Hard Head logo

025025 Stone cracker
Instruction ManualHard Head 025025 StonecrackerClarke IDH70L 70L Industrial Dehumidifier - icon 5025025

025025 Stone cracker

STONECRACKER OPERATING INSTRUCTIONS 
Original instructions

Jola AB reserves the right to make changes to the product. Jola AB claims copyright on this documentation. It is not allowed to modify or alter this documentation in  any way and the manual shall be printed and used as it is in relation to the product. For the latest version of operating instructions, refer to the Jola website.Hard Head 025025 Stonecracker - figHard Head 025025 Stonecracker - fig1

SAFETY INSTRUCTIONS

Use safety equipment:
– protective breathing mask
– rubber gloves
– safety glasses
– full coverage clothing

SYMBOLS

Clarke IDH70L 70L Industrial Dehumidifier - icon 5 Read the instructions.
Hard Head 025025 Stonecracker - SYMBOLS Warning!
Hard Head 025025 Stonecracker - SYMBOLS1 Irritates the skin. Can cause serious eye damage.

TECHNICAL DATA

Power 130 Map (1300 kg/cm²)
Weight 5 kg

DESCRIPTION

Stone cracker for cracking rock, concrete and stone. Noiseless and vibration-free. Can be used indoors and outdoors. Power of up to 130 Map (1300 kg/cm²). No permit required to use.

USE

  1. Drill:
    – Recommended minimum depth: 30 cm (drill about 10% deeper than required bottom).
    – Recommended hole spacing CC 15-30 cm.
    – Recommended Ø34-45 mm (larger holes –> wider spacing).
    – The expansion force acts at right angles to the drill hole, so make sure that at least one direction of expansion is free. This can mean that the holes need to be drilled with a certain angle.
    – Blow the holes free from dust and water.
  2. Mix in bucket:
    – 1.2-1.3 L cold water + 5 kg powder.
    – Mix well (mechanical mixing with mixing rod or concrete beater) until the aggregate is completely smooth and without lumps, approx. 30-60s.
  3. Fill the holes all the way up.
  4. Evacuate the area and wait at least 2 days (the splitting can take longer at lower temperatures).
  5. Clean the equipment.

DRILLING SUGGESTIONS FOR REQUIRED RESULT
Divide the stone.
FIG. 1
Split the stone into smaller pieces.
FIG. 2
Split flat rock.
FIG. 3
Split part of stone in pipeline trench.
FIG. 4
Split top of stone.
FIG. 5

TEMPERATURE
The recommended outside temperature is 10-25°C (use at other temperatures is not advised as a result of the risk of failure to split or blowout, which can be dangerous for persons nearby).
WARNING!
Blowout means that the cracking pulp is pressed up from the drill hole and expands too quickly to crack the rock. This is because the temperature is too high, or the  wrong amount of water has been added, and can be dangerous in that there is a risk of the escaping pulp hitting anyone too near the holes.

MAINTENANCE

STORAGE
Store in a dry place out of the reach of children.

Hard Head logo

WWW.JULA.COM
© JULA AB 
BOX 363, 532 24 SKARA, SWEDEN
2023-05-10

Documents / Resources

Hard Head 025025 Stonecracker [pdf] Instruction Manual
025025, 025025 Stonecracker, Stonecracker

References

Leave a comment

Your email address will not be published. Required fields are marked *