CSI Spec<br />

Number<br />

012513 001<br />

012513 002<br />

012613 003<br />

013113 004<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

FIO<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

YES<br />

YES<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

012513 PRODUCT<br />

SUBSTITUTION<br />

Request for Substitution of<br />

Products, Materials, Equipment or<br />

Methods of Instruction for Cause<br />

Request for Substitution of<br />

Products, Materials, Equipment or<br />

Methods of Instruction for<br />

Convenience<br />

012613 REQUEST FOR<br />

CLARIFICATION<br />

Person Responsible for Receiving<br />

Changes<br />

013113 COORDINATION<br />

Construction Work Execution Plans<br />

011100 Summary of Work<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

SC-15 Eng 5 SOW 1.3.2<br />

A+60 Eng 5 SOW 1.3.3<br />

A+10 PM NA SOW 1.2.2, 1.4.1.2<br />

SC-20 (work<br />

days)<br />

PM 10 SOW 1.2.2, 1.7.3.4<br />

011100 0<strong>05</strong> APW Procedure Review A+60 BTR 15 SOW 1.3.1.2<br />

013200 006<br />

013200 007<br />

013200 008<br />

013200 0<strong>09</strong><br />

013200 010<br />

013200 011<br />

AP<br />

P6;PDF<br />

AP<br />

P6;PDF<br />

AP<br />

P6;PDF<br />

FIO<br />

P6;PDF<br />

FIO<br />

PDF<br />

FIO<br />

PDF<br />

013200 PROJECT SCHEDULES,<br />

PROJECT CONTROLS, AND<br />

PROJECT PERFORMANCE<br />

MILESTONES<br />

Startup Project Schedule A+10 PM 5 SOW 1.2.2, 1.3<br />

Project Schedule A+30 PM 10 SOW 1.2.3, 1.3<br />

Revised Schedule AR PM 5 SOW 1.2.4, 1.4<br />

3-Week “look ahead” Schedule Weekly PM NA SOW 1.2.5, 1.5.6<br />

Progress Report Monthly PM NA SOW 1.2.6, 1.5<br />

Weekly Labor Cost Reports Weekly PM NA SOW 1.2.7<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 1 of 46


CSI Spec<br />

Number<br />

013500 012<br />

013500 013<br />

013500 014<br />

013500 015<br />

013500 016<br />

013500 017<br />

013500 018<br />

013529 019<br />

013529 020<br />

013529 021<br />

013529 022<br />

013529 023<br />

014000 024<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

013500 ENVIRONMENTAL,<br />

RADIOLOGICAL AND<br />

NUCLEAR SAFETY<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

Waste Management Plan M-10 E 5 SOW 1.2.2<br />

Material Safety Data Sheets M-10 S 5 SOW 1.2.3, 1.6.2<br />

Chemical Inventory M-10 S 5 SOW 1.2.4, 1.6.1<br />

Air Emissions M-10 E 5 SOW 1.2.5, 1.4<br />

Dust Control Plan M-10 E 5 SOW 1.2.6, 1.4.2<br />

Radioactive Sources M-10 R 5 SOW 1.2.7, 1.7.4<br />

Final Chemical Inventory (A-6004-<br />

750)<br />

013529 OCCUPATIONAL<br />

SAFETY/<br />

INDUSTRIAL HYGIENE<br />

Alternate Safety Program (as<br />

required)<br />

EC+30 S 5 SOW 1.2.8,1.6.1<br />

B S 5 SOW 1.2.2<br />

Designated Safety Representative B S 5 SOW 1.2.3<br />

Employee Job Task Analysis<br />

(EJTA)<br />

Job Safety Analysis (JSA) / Job<br />

Hazard Analysis (JHA)<br />

Critical Lift Plan<br />

014000 QUALITY ASSURANCE<br />

AND CONTROL<br />

B S 5 SOW 1.2.4, 1.5.1<br />

A+10 S 5 SOW 1.2.5, 1.4<br />

10 days prior to<br />

lift<br />

CM 5 SOW 1.2.6<br />

Quality Assurance Program B Q 5 SOW 1.4.2<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 2 of 46


CSI Spec<br />

Number<br />

014000 025<br />

014000 026<br />

014326 027<br />

014326 028<br />

033000 029<br />

033000 030<br />

033000 031<br />

033000 032<br />

033000 033<br />

033000 034<br />

033000 035<br />

033000 036<br />

033000 037<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

FIO<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

Inspector Qualification SC-14 Q 5 SOW 1.4.3<br />

Written Statement that Items are<br />

New (Used)<br />

014326 TRAINING AND<br />

QUALIFICATIONS<br />

B Q NA SOW 1.4.4<br />

Completion of Training M-5 S 5 SOW 1.2.2<br />

Hoisting and Rigging OJE M+5 S 5 SOW 1.2.3<br />

033000 CAST IN PLACE<br />

CONCRETE<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

YES Design Mixtures SC-14 Q 5 1.2.B<br />

YES Steel Reinforcement Shop Drawings SC-14 Eng 5 1.2.C<br />

YES Wall Formwork Shop Drawings SC-14 Eng 5 1.2.C<br />

YES Wall Formwork Calculations SC-14 Eng 5 1.2.E<br />

YES Construction Joint Layout SC-14 Eng 5 1.2.C<br />

YES<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records<br />

SC-14 Eng 5 1.2.G<br />

YES Manufacturer Qualifications SC-14 BTR 5 1.2.H<br />

YES Repair Methods SC-14 Q 5 1.2.I<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 3 of 46


CSI Spec<br />

Number<br />

033000 038<br />

033000 039<br />

033000 040<br />

033000 041<br />

033000 042<br />

033000 043<br />

033000 044<br />

033000 045<br />

033000 046<br />

033000 047<br />

033000 048<br />

033000 049<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

YES Finisher Qualifications SC-14 Q 5 1.2.J<br />

YES Testing Agency Qualifications SC-14 Q 5 1.2.K<br />

YES Welding Certificates SC-14 Eng 5 1.2.L<br />

YES Material Certificates SC-14 Q 5 1.2.M<br />

YES Certified Material Test Reports SC-14 Q 5 1.2.N<br />

YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

YES<br />

YES<br />

YES<br />

Field Quality Control Reports -<br />

Concrete<br />

Field Quality Control Reports –<br />

Steel Reinforcement<br />

Independent Laboratory Testing<br />

Quality Control Reports<br />

5 days after<br />

activity<br />

completion<br />

5 days after<br />

activity<br />

completion<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.2.O<br />

Q 5 1.2.P<br />

Q 5 1.2.Q<br />

YES Conveying Equipment SC-14 Q 5 1.2.R<br />

YES Temperature Measurements<br />

YES<br />

Floor Surface Flatness and<br />

Levelness Measurements<br />

5 days after<br />

activity<br />

completion<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.2.S<br />

Q 5 1.2.T<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 4 of 46


CSI Spec<br />

Number<br />

033000 <strong>05</strong>0<br />

<strong>05</strong>1200 <strong>05</strong>1<br />

<strong>05</strong>1200 <strong>05</strong>2<br />

<strong>05</strong>1200 <strong>05</strong>3<br />

<strong>05</strong>1200 <strong>05</strong>4<br />

<strong>05</strong>1200 <strong>05</strong>5<br />

<strong>05</strong>1200 <strong>05</strong>6<br />

<strong>05</strong>1200 <strong>05</strong>7<br />

<strong>05</strong>1200 <strong>05</strong>8<br />

<strong>05</strong>1200 <strong>05</strong>9<br />

<strong>05</strong>1200 060<br />

<strong>05</strong>1200 061<br />

1. Number 2. Type & Format<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

Minutes of Preinstallation<br />

Conference<br />

<strong>05</strong>1200 STRUCTURAL STEEL<br />

FRAMING<br />

6. Submittal Date<br />

(Calendar Days)<br />

5 days after<br />

activity<br />

completion<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

CM 5 1.2.U<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

YES Shop Drawings SC-14 Eng 5 1.3.B<br />

YES<br />

YES<br />

YES<br />

YES<br />

YES<br />

YES<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records<br />

Qualification Data for Qualified<br />

Installer<br />

Qualification Data for Qualified<br />

Fabricator<br />

Qualification Data for Qualified<br />

Testing Agency<br />

Welding Inspection Plan - Weld<br />

Inspection and Test Teports (weld<br />

maps, gamma scan, radiograph)<br />

NDE Qualification and Cert<br />

Procedures (Personnel Level I, II,<br />

III, quals and certs NDE method,<br />

exam procedures)<br />

SC-14 Eng 5 1.3.C<br />

SC-14 Q 5 1.3.D<br />

SC-14 Q 5 1.3.E<br />

SC-14 Q 5 1.3.F<br />

SC-14 Q 5 1.3.G<br />

SC-14 Q 5 1.3.H<br />

YES Grout Plan SC-14 Eng 5 1.3.I<br />

YES Welding Certificates SC-14 Eng 5 1.3.J<br />

YES YES Mill Test Reports SC-14 Q 5 1.3.K<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 5 of 46


CSI Spec<br />

Number<br />

<strong>05</strong>1200 062<br />

<strong>05</strong>1200 063<br />

<strong>05</strong>1200 064<br />

<strong>05</strong>1200 065<br />

<strong>05</strong>1200 066<br />

<strong>05</strong>1200 067<br />

<strong>05</strong>3100 068<br />

<strong>05</strong>3100 069<br />

<strong>05</strong>3100 070<br />

<strong>05</strong>3100 071<br />

<strong>05</strong>3100 072<br />

<strong>05</strong>3100 073<br />

<strong>05</strong>3100 074<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

YES YES Product Test Reports SC-14 Q 5 1.3.L<br />

YES Source Quality Control Reports SC-14 Q 5 1.3.M<br />

YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

YES Field Quality Control Reports<br />

YES<br />

Independent Laboratory Testing<br />

Quality Control Reports<br />

Minutes of Preinstallation<br />

Conference<br />

<strong>05</strong>3100 STEEL DECKING<br />

5 days after<br />

activity<br />

completion<br />

5 days after<br />

activity<br />

completion<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.3.N<br />

Q 5 1.3.0<br />

CM 5 1.3.P<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

YES Shop Drawings SC-14 Eng 5 1.2.B<br />

YES<br />

YES<br />

YES<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records<br />

Qualification Data for Qualified<br />

Testing Agency<br />

Qualification Data for Qualified<br />

Installer<br />

SC-14 Eng 5 1.2.C<br />

SC-14 Q 5 1.2.D<br />

SC-14 Q 5 1.2.E<br />

YES Evaluation Reports for Steel Deck SC-14 Q 5 1.2.F<br />

YES<br />

Welding Inspection Plan - Weld<br />

Inspection and Test Reports (weld<br />

maps, gamma scan, radiograph)<br />

SC-14 Q 5 1.2.G<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 6 of 46


CSI Spec<br />

Number<br />

<strong>05</strong>3100 075<br />

<strong>05</strong>3100 076<br />

<strong>05</strong>3100 077<br />

<strong>05</strong>3100 078<br />

<strong>05</strong>3100 079<br />

<strong>05</strong>5000 080<br />

<strong>05</strong>5000 081<br />

<strong>05</strong>5000 082<br />

<strong>05</strong>5000 083<br />

<strong>05</strong>5000 084<br />

<strong>05</strong>5000 085<br />

<strong>05</strong>5000 086<br />

<strong>05</strong>5000 087<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

YES<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

NDE qualification and Cert<br />

Procedures (Personnel Level I, II,<br />

III, quals and certs NDE method,<br />

exam procedures)<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

SC-14 Q 5 1.2.H<br />

YES Welding Certificates SC-14 Eng 5 1.2.I<br />

YES Product Certificates SC-14 Eng 5 1.2.J<br />

YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

YES Field Quality Control Reports<br />

<strong>05</strong>5000 METAL<br />

FABRICATIONS<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.2.K<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

YES Shop Drawings SC-14 Eng 5 1.2.B<br />

YES<br />

YES<br />

YES<br />

YES<br />

YES<br />

YES<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records<br />

Qualification Data for Qualified<br />

Installer<br />

Qualification Data for Qualified<br />

Fabricator<br />

Qualification Data for Qualified<br />

Testing Agency<br />

Welding Inspection Plan - Weld<br />

Inspection and Test Reports (weld<br />

maps, gamma scan, radiograph)<br />

NDE Qualification and Cert<br />

Procedures (Personnel Level I, II,<br />

III, quals and certs NDE method,<br />

exam procedures)<br />

SC-14 Eng 5 1.2.C<br />

SC-14 Q 5 1.2.D<br />

SC-14 Q 5 1.2.E<br />

SC-14 Q 5 1.2.F<br />

SC-14 Q 5 1.2.G<br />

SC-14 Q 5 1.2.H<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 7 of 46


CSI Spec<br />

Number<br />

<strong>05</strong>5000 088<br />

<strong>05</strong>5000 089<br />

<strong>05</strong>5000 <strong>09</strong>0<br />

<strong>05</strong>5000 <strong>09</strong>1<br />

<strong>05</strong>5000 <strong>09</strong>2<br />

<strong>05</strong>5000 <strong>09</strong>3<br />

<strong>05</strong>5000 <strong>09</strong>4<br />

<strong>05</strong>5000 <strong>09</strong>5<br />

<strong>05</strong>5100 <strong>09</strong>6<br />

<strong>05</strong>5100 <strong>09</strong>7<br />

<strong>05</strong>5100 <strong>09</strong>8<br />

<strong>05</strong>5100 <strong>09</strong>9<br />

<strong>05</strong>5100 100<br />

<strong>05</strong>5100 101<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

YES Grout Procedures SC-14 Eng 5 1.2.I<br />

YES Welding Certificates SC-14 Q 5 1.2.J<br />

YES Mill Test Reports SC-14 Q 5 1.2.K<br />

YES Product Test Reports SC-14 Q 5 1.2.L<br />

YES Source Quality Control Reports SC-14 Q 5 1.2.M<br />

YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

YES Field Quality Control Reports<br />

YES<br />

Independent Laboratory Testing<br />

Quality Control Reports<br />

<strong>05</strong>5100 METAL STAIRS<br />

5 days after<br />

activity<br />

completion<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.2.N<br />

Q 5 1.2.O<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

YES Shop Drawings SC-14 Eng 5 1.2.B<br />

YES<br />

Qualification Data for Qualified<br />

Testing Agency<br />

SC-14 Q 5 1.2.C<br />

YES Certificate of Performance SC-14 Eng 5 1.2.D<br />

YES<br />

YES<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records<br />

Welding Inspection Plan - Weld<br />

Inspection and test reports (weld<br />

maps, gamma scan, radiograph)<br />

SC-14 Eng 5 1.2.E<br />

SC-14 Q 5 1.2.F<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 8 of 46


CSI Spec<br />

Number<br />

<strong>05</strong>5100 102<br />

<strong>05</strong>5100 103<br />

<strong>05</strong>5100 104<br />

<strong>05</strong>5100 1<strong>05</strong><br />

<strong>05</strong>5100 106<br />

<strong>05</strong>5100 107<br />

<strong>05</strong>5100 108<br />

<strong>05</strong>5213 1<strong>09</strong><br />

<strong>05</strong>5213 110<br />

<strong>05</strong>5213 111<br />

<strong>05</strong>5213 112<br />

<strong>05</strong>5300 113<br />

<strong>05</strong>5300 114<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

YES<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

NDE Qualification and Cert<br />

Procedures (Personnel Level I, II,<br />

III, quals and certs NDE method,<br />

exam procedures)<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

SC-14 Q 5 1.2.G<br />

YES Welding Certificates SC-14 Eng 5 1.2.H<br />

YES Mill Test Reports SC-14 Q 5 1.2.I<br />

YES Source Quality Control Reports SC-14 Q 5 1.2.J<br />

YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

YES Field Quality Control Reports<br />

YES<br />

Independent Laboratory Testing<br />

Quality Control Reports<br />

<strong>05</strong>5213 PIPE AND TUBE<br />

RAILINGS<br />

5 days after<br />

activity<br />

completion<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.2.K<br />

Q 5 1.2.L<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

YES Shop Drawings SC-14 Eng 5 1.2.B<br />

YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

YES Field Quality Control Reports<br />

<strong>05</strong>5300 METAL GRATING<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.2.C<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

YES Shop Drawings SC-14 Eng 5 1.2.B<br />

061000 ROUGH CARPENTRY<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 9 of 46


CSI Spec<br />

Number<br />

061000 115<br />

074219 116<br />

074219 117<br />

074219 118<br />

074219 119<br />

074219 120<br />

074219 121<br />

074219 122<br />

074219 123<br />

074219 124<br />

075323 125<br />

075323 126<br />

075323 127<br />

075323 128<br />

075323 129<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

FIO<br />

PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

YES<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

Evaluation Reports for Expansion<br />

Anchors<br />

074219 FIRE RESISTIVE-CORE<br />

METAL WALL PANELS<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

SC-14 Q 5 1.2.A<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

YES Shop Drawings SC-14 Eng 5 1.3.B<br />

YES Calculations SC-14 Eng 5 1.3.C<br />

YES Samples SC-14 BTR 5 1.3.D<br />

YES Coordination Drawings SC-14 Eng 5 1.3.E<br />

YES Product Test Reports SC-14 Q 5 1.3.F<br />

YES Warranty EC BTR NA 1.3.G<br />

YES YES Maintenance Data EC Eng 5 1.4.A<br />

YES<br />

As-Built Drawings for Fire Marshal<br />

Approval<br />

075323 ETHYLENE-<br />

PROPYLENE-DIENE-<br />

MONOMER (EPDM) ROOFING<br />

EC FP 5 1.4.B<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

YES Shop Drawings SC-14 Eng 5 1.3.B<br />

YES Samples SC-14 BTR 5 1.3.C<br />

YES Research/ Evaluation Report EC FP 5 1.3.D<br />

YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 10 of 46


CSI Spec<br />

Number<br />

075323 130<br />

075323 131<br />

075323 132<br />

076200 133<br />

076200 134<br />

076200 135<br />

076200 136<br />

076200 137<br />

077100 138<br />

077100 139<br />

077100 140<br />

077100 141<br />

077100 142<br />

077100 143<br />

1. Number 2. Type & Format<br />

AP<br />

PDF<br />

FIO<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

FIO<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

FIO<br />

PDF<br />

AP<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

YES Field Quality Control Reports<br />

6. Submittal Date<br />

(Calendar Days)<br />

5 days after<br />

activity<br />

completion<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

Q 5 1.3.E<br />

YES Warranty EC BTR NA 1.3.F<br />

YES YES Maintenance Data EC Eng 5 1.4.A<br />

076200 SHEET METAL<br />

FLASHING AND TRIM<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

YES Shop Drawings SC-14 Eng 5 1.2.B<br />

YES Samples SC-14 BTR 5 1.2.C<br />

YES Warranty EC BTR NA 1.2.D<br />

YES YES Maintenance Data EC Eng 5 1.3.A<br />

077100 ROOF SPECIALTIES<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

YES Shop Drawings SC-14 Eng 5 1.3.B<br />

YES Samples SC-14 BTR 5 1.3.C<br />

YES Product Test Report SC-14 Q 5 1.3.D<br />

YES Warranty EC BTR NA 1.3.E<br />

YES YES Maintenance Data EC Eng 5 1.4.A<br />

078123 INTUMESCENT<br />

MASTIC FIREPROOFING<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 11 of 46


CSI Spec<br />

Number<br />

078123 144<br />

078123 145<br />

078123 146<br />

078123 147<br />

078123 148<br />

078123 149<br />

078123 150<br />

078413 151<br />

078413 152<br />

078413 153<br />

078413 154<br />

078413 155<br />

078446 156<br />

078446 157<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

YES Shop Drawings SC-14 Eng 5 1.3.B<br />

YES Product Certificates SC-14 Q 5 1.3.C<br />

YES Evaluation Reports<br />

5 days after<br />

activity<br />

Q 5 1.3.D<br />

YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

YES Field Quality Control Reports<br />

YES<br />

As-Built Drawings for Fire Marshal<br />

Approval<br />

078413 PENETRATION<br />

FIRESTOPPING<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.3.E<br />

EC FP 5 1.4.A<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

YES Product Schedule SC-14 Eng 5 1.2.B<br />

YES<br />

Qualification Data for Qualified<br />

Installer<br />

SC-14 Q 5 1.2.C<br />

YES Product Test Report SC-14 FP 5 1.2.D<br />

YES<br />

As-Built Drawings for Fire Marshal<br />

Approval<br />

078446 - FIRE-RESISTIVE<br />

JOINT SYSTEMS<br />

EC FP 5 1.3.A<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

YES Product Schedule SC-14 FP 5 1.2.B<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 12 of 46


CSI Spec<br />

Number<br />

078446 158<br />

078446 159<br />

078446 160<br />

079200 161<br />

079200 162<br />

079200 163<br />

079200 164<br />

081113 165<br />

081113 166<br />

081113 167<br />

081113 168<br />

083323 169<br />

083323 170<br />

083323 171<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

FIO<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

YES<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

Qualification Data for Qualified<br />

Installer<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

SC-14 FP 5 1.2.C<br />

YES Product Test Report SC-14 Q 5 1.2.D<br />

YES<br />

As-Built Drawings for Fire Marshal<br />

Approval<br />

079200 - JOINT SEALANTS<br />

EC FP 5 1.3.A<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

YES Joint Sealant Schedule SC-14 FP 5 1.2.B<br />

YES Product Test Report SC-14 Q 5 1.2.C<br />

YES Warranty EC BTR NA 1.2.D<br />

081113 - HOLLOW METAL<br />

DOORS AND FRAMES<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

YES Shop Drawings SC-14 Eng 5 1.3.B<br />

YES Door Schedule SC-14 Eng 5 1.3.C<br />

YES Product Test Report SC-14 Q 5 1.3.D<br />

083323 - OVERHEAD COILING<br />

DOORS<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

YES Shop Drawings SC-14 Eng 5 1.3.B<br />

Coating Color Samples SC-14 BTR 5 1.3.C<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 13 of 46


CSI Spec<br />

Number<br />

083323 172<br />

083323 173<br />

087100 174<br />

087100 175<br />

087100 176<br />

087100 177<br />

087100 178<br />

<strong>09</strong>2216 179<br />

<strong>09</strong>2900 180<br />

<strong>09</strong>6513 181<br />

<strong>09</strong>6513 182<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

YES Seismic Qualification Certificates SC-14 Q 5 1.3.D<br />

YES Oversize Construction Certification SC-14 Q 5 1.3.E<br />

087100 - DOOR HARDWARE<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

YES Shop Drawings SC-14 Eng 5 1.2.B<br />

Coating Color Samples SC-14 BTR 5 1.2.C<br />

YES Door Hardware Schedule SC-14 Q 5 1.2.D.1<br />

YES Keying Schedule SC-14 Q 5 1.2.D.2<br />

<strong>09</strong>2216 - NON-STRUCTURAL<br />

METAL FRAMING<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

<strong>09</strong>2900 - GYPSUM BOARD<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

<strong>09</strong>6513 - RESILIENT BASE<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

Samples SC-14 BTR 5 1.2.B<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 14 of 46


CSI Spec<br />

Number<br />

<strong>09</strong>9113 183<br />

<strong>09</strong>9113 184<br />

<strong>09</strong>9113 185<br />

<strong>09</strong>9113 186<br />

<strong>09</strong>9123 187<br />

<strong>09</strong>9123 188<br />

<strong>09</strong>9123 189<br />

<strong>09</strong>9600 190<br />

<strong>09</strong>9600 191<br />

<strong>09</strong>9600 192<br />

<strong>09</strong>9600 193<br />

<strong>09</strong>9600 194<br />

<strong>09</strong>9600 195<br />

101400 196<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

FIO<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

FIO<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

FIO<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

<strong>09</strong>9113 - EXTERIOR PAINTING<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

Samples SC-14 BTR 5 1.3.B<br />

YES YES Product List SC-14 BTR 5 1.3.C<br />

YES Maintenance Material EC BTR NA 1.4.A.1<br />

<strong>09</strong>9123 - INTERIOR PAINTING<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

YES Samples SC-14 BTR 5 1.3.B<br />

YES Maintenance Material EC BTR NA 1.5.A<br />

<strong>09</strong>9600 - HIGH-<br />

PERFORMANCE COATINGS<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

YES Samples for Initial Selection SC-14 BTR 5 1.3.B<br />

YES YES Product List SC-14 BTR 5 1.3.C<br />

YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

YES Field Quality Control Reports<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.3.D<br />

YES Maintenance Material EC BTR NA 1.4.A<br />

101400 - SIGNAGE<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 15 of 46


CSI Spec<br />

Number<br />

101400 197<br />

101400 198<br />

104400 199<br />

104413 200<br />

104413 201<br />

104416 202<br />

104416 203<br />

104416 204<br />

1<strong>05</strong>113 2<strong>05</strong><br />

1<strong>05</strong>113 206<br />

1<strong>05</strong>113 207<br />

1<strong>05</strong>113 208<br />

1<strong>05</strong>113 2<strong>09</strong><br />

1. Number 2. Type & Format<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

FIO<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

FIO<br />

PDF<br />

FIO<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

YES Shop Drawings SC-14 Eng 5 1.2.B<br />

Samples SC-14 BTR 5 1.2.C<br />

104400 - FIRE PROTECTION<br />

SPECIALTIES<br />

YES YES Catalog Data SC-14 Eng 5 1.4.A<br />

104413 - FIRE EXTINGUISHER<br />

CABINETS<br />

YES YES Catalog Data SC-14 Eng 5 1.5.A.1<br />

YES Shop Drawings SC-14 Eng 5 1.5.A.2<br />

104416 - FIRE<br />

EXTINGUISHERS<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

YES Warranty EC BTR NA 1.2.B<br />

YES YES Operation and Maintenance Data EC BTR 5 1.3.A<br />

1<strong>05</strong>113 - METAL LOCKERS<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

YES Shop Drawings SC-14 Eng 5 1.2.B<br />

YES Samples SC-14 BTR 5 1.2.C<br />

YES Warranty EC BTR NA 1.2.D<br />

YES Maintenance Data EC BTR NA 1.3.A<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 16 of 46


CSI Spec<br />

Number<br />

111300 210<br />

111300 211<br />

111300 212<br />

211220 213<br />

211313 214<br />

211313 215<br />

211313 216<br />

211313 217<br />

211313 218<br />

211313 219<br />

211313 220<br />

211313 221<br />

211313 222<br />

211313 223<br />

211313 224<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

AP<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

111300 - LOADING DOCK<br />

EQUIPMENT<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

YES Shop Drawings SC-14 Eng 5 1.2.B<br />

YES YES Operation and Maintenance Data EC BTR 5 1.3.A<br />

211220– STORAGE TANKS<br />

YES YES Catalog Data SC-14 Eng 5 1.3.A.1<br />

211313 – WET PIPE<br />

SPRINKLER SYSTEM<br />

YES Shop Drawings SC-21 Eng 5 1.3.A.1<br />

YES As Built Drawings EC+14 FP 5 1.3.A.2<br />

YES YES List of Submittals SC-30 Eng 5 1.3.B.1<br />

YES YES Product Data SC-14 Q 5 1.3.B.2<br />

YES YES Spare Parts Data SC-21 FP 5 1.3.B.3<br />

YES<br />

Fire Protection Specialist<br />

Documentation<br />

SC-45 FP 5 1.3.B.4<br />

YES Installer Qualifications SC-14 Q 5 1.3.B.5<br />

YES Sway Bracing Calculations SC-21 Eng 5 1.3.C.1<br />

YES Hydraulic Calculations SC-14 Eng 5 1.3.C.2<br />

YES<br />

YES<br />

Preliminary Acceptance Test<br />

Procedure<br />

Preliminary Acceptance Test<br />

Report<br />

SC-14 Q 5 1.3.D.1.a<br />

EC+7 Q 5 1.3.D.1.b<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 17 of 46


CSI Spec<br />

Number<br />

211313 225<br />

211313 226<br />

211313 227<br />

211313 228<br />

211313 229<br />

211313 230<br />

211313 231<br />

22<strong>05</strong>23 232<br />

22<strong>05</strong>29 233<br />

22<strong>05</strong>29 234<br />

22<strong>05</strong>29 235<br />

22<strong>05</strong>29 236<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

YES Final Acceptance Test Procedure SC-20 FP 5 1.3.D.2.a<br />

YES Final Acceptance Test Report EC+30 FP 5 1.3.D.2.b<br />

YES Certifications EC+30 FP 5 1.3.E<br />

YES YES<br />

YES<br />

YES<br />

YES<br />

Operation and Maintenance<br />

Manuals<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records per AWS<br />

D1.1<br />

CWI Documentation (Certs, VT,<br />

inspection documents)<br />

Welding Inspection Plan - Weld<br />

Inspection and Test Reports (weld<br />

maps, gamma scan, radiograph)<br />

22<strong>05</strong>23 - GENERAL-DUTY<br />

VALVES FOR PLUMBING<br />

PIPING<br />

SU-14 Eng 5 1.3.F<br />

SC-14 Eng 5 3.9.A<br />

SC-14 Q 5 3.9.B<br />

SC-14 Q 5 3.9.C<br />

YES YES Product Data SC-14 Q 5 1.4.A<br />

22<strong>05</strong>29 - HANGERS AND<br />

SUPPORTS FOR PLUMBING<br />

PIPING AND EQUIPMENT<br />

YES YES Product Data SC-14 Q 5 1.4.A<br />

YES<br />

YES<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records<br />

CWI Documentation (Certs, VT,<br />

inspection documents)<br />

SC-14 Eng 5 1.4.B<br />

SC-14 Q 5 1.4.C<br />

YES Welding Certificates SC-14 Eng 5 1.4.D<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 18 of 46


CSI Spec<br />

Number<br />

22<strong>05</strong>29 237<br />

22<strong>05</strong>29 238<br />

22<strong>05</strong>29 239<br />

22<strong>05</strong>33 240<br />

22<strong>05</strong>33 241<br />

22<strong>05</strong>33 242<br />

22<strong>05</strong>33 243<br />

22<strong>05</strong>33 244<br />

22<strong>05</strong>33 245<br />

22<strong>05</strong>48 246<br />

22<strong>05</strong>48 247<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

FIO<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

YES<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

Welding Inspection Plan - Weld<br />

Inspection and Test Reports (weld<br />

maps, gamma scan, radiograph)<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

SC-14 Q 5 1.4.E<br />

YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

YES Field Quality Control Reports<br />

22<strong>05</strong>33 – HEAT TRACING FOR<br />

PLUMBING PIPING<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.4.F<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

YES Shop Drawings SC-14 Eng 5 1.3.B<br />

YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

YES Field Quality Control Reports<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.3.C<br />

YES YES Operation and Maintenance Data EC Eng 5 1.3.D<br />

YES Warranty EC BTR NA 1.3.E<br />

22<strong>05</strong>48 - VIBRATION AND<br />

SEISMIC CONTROLS FOR<br />

PLUMBING PIPING AND<br />

EQUIPMENT<br />

YES YES Product Data SC-14 Q 5 1.5.A<br />

YES<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records<br />

SC-14 Eng 5 1.5.B<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 19 of 46


CSI Spec<br />

Number<br />

22<strong>05</strong>48 248<br />

22<strong>05</strong>48 249<br />

22<strong>05</strong>48 250<br />

22<strong>05</strong>48 251<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW/AP<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

YES<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

CWI Documentation (Certs, VT,<br />

inspection documents)<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

SC-14 Q 5 1.5.C<br />

YES Welding Certificates SC-14 Eng 5 1.5.D<br />

YES<br />

YES<br />

Welding Inspection Plan - Weld<br />

Inspection and test reports (weld<br />

maps, gamma scan, radiograph)<br />

Qualification Data for Testing<br />

Agency<br />

SC-14 Q 5 1.5.E<br />

SC-14 Q 5 1.5.F<br />

22<strong>05</strong>48 252 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

22<strong>05</strong>48 253<br />

22<strong>05</strong>53 254<br />

22<strong>05</strong>53 255<br />

22<strong>05</strong>53 256<br />

22<strong>05</strong>53 257<br />

22<strong>05</strong>53 258<br />

221329 259<br />

221329 260<br />

221329 261<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

AP<br />

PDF<br />

YES Field Quality Control Reports<br />

22<strong>05</strong>53 - IDENTIFICATION<br />

FOR PLUMBING PIPING AND<br />

EQUIPMENT<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.5.G<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

YES Samples SC-14 BTR 5 1.3.B<br />

YES Equipment Label Schedule SC-14 Eng 5 1.3.C<br />

YES Valve Numbering SC-14 Eng 5 1.3.D<br />

YES Valve Scheduling SC-14 Eng 5 1.3.E<br />

221329 - SANITARY<br />

SEWERAGE PUMPS<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

YES Shop Drawings SC-14 Eng 5 1.3.B<br />

YES YES Operation and Maintenance Data EC Eng 5 1.3.C<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 20 of 46


CSI Spec<br />

Number<br />

221413 262<br />

221413 263<br />

221413 264<br />

221413 265<br />

221413 266<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW/AP<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

221413 - FACILITY STORM<br />

DRAINAGE PIPING<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

YES YES Product Data SC-14 Q 5 1.5.A<br />

YES LEED <strong>SUBMITTAL</strong>-VOC Content SC-14 Q 5 1.5.B<br />

YES<br />

YES<br />

YES<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records for AWS<br />

D1.1<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records for ASME<br />

B31.9<br />

Welding Inspection Plan - Weld<br />

Inspection and Test Reports (weld<br />

maps, gamma scan, radiograph)<br />

SC-14 Eng 5 1.5.C<br />

SC-14 Eng 5 1.5.D<br />

SC-14 Q 5 1.5.E<br />

221413 267 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

221413 268<br />

221413 269<br />

221513 270<br />

221513 271<br />

221513 272<br />

221513 273<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

YES Field Quality Control Reports<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.5.F<br />

YES Welding Certificates SC-14 Eng 5 1.5.G<br />

221513 – GENERAL SERVICE<br />

COMPRESSED AIR PIPING<br />

YES YES Product Data SC-14 Q 5 1.3.B<br />

YES Fabrication Drawings SC-14 Eng 5 1.3.C<br />

YES Piping Material Certification SC-14 Q 5 1.3.D<br />

YES<br />

Certificates of Shop Inspection and<br />

Data Report<br />

SC-14 Q 5 1.3.E<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 21 of 46


CSI Spec<br />

Number<br />

221513 274<br />

221513 275<br />

221513 276<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

YES<br />

YES<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records for AWS<br />

D1.1<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records for ASME<br />

B31.3<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

SC-14 Eng 5 1.3.F<br />

SC-14 Eng 5 1.3.G<br />

YES Weld Inspection Reports SC-14 Eng 5 1.3.H<br />

221513 277 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

221513 278<br />

221513 279<br />

221513 280<br />

221519 281<br />

221519 282<br />

226313 283<br />

226313 284<br />

226313 285<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

YES Field Quality Control Reports<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.3.I<br />

YES YES Operation and Maintenance Data EC Eng 5 1.3.J<br />

YES YES Final Data Package EC+14 Eng 5 1.3.K<br />

221519 - GENERAL-SERVICE<br />

PACKAGED AIR<br />

COMPRESSORS AND<br />

RECEIVERS<br />

YES YES Product Data SC-14 Q 5 1.3.B<br />

YES YES Operation and Maintenance Data EC Eng 5 1.3.C<br />

SECTION 226313 - NITROGEN<br />

GAS PIPING<br />

YES YES Product Data SC-14 Q 5 1.3.B<br />

YES Fabrication Drawings SC-14 Eng 5 1.3.C<br />

YES Piping Material Certification SC-14 Eng 5 1.3.D<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 22 of 46


CSI Spec<br />

Number<br />

1. Number 2. Type & Format<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

226313 286<br />

APW<br />

PDF<br />

YES<br />

Certificates of Shop Inspection and<br />

Data Report<br />

Welding Procedure<br />

SC-14 Eng 5 1.3.E<br />

226313 287<br />

APW<br />

PDF<br />

YES<br />

Specifications/Procedure<br />

Qualification Records for AWS<br />

D1.1<br />

Welding Procedure<br />

SC-14 Eng 5 1.3.F<br />

226313 288<br />

APW<br />

PDF<br />

YES<br />

Specifications/Procedure<br />

Qualification Records for ASME<br />

B31.3<br />

SC-14 Eng 5 1.3.G<br />

226313 289<br />

APW<br />

PDF<br />

YES Weld Inspection Reports SC-14 Eng 5 1.3.H<br />

226313 290 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

226313 291<br />

226313 292<br />

226313 293<br />

23<strong>05</strong>19 294<br />

23<strong>05</strong>19 295<br />

23<strong>05</strong>23 296<br />

23<strong>05</strong>29 297<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

YES Field Quality Control Reports<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.3.I<br />

YES YES Operation and Maintenance Data EC Eng 5 1.3.J<br />

YES YES Final Data Package EC+14 Eng 5 1.3.K<br />

23<strong>05</strong>19 - METERS AND GAGES<br />

FOR HVAC PIPING<br />

YES YES Product Data SC-14 Q 5 1.4.A<br />

YES Product Certificates SC-14 Eng 5 1.4.B<br />

23<strong>05</strong>23 - GENERAL-DUTY<br />

VALVES FOR HVAC PIPING<br />

YES YES Product Data SC-14 Q 5 1.4.A<br />

23<strong>05</strong>29 - HANGERS AND<br />

SUPPORTS FOR HVAC PIPING<br />

AND EQUIPMENT<br />

YES YES Product Data SC-14 Q 5 1.4.A<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 23 of 46


CSI Spec<br />

Number<br />

23<strong>05</strong>29 298<br />

23<strong>05</strong>29 299<br />

23<strong>05</strong>29 300<br />

23<strong>05</strong>29 301<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

YES<br />

YES<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records<br />

CWI Documentation (Certs, VT,<br />

inspection documents)<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

SC-14 Eng 5 1.4.B<br />

SC-14 Q 5 1.4.C<br />

YES Welding Certificates SC-14 Eng 5 1.4.D<br />

YES Weld Inspection Reports SC-14 Eng 5 1.4.E<br />

23<strong>05</strong>29 302 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

23<strong>05</strong>29 303<br />

23<strong>05</strong>48 304<br />

23<strong>05</strong>48 3<strong>05</strong><br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

YES Field Quality Control Reports<br />

23<strong>05</strong>48 - VIBRATION AND<br />

SEISMIC CONTROLS FOR<br />

HVAC PIPING AND<br />

EQUIPMENT<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.4.F<br />

YES YES Product Data SC-14 Q 5 1.5.A<br />

YES<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records<br />

SC-14 Eng 5 1.5.B<br />

23<strong>05</strong>48 306<br />

APW<br />

PDF<br />

YES Welding Certificates SC-14 Eng 5 1.5.C<br />

23<strong>05</strong>48 307<br />

APW<br />

PDF<br />

YES<br />

Qualification Data for Testing<br />

Agency<br />

SC-14 Q 5 1.5.D<br />

23<strong>05</strong>48 308 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

23<strong>05</strong>48 3<strong>09</strong><br />

AP<br />

PDF<br />

YES Field Quality Control Reports<br />

23<strong>05</strong>53 - IDENTIFICATION<br />

FOR HVAC PIPING AND<br />

EQUIPMENT<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.5.E<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 24 of 46


CSI Spec<br />

Number<br />

23<strong>05</strong>53 310<br />

23<strong>05</strong>53 311<br />

23<strong>05</strong>53 312<br />

23<strong>05</strong>53 313<br />

23<strong>05</strong>53 314<br />

23<strong>05</strong>93 315<br />

23<strong>05</strong>93 316<br />

23<strong>05</strong>93 317<br />

23<strong>05</strong>93 318<br />

23<strong>05</strong>93 319<br />

23<strong>05</strong>93 320<br />

230700 321<br />

230700 322<br />

230700 323<br />

230700 324<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

FIO<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

YES Samples SC-14 BTR 5 1.3.B<br />

YES Equipment Label Schedule SC-14 Eng 5 1.3.C<br />

YES Valve Numbering Scheme SC-14 Eng 5 1.3.D<br />

YES Valve Schedules SC-14 Eng 5 1.3.E<br />

23<strong>05</strong>93 - TESTING,<br />

ADJUSTING, AND<br />

BALANCING FOR HVAC<br />

YES LEED Submittals SC-14 Eng 5 1.4.A<br />

YES Qualification Data NP+30 Q 5 1.4.B<br />

YES<br />

Contract Documents Examination<br />

Report<br />

NP+45 Q 5 1.4.C<br />

YES Strategies and Procedures Plan NP+90 Eng 5 1.4.D<br />

YES Certified TAB Reports EC Eng 5 1.4.E<br />

YES Warranty EC BTR NA 1.4.F<br />

230700 - HVAC INSULATION<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

YES LEED Submittal for VOC Content SC-14 Eng 5 1.3.B<br />

YES Shop Drawings SC-14 Eng 5 1.3.C<br />

YES Qualification Data SC-14 Q 5 1.3.D<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 25 of 46


CSI Spec<br />

Number<br />

1. Number 2. Type & Format<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

230700 325<br />

APW<br />

PDF<br />

YES Certified Material Test Reports SC-14 Q 5 1.3.E<br />

230700 326 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

230700 327<br />

AP<br />

PDF<br />

YES Field Quality Control Reports<br />

23<strong>09</strong>00 - INSTRUMENTATION<br />

AND CONTROL FOR HVAC<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.3.F<br />

23<strong>09</strong>00 328<br />

APW<br />

PDF<br />

YES YES Product Data SC-14 Q 5 1.5.A<br />

23<strong>09</strong>00 329<br />

APW<br />

DWG;PDF<br />

YES Shop Drawings SC-14 Eng 5 1.5.B<br />

23<strong>09</strong>00 330<br />

APW<br />

PDF<br />

YES<br />

Data Communications Protocol<br />

Certificates<br />

SC-14 Eng 5 1.5.C<br />

23<strong>09</strong>00 331<br />

APW<br />

PDF<br />

YES Samples for Selection SC-14 BTR 5 1.5.D<br />

23<strong>09</strong>00 332<br />

APW<br />

PDF<br />

YES Samples for Verification SC-14 BTR 5 1.5.E<br />

23<strong>09</strong>00 333<br />

APW<br />

PDF<br />

YES<br />

Software and Firmware Operational<br />

Documentation<br />

EC Eng 5 1.5.F<br />

23<strong>09</strong>00 334<br />

APW<br />

PDF<br />

YES Software Upgrade Kit EC Eng 5 1.5.G<br />

23<strong>09</strong>00 335<br />

AP<br />

PDF<br />

YES Qualification Data EC Q 5 1.5.H<br />

23<strong>09</strong>00 336 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

23<strong>09</strong>00 337<br />

23<strong>09</strong>00 338<br />

232113 339<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

YES Field Quality Control Reports<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.5.I<br />

YES YES Operation and Maintenance Data EC Eng 5 1.5.J<br />

232113 - HYDRONIC PIPING<br />

YES YES Product Data SC-14 Q 5 1.4.A<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 26 of 46


CSI Spec<br />

Number<br />

232113 340<br />

232113 341<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

YES<br />

YES<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records for AWS<br />

D1.1<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records for ASME<br />

B31.9<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

SC-14 Eng 5 1.4.B<br />

SC-14 Eng 5 1.4.C<br />

232113 342<br />

APW<br />

PDF<br />

Weld Inspection Reports SC-14 Eng 5 1.4.D<br />

232113 343<br />

APW<br />

PDF<br />

YES Welding Certificates SC-14 Eng 5 1.4.E<br />

232113 344<br />

APW<br />

PDF<br />

YES Qualification Data SC-14 Q 5 1.4.F<br />

232113 345 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

232113 346<br />

232113 347<br />

232113 348<br />

232123 349<br />

232123 350<br />

233113 351<br />

233113 352<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

YES Field Quality Control Reports<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.4.G<br />

YES YES Operation and Maintenance Data EC Eng 5 1.4.H<br />

YES Water Analysis SC-14 Eng 5 1.4.I<br />

232123 - HYDRONIC PUMPS<br />

YES YES Product Data SC-14 Q 5 1.4.A<br />

YES YES Operation and Maintenance Data EC Eng 5 1.4.B<br />

233113 - METAL DUCTS<br />

YES YES Product Data SC-14 Q 5 1.4.A<br />

YES LEED Submittals SC-14 Eng 5 1.4.B<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 27 of 46


CSI Spec<br />

Number<br />

233113 353<br />

233113 354<br />

233113 355<br />

233113 356<br />

233113 357<br />

233113 358<br />

233113 359<br />

233113 360<br />

1. Number 2. Type & Format<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

YES Shop Drawings SC-14 Eng 5 1.4.C<br />

YES Delegated Design Submittal SC-14 Eng 5 1.4.D<br />

YES<br />

YES<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records for AWS<br />

D1.1<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records for ASME<br />

AG-1<br />

SC-14 Eng 5 1.4.E<br />

SC-14 Eng 5 1.4.F<br />

Weld Inspection Reports SC-14 Eng 5 1.4.G<br />

YES Inspection and Test Procedures SC-14 Eng 5 1.4.H<br />

YES<br />

YES<br />

Inspection and Test Reports<br />

Required by ASME AG-1<br />

Inspection and Test Reports<br />

Required by ASME N511<br />

5 days after<br />

activity<br />

completion<br />

5 days after<br />

activity<br />

completion<br />

Eng 5 1.4.I<br />

Eng 5 1.4.J<br />

233113 361<br />

APW<br />

PDF<br />

YES Certified Material Test Reports SC-14 Q 5 1.4.K<br />

233113 362<br />

APW<br />

PDF<br />

YES Certificate of Conformance EC Q 5 1.4.L<br />

233113 363<br />

APW<br />

PDF<br />

YES Welding Certificates SC-14 Eng 5 1.4.M<br />

233113 364 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

233113 365<br />

233300 366<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

YES Field Quality Control Reports<br />

233300 - AIR DUCT<br />

ACCESSORIES<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.4.N<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 28 of 46


CSI Spec<br />

Number<br />

233300 367<br />

233300 368<br />

233300 369<br />

233300 370<br />

233713 371<br />

234100 372<br />

235100 373<br />

235100 374<br />

235100 375<br />

235100 376<br />

235100 377<br />

235100 378<br />

235100 379<br />

235100 380<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

YES LEED Submittals SC-14 Eng 5 1.3.B<br />

YES Shop Drawings SC-14 Eng 5 1.3.C<br />

YES YES Operation and Maintenance Data EC Eng 5 1.3.D<br />

YES Test and Inspection Reports<br />

233713 - DIFFUSERS,<br />

<strong>REGISTER</strong>S, AND GRILLES<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.3.E<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

234100 - PARTICULATE AIR<br />

FILTRATION<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

235100 - BREECHINGS AND<br />

STACKS<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

YES Shop Drawings SC-14 Eng 5 1.3.B<br />

YES Certified Material Test Reports SC-14 Q 5 1.3.C<br />

YES Certificate of Conformance EC Q 5 1.3.D<br />

YES<br />

YES<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records for ASME<br />

STS-1<br />

CWI Documentation (Certs, VT,<br />

inspection documents)<br />

SC-14 Eng 5 1.3.E<br />

SC-14 Q 5 1.3.F<br />

YES Welding Certificates SC-14 Eng 5 1.3.G<br />

YES Weld Inspection Reports SC-14 Eng 5 1.3.H<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 29 of 46


CSI Spec<br />

Number<br />

1. Number 2. Type & Format<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

235100 381 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

235100 382<br />

AP<br />

PDF<br />

YES Field Quality Control Reports<br />

235213 - ELECTRIC BOILERS<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.4.N<br />

235213 383<br />

APW<br />

PDF<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

235213 384<br />

APW<br />

DWG;PDF<br />

YES Shop Drawings SC-14 Eng 5 1.3.B<br />

235213 385<br />

APW<br />

PDF<br />

YES Source Quality Control Reports SC-14 Q 5 1.3.C<br />

235213 386 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

235213 387<br />

235213 388<br />

235213 389<br />

235213 390<br />

236423 391<br />

236423 392<br />

236423 393<br />

236423 394<br />

236423 395<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

FIO<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

YES Field Quality Control Reports<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.3.D<br />

YES YES Operation and Maintenance Data EC Eng 5 1.3.E<br />

YES Warranty EC BTR NA 1.3.F<br />

YES<br />

Informational Submittals-ASME<br />

Stamp Certification and Report<br />

236423 - SCROLL HEAT PUMP<br />

CHILLERS<br />

EC Eng 5 1.3.G<br />

YES YES Product Data SC-14 Q 5 1.4.A<br />

YES LEED Submittal SC-14 Eng 5 1.4.B<br />

YES Shop Drawings SC-14 Eng 5 1.4.C<br />

YES Certificates SC-14 Q 5 1.4.D<br />

YES Source Quality Control Reports SC-14 Q 5 1.4.E<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 30 of 46


CSI Spec<br />

Number<br />

1. Number 2. Type & Format<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

236423 396<br />

AP<br />

PDF<br />

YES Startup Service Reports EC Eng 5 1.4.F<br />

236423 397<br />

AP<br />

PDF<br />

YES YES Operation and Maintenance Data EC Eng 5 1.4.G<br />

236423 398<br />

FIO<br />

PDF<br />

YES Warranty<br />

237313 - MODULAR INDOOR<br />

CENTRAL-STATION AIR-<br />

HANDLING UNITS<br />

EC BTR NA 1.4.H<br />

237313 399<br />

APW<br />

PDF<br />

YES YES Product Data SC-14 Q 5 1.4.A<br />

237313 400<br />

APW<br />

PDF<br />

YES LEED Submittal SC-14 Eng 5 1.4.B<br />

237313 401<br />

APW<br />

PDF<br />

YES Source Quality Control Reports SC-14 Q 5 1.4.C<br />

237313 402 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

237313 403<br />

237313 404<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

YES Field Quality Control Reports<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.4.D<br />

YES YES Operation and Maintenance Data EC Eng 5 1.4.E<br />

26<strong>05</strong>13 4<strong>05</strong><br />

APW<br />

PDF<br />

YES YES<br />

26<strong>05</strong>13-MEDIUM VOLTAGE<br />

CABLES<br />

Product Data SC-14 Q 5 1.4.A<br />

26<strong>05</strong>13 406<br />

APW<br />

PDF<br />

YES Qualification Data for Installer SC-14 Q 5 1.4.B<br />

26<strong>05</strong>13 407<br />

APW<br />

PDF<br />

YES Material Certificates SC-14 Q 5 1.4.C<br />

26<strong>05</strong>13 408 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

26<strong>05</strong>13 4<strong>09</strong><br />

AP<br />

PDF<br />

YES Field Quality Control Reports<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.4.D<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 31 of 46


CSI Spec<br />

Number<br />

1. Number 2. Type & Format<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

26<strong>05</strong>19-LOW VOLTAGE<br />

ELECTRICAL POWER<br />

CONDUCTORS AND CABLES<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

26<strong>05</strong>19 410<br />

APW<br />

PDF<br />

YES YES Product Data SC-14 Q 5 1.4.A<br />

26<strong>05</strong>19 411<br />

APW<br />

PDF<br />

Qualification Data for Testing<br />

Agency<br />

SC-14 Q 5 1.4.B<br />

26<strong>05</strong>19 412 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

26<strong>05</strong>19 413<br />

AP<br />

PDF<br />

Field Quality Control Reports<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.4.C<br />

26<strong>05</strong>23 414<br />

APW<br />

PDF<br />

YES YES<br />

26<strong>05</strong>23-CONTROL VOLTAGE<br />

ELECTRICAL POWER<br />

CABLES<br />

Product Data SC-14 Q 5 1.4.A<br />

26<strong>05</strong>23 415<br />

APW<br />

PDF<br />

YES Qualification Data SC-14 Q 5 1.4.B<br />

26<strong>05</strong>23 416 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

26<strong>05</strong>23 417<br />

AP<br />

PDF<br />

YES Field Quality Control Reports<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.4.C<br />

26<strong>05</strong>26 418<br />

APW<br />

PDF<br />

YES YES<br />

26<strong>05</strong>26 – GROUNDING AND<br />

BONDING FOR ELECTRICAL<br />

SYSTEMS<br />

Product Data SC-14 Q 5 1.3.A<br />

26<strong>05</strong>26 419<br />

FIO<br />

PDF<br />

YES Informational Submittal EC Eng NA 1.3.B<br />

26<strong>05</strong>26 420<br />

APW<br />

PDF<br />

YES<br />

Qualification Data for Testing<br />

Agency<br />

SC-14 Q 5 1.3.C<br />

26<strong>05</strong>26 421 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 32 of 46


CSI Spec<br />

Number<br />

26<strong>05</strong>26 422<br />

26<strong>05</strong>26 423<br />

26<strong>05</strong>29 424<br />

26<strong>05</strong>29 425<br />

1. Number 2. Type & Format<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

YES Field Quality Control Reports<br />

6. Submittal Date<br />

(Calendar Days)<br />

5 days after<br />

activity<br />

completion<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

Q 5 1.3.D<br />

YES YES Operation and Maintenance Data EC Eng 5 1.3.E<br />

26<strong>05</strong>29-HANGERS AND<br />

SUPPORTS FOR ELECTRICAL<br />

SYSTEMS<br />

YES YES Product Data SC-14 Q 5 1.5.A<br />

YES<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records for AWS<br />

SC-14 Eng 5 1.5.B<br />

26<strong>05</strong>29 426<br />

APW<br />

PDF<br />

YES<br />

D1.1<br />

CWI Documentation (Certs, VT,<br />

inspection documents)<br />

SC-14 Q 5 1.5.C<br />

26<strong>05</strong>29 427<br />

APW<br />

PDF<br />

YES Welding Certificates SC-14 Eng 5 1.5.D<br />

26<strong>05</strong>29 428<br />

APW<br />

PDF<br />

YES Weld Inspection Reports SC-14 Eng 5 1.5.E<br />

26<strong>05</strong>29 429 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

26<strong>05</strong>29 430<br />

26<strong>05</strong>33 431<br />

26<strong>05</strong>33 432<br />

26<strong>05</strong>33 433<br />

26<strong>05</strong>33 434<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

YES Field Quality Control Reports<br />

26<strong>05</strong>33-RACEWAY AND<br />

BOXES FOR ELECTRICAL<br />

SYSTEMS<br />

5 days after<br />

activity<br />

completion<br />

Q 5<br />

YES YES Product Data SC-14 Q 5 1.4.A<br />

YES Shop Drawings SC-14 Eng 5 1.4.B<br />

YES Coordination Drawings SC-14 Eng 5 1.4.C<br />

YES<br />

Qualification Data for Testing<br />

Agency<br />

SC-14 Q 5 1.4.E<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 33 of 46


CSI Spec<br />

Number<br />

1. Number 2. Type & Format<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

26<strong>05</strong>33 435<br />

APW<br />

PDF<br />

YES Source Quality Control Reports<br />

26<strong>05</strong>36-CABLE TRAYS FOR<br />

ELECTRICAL SYSTEMS<br />

SC-14 Q 5 1.2.O<br />

26<strong>05</strong>36 436<br />

APW<br />

PDF<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

26<strong>05</strong>36 437<br />

APW<br />

DWG;PDF<br />

YES Shop Drawings SC-14 Eng 5 1.3.B<br />

26<strong>05</strong>36 438 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

26<strong>05</strong>36 439<br />

AP<br />

PDF<br />

YES Field Quality Control Reports<br />

26<strong>05</strong>43- UNDERGROUND<br />

DUCTS AND RACEWAYS FOR<br />

ELECTRICAL SYSTEMS<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.3.C<br />

26<strong>05</strong>43 440<br />

APW<br />

PDF<br />

YES YES Product Data SC-14 Q 5 1.4.A<br />

26<strong>05</strong>43 441<br />

APW<br />

PDF<br />

YES Source Quality Control Reports SC-14 Q 5 1.4.B<br />

26<strong>05</strong>43 442 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

26<strong>05</strong>43 443<br />

26<strong>05</strong>48 444<br />

26<strong>05</strong>48 445<br />

26<strong>05</strong>48 446<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

YES Field Quality Control Reports<br />

26<strong>05</strong>48- VIBRATION AND<br />

SEISMIC CONTROLS FOR<br />

ELECTRICAL SYSTEMS<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.4.C<br />

YES YES Product Data SC-14 Q 5 1.5.A<br />

YES Coordination Drawings SC-14 Eng 5 1.5.B<br />

YES<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records for AWS<br />

D1.1<br />

SC-14 Eng 5 1.5.C<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 34 of 46


CSI Spec<br />

Number<br />

26<strong>05</strong>48 447<br />

26<strong>05</strong>48 448<br />

26<strong>05</strong>48 449<br />

26<strong>05</strong>53 450<br />

26<strong>05</strong>53 451<br />

26<strong>05</strong>53 452<br />

261200 453<br />

261200 454<br />

261200 455<br />

261200 456<br />

261200 457<br />

261200 458<br />

261200 459<br />

262200 460<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

YES<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

CWI Documentation (Certs, VT,<br />

inspection documents)<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

SC-14 Q 5 1.5.D<br />

YES Welding Certificates SC-14 Eng 5 1.5.E<br />

YES Weld Inspection Reports SC-14 Eng 5 1.5.F<br />

26<strong>05</strong>53-IDENTIFICATION FOR<br />

ELECTRICAL SYSTEMS<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

YES Identification Schedule SC-14 Eng 5 1.3.B<br />

YES Samples SC-14 BTR 5 1.3.C<br />

261200 - MEDIUM VOLTAGE<br />

TRANSFORMERS<br />

YES YES Product Data SC-14 Q 5 1.4.A<br />

YES Shop Drawings SC-14 Eng 5 1.4.B<br />

YES<br />

Qualification Data for Testing<br />

Agency<br />

SC-14 Eng 5 1.4.C<br />

YES Source Quality Control Reports SC-14 Q 5 1.4.D<br />

YES Specifications SC-14 Eng 5 1.4.E<br />

YES Material Safety Data Sheets SC-14 S 5 1.4.F<br />

YES YES Operation and Maintenance Data EC Eng 5 1.4.G<br />

262200-LOW VOLTAGE<br />

TRANSFORMERS<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 35 of 46


CSI Spec<br />

Number<br />

262200 461<br />

262200 462<br />

1. Number 2. Type & Format<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

YES Shop Drawings SC-14 Eng 5 1.3.B<br />

YES<br />

Qualification Data for Testing<br />

Agency<br />

SC-14 Q 5 1.3.C<br />

262200 463<br />

APW<br />

PDF<br />

YES Source Quality Control Reports SC-14 Q 5 1.3.D<br />

262200 464 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

262200 465<br />

AP<br />

PDF<br />

YES Field Quality Control Reports<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.3.E<br />

262200 466 AP PDF YES YES Operation and Maintenance Data EC Eng 5 1.3.F<br />

262416 467<br />

262416 468<br />

262416 469<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

262416-PANELBOARDS<br />

YES YES Product Data SC-14 Q 5 1.5.A<br />

YES Shop Drawings SC-14 Eng 5 1.5.B<br />

YES<br />

Qualification Data for Testing<br />

Agency<br />

SC-14 Q 5 1.5.C<br />

262416 470 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

262416 471<br />

262416 472<br />

262416 473<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

YES Field Quality Control Reports<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.5.D<br />

YES YES Panelboard Schedules SC-14 Eng 5 1.5.E<br />

YES YES Operation and Maintenance Data EC Eng 5 1.5.F<br />

262713-ELECTRICTY<br />

METERING<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 36 of 46


CSI Spec<br />

Number<br />

262713 474<br />

262713 475<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

YES Shop Drawings SC-14 Eng 5 1.3.B<br />

262713 476 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

262713 477<br />

AP<br />

PDF<br />

YES Field Quality Control Reports<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.3.C<br />

262713 478 AP PDF YES YES Operation and Maintenance Data EC Eng 5 1.3.D<br />

262726-WIRING DEVICES<br />

262726 479<br />

APW<br />

PDF<br />

YES YES Product Data SC-14 Q 5 1.4.A<br />

262726 480<br />

APW<br />

DWG;PDF<br />

YES Shop Drawings SC-14 Eng 5 1.4.B<br />

262726 481<br />

AP<br />

PDF<br />

YES YES Operation and Maintenance Data EC Eng 5 1.4.C<br />

262726 482 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

262726 483<br />

AP<br />

PDF<br />

Field Quality Control Reports<br />

262816-ENCLOSED SWITCHES<br />

AND CIRCUIT BREAKERS<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.4.D<br />

262816 484<br />

APW<br />

PDF<br />

YES YES Product Data SC-14 Q 5 1.5.A<br />

262816 485<br />

APW<br />

DWG;PDF<br />

YES Shop Drawings SC-14 Eng 5 1.5.B<br />

262816 486<br />

APW<br />

PDF<br />

YES<br />

Qualification Data for Testing<br />

Agency<br />

SC-14 Eng 5 1.5.C<br />

262816 487 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 37 of 46


CSI Spec<br />

Number<br />

262816 488<br />

262816 489<br />

1. Number 2. Type & Format<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

YES Field Quality Control Reports<br />

6. Submittal Date<br />

(Calendar Days)<br />

5 days after<br />

activity<br />

completion<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

Q 5 1.5.D<br />

YES YES Operation and Maintenance Data EC Eng 5 1.5.E<br />

262913 490<br />

APW<br />

PDF<br />

YES YES<br />

262913-ENCLOSED<br />

CONTROLLERS<br />

Product Data SC-14 Q 5 1.3.A<br />

262913 491<br />

APW<br />

PDF<br />

YES Wiring Diagram SC-14 Eng 5 1.3.B<br />

262913 492<br />

APW<br />

PDF<br />

YES Installation Instructions SC-14 Eng 5 1.3.C<br />

262913 493 APW PDF YES YES<br />

Operation and Maintenance<br />

Instructions<br />

SU-14 Eng 5 1.3.D<br />

262913 494 APW PDF YES<br />

Load Current and Overload-Relay<br />

Heater List<br />

EC Eng 5 1.3.E<br />

262913 495 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

262913 496<br />

AP<br />

PDF<br />

YES Field Quality Control Reports<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.3.F<br />

262923 497<br />

APW<br />

PDF<br />

YES YES<br />

262923-VARIABLE<br />

FREQUENCY MOTOR<br />

CONTROLLERS<br />

Product Data SC-14 Q 5 1.4.A<br />

262923 498<br />

APW<br />

PDF<br />

YES Qualification Data for Manufacturer SC-14 Q 5 1.4.B<br />

262923 499 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

262923 500<br />

262923 501<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

YES Field Quality Control Reports<br />

YES YES<br />

Operation and Maintenance<br />

Instructions<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.4.C<br />

SU-14 Eng 5 1.4.D<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 38 of 46


CSI Spec<br />

Number<br />

262923 502<br />

1. Number 2. Type & Format<br />

AP<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

YES Load Current and Relay Settings EC Eng 5 1.4.E<br />

264313-TRANSIENT VOLTAGE<br />

SUPRESSION FOR LOW<br />

VOLTAGE ELECTRICAL<br />

POWER CIRCUITS<br />

264313 503<br />

APW<br />

PDF<br />

YES YES Product Data SC-14 Q 5 1.4.A<br />

264313 504<br />

APW<br />

PDF<br />

YES Product Certificates SC-14 Q 5 1.4.B<br />

264313 5<strong>05</strong><br />

APW<br />

PDF<br />

YES<br />

Qualification Data for Testing<br />

Agency<br />

SC-14 Q 5 1.4.C<br />

264313 506 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

264313 507<br />

264313 508<br />

264313 5<strong>09</strong><br />

AP<br />

PDF<br />

AP<br />

PDF<br />

FIO<br />

PDF<br />

YES Field Quality Control Reports<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.2.O<br />

YES YES Operation and Maintenance Data EC Eng 5 1.4.E<br />

YES Warranty EC BTR NA 1.4.F<br />

265100-INTERIOR LIGHTING<br />

265100 510<br />

APW<br />

PDF<br />

YES YES Product Data SC-14 Q 5 1.4.A<br />

265100 511<br />

APW<br />

DWG;PDF<br />

YES Shop Drawings SC-14 Eng 5 1.4.B<br />

265100 512<br />

APW<br />

PDF<br />

YES Product Certificates SC-14 Q 5 1.4.C<br />

265100 513<br />

APW<br />

PDF<br />

YES Qualification Data SC-14 Q 5 1.4.D<br />

265100 514 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 39 of 46


CSI Spec<br />

Number<br />

265100 515<br />

265100 516<br />

265100 517<br />

1. Number 2. Type & Format<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

FIO<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

YES Field Quality Control Reports<br />

YES YES<br />

Operation and Maintenance<br />

Instructions<br />

6. Submittal Date<br />

(Calendar Days)<br />

5 days after<br />

activity<br />

completion<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

Q 5 1.4.E<br />

SU-14 Eng 5 1.4.F<br />

YES Warranty EC BTR NA 1.4.G<br />

265600-EXTERIOR LIGHTING<br />

265600 518<br />

APW<br />

PDF<br />

YES YES Product Data SC-14 Q 5 1.4.A<br />

265600 519<br />

APW<br />

PDF<br />

YES Qualification Data SC-14 Q 5 1.4.B<br />

265600 520 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

265600 521<br />

265600 522<br />

265600 523<br />

271500 524<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

FIO<br />

PDF<br />

APW<br />

PDF<br />

YES Field Quality Control Reports<br />

YES YES<br />

Operation and Maintenance<br />

Instructions<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.4.C<br />

SU-14 Eng 5 1.4.D<br />

YES Warranty EC BTR NA 1.4.E<br />

271500-COMMUNICATION<br />

HORIZONTAL CABLING<br />

YES YES Product Data SC-14 Q 5 1.5.A<br />

282300 525<br />

APW<br />

PDF<br />

YES YES<br />

282300-VIDEO<br />

SURVEILLANCE<br />

Product Data SC-14 Q 5 1.4.A<br />

282300 526<br />

APW<br />

DWG;PDF<br />

YES Shop Drawings SC-14 Eng 5 1.4.B<br />

282300 527<br />

APW<br />

PDF<br />

YES Equipment Lists SC-14 Eng 5 1.4.C<br />

282300 528 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 40 of 46


CSI Spec<br />

Number<br />

282300 529<br />

1. Number 2. Type & Format<br />

AP<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

YES Field Quality Control Reports<br />

6. Submittal Date<br />

(Calendar Days)<br />

5 days after<br />

activity<br />

completion<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

Q 5 1.4.D<br />

282300 530<br />

APW<br />

PDF<br />

YES YES<br />

Operation and Maintenance<br />

Instructions<br />

SU-14 Eng 5 1.4.E<br />

282300 531<br />

FIO<br />

PDF<br />

YES Warranty<br />

283100-FIRE DETECTION AND<br />

ALARM<br />

EC BTR NA 1.4.F<br />

283100 532<br />

APW<br />

PDF<br />

YES Calculations SC-14 Eng 5 1.4.A.1<br />

283100 533<br />

APW<br />

PDF<br />

YES YES Catalog Data SC-30 Eng 5 1.4.A.2<br />

283100 534<br />

APW<br />

PDF<br />

YES Certifications NP+30 Eng 5 1.4.A.3<br />

283100 535<br />

APW<br />

PDF<br />

YES Installation Instructions SU-30 Eng 5 1.4.A.4<br />

283100 536<br />

APW<br />

PDF<br />

YES Materials and Parts List SU-30 Eng 5 1.4.A.5<br />

283100 537<br />

APW<br />

DWG;PDF<br />

YES Shop Drawings SC-14 Eng 5 1.4.A.6<br />

283100 538<br />

APW<br />

DWG;PDF<br />

YES FCP Program SC-14 Eng 5 1.4.A.7<br />

283100 539<br />

APW<br />

DWG;PDF<br />

YES Test Reports SC-14 Eng 5 1.4.A.8<br />

283100 540<br />

APW<br />

DWG;PDF<br />

YES Wiring Diagrams SC-14 Eng 5 1.4.A.9<br />

283100 541<br />

AP<br />

PDF<br />

YES YES<br />

Operation and Maintenance<br />

Manuals<br />

SU-14 Eng 5 1.4.A.10<br />

283100 542<br />

AP<br />

PDF<br />

YES Project Record documents EC Eng 5 1.4.A.11<br />

283100 543<br />

FIO<br />

PDF<br />

YES Warranty<br />

283233-RADIATION<br />

DETECTION AND ALARM<br />

EC BTR NA 1.4.A.12<br />

283233 544 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 41 of 46


CSI Spec<br />

Number<br />

283233 545<br />

1. Number 2. Type & Format<br />

AP<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

YES Field Quality Control Reports<br />

6. Submittal Date<br />

(Calendar Days)<br />

5 days after<br />

activity<br />

completion<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

Q 5 1.4.A<br />

283233 546<br />

APW<br />

PDF<br />

YES<br />

Qualification Data for Testing<br />

Agency<br />

312000-EARTH MOVING<br />

SC-14 Eng 5 1.4.B<br />

312000 547<br />

APW<br />

PDF<br />

YES Fill Material SC-14 Eng 5 1.2.A<br />

312000 548 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

312000 549<br />

AP<br />

PDF<br />

YES Field Quality Control Reports<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.2.B<br />

312000 550<br />

APW<br />

PDF<br />

YES Testing Agency Qualifications SC-14 Q 5 1.2.C<br />

312000 551<br />

APW<br />

PDF<br />

Excavation Safety Plan<br />

321216 - ASPHALT PAVING<br />

SC-14 S 10 1.2.D<br />

321216 552<br />

APW<br />

PDF<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

321216 553<br />

APW<br />

PDF<br />

YES Testing Agency Qualifications SC-14 Q 5 1.2.B<br />

321216 554 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

321216 555<br />

331116 556<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

YES Field Quality Control Reports<br />

331116 – FACILITY WATER<br />

DISTRIBUTION PIPING<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.2.C<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

331116 557 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

331116 558<br />

AP<br />

PDF<br />

YES Field Quality Control Reports<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.2.B<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 42 of 46


CSI Spec<br />

Number<br />

1. Number 2. Type & Format<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

331116 559<br />

AP<br />

PDF<br />

YES Cleaning Reports EC E 5 1.2.C<br />

331116 560<br />

AP<br />

PDF<br />

YES YES Operation and Maintenance Data<br />

40<strong>05</strong>27 – PIPING AND<br />

TUBINGINSPECTION<br />

CHECKLIST<br />

EC Eng 5 1.2.D<br />

40<strong>05</strong>27 561 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

40<strong>05</strong>27 562<br />

40<strong>05</strong>27 563<br />

40<strong>05</strong>27 564<br />

402319 565<br />

402319 566<br />

402319 567<br />

402319 568<br />

402319 569<br />

402319 570<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

YES Welding Certificates SC-14 Eng 5 1.3.A<br />

YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

YES Field Quality Control Reports<br />

402319 – PROCESS PLANT<br />

NON-POTABLE WATER PIPE<br />

(MODIFIED FOR IXM)<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.3.B<br />

YES YES Product Data SC-14 Q 5 1.3.B<br />

YES Fabrication Drawings SC-14 Eng 5 1.3.C<br />

YES Piping Material Certification SC-14 Q 5 1.3.D<br />

YES Certificates of Shop Inspection SC-14 Q 5 1.3.E<br />

YES<br />

YES<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records for AWS<br />

D1.1<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records for AMSE<br />

B31.3<br />

SC-14 Eng 5 1.3.F<br />

SC-14 Eng 5 1.3.G<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 43 of 46


CSI Spec<br />

Number<br />

402319 571<br />

1. Number 2. Type & Format<br />

AP<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

YES Welding Inspection Reports<br />

6. Submittal Date<br />

(Calendar Days)<br />

5 days after<br />

activity<br />

completion<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

Eng 5 1.3.H<br />

402319 572 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

402319 573<br />

402319 574<br />

402319 575<br />

431510 576<br />

431510 577<br />

431510 578<br />

431510 579<br />

431510 580<br />

431510 581<br />

431510 582<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

YES Field Quality Control Reports<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.3.I<br />

YES YES Operation and Maintenance Data EC Eng 5 1.3.J<br />

YES YES Final Data Package EC+14 Eng 5 1.3.K<br />

431510 – LOW PRESSURE AIR<br />

PURGE PIPING<br />

YES YES Product Data SC-14 Q 5 1.3.B<br />

YES Fabrication Drawings SC-14 Eng 5 1.3.C<br />

YES Piping Material Certification SC-14 Q 5 1.3.D<br />

YES Certificates of Shop Inspection SC-14 Q 5 1.3.E<br />

YES<br />

YES<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records for AWS<br />

D1.1<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records for AMSE<br />

B31.3<br />

YES Welding Inspection Reports<br />

SC-14 Eng 5 1.3.F<br />

SC-14 Eng 5 1.3.G<br />

5 days after<br />

activity<br />

completion<br />

Eng 5 1.3.H<br />

431510 583 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 44 of 46


CSI Spec<br />

Number<br />

431510 584<br />

431510 585<br />

431510 586<br />

1. Number 2. Type & Format<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

YES Field Quality Control Reports<br />

6. Submittal Date<br />

(Calendar Days)<br />

5 days after<br />

activity<br />

completion<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

Q 5 1.3.I<br />

YES YES Operation and Maintenance Data EC Eng 5 1.3.J<br />

YES YES Final Data Package EC+14 Eng 5 1.3.K<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 45 of 46