load is designated as "critical" and requires Uninterruptible Power Supply Systems for<br />

instantaneous application in case of loss or disturbance of the primary power source.<br />

Page 1 of 4


FY2005 President's Budget Submission<br />

Commander, U. S. Atlantic Fleet<br />

Department of the Navy<br />

Other Procurement, Navy<br />

Cost Analysis<br />

Exhibit P-5<br />

Program Cost Breakdown DATE: February 2004<br />

Exhibit P-5 Cost Analysis<br />

Appropriation Code/CC/BA/BSA/Item Control Number<br />

1810 / BA 2 3303 Comm & Electronics Equipment<br />

82<br />

FY 03 FY 03 FY 04 FY 04 FY 05 FY 05 FY 06 FY 06 FY 07 FY 07 FY 08 FY 08 FY 09 FY 09<br />

QTY Unit Total Unit Total Unit Total Unit Total Unit Total Unit Total Unit Total<br />

Cost Elements Cost Cost Cost Cost Cost Cost Cost Cost Cost Cost Cost Cost Cost Cost<br />

Replace 80 KVA UPS SATCOM Site(1 SYSTEM) 1 0.558<br />

Replace 500 KVA UPS Main Comm Center 2 0.685<br />

Replace 400 KVA UPS, SATCOM Facility 1 0.680<br />

Replace 200 KVA UPS, SATCOM Site 3 0.746<br />

New SCADA System Phase 2, VLF Site 1 0.400<br />

Replace 500 KVA UPS Main Comm Center 1 0.394<br />

Replace 500 KW Gen, Main Comm Center 2 0.497<br />

Total 1.243 1.426 1.291 0.000 0.000 0.000 0.000<br />

Page 2 of 4


FY2005 President's Budget Submission<br />

Commander, U. S. Atlantic Fleet<br />

BUDGET PROCUREMENT HISTORY AND PLANNING<br />

EXHIBIT P-5A DATE: February 2004<br />

Appropriation Code/CC/BA/BSA/Item Control Number P-1 Line Item Nomenclature 82<br />

1810 / BA 2 / Program Line 3303 Communications and Electronics Equipment<br />

CONTRACT DATE OF SPECS SPEC IF YES<br />

COST LINE ITEM/ CONTRACTOR METHOD CONTRACTED AWARD FIRST QUANTITY COST AVAILABLE REV WHEN<br />

CODE FISCAL YEAR AND LOCATION & TYPE BY DATE DELIVERY NOW REQ'D AVAILABLE<br />

3303 FY03<br />

Replace 80KVA UPS SATCOM Site<br />

Replace 500 KVA UPS Main Comm Center<br />

ICON INC ; Jessup<br />

MD Competitive<br />

ICON INC ; Jessup<br />

MD Competitive<br />

Department of the Navy<br />

Other Procurement, Navy<br />

Budget Procurement History & Planning<br />

Exhibit P-5A<br />

SPAWAR,<br />

Charleston SC 12-May-03 5/12/2003 1 0.558 Y N<br />

SPAWAR,<br />

Charleston SC 12-May-03 5/12/2003 2 0.685 Y N<br />

TOTAL 1.243<br />

Page 3 of 4


FY2005 President's Budget Submission<br />

Commander, U. S. Atlantic Fleet<br />

BUDGET PROCUREMENT HISTORY AND PLANNING<br />

EXHIBIT P-5A DATE: February 2004<br />

Appropriation Code/CC/BA/BSA/Item Control Number P-1 Line Item Nomenclature 82<br />

1810 / BA 2 / Program Line 3303 Communications and Electronics Equipment<br />

CONTRACT DATE OF SPECS SPEC IF YES<br />

COST LINE ITEM/ CONTRACTOR METHOD CONTRACTED AWARD FIRST QUANTITY COST AVAILABLE REV WHEN<br />

CODE FISCAL YEAR AND LOCATION & TYPE BY DATE DELIVERY NOW REQ'D AVAILABLE<br />

3303 FY04<br />

Replace p 1-400 KVA UPS, SATCOM Facility<br />

Replace 3-200 KVA UPS, SATCOM Site<br />

Still working on the<br />

contract Competitive<br />

Still working on the<br />

contract Competitive<br />

Department of the Navy<br />

Other Procurement, Navy<br />

Budget Procurement History & Planning<br />

Exhibit P-5A<br />

SPAWAR,<br />

Charleston SC 1/04 1 0.680 Y N<br />

SPAWAR,<br />

Charleston SC 1/04 3 0.746 Y N<br />

TOTAL 1.426<br />

Page 4 of 4


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI 3306 Navy Standard Integrated Personnel Systems (NSIPS) 52DG<br />

QUANTITY<br />

PY FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TOTAL<br />

COST<br />

(in millions) 5.296 .36 .289 0 0 0 0<br />

PROGRAM COVERAGE/JUSTIFICATION FOR BUDGET YEAR REQUIREMENTS:<br />

The Navy Standard Integrated Personnel System (NSIPS) is a special-interest, major Automated Information System (AIS) to collect, process and distribute personnel and pay<br />

data within Navy and to various corporate level activities within DoD. NSIPS will achieve the integration of active, reserve, and retired military personnel systems within the Navy,<br />

improve the military personnel tracking process, consolidate processes and systems within life cycle areas of military personnel, and the functionalilty of existing Navy source data<br />

collection requirements. NSIPS will operate on shore and afloat servers, client workstations, stand-alone workstations, portable stand-alone workstations, LANs and<br />

miscellaneous hardware and will maintain regional data warehouses as well as an all-Navy archival data warehouse.<br />

In order to comply with the NSIPS MS III ORD, the NSIPS program must deploy an electronic service record that will automate the current paper service record maintenance<br />

process and allow commands electronic access to service record data on assigned personnel. This electronic service record system and concept will be called NSIPS/ESR.<br />

NSIPS/ESR will replace the hard copy officer and enlisted personnel service record used in the field. This will enable electronic filing, processing, storing, retrieving, viewing, and<br />

routing of any service record required images and data. This will allow for more efficient documentation and display of information normally placed into the service record;<br />

increase efficiencies in the record transfers between activities; reduce lost or misplaced records and their reconstruction; reduce lost or mutilated pages; allow for bulk and group<br />

entries (e.g., pay entitlements, training documentation, unit awards, etc.); and reduce manual record maintenance workload. It will also allow for more than one authorized perso<br />

to access a record simultaneously, if required (e.g., Legal and Personnel). Additionally, by having a controlled access, there will be increased security of records and the<br />

information that they contain. This is anticipated to reduce the workload levels at commands, afloat and ashore, as well as at PSDs.<br />

FY 04 and FY 05 hardware requirements are limited to only extingent hardware upgrades requirements and new unforeseen hardware requirements which may arise due to web<br />

enablement. The majority of this funding will be provided to the hardware/software configuration facility to support fielding of NSIPS equipment and software.<br />

DD FORM 2446, JUN 86 P-1 Shopping List-Item No 83 Page 1 of 5 Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

COST ANALYSIS<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT BLI 3306 Navy Standard Integrated Personnel Systems (NSIPS)<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

52DG<br />

FY2003<br />

FY2004 FY2005<br />

COST ID UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE QTY COST COST QTY COST COST QTY COST COST QTY COST COST<br />

DG010 NSIPS HW Tech Refresh (Shore) A var 177<br />

DG020 NSIPS HW Tech Refresh (Ship) A var 2,326 var 102 var 130<br />

DG030 NSIPS Software Licenses A var 1,230<br />

DG777 Installation Costs 1,563 258 159<br />

Remarks:<br />

"Various" quantities represent hardware/software configurations that are dependent upon the type of site or platform.<br />

TOTAL CONTROL 5,296 360 289<br />

DD FORM 2446, JUN 86 P-1 Shopping List-Item No 83 Page 2 of 5 Exhibit P-5, Budget Item Justification<br />

Unclassified<br />

Classification<br />

DATE<br />

February 2004


UNCLASSIFIED<br />

CLASSIFICATION<br />

A. DATE<br />

PROCUREMENT HISTORY AND PLANNING February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT BLI 3306 Navy Standard Integrated Personnel Systems (NSIPS) 52DG<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE DELIVERY COST NOW AVAILABLE<br />

DG010 NSIPS HW Tech Refresh (Shore) 03 VARIOUS IDIQ SPAWAR Multiple Multiple Multiple Var Var Yes N/A<br />

NSIPS HW Tech Refresh (Shore) 04 VARIOUS IDIQ SPAWAR Multiple Multiple Multiple Var Var Yes N/A<br />

DG020 NSIPS HW Tech Refresh (Ship) 03 VARIOUS IDIQ SPAWAR Multiple Multiple Multiple Var Var Yes N/A<br />

NSIPS HW Tech Refresh (Ship) 04 VARIOUS IDIQ SPAWAR Multiple Multiple Multiple Var Var Yes N/A<br />

NSIPS HW Tech Refresh (Ship) 05 VARIOUS IDIQ SPAWAR Multiple Multiple Multiple Var Var Yes N/A<br />

DG030 NSIPS Software Licenses 03 VARIOUS IDIQ SPAWAR Multiple Multiple Multiple Var Var Yes N/A<br />

D. Remarks:<br />

"Various" quantities represent various hardware/software configurations that are dependent upon the type of site or platform.<br />

DD FORM 2446, JUN 86 P-1 Shopping List-Item No 83 Page 3 of 5 Exhibit P-5A, Procurement History and Planning<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: NSIPS HW Refresh - Shore<br />

February 2004<br />

COST CODE DG010<br />

MODELS OF SYSTEMS AFFECTED: Navy Standard Integrated Personnel (NSIPS)<br />

DESCRIPTION/JUSTIFICATION: Shore sites consist of small, medium and large NSIPS Server and Workstations provided by NMCI to store, pass, and report personnel and pay data for<br />

all Navy Active Duty, Reserve and Retired personnel. Enterprize sites are also included.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY08 FY09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

Other<br />

Interm Contractor Support<br />

var 2.4 var 1.9 var 0.2 var 0.0 var 0.0 Var 4.5<br />

Installation of Hardware (Sites) 19 1.6 51 1.7 14 0.0 0 0.0 0 0.0 84 3.3<br />

PRIOR YR EQUIP 0 0.0<br />

FY 00 EQUIP 16 0.8 16 0.8<br />

FY 01 EQUIP 3 0.8 3 0.8<br />

FY 02 EQUIP 51 1.7 51 1.7<br />

FY 03 EQUIP 14 0.0 14 0.0<br />

FY 04 EQUIP 0.0 0 0.0<br />

FY 05 EQUIP 0.0 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 1.6 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.3<br />

TOTAL PROCUREMENT COST 4.0 3.6 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.8<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: Varies PRODUCTION LEADTIME: N/A<br />

CONTRACT DATES: FY 2003: Multiple FY 2004: FY 2005:<br />

DELIVERY DATES: FY 2003: Multiple FY 2004: FY 2005:<br />

FY03 FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT (Sites) 70 3 5 3 3 0 0 0 0 0 0 0 0 0 0 0 0<br />

OUTPUT (Sites) 70 3 5 3 3 0 0 0 0 0 0 0 0 0 0 0 0<br />

FY07 FY08 FY09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT (Sites) 0 0 0 0 0 0 0 0 0 0 0 0 84<br />

OUTPUT (Sites) 0 0 0 0 0 0 0 0 0 0 0 0 84<br />

Notes/Comments<br />

Install quantities reflect shore sites.<br />

Installation schedule projected, varies by type of site and equipment.<br />

Exhibit P-3a, Individual Modification Program<br />

P-1 Shopping List-Item No 83 Page 4 of 5 Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE: NSIPS HW Refresh - Ship<br />

COST CODE DG020<br />

MODELS OF SYSTEMS AFFECTED: Navy Standard Integrated Personnel (NSIPS)<br />

DESCRIPTION/JUSTIFICATION: Each ship consist of small or medium NSIPS Server and Workstations to store, pass, and report personnel and pay data for ships company.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY08 FY09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment var 0.2 var 0.7 var 2.3 var 0.1 var 0.1 Var 3.4<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

Other 0.0<br />

Interm Contractor Support<br />

Installation of Hardware (Sites) 3 0.3 60 0.9 122 1.6 5 0.3 6 0.2 196 3.2<br />

PRIOR YR EQUIP 0 0.0<br />

FY 00 EQUIP 0 0.0<br />

FY 01 EQUIP 3 0.3 3 0.3<br />

FY 02 EQUIP 60 0.9 60 0.9<br />

FY 03 EQUIP 122 1.6 122 1.6<br />

FY 04 EQUIP 5 0.3 5 0.3<br />

FY 05 EQUIP 6 6 0.0<br />

FY 06 EQUIP 0.2 0 0.2<br />

FY 07 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.3 0.9 1.6 0.3 0.2 0.0 0.0 0.0 0.0 0.0 3.2<br />

TOTAL PROCUREMENT COST 0.5 1.5 3.9 0.4 0.3 0.0 0.0 0.0 0.0 0.0 6.6<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: Varies PRODUCTION LEADTIME: N/A<br />

CONTRACT DATES: FY 2003: Multiple FY 2004: Multiple FY 2005: Multiple<br />

DELIVERY DATES: FY 2003: Multiple FY 2004: Multiple FY 2005: Multiple<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT (SITES) 63 20 40 40 22 1 2 1 1 1 2 3 0 0 0 0 0<br />

OUTPUT (SITES) 63 20 40 40 22 1 2 1 1 1 2 3 0 0 0 0 0<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT (SITES) 0 0 0 0 0 0 0 0 0 0 0 0 196<br />

OUTPUT (SITES) 0 0 0 0 0 0 0 0 0 0 0 0 196<br />

Notes/Comments<br />

Install quantities reflect ship sites.<br />

Installation schedule projected, varies by type of ship and availablity.<br />

February 2004<br />

Exhibit P-3a, Individual Modification Program<br />

P-1 Shopping List-Item No 83 Page 5 of 5 Unclassified<br />

Classification


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/BA2 BLI 3311 JEDMICS<br />

Program Element for Code B Items: Other Related Program Elements<br />

Prior ID To<br />

Years Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

QUANTITY 5800 5800<br />

COST<br />

(In Millions) $47.1 $11.7 $6.4 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $65.2<br />

The Joint Engineering Data Management Information and Control System (JEDMICS) is the Joint DoD system for permanently storing, managing and controlling digital engineering<br />

drawings and associated technical data. The JEDMICS System replaced labor intensive, inefficient manual and semi-automated engineering drawing repositories with automated central<br />

repositories for all engineering and manufacturing information for DOD Weapon Systems. This information is used by the fleet shore establishment and industry in support of spares<br />

acquisition, equipment maintenance, and modernization and preparation of technical publications. The JEDMICS system is deployed at 26 interoperable sites that service 600 locations<br />

worldwide. JEDMICS currently manages and controls 77,000,000 engineering images and has 34,000 authorized users responsible for over 70,000 user sessions per month. Over 2.5<br />

million digital images are retrieved each month. The effective utilization of JEDMICS by the contractor and Government communities will require secure network access and adequate<br />

security for all data stored within the repository.<br />

Funding is used to comply with Congressional direction as follows: (1) $5.905 FY03 funds were for the procurement & integration of the same Multi-Level Security Solution implemented in<br />

FY2000 and FY2001 and the extension of those products into other Logistics process environments and (2) $12.195, ($5.842 FY03 and $6.353 FY04 funds) continues to acquire a Pacific<br />

Fleet Combined Operations Wide Area Network system consisting of a National Security Administration (NSA) certified product for a secured network solution.<br />

FY03 values reflect actual program values.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 84 PAGE NO. 1<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS DATE:<br />

P-40a February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY/ BA2 BLI 3311 JEDMICS<br />

ID Prior To<br />

Procurement Items Code Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Complete Total<br />

Diamond NIC Secure Network Interface System A<br />

Quantity 5800 5800<br />

Cost 20.471 20.471<br />

HW/SW test site upgrades 0.300 0.300<br />

Certification/Accreditation 7.500 7.500<br />

Open Application Interface (OAI) S/W Pkg 2.452 2.452<br />

System H/W & S/W to run OAI 2.406 2.406<br />

COTS H/W &S/W for a turnkey WEB solution 2.590 2.590<br />

COTS HW & SW for expanded JEDMICS Security<br />

access and WEB Security Improvements. 3.456 3.456<br />

COTS HW & SW for extension of the JEDMICS<br />

Security solution into logistics processes. 3.458 5.905 9.363<br />

COTS HW & SW for Combined Operations WAN 4.460 5.842 6.353 16.655<br />

Total Funding 47.093 0.000 11.747 6.353 0.000 0.000 0.000 0.000 0.000 0.000 65.193<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 84 PAGE NO. 2<br />

Note: UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

IT SYSTEM COST ANALYSIS IT System DATE:<br />

P-5 JEDMICS February 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD<br />

Other Procurement, Navy, BA2 JEDMICS<br />

BLI 3311 JEDMICS/42JD<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID Prior FY 2003 FY 2004 FY 2005<br />

CODE Code Years<br />

Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

JE100 DiamondNIC Secure Network Interface System A 20,471<br />

JE100 Test Center HW/SW upgrade 300<br />

JE100 Certification/Accreditation 7,500<br />

JE100 Open Application Interface (OAI) S/W Pkg 2,452<br />

JE100 System H/W & S/W to run OAI 2,406<br />

JE100 COTS H/W &S/W for a turnkey WEB solution 2,590<br />

JE100 Combined Operations Wide Area Network (COWAN)<br />

COTS HW / SW Solution 4,460 5,842 5,842 6,353 6,353<br />

JE100 Turnkey WEB Secure Access Upgrades 3,456<br />

JE100 NAVAIR Logistics IT Prototype 3,458 5,905 5,905<br />

47,093 0 11,747 6,353 0<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 84 PAGE NO. 3<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) IT System A. DATE<br />

JEDMICS February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE<br />

Other Procurement, Navy 42JD<br />

BA2, JEDMICS BLI 3311 JEDMICS<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

JD100/FY04 - Combined Operations Wide<br />

Area Network COTS HW / SW Solution 5,817 NAWC-AD, Pax River, 3/04 Sole S. FFP/CPFF CRYPTEK Secure Communications,LLC 5/04 9/04 Yes N/A<br />

MD Sterling, VA<br />

300 NAWC-AD, Pax River, N/A WX NAWC-AD, Pax River, MD 2/04 6/04 Yes N/A<br />

MD<br />

236 SPAWARSYSCEN, N/A WX SPAWARSYSCEN, San Diego, CA 2/04 6/04 Yes N/A<br />

San Diego, CA<br />

D. REMARKS:<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 84 Classification:<br />

PAGE NO. 4 UNCLASSIFIED


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT 336800 NAVAL SHORE COMMUNICATIONS 52D6<br />

QUANTITY<br />

FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TO COMP TOTAL<br />

COST<br />

(in millions) $97.4 $76.3 $57.1 $58.1 $47.7 $48.8 $49.8 Continuing Continuing<br />

PROGRAM COVERAGE FY02-09: The Naval Shore Communications program procures and installs the Defense Message System and Base Level Information Infrastructure requirement<br />

at shore stations.<br />

(1) Defense Message System(D6001)) The Defense Message System ( DMS) replaces the Automated Digital Network (AUTODIN) message delivery architecture with a single<br />

organizational messaging system throughout the DoD, with seamless strategic (ashore) and tactical (afloat) interoperability. DMS is an integrated suite of COTS-based applications for<br />

electronic delivery of organizational messages, which is designed to run on the Defense Information System Network (DISN). The DoN DMS program provides for the planning, procuremen<br />

integration, installation and upgrade of DMS components to provide end-to-end interoperable messaging capabilities for all Navy and USCG shore activities, as well as procurement of some<br />

DMS components for USMC activities. Implementation of the end-to-end messaging capability comprises four functional categories. Specific configurations implemented at individual sites<br />

within each functional category vary to such a degree that aggregate quantities (and unit costs) are not applicable and would be misleading<br />

(a) Messaging Control Centers (aka DMS messaging infrastructure sites): provides for site survey and design engineering, hardware procurement, hardware/software integration,<br />

installation and checkout, certification and technical support to implement Navy and Coast Guard DMS messaging infrastructure control centers, which provide messaging, directory, and<br />

security services and network interface to the Joint DMS backbone for Navy organizational messaging user commands. Implements 4 Area Control Centers (ACCs), 9 Local Control Centers<br />

(LCCs), and 8 Remote Server Sites (RSSs) at Naval Computer and Telecommunications Area Master Stations (NCTAMS) and Naval Computer and Telecommunications Stations (NCTS)<br />

worldwide. Separate DMS enclaves are provided at each ACC/LCC/RSS for Sensitive But Unclassified (SBU) and Secret classifications of organizational messaging; separate TS/Collatera<br />

enclaves are provided at the 4 ACCs. Also provides for implementation of Sensitive Compartmented Information (SCI) ACCs/LCCs at 11 Naval Intelligence Community sites worldwide.<br />

Includes integration and phased implementation of Tactical Messaging Gateway (TMG) at 3 NCTAMS and 3 SCI messaging centers, which will constitute the DMS messaging tactical<br />

gateway to afloat users. Site configurations vary, depending on volume of organizational user commands serviced by each messaging control center.<br />

(b) Organizational Messaging Capabilities at User Commands: provides for hardware and software procurement, hardware/software integration, installation and checkout, and initial<br />

user training necessary to provide organizational messaging Enabling Capabilities (ECs) to approximately 3,000 designated Navy shore commands. Separate DMS ECs are provided for<br />

Sensitive But Unclassified (SBU), Secret, and Top Secret/Collateral GENSER classifications (depending on messaging requirements of individual command), as well as Sensitive<br />

Compartmented Information (SCI) messaging capabilities for Navy user commands in the Intelligence Community. Individual EC configurations vary, depending upon each command's<br />

available means of network connectivity (i.e., dial-up or NIPRNET/SIPRNET connection, direct or through local network); EC configurations range from a workstation with DMS user agent<br />

(client) software to a DMS groupware server upgrade for existing email server. Also provides for implementation of DMS groupware servers and approximately 10,000 desktop user agents<br />

at headquarters of designated Combatant Unified Commanders (JFCOM, USPACOM) and their sub-unified commands, as well as CNO/SECNAV headquarters and Navy Fleet Commander<br />

in Chief (FLTCINCs). FY04-09 provides for hardware and software procurement, hardware/software integration, installation and checkout for shore tactical sites and Tac Mobile units<br />

including Joint Mobile Ashore Support Terminal (JMAST), Mobile Operational Command Center (MOCC) and Mobile Inshore Undersea Warfare (MIUW).<br />

(c) Upgrades: provides for hardware technical refresh of DMS messaging infrastructure components at Navy ACCs, LCCs, and RSSs necessary to integrate successive releases of<br />

DMS software upgrades and major versions. Also provides for implementation of augmented DMS components necessary to accommodate fielding of afloat tactical users.<br />

(d) Technical Refresh of Transitional Messaging Components:provides for technical refresh/upgrade of existing transitional messaging systems necessary to maintain interoperability<br />

with legacy messaging formats and interface with tactical users. Transitional messaging systems will remain operational until the transition from the AUTODIN messaging system to DMS is<br />

completed for all Navy activities, ashore and afloat.<br />

JUSTIFICATION OF BUDGET YEAR REQUIREMENTS:<br />

DMS is a DoD-mandated, Joint ACAT IAM program managed by the Defense Information Systems Agency (DISA) and executed by the individual Services/Agencies.<br />

Assistant Secretary of Defense (C3I) memorandum " Electronic Mail Policy-Implementation Guidance" (9 Mar 1995) established DMS as the "one seamless, end-to-end global electronic<br />

messaging service within the Department of Defense . All electronic messaging (AUTODIN and legacy electronic mail) within the DoD must migrate to DMS-compliant messaging as rapidly<br />

as possible.”<br />

Assistant Secretary of Defense (C3I) memorandum "Revised Defense Message System Transition Plan" (28 Dec 1999) provides updated milestones for the phased transition from<br />

AUTODIN to DMS messaging.<br />

P-1 Shopping List - Item No. 85 - 1 of 8<br />

Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET (Continued) DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT<br />

336800 NAVAL SHORE COMMUNICATIONS 52D6<br />

2) Base Level Information Infrastructure (D6005): The Base Level Information Infrastructure (BLII) program modernizes existing Information Technology (IT) plants and installs up to date IT capability where none currently<br />

exists at major OCONUS fleet concentration bases and stations. Primary functional areas of BLII are:<br />

(a) BLII OCONUS IT Infrastructure (formerly BLII WAN, RNOC, MAN, BAN, LAN): Provides a fully integrated, interoperable, secure IT infrastructure designed to enable rapid and reliable transfer of voice, video and data<br />

at prioritized OCONUS bases, stations and homeports. Installs/modernizes inside and outside cable plants including LAN/BAN/WAN electronics, and provides information assurance, asset inventory, and network management<br />

capabilities at each site. Improves capabilities and reduces total ownership costs by consolidating network services at efficient Information Technology Support/Outreach Centers (ITSC/ITOCs) in the Far East, European, and<br />

Bahrain theaters.<br />

(b) Telephony Replacement/Modernization (formerly BLII Voice): Replaces obsolete telephone switches and upgrades firmware and software, in accordance with CJCSI 6215.01B, at telephone switch locations that<br />

service OCONUS and CONUS forces. Modernizes outdated and overloaded telephone switch cable plants.<br />

(c) Force Protection Projects OCONUS: (c) CINCPACFLT (CPF), CINUSNAVEUR (CNE) and COMUSNAVCENT (CUSNC) have declared pier IT infrastructure modernization to be a Force Protection issue, since it<br />

enables forward deployed ships to maintain situational awareness and receive operational and intelligence traffic while performing maintenance or training on their RF systems while pier-side. CPF, CNE and CUSNC have<br />

emphasized their requirement to expand SIPRnet capability due to anti-terrorist military operations. Installs/modernizes OCONUS pier IT infrastructure to IT-21 standards. Provides IT Infrastructure to operational and logistical<br />

support buildings.<br />

(d) BLII Equipment - MILCON Projects: Procures shore Defense Red Switch Network (DRSN), Defense Switch Network (DSN), LAN, BAN, cable plant, switches, hubs, routers, basic network/information distribution servers<br />

and workstations in support of the C4I upgrades associated with Military Construction (MILCON) projects for USPACOM and CUSNC.<br />

(3) Equipment Installation (D6776): Installs the above procured equipment at shore stations worldwide. Installations include quality assurance, acceptance test & evaluation, and as-built drawings. However in a majority of<br />

BLII efforts, a "turnkey" procurement and install integrated contract is used to achieve cost effectiveness and efficiency. Only government oversight of the install effort is required in these cases.<br />

P-1 Shopping List - Item No. 85 - 2 of 8<br />

Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE<br />

COST ANALYSIS February 2004<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT 336800 NAVAL SHORE COMMUNICATIONS 52D6<br />

FY 2003<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

FY 2004 FY 2005<br />

COST ID UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE QTY COST COST QTY COST COST QTY COST COST<br />

D6001 Defense Messaging Systems (DMS) 1<br />

DMS<br />

A Var 24,805 Var 4,575 Var 4,157<br />

Messaging Control Centers Var 7,887 1,121 Var 0<br />

Organizational Messaging Capabilities at User Commands Var 6,587 Var 1,121 Var 0<br />

Upgrades Var 8,390 Var 533 Var 1,328<br />

Transitional Messaging Components Technical Refresh Var 1,941 Var 1,800 Var 2,829<br />

D6005 Base Level Information Infrastructure (BLII 2,3<br />

A 51,621 64,097 46,830<br />

BLII OCONUS IT Infrastructure Var 24,888 Var 20,640<br />

BLII Wide Area Network (WAN) 0 0.00 0<br />

BLII Regional Network Operating Center (RNOC) 0 0.00 0<br />

BLII Metropolitan Area Network (MAN) 0 0.00 0<br />

BLII Base Area Network (BAN) 16 1,768.38 28,294<br />

BLII Local Area Network (LAN) 0 0.00 0<br />

Telephony Replacement/Modernization 4<br />

5 2,073.20 10,366 Var 15,997 Var 7,155<br />

Force Protection Projects OCONUS Var 23,212 Var 19,035<br />

BLII Equipment - MILCON projects 12,961 0 0<br />

D6555 Production Support 3,789 3,122 1,828<br />

Defense Messaging Systems 2,323 689 231<br />

Base Level Information Infrastructure (BLII) 1,466 2,433 1,597<br />

D6776 Non-FMP Installation A 17,223 4,543 4,251<br />

Defense Messaging Systems (DMS) 6,623 973 681<br />

Base Level Information Infrastructure (BLII)<br />

BLII<br />

10,600 3,570 3,570<br />

BLII Install 2,5<br />

3,570 3,570<br />

BLII Wide Area Network (WAN) 2,200<br />

BLII Regional Network Operating Center (RNOC) 200<br />

BLII Metropolitan Area Network (MAN) 0<br />

BLII Base Area Network (BAN) 1,200<br />

BLII Local Area Network (LAN) 0<br />

BLII Voice 0<br />

BLII Equipment - MILCON projects 7,000 0 0<br />

Total SPAWAR Control 97,438 76,337 57,066<br />

Remarks:<br />

1) DMS FY03-09 reflect functional categories to depict types of capabilities being implemented.<br />

2) BLII FY03 includes separate lines for WAN, RNOC, MAN, BAN, LAN equipment and installations. In FY04-09 the equipment and installation lines are combined into the single line BLII OCONUS IT infrastructure.<br />

Specific configurations implemented at individual sites within each infrastructure category vary to such a degree that aggregate quantities (and unit costs) previously depicted are not applicable and would be misleading.<br />

The preferred execution vehicle for BLII is the ViViD contract--an omnibus contract to procure and install BLII infrastructure.<br />

3) BLII FY03: Unit cost fluctuations are due to size and complexity of Navy facilities and activities being upgraded. Example: More buildings on a Navy facility will require a more extensive and complex Base Area Network<br />

(BAN) to be installed and increased capability at the supporting NOC. Thus, unit costs depicted above are based on an average cost of each planned component installation.<br />

4) BLII Voice renamed Telephony Replacement/Modernization in FY04 - 09.<br />

5) FY04-09: BLII Install line is non turnkey BLII OCONUS IT Infrastructure and Force Protection Projects OCONUS Installations.<br />

DD FORM 2446, JUN 86 Exhibit P-5, Budget Item Justification<br />

Unclassified<br />

P-1 Shopping List - Item No. 85 - 3 of 8


UNCLASSIFIED<br />

CLASSIFICATION<br />

PROCUREMENT HISTORY AND PLANNING<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT 336800 NAVAL SHORE COMMUNICATIONS 52D6<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE Delivery COST NOW AVAILABLE<br />

D6001 Defense Messaging Systems 03 Various Various SPAWAR N/A Dec-02 Feb-03 Var Yes N/A<br />

04 Various Various SPAWAR N/A Dec-03 Feb-04 Var Yes N/A<br />

05 Various Various SPAWAR N/A Dec-04 Feb-05 Var Yes N/A<br />

D6005 Base Level Information Infrastructure (BLII) 1<br />

A. DATE<br />

03 Various Various SPAWAR N/A Dec-02 Feb-03 Var Yes N/A<br />

04 Various Various SPAWAR N/A Dec-03 Feb-04 Var Yes N/A<br />

05 Various Various SPAWAR N/A Dec-04 Feb-05 Var Yes N/A<br />

D. REMARKS<br />

1) The preferred execution vehicle for BLII is the ViViD contract--an omnibus contract to procure and install BLII infrastructure.<br />

P-1 Shopping List - Item No. 85 - 4 of 8<br />

February 2004<br />

Exhibit P-5a, Procurement History and Planning<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

MODIFICATION TITLE:<br />

Defense Messaging Systems (ASHORE) 1,2<br />

COST CODE D6001<br />

MODELS OF SYSTEMS AFFECTED: Various<br />

DESCRIPTION/JUSTIFICATION: State of the art technologies for messaging functions which will replace AUTODIN. Costs vary by site size, requirements, and configuration.<br />

Funding provides for procurement and installation of Fleet Tactical Gateways at DMS messaging control centers, SCI messaging control centers, DMS organizational<br />

messaging capabilities for SCI user commands, messaging control center hardware upgrades to support software releases, shore tactical sites and Tac Mobile units,<br />

and technical refresh of transitional messaging components.<br />

February 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 4 120.9 16.0 24.8 4.6 4.2 2.7 2.4 2.4 2.5 con't 180.3<br />

Messaging Control Centers 5.9 7.9 1.1 0.0 0.0 0.0 0.0 0.0 con't 14.9<br />

User Commands Messaging Capabilities 1.7 6.6 1.1 0.0 0.0 0.0 0.0 0.0 con't 9.4<br />

Upgrades 5.8 8.4 0.5 1.3 2.7 1.4 1.6 2.5 con't 24.3<br />

Transitional Messaging Components 2.6 1.9 1.8 2.8 0.0 1.0 0.7 0.0 con't 10.9<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 6.1 2.2 2.3 0.7 0.2 0.2 0.2 0.1 0.2 con't 12.2<br />

Other - (DSA)<br />

Interm Contractor Support<br />

Installation of Hardware 0.0 41.5 Var 6.4 Var 6.6 Var 1.0 Var 0.7 Var 0.5 Var 0.4 Var 0.4 Var 0.4 con't 57.8<br />

PRIOR YR EQUIP 0.0 41.5 41.5<br />

FY 02 EQUIP Var 6.4 6.4<br />

FY 03 EQUIP Var 6.6 6.6<br />

FY 04 EQUIP Var 1.0 1.0<br />

FY 05 EQUIP Var 0.7 0.7<br />

FY 06 EQUIP Var 0.5 0.5<br />

FY 07 EQUIP Var 0.4 0.4<br />

FY 08 EQUIP Var 0.4 0.4<br />

FY 09 EQUIP Var 0.4<br />

FY TC EQUIP con't<br />

TOTAL INSTALLATION COST 41.5 6.4 6.6 1.0 0.7 0.5 0.4 0.4 0.4 con't 57.8<br />

TOTAL PROCUREMENT COST 168.5 24.5 33.8 6.2 5.1 3.3 2.9 2.9 3.0 250.3<br />

METHOD OF IMPLEMENTATION: SPAWAR Sys Center Install ADMINISTRATIVE LEADTIME: 2 Mos PRODUCTION LEADTIME: 2 Mos<br />

CONTRACT DATES: FY 2003: Dec-02 FY 2004: Dec-03 FY 2005: Dec-04<br />

DELIVERY DATES: FY 2003: Feb-03 FY 2004: Feb-04 FY 2005: Feb-05<br />

FY 04 FY 05 FY 06 FY 07<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT Var Var Var Var Var<br />

OUTPUT Var Var Var Var Var<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT Var Var con't<br />

OUTPUT Var Var con't<br />

Notes/Comments<br />

1/ Total quantity meets inventory objective. Program continues indefinitely. Exhibit P-3a, Individual Modification Program<br />

2/ PY quantities are regions to match the budgets submitted in those years. Beginning in FY02 quantities reflect equipment functional categories to better depict capabilities implemented. Unclassified<br />

Classification<br />

P-1 Shopping List - Item No. 85 - 5 of 8


UNCLASSIFIED<br />

MODIFICATION TITLE: Base Level Information Infrastructure (BLII) 1<br />

COST CODE D6005<br />

MODELS OF SYSTEMS AFFECTED: Various<br />

DESCRIPTION/JUSTIFICATION: BLII modernizes existing IT plans and installs up to date IT capability where none exists at major OCONUS fleet concentration bases and stations.<br />

Major functional areas of BLII are BLII OCONUS IT Infrastructure, Telephony Replacement/Modernization, and Force Protection Projects OCONUS.<br />

February 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

BLII Equipment 1,2<br />

Var 242.3 21.4 38.7 64.1 46.8 52.8 43.2 44.2 45.1 con't 598.6<br />

BLII OCONUS IT Infrastructure Var 24.9 Var 20.6 Var 25.7 Var 25.2 Var 25.5 Var 25.6 con't 147.5<br />

BLII Wide Area Network (WAN) 12 9.7 1 0.6 0.0 0<br />

BLII Regional Network Operating Center (RNOC) 8 30.9 3 1.3 0.0 0<br />

BLII Metropolitan Area Network (MAN) 3 5.2 0 0.0 0.0 0<br />

BLII Base Area Network (BAN) 20 45.0 1 1.0 16.0 28.3<br />

BLII Local Area Network (LAN) 580 29.2 85 3.5 0.0 0<br />

Telephony Replacement/Modernization (Voice) 2 12.0 5 15.0 5.0 10.4 Var 16.0 Var 7.2 Var 18.9 Var 9.7 Var 10.5 Var 11.3 con't 110.8<br />

Force Protection Projects OCONUS<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Var 23.2 Var 19.0 Var 8.2 Var 8.3 Var 8.3 Var 8.3 con't 75.3<br />

Production Support<br />

Other - (DSA)<br />

Interm Contractor Support<br />

6.2 1.6 1.5 2.4 1.6 1.8 1.4 1.5 1.5 con't 19.5<br />

Installation of Hardware Var 72.6 95 0.4 21.0 3.6 Var 3.6 Var 3.6 Var 0.2 Var 0.2 Var 0.2 Var 0.2 con't 84.5<br />

PRIOR YR EQUIP Var 72.6 72.6<br />

FY 02 EQUIP 95 0.4 0.4<br />

FY 03 EQUIP 21.0 3.6 3.6<br />

FY 04 EQUIP Var 3.6 3.6<br />

FY 05 EQUIP Var 3.6 3.6<br />

FY 06 EQUIP Var 0.2 0.2<br />

FY 07 EQUIP Var 0.2 0.2<br />

FY 08 EQUIP Var 0.2 0.2<br />

FY 09 EQUIP Var 0.2 0.2<br />

FY TC EQUIP con't<br />

TOTAL INSTALLATION COST 72.6 95 0.4 21 3.6 3.6 3.6 0.2 0.2 0.2 0.2 con't 84.5<br />

TOTAL PROCUREMENT COST 321.1 23.3 43.7 70.1 52.0 54.8 44.8 45.9 46.8 702.6<br />

METHOD OF IMPLEMENTATION: VIVID Turnkey Contract ADMINISTRATIVE LEADTIME: 2 Mos PRODUCTION LEADTIME: 2 Mos<br />

CONTRACT DATES: FY 2003: Dec-02 FY 2004: Dec-03 FY 2005: Dec-04<br />

DELIVERY DATES: FY 2003: Feb-03 FY 2004: Feb-04 FY 2005: Feb-05<br />

FY 04 FY 05 FY 06 FY 07<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT Var Var Var Var Var<br />

OUTPUT Var Var Var Var Var<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT Var Var con't<br />

OUTPUT<br />

Notes/Comments<br />

Var Var con't<br />

1) PY: BLII Equipment broken out into WAN/RNOC/MAN/BAN/LAN only in FY01. Exhibit P-3a, Individual Modification Program<br />

2) FY04-09: WAN/RNOC/MAN/BAN/LAN consolidated into BLII OCONUS IT Infrastructure to better describe products and capabilities delivered to the customer. Unclassified<br />

Classification<br />

P-1 Shopping List - Item No. 85 - 6 of 8


UNCLASSIFIED<br />

MODIFICATION TITLE: Base Level Information Infrastructure (BLII) Equipment - MILCON projects. February 2004<br />

COST CODE D6005<br />

MODELS OF SYSTEMS AFFECTED: All ship (pierside) and shore voice, video and data requirements.<br />

DESCRIPTION/JUSTIFICATION: Procures shore Defense Red Switch Network (DRSN), Defense Switch Network (DSN), LAN, BAN, cable plant, switches, hubs,<br />

routers, basic network/information distribution servers and workstations in support of the C4I upgrades associated with<br />

Military Construction (MILCON) projects for USPACOM and CUSNC.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs<br />

FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Gulf Region<br />

Europe Region<br />

0.0 0.9 0.0 0.9<br />

Far East Region 4.5 11.5 11.4 27.4<br />

Other Requirements<br />

Production Support<br />

Other (DSA)<br />

2.5 1.6 4.1<br />

Installation of Hardware 0.3 6.9 7.0 14.2<br />

PRIOR YR EQUIP 0.3 0.3<br />

FY 02 EQUIP 6.9 6.9<br />

FY 03 EQUIP 7.0 7.0<br />

FY 04 EQUIP<br />

FY 05 EQUIP<br />

FY 06 EQUIP<br />

FY 07 EQUIP<br />

FY 08 EQUIP<br />

FY 09 EQUIP<br />

FY TC EQUIP<br />

0.0<br />

TOTAL INSTALLATION COST 0 0.3 0 6.9 0 7.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 14.2<br />

TOTAL PROCUREMENT COST 0 4.8 0 21.7 0 20.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 46.5<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: N/A PRODUCTION LEAD-TIME: N/A<br />

CONTRACT DATES: FY 2003: N/A FY 2004: N/A FY 2005: N/A<br />

DELIVERY DATES: FY 2003: Var FY 2004: Var FY 2005: N/A<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT Var<br />

OUTPUT Var<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT<br />

OUTPUT<br />

Notes/Comments Exhibit P-3a, Individual Modification Program<br />

1) Gulf Region: C4I upgrades to support MILCON P903/904 (NAVCENT Hq Bld). Estimated Completion Date: Third Quarter, FY04 Unclassified<br />

2) Far East Region: C4I upgrades and equipment transition in support of MILCON (USPACOM Command Center). Estimated Completion Date: First Quarter, FY05 Classification<br />

3) Each Milcon project represents 1 command center. Installation includes various equipment.<br />

4) Other Requirements is a Site R requirement.<br />

P-1 Shopping List - Item No. 85 - 7 of 8


UNCLASSIFIED<br />

CLASSIFICATION<br />

PRODUCTION SCHEDULE February 2004<br />

(DOD EXHIBIT P-21)<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD NO.<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT 336800 NAVAL SHORE COMMUNICATIONS 52D6<br />

S ACCEP BAL FISCAL YEAR 04 FISCAL YEAR 05 FISCAL YEAR 06<br />

COST ITEM/MANUFACTURER E PROC PRIOR DUE CY 03 CALENDAR YEAR 04 CALENDAR YEAR 05 CALENDAR YEAR 06<br />

CODE R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S<br />

D6001 Defense Messaging Systems 1<br />

D6005 Base Level Information Infrastructure 1<br />

V 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E<br />

FY T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P<br />

04 Var Var A V<br />

05 Var Var A V<br />

06 Var A V<br />

04 Var Var A V<br />

05 Var Var A V<br />

06 Var Var A V<br />

1) V = Various OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP<br />

PRODUCTION RATE PROCUREMENT LEADTIMES<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

ITEM Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

P-1 Shopping List - Item No. 85 - 8 of 8<br />

DATE<br />

Exhibit P-21 Production Schedule<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT 341500 - ISSP (Information Systems Security Program) 52DA<br />

QUANTITY<br />

FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TO COMP TOTAL<br />

COST<br />

(in millions) $83.9 $81.2 $88.4 $112.6 $122.5 $118.2 $118.5 Continuing Continuing<br />

P.E. #0303140N<br />

PROGRAM COVERAGE: The Information Systems Security Program (ISSP) provides funds for procurement of secure communications equipment for Navy Ships, shore sites, aircraft, Marine Corps, and U.S. Coast Guard to PROTECT information<br />

systems from unauthorized access or modification of information, and against the denial of service to authorized users or provision of service to unauthorized users. Information Assurance is a layered protection strategy, using COTS and GOTS<br />

hardware and software products that collectively provides an effective Network Security Infrastructure (multiple level security mechanisms and ability to detect and react to intrusions). Information Assurance is critical in protecting our ability to wage<br />

Network Centric Warfare. The following ISSP specific efforts will be funded under this program:<br />

SECURE VOICE: The Secure Voice program procures equipment to secure voice communications. Equipment to be procured in FY 04 and FY 05 include various configurations of Secure Terminal Equipment (STE), Secure Voice for the 21st<br />

Century Interworking Functions (SV-21 IWF), Secure Voice for the 21st Century Crypto (SV-21 Crypto), and associated ancillary equipment, production and installation support efforts. The STE is a ship and shore desktop terminal for classified voice,<br />

data, facsimile, and video conferencing. It will replace the existing STU-III units via a phased approach. Various configurations of STE equipment to be procured include: Office, Data, Tactical, Narrowband, Condor (wireless), C2 (TACTERM), OMNI<br />

and Omega. Secure Voice for the 21st Century (SV-21) provides a direct dial gateway, rack mountable, and multi-channel gateway that transfers clear or encrypted digital voice/data to multiplexer radio frequency equipment for SATCOM transmission<br />

Associated ancillary items to be procured inlcude: handsets, power supplies, PUP sleeves and FNDBT upgrade kits.<br />

SECURE DATA: The Secure Data program procures equipment to secure record and data communications. Equipment to be procured in FY 04 and FY 05 include Network Firewall Security Suites (NFSS) and Cryptographic<br />

(CRYPTO)/Communication Security (COMSEC) Equipment, and associated ancillary, production and installation support efforts. The NFSS program procures equipment to secure Navy network information systems. Procurements within the NFSS<br />

equipment line include: Standard Mail Guards (SMG), which allows two way flow between SECRET high Local Area Networks (LANs) and Unclassified LANs, FIREWALL components, which provides protection for networks from unauthorized users,<br />

Virtual Private Networks (VPNs), which provides encrypted "Point-to-Point" virtual communication networks, IDS (Intrusion Detection Systems), Coalition Data Servers (CODs), Administrator Tool Kits, Network Security tools, Network Intrusion filters,<br />

and token access controllers. Procurements within the CRYPTO/COMSEC equipment line include: KG family of cryptos, Fastlanes (KG-75), Taclanes (KG-175), Sonets (KG-189), KIV-6, KIV-7s, KIV-19s, Programmable Embedded Infosec Product<br />

(PEIP), and Hayfield Chips.<br />

KEY MANAGEMENT INFRASTRUCTURE (KMI): The Key Management program is a COMSEC key distribution and hardware management system consisting of interoperable Joint Service and Civil Agency key management systems. NSA<br />

established the Electronic Key Management System (EKMS) program to meet multiple objectives which includes supplying electronic key in a secure and operationally responsive manner and providing COMSEC managers with an automated system<br />

capable of ordering, generation, distribution, storage, security, accounting, and access control. Equipment to be procured in FY 04 and FY 05 include Local Management Devices (LMDs), Local COMSEC Management Systems (LCMS), Tier 2 Central<br />

Processing Unit (CPU) replacement upgrades, EKMS Upgrades (hardware and software), Data Transfer Devices (DTDs), Public Key Infrastructure (PKI) security products, and associated ancillary, production and installation support efforts.<br />

The LMD is a COTS computer that runs LCMS software which controls the Key Processor Equipment (KPE) and provides the COMSEC manager with improved security and enhanced management capabilities.<br />

The Data Transfer Device (DTD), Tier 3, stores, manages, transfers and loads key and COMSEC data through automatic loading of End Crypto Units (ECUs). Specifically, the DTD-2000 (KOV-21) provides the next generation DTD which is based on<br />

a PCMCIA card (crypto engine) and COTS notebook/palmtop computer.<br />

Public Key Infrastructure (PKI) provides digital certificate management to authenticate the identity of users on networks as well as to encrypt electronic information flowing over those networks. Procurements include: Component Authority Devices<br />

(CAD), Token readers, Tokens for Classified users, Class 4 tokens, Local Registration Authority (LRA) workstations. The Security Token card provides writer to reader security for Local Area Networks (LANs).<br />

P-1 Shopping List - Item No 86 - Page 1 of 16 Exhibit P-40, Budget Item Justification


UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET (Continued) DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT 341500 - ISSP (Information Systems Security Program) 52DA<br />

INSTALLING AGENT: The ISSP equipment will be installed by the In-Service Engineering Activity (ISEA).<br />

P-1 Shopping List - Item No 86 - Page 2 of 16 Exhibit P-40, Budget Item Justification


UNCLASSIFIED<br />

COST ANALYSIS February 2004<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT 341500 - ISSP (Information Systems Security Program) 52DA<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

PY FY 2003 FY 2004 FY 2005<br />

COST ID TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE COST QTY COST COST QTY COST COST QTY COST COST<br />

DA013 STE A 9,793 3.51 34,418 10,655 3.18 33,887 679 4.36 2,959<br />

DA042 SV-21 (IWF) B 229 8.25 1,890 297 8.35 2,481<br />

DA043 SV-21 (CRYPTO) B 121 13.81 1,671 168 13.95 2,344<br />

SECURE VOICE: 34,418 37,448 7,784<br />

DA070 CND A VAR 10,362 VAR 10,239 VAR 9,190<br />

DA070 COMSEC A VAR 12,407<br />

DA071 COMSEC A VAR 15,770 VAR 55,907<br />

SECURE DATA: 22,769 26,009 65,097<br />

DA009 SDS A 1,435 2.00 2,870 1,547 2.03 3,136 948 2.05 1,948<br />

DA009 CYZ-10 UPGRADES A 0 0 0<br />

DA003 LMD REPLACEMENT A 50 3.00 150 101 3.05 308 140 3.08 431<br />

DA004 EKMS UPGRADES A VAR 1,434 VAR 856 VAR 398<br />

DA018 PKI SECURITY PRODUCTS A VAR 5,999 VAR 4,735 VAR 3,799<br />

DA019 DMS SECURITY PRODUCTS A VAR 920 VAR 0 VAR 0<br />

KEY MGMT INFRASTRUCTURE (KMI): 11,373 9,035 6,576<br />

DA555 PRODUCTION SUPPORT N/A 7,993 3,708 4,227<br />

TOTAL PROCUREMENT: 76,553 76,200 83,684<br />

DA777 INSTALLATION NON FMP N/A 4,101 1,134 873<br />

DA777 INSTALLATION FMP N/A 2,763 3,401 3,582<br />

DA777 DSA N/A 524 478 279<br />

INSTALLATION: 7,388 5,013 4,734<br />

TOTAL PROCUREMENT & INSTALLATION: 83,941 81,213 88,418<br />

Remarks:<br />

DA009 - FY02 unit cost includes non-recurring costs in support of the DTD procurements.<br />

DA009 - Product name change from DTD/KOV-21 to Secure DTD 2000 System (SDS) beginning in FY03.<br />

DA013 - STE Unit cost is based on an average of 6 different configurations and can vary from year to year. Reference L3 Comms NSA Contract 96-D-0025 (POOOO7).<br />

DA070 - Network Systems Security (NSS) name change to Computer Network Defense (CND) beginning in FY03.<br />

DA071 - New cost code created to distinguish COMSEC from CND beginning in FY04.<br />

P-1 Shopping List - Item No 86 - Page 3 of 16 Exhibit P-5, Cost Analysis<br />

DATE


UNCLASSIFIED<br />

PROCUREMENT HISTORY AND PLANNING<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT 341500 - ISSP (Information Systems Security Program) 52DA<br />

CONTRACTOR CONTRACT RFP DATE SPECS DATE<br />

COST ELEMENT OF COST FY AND METHOD LOCATION ISSUE AWARD OF FIRST QTY UNIT AVAILABLE REVISIONS<br />

CODE LOCATION & TYPE OF PCO DATE DATE Delivery COST NOW AVAILABLE<br />

DA013 STE 02 L3 Comms Corp, NJ SS/FFP DIR NSA Mar-02 Sep-03 3,007 3.64 YES N/A<br />

DA013 STE 03 L3 Comms Corp, NJ SS/FFP DIR NSA Jan-03 Jul-04 9,793 3.51 YES N/A<br />

DA013 STE 04 L3 Comms Corp, NJ SS/FFP DIR NSA Jan-04 Jul-05 10,655 3.18 YES N/A<br />

DA013 STE 05 L3 Comms Corp, NJ SS/FFP DIR NSA Jan-05 Jul-06 679 4.36 YES N/A<br />

DA042 SV-21 (IWF) 04 L3 Comms Corp, NJ SS/FFP DIR NSA Jan-04 Jul-05 229 8.25 YES N/A<br />

DA042 SV-21 (IWF) 05 L3 Comms Corp, NJ SS/FFP DIR NSA Jan-05 Jul-06 297 8.35 YES N/A<br />

DA043 SV-21 (CRYPTO) 04 L3 Comms Corp, NJ SS/FFP DIR NSA Jan-04 Jul-05 121 13.81 YES N/A<br />

DA043 SV-21 (CRYPTO) 05 L3 Comms Corp, NJ SS/FFP DIR NSA Jan-05 Jul-06 168 13.95 YES N/A<br />

DA009 SDS 03 GTC (Group Tech Corp), FL SS/FFP NSA/SSC SD Jun-03 Jun-04 1,435 2.00 YES N/A<br />

DA009 SDS 04 GTC (Group Tech Corp), FL SS/FFP NSA/SSC SD Apr-04 Apr-05 1,547 2.03 YES N/A<br />

DA009 SDS 05 GTC (Group Tech Corp), FL SS/FFP NSA/SSC SD Apr-05 Apr-06 948 2.05 YES N/A<br />

DA003 LMD REPLACEMENT 03 L3 Comms Corp, NJ C/IDIQ NSA/SSC CH Jul-03 Jan-04 50 3.00 YES N/A<br />

DA003 LMD REPLACEMENT 04 L3 Comms Corp, NJ C/IDIQ NSA/SSC CH Jan-04 Jul-04 101 3.05 YES N/A<br />

DA003 LMD REPLACEMENT 05 L3 Comms Corp, NJ C/IDIQ NSA/SSC CH Jan-05 Jul-05 140 3.08 YES N/A<br />

0329P STE - (DERF)/(COW) 02 L3 Comms Corp, NJ SS/FFP DIR NSA Dec-01 Jun-03 2,410 5.10 YES N/A<br />

D. REMARKS<br />

DA009 - FY02 unit cost includes NRE costs in support of the DTD procurements.<br />

DA009 - Product name change from DTD/KOV-21 to Secure DTD 2000 System (SDS) beginning in FY03.<br />

DA013 - STE Unit cost is based on an average of 6 different configurations and can vary from year to year. Reference L3 Comms NSA Contract 96-D-0025 (POOOO7).<br />

0329P - FY02 DERF/COW funding under this cost code is $12,300K.<br />

A. DATE<br />

February 2004<br />

P-1 Shopping List - Item No 86 - Page 4 of 16 Exhibit P-5a, Procurement History and Planning


UNCLASSIFIED<br />

MODIFICATION TITLE: STE (SECURE TERMINAL EQUIPMENT) - SHIP February 2004<br />

COST CODE DA013/DA777<br />

MODELS OF SYSTEMS AFFECTED: NONE<br />

DESCRIPTION/JUSTIFICATION:<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

Prior Yrs<br />

FY 02 FY 03 FY 04 FY 05<br />

FINANCIAL PLAN: ($ in millions)<br />

FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

2,575 16.2 1,250 4.6 1,250 4.4 412 1.3 955 2.4 940 2.7 945 2.7 963 3.2 CONT CONT CONT CONT<br />

Production Support 1.5 1.0 3.5 1.7 0.3 1.1 1.0 1.0 1.0 CONT CONT CONT CONT<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.5 0.1 CONT CONT CONT CONT<br />

Installation of Hardware 1,250 0.0 1,325 1.5 1,250 1.4 1,250 1.2 1,250 1.3 412 0.2 955 1.0 940 0.9 CONT CONT CONT CONT<br />

PRIOR YR EQUIP 1,250 0.0 1,325 1.5 1,250 1.4 3,825 2.9<br />

FY 02 EQUIP 1,250 1.2 1,250 1.2<br />

FY 03 EQUIP 1,250 1.3 1,250 1.3<br />

FY 04 EQUIP 412 0.2 412 0.2<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 955 1.0 955 1.0<br />

FY 07 EQUIP 940 0.9 940 0.9<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP CONT CONT CONT CONT<br />

TOTAL INSTALLATION COST 0.5 1.6 1.4 1.2 1.3 0.2 0.0 1.0 0.9 CONT CONT<br />

TOTAL PROCUREMENT COST 18.2 7.2 9.3 4.2 1.6 3.7 3.7 4.7 5.1 CONT CONT<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 Months PRODUCTION LEADTIME: 18 Months<br />

CONTRACT DATES: FY 2002: Mar-02 FY 2003: Jan-03 FY 2004: Jan-04 FY 2005: Jan-05<br />

DELIVERY DATES: FY 2002: Sep-03 FY 2003: Jul-04 FY 2004: Jul-05 FY 2005: Jul-06<br />

FY02 FY03 FY04 FY05<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

IN 396 396 396 137 312 310 315 313 312 310 315 313 312 310 315 313<br />

OUT 396 396 396 137 312 310 315 313 312 310 315 313 312 310 315 313<br />

FY06 FY07 FY08 FY09<br />

INSTALLATION SCHEDULE (Cont): 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

Notes/Comments:<br />

Inventory Objective - 60,000 total for Navy, Marine Corps and Coast Guard.<br />

Production Support - all STE production support is reflected on this shipboard P-3a.<br />

Installations costs - not applicable for prior years due to self-installs.<br />

STE is a desktop terminal for classified voice, data, facsimile, video and voice conferencing. Various configurations of STE phones exist including: Office, Data, Tactical, Narrowband, Condor (wireless), and C2<br />

(TACTERM). In addition, associated ancillary items procured include: handsets, power supplies, PUP sleeves and FNDBT upgrade kits.<br />

IN 103 103 103 103 238 238 239 240 235 235 235 235 CONT CONT<br />

OUT 103 103 103 103 238 238 239 240 235 235 235 235 CONT CONT<br />

P-1 Shopping List - Item No 86 - Page 5 of 16 P-3a, Individual Modification Program


UNCLASSIFIED<br />

MODIFICATION TITLE: STE (SECURE TERMINAL EQUIPMENT) - SHORE February 2004<br />

COST CODE DA013/DA777<br />

MODELS OF SYSTEMS AFFECTED: NONE<br />

DESCRIPTION/JUSTIFICATION:<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

STE is a desktop terminal for classified voice, data, facsimile, video and voice conferencing. Various configurations of STE phones exist including: Office, Data, Tactical, Narrowband, Condor (wireless), and C2<br />

(TACTERM). In addition, associated ancillary items procured include: handsets, power supplies, PUP sleeves and FNDBT upgrade kits.<br />

Prior Yrs<br />

FY 02 FY 03 FY 04 FY 05<br />

FINANCIAL PLAN: ($ in millions)<br />

FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

2,341 14.7 1,757 6.3 8,543 30.0 10,243 32.6 679 3.0 6,565 16.8 5,507 16.0 5,532 16.1 5,203 17.0 CONT CONT CONT CONT<br />

Installation of Hardware 19 0.8 3 0.7 5 1.0 CONT CONT CONT CONT<br />

PRIOR YR EQUIP 19 0.8 3 0.7 5 1.0 27 2.5<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP CONT CONT CONT CONT<br />

TOTAL INSTALLATION COST 0.8 0.7 1.0 0.0 0.0 0.0 0.0 0.0 0.0 CONT CONT<br />

TOTAL PROCUREMENT COST 15.5 7.0 31.0 32.6 3.0 16.8 16.0 16.1 17.0 CONT CONT<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 Months PRODUCTION LEADTIME: 18 Months<br />

CONTRACT DATES: FY 2002: Mar-02 FY 2003: Jan-03 FY 2004: Jan-04 FY 2005: Jan-05<br />

DELIVERY DATES: FY 2002: Sep-03 FY 2003: Jul-04 FY 2004: Jul-05 FY 2005: Jul-06<br />

FY02 FY03 FY04 FY05<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

IN 19 1 1 1 1 2 2<br />

OUT 19 1 1 1 1 2 2<br />

FY06 FY07 FY08 FY09<br />

INSTALLATION SCHEDULE (Cont): 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

Notes/Comments:<br />

Inventory Objective - 60,000 total for Navy, Marine Corps and Coast Guard.<br />

Production Support - all STE production support is reflected on the shipboard P-3a.<br />

Installation costs - only applicable to shore STE Inter-Working Functions (IWF).<br />

IN CONT CONT<br />

OUT CONT CONT<br />

P-1 Shopping List - Item No 86 - Page 6 of 16 P-3a, Individual Modification Program


UNCLASSIFIED<br />

MODIFICATION TITLE: SV-21 (IWF) - SHORE February 2004<br />

COST CODE DA042/DA777<br />

MODELS OF SYSTEMS AFFECTED: NONE<br />

DESCRIPTION/JUSTIFICATION:<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

Prior Yrs<br />

FY 02 FY 03 FY 04 FY 05<br />

FINANCIAL PLAN: ($ in millions)<br />

FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

229 1.9 297 2.5 46 0.4 41 0.4 40 0.4 41 0.4 CONT CONT CONT CONT<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.1 0.1 0.0 0.0 0.0 0.0 CONT CONT CONT CONT<br />

Installation of Hardware 229 0.4 297 0.4 46 0.3 41 0.3 CONT CONT CONT CONT<br />

PRIOR YR EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 229 0.4 229 0.4<br />

FY 05 EQUIP 297 0.4 297 0.4<br />

FY 06 EQUIP 46 0.3 46 0.3<br />

FY 07 EQUIP 41 0.3 41 0.3<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP CONT CONT CONT CONT<br />

TOTAL INSTALLATION COST 0.0 0.0 0.0 0.0 0.0 0.4 0.4 0.3 0.3 CONT CONT<br />

TOTAL PROCUREMENT COST 0.0 0.0 0.0 2.0 2.6 0.8 0.8 0.7 0.7 CONT CONT<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 Months PRODUCTION LEADTIME: 18 Months<br />

CONTRACT DATES: FY 2003: FY 2004: Jan-04 FY 2005: Jan-05<br />

DELIVERY DATES: FY 2003: FY 2004: Jul-05 FY 2005: Jul-06<br />

FY02 FY03 FY04 FY05<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

IN<br />

OUT<br />

FY06 FY07 FY08 FY09<br />

INSTALLATION SCHEDULE (Cont): 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

Notes/Comments:<br />

Secure Voice for the 21st Century (SV-21) is a device called the Inter-Working Functions (IWF) which provides a direct dial gateway, rack mountable, and multi-channel gateway that transfers clear or encrypted digital<br />

voice/data to multiplexer radio frequency equipment for SATCOM transmission.<br />

IN 57 57 57 58 74 74 74 75 12 12 11 11 11 10 10 10 CONT CONT<br />

OUT 57 57 57 58 74 74 74 75 12 12 11 11 11 10 10 10 CONT CONT<br />

P-1 Shopping List - Item No 86 - Page 7 of 16 P-3a, Individual Modification Program


UNCLASSIFIED<br />

MODIFICATION TITLE: CND (COMPUTER NETWORK DEFENSE) - SHIP February 2004<br />

COST CODE DA070/DA777<br />

MODELS OF SYSTEMS AFFECTED: NONE<br />

DESCRIPTION/JUSTIFICATION:<br />

Computer Network Defense systems include: Firewalls, Virtual Private Networks (VPNs), Intrusion Detection Systems (IDSs), Coalition Data Servers (CODs), Standard Mail Guards (SMGs), Certification Authority<br />

Workstations (CAWs), and other related security tools.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

Prior Yrs<br />

FY 02 FY 03 FY 04 FY 05<br />

FINANCIAL PLAN: ($ in millions)<br />

FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment - CND VAR 20.1 VAR 4.5 VAR 2.1 VAR 3.0 VAR 4.2 VAR 3.9 VAR 4.6 VAR 3.8 VAR 3.8 CONT CONT CONT CONT<br />

Equipment - COMSEC<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

VAR 0.0 VAR 0.0 VAR 0.0 ****************************COMSEC moved to Cost Code DA071 beginning in FY04 *****************************<br />

Production Support - CND 2.3 1.9 1.7 0.5 0.5 0.6 0.6 0.6 0.6 CONT CONT CONT CONT<br />

Production Support - COMSEC 1.0 1.3 1.8 ****************************COMSEC moved to Cost Code DA071 beginning in FY04 *****************************<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.7 0.3 0.2 0.2 0.3 0.2 0.2 0.2 0.2 CONT CONT CONT CONT<br />

Installation of Hardware VAR 1.8 VAR 0.6 VAR 0.8 VAR 1.5 VAR 1.6 VAR 1.7 VAR 1.9 VAR 1.4 VAR 1.5 CONT CONT CONT CONT<br />

PRIOR YR EQUIP VAR 1.8 VAR 1.8<br />

FY 02 EQUIP VAR 0.6 VAR 0.6<br />

FY 03 EQUIP VAR 0.8 VAR 0.8<br />

FY 04 EQUIP VAR 1.5 VAR 1.5<br />

FY 05 EQUIP VAR 1.6 VAR 1.6<br />

FY 06 EQUIP VAR 1.7 VAR 1.7<br />

FY 07 EQUIP VAR 1.9 VAR 1.9<br />

FY 08 EQUIP VAR 1.4 VAR 1.4<br />

FY 09 EQUIP VAR 1.5 VAR 1.5<br />

FY TC EQUIP CONT CONT CONT CONT<br />

TOTAL INSTALLATION COST 2.5 0.9 1.0 1.7 1.9 1.9 2.1 1.6 1.7 CONT CONT<br />

TOTAL PROCUREMENT COST 25.9 8.6 6.6 5.2 6.6 6.4 7.3 6.0 6.1 CONT CONT<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: Various PRODUCTION LEADTIME: Various<br />

CONTRACT DATES: FY 2003: FY 2004: FY 2005:<br />

DELIVERY DATES: FY 2003: FY 2004: FY 2005:<br />

FY02 FY03 FY04 FY05<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

IN<br />

OUT<br />

FY06 FY07 FY08 FY09<br />

INSTALLATION SCHEDULE (Cont): 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

IN CONT CONT<br />

OUT CONT CONT<br />

Notes/Comments:<br />

Production Support - all NSS/COMSEC production support is reflected on this shipboard P-3a.<br />

COMSEC portion moved to separate cost code DA071 beginning in FY04.<br />

P-1 Shopping List - Item No 86 - Page 8 of 16 P-3a, Individual Modification Program


UNCLASSIFIED<br />

MODIFICATION TITLE: CND (COMPUTER NETWORK DEFENSE) - SHORE February 2004<br />

COST CODE DA070/DA777<br />

MODELS OF SYSTEMS AFFECTED: NONE<br />

DESCRIPTION/JUSTIFICATION:<br />

Computer Network Defense systems include: Firewalls, Virtual Private Networks (VPNs), Intrusion Detection Systems (IDSs), Coalition Data Servers (CODs), Standard Mail Guards (SMGs), Certification Authority<br />

Workstations (CAWs), and other related security tools.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

Prior Yrs<br />

FY 02 FY 03 FY 04 FY 05<br />

FINANCIAL PLAN: ($ in millions)<br />

FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment - CND VAR 16.2 VAR 6.2 VAR 8.3 VAR 7.3 VAR 5.0 VAR 8.0 VAR 6.4 VAR 7.4 VAR 7.6 CONT CONT CONT CONT<br />

Equipment - COMSEC<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

VAR 91.4 VAR 33.7 VAR 12.4 ****************************COMSEC moved to Cost Code DA071 beginning in FY04 *****************************<br />

Installation of Hardware VAR 18.5 VAR 3.4 VAR 1.7 VAR 0.6 VAR 0.9 VAR 0.7 VAR 0.6 VAR 0.9 VAR 0.9 CONT CONT CONT CONT<br />

PRIOR YR EQUIP VAR 18.5 VAR 18.5<br />

FY 02 EQUIP VAR 3.4 VAR 3.4<br />

FY 03 EQUIP VAR 1.7 VAR 1.7<br />

FY 04 EQUIP VAR 0.6 VAR 0.6<br />

FY 05 EQUIP VAR 0.9 VAR 0.9<br />

FY 06 EQUIP VAR 0.7 VAR 0.7<br />

FY 07 EQUIP VAR 0.6 VAR 0.6<br />

FY 08 EQUIP VAR 0.9 VAR 0.9<br />

FY 09 EQUIP VAR 0.9 VAR 0.9<br />

FY TC EQUIP CONT CONT CONT CONT<br />

TOTAL INSTALLATION COST 18.5 3.4 1.7 0.6 0.9 0.7 0.6 0.9 0.9 CONT CONT<br />

TOTAL PROCUREMENT COST 126.1 43.3 22.4 7.9 5.9 8.7 7.0 8.3 8.5 CONT CONT<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: Various PRODUCTION LEADTIME: Various<br />

CONTRACT DATES: FY 2003: FY 2004: FY 2005:<br />

DELIVERY DATES: FY 2003: FY 2004: FY 2005:<br />

FY02 FY03 FY04 FY05<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

IN<br />

OUT<br />

FY06 FY07 FY08 FY09<br />

INSTALLATION SCHEDULE (Cont): 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

Notes/Comments:<br />

Production Support - all NSS/COMSEC production support is reflected on the shipboard P-3a.<br />

COMSEC portion moved to separate cost code DA071 beginning in FY04.<br />

IN CONT CONT<br />

OUT CONT CONT<br />

P-1 Shopping List - Item No 86 - Page 9 of 16 P-3a, Individual Modification Program


UNCLASSIFIED<br />

MODIFICATION TITLE: CND NIASM IDS - SHIP February 2004<br />

COST CODE DA070/DA777<br />

MODELS OF SYSTEMS AFFECTED: NONE<br />

DESCRIPTION/JUSTIFICATION:<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

Prior Yrs<br />

FY 02 FY 03 FY 04 FY 05<br />

FINANCIAL PLAN: ($ in millions)<br />

FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

12 3.7 12.0 3.7<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support<br />

1.0 0.0 1.0<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.2 0.2 0.0 0.4<br />

Installation of Hardware 4 0.4 4 0.4 4 0.4 12.0 1.2<br />

PRIOR YR EQUIP 4 0.4 4 0.4 4 0.4 12.0 1.2<br />

FY 02 EQUIP 0.0 0.0<br />

FY 03 EQUIP 0.0 0.0<br />

FY 04 EQUIP 0.0 0.0<br />

FY 05 EQUIP 0.0 0.0<br />

FY 06 EQUIP 0.0 0.0<br />

FY 07 EQUIP 0.0 0.0<br />

FY 08 EQUIP 0.0 0.0<br />

FY 09 EQUIP 0.0 0.0<br />

FY TC EQUIP 0.0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.0 0.2 0.6 0.4 0.4 0.0 0.0 0.0 0.0 1.6<br />

TOTAL PROCUREMENT COST 3.7 1.0 0.2 0.6 0.4 0.4 0.0 0.0 0.0 0.0 6.3<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: Various PRODUCTION LEADTIME: Various<br />

CONTRACT DATES: FY 2003: FY 2004: FY 2005:<br />

DELIVERY DATES: FY 2003: FY 2004: FY 2005:<br />

FY02 FY03 FY04 FY05<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

IN 1 1 1 1 1 1 1 1<br />

OUT 1 1 1 1 1 1 1 1<br />

FY06 FY07 FY08 FY09<br />

INSTALLATION SCHEDULE (Cont): 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

Notes/Comments:<br />

FY02 NIASM is a congressional plus-up for upgrades shown in Engineering Change Order.<br />

Procurement and installation of the Navy Intelligent Agent Security Module (NIASM), a network intrusion detection system that provides sensors at key points in the network that read and interpret intrusion events as they<br />

occur and signal network operation personnel of attacks.<br />

IN 1 1 1 1 12<br />

OUT 1 1 1 1 12<br />

P-1 Shopping List - Item No 86 - Page 10 of 16 P-3a, Individual Modification Program


UNCLASSIFIED<br />

MODIFICATION TITLE: CND NIASM IDS - SHORE February 2004<br />

COST CODE DA070/DA777<br />

MODELS OF SYSTEMS AFFECTED: NONE<br />

DESCRIPTION/JUSTIFICATION:<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

Prior Yrs<br />

FY 02 FY 03 FY 04 FY 05<br />

FINANCIAL PLAN: ($ in millions)<br />

FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

8 2.6 8.0 2.6<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.5 0.0 0.5<br />

Installation of Hardware 8 0.5 8.0 0.5<br />

PRIOR YR EQUIP 8 0.5 8.0 0.5<br />

FY 02 EQUIP 0.0 0.0<br />

FY 03 EQUIP 0.0 0.0<br />

FY 04 EQUIP 0.0 0.0<br />

FY 05 EQUIP 0.0 0.0<br />

FY 06 EQUIP 0.0 0.0<br />

FY 07 EQUIP 0.0 0.0<br />

FY 08 EQUIP 0.0 0.0<br />

FY 09 EQUIP 0.0 0.0<br />

FY TC EQUIP 0.0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.5<br />

TOTAL PROCUREMENT COST 2.6 0.5 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 3.6<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: Various PRODUCTION LEADTIME: Various<br />

CONTRACT DATES: FY 2003: FY 2004: FY 2005:<br />

DELIVERY DATES: FY 2003: FY 2004: FY 2005:<br />

FY02 FY03 FY04 FY05<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

IN 2 2 2 2<br />

OUT 2 2 2 2<br />

FY06 FY07 FY08 FY09<br />

INSTALLATION SCHEDULE (Cont): 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

Notes/Comments:<br />

FY02 NIASM is a congressional plus-up for upgrades shown in Engineering Change Order.<br />

Procurement and installation of the Navy Intelligent Agent Security Module (NIASM), a network intrusion detection system that provides sensors at key points in the network that read and interpret intrusion events as they<br />

occur and signal network operation personnel of attacks.<br />

IN 8<br />

OUT 8<br />

P-1 Shopping List - Item No 86 - Page 11 of 16 P-3a, Individual Modification Program


UNCLASSIFIED<br />

MODIFICATION TITLE: LMD (LOCAL MANAGEMENT DEVICE) - SHIP February 2004<br />

COST CODE DA003/DA777<br />

MODELS OF SYSTEMS AFFECTED: NONE<br />

DESCRIPTION/JUSTIFICATION:<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

Tier 2 LMD replacements provide upgraded COTS (Commercial Off The Shelf) computer processing units (CPUs) which interface between the Key Processor (I.e. KOK-22) and other EKMS elements to provide enhanced<br />

management capabilities to order and account for all forms of COMSEC material. Capabilities include storing in key encrypted form, performing key generation and automatic key distribution.<br />

Prior Yrs<br />

FY 02 FY 03 FY 04 FY 05<br />

FINANCIAL PLAN: ($ in millions)<br />

FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

50 0.2 60 0.2 25 0.1 40 0.1 40 0.1 40 0.1 40 0.1 CONT CONT CONT CONT<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.0 0.0 0.0 0.0 0.0 0.0 0.0 CONT CONT CONT CONT<br />

Installation of Hardware 50 0.3 60 0.3 25 0.1 40 0.2 40 0.2 40 0.2 CONT CONT CONT CONT<br />

PRIOR YR EQUIP 0.0 0.0<br />

FY 02 EQUIP 0.0 0.0<br />

FY 03 EQUIP 50 0.3 50.0 0.3<br />

FY 04 EQUIP 60 0.3 60.0 0.3<br />

FY 05 EQUIP 25 0.1 25.0 0.1<br />

FY 06 EQUIP 40 0.2 40.0 0.2<br />

FY 07 EQUIP 40 0.2 40.0 0.2<br />

FY 08 EQUIP 40 0.2 40.0 0.2<br />

FY 09 EQUIP 0.0 0.0<br />

FY TC EQUIP CONT CONT CONT CONT<br />

TOTAL INSTALLATION COST 0.0 0.0 0.0 0.3 0.3 0.1 0.2 0.2 0.2 CONT CONT<br />

TOTAL PROCUREMENT COST 0.0 0.0 0.2 0.5 0.4 0.2 0.3 0.3 0.3 CONT CONT<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 Months PRODUCTION LEADTIME: 6 Months<br />

CONTRACT DATES: FY 2003: Jul-03 FY 2004: Jan-04 FY 2005: Jan-05<br />

DELIVERY DATES: FY 2003: Jan-04 FY 2004: Jul-04 FY 2005: Jul-05<br />

FY02 FY03 FY04 FY05<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

IN 10 20 15 5 5 25 25 5<br />

OUT 10 20 15 5 5 25 25 5<br />

FY06 FY07 FY08 FY09<br />

INSTALLATION SCHEDULE (Cont): 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

IN 5 10 5 5 5 10 20 5 5 10 20 5 5 10 20 5 CONT CONT<br />

OUT 5 10 5 5 5 10 20 5 5 10 20 5 5 10 20 5 CONT CONT<br />

Notes/Comments:<br />

Production Support - all LMD production support is reflected on this shipboard P-3a. Cost less than $30K per year,<br />

DSA costs - not applicable due to the install being a field change.<br />

P-1 Shopping List - Item No 86 - Page 12 of 16 P-3a, Individual Modification Program


UNCLASSIFIED<br />

MODIFICATION TITLE: LMD (LOCAL MANAGEMENT DEVICE) - SHORE February 2004<br />

COST CODE DA003<br />

MODELS OF SYSTEMS AFFECTED: NONE<br />

DESCRIPTION/JUSTIFICATION:<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

Prior Yrs<br />

FY 02 FY 03 FY 04 FY 05<br />

FINANCIAL PLAN: ($ in millions)<br />

FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

Installation of Hardware<br />

187 1.0 58 0.3 0 0.0 41 0.1 115 0.3 143 0.5 81 0.3 80 0.3 80 0.3 CONT CONT CONT CONT<br />

PRIOR YR EQUIP 0.0 0.0<br />

FY 02 EQUIP 0.0 0.0<br />

FY 03 EQUIP 0.0 0.0<br />

FY 04 EQUIP 0.0 0.0<br />

FY 05 EQUIP 0.0 0.0<br />

FY 06 EQUIP 0.0 0.0<br />

FY 07 EQUIP 0.0 0.0<br />

FY 08 EQUIP 0.0 0.0<br />

FY 09 EQUIP 0.0 0.0<br />

FY TC EQUIP CONT CONT<br />

TOTAL INSTALLATION COST 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0<br />

TOTAL PROCUREMENT COST 1.0 0.3 0.0 0.1 0.3 0.5 0.3 0.3 0.3 CONT CONT<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 3 Months PRODUCTION LEADTIME: 6 Months<br />

CONTRACT DATES: FY 2003: Jul-03 FY 2004: Jan-04 FY 2005: Jan-05<br />

DELIVERY DATES: FY 2003: Jan-04 FY 2004: Jul-04 FY 2005: Jul-05<br />

FY02 FY03 FY04 FY05<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

IN<br />

OUT<br />

FY06 FY07 FY08 FY09<br />

INSTALLATION SCHEDULE (Cont): 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

IN<br />

OUT<br />

Notes/Comments:<br />

Production Support - all LMD production support is reflected on the shipboard P-3a.<br />

Installations - all LMD replacements are self-installs for shore activities.<br />

Tier 2 LMD replacements provide upgraded COTS (Commercial Off The Shelf) computer processing units (CPUs) which interface between the Key Processor (I.e. KOK-22) and other EKMS elements to provide enhanced<br />

management capabilities to order and account for all forms of COMSEC material. Capabilities include storing in key encrypted form, performing key generation and automatic key distribution.<br />

P-1 Shopping List - Item No 86 - Page 13 of 16 P-3a, Individual Modification Program


UNCLASSIFIED<br />

MODIFICATION TITLE: DMS (DEFENSE MESSAGE SYSTEM) SECURITY PRODUCTS - SHIP February 2004<br />

COST CODE DA019/DA777<br />

MODELS OF SYSTEMS AFFECTED: NONE<br />

DESCRIPTION/JUSTIFICATION:<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

Prior Yrs<br />

FY 02 FY 03 FY 04 FY 05<br />

FINANCIAL PLAN: ($ in millions)<br />

FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

VAR 0.5 VAR 0.5<br />

Production Support 0.1 0.1 0.2<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.1 0.1 0.2<br />

Installation of Hardware VAR 0.4 VAR 0.4<br />

PRIOR YR EQUIP 0.0 0.0<br />

FY 02 EQUIP 0.0 0.0<br />

FY 03 EQUIP VAR 0.4 VAR 0.4<br />

FY 04 EQUIP 0.0 0.0<br />

FY 05 EQUIP 0.0 0.0<br />

FY 06 EQUIP VAR 0.0<br />

FY 07 EQUIP 0.0 0.0<br />

FY 08 EQUIP 0.0 0.0<br />

FY 09 EQUIP 0.0 0.0<br />

FY TC EQUIP 0.0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.1 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6<br />

TOTAL PROCUREMENT COST 0.0 0.2 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: Various PRODUCTION LEADTIME: Various<br />

CONTRACT DATES: FY 2003: FY 2004: FY 2005:<br />

DELIVERY DATES: FY 2003: FY 2004: FY 2005:<br />

FY02 FY03 FY04 FY05<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

IN<br />

OUT<br />

FY06 FY07 FY08 FY09<br />

INSTALLATION SCHEDULE (Cont): 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

IN<br />

OUT<br />

Notes/Comments:<br />

Production Support - all DMS production support is reflected on this shipboard P-3a.<br />

DMS provides secure, accountable and reliable messaging with global integrated directory services. Procurements include a combination of Certificate Authority Workstations (CAWs), Fortezza cards (KOV-11) and<br />

Standard Mail Guards (SMGs). These products allow two-way flow between Secret Local Area Networks (LANs) and Unclassified LANs.<br />

P-1 Shopping List - Item No 86 - Page 14 of 16 P-3a, Individual Modification Program


UNCLASSIFIED<br />

MODIFICATION TITLE: DMS (DEFENSE MESSAGE SYSTEM) SECURITY PRODUCTS - SHORE February 2004<br />

COST CODE DA019/DA777<br />

MODELS OF SYSTEMS AFFECTED: NONE<br />

DESCRIPTION/JUSTIFICATION:<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

Prior Yrs<br />

FY 02 FY 03 FY 04 FY 05<br />

FINANCIAL PLAN: ($ in millions)<br />

FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

VAR 2.5 VAR 0.5 VAR 3.0<br />

Installation of Hardware VAR 1.3 VAR 1.2 VAR 2.5<br />

PRIOR YR EQUIP 0.0 0.0<br />

FY 02 EQUIP VAR 1.3 VAR 1.3<br />

FY 03 EQUIP VAR 1.2 VAR 1.2<br />

FY 04 EQUIP 0.0 0.0<br />

FY 05 EQUIP 0.0 0.0<br />

FY 06 EQUIP 0.0 0.0<br />

FY 07 EQUIP 0.0 0.0<br />

FY 08 EQUIP 0.0 0.0<br />

FY 09 EQUIP 0.0 0.0<br />

FY TC EQUIP 0.0 0.0<br />

TOTAL INSTALLATION COST 0.0 1.3 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.5<br />

TOTAL PROCUREMENT COST 0.0 3.8 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.5<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: Various PRODUCTION LEADTIME: Various<br />

CONTRACT DATES: FY 2003: FY 2004: FY 2005:<br />

DELIVERY DATES: FY 2003: FY 2004: FY 2005:<br />

FY02 FY03 FY04 FY05<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

IN<br />

OUT<br />

FY06 FY07 FY08 FY09<br />

INSTALLATION SCHEDULE (Cont): 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

IN<br />

OUT<br />

Notes/Comments:<br />

Production Support - all DMS production support is reflected on the shipboard P-3a.<br />

DMS provides secure, accountable and reliable messaging with global integrated directory services. Procurements include a combination of Certificate Authority Workstations (CAWs), Fortezza cards (KOV-11) and<br />

Standard Mail Guards (SMGs). These products allow two-way flow between Secret high Local Area Networks (LANs) and Unclassified LANs.<br />

P-1 Shopping List - Item No 86 - Page 15 of 16 P-3a, Individual Modification Program


UNCLASSIFIED<br />

PRODUCTION SCHEDULE<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD NO.<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT 341500 - ISSP (Information Systems Security Program) 52DA<br />

S ACCEP BAL FISCAL YEAR 04 FISCAL YEAR 05 FISCAL YEAR 06<br />

COST ITEM/MANUFACTURER E PROC PRIOR DUE CALENDAR YEAR 04 CALENDAR YEAR 05 CALENDAR YEAR 06<br />

CODE R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S<br />

V 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E<br />

FY T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P<br />

DA013 STE 02 3,007 250 2,757 250 250 250 250 251 251 251 251 251 251 251<br />

DA013 STE 03 9,793 9,793 816 816 816 816 816 816 816 816 816 816 816 817<br />

DA013 STE 04 10,655 10,655 A 888 888 888 888 888 888 888 888 888 888 888 887<br />

DA013 STE 05 679 679 A 57 57 57<br />

DA042 SV-21 (IWF) 04 229 229 A 19 19 19 19 19 19 19 19 19 19 19 20<br />

DA042 SV-21 (IWF) 05 297 297 A 25 25 25<br />

DA043 SV-21 (CRYPTO) 04 121 121 A 10 10 10 10 10 10 10 10 10 10 10 11<br />

DA043 SV-21 (CRYPTO) 05 168 168 A 14 14 14<br />

DA009 SDS 03 1,435 1,435 120 120 120 120 120 120 120 119 119 119 119 119<br />

DA009 SDS 04 1,547 1,547 A 258 258 258 258 258 257<br />

DA009 SDS 05 948 948 A 158 158 158 158 158 158<br />

DA003 LMD REPLACEMENT 03 50 9 41 8 8 8 8 9<br />

DA003 LMD REPLACEMENT 04 101 101 A 8 8 8 8 8 8 8 9 9 9 9 9<br />

DA003 LMD REPLACEMENT 05 140 140 A 12 12 12 12 12 12 12 12 11 11 11 11<br />

0329P STE - (DERF)/(COW) 02 2,410 804 201 201 201 201 201 201 200 200<br />

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP<br />

PRODUCTION RATE PROCUREMENT LEADTIMES<br />

Manufacturer's ALT Prior ALT After Initial Reorder Unit of<br />

ITEM Name and Location MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure<br />

DA013 - STE L3 Comms Corp, New Jersey ** ** **<br />

DA009 - SDS Group Tech Corp, Florida 500 1,000 2,000<br />

DA009 - CYZ-10 UPGRADES Group Tech Corp, Florida 500 1,000 2,000<br />

DA003 - LMD REPLACEMENT L3 Comms Corp, New Jersey TBD TBD TBD<br />

0329P - STE (DERF)/(COW) L3 Comms Corp, New Jersey ** ** **<br />

** All services procure requirements thru NSA. Production rates are determined by NSA.<br />

REMARKS:<br />

DA009 - Product name change to SDS in FY03.<br />

DA013 - (STE) Units delivered May through August are for shore sites. Units for installation aboard ships begin with September deliveries.<br />

DA013 - (STE) FY01 delivery schedule is based upon the individual service's (Navy, Airforce, Army) priorities. Navy deliveries begin Sept 02.<br />

DATE<br />

February 2004<br />

P-1 Shopping List - Item No 86 - Page 16 of 16 Exhibit P-21 Production Schedule


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT CRYPTOLOGIC EQUIPMENT 3501 521V<br />

QUANTITY<br />

COST<br />

FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TO COMP TOTAL<br />

$21.5 $24.5 $26.1 $26.2 $27.5 $27.4 $27.0 Continuing Continuing<br />

NARRATIVE DESCRIPTION JUSTIFICATION: This line supports the Cryptologic Carry-on Program (CCOP), the Signals Analysis Laboratory Program (SAL), the Navy Elint Program and the IW<br />

PROGRAM.<br />

CRYPTOLOGIC CARRY-ON EQUIPMENT: This program procures state-of-the-art, Commercial Off-The-Shelf (COTS) signal acquisition equipment (hardware and software) in response to Combatant<br />

Command requirements for a quick-reaction surface, subsurface and airborne cryptologic carry-on capability. The equipment is procured according to the overall requirements detailed in the Shipboard<br />

Information Warfare (IW)/Cryptologic System (SIWCS) ORD (Serial Number: 537-06-99) of 9 Dec 99. Due to a continually changing threat environment, detailed requirements are dynamic and equipment<br />

procured varies by quantity and type. Equipment can be suites configured for many targets and tasking, or target specific subsystems that can either operate standalone within cryptologic spaces or as an<br />

add-on to existing equipment. Hardware procurement includes: receivers, recorders, Transportable-Radio Direction Finding (T-RDF) systems, tactical computers and related peripherals, antennas, Electronic-<br />

Warfare Support Measures (ESM) systems, and advanced signal and search equipment including spectrum analyzers, VXI chassis/cards and associated portable Special Intelligence communications<br />

equipment. CCOP equipment is installed in AN/SSQ-99 vans for deployment, and as an augment to cryptologic capabilities on subsurface, surface and air platforms . There are approximately 100<br />

cryptologic capable surface ships in the current Navy inventory. Each of these ships are potential users of this carry-on equipment, depending on deployment schedules and the tempo of operations. In<br />

addition, there are numerous subsurface and air platforms that are also potential users. The temporary installation of equipment is coordinated through Fleet Electronic Support (FES) personnel. A primary<br />

product of this line is the Advanced Cryptologic Carry-on Exploitation System (ACCES). The outdated SSQ-80A(V) analog systems were converted to ACCES by modernizing them with VXI-based digital<br />

Signal Processing (DSP) capabilities and an open, modular architecture that provides flexibility and vastly increased capabilities. Funds continue to procure ACCES core architecture system upgrades to<br />

provide affordable additional functionality to the Combatant Commands. In FY03, a significant ACCES upgrade was introduced to begin replacement of aging hardware suites.T-RDF (AN/SSQ-120 (V)) has<br />

adeptly satisfied Combatant Command requirements for organic direction finding capabilities; the system covers an extremely wide frequency spectrum, is low cost and highly accurate. T-RDF is temporarily<br />

installed on ACCES equipped ships. T-RDF below deck systems have been procured to service all T-RDF pre-groomed ships in inventory as required to meet deployment schedules. T-RDF below deck<br />

systems reached the Fleet specified inventory objective in FY03.<br />

P-1 Shopping List - Item No. 87 Page 1 of 3<br />

Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

BUDGET ITEM JUSTIFICATION SHEET DATE February 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OPN - BA2 COMMUNICATIONS & ELECTRONIC EQUIPMENT CRYPTOLOGIC EQUIPMENT 3501 521V<br />

GLOBAL SIGNAL ANALYSIS LABORATORY (GSAL): The GSAL (Commander Naval Security Group CLASSIC SENSEI) Program directly supports tactical commanders with tailored and responsive feedback<br />

from theater Information Warfare (IW) exploitation operations. Navy Signal Analysis Laboratories (SALs) are forward based signal analysis and processing centers for complex communications and electronic<br />

emissions. SALs require advanced signal processing equipment to keep pace with information technology and continually changing target sets. Funds are required to procure signal analysis equipment and<br />

information transfer backbone to perform shore-based IW exploitation of data resulting from mobile collection missions, and to aid real-time exploitation efforts. Signal analysis is performed at the labs using<br />

various advanced exploitation analog and digital processing devices. Signal information is passed back to the labs via electronic means and various magnetic media The lab requires a high capacity Local Area<br />

Network (LAN) infrastructure tied in with the Global Command and Control System Maritime (GCCS-M) to properly conduct information and data exchange. GSAL signals analysis equipment exist at Naval<br />

Information Warfare Activity (NIWA), NSGA Rota, NSGA Yokosuka and NSGA Norfolk. Under Commander Naval Security Group transformational initiative titled GSAL realignment, GSAL signals analysis<br />

equipment is envisioned to support theater - level National Maritime operations at NSGA Kunia, NSGA Fort Gordon, and NSGA Rota, with forward digitization nodes (Smart Nodes) at Kadena Okinawa, JA,<br />

NSGA Bahrain, and Souda Bay Crete, Greece.<br />

NAVY ELINT: To procure the Naval Electronic Support Sensor Enhancement (NESSE) augmentation package, a modular system that performs radar search, detection and data collection is support of a variety<br />

of surface ship requirements. NESSE will provide the tactical commander with automated reporting, enhanced connectivity and the ability to link with like sensors.<br />

IW PROGRAMS: To procure equipment to support the augmentation of permanently installed cryptologic equipment with emergent cryptologic capabilities in support of operational and target developmental<br />

tasking.<br />

MARITIME CRYPTOLOGIC DATABASE FACILITY (MCDF): The funding will provide for Advanced Database Replication for tactical intelligence networks, improved life cycle support to deployed systems,<br />

improved integration into Joint Shared Data Environments, and tighter integration of MIDB into the Maritime Cryptologic Architecture (MCA), and technology refresh.<br />

P-1 Shopping List - Item No. 87 Page 2 of 3<br />

Exhibit P-40, Budget Item Justification<br />

Unclassified<br />

Classification


UNCLASSIFIED<br />

CLASSIFICATION<br />

DATE<br />

COST ANALYSIS February 2004<br />

APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE SUBHEAD<br />

OP,N - BA-2 COMMUNICATIONS AND ELECTRONIC EQUIPMENT CRYPTOLOGIC EQUIPMENT 3501 521V<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

PY FY02 FY03 FY04 FY05<br />

COST ID TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL<br />

CODE ELEMENT OF COST CODE COST QTY COST COST QTY COST COST QTY COST COST QTY COST COST<br />

MAJOR CLAIMANCY -- SPAWAR<br />

1V555 PRODUCTION SUPPORT A 1,010 1,307 1,381<br />

1V043 T-RDF EQUIPMENT A 5 369 1,845<br />

1V045 ACCES SYSTEMS A VAR 17,218 VAR 17,204 VAR 18,259<br />

MAJOR CLAIMANCY -- CNSG<br />

TOTAL SPAWAR CONTROL 20,073 18,511 19,640<br />

1V042 SIGNAL ANALYSIS LAB (SAL) VAR 975 VAR 1,058 VAR 1,181<br />

REMARKS:<br />

NAVY ELINT VAR 3,687 VAR 4,114<br />

FLEET ELECTRONIC SUPPORT VAR 433 VAR 297 VAR 313<br />

MARITIME CRYPTOLOGIC DATABASE FACILITY (MCDF) VAR 974 VAR 863<br />

TOTAL CNSG CONTROL 1,408 6,016 6,471<br />

GRAND TOTAL 21,481 24,527 26,111<br />

SAL - FY03 upgraded theater Si+A102gnals Processing Capability. FY04 and beyond continues technology refresh and implements equipment acquisition in support of NSG wide SAL transformation from 5 SALs to 3 SALS.<br />

Exhibit P-5, Cost Analysis<br />

DD FORM 2446, JUN 86 P-1 Shopping List-Item No. 87 Page 3 of 3 Unclassified


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET ITEM JUSTIFICATION SHEET DATE:<br />

P-40 FEBRUARY 2004<br />

APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE<br />

OTHER PROCUREMENT, NAVY<br />

BA-2 Communications & Electronic Equipment Coast Guard Equipment/BLI 3620<br />

Program Element for Code B Items: Other Related Program Elements<br />

ID To<br />

Code FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY2009 Complete Total<br />

QUANTITY<br />

COST<br />

(In Millions) $0.0 $12.5 $7.6 $31.2 $29.3 $28.6 $28.2 CONT. CONT.<br />

SPARES COST<br />

(In Millions)<br />

MISSION DESCRIPTION AND BUDGET JUSTIFICATION:<br />

The Coast Guard Equipment line funds the Coast Guard requirement for Combat System Suites for new construction ships under the Coast Guard Integrated Deepwater System<br />

Replacement Project. Under inter-service agreement (delineated in OPNAVINST 4000.79A), DON provides the combat, detection, and electronic systems required for the Coast Guard<br />

to integrate with the Navy in times of war and conflict. Ship Construction costs are funded under the Department of Transportation appropriation.<br />

Combat System Suite procured must complement and integrate with future Navy Combat Systems. The suite is an appropriate balance of equipment to ensure the Coast Guard is<br />

prepared to accomplish its assigned Naval Warfare Tasks in concert with U.S. Navy units. The Combat Systems Suite will be aligned with future Naval ship building programs to support<br />

commonality among the two Services' systems and meet National Fleet objectives.<br />

The Deepwater Combat Suites will include the following:<br />

Detection Systems - Provides radar, Electro-Optical Sensor , and EW systems to search, detect, track and ID surface and air contacts. Provides situation awareness with which to<br />

make tactical decision, and allows for timely defensive evasion/avoidance action.<br />

Control Systems - Provides multi-sensor integration, embedded doctrine, improved decision making efficiency, and critical function availability.<br />

Engagement - Provides decoy systems to engage surface and air threats to achieve mission kill against anticipated threats.<br />

P-1 SHOPPING LIST CLASSIFICATION:<br />

DD Form 2454, JUN 86 ITEM NO. 88 PAGE NO. 1<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

WEAPONS SYSTEM COST ANALYSIS Weapon System DATE:<br />

P-5 February 2004<br />

APPROPRIATION/BUDGET ACTIVITY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD SUBHEAD:<br />

Other Procurement, Navy<br />

BA-2 COMMUNICATIONS & ELECTRONIC EQUIPMENT COAST GUARD EQUIPMENT BLI: 362000 A2CG<br />

TOTAL COST IN THOUSANDS OF DOLLARS<br />

COST ELEMENT OF COST ID FY 2004 FY 2005<br />

CODE Code<br />

Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost<br />

DEEP WATER Combat Suites<br />

CG001 Detection Systems<br />

SPQ 9B Radar 1 6,800 6,800 1 6,100 6,100<br />

SLQ 32 1 1,620 1,620<br />

MK 46 Mod 1 Optical Sighting 1 1,669 1,669<br />

CG002 Combat Integration System 1 1,200 2,400 0<br />

CG003 Engagement 1,538<br />

0 0 0 12,489 7,638<br />

DD FORM 2446, JUN 86 P-1 SHOPPING LIST CLASSIFICATION:<br />

ITEM NO. 88 PAGE NO. 2<br />

UNCLASSIFIED


CLASSIFICATION: UNCLASSIFIED<br />

BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE<br />

February 2004<br />

B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD<br />

Other Procurement, Navy / BA-2<br />

COMMUNICATIONS & ELECTRONIC EQUIPMENT COAST GUARD EQUIPMENT BLI: 362000 A2CG<br />

CONTRACT DATE OF SPECS DATE<br />

Cost Element/ QUANTITY UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE REVISIONS<br />

FISCAL YEAR COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE<br />

(000)<br />

FY 2004<br />

AN/SPQ-9B Radar 1 6,800 NAVSEA Northrop Grumman TBD TBD TBD TBD<br />

AN/SLQ-32A(V)2 SEWIP 1 1,620 NAVSEA NSWC, Crane TBD TBD TBD TBD<br />

System 1 1,669 NAVSEA Kollmorgen Mar 04 TBD TBD TBD<br />

Combat Integration System 2 1,200 NAVSEA NSWC, Louisville TBD TBD TBD TBD<br />

FY 2005<br />

AN/SPQ-9B Radar 1 6,100 NAVSEA Northrop Grumman TBD TBD TBD TBD<br />

D. REMARKS<br />

DD Form 2446-1, JUL 87 P-1 SHOPPING LIST PAGE NO. Classification:<br />

ITEM NO. 88 3 UNCLASSIFIED

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!