DEPARTMENT OF THE ARMY<br />

<strong>Procurement</strong> Programs<br />

Committee Staff <strong>Procurement</strong> Backup Book<br />

FY 2008 Global War on Terror Budget Estimate Submission Cost Adjustment<br />

September 2007<br />

OTHER PROCUREMENT, ARMY<br />

<strong>Other</strong> Support Equipment/Initial Spares<br />

Budget Activity 3/4<br />

APPROPRIATION


*** UNCLASSIFIED ***<br />

DEPARTMENT OF THE ARMY<br />

FY 2008 PROCUREMENT PROGRAM<br />

FY 2008 GLOBAL WAR ON TERRORISM COST ADJUSTMENT<br />

EXHIBIT P-1<br />

DATE: 9/11/2007<br />

DOLLARS IN THOUSANDS<br />

APPROPRIATION <strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> ACTIVITY 03 <strong>Other</strong> Support Equipment<br />

FY 2008 FY 2008 GWOT<br />

Base GWOT Cost Adjustment FY 2008<br />

LINE NO ITEM NOMENCLATURE Appropriation Request Request Total<br />

SMOKE/OBSCURANTS SYSTEMS<br />

121 Reconnaissance System Nuclear-Biological Chemica (M92300) 316 72,000 0 72,316<br />

122 CBRN Soldier Protection (M01001) 46,294 44,564 92,801 183,659<br />

123 Smoke & Obscurant Family (MX0600) 7,700 0 1,098 8,798<br />

SUB-ACTIVITY TOTAL 54,310 116,564 93,899 264,773<br />

BRIDGING EQUIPMENT<br />

124 Tactical Bridge (MX0100) 50,443 0 76,000 126,443<br />

125 Tactical Bridge, Float-Ribbon (MA8890) 74,785 39,000 3,500 117,285<br />

SUB-ACTIVITY TOTAL 125,228 39,000 79,500 243,728<br />

ENGINEER (NON CONSTRUCTION) EQUIPMENT<br />

130 Explosive Ordnance Disposal Equip (MA9200) 33,283 3,300 4,350 40,933<br />

SUB-ACTIVITY TOTAL 33,283 3,300 4,350 40,933<br />

COMBAT SERVICE SUPPORT EQUIPMENT<br />

133 Heaters and ECU's (MF9000) 18,463 6,859 6,653 31,975<br />

134 Laundries, Showers & Latrines (M82700) 0 0 5,200 5,200<br />

135 Soldier Enhancement (MA6800) 13,540 8,757 0 22,297<br />

139 Force Provider (M80200) 0 0 18,400 18,400<br />

140 Field Feeding Equipment (M65800) 26,123 0 12,060 38,183<br />

141 Cargo Aerial Delivery Program (MA7804) 43,842 22,400 26,750 92,992<br />

SUB-ACTIVITY TOTAL 101,968 38,016 69,063 209,047<br />

PETROLEUM EQUIPMENT<br />

145 Quality Surveillance Equipment (MB6400) 1,293 12,680 52,684 66,657<br />

146 Distribution Systems, Petroleum & Water (MA6000) 34,056 21,741 42,808 98,605<br />

SUB-ACTIVITY TOTAL 35,349 34,421 95,492 165,262<br />

WATER EQUIPMENT<br />

147 Water Purification Systems (R05600) 41,981 1,600 6,535 50,116<br />

SUB-ACTIVITY TOTAL 41,981 1,600 6,535 50,116<br />

MEDICAL EQUIPMENT<br />

148 Combat Support Medical (MN1000) 85,490 3,617 4,461 93,568<br />

SUB-ACTIVITY TOTAL 85,490 3,617 4,461 93,568<br />

MAINTENANCE EQUIPMENT<br />

149 Mobile Maintenance Equipement Systems (G05301) 51,475 190,583 75,042 317,100<br />

SUB-ACTIVITY TOTAL 51,475 190,583 75,042 317,100<br />

*** UNCLASSIFIED ***<br />

EXHIBIT P-1<br />

Page 1 <strong>of</strong> 2


*** UNCLASSIFIED ***<br />

DEPARTMENT OF THE ARMY<br />

FY 2008 PROCUREMENT PROGRAM<br />

FY 2008 GLOBAL WAR ON TERRORISM COST ADJUSTMENT<br />

EXHIBIT P-1<br />

DATE: 9/11/2007<br />

DOLLARS IN THOUSANDS<br />

APPROPRIATION <strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> ACTIVITY 03 <strong>Other</strong> Support Equipment<br />

FY 2008 FY 2008 GWOT<br />

Base GWOT Cost Adjustment FY 2008<br />

LINE NO ITEM NOMENCLATURE Appropriation Request Request Total<br />

CONSTRUCTION EQUIPMENT<br />

151 Grader, Road Mtzd, Hvy, 6x4 (CCE) (R03800) 11,700 0 788 12,488<br />

153 Scrapers, Earthmoving (RA0100) 19,440 0 1,438 20,878<br />

156 Loaders (R04500) 18,842 0 9,502 28,344<br />

157 Hydraulic Excavator (X01500) 3,371 0 400 3,771<br />

161 High Mobility Engineer Excavator (HMEE) FOS (R05901) 37,800 0 14,609 52,409<br />

162 Const Equip ESP (M05500) 42,984 9,500 0 52,484<br />

SUB-ACTIVITY TOTAL 134,137 9,500 26,737 170,374<br />

GENERATORS<br />

169 Generators and Associated Equip (MA9800) 92,863 99,998 52,260 245,121<br />

SUB-ACTIVITY TOTAL 92,863 99,998 52,260 245,121<br />

MATERIAL HANDLING EQUIPMENT<br />

170 Rough Terrain Container Handler (M41200) 20,587 29,219 80,195 130,001<br />

171 All Terrain Lifting <strong>Army</strong> System (M41800) 24,757 22,064 11,317 58,138<br />

SUB-ACTIVITY TOTAL 45,344 51,283 91,512 188,139<br />

TRAINING EQUIPMENT<br />

173 Training Devices, Nonsystem (NA0100) 201,843 342 0 202,185<br />

SUB-ACTIVITY TOTAL 201,843 342 0 202,185<br />

TEST MEAS & DIAG EQUIP (TMDE)<br />

176 Calibration Sets Equipment (N10000) 10,644 36,856 20,451 67,951<br />

177 Integrated Family <strong>of</strong> Test Equipment (MB4000) 36,516 57,111 76,807 170,434<br />

178 Test Equipment Modernization (TEMOD) (N11000) 19,302 10,840 0 30,142<br />

SUB-ACTIVITY TOTAL 66,462 104,807 97,258 268,527<br />

OTHER SUPPORT EQUIPMENT<br />

179 Rapid Equipping Force (M80101) 48,704 0 1,161,554 1,210,258<br />

181 Physical Security Systems (OPA3) (MA0780) 103,018 35 1,156 104,209<br />

183 Modification <strong>of</strong> In-Svc Equip (OPA3) (MA4500) 58,223 4,620 18,387 81,230<br />

185 Building, Pre Fab Relocatables (MA9160) 0 0 134,469 134,469<br />

187 AMC Critical Items OPA3 (G01001) 7,000 0 131,740 138,740<br />

SUB-ACTIVITY TOTAL 216,945 4,655 1,447,306 1,668,906<br />

ACTIVITY TOTAL 1,286,678 697,686 2,143,415 4,127,779<br />

*** UNCLASSIFIED ***<br />

EXHIBIT P-1<br />

Page 2 <strong>of</strong> 2


i - 1<br />

<strong>Table</strong> <strong>of</strong> <strong>Contents</strong> - <strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong><br />

BLIN SSN Nomenclature Page<br />

121 M92300 RECONNAISSANCE SYSTEM NUCLEAR - BIOLOGICAL CHEMICA ..........................1<br />

122 M01001 CBRN SOLDIER PROTECTION .....................................................4<br />

123 MX0600 SMOKE & OBSCURANT FAMILY: SOF (NON AAO ITEM) ...............................51<br />

124 MX0100 TACTICAL BRIDGING ..........................................................56<br />

125 MA8890 TACTICAL BRIDGE, FLOAT-RIBBON ..............................................62<br />

130 MA9200 EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD EQPMT) ..............................75<br />

133 MF9000 Heaters and ECU's ..........................................................86<br />

134 M82700 LAUNDRIES, SHOWERS AND LATRINES ............................................96<br />

135 MA6800 SOLDIER ENHANCEMENT ........................................................97<br />

139 M80200 FORCE PROVIDER .............................................................98<br />

140 M65800 FIELD FEEDING EQUIPMENT ...................................................102<br />

141 MA7804 Cargo Aerial Delivery Program .............................................115<br />

145 MB6400 QUALITY SURVEILLANCE EQUIPMENT ............................................124<br />

146 MA6000 DISTRIBUTION SYSTEMS, PETROLEUM & WATER ...................................128<br />

147 R05600 WATER PURIFICATION SYSTEMS ................................................139<br />

148 MN1000 COMBAT SUPPORT MEDICAL ....................................................144<br />

149 G05301 MOBILE MAINTENANCE EQUIPMENT SYSTEMS ......................................150<br />

151 R03800 GRADER, ROAD MTZD, HVY, 6X4 (CCE) .........................................158<br />

153 RA0100 SCRAPERS, EARTHMOVING ....................................................164<br />

156 R04500 LOADERS ...................................................................169<br />

157 X01500 HYDRAULIC EXCAVATOR .......................................................178<br />

161 R05901 HIGH MOBILITY ENGINEER EXCAVATOR (HMEE) FOS ...............................182<br />

162 M05500 CONST EQUIP ESP ...........................................................191<br />

169 MA9800 GENERATORS AND ASSOCIATED EQUIP ...........................................196<br />

170 M41200 Rough Terrain Container Handler (RTCH) ....................................230<br />

171 M41800 ALL TERRAIN LIFTING ARMY SYSTEM ...........................................236<br />

173 NA0100 TRAINING DEVICES, NONSYSTEM ...............................................240<br />

174 M80101 Rapid Equipping Soldier Support Equipment .................................254<br />

176 N10000 CALIBRATION SETS EQUIPMENT ................................................262<br />

177 MB4000 INTEGRATED FAMILY OF TEST EQUIPMENT (IFTE) ................................283<br />

178 N11000 TEST EQUIPMENT MODERNIZATION (TEMOD) ......................................291<br />

181 MA0780 PHYSICAL SECURITY SYSTEMS (OPA3) ..........................................296


i - 2<br />

<strong>Table</strong> <strong>of</strong> <strong>Contents</strong> - <strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong><br />

BLIN SSN Nomenclature Page<br />

183 MA4500 MODIFICATION OF IN-SVC EQUIPMENT (OPA-3) ..................................303<br />

185 MA9160 BUILDING, PRE-FAB, RELOCATABLE ............................................312<br />

187 G01001 AMC CRITICAL ITEMS OPA3 ...................................................314


Exhibit P-40<br />

Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

RECONNAISSANCE SYSTEM NUCLEAR - BIOLOGICAL CHEMICA<br />

M92300<br />

Date:<br />

September 2007<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

P-1 Item Nomenclature<br />

RECONNAISSANCE SYSTEM NUCLEAR - BIOLOGICAL CHEMICA (M92300)<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 72.3 72.3<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 72.3 72.3<br />

Initial Spares<br />

Total Proc Cost 72.3 72.3<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The NBCRS provides nuclear and chemical sampling, detection, and warning equipment and biological sampling equipment integrated into a high speed, high mobility, armored carrier capable <strong>of</strong><br />

performing reconnaissance on primary, secondary, and cross-country routes wherever combat forces are deployed. The system contains a vehicle-mounted surface sampler, mobile mass<br />

spectrometer, chemical agent monitor, chemical agent detector alarm, radiation detection device, navigation system, secure communications, area marking and collective protection.<br />

Justification:<br />

FY 2008 Base Appropriation: $ .316 million<br />

FY 2008 GWOT Request: $72.000 million<br />

FY 2008 Total $72.316 million<br />

Qty: 40<br />

FY08 procures 40 reconstituted NBCRS Fox.<br />

M92300 Item No. 121 Page 1 <strong>of</strong> 3 Exhibit P-40<br />

RECONNAISSANCE SYSTEM NUCLEAR - BIOLOGICAL CHEMICA 1 Budget Item Justification Sheet


RECONNAISSANCE SYSTEM NUCLEAR - BIOLOGICAL CHEMICA<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

RECONNAISSANCE SYSTEM NUCLEAR - BIOLOGICAL<br />

CHEMICA (M92300)<br />

M92300<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

NBCRS Fox Hardware 55922 40 1398<br />

S<strong>of</strong>tware/Quality Assurance 5785<br />

Tech Manuals/Trng Aids/Matls 5400<br />

Engineering Support 5209<br />

Total: 72316<br />

M92300 Item No. 121 Page 2 <strong>of</strong> 3 Exhibit P-5<br />

RECONNAISSANCE SYSTEM NUCLEAR - BIOLOGICAL CHEMICA 2 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

RECONNAISSANCE SYSTEM NUCLEAR - BIOLOGICAL CHEMICA<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

NBCRS Fox Hardware<br />

P-1 Line Item Nomenclature:<br />

RECONNAISSANCE SYSTEM NUCLEAR - BIOLOGICAL CHEMICA (M92300)<br />

M92300<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

FY 2008 C/FFP Mar 08 May 09 40 1398<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

M92300 Item No. 121 Page 3 <strong>of</strong> 3 Exhibit P-5a<br />

RECONNAISSANCE SYSTEM NUCLEAR - BIOLOGICAL CHEMICA 3 Budget <strong>Procurement</strong> History and Planning


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

CBRN SOLDIER PROTECTION<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

P-1 Item Nomenclature<br />

CBRN SOLDIER PROTECTION (M01001)<br />

M01001<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 183.7 183.7<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 183.7 183.7<br />

Initial Spares<br />

Total Proc Cost 183.7 183.7<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

Funds support critically required Chemical Biological equipment needed to support increased <strong>Army</strong> mission requirements.<br />

Justification:<br />

FY2008 GWOT dollars provide additional assets to prosecute the Global War on Terror by resetting items, replacing battle losses, generating and protecting forces, and enhancing military<br />

capabilities. Specific quantity, cost element, and pricing data is not available at this time and will be adjusted by available FY2008 base dollars, mix <strong>of</strong> forces, and production and requirements<br />

adjustments.<br />

FY2008 GWOT Cost Adjustment funds additional requirements in support <strong>of</strong> ongoing GWOT operations.<br />

FY 2008 Base Appropriation: $46.294 million<br />

FY 2008 GWOT Request: $44.564 million<br />

FY 2008 GWOT Cost Adjustment: $92.801 million<br />

FY 2008 Total: $183.659 million<br />

M01001 Item No. 122 Page 1 <strong>of</strong> 47 Exhibit P-40<br />

CBRN SOLDIER PROTECTION 4 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

RADIAC - POCKET (OPA3)<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

P-1 Item Nomenclature<br />

RADIAC - POCKET (OPA3) (B96800)<br />

M01001 (B96800)<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 14.9 14.9<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 14.9 14.9<br />

Initial Spares<br />

Total Proc Cost 14.9 14.9<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The AN/UDR-13 is a nuclear radiation detector that is used by the <strong>Army</strong> and the Navy SEALS to detect and measure various forms <strong>of</strong> nuclear radiation in the battlespace and in Operations <strong>Other</strong><br />

Than War. The system allows users to avoid contamination and to reduce their exposure when avoidance is not possible. The AN/UDR-13 is a tactical dosimeter that is used in the field to monitor<br />

the radiation dose <strong>of</strong> a platoon or equivalent sized unit to make tactical decisions on stay time and route. It also has a rate meter function. The AN/VDR-2 is a nuclear radiation detector used by the<br />

<strong>Army</strong> and the Marines to detect and measure bata and gamma nuclear radiation in the battlespace and in Operations <strong>Other</strong> Than War. The system allows users to avoid contamination and to reduce<br />

their exposure when avoidance is not possible.<br />

Justification:<br />

FY08 Global War on Terrorism (GWOT) Request: funds replacement items left in theater becuase they will be uneconomical to repair. Additional items will bring fill levels to acceptable risk and<br />

enable Soldiers to fulfill Homeland Security missions and support for disaster relief.<br />

FY08 GWOT Cost Adjustement funds procurements that will support ongoing GWOT operations.<br />

FY 2008 Base Appropriation: $3.706 million<br />

FY 2008 GWOT Request: $3.524 million<br />

FY 2008 GWOT Cost Adjustment Request: $7.650 million<br />

FY 2008 Total $14.880 million<br />

M01001 (B96800) Item No. 122 Page 2 <strong>of</strong> 47 Exhibit P-40<br />

RADIAC - POCKET (OPA3) 5 Budget Item Justification Sheet


RADIAC - POCKET (OPA3)<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

RADIAC - POCKET (OPA3) (B96800)<br />

M01001 (B96800)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

AN/UDR-13 Hardware 3056 4215 0.725<br />

AN/UDR-13 Hardware (GWOT) 3524 4860 0.725<br />

Engineering Support (Govt) 300<br />

Engineering Support (Govt) (GWOT)<br />

Quality Assurance 350<br />

Quality Assurance (GWOT)<br />

FY2008 GWOT Cost Adjustment Request<br />

AN/UDR-13 Hardware (GWOT Cost Adjust) 7000 9655 0.725<br />

Engineering Support (Govt) 300<br />

Quality Assurance 350<br />

Total: 14880<br />

M01001 (B96800) Item No. 122 Page 3 <strong>of</strong> 47 Exhibit P-5<br />

RADIAC - POCKET (OPA3) 6 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

RADIAC - POCKET (OPA3)<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

AN/UDR-13 Hardware<br />

FY 2007<br />

Canberra Dover<br />

Dover, NJ<br />

FY 2008<br />

Canberra Dover<br />

C/FFP<br />

Dover, NJ<br />

AN/UDR-13 Hardware (GWOT)<br />

FY 2007<br />

Canberra Dover<br />

Dover, NJ<br />

FY 2008<br />

Canberra Dover<br />

C/FFP<br />

Dover, NJ<br />

AN/UDR-13 Hardware (GWOT Cost Adjust)<br />

FY 2008<br />

Canberra Dover<br />

C/FFP<br />

Dover, NJ<br />

P-1 Line Item Nomenclature:<br />

RADIAC - POCKET (OPA3) (B96800)<br />

M01001 (B96800)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

CELCNC, Ft Monmouth,<br />

NJ<br />

CELCNC, Ft Monmouth,<br />

NJ<br />

CELCNC, Ft Monmouth,<br />

NJ<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Dec 07 Apr 08 4215 1 Yes<br />

Jul 08 May 09 4860 1 Yes<br />

Dec 07 Aug 08 9655 1 Yes<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

M01001 (B96800) Item No. 122 Page 4 <strong>of</strong> 47 Exhibit P-5a<br />

RADIAC - POCKET (OPA3) 7 Budget <strong>Procurement</strong> History and Planning


RADIAC - POCKET (OPA3)<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

RADIAC - POCKET (OPA3) (B96800)<br />

M01001 (B96800)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

AN/UDR-13 Hardware<br />

2 FY 08 A 4215 4215 1000 1000 1000 1000 215 -4215<br />

AN/UDR-13 Hardware (GWOT)<br />

2 FY 08 4860 4860 130 1200 1200 1200 1130 -4860<br />

AN/UDR-13 Hardware (GWOT Cost Adjust)<br />

2 FY 08 9655 9655 785 1000 1000 1000 1000 1000 1000 1000 1000 870 -9655<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 18730 18730 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1200 1200 1200 1130 -18730<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Canberra Dover, Dover, NJ 300 2000 2500<br />

2 Canberra Dover, Dover, NJ 100 600 2000<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 3 7 10<br />

Reorder 0 2 5 7<br />

2 Initial 0 3 12 15<br />

Reorder 0 0 0 0<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

NOTE: $9K for 2 AN/PDR-77, stock secondary<br />

item, included in initial spares total.<br />

M01001 (B96800) Item No. 122 Page 5 <strong>of</strong> 47 Exhibit P-21<br />

RADIAC - POCKET (OPA3) 8 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

DECONTAMINATE APP PWR DR LT WT M17<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

$14.6 Total <strong>of</strong> Base/GWOT/Amend GWOT<br />

Date:<br />

P-1 Item Nomenclature<br />

DECONTAMINATE APP PWR DR LT WT M17 (M67400)<br />

M01001 (M67400)<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 13.5 13.5<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 13.5 13.5<br />

Initial Spares<br />

Total Proc Cost 13.5 13.5<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Joint Service Transportable Decontamination System, Small Scale (JSTDS-SS) is a replacement for the M17 LDS and will be transportable by a platform capable <strong>of</strong> being operated in close<br />

proximity to combat operations [i.e., High Mobility Multi-purpose Wheeled Vehicle/Trailer, Family <strong>of</strong> Medium Tactical Vehicles/Trailer] <strong>of</strong>f-road over any terrain. The JSTDS-SS will consist <strong>of</strong> an<br />

applicator and accessories that apply JSTDS-SS decontaminant to conduct operational and thorough decontamination <strong>of</strong> non-sensitive military materiel, limited facility decontamination at logistics<br />

bases, airfields (and critical airfield assets), naval ships, ports, key command and control centers, and other fixed facilities that have been exposed to CBRN warfare agents/contamination and toxic<br />

industrial materials (TIMs).<br />

Justification:<br />

FY08 GWOT Cost Adjustement funds the Joint Service Transportable Decontamination System, Small Scale (JSTDS-SS). The system is a replacement for the M17 LDS and will be used to fill<br />

MTOE shortages at the BN and below level. <strong>Army</strong> is currently filling units to an FFR <strong>of</strong> 50% <strong>of</strong> authorized systems. Funding this purchase would relieve the FFR Restriction. Additionally, to<br />

efficiently execute the Global War on Terror (GWOT), the U. S. <strong>Army</strong> directed that early deployers leave assigned equipment for use by follow-on units deploying for OIF/OEF, including mobilized<br />

Reserve Components Units (RC). Additionally, the <strong>Army</strong> directed Reserve units as well as Active component units to transfer a considerable quantity <strong>of</strong> assigned equipment to other components,<br />

services, and contractors. Since it is anticipated that an unknown amount <strong>of</strong> equipment will be turned over to the Iraqi Security Force or will be uneconomical to repair, it is necessary to replace this<br />

equipment through new procurement. Items will replace items left in theater that will be uneconomical to repair. Additional items will bring fill levels to acceptable levels and enable Soldiers to<br />

fulfill Homeland Security missions and support for disaster relief.<br />

FY08 Base: $2.366 million Qty: 61<br />

FY08 GWOT Request : $0<br />

FY08 GWOT Cost Adjustment: $11.167 million Qty: 279<br />

FY08 Total: $13.533 million<br />

M01001 (M67400) Item No. 122 Page 6 <strong>of</strong> 47 Exhibit P-40<br />

DECONTAMINATE APP PWR DR LT WT M17 9 Budget Item Justification Sheet


DECONTAMINATE APP PWR DR LT WT M17<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

DECONTAMINATE APP PWR DR LT WT M17 (M67400)<br />

M01001 (M67400)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

JSTDS-SS<br />

FY08 Base Appn 1879 61 31<br />

Base Total Package Fielding 487<br />

Total Baseline 2366<br />

FY08 GWOT Cost Adjustment Request 9486 279 34<br />

Total Package Fielding 1681<br />

Total GWOT Cost Adjustment 11167<br />

Total: 13533<br />

M01001 (M67400) Item No. 122 Page 7 <strong>of</strong> 47 Exhibit P-5<br />

DECONTAMINATE APP PWR DR LT WT M17 10 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

DECONTAMINATE APP PWR DR LT WT M17<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

JSTDS-SS<br />

FY08 Base Appn<br />

FY 2008<br />

FY08 GWOT Cost Adjustment Request<br />

FY 2008<br />

DRS<br />

ST Louis, MO<br />

DRS<br />

ST Louis, MO<br />

P-1 Line Item Nomenclature:<br />

DECONTAMINATE APP PWR DR LT WT M17 (M67400)<br />

M01001 (M67400)<br />

FFP/OPT 2 RDECOM, Natick<br />

MASS<br />

FFP/OPT 2 RDECOM, Natick<br />

MASS<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Units<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Mar 08 Jul 08 61 31 Yes<br />

Mar 08 Jul 08 279 34 Yes<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

M01001 (M67400) Item No. 122 Page 8 <strong>of</strong> 47 Exhibit P-5a<br />

DECONTAMINATE APP PWR DR LT WT M17 11 Budget <strong>Procurement</strong> History and Planning


DECONTAMINATE APP PWR DR LT WT M17<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

DECONTAMINATE APP PWR DR LT WT M17 (M67400)<br />

M01001 (M67400)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

FY08 Base Appn<br />

1 FY 08 A 61 0 61 A 20 20 20 1 0<br />

FY08 GWOT Cost Adjustment Request<br />

1 FY 08 A 279 0 279 A 20 25 25 25 25 25 25 30 30 35 14 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 340 340 40 45 45 26 25 25 25 30 30 35 14<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 DRS, ST Louis, MO 5 100 200<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 4 5 9<br />

Reorder 0 2 4 6<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

M01001 (M67400) Item No. 122 Page 9 <strong>of</strong> 47 Exhibit P-21<br />

DECONTAMINATE APP PWR DR LT WT M17 12 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

SIMP COLL PROT EQUIP M20<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

P-1 Item Nomenclature<br />

SIMP COLL PROT EQUIP M20 (M97400)<br />

M01001 (M97400)<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 12.7 12.7<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 12.7 12.7<br />

Initial Spares<br />

Total Proc Cost 12.7 12.7<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The M20A1 is a lightweight, low cost system that provides Nuclear, Biological, Chemical(NBC) collective protection for existing structures. It consists <strong>of</strong> a large,cylindrical shaped Room Liner,<br />

designed to be pressurized inside a room or building. A Support Kit contains a motor blower for pressurization and flexible air ducts to direct the air. A Hermetically Sealed Filter Canister (HSFC)<br />

is provided to filter ambient air before it is ducted into the liner. A collapsible Protective Entrance (PE) attaches to the pressurized liner and serves as an airlock for personnel entry/exit. A<br />

Recirculation Filter, located inside the Room Liner near the PE, provides an extra margin <strong>of</strong> agent filtration. The system comes with two packaged spare Room Liners. Room Liners can be<br />

interconnected with an adapter to enlarge the protective area (with the addition <strong>of</strong> a Support Kit and HSFC per additional liner). A single packaged M20A1 SCPE system weighs about 500 lbs and<br />

requires 40 cu. ft.<br />

Justification:<br />

FY08 Baseline: Procures 89 SCPE. <strong>Procurement</strong> will support deployed and deploying combat units.<br />

FY08 Global War on Terrorism (GWOT) request: Procures 567 additional SCPE.<br />

FY08 Global War on Terrorism Amendment funds the M20 A1 SCPE. The porgram provides a safe environment for command and control operations (CCO) and an area for releif from the<br />

degrading effects <strong>of</strong> individual protective equipment. The SCPE will be used whenever a CB attack is imminent. The protective entrance, filter unit, liner and sealants will be used withing the<br />

existing structures (room/basement). If not funded, <strong>Army</strong> systems needs will remain below 60% <strong>of</strong> the total force requirement.<br />

FY08 Base Appropriation - $1.818 million<br />

FY08 GWOT Request - $0<br />

FY08 GWOT Cost Adjustment Request - $10.857 million<br />

FY08 Total - $12.675 million<br />

M01001 (M97400) Item No. 122 Page 10 <strong>of</strong> 47 Exhibit P-40<br />

SIMP COLL PROT EQUIP M20 13 Budget Item Justification Sheet


SIMP COLL PROT EQUIP M20<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

SIMP COLL PROT EQUIP M20 (M97400)<br />

M01001 (M97400)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000<br />

FY08 Base Appropriation<br />

M20A1 SCPE 1728 89 19<br />

Engineering Support 90<br />

Total Base Appropriation 1818<br />

FY08 GWOT Cost Adjustment Request<br />

M20A1 SCPE 10773 567 19<br />

Engineering Support 84<br />

Total GWOT Cost Adjustment Request 10857<br />

Total: 12675<br />

M01001 (M97400) Item No. 122 Page 11 <strong>of</strong> 47 Exhibit P-5<br />

SIMP COLL PROT EQUIP M20 14 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

SIMP COLL PROT EQUIP M20<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

FY08 Base Appropriation<br />

FY 2008<br />

Production Products Inc.<br />

St. Louis, MO<br />

FY08 GWOT Cost Adjustment Request<br />

FY 2008<br />

Production Products Inc.<br />

St. Louis, MO<br />

P-1 Line Item Nomenclature:<br />

SIMP COLL PROT EQUIP M20 (M97400)<br />

M01001 (M97400)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

SS/FP TACOM, Rock Island, IL Dec 07 Jun 08 89 Yes<br />

SS/FP TACOM, Rock Island, IL Jun 08 Dec 08 567 Yes<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

M01001 (M97400) Item No. 122 Page 12 <strong>of</strong> 47 Exhibit P-5a<br />

SIMP COLL PROT EQUIP M20 15 Budget <strong>Procurement</strong> History and Planning


SIMP COLL PROT EQUIP M20<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

SIMP COLL PROT EQUIP M20 (M97400)<br />

M01001 (M97400)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

FY08 Base Appropriation<br />

1 FY 08 A 89 0 89 A 89 0<br />

FY08 Amended GWOT Request<br />

1 FY 08 A 567 0 567 A 109 109 109 109 109 22 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 656 656 89 109 109 109 109 109 22<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Production Products Inc., St. Louis, MO 10 109 120<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 5 7 12<br />

Reorder 0 0 0 0<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

M01001 (M97400) Item No. 122 Page 13 <strong>of</strong> 47 Exhibit P-21<br />

SIMP COLL PROT EQUIP M20 16 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

AUTO CHEMICAL AGENT ALARM (ACADA), XM22<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

Date:<br />

P-1 Item Nomenclature<br />

AUTO CHEMICAL AGENT ALARM (ACADA), XM22 (M98800)<br />

M01001 (M98800)<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 64.5 64.5<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 64.5 64.5<br />

Initial Spares<br />

Total Proc Cost 64.5 64.5<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Automatic Chemical Agent Detector and Alarm (ACADA) is a man-portable automatic alarm system capable <strong>of</strong> detecting blister and nerve agent/vapors. The ACADA has improved agent<br />

sensitivity, response time, and interference rejection over prior point detectors. The ACADA operates independently after system start-up, detects automatically for a minimum <strong>of</strong> 24 hours, provides<br />

audio and visual alarms, and has a communication interference to support battlespace automations systems. The ACADA provides a first time, point detection capability to automatically detect<br />

blister agents. The ACADA allows battlespace commanders to use information obtained to make rapid and effective decisions concerning the adjustment <strong>of</strong> the protective posture <strong>of</strong> their soldiers.<br />

The ACADA meets the critical needs <strong>of</strong> the US Forces for an automatic, point sampling, chemical agent alarm. A shipboard ACADA variant was developed to operate under shipboard specific<br />

environments.<br />

Justification:<br />

BIOLOGICAL INTEGREATED DETECTION SYSTEM (BIDS)<br />

The <strong>Army</strong> has made a determination to change the platform the M31E2 Biological Integrated Detection System currently mounted on an M1152 HMMWV, to the M1083A2 Long Term Armor<br />

Solution (LTAS) - armor ready vehicle. The 1083A2 reduces crew vulnerability to IEDs and small arms fire. The M1083A2 is a five ton medium tactical vehicle with an integral armored cab and<br />

armor attach points for field mountable armor to increase protection as needed. New vehicle provides: increased roll-over protection designed into new cab and improved crew restraint and<br />

protection.<br />

FY08 GWOT Cost Adjustement funds ACADA hardware that will support ongoing GWOT operations.<br />

ACADA Funding:<br />

FY 2008 Base Appropriation: $10.233 million<br />

FY 2008 GWOT Request: $13.723 million<br />

FY 2008 Amended GWOT Request: $30.588 million<br />

FY 2008 Total $54.544 million<br />

M01001 (M98800) Item No. 122 Page 14 <strong>of</strong> 47 Exhibit P-40<br />

AUTO CHEMICAL AGENT ALARM (ACADA), XM22 17 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

AUTO CHEMICAL AGENT ALARM (ACADA), XM22<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

Date:<br />

P-1 Item Nomenclature<br />

AUTO CHEMICAL AGENT ALARM (ACADA), XM22 (M98800)<br />

M01001 (M98800)<br />

September 2007<br />

BIDS Funding:<br />

FY 2008 Base Appropriation: $0.000 million<br />

FY 2008 GWOT Request: $10.000 million<br />

FY 2008 Total $10.000 million<br />

M01001 (M98800) Item No. 122 Page 15 <strong>of</strong> 47 Exhibit P-40<br />

AUTO CHEMICAL AGENT ALARM (ACADA), XM22 18 Budget Item Justification Sheet


AUTO CHEMICAL AGENT ALARM (ACADA), XM22<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

AUTO CHEMICAL AGENT ALARM (ACADA), XM22<br />

(M98800)<br />

M01001 (M98800)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000<br />

M22 ACADA Hardware 8782 738 12<br />

M22 ACADA Hardware Supplemental 11774 981 12<br />

Engineering Support 1019<br />

Engineering Support (S) 1370<br />

System Fielding Support 432<br />

System Fielding Support (S) 579<br />

BIDS Hardware Supplemental 9356 35 267<br />

Engineering Support 644<br />

FY2008 GWOT Cost Adjustment Request<br />

M22 ACADA Hardware (GWOT CA) 25992 2166 12<br />

Engineering Support 3067<br />

System Fielding Support 1529<br />

Total: 64544<br />

M01001 (M98800) Item No. 122 Page 16 <strong>of</strong> 47 Exhibit P-5<br />

AUTO CHEMICAL AGENT ALARM (ACADA), XM22 19 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

AUTO CHEMICAL AGENT ALARM (ACADA), XM22<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

M22 ACADA Hardware<br />

FY 2007<br />

Smiths Detection<br />

Edgewood, MD<br />

FY 2008<br />

Smiths Detection<br />

Edgewood, MD<br />

M22 ACADA Hardware Supplemental<br />

FY 2008<br />

Smiths Detection<br />

Edgewood, MD<br />

BIDS Hardware Supplemental<br />

P-1 Line Item Nomenclature:<br />

AUTO CHEMICAL AGENT ALARM (ACADA), XM22 (M98800)<br />

M01001 (M98800)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

SS/FFP RDECOM, APG, MD Jan 08 May 08 738 12 Yes<br />

SS/FFP RDECOM, APG, MD Jul 08 Feb 09 981 12 Yes<br />

FY 2008 C/FFP TBD Mar 08 Mar 09 35 267<br />

FY2008 GWOT Cost Adjustment Request<br />

M22 ACADA Hardware (GWOT CA)<br />

FY 2008<br />

Smiths Detection<br />

Edgewood, MD<br />

SS/FFP RDECOM, APG. MD Jan 08 Jul 08 2166 12 Yes<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

M01001 (M98800) Item No. 122 Page 17 <strong>of</strong> 47 Exhibit P-5a<br />

AUTO CHEMICAL AGENT ALARM (ACADA), XM22 20 Budget <strong>Procurement</strong> History and Planning


AUTO CHEMICAL AGENT ALARM (ACADA), XM22<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

AUTO CHEMICAL AGENT ALARM (ACADA), XM22 (M98800)<br />

M01001 (M98800)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

M22 ACADA Hardware<br />

1 FY 08 A 738 0 738 300 300 138 0<br />

M22 ACADA Hardware Supplemental<br />

1 FY 08 A 981 0 981 96 300 300 285 0<br />

M22 ACADA Hardware (GWOT CA)<br />

1 FY 08 A 2166 0 2166 162 300 300 300 300 300 300 204 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 3885 3885 300 300 300 300 300 300 300 300 300 300 300 300 285<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Smiths Detection, Edgewood, MD 20 500 1500<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 4 5 9<br />

Reorder 0 0 0 0<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

M01001 (M98800) Item No. 122 Page 18 <strong>of</strong> 47 Exhibit P-21<br />

AUTO CHEMICAL AGENT ALARM (ACADA), XM22 21 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

MASK,TANK<br />

P-1 Item Nomenclature<br />

MASK,TANK (M99400)<br />

M01001 (M99400)<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

$3.1 This amount is the total <strong>of</strong> the BASE/GWOT/AMENDED GWOT<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 82.6 3.1 85.7<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 82.6 3.1 85.7<br />

Initial Spares<br />

Total Proc Cost 82.6 3.1 85.7<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The M42A2 mask is designed to protect the face, eyes, and respiratory tract against field concentrations <strong>of</strong> chemical and biological agents. This mask is issued to Combat Vehicle Warfighters and<br />

has a form-fitting facepiece with rigid binocular lenses attached to the facepiece. The canister is the air-filtering medium for the mask and is connected to the facepiece by a detachable hose which<br />

can be worn on either the left or right side, as desired by the wearer. A front Voicemitter is used for face-to-face communication, which is enhanced by use <strong>of</strong> a detachable microphone, and a side<br />

Voicemitter is used for communications with telephone and radio handsets. The M42A2 mask was designed to be compatible with and use North Atlantic Treaty Organization (NATO) canisters.<br />

The externally mounted NATO interchangeable canister reduces time required to change filtration systems and allows the use <strong>of</strong> other countries canisters, improving battlefield availability.<br />

Justification:<br />

FY08 Baseline: Support the production <strong>of</strong> M42 protective mask to replace battle and other losses. If not supported, Combat Vehicle Crew members will not have individual protective masks<br />

available for deployment <strong>of</strong> their units.<br />

FY08 Global War on Terrorism (GWOT) request: Funds the replacement and repair <strong>of</strong> battlefield losses <strong>of</strong> current assets, washouts and to support warfighters with individual protection during<br />

deployments.<br />

FY 2008 Global War on Terrorism Amendment funds: Funds the replacement and repair <strong>of</strong> battlefield losses <strong>of</strong> current assets, washouts and to support warfighters with individual protection during<br />

deployments.<br />

FY08 Base Appropriation - $0.314 million<br />

FY08 GWOT Request - $2.512 million<br />

FY08 GWOT Cost Adjustment - $0.313 million<br />

FY08 Total - $3.139 million<br />

M01001 (M99400) Item No. 122 Page 19 <strong>of</strong> 47 Exhibit P-40<br />

MASK,TANK 22 Budget Item Justification Sheet


MASK,TANK<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

MASK,TANK (M99400)<br />

M01001 (M99400)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

M42A2 Protective Field Mask 262 780 0.336<br />

M42A2 Protective Field Mask (Supp) 2382 7088 0.336<br />

C2A1 Canister 110<br />

Engineering Support 29<br />

Engineering Support (Supp) 19<br />

System Fielding 24<br />

Subtotal 2826<br />

M42A2 Protective Field Mask GWOT Cost Ad 298 888 0.336<br />

C2A1 Canister GWOT Cost Adjustment 15<br />

Subtotal 313<br />

Total: 3139<br />

M01001 (M99400) Item No. 122 Page 20 <strong>of</strong> 47 Exhibit P-5<br />

MASK,TANK 23 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

MASK,TANK<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

P-1 Line Item Nomenclature:<br />

MASK,TANK (M99400)<br />

M01001 (M99400)<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

M42A2 Protective Field Mask<br />

FY 2007<br />

Pine Bluff Arsenal<br />

AR<br />

FY 2008<br />

Pine Bluff Arsenal<br />

C/FFP<br />

AR<br />

M42A2 Protective Field Mask (Supp)<br />

FY 2007<br />

Pine Bluff Arsenal<br />

AR<br />

FY 2008<br />

Pine Bluff Arsenal<br />

C/FFP<br />

AR<br />

M42A2 Protective Field Mask GWOT Cost Ad<br />

FY 2008<br />

Pine Bluff Arsenal<br />

C/FFP<br />

AR<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

TACOM IMMC, Rock<br />

Island, IL<br />

TACOM IMMC, Rock<br />

Island, IL<br />

TACOM IMMC, Rock<br />

Island, IL<br />

QTY<br />

Each<br />

Unit Cost<br />

$<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Oct 07 Nov 07 780 0.336 Yes<br />

Dec 07 Jan 08 7088 0.336 Yes<br />

Jan 08 Aug 08 888 0.336 Yes<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

M01001 (M99400) Item No. 122 Page 21 <strong>of</strong> 47 Exhibit P-5a<br />

MASK,TANK 24 Budget <strong>Procurement</strong> History and Planning


MASK,TANK<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 09 / 10 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

MASK,TANK (M99400)<br />

M01001 (M99400)<br />

COST ELEMENTS<br />

Fiscal Year 09 Fiscal Year 10<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 09 Calendar Year 10<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

M42A2 Protective Field Mask<br />

1 FY 08 A 780 0 780 A 780 0<br />

M42A2 Protective Field Mask (Supp)<br />

1 FY 08 A 7088 0 7088 A 1000 1000 1000 1000 1000 1000 1088 0<br />

M42A2 Protective Field Mask GWOT Cost Ad<br />

1 FY 08 A 888 0 888 A 888 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 8756 8756 780 1000 1000 1000 1000 1000 1000 1088 888<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Pine Bluff Arsenal, AR 1000 3500 5000<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 3 10 13<br />

Reorder 0 3 13 16<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

M01001 (M99400) Item No. 122 Page 22 <strong>of</strong> 47 Exhibit P-21<br />

MASK,TANK 25 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

MASK CHEMICAL BIOLOGICAL AIRCRAFT M43E1 (PIP)<br />

M01001 (M99505)<br />

Date:<br />

September 2007<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

P-1 Item Nomenclature<br />

MASK CHEMICAL BIOLOGICAL AIRCRAFT M43E1 (PIP) (M99505)<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 0.5 0.5<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 0.5 0.5<br />

Initial Spares<br />

Total Proc Cost 0.5 0.5<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The M48 Chemical-Biological Apache Aviator Mask was developed for the AH-64 Apache Helicopter aviators. The M48 was designed for compatibility with the Integrated Helmet and Display<br />

Sighting System and the Optical Relay Tube subsystems <strong>of</strong> the Apache. The M48 Mask has a lightweight motor blower that is mounted on the user during dismounted operations and is mounted to<br />

the airframe during flight operations. The motor blower provides filtered, breathable air that keeps the head cool and prevents the eye lenses from fogging.<br />

NOTE: The M43 Mask is no longer being produced and has been replaced by the M48 Mask.<br />

Justification:<br />

FY 2008 Base Appropriation: $0.000 million<br />

FY 2008 Main Supplemental Request: $0.500 million<br />

FY 2008 Total $0.500 million<br />

M43E1 Protective masks were not fielded due to weight restrictions. Funding will provide lighter weight blowers to convert M43E1 to M48 Apache masks. Funding will support the conversion <strong>of</strong><br />

M43E1 masks to M48 apache masks needed to replace battle losses and washouts.<br />

M01001 (M99505) Item No. 122 Page 23 <strong>of</strong> 47 Exhibit P-40<br />

MASK CHEMICAL BIOLOGICAL AIRCRAFT M43E1 (PIP) 26 Budget Item Justification Sheet


MASK CHEMICAL BIOLOGICAL AIRCRAFT M43E1 (PIP)<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

MASK CHEMICAL BIOLOGICAL AIRCRAFT M43E1 (PIP)<br />

(M99505)<br />

M01001 (M99505)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

AH64 Apache M48 Mask Supplemental 320 340 0.941<br />

Engineering Support 90<br />

Production Support 90<br />

Total: 500<br />

M01001 (M99505) Item No. 122 Page 24 <strong>of</strong> 47 Exhibit P-5<br />

MASK CHEMICAL BIOLOGICAL AIRCRAFT M43E1 (PIP) 27 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

MASK CHEMICAL BIOLOGICAL AIRCRAFT M43E1 (PIP)<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

AH64 Apache M48 Mask Supplemental<br />

FY 2008<br />

Pine Bluff Arsenal<br />

Pine Bluff, AR<br />

P-1 Line Item Nomenclature:<br />

MASK CHEMICAL BIOLOGICAL AIRCRAFT M43E1 (PIP) (M99505)<br />

M01001 (M99505)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

C/FFP TACOM IMMC, RI IL Dec 07 Feb 08 340 1<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

M01001 (M99505) Item No. 122 Page 25 <strong>of</strong> 47 Exhibit P-5a<br />

MASK CHEMICAL BIOLOGICAL AIRCRAFT M43E1 (PIP) 28 Budget <strong>Procurement</strong> History and Planning


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

MASK, AIRCREW<br />

P-1 Item Nomenclature<br />

MASK, AIRCREW (M99506)<br />

M01001 (M99506)<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

$2.6 This amount is the toatl <strong>of</strong> BASE/GWOT/AMENDED GWOT<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 2.6 2.6<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 2.6 2.6<br />

Initial Spares<br />

Total Proc Cost 2.6 2.6<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The M45 Aircrew Protective Mask (ACPM) consists <strong>of</strong> a facepiece, hose assembly, second skin (removavble overcover), filter canister, laser and ballistic eye lens covers, vision corrective eye lens,<br />

and carrier. The M45 addresses limitations <strong>of</strong> previous aircraft masks such as a high unit cost and requirements for a separate air motor/blower system. Improvements over previous aircraft masks<br />

include protection and defogging <strong>of</strong> lenses without use <strong>of</strong> an air motor/blower, reduced weight and bulk, reduced logistics and support cost, and improved sizing and fitting. The ACPM will be the<br />

principal CB protective equipment for both pilots and aircrew. The M45 is also used to provide hard-to-fit soldiers, sailors, marines, and airmen with a protective mask.<br />

Justification:<br />

FY08 Baseline: Funding will be used to replace or repair/replace losses <strong>of</strong> current assets and washouts. If funding is not approved, aircrew members will not be supported with individual protection<br />

during deployment.<br />

FY08 Gloal War on Terrorism (GWOT) request: Funding will also be used to replace or repair/replace losses <strong>of</strong> current assets and washouts. If funding is not approved, aircrew members will not be<br />

supported with individual protection during deployment.<br />

FY08 GWOT Cost Adjustment funds: Funding will also be used to replace or repair/replace losses <strong>of</strong> current assets and washouts. If funding is not approved, aircrew members will not be supported<br />

with individual protection during deployment.<br />

FY 2008 Base Appropriation - $0.0 million<br />

FY 2008 GWOT Request - $1.500 million<br />

FY 2008 GWOT Cost Adjustment - $1.100 million<br />

FY 2008 Total - $2.600 million<br />

M01001 (M99506) Item No. 122 Page 26 <strong>of</strong> 47 Exhibit P-40<br />

MASK, AIRCREW 29 Budget Item Justification Sheet


MASK, AIRCREW<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

MASK, AIRCREW (M99506)<br />

M01001 (M99506)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

Mask, Aircraft M45 1400 2766 0.506<br />

Engineering Support 100<br />

Subtotal 1500<br />

Mask, Aircrew M45 (GWOT COST ADJUSTMENT) 1000 1976 0.506<br />

Engineering Support (GWOT COST ADJ) 100<br />

Subtotal 1100<br />

Total: 2600<br />

M01001 (M99506) Item No. 122 Page 27 <strong>of</strong> 47 Exhibit P-5<br />

MASK, AIRCREW 30 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

MASK, AIRCREW<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

Mask, Aircraft M45<br />

FY 2007<br />

Pine Bluff Arsenal<br />

Pine Bluff, AR<br />

FY 2008<br />

Pine Bluff Arsenal<br />

Pine Bluff, AR<br />

Mask, Aircrew M45 (GWOT COST ADJUSTMENT)<br />

FY 2008<br />

Pine Bluff Arsenal<br />

Pine Bluff, AR<br />

P-1 Line Item Nomenclature:<br />

MASK, AIRCREW (M99506)<br />

M01001 (M99506)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

C/FFP TACOM IMMC, RI, IL Dec 07 Feb 08 2766 1 Yes<br />

C/FFP TACOM IMMC, RI, IL Dec 07 Feb 08 1976 1 Yes<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

M01001 (M99506) Item No. 122 Page 28 <strong>of</strong> 47 Exhibit P-5a<br />

MASK, AIRCREW 31 Budget <strong>Procurement</strong> History and Planning


MASK, AIRCREW<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

MASK, AIRCREW (M99506)<br />

M01001 (M99506)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Mask, Aircraft M45<br />

1 FY 08 A 2766 0 2766 A 300 300 300 300 300 300 300 300 366 0<br />

Mask, Aircrew M45 (GWOT COST ADJUSTMENT)<br />

1 FY 08 A 1976 0 1976 A 200 200 200 200 200 200 200 200 376 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 4742 4742 500 500 500 500 500 500 500 500 742<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Pine Bluff Arsenal, Pine Bluff, AR 500 1700 3000<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 3 7 10<br />

Reorder 0 0 0 0<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

M01001 (M99506) Item No. 122 Page 29 <strong>of</strong> 47 Exhibit P-21<br />

MASK, AIRCREW 32 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

MASK, CHEM BIOLOGICAL PROTECTIVE FIELD<br />

Date:<br />

P-1 Item Nomenclature<br />

MASK, CHEM BIOLOGICAL PROTECTIVE FIELD (M99600)<br />

M01001 (M99600)<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

$8.9 This amount is the total <strong>of</strong> BASE/GWOT/AMENDED GWOT<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 8.9 8.9<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 8.9 8.9<br />

Initial Spares<br />

Total Proc Cost 8.9 8.9<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The M40A1 mask is designed to protect the face, eyes, and respiratory tract against field concentrations <strong>of</strong> chemical and biological agents. This mask is issued to Warfighters and has a form-fitting<br />

facepiece with rigid binocular lenses attached to the facepiece. The canister is the air-filtering medium for the mask and is mounted on the facepiece on either the left or right side, as desired by the<br />

wearer. A front Voicemitter is used for face-to-face communication and a side Voicemitter is used for communications with telephone and radio handsets. The M40A1 mask was designed to be<br />

compatible with and use North Atlantic Treaty Organization (NATO) canisters. The externally mounted NATO interchangeable canister reduces time required to change filtration systems and allows<br />

the use <strong>of</strong> other countries canisters, improving battlefield availability.<br />

Justification:<br />

FY08 Baseline: Funding is required to support the replacement or repair <strong>of</strong> battle losses, and washouts during deployment.<br />

FY08 Global War on Terrorism (GWOT) request: Funding is required to support the replacement or repair <strong>of</strong> battle losses, and washouts during deployment.<br />

FY 2008 GWOT Cost Adjustment funds: Funding is required to support the replacement or repair <strong>of</strong> battle losses, and washouts during deployment.<br />

FY 2008 Base Appropriation - $4.057 million<br />

FY 2008 GWOT Request - $4.305 million<br />

FY 2008 GWOT Cost Adjustment Request - $0.578 million<br />

FY 2008 Total - $8.940 million<br />

M01001 (M99600) Item No. 122 Page 30 <strong>of</strong> 47 Exhibit P-40<br />

MASK, CHEM BIOLOGICAL PROTECTIVE FIELD 33 Budget Item Justification Sheet


MASK, CHEM BIOLOGICAL PROTECTIVE FIELD<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

MASK, CHEM BIOLOGICAL PROTECTIVE FIELD<br />

(M99600)<br />

M01001 (M99600)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

M40A1 Protective Field Mask 3520 15044 0.234<br />

Engineering Support 203<br />

C2A1 Canister 435<br />

System Fielding Support 246<br />

Total Baseline 4404<br />

M40A1 Protective Field Mask (GWOT) 3755 16047 0.234<br />

Engineering Support (GWOT) 203<br />

Total GWOT Request 3958<br />

M40A1 Protective Field Mask GWOT CA 541 2312 0.234<br />

C2A1 Canister GWOT CA 37<br />

Total GWOT Cost Adjustment 578<br />

Total 8940<br />

Total: 8940<br />

M01001 (M99600) Item No. 122 Page 31 <strong>of</strong> 47 Exhibit P-5<br />

MASK, CHEM BIOLOGICAL PROTECTIVE FIELD 34 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

MASK, CHEM BIOLOGICAL PROTECTIVE FIELD<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

M40A1 Protective Field Mask<br />

FY 2007<br />

Pine Bluff Arsenal<br />

Pine Bluff, AR<br />

FY 2008<br />

Pine Bluff Arsenal<br />

Pine Bluff, AR<br />

M40A1 Protective Field Mask (GWOT)<br />

FY 2007<br />

Pine Bluff Arsenal<br />

Pine Bluff, AR<br />

FY 2008<br />

Pine Bluff Arsenal<br />

Pine Bluff, AR<br />

M40A1 Protective Field Mask GWOT CA<br />

FY 2008<br />

Pine Bluff Arsenal<br />

Pine Bluff, AR<br />

P-1 Line Item Nomenclature:<br />

MASK, CHEM BIOLOGICAL PROTECTIVE FIELD (M99600)<br />

M01001 (M99600)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

C/FFP TACOM IMMC, RI, IL Jan 08 Jun 08 15044 0.234 Yes<br />

C/FFP TACOM IMMC, RI, IL Jan 08 Jun 08 16047 0.234 Yes<br />

C/FFP TACOM IMMC, RI, IL Jan 08 Jun 08 2312 0.234 Yes<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

M01001 (M99600) Item No. 122 Page 32 <strong>of</strong> 47 Exhibit P-5a<br />

MASK, CHEM BIOLOGICAL PROTECTIVE FIELD 35 Budget <strong>Procurement</strong> History and Planning


MASK, CHEM BIOLOGICAL PROTECTIVE FIELD<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

MASK, CHEM BIOLOGICAL PROTECTIVE FIELD (M99600)<br />

M01001 (M99600)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

M40A1 Protective Field Mask<br />

1 FY 08 A 15044 0 15044 A 1000 1000 1500 1500 1500 1500 1500 1500 1500 1544 1000 0<br />

M40A1 Protective Field Mask (GWOT)<br />

1 FY 08 A 16047 0 16047 A 1000 1000 1600 1600 1600 1600 1600 1600 1600 1647 1200 0<br />

M40A1 Protective Field Mask GWOT CA<br />

1 FY 08 A 2312 0 2312 A 1000 1000 312 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 33403 33403 3000 3000 3412 3100 3100 3100 3100 3100 3100 3191 2200<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Pine Bluff Arsenal, Pine Bluff, AR 1000 3500 5000<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 3 8 11<br />

Reorder 0 3 8 11<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

Note: The M40A1 production line is shared with<br />

M42A2 production line. Therefore, quantities<br />

must be split for production.<br />

M01001 (M99600) Item No. 122 Page 33 <strong>of</strong> 47 Exhibit P-21<br />

MASK, CHEM BIOLOGICAL PROTECTIVE FIELD 36 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

CHEM/BIO PROTECTIVE SHELTER<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

P-1 Item Nomenclature<br />

CHEM/BIO PROTECTIVE SHELTER (R12300)<br />

M01001 (R12300)<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 7.0 46.7 53.6<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 7.0 46.7 53.6<br />

Initial Spares<br />

Total Proc Cost 7.0 46.7 53.6<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Services need a highly mobile, self-contained collective protection system which can provide a contamination free working area for Echelon I and II medical treatment facilities and other<br />

selected units. The Chemical Biological Protective Shelter (CBPS) satisfies this need. The CBPS replaces the M51 Chemical Protective Shelter. It consists <strong>of</strong> a Collectively Protected (CP) shelter<br />

modularized and integrated into a service selected up-armored prime-mover. The system is completely self contained, self powered, mobile, and adaptable to a variety <strong>of</strong> missions. CBPS relieves<br />

medical, combat service, and combat service support personnel from wearing chemical-biological protective clothing. The system is capable <strong>of</strong> operating continuously for 72 hours providing a<br />

contamination free, environmentally controlled working area.<br />

Justification:<br />

FY08 Baseline: Procures 29 CBPS systems. <strong>Procurement</strong> will support deployed and deploying combat units.<br />

FY08 Global War on Terrorism (GWOT) Cost Adjustment request procures 41 additional CBPS systems.<br />

FY08 Base Appropriation - $17.019 million<br />

FY08 GWOT Request - $0<br />

FY08 GWOT Cost Adjustment Request - $29.634 million<br />

FY08 Total - $46.653 million<br />

M01001 (R12300) Item No. 122 Page 34 <strong>of</strong> 47 Exhibit P-40<br />

CHEM/BIO PROTECTIVE SHELTER 37 Budget Item Justification Sheet


CHEM/BIO PROTECTIVE SHELTER<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

CHEM/BIO PROTECTIVE SHELTER (R12300)<br />

M01001 (R12300)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY08 Base Appropriation<br />

CP Protective Shelter Conversion 8810 29 304<br />

Prime Mover 7540 29 260<br />

CBR Filters 67 58 1<br />

Recirculation Filter Assemblies 145 58 3<br />

Engineering Support 457<br />

Total Base Appropriation 17019<br />

FY08 GWOT Cost Adjustment Request<br />

CP Protective Shelter 16400 41 400<br />

Prime Mover 12792 41 312<br />

CBR Filters 82 82 1<br />

Recirculation Filter Assemblies 246 82 3<br />

Engineering Support 114<br />

Total GWOT Cost Adjustment 29634<br />

Total: 46653<br />

M01001 (R12300) Item No. 122 Page 35 <strong>of</strong> 47 Exhibit P-5<br />

CHEM/BIO PROTECTIVE SHELTER 38 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

CHEM/BIO PROTECTIVE SHELTER<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

FY08 Base Appropriation<br />

FY 2008<br />

DRS-SSI<br />

St. Louis, MO<br />

FY08 GWOT Cost Adjustment Request<br />

FY 2008<br />

Smiths Detection<br />

Edgewood, MD<br />

P-1 Line Item Nomenclature:<br />

CHEM/BIO PROTECTIVE SHELTER (R12300)<br />

M01001 (R12300)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Units<br />

C/FFP TACOM, Rock Island, IL Feb 08 May 09 29<br />

C/FFP TACOM, Rock Island, IL Feb 08 May 10 41<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

M01001 (R12300) Item No. 122 Page 36 <strong>of</strong> 47 Exhibit P-5a<br />

CHEM/BIO PROTECTIVE SHELTER 39 Budget <strong>Procurement</strong> History and Planning


CHEM/BIO PROTECTIVE SHELTER<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

CHEM/BIO PROTECTIVE SHELTER (R12300)<br />

M01001 (R12300)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

FY08 Base Appropriation<br />

1 FY 08 A 29 0 29 A 4 8 8 8 1 0<br />

FY08 Amended GWOT<br />

2 FY 08 A 41 0 41 A 41<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 70 70 4 8 8 8 1 41<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 DRS-SSI, St. Louis, MO 1 1 8 16<br />

2 Smiths Detection, Edgewood, MD 1 4 12<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 4 29 33<br />

Reorder 0 0 0 0<br />

2 Initial 0 5 27 32<br />

Reorder 0 0 0 0<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

M01001 (R12300) Item No. 122 Page 37 <strong>of</strong> 47 Exhibit P-21<br />

CHEM/BIO PROTECTIVE SHELTER 40 Production Schedule


CHEM/BIO PROTECTIVE SHELTER<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

CHEM/BIO PROTECTIVE SHELTER (R12300)<br />

M01001 (R12300)<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

FY08 Base Appropriation<br />

1 FY 08 A 29 29 0<br />

FY08 Amended GWOT<br />

2 FY 08 A 41 0 41 4 4 4 4 4 4 4 4 4 4 1 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 70 29 41 4 4 4 4 4 4 4 4 4 4 1<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 DRS-SSI, St. Louis, MO 1 1 8 16<br />

2 Smiths Detection, Edgewood, MD 1 4 12<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 4 29 33<br />

Reorder 0 0 0 0<br />

2 Initial 0 5 27 32<br />

Reorder 0 0 0 0<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

M01001 (R12300) Item No. 122 Page 38 <strong>of</strong> 47 Exhibit P-21<br />

CHEM/BIO PROTECTIVE SHELTER 41 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

IMPROVED CHEMICAL AGENT MONITOR<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

Date:<br />

P-1 Item Nomenclature<br />

IMPROVED CHEMICAL AGENT MONITOR (S02200)<br />

M01001 (S02200)<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 89.6 15.2 104.8<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 89.6 15.2 104.8<br />

Initial Spares<br />

Total Proc Cost 89.6 15.2 104.8<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Improved Chemical Agent Monitor (ICAM) is a hand-held, service member operated device for monitoring chemical agent contamination on personnel and equipment. The ICAM detects<br />

vapors from chemical agents on the surface by sensing the molecular ions <strong>of</strong> specific mobilities (time-<strong>of</strong>-flight). It uses special timing and microprocessor techniques to reject interference and false<br />

alarms. The ICAM detects and discriminates between vapors <strong>of</strong> nerve and mustard agents. It identifies and provides a positive indication <strong>of</strong> specific areas and relative levels <strong>of</strong> contamination hazard.<br />

The ICAM consists <strong>of</strong> a drift tube, electronics board, molecular sieve, vacuum pump, and buzzer. It includes expendables such as batteries, a battery pack, test simulant, and dust filters. The ICAM<br />

is a smaller, lighter upgrade <strong>of</strong> the CAM and significantly improves reliability and maintainability.<br />

Justification:<br />

FY08 GWOT Cost Adjustement funds procurements that will support ongoing GWOT operations.<br />

FY 2008 Base Appropriation: $5.928 million<br />

FY 2008 GWOT Request: $8.500 million<br />

FY 2008 GWOT Cost Adjustment Request: $.792 million<br />

FY 2008 Total $15.220 million<br />

M01001 (S02200) Item No. 122 Page 39 <strong>of</strong> 47 Exhibit P-40<br />

IMPROVED CHEMICAL AGENT MONITOR 42 Budget Item Justification Sheet


IMPROVED CHEMICAL AGENT MONITOR<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

IMPROVED CHEMICAL AGENT MONITOR (S02200)<br />

M01001 (S02200)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000<br />

ICAM Hardware 5218 1023<br />

Engineering Support 225<br />

System Fielding Support 485<br />

Total Baseline<br />

ICAM Hardware (S) 7619 1605 4.747<br />

Engineering Support (S) 230<br />

System Fielding Support (S) 651<br />

Total GWOT Request<br />

ICAM Hardware GWOT CA 703 148 4.750<br />

Engineering Support GWOT CA 26<br />

System Fielding Support GWOT CA 63<br />

GWOT Cost Adjustment Total<br />

Total: 15220<br />

M01001 (S02200) Item No. 122 Page 40 <strong>of</strong> 47 Exhibit P-5<br />

IMPROVED CHEMICAL AGENT MONITOR 43 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

IMPROVED CHEMICAL AGENT MONITOR<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

ICAM Hardware<br />

FY 2007<br />

Smiths Detection<br />

Edgewood, MD<br />

FY 2008<br />

Smiths Detection<br />

Edgewood, MD<br />

ICAM Hardware (S)<br />

FY 2007<br />

Smiths Detection<br />

Edgewood, MD<br />

FY 2008<br />

Smiths Detection<br />

Edgewood, MD<br />

ICAM Hardware GWOT CA<br />

FY 2008<br />

Smiths Detection<br />

Edgewood, MD<br />

P-1 Line Item Nomenclature:<br />

IMPROVED CHEMICAL AGENT MONITOR (S02200)<br />

M01001 (S02200)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Units<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

C/FFP TACOM, RI, IL Dec 07 May 09 1023 Yes<br />

C/FFP TACOM, RI, IL Sep 08 Dec 09 1605 5 Yes<br />

C/FFP TACOM, RI, IL Dec 07 Dec 09 148 5 Yes<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

M01001 (S02200) Item No. 122 Page 41 <strong>of</strong> 47 Exhibit P-5a<br />

IMPROVED CHEMICAL AGENT MONITOR 44 Budget <strong>Procurement</strong> History and Planning


IMPROVED CHEMICAL AGENT MONITOR<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

IMPROVED CHEMICAL AGENT MONITOR (S02200)<br />

M01001 (S02200)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

ICAM Hardware<br />

1 FY 08 A 1023 0 1023 300 723<br />

ICAM Hardware (S)<br />

1 FY 08 A 1605 0 1605 1605<br />

ICAM Hardware GWOT CA<br />

1 FY 08 A 148 0 148 148<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 2776 2776 300 2476<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Smiths Detection, Edgewood, MD 50 300 600<br />

2 General Dynamics Land Systems, Detroit, MI 1 2 4<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 7 18 25<br />

Reorder 0 2 8 10<br />

2 Initial 0 9 22 31<br />

Reorder 0 0 0 0<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

M01001 (S02200) Item No. 122 Page 42 <strong>of</strong> 47 Exhibit P-21<br />

IMPROVED CHEMICAL AGENT MONITOR 45 Production Schedule


IMPROVED CHEMICAL AGENT MONITOR<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

IMPROVED CHEMICAL AGENT MONITOR (S02200)<br />

M01001 (S02200)<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

ICAM Hardware<br />

1 FY 08 A 1023 300 723 300 300 123 0<br />

ICAM Hardware (S)<br />

1 FY 08 A 1605 0 1605 29 300 300 300 300 300 76 0<br />

ICAM Hardware GWOT CA<br />

1 FY 08 A 148 0 148 148 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 2776 300 2476 300 300 300 300 300 300 300 300 76<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Smiths Detection, Edgewood, MD 50 300 600<br />

2 General Dynamics Land Systems, Detroit, MI 1 2 4<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 7 18 25<br />

Reorder 0 2 8 10<br />

2 Initial 0 9 22 31<br />

Reorder 0 0 0 0<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

M01001 (S02200) Item No. 122 Page 43 <strong>of</strong> 47 Exhibit P-21<br />

IMPROVED CHEMICAL AGENT MONITOR 46 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

DIAGNOSTIC TEST SET ASSEMBLY<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

P-1 Item Nomenclature<br />

DIAGNOSTIC TEST SET ASSEMBLY (S06500)<br />

M01001 (S06500)<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 1.0 1.0<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 1.0 1.0<br />

Initial Spares<br />

Total Proc Cost 1.0 1.0<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Chemical Agent Monitor Diagnostic Test Set (DTS) is used by direct support maintenance personnel to test and fault isolate the Improved Chemical Agent Monitor (ICAM) down to replacement<br />

module level. Tests are performed with the ICAM intact and/or when a monitor module assembly is in a chassis assembly. The DTS checks ICAM electric/electronic circuits and pneumatic circuits.<br />

It can detect minute pressure leaks in the ICAM. The DTS is lightweight and operated from either 115V or 230V ac power (60/50 Hz).<br />

Justification:<br />

Diagnostic testing is necessary to perform required maintenance and repair on the ICAM.<br />

FY08 GWOT Cost Adjustement funds procurements that will support ongoing GWOT operations.<br />

FY 2008 Base Appropriation: $.853 million<br />

FY 2008 GWOT Request: $.000 million<br />

FY 2008 GWOT Cost Adjustment Request: $.122 million<br />

FY 2008 Total: $.975 million<br />

M01001 (S06500) Item No. 122 Page 44 <strong>of</strong> 47 Exhibit P-40<br />

DIAGNOSTIC TEST SET ASSEMBLY 47 Budget Item Justification Sheet


DIAGNOSTIC TEST SET ASSEMBLY<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

DIAGNOSTIC TEST SET ASSEMBLY (S06500)<br />

M01001 (S06500)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

CAM DTS Hardware 725 36 20<br />

Engineering Support (Govt) 128<br />

Total Baseline 853<br />

CAM DTS Hardware (GWOT Cost Adjust) 120 6 20<br />

Engineering Support (Govt) (GWOT CA) 2<br />

Total GWOT Cost Adjustment 122<br />

Total: 975<br />

M01001 (S06500) Item No. 122 Page 45 <strong>of</strong> 47 Exhibit P-5<br />

DIAGNOSTIC TEST SET ASSEMBLY 48 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

DIAGNOSTIC TEST SET ASSEMBLY<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

CAM DTS Hardware<br />

FY 2007<br />

Crane-Govt Facility<br />

Crane, IN<br />

P-1 Line Item Nomenclature:<br />

DIAGNOSTIC TEST SET ASSEMBLY (S06500)<br />

M01001 (S06500)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

FFP N/A Dec 06 Feb 07 Y<br />

FY 2008 C/FFP TACOM, Rock Island, IL Dec 07 Aug 08 36 20<br />

CAM DTS Hardware (GWOT Cost Adjust)<br />

FY 2008 C/FFP TACOM, Rock Island, IL Dec 07 Jun 09 6 20<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

M01001 (S06500) Item No. 122 Page 46 <strong>of</strong> 47 Exhibit P-5a<br />

DIAGNOSTIC TEST SET ASSEMBLY 49 Budget <strong>Procurement</strong> History and Planning


DIAGNOSTIC TEST SET ASSEMBLY<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

DIAGNOSTIC TEST SET ASSEMBLY (S06500)<br />

M01001 (S06500)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Each TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

CAM DTS Hardware<br />

2 FY 08 A 36 0 36 4 4 4 4 4 4 4 4 4 0<br />

CAM DTS Hardware (GWOT Cost Adjust)<br />

2 FY 08 A 6 0 6 1 4 1 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 42 42 4 4 4 4 4 4 4 4 4 1 4 1<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Crane-Govt Facility, Crane, IN 4 6 16<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 2 12 14<br />

Reorder 0 2 13 15<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

M01001 (S06500) Item No. 122 Page 47 <strong>of</strong> 47 Exhibit P-21<br />

DIAGNOSTIC TEST SET ASSEMBLY 50 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

SMOKE & OBSCURANT FAMILY: SOF (NON AAO ITEM)<br />

MX0600<br />

Date:<br />

September 2007<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

P-1 Item Nomenclature<br />

SMOKE & OBSCURANT FAMILY: SOF (NON AAO ITEM) (MX0600)<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 8.8 8.8<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 8.8 8.8<br />

Initial Spares<br />

Total Proc Cost 8.8 8.8<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

U.S. Forces must be able to effectively neutralize and degrade energy weapon systems and threat electro-optical systems/smart weapons that operate across the electromagnetic spectrum. The smoke<br />

and obscuration program supports the production <strong>of</strong> logistically supportable, high performance obscuration agents, munitions, and devices to improve the survivability <strong>of</strong> U.S. forces and to<br />

compliment weapons systems. Improvements are sought across the entire spectral range from visual through infrared (IR) and millimeter wavelength (MMW) radar for incorporation into selfprotection,<br />

small, medium, large area, and projected obscuration systems. The technologies supported by this program enhance obscuration systems as combat multipliers.<br />

Justification:<br />

FY08 procures kits to mount the LVOSS to the M1151 HMMWV for the fleet <strong>of</strong> new <strong>Army</strong> Stryker Brigade Combat Team (SBCT). These devices improve the survivability <strong>of</strong> the combined armed<br />

forces, compliment weapon systems, and enhance force effectiveness and combat power.<br />

FY08 Global War on Terrorism (GWOT) Cost Adjustment funds hardware required to support ongoing GWOT operations.<br />

FY08 Base Appropriation - $7.700 million<br />

FY08 GWOT Request - $0.00 million<br />

FY08 GWOT Cost Adjustment Request - $1.098 million<br />

FY08 Total - $8.798 million<br />

MX0600 Item No. 123 Page 1 <strong>of</strong> 5 Exhibit P-40<br />

SMOKE & OBSCURANT FAMILY: SOF (NON AAO ITEM) 51 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

VEHICLE OBSCUR SMK SYS<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

P-1 Item Nomenclature<br />

VEHICLE OBSCUR SMK SYS (G71300)<br />

MX0600 (G71300)<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 8.8 8.8<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 8.8 8.8<br />

Initial Spares<br />

Total Proc Cost 8.8 8.8<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The M6 Discharger provides all vehicles in the Interim and Future Brigades, or any other host vehicle, concealment from threat surveillance, target acquisition, and weapons guidance systems by<br />

projecting the 66mm family <strong>of</strong> smoke grenades. Each M6 discharger consists <strong>of</strong> a four grenade launch tube module which is designed for use on a vehicle platform. Each tube <strong>of</strong> the M6 discharger<br />

can be separately fired on command. The system provides up to 360 degrees coverage, overhead screening protection, and can interface with a Vehicle Integrated Defense System. The Light<br />

Vehicle Obscuration Smoke System (LVOSS) provides 360 degrees <strong>of</strong> coverage to the M1114 Up-Armor High Mobility Multi-Purpose Wheeled Vehicle (HMMWV) as well as a number <strong>of</strong> other<br />

HMMWV versions. LVOSS, consisting <strong>of</strong> 4 4-tube dischargers, fire controls, and associated brackets, wiring, and mounting hardware, can fire the 66mm, M90 obscurant grenade either in a volley<br />

<strong>of</strong> 16 grenades, or a quadrant (forward, left, right, and aft) as needed. LVOSS can also fire a number <strong>of</strong> non-lethal 66mm grenades.<br />

Justification:<br />

FY08 procures kits to mount the LVOSS to the M1151 HMMWV.<br />

FY08 Global War on Terrorism (GWOT) Cost Adjustment funds hardware required to support ongoing GWOT operations.<br />

FY08 Base Appropriation - $7.700 million<br />

FY08 GWOT Request - $0.000 million<br />

FY08 GWOT Cost Adjustment Request - $1.098 million<br />

FY08 Total - $8.798 million<br />

MX0600 (G71300) Item No. 123 Page 2 <strong>of</strong> 5 Exhibit P-40<br />

VEHICLE OBSCUR SMK SYS 52 Budget Item Justification Sheet


VEHICLE OBSCUR SMK SYS<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

VEHICLE OBSCUR SMK SYS (G71300)<br />

MX0600 (G71300)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000<br />

Base<br />

Hardware A 6780 1695 4<br />

Quality Assurance 77<br />

Engineering Support 678<br />

System Fielding Support 165<br />

FY2008 GWOT Cost Adjustment Request<br />

Hardware 1098 274 4<br />

Total: 8798<br />

MX0600 (G71300) Item No. 123 Page 3 <strong>of</strong> 5 Exhibit P-5<br />

VEHICLE OBSCUR SMK SYS 53 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

VEHICLE OBSCUR SMK SYS<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

Base<br />

FY 2008<br />

Ronal Industries<br />

Port Chester, NY<br />

FY2008 GWOT Cost Adjustment Request<br />

FY 2008<br />

Ronal Industries<br />

Port Chester, NY<br />

P-1 Line Item Nomenclature:<br />

VEHICLE OBSCUR SMK SYS (G71300)<br />

MX0600 (G71300)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Units<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

C/FFP Tacom, RI, IL Dec 07 May 08 1695 yes<br />

C/FFP Tacom, RI, IL Oct 08 Feb 10 274 yes<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

MX0600 (G71300) Item No. 123 Page 4 <strong>of</strong> 5 Exhibit P-5a<br />

VEHICLE OBSCUR SMK SYS 54 Budget <strong>Procurement</strong> History and Planning


VEHICLE OBSCUR SMK SYS<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

VEHICLE OBSCUR SMK SYS (G71300)<br />

MX0600 (G71300)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Base<br />

1 FY 08 A 1695 0 1695 A 400 400 400 400 95 0<br />

GWOT Cost Adjustment<br />

1 FY 08 A 274 0 274 A 274 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 1969 1969 400 400 400 400 95 274<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Ronal Industries, Port Chester, NY 400 800 1500 5<br />

2 Wheatley Enterprises, Aberdeen, Md 400 800 1500 5<br />

3 Industrial Maching & Design, Youngstown, Ohio 400 800 1500 5<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 2 6 8<br />

Reorder 0 5 6 11<br />

2 Initial 0 6 4 10<br />

Reorder 0 5 6 11<br />

3 Initial 2 1 11 12<br />

Reorder 0 9 3 12<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

MX0600 (G71300) Item No. 123 Page 5 <strong>of</strong> 5 Exhibit P-21<br />

VEHICLE OBSCUR SMK SYS 55 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

TACTICAL BRIDGING<br />

Program Elements for Code B Items:<br />

0604804A/H02<br />

Code:<br />

B<br />

P-1 Item Nomenclature<br />

TACTICAL BRIDGING (MX0100)<br />

MX0100<br />

<strong>Other</strong> Related Program Elements:<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 126.4 126.4<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 126.4 126.4<br />

Initial Spares<br />

Total Proc Cost 126.4 126.4<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Dry Support Bridge (DSB) is a mobile, rapidly erected, modular military bridging system used by the Multi-Role Bridge Company (MRBC). The DSB can span either a 40-meter gap or two 20-<br />

meter gaps and support up to Military Load Class (MLC) 96 Wheeled/MLC 70 Tracked. The DSB has a road width <strong>of</strong> 4.3 meters and an emplacement time <strong>of</strong> 90 minutes or less. Each DSB set<br />

consists <strong>of</strong> one M1975 Launcher mounted to a dedicated Palletized Load System (PLS) Chassis; the modular bridge sections; and seven M1077 Flatracks to transport the bridge sections. Four DSB<br />

systems are fielded per MRBC. When the DSB is employed, one system requires use <strong>of</strong> three M1977 Common Bridge Transporters (CBT) and four PLS trailers to transport the Flatracks <strong>of</strong> DSB<br />

components. CBTs and PLS trailers are not funded under this line. The <strong>Army</strong> plans to have 26 Multi-Role Bridge Companies (MRBC). The Line <strong>of</strong> Communication (LOC) bridging system is used<br />

to provide new routes, replace damaged bridges, or upgrade routes for heavier traffic. It is designed to be left in place as a semi-permanent bridge, supporting civilian and military traffic with loads<br />

up to MLC 80T/110W. It is an all-steel bridge with modular parts and it can be built by hand or using mechanical assistance. LOC bridging enhances mobility and supply distribution for disaster<br />

relief, humanitarian missions and on the battle field.<br />

The Rapidly Emplaced Bridging System (REBS) is capable <strong>of</strong> spanning a 13-meter unprepared bank gap in support <strong>of</strong> the Stryker Brigade Combat Team (SBCT). The REBS is deployed from a<br />

flatrack-based launch mechanism loaded onto and powered by a Common Bridge Transporter (CBT). The bridge is capable <strong>of</strong> transporting MLC 30 normal and MLC 40 caution traffic, and can be<br />

deployed or retrieved within 10 minutes <strong>of</strong> arrival at the bridge site.<br />

The DSB and REBS will support the Joint Force Commander's ability to employ and sustain forces throughout the global battlespace.<br />

Justification:<br />

FY2008 Base: Procures Dry Support Bridge systems.<br />

FY2008 Global War on Terrorism (GWOT) Cost Adjustment funds additional assets to prosecute the Global War on Terror by resetting items, replacing battle losses, generating and protecting<br />

forces, and enhancing military capabilities. Specific quantity, cost element, and pricing data is not available at this time and will be adjusted by available FY2008 base dollars, mix <strong>of</strong> forces, and<br />

production and requirements adjustments.<br />

FY2008 Base Appropriation $50.443 million<br />

MX0100 Item No. 124 Page 1 <strong>of</strong> 6 Exhibit P-40<br />

TACTICAL BRIDGING 56 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Date:<br />

September 2007<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

TACTICAL BRIDGING<br />

P-1 Item Nomenclature<br />

TACTICAL BRIDGING (MX0100)<br />

MX0100<br />

Program Elements for Code B Items:<br />

0604804A/H02<br />

Code:<br />

B<br />

<strong>Other</strong> Related Program Elements:<br />

FY2008 GWOT Request: $ 0<br />

FY2008 GWOT Cost Adjustment: $76.000 million<br />

FY2008 Total: $126.443 million<br />

MX0100 Item No. 124 Page 2 <strong>of</strong> 6 Exhibit P-40<br />

TACTICAL BRIDGING 57 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

DRY SUPPORT BRIDGE<br />

Program Elements for Code B Items:<br />

0604804A/H02<br />

Code:<br />

A<br />

P-1 Item Nomenclature<br />

DRY SUPPORT BRIDGE (G82400)<br />

MX0100 (G82400)<br />

<strong>Other</strong> Related Program Elements:<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty 56 56<br />

Gross Cost 126.4 126.4<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 126.4 126.4<br />

Initial Spares<br />

Total Proc Cost 126.4 126.4<br />

Flyaway U/C<br />

Weapon System Proc U/C 2.3 2.3<br />

Description:<br />

The Dry Support Bridge (DSB) is a mobile, rapidly erected, modular military bridging system used by the Multi-Role Bridge Company (MRBC). The DSB can span either a 40-meter gap or two 20-<br />

meter gaps and support up to Military Load Class (MLC) 96 Wheeled/MLC 70 Tracked. The DSB has a road width <strong>of</strong> 4.3 meters and an emplacement time <strong>of</strong> 90 minutes or less. Each DSB set<br />

consists <strong>of</strong> one M1975 Launcher mounted to a dedicated Palletized Load System (PLS) Chassis; the modular bridge sections; and seven M1077 Flatracks to transport the bridge sections. Four DSB<br />

systems are fielded per MRBC. When the DSB is employed, one system requires use <strong>of</strong> three M1977 Common Bridge Transporters (CBT) and four PLS trailers to transport the Flatracks <strong>of</strong> DSB<br />

components. CBTs and PLS trailers are not funded under this line. The <strong>Army</strong> plans to have 26 Multi-Role Bridge Companies (MRBC). The Line <strong>of</strong> Communication (LOC) bridging system is used<br />

to provide new routes, replace damaged bridges, or upgrade routes for heavier traffic. It is designed to be left in place as a semi-permanent bridge, supporting civilian and military traffic with loads<br />

up to MLC 80T/110W. It is an all-steel bridge with modular parts and it can be built by hand or using mechanical assistance. LOC bridging enhances mobility and supply distribution for disaster<br />

relief, humanitarian missions and on the battle field.<br />

Justification:<br />

FY08 Global War on Terrorism (GWOT) Cost Adjustment procures 45 Line <strong>of</strong> Comunication (LOC) bridge sets to replace required 82 Bailey Bridge Sets within the <strong>Army</strong> Prepositioned Site (APS).<br />

LOC briges restore/maintain routes within a theater, supporting both civilian and military traffic. The <strong>Army</strong> last procurred the Bailey Bridge in 1967 and it is not capable <strong>of</strong> supporting the current<br />

fleet <strong>of</strong> <strong>Army</strong> military vehicles.<br />

FY08 Baseline: $50.443 million qty 11<br />

FY08 GWOT Request: $0.00<br />

FY08 GWOT Cost Adjustment: $76.000 million qty 45<br />

FY08 Total: $126.443 million qty 56<br />

MX0100 (G82400) Item No. 124 Page 3 <strong>of</strong> 6 Exhibit P-40<br />

DRY SUPPORT BRIDGE 58 Budget Item Justification Sheet


DRY SUPPORT BRIDGE<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

DRY SUPPORT BRIDGE (G82400)<br />

MX0100 (G82400)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

1. Bridge/Launcher A 42900 11 4290<br />

2. PLS Chassis A 3540 11 354<br />

3. Flat Racks A 1106 158 7<br />

4. LOC Bridge (GWOT Cost Adjustment) A 71100 45 1580<br />

SubTotal 118646<br />

5. ECPs 94<br />

6. Documentation 250<br />

7. Field Support Rep 812<br />

8. System Fielding Support 760<br />

9. System Fielding Support (GWOT CA) 4900<br />

10. Matrix Support 495<br />

11. PM Support 486<br />

Subtotal 7797<br />

Total: 126443<br />

MX0100 (G82400) Item No. 124 Page 4 <strong>of</strong> 6 Exhibit P-5<br />

DRY SUPPORT BRIDGE 59 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

DRY SUPPORT BRIDGE<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

1. Bridge/Launcher<br />

FY 2008<br />

2. PLS Chassis<br />

FY 2008<br />

3. Flat Racks<br />

FY 2008<br />

4. LOC Bridge (GWOT Cost Adjustment)<br />

FY 2008<br />

Williams Fairey Eng. Limited<br />

Stockport, UK<br />

Oshkosh Truck Corp.,<br />

Oshkosh, WI<br />

Oshkosh Truck Corp.,<br />

Oshkosh, WI<br />

TBS<br />

TBS<br />

P-1 Line Item Nomenclature:<br />

DRY SUPPORT BRIDGE (G82400)<br />

MX0100 (G82400)<br />

SS/MYP5(4<br />

)<br />

SS/REQ5(2<br />

)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

TACOM Jan 08 Jul 08 11 4290 Yes N/A N/A<br />

TACOM Dec 07 Jul 08 11 354 Yes N/A N/A<br />

SS/REQ5 TACOM Jan 08 Jul 08 158 7 Yes N/A N/A<br />

SS/REQ1 TACOM Jun 08 Oct 08 45 1580 Yes N/A N/A<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

MX0100 (G82400) Item No. 124 Page 5 <strong>of</strong> 6 Exhibit P-5a<br />

DRY SUPPORT BRIDGE 60 Budget <strong>Procurement</strong> History and Planning


DRY SUPPORT BRIDGE<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

DRY SUPPORT BRIDGE (G82400)<br />

MX0100 (G82400)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

1. Bridge/Launcher<br />

1 FY 08 A 11 0 10 A 1 1 1 1 1 1 1 1 1 1 0<br />

2. PLS Chassis<br />

2 FY 08 A 11 0 10 A 1 1 1 1 1 1 1 1 1 1 0<br />

3. Flat Racks<br />

2 FY 08 A 158 0 158 A 13 13 13 13 13 13 13 13 13 13 13 15 0<br />

4. LOC Bridge (GWOT Cost Adjustment)<br />

3 FY 08 45 0 45 A 4 6 8 10 10 7 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 225 223 15 15 15 19 21 23 25 25 22 15 13 15<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Williams Fairey Eng. Limited, Stockport, UK 4 8 16 6<br />

2 Oshkosh Truck Corp.,, Oshkosh, WI 4 25 45 6<br />

3 TBS, TBS 4 20 16 4<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 4 6 10<br />

Reorder 0 4 6 10<br />

2 Initial 0 3 7 10<br />

Reorder 0 3 7 10<br />

3 Initial 0 9 4 13<br />

Reorder 0 0 0 0<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

Production rates are annual.<br />

MX0100 (G82400) Item No. 124 Page 6 <strong>of</strong> 6 Exhibit P-21<br />

DRY SUPPORT BRIDGE 61 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

TACTICAL BRIDGE, FLOAT-RIBBON<br />

Program Elements for Code B Items:<br />

Code:<br />

A<br />

P-1 Item Nomenclature<br />

TACTICAL BRIDGE, FLOAT-RIBBON (MA8890)<br />

MA8890<br />

<strong>Other</strong> Related Program Elements:<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 117.3 117.3<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 117.3 117.3<br />

Initial Spares<br />

Total Proc Cost 117.3 117.3<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Tactical Float Ribbon Bridge line supports the Multi-Role Bridge Company (MRBC). One Tactical Float Ribbon Bridge System consists <strong>of</strong> the Improved Ribbon Bridge (IRB) bays (30 Interior<br />

and 12 Ramp); 14 Propulsion Bridge Erection Boats (BEB) and 56 Common Bridge Transporters (CBT). These components are required to transport, launch, erect and retrieve up to 210 meters <strong>of</strong><br />

floating bridge. The IRB has a Military Load Capacity (MLC) 96 wheeled (normal) and 110 (caution)/MLC 80 tracked and is used to transport weapon systems, troops, and supplies over water<br />

when permanent bridges are not available. This MLC will support the Joint Force Commander's ability to employ and sustain forces throughout the global battlespace.<br />

Justification:<br />

FY 2008 Base Appropriation: Procures BEB SLEP Upgrades, CBTs, and IRB bays for MRBCs.<br />

FY 2008 GWOT Request: Procures MKII SLEP BEBs to replace BEBs that were left behind in theater in prior rotations. These replacement assets will provide training assets to 814th and 50th EN<br />

FORSCOM units for training/preparation for the next rotation to Iraq. Procure one AOR MRBC Mission Essential Equipment List (MEEL) company set <strong>of</strong> Improved Ribbon Bridge (IRB) consisting<br />

<strong>of</strong> 50 Interior and 12 Ramp bays. This IRB AOR company set is required to re-equip and support our next deploying MRBCs supporting OIF Assault Float Bridging (AFB) missions. Currently, there<br />

continues to be an identified shortage <strong>of</strong> mission capable AFB operational stocks in Iraq. On-hand OIF AFB operational stocks consist solely <strong>of</strong> the older, obsolete and severely degraded Standard<br />

Ribbon Bridge System, which has been in service supporting OIF Joint Force bridging operations since 2003.<br />

Also procures CBTs, PLS trailers, and BAPs required to replace MRBC equipment left in theater to provide support for ongoing operations.<br />

FY 20008 GWOT Cost Adjustment procures additional BEB assets for allocation to USAR to re-equip units requiring mandated training for readiness.<br />

BEB CBT IRB Total<br />

FY 2008 Base Appropriation 13.839 27.413 33.533 74.785<br />

FY 2008 GWOT Request 4.000 22.000 13.000 39.000<br />

FY 2008 GWOT Cost Adjustment 3.500 3.500<br />

FY 2008 Total $21.339 million $49.413 million $46.533 million $117.285 million<br />

MA8890 Item No. 125 Page 1 <strong>of</strong> 13 Exhibit P-40<br />

TACTICAL BRIDGE, FLOAT-RIBBON 62 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

BRIDGE, FLOAT-RIBBON, BAYS<br />

Program Elements for Code B Items:<br />

0604804A/H02<br />

Code:<br />

A<br />

P-1 Item Nomenclature<br />

BRIDGE, FLOAT-RIBBON, BAYS (M26600)<br />

MA8890 (M26600)<br />

<strong>Other</strong> Related Program Elements:<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty 206 206<br />

Gross Cost 46.5 46.5<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 46.5 46.5<br />

Initial Spares<br />

Total Proc Cost 46.5 46.5<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Bridge Bays (Interior and Ramp) are major components <strong>of</strong> a Tactical Ribbon Bridge. These components are part <strong>of</strong> the bridging system which is required to provide a floating bridge up to 210<br />

meters long per Multi-Role Bridge Company (MRBC). There are 30 interior bays and 12 ramp bays per MRBC. Enough Bridge Bays will be bought to fill 26 MRBCs in addition to <strong>Army</strong> Pre-<br />

Positioned Stock (APS) and War Reserves. This bridge has a Military Load Classification (MLC) <strong>of</strong> 96 wheeled (W)/70 tracked (T) normal crossing and 110W /80T under caution crossing<br />

conditions. This MLC capability will fully support the Joint Force Commander's ability to employ and sustain forces throughout the global battlespace.<br />

Justification:<br />

FY08 Global War On Terrorism request: Procures one AOR MRBC Mission Essential Equipment List (MEEL) company set <strong>of</strong> Improved Ribbon Bridge (IRB) consisting <strong>of</strong> 50 Interior and 12 Ramp<br />

bays. This IRB AOR company set is required to re-equip and support our next deploying MRBCs supporting OIF Assault Float Bridging (AFB) missions. Currently, there continues to be an<br />

identified shortage <strong>of</strong> mission capable AFB operational stocks in Iraq. On-hand OIF AFB operational stocks consist solely <strong>of</strong> the older, obsolete and severely degraded Standard Ribbon Bridge<br />

System, which has been in service supporting OIF Joint Force bridging operations since 2003. Due to on-going OPTEMPOs and high threat levels, numerous SRBs continue to be left in place for<br />

over 18 months. The OIF SRB fleet has suffered irreparable damage and continues to be coded "unrepairable" upon removal from wet gap "full-close" and long term rafting missions. Additionally,<br />

due to the older and operationally ineffective design, all AOR OIF SRBs show increased severe wear and tear, with no SRB repair options available. Sufficient operational float bridging assets<br />

continue to be critically low. The IRB is required to maintain coalition and U.S. Forces freedom <strong>of</strong> movement within OIF AOR. Replacement IRB is imperative to ensure MRBC AFB Operational<br />

readiness and theater Bridge Attack Response Plan (BARP) capability.<br />

FY08 Baseline: $33.533 million, qty 144<br />

FY08 GWOT Request: $13.000 million, qty 62<br />

FY08 GWOT Cost Adjustment: $0.000 million<br />

Total: $46.533 million, qty 206<br />

MA8890 (M26600) Item No. 125 Page 2 <strong>of</strong> 13 Exhibit P-40<br />

BRIDGE, FLOAT-RIBBON, BAYS 63 Budget Item Justification Sheet


BRIDGE, FLOAT-RIBBON, BAYS<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

BRIDGE, FLOAT-RIBBON, BAYS (M26600)<br />

MA8890 (M26600)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000<br />

1. Bays Hardware A 29232 144 203<br />

1. Bays Hardware Supplemental A 12581 62 203<br />

2. System Fielding Support 758<br />

2. System Fielding Support (Supp) 204<br />

3. Documentation 500<br />

3. Documentation (Supp) 215<br />

4. Testing 850<br />

5. Matrix Support 1214<br />

6. PM Support 979<br />

Total: 46533<br />

MA8890 (M26600) Item No. 125 Page 3 <strong>of</strong> 13 Exhibit P-5<br />

BRIDGE, FLOAT-RIBBON, BAYS 64 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

BRIDGE, FLOAT-RIBBON, BAYS<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

1. Bays Hardware<br />

FY 2008<br />

1. Bays Hardware Supplemental<br />

FY 2008<br />

GDSBS<br />

Kaiserslautern, GE<br />

GDSBS<br />

Kaiserslautern, GE<br />

P-1 Line Item Nomenclature:<br />

BRIDGE, FLOAT-RIBBON, BAYS (M26600)<br />

MA8890 (M26600)<br />

SS/REQ5(2<br />

)<br />

SS/REQ5(2<br />

)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Units<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

TACOM, Warren, MI Jan 08 Aug 08 144 203 Yes N/A Sep 04<br />

TACOM, Warren, MI Jul 08 Oct 08 62 203 Yes N/A Sep 04<br />

REMARKS:<br />

MA8890 (M26600) Item No. 125 Page 4 <strong>of</strong> 13 Exhibit P-5a<br />

BRIDGE, FLOAT-RIBBON, BAYS 65 Budget <strong>Procurement</strong> History and Planning


BRIDGE, FLOAT-RIBBON, BAYS<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

BRIDGE, FLOAT-RIBBON, BAYS (M26600)<br />

MA8890 (M26600)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

1. Bays Hardware<br />

1 FY 08 A 144 0 144 A 5 17 18 16 15 15 15 15 15 13 0<br />

1. Bays Hardware Supplemental<br />

1 FY 08<br />

Supp<br />

A 62 0 62 A 8 10 11 11 11 11 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 206 206 5 17 26 26 26 26 26 26 15 13<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 GDSBS, Kaiserslautern, GE 54 105 312 6<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 4 7 11<br />

Reorder 0 10 3 13<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

Production rates are annual. Maximum is based<br />

on two shifts.<br />

MA8890 (M26600) Item No. 125 Page 5 <strong>of</strong> 13 Exhibit P-21<br />

BRIDGE, FLOAT-RIBBON, BAYS 66 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

BRIDGE, FLOAT-RIBBON, TRANSPORTER<br />

Program Elements for Code B Items:<br />

N/A<br />

Code:<br />

A<br />

Date:<br />

P-1 Item Nomenclature<br />

BRIDGE, FLOAT-RIBBON, TRANSPORTER (M26800)<br />

MA8890 (M26800)<br />

<strong>Other</strong> Related Program Elements:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty 112 112<br />

Gross Cost 49.4 49.4<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 49.4 49.4<br />

Initial Spares<br />

Total Proc Cost 49.4 49.4<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The M1977 Common Bridge Transporter (CBT) and M1076 PLS Trailer (PLST) are part <strong>of</strong> the Ribbon Bridge System. The CBT transports the Bridge Erection Boats using the M14 Improved Boat<br />

Cradle (IBC) and Bridge Bays (Interior and Ramp) using the M15 Bridge Adapter Pallet (BAP), and all other <strong>Army</strong> Dry Span Bridging components used in a Multi-Role Bridge Company (MRBC).<br />

There are 56 CBTs, 44 PLST's, 14 IBCs and 42 BAPs per MRBC. The CBT is also the transporter for the Rapidly Emplaced Bridging System (REBS), supporting the Stryker Brigade Combat Team<br />

(SBCT). There are 4 CBTs and 4 PLSTs per Engineer Company within the SBCT. The <strong>Army</strong> plans to have 26 MRBCs and 7 SBCTs.<br />

Justification:<br />

FY08 Base: Procures 56 CBTs, 42 BAPs, 77 trailers, and 14 IBCs to fill MRBC requirements.<br />

FY08 GWOT Request: Procures 56 Transporters. Required to fill the 652nd MRBC; this equipment was left in theater to provide support for ongoing operations. These CBTs will also replace four<br />

combat losses and to provide four CBTs for Stryker. Palletized Load System (PLS) Trailers and Bridge Adapter Pallets (BAPs) are also needed to replace equipment left in theater. In addition,<br />

BAPs and Improved Boat Cradles (IBCs) are required to meet the constant theater demands for movement <strong>of</strong> the Bridge Erection Boats and Bridge Bays.<br />

FY08 Baseline: $27.413 million, qty 56<br />

FY08 GWOT Request: $22.000 million, qty 56<br />

FY08 GWOT Cost Adjustment: $0.000 million<br />

Total: $49.413 million, qty 112<br />

MA8890 (M26800) Item No. 125 Page 6 <strong>of</strong> 13 Exhibit P-40<br />

BRIDGE, FLOAT-RIBBON, TRANSPORTER 67 Budget Item Justification Sheet


BRIDGE, FLOAT-RIBBON, TRANSPORTER<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

BRIDGE, FLOAT-RIBBON, TRANSPORTER (M26800)<br />

MA8890 (M26800)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000<br />

1. Hardware<br />

--Common Bridge Transporter (CBT) A 14280 56 255<br />

--CBT FRET A 1680 56 30<br />

--CBT Supplemental A 14280 56 255<br />

--CBT FRET (Supp) A 1680 56 30<br />

--Bridge Adapter Pallet (BAP) A 2184 42 52<br />

--BAP Supplemental 2184 42 52<br />

--M1076 PLS Trailer (PLST) 5005 77 65<br />

--M1076 PLS Trailer Supplemental 2080 32 65<br />

--Winch Supplemental 110 10 11<br />

--Winch FRET Supplemental 13 10 1<br />

--Improved Boat Cradle 392 14 28<br />

--Improved Boat Cradle Supplemental 392 14 28<br />

2. System Fielding Support 2756<br />

2. System Fielding Support (Supp) 1261<br />

3. Matrix Support 220<br />

4. PM Support 896<br />

Total: 49413<br />

MA8890 (M26800) Item No. 125 Page 7 <strong>of</strong> 13 Exhibit P-5<br />

BRIDGE, FLOAT-RIBBON, TRANSPORTER 68 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

BRIDGE, FLOAT-RIBBON, TRANSPORTER<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

--Common Bridge Transporter (CBT)<br />

FY 2008<br />

--CBT Supplemental<br />

FY 2008<br />

Oshkosh Truck Corp.<br />

Oshkosh, WI<br />

Oshkosh Truck Corp.<br />

Oshkosh, WI<br />

P-1 Line Item Nomenclature:<br />

BRIDGE, FLOAT-RIBBON, TRANSPORTER (M26800)<br />

MA8890 (M26800)<br />

SS/REQ5(2<br />

)<br />

SS/REQ5(2<br />

)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Units<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

TACOM, Warren, MI Dec 07 Jul 08 56 255 Yes N/A N/A<br />

TACOM, Warren, MI Jul 08 Jan 09 56 255 N/A N/A<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

MA8890 (M26800) Item No. 125 Page 8 <strong>of</strong> 13 Exhibit P-5a<br />

BRIDGE, FLOAT-RIBBON, TRANSPORTER 69 Budget <strong>Procurement</strong> History and Planning


BRIDGE, FLOAT-RIBBON, TRANSPORTER<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

BRIDGE, FLOAT-RIBBON, TRANSPORTER (M26800)<br />

MA8890 (M26800)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

--Common Bridge Transporter (CBT)<br />

1 FY 08 A 56 0 56 A 3 4 9 9 6 6 4 4 4 3 2 2 0<br />

--CBT Supplemental<br />

1 FY 08<br />

Supp<br />

A 56 0 56 A 6 10 10 12 10 8 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 112 112 3 4 9 9 6 6 10 14 14 15 12 10<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Oshkosh Truck Corp., Oshkosh, WI 56 112 125 6<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 3 7 10<br />

Reorder 0 10 6 16<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

Production rates are annual and appply to the<br />

Oshkosh Family which the Common Bridge<br />

Transporter (CBT) is part <strong>of</strong>.<br />

MA8890 (M26800) Item No. 125 Page 9 <strong>of</strong> 13 Exhibit P-21<br />

BRIDGE, FLOAT-RIBBON, TRANSPORTER 70 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

BRIDGE, FLOAT-RIBBON, PROPULSION<br />

Program Elements for Code B Items:<br />

Code:<br />

A<br />

Date:<br />

P-1 Item Nomenclature<br />

BRIDGE, FLOAT-RIBBON, PROPULSION (M27200)<br />

MA8890 (M27200)<br />

<strong>Other</strong> Related Program Elements:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty 6 65 71<br />

Gross Cost 5.3 21.3 26.6<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 5.3 21.3 26.6<br />

Initial Spares<br />

Total Proc Cost 5.3 21.3 26.6<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Bridge Erection Boat (BEB) Service Life Extension Program (SLEP) provides an upgraded MkII-S boat that is in like new condition for appearance, performance and life expectancy. Based on<br />

availability and condition, the MkII-S uses refurbished MkI or MkII hulls and replaces the powertrain with new current technology components. The BEB provides the power and maneuverability<br />

for configuring bridge bays into a floating bridge or raft. When operating in groups, the BEB will maneuver a fully loaded raft Military Load Capacity (MLC) 96 wheeled in water velocities up to 8<br />

feet per second, or anchor a floating bridge in the same water velocities for up to 72 hours. The BEB is transported, launched and retrieved using the Common Bridge Transporter (CBT) or the M945<br />

5-Ton Bridge Truck. There are 14 BEBs per Multi-Role Bridge Company (MRBC). Enough BEBs will be procured to fill 26 MRBCs <strong>of</strong> operational units in addition to port opening companies,<br />

<strong>Army</strong> Pre-Positioned Stock (APS) and War Reserve.<br />

Justification:<br />

FY08 Base Request: Procures 44 upgrades <strong>of</strong> MkI or MKII BEBs for Multi-role Bridge Companies.<br />

FY08 GWOT Request: Procures 14 <strong>of</strong> the 21 required assets to replace BEBs that were left behind in prior rotations. One MRBC BEB set (14 each) will equip training sets for up to three units<br />

without BEB capability. These replacement assets will provide training assets to 814th and 50th EN FORSCOM units for training/preparation for the next rotation to Iraq.<br />

FY08 GWOT Cost Adjustment: Procures the remaining 7 <strong>of</strong> the 21 required assets. These assets allocated to USAR will re-equip units requiring mandated training for readiness. Replacement<br />

BEBs are required to ensure the continued positive readiness for FORSCOM units and training assets for USAR units.<br />

FY08 Baseline: $13.839 million, qty 44<br />

FY08 GWOT Request: $4.000 million, qty 14<br />

FY08 GWOT Cost Adjustment: $3.500 million, qty 7<br />

Total: $21.339 million, qty 65<br />

MA8890 (M27200) Item No. 125 Page 10 <strong>of</strong> 13 Exhibit P-40<br />

BRIDGE, FLOAT-RIBBON, PROPULSION 71 Budget Item Justification Sheet


BRIDGE, FLOAT-RIBBON, PROPULSION<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

BRIDGE, FLOAT-RIBBON, PROPULSION (M27200)<br />

MA8890 (M27200)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

1. Hardware<br />

MkII Bridge Erection Boat (BEB) SLEP A 10780 44 245<br />

MKII Bridge Erection Boat Supplemental A 3430 14 245<br />

MKII Bridge Erection Boat Amended A 1715 7 245<br />

2. Technical Manuals (chg 1) 225<br />

2. Technical Manuals (chg 1) (Supp) 72<br />

2. Technical Manuals ( chg 1) Amended 35<br />

3. System Fielding Support 728<br />

3. System Fielding Support (Supp) 475<br />

3. System Fielding Support ( Amend) 350<br />

4. Engineering Support 49<br />

5. Quality Assurance Support 54<br />

6. Maintenance Engineering 439<br />

7. PM Support 925<br />

8. Transportation 200<br />

8. Transportation (Supp) 175<br />

8. Transportation (Amend) 150<br />

9. Emergent Work 740<br />

9. Emergent Work (Supp) 475<br />

9. emergent Work ( Amend) 285<br />

10. Nav Kits 23<br />

10. Nav Kits (Supp) 7<br />

10. Nav Kits ( Amend) 7<br />

Total: 21339<br />

MA8890 (M27200) Item No. 125 Page 11 <strong>of</strong> 13 Exhibit P-5<br />

BRIDGE, FLOAT-RIBBON, PROPULSION 72 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

BRIDGE, FLOAT-RIBBON, PROPULSION<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

MkII Bridge Erection Boat (BEB) SLEP<br />

FY 2008<br />

MKII Bridge Erection Boat Supplemental<br />

FY 2008<br />

MKII Bridge Erection Boat Amended<br />

FY 2008<br />

FBM Babcock Marine,<br />

Isle <strong>of</strong> Wight UK<br />

FBM Babcock Marine,<br />

Isle <strong>of</strong> Wight UK<br />

FBM Babcock Marine,<br />

Isle <strong>of</strong> Wight UK<br />

P-1 Line Item Nomenclature:<br />

BRIDGE, FLOAT-RIBBON, PROPULSION (M27200)<br />

MA8890 (M27200)<br />

SS/REQ5(5<br />

)<br />

SS/REQ5(5<br />

)<br />

SS/REQ5(5<br />

)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

TACOM, Warren, MI Mar 08 Jul 08 44 245 Yes N/A N/A<br />

TACOM, Warren, MI Mar 08 Oct 08 14 245 Yes N/A N/A<br />

TACOM, Warren, MI Mar 08 Mar 09 7 245 Yes N/A N/A<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

MA8890 (M27200) Item No. 125 Page 12 <strong>of</strong> 13 Exhibit P-5a<br />

BRIDGE, FLOAT-RIBBON, PROPULSION 73 Budget <strong>Procurement</strong> History and Planning


BRIDGE, FLOAT-RIBBON, PROPULSION<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

BRIDGE, FLOAT-RIBBON, PROPULSION (M27200)<br />

MA8890 (M27200)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

MkII Bridge Erection Boat (BEB) SLEP<br />

1 FY 08 A 44 0 44 A 4 4 4 4 4 4 4 4 3 3 3 3 0<br />

MKII Bridge Erection Boat Supplemental<br />

1 FY 08 A 14 0 14 A 1 1 1 1 2 2 2 2 2 0<br />

Supp<br />

MKII Bridge Erection Boat Amended<br />

1 FY 08 A 7 0 7 A 1 1 1 1 3 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 65 65 4 4 4 5 5 5 5 6 6 6 6 6 3<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 FBM Babcock Marine,, Isle <strong>of</strong> Wight UK 14 42 66 2<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 4 3 7<br />

Reorder 0 6 4 10<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

Production rates are annual. Production rates<br />

below minimum will potentially increase unit<br />

costs but does not impact executability.<br />

ALT is 4 months.<br />

MA8890 (M27200) Item No. 125 Page 13 <strong>of</strong> 13 Exhibit P-21<br />

BRIDGE, FLOAT-RIBBON, PROPULSION 74 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD EQPMT)<br />

MA9200<br />

Date:<br />

September 2007<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

P-1 Item Nomenclature<br />

EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD EQPMT) (MA9200)<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 40.9 40.9<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 40.9 40.9<br />

Initial Spares<br />

Total Proc Cost 40.9 40.9<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

Description:<br />

This Explosive Ordnance Disposal equipment is used by personnel to render safe unexploded ordnance and improvised devices throughout the world. The equipment provides the capability to<br />

examine, identify, and render safe ordnance effectively and safely.<br />

This program covers various types <strong>of</strong> Explosive Ordnance Disposal (EOD) equipment for Force Protection and Homeland Defense. This equipment enables EOD soldiers to rapidly and safely render<br />

safe unexploded ordnance (UXO) and improvised explosive devices (IED) that constitute a hazard to friendly operations, installations, personnel, or materiel.<br />

1. <strong>Army</strong> National Guard Division Redesign Study (ADRS) -- provides reprocurement <strong>of</strong> EOD unique Modified <strong>Table</strong> <strong>of</strong> Organization Equipment (MTOE) equipment for 9 EOD companies being<br />

activated over FY 03 thru 08. Complete procurement <strong>of</strong> the Remote Ordnance Neutralization System (RONS) mobile, remotely controlled, robotic vehicle with advanced manipulator and<br />

reconnaissance capability.<br />

2. EOD Response Kit and Supplemental Kit for Heavy Teams - The EOD Response Kit is a set <strong>of</strong> common and special purpose tools used by EOD in response to incidents involving unexploded<br />

ordnance. It consolidates tools from 4 sets into one set, adds tools, and organizes them into mission oriented modules (e.g. demolition, technical intelligence, recon, etc). The Supplemental Kit is<br />

tools in addition to those in the EOD Response Kit that provide Heavy Team the capability to augment Light Response Teams.<br />

3. Manual Transport Robotic System (MTRS)-provide a two person portable, lightweight robotic system capable <strong>of</strong> being helicopter transported, to give EOD soldiers remote reconnaissance<br />

capability in situations where RONS is too big to employ. Includes Block Upgrade packages. Formerly known as Man Transportable Robotic System.<br />

4. Large Improvised Explosive Devices (LIED) Countermeasures - Tools required to rapidly access and dispose <strong>of</strong> large improvised explosive devices (i.e. greater than 100 lb net TNT equivalent<br />

weight) such as would be encountered in vehicle delivered bombs. Includes Medium Directional Energy Tool (MDET)<br />

5. Routine In-Svc EOD Item Reprocurement - Reprocurement <strong>of</strong> in-svc EOD items for replacement <strong>of</strong> items rendered unserviceable by explosive effects or fair wear and tear. Provide<br />

MA9200 Item No. 130 Page 1 <strong>of</strong> 7 Exhibit P-40<br />

EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD EQPMT) 75 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD EQPMT)<br />

MA9200<br />

Date:<br />

September 2007<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

P-1 Item Nomenclature<br />

EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD EQPMT) (MA9200)<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

reprocurement <strong>of</strong> EOD unique equipment for 3 New <strong>Army</strong> War Reserve Authorizations (APS-3) companies equipment to be prepositioned on ships. Provide reprocurement <strong>of</strong> EOD unique<br />

equipment for new activations and authorization increases due to conversion.<br />

6. Next Generation Citadel (NGC), Classified program.<br />

7. Submunitions Clearance System. Remotely operated aiming platform with mount for variety <strong>of</strong> weapons such as M107 .50 cal Sniper Rifle to be used for rifle disuption <strong>of</strong> munitions.<br />

8. Disposable Remote Control Demolition System. Small, low cost, remotely controllable robotic vehicle to carry demolition charge or disrupter for defeat <strong>of</strong> improvised explosive devices. Also<br />

known as Bombot.<br />

9. Future Radiographic System (FRS) -- Navy cancelled the PIP program for the MK 41 MOD 0 Advanced Radiographic System (ARS) and initiated an FY06 analysis <strong>of</strong> alternatives working<br />

group to define requirements for the FRS which will replace both the current MK 36 series portable x-ray systems and the ARS. It will provide the EOD soldier with the integrated capability to<br />

obtain real time digital x-ray images <strong>of</strong> fuzes and improvised explosive devices. The Navy identified a COTS system (designated MK 41 MOD 1) as the interim replacement for to meet Services_<br />

requirements until FRS is in production.<br />

10. Activation <strong>of</strong> Units - Provide EOD unique equipment required for that activation <strong>of</strong> EOD companies in support <strong>of</strong> contingency operations.<br />

Justification:<br />

The FY2008 Global War on Terrorism (GWOT) request procures additional assets to prosecute the GWOT by resetting items, replacing battle losses, generating and protecting forces, and enhancing<br />

military capabilities. This requirement is based on operational expenditures and supports approved <strong>Army</strong> war-fighter requirements.<br />

FY 2008 GWOT Cost Adjustment funds 26 additional Manual Transport Robotic System (MTRS), which provide a two person portable, lightweight robotic system capable <strong>of</strong> being helicopter<br />

transported, giving EOD Soldiers remote reconnaissance capability.<br />

FY 2008 Base Appropriation: $33.283 million<br />

FY 2008 GWOT Request: $3.300 million<br />

FY 2008 GWOT Cost Adjustment Request: $4.350 million<br />

FY 2008 Total: $40.933 million<br />

MA9200 Item No. 130 Page 2 <strong>of</strong> 7 Exhibit P-40<br />

EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD EQPMT) 76 Budget Item Justification Sheet


EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD EQPMT)<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD<br />

EQPMT) (MA9200)<br />

MA9200<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY 2008 BASE APPROPRIATION<br />

EOD Hardware<br />

ADRS Activations A 318 1 318<br />

EOD Response Kit and Supplemental Kit A 2363 45 53<br />

Man Transportable Robotic System A 16417 99 166<br />

LIED Countermeasures A 994 142 7<br />

Routine In-Svc EOD Item Reprocurement A 421 1 421<br />

Next Generation Citadel A 9216 532 17<br />

Submunition Clearance System A 100 1 100<br />

Disposable Remote Control Demo Sys A 51 1 51<br />

Future Radiographic System A 30 1 30<br />

Subtotal Hardware 29910<br />

Production Support<br />

Production Engineering 677<br />

Accepeptance Testing 1332<br />

Materiel Mgmt/<strong>Procurement</strong> Spt 102<br />

Integrated Logistics Support 133<br />

Contractor Logistics Support 636<br />

Program Management 443<br />

Subtotal Production Support 3323<br />

Non-Recurring Cost<br />

New Equipment Training 50<br />

Subtotal Non-Recurring Costs 50<br />

Subtotal Base Appropriation 33283<br />

FY 2008 GWOT REQUEST<br />

Reorganization <strong>of</strong> EOD Companies 3300 6 550<br />

Subtotal GWOT 3300<br />

FY 2008 GWOT Cost Adjustment<br />

Man Transportable Robotic System 4350 26 166<br />

Subtotal GWOT Cost Adjustment 4350<br />

MA9200 Item No. 130 Page 3 <strong>of</strong> 7 Exhibit P-5<br />

EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD EQPMT) 77 Weapon System Cost Analysis


EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD EQPMT)<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD<br />

EQPMT) (MA9200)<br />

MA9200<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

TOTAL 40933<br />

Total: 40933<br />

MA9200 Item No. 130 Page 4 <strong>of</strong> 7 Exhibit P-5<br />

EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD EQPMT) 78 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD EQPMT)<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

ADRS Activations<br />

FY 2008<br />

VARIOUS<br />

VARIOUS<br />

EOD Response Kit and Supplemental Kit<br />

FY 2008<br />

Kipper Tools Inc.<br />

Ganesville, GA<br />

Man Transportable Robotic System<br />

FY 2008<br />

Foster Miller, Inc. & iROBOT C<br />

Waltham, MA & Burlington, MA<br />

FY 2008 GWOT CA<br />

Foster Miller, Inc. & iROBOT C<br />

Waltham, MA & Burlington, MA<br />

LIED Countermeasures<br />

FY 2008<br />

Packaging Strategies Inc.<br />

Baltimore, MD<br />

Routine In-Svc EOD Item Reprocurement<br />

FY 2008<br />

VARIOUS<br />

VARIOUS<br />

Next Generation Citadel<br />

P-1 Line Item Nomenclature:<br />

EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD EQPMT) (MA9200)<br />

MA9200<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

C/FP Indian Head, MD Mar 08 Jul 08 1 318<br />

C/OPT Rock Island, IL Mar 08 Jul 08 45 53<br />

C/OPT Indian Head, MD Mar 08 Aug 08 99 166<br />

C/OPT Indian Head, MD Aug 08 Jan 09 26 166<br />

C/OPT Indian Head, MD Mar 08 Jul 08 142 7<br />

C/FP Indian Head, MD Mar 08 Jul 08 1 421<br />

FY 2008 TO BE SELECTED C/OPT Indian Head, MD Mar 08 Aug 08 532 17<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

Submunition Clearance System<br />

FY 2008<br />

Precision Remotes<br />

San Francisco, CA<br />

OPT/FP Indian Head, MD Mar 08 Jul 08 1 100<br />

Disposable Remote Control Demo Sys<br />

FY 2008 TO BE SELECTED C/FP Indian Head, MD Mar 08 Aug 08 1 51<br />

Future Radiographic System<br />

FY 2008 TO BE SELECTED C/FP Indian Head, MD May 08 Jan 09 1 30<br />

REMARKS: The Navy is the lead service for EOD Equipment. Several items are options to Navy contracts.<br />

MA9200 Item No. 130 Page 5 <strong>of</strong> 7 Exhibit P-5a<br />

EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD EQPMT) 79 Budget <strong>Procurement</strong> History and Planning


EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD EQPMT)<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD EQPMT) (MA9200)<br />

MA9200<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

ADRS Activations<br />

1 FY 08 A 1 0 1 A 1 0<br />

EOD Response Kit and Supplemental Kit<br />

2 FY 08 A 45 0 45 A 4 4 4 4 4 4 4 4 4 3 3 3 0<br />

Man Transportable Robotic System<br />

3 FY 08 A 26 0 26 A 4 4 4 4 4 4 2 0<br />

GWOT<br />

3 FY 08 A 99 0 99 A 9 9 9 8 8 8 8 8 8 8 8 8 0<br />

LIED Countermeasures<br />

4 FY 08 A 142 0 142 A 12 12 12 12 12 12 12 12 12 12 11 11 0<br />

Routine In-Svc EOD Item Reprocurement<br />

1 FY 08 A 1 0 1 A 1 0<br />

Next Generation Citadel<br />

7 FY 08 A 532 0 532 A 44 44 45 45 45 45 44 44 44 44 44 44 0<br />

Submunition Clearance System<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 VARIOUS, VARIOUS 5 50 150 1<br />

2 Kipper Tools Inc., Ganesville, GA 1 20 50 1<br />

3 Foster Miller, Inc. & iROBOT C, Waltham, MA & 5 30 50<br />

Burlington, MA<br />

4 Packaging Strategies Inc., Baltimore, MD 10 25 50 1<br />

5 Raytheon, Indianapolis, IN 5 50 150 1<br />

6 Precision Remotes, San Francisco, CA 1 2 4<br />

7 TO BE SELECTED 1 25 50 1<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 6 8 7 15<br />

Reorder 6 6 4 10<br />

2 Initial 6 8 7 15<br />

Reorder 6 6 4 10<br />

3 Initial 6 8 8 16<br />

Reorder 6 6 5 11<br />

4 Initial 6 8 7 15<br />

Reorder 6 6 4 10<br />

5 Initial 6 8 7 15<br />

Reorder 6 6 4 10<br />

REMARKS<br />

MA9200 Item No. 130 Page 6 <strong>of</strong> 7 Exhibit P-21<br />

EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD EQPMT) 80 Production Schedule


EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD EQPMT)<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD EQPMT) (MA9200)<br />

MA9200<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

6 FY 08 A 1 0 1 A 1 0<br />

Disposable Remote Control Demo Sys<br />

7 FY 08 A 1 0 1 A 1 0<br />

Future Radiographic System<br />

7 FY 08 A 1 0 1 A 1 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 849 849 19 70 69 70 69 69 74 72 72 71 70 70 54<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 VARIOUS, VARIOUS 5 50 150 1<br />

2 Kipper Tools Inc., Ganesville, GA 1 20 50 1<br />

3 Foster Miller, Inc. & iROBOT C, Waltham, MA & 5 30 50<br />

Burlington, MA<br />

4 Packaging Strategies Inc., Baltimore, MD 10 25 50 1<br />

5 Raytheon, Indianapolis, IN 5 50 150 1<br />

6 Precision Remotes, San Francisco, CA 1 2 4<br />

7 TO BE SELECTED 1 25 50 1<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 6 8 7 15<br />

Reorder 6 6 4 10<br />

2 Initial 6 8 7 15<br />

Reorder 6 6 4 10<br />

3 Initial 6 8 8 16<br />

Reorder 6 6 5 11<br />

4 Initial 6 8 7 15<br />

Reorder 6 6 4 10<br />

5 Initial 6 8 7 15<br />

Reorder 6 6 4 10<br />

REMARKS<br />

MA9200 Item No. 130 Page 7 <strong>of</strong> 7 Exhibit P-21<br />

EXPLOSIVE ORDNANCE DISPOSAL EQPMT (EOD EQPMT) 81 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

LAUNDRY ADVANCED SYSTEM (LADS)<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

Date:<br />

P-1 Item Nomenclature<br />

LAUNDRY ADVANCED SYSTEM (LADS) (M82701)<br />

M82700 (M82701)<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty 6 6<br />

Gross Cost 5.2 5.2<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 5.2 5.2<br />

Initial Spares<br />

Total Proc Cost 5.2 5.2<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Laundry Advanced System (LADS) is the <strong>Army</strong>'s water-based, mobile field laundry system, with one LADS replacing up to four <strong>of</strong> the current M85 laundries. It consists <strong>of</strong> laundry-processing<br />

and water recycling equipment mounted on an International Standards Organization (ISO) certified frame, a 30 kW Tactical Quiet Generator, all mounted on a 40' M871 trailer and towed by a 5-ton<br />

tractor. Each LADS will wash laundry for 500 soldiers per day using a dry-to-dry process (dirty clothes are placed in the drum and removed clean and dry at the end <strong>of</strong> the one-hour cycle). The<br />

LADS will recycle approximately 97% <strong>of</strong> the water used in the laundry process, reducing water consumption to under 500 gallons per day compared to over 20,000 gallons for four M85s (with only<br />

20 gallons <strong>of</strong> waste water produced). The system is run by two operators per 10-hour shift; two shifts per day result in a 75% manpower reduction compared to the four-M85 laundry operation. This<br />

program procures and fields a critical capability that supports the <strong>Army</strong>'s transformation by maintaining readiness through fielding and integrating new equipment and by reducing sustainment<br />

requirements, related Combat Support/Combat Service Support (CS/CSS) demands on lift, combat zone footprint, and costs for logistical support.<br />

Justification:<br />

FY 08 Global War on Terrorism (GWOT) cost adjustment procures LADS to fill shortages in <strong>Army</strong> prepositioned stocks previously depleted to fill shortages in <strong>Army</strong> units supporting operations.<br />

Funds also procure LADS to replace any battle losses and/or reset items.<br />

FY 08 GWOT Cost Adjustment Request - $5.200 million<br />

FY 08 Total - $5.200 million<br />

M82700 (M82701) Item No. 133 Page 1 <strong>of</strong> 14 Exhibit P-40<br />

LAUNDRY ADVANCED SYSTEM (LADS) 82 Budget Item Justification Sheet


LAUNDRY ADVANCED SYSTEM (LADS)<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

LAUNDRY ADVANCED SYSTEM (LADS) (M82701)<br />

M82700 (M82701)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

Hardware FY08 GWOT Cost Adjustment 4380 6 730<br />

Initial Spares FY08 GWOT Cost Adjustment 20<br />

Testing FY08 GWOT Cost Adjustment 70<br />

Engineering Support FY08 GWOT Cost Adju 237<br />

ILS FY08 GWOT Cost Adjustment 133<br />

Fielding/NET FY08 GWOT Cost Adjustment 235<br />

PM Support FY08 GWOT Cost Adjustment 125<br />

Total: 5200<br />

M82700 (M82701) Item No. 133 Page 2 <strong>of</strong> 14 Exhibit P-5<br />

LAUNDRY ADVANCED SYSTEM (LADS) 83 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

LAUNDRY ADVANCED SYSTEM (LADS)<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

Hardware FY08 GWOT Cost Adjustment<br />

FY 2008<br />

Guild Associates<br />

Dublin, OH<br />

P-1 Line Item Nomenclature:<br />

LAUNDRY ADVANCED SYSTEM (LADS) (M82701)<br />

M82700 (M82701)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

SS/FP2 RDECOM, Natick, MA Dec 07 Jun 08 6 730 Yes Oct 07<br />

REMARKS:<br />

M82700 (M82701) Item No. 133 Page 3 <strong>of</strong> 14 Exhibit P-5a<br />

LAUNDRY ADVANCED SYSTEM (LADS) 84 Budget <strong>Procurement</strong> History and Planning


LAUNDRY ADVANCED SYSTEM (LADS)<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

LAUNDRY ADVANCED SYSTEM (LADS) (M82701)<br />

M82700 (M82701)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Hardware FY08 GWOT Cost Adjustment<br />

1 FY 08 A 6 0 6 A 1 2 2 1 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 6 6 1 2 2 1<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Guild Associates, Dublin, OH 12 36 60 4<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 2 10 12<br />

Reorder 0 3 6 9<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

M82700 (M82701) Item No. 133 Page 4 <strong>of</strong> 14 Exhibit P-21<br />

LAUNDRY ADVANCED SYSTEM (LADS) 85 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Heaters and ECU's<br />

Program Elements for Code B Items:<br />

64804-L39<br />

Code:<br />

A/B<br />

P-1 Item Nomenclature<br />

Heaters and ECU's (MF9000)<br />

MF9000<br />

<strong>Other</strong> Related Program Elements:<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 32.0 32.0<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 32.0 32.0<br />

Initial Spares<br />

Total Proc Cost 32.0 32.0<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The 60k Improved Environmental Control Unit (IECU) program is a joint <strong>Army</strong> and Air Force effort to replace the heavy and inefficient field Environmental Control Units that utilize ozone<br />

depleting refrigerants. The 60k IECU will be a replacement for the existing <strong>Army</strong> 54,000-BTU/HR Environmental Control Unit (ECU) and Air Force developed 66,000-BTU/HR Field Deployable<br />

Environmental Control Unit. The 60k IECU will be lighter in weight than the existing military ECUs.<br />

The Large Capacity Field Heater (LCFH) provides 400,000 - 450,000 BTUH. It will be used to heat maintenance tents, specifically the Lightweight Maintenance Enclosure (LME), in cold<br />

environments so that soldiers can safely repair a wide variety <strong>of</strong> equipment such as trucks, tanks, helicopters; and air defense and field artillery systems. It is thermostatically controlled and uses<br />

either diesel or JP-8 fuel to produce heat. This supports the single fuel on the battlefield concept. The LCFH is mobile and delivers both heated and re-circulated fresh and vented air through sealed,<br />

detachable, flexible ducts. It is suitable for use in temperate and arctic environments. It replaces the dangerous, outdated, gasoline powered, 400,000 BTUH Herman Nelson Heater. It will be safer<br />

for personnel operating equipment in enclosed areas because it eliminates carbon monoxide emissions.<br />

This program procures and fields critical environmental control systems that support the <strong>Army</strong>'s transformation and expeditionary requirements by maintaining readiness through fielding and<br />

integrating new equipment to Stryker Brigades and other Modular Forces. They enhance the field soldier's performance and well-being. They reduce sustainment requirements and logistical support<br />

costs.<br />

Justification:<br />

FY 2008 Supplemental Request: Funds additional assets to execute the Global War on Terror by resetting items, replacing battle losses, generating and protecting forces, and enhancing military<br />

capabilities.<br />

FY 2008 Global War on Terrorism (GWOT) Cost Adjustment supports ongoing GWOT operations.<br />

FY 2008 Base Appropriation: $18.463 Million<br />

MF9000 Item No. 133 Page 5 <strong>of</strong> 14 Exhibit P-40<br />

Heaters and ECU's 86 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Date:<br />

September 2007<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Heaters and ECU's<br />

P-1 Item Nomenclature<br />

Heaters and ECU's (MF9000)<br />

MF9000<br />

Program Elements for Code B Items:<br />

64804-L39<br />

Code:<br />

A/B<br />

<strong>Other</strong> Related Program Elements:<br />

FY 2008 GWOT Request: $6.859 Million<br />

FY 2008 GWOT Cost Adjustment: $6.653 Million<br />

FY 2008 Total: $31.975 Million<br />

MF9000 Item No. 133 Page 6 <strong>of</strong> 14 Exhibit P-40<br />

Heaters and ECU's 87 Budget Item Justification Sheet


Heaters and ECU's<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

Heaters and ECU's (MF9000)<br />

MF9000<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

HARDWARE LCFH BASE 5403 377 14<br />

FIELDING/NET LCFH BASE 175<br />

LOGISTICS SUPPORT LCFH BASE 270<br />

PM SUPPORT LCFH BASE 512<br />

TECH/ENG SUPPORT LCFH BASE 475<br />

HARDWARE LCFH FY 08 GWOT 5687 396 14<br />

FIELDING/NET LCFH FY 08 GWOT 200<br />

LOGISTIC SUPPORT LCFH FY 08 GWOT 200<br />

PM SUPPORT LCFH FY 08 GWOT 400<br />

TECH/ENG SUPPORT LCFH FY 08 GWOT 372<br />

HARDWARE LCFH FY 08 GWOT Cost Adj 4500 300 15<br />

FIELDING/NET LCFH FY 08 GWOT Cost Adj 450<br />

LOGISTIC SUPPORT LCFH FY 08 GWOT CostAdj 261<br />

PM SUPPORT LCFH FY 08 GWOT Cost Adj 403<br />

TECH/ENG SUPPORT LCFH FY 08 GWOT CostAdj 300<br />

IECU/ECU Base SEE MF9303 11628<br />

IECU/ECU GWOT Cost Adj SEE MF9303 739<br />

Total: 31975<br />

MF9000 Item No. 133 Page 7 <strong>of</strong> 14 Exhibit P-5<br />

Heaters and ECU's 88 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

Heaters and ECU's<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

HARDWARE LCFH BASE<br />

FY 2008<br />

HUNTER<br />

SOLON, OH<br />

HARDWARE LCFH FY 08 GWOT<br />

FY 2008<br />

HUNTER<br />

SOLON, OH<br />

HARDWARE LCFH FY 08 GWOT Cost Adj<br />

FY 2008<br />

HUNTER<br />

SOLON, OH<br />

P-1 Line Item Nomenclature:<br />

Heaters and ECU's (MF9000)<br />

MF9000<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

C/FP10(4) CECOM Dec 07 May 08 377 14 YES<br />

C/FP10(4) CECOM Dec 07 May 08 396 14 YES<br />

C/FP10(4) CECOM Dec 07 May 08 300 15 Yes<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS: The contracts for the Improved Environmental Control Units are shown in detail on the MF9303 P Forms.<br />

MF9000 Item No. 133 Page 8 <strong>of</strong> 14 Exhibit P-5a<br />

Heaters and ECU's 89 Budget <strong>Procurement</strong> History and Planning


Heaters and ECU's<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

Heaters and ECU's (MF9000)<br />

MF9000<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

HARDWARE LCFH BASE<br />

1 FY 08 A 377 0 377 A 40 40 40 40 40 40 40 30 20 20 20 7 0<br />

HARDWARE LCFH FY 08 GWOT<br />

1 FY 08 A 396 0 396 A 30 30 30 30 30 30 30 30 40 40 40 36 0<br />

HARDWARE LCFH FY 08 GWOT Cost Adj<br />

1 FY 08 A 300 0 300 A 30 30 30 30 30 30 30 20 20 20 20 10 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 1073 1073 100 100 100 100 100 100 100 80 80 80 80 53<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 HUNTER, SOLON, OH 120 720 1920 4<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 2 5 7<br />

Reorder 0 2 5 7<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

MF9000 Item No. 133 Page 9 <strong>of</strong> 14 Exhibit P-21<br />

Heaters and ECU's 90 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

IMPROVED ENVIRONMENTAL CONTROL UNITS<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

Date:<br />

P-1 Item Nomenclature<br />

IMPROVED ENVIRONMENTAL CONTROL UNITS (MF9303)<br />

MF9000 (MF9303)<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 12.4 12.4<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 12.4 12.4<br />

Initial Spares<br />

Total Proc Cost 12.4 12.4<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The 60k Improved Environmental Control Unit (IECU) program is a joint <strong>Army</strong> and Air Force effort to replace the heavy and inefficient field Environmental Control Units that utilize ozone<br />

depleting refrigerants. The 60k IECU will be a replacement for the existing <strong>Army</strong> 54,000-BTU/HR Environmental Control Unit (ECU) and Air Force developed 66,000-BTU/HR Field Deployable<br />

Environmental Control Unit. The 60k IECU will be lighter in weight than the existing military ECUs.<br />

This program procures and fields critical environmental control systems(18,000 BTU/HR ECU, 36,000 BTU/HR ECU and 60,000 BTU/HR ECU) that support the <strong>Army</strong>'s transformation and<br />

expeditionary requirements by maintaining readiness through fielding and integrating new equipment to Stryker Brigades and other Modular Forces. They enhance the field soldier's performance<br />

and well-being. They reduce sustainment requirements and logistical support costs.<br />

Justification:<br />

FY08 Baseline: Procures 9,000 BTU/HR ECU, 36,000 BTU/HR ECU and the 60,000 BTU/HR IECU<br />

FY08 Global War on Terrorism (GWOT) Cost Adjustment procures 18,000 BTU/HR ECU, 36,000 BTU/HR ECU and the 60,000 BTU/HR ECU<br />

FY08 Base: $11.628 Million<br />

FY08 GWOT Request: $0 Million<br />

FY08 GWOT Cost Adjustment: $0.739 Million<br />

FY08 Total: $12.367 Million<br />

MF9000 (MF9303) Item No. 133 Page 10 <strong>of</strong> 14 Exhibit P-40<br />

IMPROVED ENVIRONMENTAL CONTROL UNITS 91 Budget Item Justification Sheet


IMPROVED ENVIRONMENTAL CONTROL UNITS<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

IMPROVED ENVIRONMENTAL CONTROL UNITS<br />

(MF9303)<br />

MF9000 (MF9303)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY 2008 Base Appropriation<br />

1. Item Hardware (MF9303)<br />

ECU<br />

9,000 BTU/HR ECU A 850 170 5<br />

36,000 BTU/HR ECU A 1026 171 6<br />

60,000 BTU/HR IECU A 8300 1000 8<br />

2. Engineering Support 650<br />

3. Engineering Change Orders 50<br />

4. Testing 50<br />

5. System Fielding Support 50<br />

6. System Assessment<br />

7. Logistic Support 100<br />

8. Data 50<br />

9. Program Management Support 502<br />

Base Appropriation Subtotal 11628<br />

FY 2008 GWOT Cost Adjustment Request<br />

ECU<br />

18,000 BTU/HR ECU A 103 28 4<br />

36,000 BTU/HR ECU A 297 27 11<br />

60,000 BTU/HR ECU A 339 32 11<br />

Total FY 2008 GWOT Cost Adjustment 739<br />

Total: 12367<br />

MF9000 (MF9303) Item No. 133 Page 11 <strong>of</strong> 14 Exhibit P-5<br />

IMPROVED ENVIRONMENTAL CONTROL UNITS 92 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

IMPROVED ENVIRONMENTAL CONTROL UNITS<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

9,000 BTU/HR ECU (Base)<br />

FY 2008<br />

TBD(1)<br />

TBD<br />

36,000 BTU/HR ECU (Base)<br />

FY 2008<br />

TBD(2)<br />

TBD<br />

60,000 BTU/HR IECU (Base)<br />

FY 2008<br />

DRS<br />

Florence, KY<br />

18,000 BTU/HR ECU (GWOT CA)<br />

FY 2008<br />

Snowbird, Inc<br />

Jacksonville, FL<br />

36,000 BTU/HR ECU (GWOT CA)<br />

FY 2008<br />

TBD(2)<br />

TBD<br />

60,000 BTU/HR ECU (GWOT CA)<br />

FY 2008<br />

TBD(3)<br />

TBD<br />

P-1 Line Item Nomenclature:<br />

IMPROVED ENVIRONMENTAL CONTROL UNITS (MF9303)<br />

MF9000 (MF9303)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

C/FP CECOM Nov 07 Nov 08 170 5 YES<br />

C/FP CECOM Mar 08 Mar 09 171 6 YES<br />

C/FP CECOM Jul 08 Jul 09 1000 8 YES<br />

C/FP CECOM Nov 07 Nov 08 28 4 YES<br />

C/FP CECOM Mar 08 Mar 09 27 11 YES<br />

C/FP CECOM Nov 07 Nov 08 32 8 YES<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

MF9000 (MF9303) Item No. 133 Page 12 <strong>of</strong> 14 Exhibit P-5a<br />

IMPROVED ENVIRONMENTAL CONTROL UNITS 93 Budget <strong>Procurement</strong> History and Planning


IMPROVED ENVIRONMENTAL CONTROL UNITS<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

IMPROVED ENVIRONMENTAL CONTROL UNITS (MF9303)<br />

MF9000 (MF9303)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

9,000 BTU/HR ECU (Base)<br />

2 FY 08 A 170 0 170 A 15 15 14 14 14 14 14 14 14 14 14 14<br />

36,000 BTU/HR ECU (Base)<br />

3 FY 08 A 171 0 171 A 15 15 15 14 14 14 14 70<br />

60,000 BTU/HR IECU (Base)<br />

1 FY 08 A 1000 0 1000 A 84 84 84 748<br />

18,000 BTU/HR ECU (GWOT CA)<br />

5 FY 08 A 28 0 28 A 3 3 3 3 2 2 2 2 2 2 2 2<br />

36,000 BTU/HR ECU (GWOT CA)<br />

3 FY 08 A 27 0 27 A 3 3 3 2 2 2 2 10<br />

60,000 BTU/HR ECU (GWOT CA)<br />

4 FY 08 A 32 0 32 A 3 3 3 3 3 3 3 3 2 2 2 2<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 1428 1428 21 21 20 20 37 37 37 35 118 118 118 846<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 DRS, Florence, KY 10 1000 3000<br />

2 TBD(1), TBD 10 1000 3000<br />

3 TBD(2), TBD 10 1000 3000<br />

4 TBD(3), TBD 10 1000 3000<br />

5 Snowbird, Inc, Jacksonville, FL 10 1000 3000<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 6 9 12 21<br />

Reorder 6 3 12 15<br />

2 Initial 6 5 12 17<br />

Reorder 6 1 12 13<br />

3 Initial 6 5 12 17<br />

Reorder 6 1 12 13<br />

4 Initial 6 1 12 13<br />

Reorder 6 1 12 13<br />

5 Initial 6 1 12 13<br />

Reorder 6 1 12 13<br />

REMARKS<br />

MF9000 (MF9303) Item No. 133 Page 13 <strong>of</strong> 14 Exhibit P-21<br />

IMPROVED ENVIRONMENTAL CONTROL UNITS 94 Production Schedule


IMPROVED ENVIRONMENTAL CONTROL UNITS<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

IMPROVED ENVIRONMENTAL CONTROL UNITS (MF9303)<br />

MF9000 (MF9303)<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

9,000 BTU/HR ECU (Base)<br />

2 FY 08 A 170 156 14 14 0<br />

36,000 BTU/HR ECU (Base)<br />

3 FY 08 A 171 101 70 14 14 14 14 14 0<br />

60,000 BTU/HR IECU (Base)<br />

1 FY 08 A 1000 252 748 84 83 83 83 83 83 83 83 83 0<br />

18,000 BTU/HR ECU (GWOT CA)<br />

5 FY 08 A 28 26 2 2 0<br />

36,000 BTU/HR ECU (GWOT CA)<br />

3 FY 08 A 27 17 10 2 2 2 2 2 0<br />

60,000 BTU/HR ECU (GWOT CA)<br />

4 FY 08 A 32 30 2 2 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 1428 582 846 118 99 99 99 99 83 83 83 83<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 DRS, Florence, KY 10 1000 3000<br />

2 TBD(1), TBD 10 1000 3000<br />

3 TBD(2), TBD 10 1000 3000<br />

4 TBD(3), TBD 10 1000 3000<br />

5 Snowbird, Inc, Jacksonville, FL 10 1000 3000<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 6 9 12 21<br />

Reorder 6 3 12 15<br />

2 Initial 6 5 12 17<br />

Reorder 6 1 12 13<br />

3 Initial 6 5 12 17<br />

Reorder 6 1 12 13<br />

4 Initial 6 1 12 13<br />

Reorder 6 1 12 13<br />

5 Initial 6 1 12 13<br />

Reorder 6 1 12 13<br />

REMARKS<br />

MF9000 (MF9303) Item No. 133 Page 14 <strong>of</strong> 14 Exhibit P-21<br />

IMPROVED ENVIRONMENTAL CONTROL UNITS 95 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

LAUNDRIES, SHOWERS AND LATRINES<br />

Program Elements for Code B Items:<br />

Code:<br />

A<br />

Date:<br />

P-1 Item Nomenclature<br />

LAUNDRIES, SHOWERS AND LATRINES (M82700)<br />

M82700<br />

<strong>Other</strong> Related Program Elements:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 54.8 5.2 60.0<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 54.8 5.2 60.0<br />

Initial Spares<br />

Total Proc Cost 54.8 5.2 60.0<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

Provides unit and field service equipment to enhance soldier efficiency, effectiveness, and sustainability. Items include laundries, latrines, and showers which directly affect combat readiness and<br />

sustain combat power by promoting wellness and preventing disease. These efforts are in accord with the standards determined by the Surgeon General. This program procures and fields a critical<br />

capability that supports the <strong>Army</strong>'s transformation and maintains readiness through fielding and integrating new equipment. Products produced reduce sustainment requirements, related Combat<br />

Support/Combat Service Support(CS/CSS) lift demands, the overall combat zone footprint, and logistical support costs.<br />

Justification:<br />

FY 2008 Global War on Terrorism (GWOT) Cost Adjustment funds 6 Laundry Advanced Systems (LADS) additional assets to prosecute the Global War on Terror with this critical capability which<br />

supports the <strong>Army</strong>'s transformation, supports readiness, and reduces sustainment requirements.<br />

FY 2008 Base Appropriation $ 0.000 million<br />

FY 2008 GWOT Request $ 0.000 million<br />

FY 2008 GWOT Cost Adjustment Request $ 5.200 million<br />

FY 2008 Total $ 5.200 million<br />

M82700 Item No. 134 Page 1 <strong>of</strong> 1 Exhibit P-40<br />

LAUNDRIES, SHOWERS AND LATRINES 96 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

SOLDIER ENHANCEMENT<br />

Program Elements for Code B Items:<br />

Code:<br />

A<br />

P-1 Item Nomenclature<br />

SOLDIER ENHANCEMENT (MA6800)<br />

MA6800<br />

<strong>Other</strong> Related Program Elements:<br />

RDT&E 0604713<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 22.3 22.3<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 22.3 22.3<br />

Initial Spares<br />

Total Proc Cost 22.3 22.3<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The emphasis <strong>of</strong> this program is on Soldier modernization and enhancements. It procures items that improve Soldier lethality, survivability, mobility, command and control and sustainment. The<br />

items currently being procured are the M25 Stabilized Binocular. The Stabilizated Binocular provides the Soldier, both mounted and dismounted, with enhanced target acquisition capability. The<br />

M25 is a high powered (14X magnification), hand held binocular which uses a gyro stabilizer to compensate for resolution degrading effects <strong>of</strong> using a hand held high powered optic and/or in certain<br />

moving vehicular scenarios.<br />

Justification:<br />

FY2008 Supplemental dollars are for additional assets to prosecute the Global War on Terror by resetting items, replacing battle losses, generating and protecting forces, and enhancing military<br />

capabilities. Specific quantity, cost element, and pricing data is not available at this time and will be adjusted by available FY2008 base dollars, mix <strong>of</strong> forces, and production and requirements<br />

adjustments.<br />

Specifically, FY2008 Supplemental funds procure Personnel Recovery Support Equipment (PRSE) procurement and integration <strong>of</strong> equipment and technology for personnel recovery and provides the<br />

<strong>Army</strong> with significantly enhanced ability to report and locate isolated, missing, detained or captured conventional ground forces.<br />

FY 2008 Base Appropriation - $13.540 Million<br />

FY 2008 GWOT Request - $ 8.757 Million<br />

FY 2008 Total - $22.297 Million<br />

MA6800 Item No. 135 Page 1 <strong>of</strong> 1 Exhibit P-40<br />

SOLDIER ENHANCEMENT 97 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

FORCE PROVIDER<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

P-1 Item Nomenclature<br />

FORCE PROVIDER (M80200)<br />

M80200<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 18.4 18.4<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 18.4 18.4<br />

Initial Spares<br />

Total Proc Cost 18.4 18.4<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

A fully engineered system, this deployable tent city provides high quality climate-controlled billeting, dining, shower, latrine, laundry, and Morale Welfare Recreation (MWR) facilities and<br />

equipment capable <strong>of</strong> supporting 550+ soldiers. Force Provider is fully containerized for rapid deployment and is transportable by rail, sea, land, and air using C-130, C-141, C-17 or C-5A aircraft.<br />

With the addition <strong>of</strong> Cold Weather Kits (CWKs), the module is deployable in temperatures as low as -15 degrees Fahrenheit. Missions for Force Provider are: base camps for enforcement missions,<br />

peace keeping, theater reception/redeployment, intermediate staging base operations, humanitarian aid, and disaster relief; both in theater and in austere environments. Force Provider modules are<br />

placed in Prepositioned Stocks to meet critical Commander in Chief (CINC) Operations Plan requirements.<br />

Justification:<br />

FY 2008 Global War on Terrorism (GWOT) Cost Adjustment Request procures two (2) Force Provider Modules, packaged in the expeditionary configuration along with prime power connection<br />

kits.<br />

FY08 GWOT Cost Adjustment Request - $18.400 million<br />

FY08 Total - $18.400 million<br />

M80200 Item No. 139 Page 1 <strong>of</strong> 4 Exhibit P-40<br />

FORCE PROVIDER 98 Budget Item Justification Sheet


FORCE PROVIDER<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

FORCE PROVIDER (M80200)<br />

M80200<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

Force Provider Module w/ Prime Power Kit 16008 2 8004<br />

Cold Weather Kit<br />

PM Support 552<br />

Engineering Support 900<br />

ILS Support 590<br />

Fielding & Deployment Support 350<br />

Total: 18400<br />

M80200 Item No. 139 Page 2 <strong>of</strong> 4 Exhibit P-5<br />

FORCE PROVIDER 99 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

FORCE PROVIDER<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

Force Provider Module w/ Prime Power Kit<br />

FY 2008<br />

SFA, Frederick MFG<br />

Frederick, MD<br />

P-1 Line Item Nomenclature:<br />

FORCE PROVIDER (M80200)<br />

M80200<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

FFP4(2) RDECOM, APG Nov 07 Nov 08 2 8004 Yes May 07<br />

REMARKS:<br />

M80200 Item No. 139 Page 3 <strong>of</strong> 4 Exhibit P-5a<br />

FORCE PROVIDER 100 Budget <strong>Procurement</strong> History and Planning


FORCE PROVIDER<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

FORCE PROVIDER (M80200)<br />

M80200<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Force Provider Module w/ Prime Power Kit<br />

1 FY 08 A 2 0 2 A 2 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 2 2 2<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 SFA, Frederick MFG, Frederick, MD 2 6 9<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 1 12 13<br />

Reorder 0 0 0 0<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

M80200 Item No. 139 Page 4 <strong>of</strong> 4 Exhibit P-21<br />

FORCE PROVIDER 101 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

FIELD FEEDING EQUIPMENT<br />

Program Elements for Code B Items:<br />

Code:<br />

A<br />

P-1 Item Nomenclature<br />

FIELD FEEDING EQUIPMENT (M65800)<br />

M65800<br />

<strong>Other</strong> Related Program Elements:<br />

0604713A<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 38.2 38.2<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 38.2 38.2<br />

Initial Spares<br />

Total Proc Cost 38.2 38.2<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Field Feeding and Refrigeration program provides equipment to conduct tactical food service operations. Field Feeding is a combat multiplier, it improves morale and enhances the warfighters<br />

physical and cognitive capabilities. Associated with food service operations are storage, preparation, serving and cleanup. Equipment items include: field kitchens, food sanitation centers, and<br />

refrigerated containers. In conjunction with food service personnel and field rations, this equipment comprises the <strong>Army</strong> Field Feeding System (AFFS) which supports the <strong>Army</strong> standard <strong>of</strong> one hotcooked,<br />

prepared meal per day in the field. This program provides a critical capability that supports <strong>Army</strong> transformation and the modularity concept. It maintains readiness through fielding and<br />

integrating new equipment. It enhances the field soldier's well being and reduces sustainment requirements, related Combat Support/Combat Service Support (CS/CSS) lift demands, the combat zone<br />

footprint, and logistical support costs.<br />

Justification:<br />

FY 2008 Global War On Terrorism (GWOT) Cost Adjustment funds additional assets to prosecute the GWOT by resetting items, replacing battle losses, generating and protecting forces, and<br />

enhancing military capabilities. Specific quantity, cost element, and pricing data is not available at this time and will be adjusted by available FY2008 base dollars, mix <strong>of</strong> forces, and production and<br />

requirements adjustments.<br />

FY 08 Base Appropriation $26.123 million<br />

FY 08 GWOT Cost Adjustment Request $12.060 million<br />

FY 08 Total $38.183 million<br />

M65800 Item No. 140 Page 1 <strong>of</strong> 13 Exhibit P-40<br />

FIELD FEEDING EQUIPMENT 102 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

REFRIGERATED CONTAINER SYSTEMS<br />

Program Elements for Code B Items:<br />

M65801<br />

Code:<br />

A/B<br />

Date:<br />

P-1 Item Nomenclature<br />

REFRIGERATED CONTAINER SYSTEMS (M65801)<br />

M65800 (M65801)<br />

<strong>Other</strong> Related Program Elements:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty 99 99<br />

Gross Cost 12.7 12.7<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 12.7 12.7<br />

Initial Spares<br />

Total Proc Cost 12.7 12.7<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

Refrigerated containers are essential to bringing fresh and frozen food stuffs to the battlefield and the mature theater. The current systems are single compartment / single temperature containers.<br />

The Multi-Temperature Refrigerated Container System (MTRCS) is the follow-on generation <strong>of</strong> refrigeration systems. It will provide the capability to transport and store both refrigerated and frozen<br />

product in a single container. It consists <strong>of</strong> an insulated 8' x 8' x 20' International Organization for Standardization (ISO) shipping container with an engine-driven refrigeration unit that will allow<br />

operation on the move. The two compartments will be separated by a moveable partition varying proportions <strong>of</strong> refrigerated versus frozen product resulting in maximum loading <strong>of</strong> the container.<br />

The result is more efficient space utilization and reduced transportation requirements. The MTRCS will be used principally by Brigade Combat Teams (BCTs) Subsistance Platoons, and BCTs<br />

Manuever, it is also used by medical units for transport and storage <strong>of</strong> refrigerated medical supplies, to include blood products. This program procures and fields a system that supports the <strong>Army</strong>'s<br />

transformation and modularity concept. It maintains readiness through fielding and integrating new equipment. It reduces sustainment requirements, and logistical support costs.<br />

Justification:<br />

FY 2008 Baseline: Procures 36 <strong>of</strong> the MTRCS for issue to UEx Subsistence Platoons, UEx Manuever and Support BCT's in support <strong>of</strong> <strong>Army</strong> Modularity Requirements and implementation <strong>of</strong> the<br />

Configured Load subsistence supply concept.<br />

FY 2008 Global War on Terrorism (GWOT) Cost Adjustment procures 63 <strong>of</strong> the MTRCS for issue to UEx Subsistence Platoons, UEx Manuever and Support BCT's in support <strong>of</strong> <strong>Army</strong> Modularity<br />

Requirements and implementation <strong>of</strong> the Configured Load subsistence supply concept.<br />

FY 08 Base Appropriation $ 4.220 million<br />

FY 08 Cost Adjustment GWOT Request $ 8.470 million<br />

FY 08 Total $12.690 million<br />

M65800 (M65801) Item No. 140 Page 2 <strong>of</strong> 13 Exhibit P-40<br />

REFRIGERATED CONTAINER SYSTEMS 103 Budget Item Justification Sheet


REFRIGERATED CONTAINER SYSTEMS<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

REFRIGERATED CONTAINER SYSTEMS (M65801)<br />

M65800 (M65801)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000<br />

Hardware MTRCS 3060 36 85<br />

Initial Spares 153<br />

Engineering Support 300<br />

Testing<br />

ILS 230<br />

Fielding/NET 350<br />

PM Support 127<br />

Hardware MTRCS GWOT Cost Adjustment 6072 66 92<br />

Initial Spares GWOT Cost Adjustment 504<br />

Engineering Support GWOT Cost Adjustment 464<br />

Testing GWOT Cost Adjustment 75<br />

ILS GWOT Cost Adjustment 406<br />

Fielding/NET GWOT Cost Adjustment 567<br />

PM Support GWOT Cost Adjustment 382<br />

Total: 12690<br />

M65800 (M65801) Item No. 140 Page 3 <strong>of</strong> 13 Exhibit P-5<br />

REFRIGERATED CONTAINER SYSTEMS 104 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

REFRIGERATED CONTAINER SYSTEMS<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

Hardware MTRCS<br />

FY 2008<br />

Keco Industries<br />

Florence KY<br />

Hardware MTRCS GWOT Cost Adjustment<br />

FY 2008<br />

Keco Industries<br />

Florence KY<br />

P-1 Line Item Nomenclature:<br />

REFRIGERATED CONTAINER SYSTEMS (M65801)<br />

M65800 (M65801)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Units<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

C/FP8(2) RDECOM, Natick, MA Jan 08 Aug 08 36 85 Yes APR 03<br />

C/FP8(2) RDECOM, Natick, MA Dec 07 Jul 08 66 92 Yes APR 03<br />

REMARKS:<br />

M65800 (M65801) Item No. 140 Page 4 <strong>of</strong> 13 Exhibit P-5a<br />

REFRIGERATED CONTAINER SYSTEMS 105 Budget <strong>Procurement</strong> History and Planning


REFRIGERATED CONTAINER SYSTEMS<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

REFRIGERATED CONTAINER SYSTEMS (M65801)<br />

M65800 (M65801)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Hardware MTRCS<br />

1 FY 08 A 36 0 36 A 1 6 6 6 6 6 5 0<br />

Hardware MTRCS GWOT Cost Adjustment<br />

1 FY 08 A 66 0 66 A 4 4 4 8 8 8 5 5 5 5 5 5 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 102 102 4 5 10 14 14 14 11 10 5 5 5 5<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Keco Industries, Florence KY 48 120 360 6<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 10 7 17<br />

Reorder 0 3 7 10<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

M65800 (M65801) Item No. 140 Page 5 <strong>of</strong> 13 Exhibit P-21<br />

REFRIGERATED CONTAINER SYSTEMS 106 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

SANITATION CENTER, FIELD FEEDING (FSC)<br />

Program Elements for Code B Items:<br />

Code:<br />

A<br />

Date:<br />

P-1 Item Nomenclature<br />

SANITATION CENTER, FIELD FEEDING (FSC) (M65802)<br />

M65800 (M65802)<br />

<strong>Other</strong> Related Program Elements:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty 125 125<br />

Gross Cost 7.6 7.6<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 7.6 7.6<br />

Initial Spares<br />

Total Proc Cost 7.6 7.6<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Food Sanitation Center (FSC) provides the sanitation capability required to perform clean-up following food service operations in the field. The FSC replaces the dangerous gasoline burning<br />

immersion heaters currently used to heat water in old-fashioned steel trash containers. The FSC consists <strong>of</strong> integrated equipment including sinks, racks, work tables, water heating equipment, and a<br />

tent. The FSC employs a three sink sanitation method with each sink <strong>of</strong> water maintained at a different temperature for successive cleaning, rinsing, and sanitizing <strong>of</strong> pots, pans, and utensils. The<br />

FSC uses a JP8 fuel burner that supports the <strong>Army</strong>'s initiative to have a single fuel on the battlefield. This program procures and fields a system that supports the <strong>Army</strong>'s transformation and<br />

Modularity Concept. It maintains readiness through fielding and integrating new equipment, by enhancing the field soldier's well-being; and reduces sustainment requirements, related Combat<br />

Support/Combat Service Support (CS/CSS) lift demands, the overall combat zone footprint, and logistical support costs. Ultimately the program will replace hazardous gasoline burning immersion<br />

heaters throughout the <strong>Army</strong>.<br />

Justification:<br />

FY 08 Baseline: Procures 68 <strong>of</strong> the FSC for fielding to Active, Reserve and National Guard Units and supports unit deployments and <strong>Army</strong> transformation.<br />

FY 08 Global War on Terrorism (GWOT) Cost Adjustment procures FSC's for issue to fill shortages in <strong>Army</strong> Reserve units.<br />

FY 08 Base Appropriation $ 4.501 million<br />

FY 08 GWOT Cost Adjustment Request $ 3.102 million<br />

FY 08 Total $ 7.603 million<br />

M65800 (M65802) Item No. 140 Page 6 <strong>of</strong> 13 Exhibit P-40<br />

SANITATION CENTER, FIELD FEEDING (FSC) 107 Budget Item Justification Sheet


SANITATION CENTER, FIELD FEEDING (FSC)<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

SANITATION CENTER, FIELD FEEDING (FSC) (M65802)<br />

M65800 (M65802)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

Hardware A 2992 68 44<br />

Initial Spares 90<br />

Engineering Support 400<br />

ILS 250<br />

Fielding/NET 500<br />

PM Support 269<br />

Hardware FY 08 GWOT Cost Adjustment 2622 57 46<br />

Initial Spares FY08 GWOT Cost Adjustment 68<br />

Fielding/NET FY 08 GWOT Cost Adjustment 68<br />

PM Support FY 08 GWOT Cost Adjustment 134<br />

ILS FY 08 GWOT Cost Adjustment 79<br />

Engineering Support FY 08 GWOT Cost Adju 131<br />

Total: 7603<br />

M65800 (M65802) Item No. 140 Page 7 <strong>of</strong> 13 Exhibit P-5<br />

SANITATION CENTER, FIELD FEEDING (FSC) 108 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

SANITATION CENTER, FIELD FEEDING (FSC)<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

Hardware<br />

FY 2008<br />

SFA Defense<br />

Easton, MD<br />

Hardware FY 08 GWOT Cost Adjustment<br />

FY 2008<br />

SFA Defense<br />

Easton, MD<br />

P-1 Line Item Nomenclature:<br />

SANITATION CENTER, FIELD FEEDING (FSC) (M65802)<br />

M65800 (M65802)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

C/FP8(6) RDECOM, Natick, MA Jan 08 Jul 08 68 44 Yes Jan 01<br />

C/FP8(6) RDECOM, Natick, MA Dec 07 Jun 08 57 46 Yes Jan 01<br />

REMARKS:<br />

M65800 (M65802) Item No. 140 Page 8 <strong>of</strong> 13 Exhibit P-5a<br />

SANITATION CENTER, FIELD FEEDING (FSC) 109 Budget <strong>Procurement</strong> History and Planning


SANITATION CENTER, FIELD FEEDING (FSC)<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

SANITATION CENTER, FIELD FEEDING (FSC) (M65802)<br />

M65800 (M65802)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Hardware<br />

1 FY 08 A 68 0 68 A 30 30 8 0<br />

Hardware FY 08 GWOT Cost Adjustment<br />

1 FY 08 A 57 0 57 A 9 10 10 10 10 8 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 125 125 9 40 40 18 10 8<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 SFA Defense, Easton, MD 120 480 720 4<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 8 7 15<br />

Reorder 0 3 6 9<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

M65800 (M65802) Item No. 140 Page 9 <strong>of</strong> 13 Exhibit P-21<br />

SANITATION CENTER, FIELD FEEDING (FSC) 110 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

KITCHEN, CONTAINERIZED, FIELD (CK)<br />

Program Elements for Code B Items:<br />

Code:<br />

A<br />

Date:<br />

P-1 Item Nomenclature<br />

KITCHEN, CONTAINERIZED, FIELD (CK) (M65803)<br />

M65800 (M65803)<br />

<strong>Other</strong> Related Program Elements:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty 49 49<br />

Gross Cost 12.0 12.0<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 12.0 12.0<br />

Initial Spares<br />

Total Proc Cost 12.0 12.0<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Containerized Kitchen (CK) is a mobile field kitchen that provides an efficient, rapidly deployable food service capability as part <strong>of</strong> the <strong>Army</strong> Field Feeding System (AFFS). The CK consists <strong>of</strong><br />

a combination <strong>of</strong> existing military standard kitchen equipment and commercial components that are integrated into an expandable 20' container mounted on a tactical trailer. The CK which is towed<br />

by a 5 ton cargo truck, replaces two <strong>of</strong> the current Mobile Kitchen Trailers (MKT) in units with consolidated food service operations. The CK can support 800 soldiers with three hot meals per day.<br />

Major features include capability to perform roasting, baking, grilling, boiling, and frying; on-board power generation; ventilation and environmental control; refrigerated storage; and running water.<br />

The CK supports the Stryker Brigades and the modular force. It maintains readiness through fielding and integrating new equipment, enhances the field soldier's well-being; and reduces overall<br />

sustainment requirements, related Combat Support/Combat Service Support (CS/CSS) lift demands, the combat zone footprint, and logistical support costs. The CK will reduce the overall footprint<br />

<strong>of</strong> food service operations by reducing the quantity <strong>of</strong> field kitchens, and associated prime movers.<br />

Justification:<br />

FY 08 Baseline: Procures 47 <strong>of</strong> the CKs to replace outdated Mobile Kitchen Trailers (MKTs) for Modular Force Units with consolidated food service operations. The CK is urgently needed to<br />

modernize the field kitchen fleet and meet doctrinal and organizational requirements.<br />

FY 08 Global War on Terrorism (GWOT) Cost Adjustment procures 2 CK's for issue to fill shortages in <strong>Army</strong> Reserve units.<br />

FY 08 Base Appropriation $ 11.478 million<br />

FY 08 GWOT Cost Adjustment Request $ 0.488 million<br />

FY 08 Total $ 11.966 million<br />

M65800 (M65803) Item No. 140 Page 10 <strong>of</strong> 13 Exhibit P-40<br />

KITCHEN, CONTAINERIZED, FIELD (CK) 111 Budget Item Justification Sheet


KITCHEN, CONTAINERIZED, FIELD (CK)<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

KITCHEN, CONTAINERIZED, FIELD (CK) (M65803)<br />

M65800 (M65803)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

Hardware A 9165 47 195<br />

Initial Spares 38<br />

Engineering Support 567<br />

ILS 374<br />

Fielding/NET 760<br />

PM Support 623<br />

Hardware FY 08 GWOT Cost Adjustment 390 2 195<br />

Initial Spares FY 08 GWOT Cost Adjustmen 36<br />

Engineering Support FY 08 GWOT Cost Adj 20<br />

Fielding/NET FY 08 GWOT Cost Adjustment 6<br />

PM Support FY 08 GWOT Cost Adjustment 36<br />

Total: 12015<br />

M65800 (M65803) Item No. 140 Page 11 <strong>of</strong> 13 Exhibit P-5<br />

KITCHEN, CONTAINERIZED, FIELD (CK) 112 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

KITCHEN, CONTAINERIZED, FIELD (CK)<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

Hardware<br />

FY 2008<br />

SFA Defense<br />

Easton MD<br />

Hardware FY 08 GWOT Cost Adjustment<br />

FY 2008<br />

SFA Defense<br />

Easton MD<br />

P-1 Line Item Nomenclature:<br />

KITCHEN, CONTAINERIZED, FIELD (CK) (M65803)<br />

M65800 (M65803)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

C/FP5(4) RDECOM, Natick, MA Jan 08 Jul 08 47 195 Yes Aug 04<br />

C/FP5(4) RDECOM, Natick, MA Dec 07 Jun 08 2 195 Yes Aug 04<br />

REMARKS:<br />

M65800 (M65803) Item No. 140 Page 12 <strong>of</strong> 13 Exhibit P-5a<br />

KITCHEN, CONTAINERIZED, FIELD (CK) 113 Budget <strong>Procurement</strong> History and Planning


KITCHEN, CONTAINERIZED, FIELD (CK)<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

KITCHEN, CONTAINERIZED, FIELD (CK) (M65803)<br />

M65800 (M65803)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Hardware<br />

1 FY 08 A 47 0 47 A 3 4 4 4 4 4 4 4 4 4 4 4 0<br />

Hardware FY 08 GWOT Cost Adjustment<br />

1 FY 08 A 2 0 2 A 2 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 49 49 2 3 4 4 4 4 4 4 4 4 4 4 4<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 SFA Defense, Easton MD 36 72 120 4<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 6 6 12<br />

Reorder 0 3 6 9<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

M65800 (M65803) Item No. 140 Page 13 <strong>of</strong> 13 Exhibit P-21<br />

KITCHEN, CONTAINERIZED, FIELD (CK) 114 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Cargo Aerial Delivery Program<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

P-1 Item Nomenclature<br />

Cargo Aerial Delivery Program (MA7804)<br />

MA7804<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 93.0 93.0<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 93.0 93.0<br />

Initial Spares<br />

Total Proc Cost 93.0 93.0<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Advance Tactical Parachute Delivery system (ATPS) represents the US <strong>Army</strong>'s next generation personal parachute system and provides the airborne Soldier with the first wholesale<br />

modernization <strong>of</strong> the tactical parachute system since the 1950s. ATPS includes a completely redesigned system <strong>of</strong> main and reserve parachutes and an integrated harness system.<br />

The Joint Precision Airdrop System (JPADS) is a guided, high altitude capable, precision airdrop system providing controlled flight upon release from the aircraft and reduced ground load<br />

dispersion through superior landing accuracy. The current and future operational environment demands an increased reliance upon aerial delivery <strong>of</strong> supplies. Using the JPADS, airdrop operations<br />

can be fully adapted to provide a more routine, force projection, and sustainment capability supporting total <strong>Army</strong>, multi-service, and multi-national ground forces.<br />

The Enhanced Containerized Delivery System (ECDS) is comprised <strong>of</strong> a new platform and cargo restraint which works in conjunction with existing G-12D recovery parachutes and will be the<br />

platform <strong>of</strong> choice for the Joint Precision Airdrop System (JPADS) 10K system. Its primary mission is the delivery <strong>of</strong> supplies and equipment when airdrop is required due to port, airfield or ground<br />

threat and terrain or weather conditions.<br />

Justification:<br />

FY08 Baseline: Procures 8,837 non-maneuverable canopy variant (T-11) <strong>of</strong> Advance Tactical Parachute Delivery System (ATPS) which is used for mass tactical static line air drop operations.<br />

FY08 Global War on Terrorism (GWOT) procures 270 <strong>of</strong> the JPADS 2K systems in support <strong>of</strong> the Vice Chief Joint Chief <strong>of</strong> Staff's memorandum requesting acceleration <strong>of</strong> the JPADS 2K increment<br />

to fulfill the warfighter's urgent need for a precision airdrop system.<br />

FY08 GWOT Cost Adjustment procures 1,503 ECDS in support <strong>of</strong> the total projected <strong>Army</strong> Acquisition Objective (AAO) <strong>of</strong> 2,152 systems. The ECDS supports both the JPADS 10k and other<br />

<strong>Army</strong> airdrop non precision systems. Both systems support joint service requirements for Operation Enduring Freedom (OEF).<br />

FY08 Base Appropriation: $43.842 million<br />

FY08 GWOT Request: $22.400 million<br />

FY08 GWOT Cost Adjustment: $26.750 million<br />

FT08 Total: $92.992 million<br />

MA7804 Item No. 141 Page 1 <strong>of</strong> 9 Exhibit P-40<br />

Cargo Aerial Delivery Program 115 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Precision Airdrop<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

P-1 Item Nomenclature<br />

Precision Airdrop (MA7806)<br />

MA7804 (MA7806)<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty 333 333<br />

Gross Cost 26.8 26.8<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 26.8 26.8<br />

Initial Spares<br />

Total Proc Cost 26.8 26.8<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Joint Precision Airdrop System (JPADS) is a guided, high altitude capable, precision airdrop system providing controlled flight upon release from the aircraft and reduced ground load dispersion<br />

through superior landing accuracy. The current and future operational environment demands an increased reliance upon aerial delivery <strong>of</strong> supplies. Using the JPADS, airdrop operations can be fully<br />

adapted to provide a more routine, force projection, and sustainment capability supporting total <strong>Army</strong>, multi-service, and multi-national ground forces.<br />

Justification:<br />

FY08 GWOT Request: procures 270 <strong>of</strong> the JPADS 2K systems in support <strong>of</strong> the Vice Chief Joint Chief <strong>of</strong> Staff's memorandum requesting acceleration <strong>of</strong> the JPADS 2K increment to fulfill the<br />

warfighter's urgent need for a precision airdrop system.<br />

FY08 GWOT Cost Adjustment procures an additional 63 JPADS 2K systems.<br />

FY 08 GWOT Request: $22.400 million<br />

FY 08 GWOT Cost Adjustment: $ 4.350 million<br />

Total Funding: $26.750 million<br />

MA7804 (MA7806) Item No. 141 Page 2 <strong>of</strong> 9 Exhibit P-40<br />

Precision Airdrop 116 Budget Item Justification Sheet


Precision Airdrop<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

Precision Airdrop (MA7806)<br />

MA7804 (MA7806)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

Hardware GWOT 15680 270 58<br />

Initial Spares GWOT 2240<br />

Testing GWOT 448<br />

Engineering Support GWOT 1120<br />

ILS GWOT 1344<br />

Fielding/NET GWOT 448<br />

PM Support GWOT 1120<br />

Hardware GWOT Cost Adjustment 3654 63 58<br />

Initial Spares GWOT Cost Adjustment 415<br />

Engineering Support GWOT Cost Adjustment 110<br />

ILS GWOT Cost Adjustment 50<br />

Fielding/NET GWOT Cost Adjustment 87<br />

PM Support GWOT Cost Adjustment 34<br />

Total: 26750<br />

MA7804 (MA7806) Item No. 141 Page 3 <strong>of</strong> 9 Exhibit P-5<br />

Precision Airdrop 117 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

Precision Airdrop<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

Hardware GWOT<br />

P-1 Line Item Nomenclature:<br />

Precision Airdrop (MA7806)<br />

MA7804 (MA7806)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

FY 2008 TBS IDIQ RDECOM, Natick, MA Jun 08 Aug 08 270 58 Yes Nov 06<br />

Hardware GWOT Cost Adjustment<br />

FY 2008 TBS IDIQ RDECOM, Natick, MA Jun 08 Aug 08 63 58 Yes Nov 06<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

MA7804 (MA7806) Item No. 141 Page 4 <strong>of</strong> 9 Exhibit P-5a<br />

Precision Airdrop 118 Budget <strong>Procurement</strong> History and Planning


Precision Airdrop<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

Precision Airdrop (MA7806)<br />

MA7804 (MA7806)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Each TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Hardware GWOT<br />

1 FY 08 A 270 0 270 A 27 27 27 27 27 27 27 27 27 27 0<br />

Hardware GWOT Cost Adjustment<br />

1 FY 08 A 63 0 63 A 6 6 6 6 6 6 6 6 6 5 4 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 333 333 33 33 33 33 33 33 33 33 33 32 4<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 TBS 120 216 420 1<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 2 2 4<br />

Reorder 0 0 0 0<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

MA7804 (MA7806) Item No. 141 Page 5 <strong>of</strong> 9 Exhibit P-21<br />

Precision Airdrop 119 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Containerized Delivery System<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

P-1 Item Nomenclature<br />

Containerized Delivery System (MA7807)<br />

MA7804 (MA7807)<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty 1503 1503<br />

Gross Cost 22.4 22.4<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 22.4 22.4<br />

Initial Spares<br />

Total Proc Cost 22.4 22.4<br />

Flyaway U/C<br />

Weapon System Proc U/C 0.0 0.0<br />

Description:<br />

The Enhanced Containerized Delivery System (ECDS) is comprised <strong>of</strong> a new platform and cargo restraint which works in conjunction with existing G-12D recovery parachutes and will be the<br />

platform <strong>of</strong> choice for the Joint Precision Airdrop System (JPADS) 10K system. Its primary mission is the delivery <strong>of</strong> supplies and equipment when airdrop is required due to port, airfield or ground<br />

threat and terrain or weather conditions.<br />

Justification:<br />

FY08 Global War on Terrorism (GWOT) Cost Adjustment: Procures 1,503 ECDS in support <strong>of</strong> the total projected <strong>Army</strong> Acquisition Objective (AAO) <strong>of</strong> 2,152 systems. The ECDS supports both<br />

the JPADS 10k, other <strong>Army</strong> airdrop non precision systems, and joint service requirements for Operation Enduring Freedom (OEF).<br />

FY 08 Base Appropriation: $0.000 million<br />

FY 08 GWOT Request: $0.000 million<br />

FY 08 GWOT Cost Adjustment: $22.400 million<br />

FY 08 Total: $22.400 million<br />

MA7804 (MA7807) Item No. 141 Page 6 <strong>of</strong> 9 Exhibit P-40<br />

Containerized Delivery System 120 Budget Item Justification Sheet


Containerized Delivery System<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

Containerized Delivery System (MA7807)<br />

MA7804 (MA7807)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

Hardware GWOT Cost Adjustment 12024 1503 8<br />

Initial Spares GWOT Cost Adjustment 2100<br />

GFE GWOT Cost Adjustment 4032<br />

Testing GWOT Cost Adjustment 400<br />

Engineering Support GWOT Cost Adjustment 1120<br />

ILS GWOT Cost Adjustment 1600<br />

Fielding/NET GWOT Cost Adjustment 448<br />

PM Support GWOT Cost Adjustment 676<br />

Total: 22400<br />

MA7804 (MA7807) Item No. 141 Page 7 <strong>of</strong> 9 Exhibit P-5<br />

Containerized Delivery System 121 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

Containerized Delivery System<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

Hardware GWOT Cost Adjustment<br />

FY 2008<br />

Seabox, Inc<br />

East Roverton, NJ<br />

P-1 Line Item Nomenclature:<br />

Containerized Delivery System (MA7807)<br />

MA7804 (MA7807)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

FFP RDECOM, Natick Nov 07 Feb 08 1503 8 Yes Sep 07<br />

REMARKS:<br />

MA7804 (MA7807) Item No. 141 Page 8 <strong>of</strong> 9 Exhibit P-5a<br />

Containerized Delivery System 122 Budget <strong>Procurement</strong> History and Planning


Containerized Delivery System<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

Containerized Delivery System (MA7807)<br />

MA7804 (MA7807)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Each TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Hardware GWOT Cost Adjustment<br />

1 FY 08 A 1503 0 1503 A 125 125 125 125 125 125 125 125 125 125 125 128 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 1503 1503 125 125 125 125 125 125 125 125 125 125 125 128<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Seabox, Inc, East Roverton, NJ 240 780 1560<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 1 3 4<br />

Reorder 0 1 3 4<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

MA7804 (MA7807) Item No. 141 Page 9 <strong>of</strong> 9 Exhibit P-21<br />

Containerized Delivery System 123 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

QUALITY SURVEILLANCE EQUIPMENT<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

R67500 Petroleum Quality Analysis System<br />

Date:<br />

P-1 Item Nomenclature<br />

QUALITY SURVEILLANCE EQUIPMENT (MB6400)<br />

MB6400<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 66.7 66.7<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 66.7 66.7<br />

Initial Spares<br />

Total Proc Cost 66.7 66.7<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

Quality Surveillance Equipment is a family <strong>of</strong> petroleum and water laboratories used to evaluate the quality <strong>of</strong> military fuels and palatable water for our soldiers.<br />

Petroleum Quality Analysis System-Full Armor Solution (PQAS-FAS)(Family <strong>of</strong> Medium Tactical Vehicles mounted version.): PQAS-FAS is a petroleum laboratory that utilizes the latest available<br />

commercial technology for testing <strong>of</strong> petroleum. The system is used in forward areas to conduct over 20 different quality tests on petroleum products and <strong>of</strong>fers immediate feedback <strong>of</strong> petroleum<br />

quality. PQAS-FAS is a new requirement for the Aviation Support Brigades and it replaces the current Air Mobile Petroleum Labs for ground aviation on a 1:1 basis. PQAS-FAS will reduce the<br />

logistic footprint with a two soldier crew instead <strong>of</strong> the present four soldiers required for the Air Mobile Lab.<br />

Justification:<br />

FY08 Baseline: Procures Documentation, Testing, and Engineering Support for the Petroleum Quality Analysis System-Full Armor Solution (PQAS-FAS): FY 2008 Baseline: $1.293, qty 0;<br />

GWOT: $12.680; qty 8; GWOT Cost Adjustment $52.684, qty 34; Total: $66.657, qty 42.<br />

FY08 Global War on Terrorism (GWOT) Request: Procures the increase in fuel analysis capability for aviation units. Units will have the capability to conduct fuel tests and analyze results in a more<br />

efficient and timely manner which reduces the risk to human life and damage to equipment. Impacts the following National Guard (NG) units: 28th, 34th, 38th, 1113th, and the 792nd. These systems<br />

also impact the 3rd QM, 123rd SPT, and the 701st SPT. These systems will also impact United States <strong>Army</strong> Reserve (USAR) units across 11 states.<br />

FY08 GWOT Cost Adjustment funds additional PQAS-FAS systems for the NG and USAR.<br />

FY08 Base Appropriation - $ 1.293 Million<br />

FY08 GWOT Request - $12.680 Million<br />

FY08 GWOT Cost Adjustment Request - $52.684 Million<br />

FY08 Total - $66.657 Million<br />

MB6400 Item No. 145 Page 1 <strong>of</strong> 4 Exhibit P-40<br />

QUALITY SURVEILLANCE EQUIPMENT 124 Budget Item Justification Sheet


QUALITY SURVEILLANCE EQUIPMENT<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

QUALITY SURVEILLANCE EQUIPMENT (MB6400)<br />

MB6400<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000<br />

FY 2008 Base Appropriation<br />

Production Support Costs<br />

Documentation - Baseline 330<br />

Testing - Baseline 308<br />

Engineering Support<br />

In-House - Baseline 280<br />

Contractor - Baseline 375<br />

FY 2008 Base Approp Subtotal 1293<br />

FY 2008 GWOT Request<br />

Petroleum Quality Analysis System-FAS 12107 8 1513<br />

Engr Change Orders/Proposals 185<br />

Quality Assurance Support<br />

Quality Assurance In-House Support 87<br />

Program Management Support 101<br />

System Fielding Support 200<br />

FY 2008 GWOT Subtotal 12680<br />

FY 2008 GWOT Cost Adjustment Request<br />

Petroleum Quality Analysis System-FAS 51442 34 1513<br />

Engr Change Orders/Proposals 185<br />

Quality Assurance Support<br />

Quality Assurance In-House Support 87<br />

Program Management Support 101<br />

System Fielding Support 869<br />

FY 2008 GWOT Cost Adjustment<br />

Subtotal<br />

52684<br />

Total: 66657<br />

MB6400 Item No. 145 Page 2 <strong>of</strong> 4 Exhibit P-5<br />

QUALITY SURVEILLANCE EQUIPMENT 125 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

QUALITY SURVEILLANCE EQUIPMENT<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

FY 2008 GWOT Request<br />

Petroleum Quality Analysis System-FAS<br />

FY 2008<br />

Rock Island Arsenal<br />

Rock Island, IL<br />

FY 2008 GWOT Cost Adjustment Request<br />

Petroleum Quality Analysis System-FAS<br />

FY 2008<br />

Rock Island Arsenal<br />

Rock Island, IL<br />

P-1 Line Item Nomenclature:<br />

QUALITY SURVEILLANCE EQUIPMENT (MB6400)<br />

MB6400<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

MIPR TACOM Jun 08 Oct 08 8 1513 YES Jan 07<br />

MIPR TACOM Sep 08 Jan 09 34 1513 YES Jan 07<br />

RFP<br />

Issue<br />

Date<br />

REMARKS: GWOT funding covers the PQAS-FAS quantity buy <strong>of</strong> 8 systems, Engineering Change Orders/Proposals, Quality Assurance Support, Program Management Support, and System Fielding Support. GWOT Cost<br />

Adjustment funding covers the PQAS-FAS quantity buy <strong>of</strong> 34 systems, Engineering Change Orders/Proposals, Quality Assurance Support, Program Management Support, and System Fielding Support.<br />

MB6400 Item No. 145 Page 3 <strong>of</strong> 4 Exhibit P-5a<br />

QUALITY SURVEILLANCE EQUIPMENT 126 Budget <strong>Procurement</strong> History and Planning


QUALITY SURVEILLANCE EQUIPMENT<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

QUALITY SURVEILLANCE EQUIPMENT (MB6400)<br />

MB6400<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

FY 2008 GWOT Request<br />

Petroleum Quality Analysis System-FAS<br />

1 FY 08 A 8 0 8 A 2 2 2 2 0<br />

FY 2008 GWOT Cost Adjustment Request<br />

Petroleum Quality Analysis System-FAS<br />

1 FY 08 A 34 0 34 A 2 4 4 4 4 4 4 4 4 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 42 42 2 2 2 4 4 4 4 4 4 4 4 4<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Rock Island Arsenal, Rock Island, IL 1 2 4 4<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 9 9 18<br />

Reorder 0 0 4 4<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

Production rates are monthly.<br />

The number <strong>of</strong> shifts at maximum capacity for<br />

the PQAS = 2<br />

MB6400 Item No. 145 Page 4 <strong>of</strong> 4 Exhibit P-21<br />

QUALITY SURVEILLANCE EQUIPMENT 127 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

Date:<br />

P-1 Item Nomenclature<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER (MA6000)<br />

MA6000<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 98.6 98.6<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 98.6 98.6<br />

Initial Spares<br />

Total Proc Cost 98.6 98.6<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Family <strong>of</strong> Petroleum and Water Distribution Systems supports the <strong>Army</strong>'s mission to supply bulk fuel and water to all Department <strong>of</strong> Defense (DoD) forces in the various theaters <strong>of</strong> operation.<br />

These systems support the <strong>Army</strong>'s mission <strong>of</strong> refueling aircraft, ground vehicles, and other <strong>Army</strong> equipment. Distribution Systems are comprised <strong>of</strong> hoses, pumps, tanks, filter separators, fittings,<br />

couplings, and nozzles.<br />

The Assault Hoseline System (AHS) has been enhanced with a rapid retrieval system to move fuel from a storage point to a distribution point or another storage point. It consists <strong>of</strong> 14,000 feet <strong>of</strong> 4<br />

inch fuel hose, along with couplings, valves, and other related equipment. It has a "throughput" rate <strong>of</strong> 350 gallons per minute (GPM). The majority <strong>of</strong> these systems will be fielded to United States<br />

<strong>Army</strong> Reserve (USAR) Units. The AHS is a transformational system that will meet bulk fuel transfer requirements for the modular force.<br />

Fuel System Supply Point (FSSP): The FSSP consists <strong>of</strong> three storage capacities: 120K, 300K, and 800K gallon systems. This system is a bulk fuel receiving, issuing, and storing facility consisting<br />

<strong>of</strong> a 350 Gallons Per Minute (GPM) pump, 350 GPM filter separator and collapsible fabric storage tanks. The 800K FSSP will have the 600 GPM pumps. The tanks vary in size from 20,000 gallons<br />

to 210,000 gallons. The FSSP 800K system is being developed to meet additional unit requirements and support the transformation <strong>of</strong> the <strong>Army</strong> to provide bulk fuel distribution and storage to the<br />

current force and the modular force.<br />

Advanced Aviation Forward Area Refueling System (AAFARS): AAFARS is a four point refueling system that provides filtered fuel at the rate <strong>of</strong> 55 GPM to each <strong>of</strong> four nozzles simultaneously.<br />

It can refuel four aircraft at one time, thus reducing refueling time and enhancing mission performance. The AAFARS is designed to fulfill the urgent requirement for forward "hot" refueling point<br />

operations. This system will support United States <strong>Army</strong> Reserve (USAR) and <strong>Army</strong> National Guard (ARNG) units as well as Future Force Systems used in Aviation Detachment and Future<br />

Combat System (FCS) Interface. This system is a Modular Force and FCS associated system. Current funding and requirements for AAFARS replaces the Forward Area Refueling System (FARE)<br />

1:2 in aviation units only.<br />

The Forward Area Water Point Supply System (FAWPSS): FAWPSS is a forward area, portable, self-contained storage system used to store and dispense potable water to soldiers. The current<br />

system is mobile and consists <strong>of</strong> 6-500 gallon storage tanks, 1-125 GPM pump, and 4 distribution points. Modular design for FAWPSS may consist <strong>of</strong> possible additional pump and flatrack<br />

distribution configuration to meet operational requirements.<br />

MA6000 Item No. 146 Page 1 <strong>of</strong> 11 Exhibit P-40<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER 128 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

Date:<br />

P-1 Item Nomenclature<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER (MA6000)<br />

MA6000<br />

September 2007<br />

The Load Handling System (LHS) Compatible Water Tank Racks System (Hippo): Hippo is a 2000 gallon potable water tank mounted on an International Standards Organization (ISO) frame flat<br />

rack. This modular configuration gives the Hippo the capability <strong>of</strong> rapid deployment and recovery. It is used for bulk load and discharge, retail distribution, and bulk storage <strong>of</strong> potable water. The<br />

Hippo is outfitted with a water pump, hose reel, and filling station. Its prime mover is the Heavy Expanded Mobility Tactical Truck-Load Handling System (HEMTT-LHS), and Palletized Load<br />

System (PLS) Trailer. Hippos will replace the Semi-trailer Mounted Fabric Tank (SMFT) and most FAWPSS. The Hippo is a complementary system for Future Combat Systems (FCS).<br />

Unit Water Pod System (Camel): The Camel is a 900 gallon unit level potable water system. It replaces the water buffaloes. Enhancements over the water buffalo includes a chiller and heater<br />

allowing dispersement <strong>of</strong> temperate water to meet a variety <strong>of</strong> climates. The Camel provides three days <strong>of</strong> water supply for up to 100 people. Select systems will be fielded first to Stryker Brigade<br />

Combat Team (SBCT) units. The Camel is a complementary system for Future Combat Systems (FCS).<br />

The Versatile Tank and Pump Unit (VTPU) is a limited bulk fuel carrier and retail dispenser for military vehicles, ground support equipment, and aircraft. There are two sizes <strong>of</strong> VTPUs: 525 gallon<br />

and 1050 gallon capacity. This systems include a 100 gallon per minute (GPH) pumping assembly, a filter separator, and related hoses and fittings necessary to perform retail refueling. The VTPU<br />

will provide the Future Combat System (FCS) with a method <strong>of</strong> extended sustainment capabilities and will support fuel storage and retail distribution missions from platoon through theater level.<br />

The VTPU will replace the Tank and Pump Unit (TPU) and the Tank Unit Liquid Dispensing systems (TULD).<br />

Justification:<br />

FY08 Baseline: Procures Distribution Systems to support the Petroleum and Water Quartermaster (QM) modular force warfighting capabilities. These systems are the <strong>Army</strong>'s primary means <strong>of</strong><br />

distributing and issuing bulk petroleum and water. The <strong>Army</strong> cannot fight without clean fuel and water. These systems enables the <strong>Army</strong> to achieve its transformation vision by providing high<br />

mobile and self-sustaining equipment to hostile theaters <strong>of</strong> operation. Bulk water and fuel accounts for the majority <strong>of</strong> all logistical tonnage moved into theater. The <strong>Army</strong> has responsibility for all<br />

inland distribution <strong>of</strong> fuel to include support to other services. The ability to rapidly, efficiently, and safely distribute fuel on the battlefield is a critical combat enabler.<br />

FY08 Global War on Terrorism (GWOT) request: Procures assets to prosecute the GWOT by resetting items, replacing battle losses, generating and protecting forces, and enhancing military<br />

capabilities.<br />

FY08 GWOT Cost Adjustment funds additional assets to prosecute the GWOT by resetting items, replacing battle losses, generating and protecting forces, and enhancing military capabilities.<br />

FY08 Base: $34.056 Million<br />

FY08 GWOT Request: $21.741 Million<br />

FY08 GWOT Cost Adjustment: $42.808 Million<br />

FY08 Total: $98.605 Million<br />

Fuel System Supply Point (120K):<br />

FY08 Base: $910 million, qty 2; FY08 GWOT: $8.970 million, qty 22; FY08 GWOT Cost Adjustment: $12.200 million, qty 15; FY08 Total: $22.080 million, qty 39.<br />

GWOT and GWOT Cost Adjustment procures FSSPs for Active Component (AC) Quartermaster (QM) Petroleum Platoon activations in FY08. These systems enhance unit readiness by providing<br />

units their authorized systems and eliminates equipment shortages <strong>of</strong> major items critical to mission acccomplishment.<br />

MA6000 Item No. 146 Page 2 <strong>of</strong> 11 Exhibit P-40<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER 129 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

Date:<br />

P-1 Item Nomenclature<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER (MA6000)<br />

MA6000<br />

September 2007<br />

Load Handling System (LHS) Compatible Water Tank Racks System (Hippo):<br />

FY08 Base: $4.814 million, qty 34; FY08 GWOT: $12.771 million, qty 98; FY08 GWOT Cost Adjustment: $15.469 million qty 118; FY08 Total: $33,054, qty 250.<br />

GWOT and GWOT Cost Adjustment procures additional assets to provide an enhanced capability for the <strong>Army</strong> to store and transport bulk water for soldiers. This replaces the old and <strong>of</strong>ten<br />

dangerous Semi-trailer Mobile Fabric Tank (SMFT). A key part <strong>of</strong> the transformation <strong>of</strong> <strong>Army</strong> units across all Components (COMPOs) and missions is to meet Soldier's bulk water requirements.<br />

These assets will fill FORSCOM divisions and Brigade Combat Teams (BCTs) IAW <strong>Army</strong> Resource List (ARPL), improving <strong>Army</strong> Readiness. This procurment accelerates the ability to field this<br />

new less risky and more mobile capability to units in a timely manner.<br />

Assault Hoseline System (AHS):<br />

FY08 Base: $4.570 million, qty 10; FY08 GWOT: $0, qty 0; FY08 GWOT Cost Adjustment: $0, qty 0; FY08 Total: $4.570 million, qty 10.<br />

Advanced Aviation Forward Area Refueling System (AAFARS):<br />

FY08 Base: $6.702 million, qty 21; FY08 GWOT: $0, qty 0; FY08 GWOT Cost Adjustment: $0, qty 0; FY08 Total: $6.702 million, qty 21.<br />

Forward Area Water Point Supply System (FAWPSS):<br />

FY08 Base: $3.639 million , qty 82; FY08 GWOT: $0, qty 0; FY08 GWOT Cost Adjustment: $1.539 million, qty 28; FY08 Total: $5.178 million, qty 110.<br />

GWOT and GWOT Cost Adjustment procures Forward Area Water Point Supply Systems (FAWPSS) for Active Component (AC) Quartermaster (QM) Petroleum Platoon activations in FY08.<br />

These systems enhance unit readiness by providing units their authorized systems and eliminates equipment shortages <strong>of</strong> major items critical to mission acccomplishment.<br />

Unit Water Pod (Camel):<br />

FY08 Base: $12.391 million, qty 46; FY08 GWOT: $0, qty 0; FY08 GWOT Cost Adjustment: $0, qty 0; FY08 Total: $12.391 million, qty 46.<br />

Versatile Tank and Pump System (VTPU):<br />

FY08 Base: $1.030 million, qty 21; FY08 GWOT: $0, qty 0; FY08 GWOT Cost Adjustment: $0, qty 0; FY08 Total: $1.030 million, qty 21.<br />

Fuel System Supply Point (FSSP) 300K:<br />

FY08 Base: $0, qty 0; FY08 GWOT; $0, qty 0; FY08 GWOT Cost Adjustment: $13.600 million, qty 15; FY08 Total: $13.600 million, QTY 15.<br />

GWOT and GWOT Cost Adjustment procures FSSPs for Active Component (AC) Quartermaster (QM) Petroleum Platoon activations in FY08. These systems enhance unit readiness by providing<br />

units thier authorized systems and eliminates equipment shortages <strong>of</strong> major items critical to mission acccomplishment.<br />

MA6000 Item No. 146 Page 3 <strong>of</strong> 11 Exhibit P-40<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER 130 Budget Item Justification Sheet


DISTRIBUTION SYSTEMS, PETROLEUM & WATER<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER<br />

(MA6000)<br />

MA6000<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000<br />

FY08 Base Appropriation<br />

Hardware<br />

Assault Hoseline System (AHS) 3430 10 343<br />

Fuel Sys Supply Point 120K (FSSP) 810 2 405<br />

Adv Aviat Forw Area Refuel Sys (AAFARS) 5502 21 262<br />

Forward Area Water Point Supply System 2952 82 36<br />

Hippo 4420 34 130<br />

Camel 5060 46 110<br />

Versatile Tank and Pump System (VTPU) 825 21 39<br />

<strong>Other</strong> Costs<br />

Engineering Change Proposals / ECPs 293<br />

Documentation 1200<br />

Testing 1815<br />

Training 619<br />

Engineering Support<br />

In House 1188<br />

Contractor 2195<br />

Quality Assurance<br />

In House 59<br />

Program Management Support 2738<br />

System Fielding Support 950<br />

Base Appropriation subtotal 34056<br />

FY08 GWOT Request<br />

FSSP 120K 8910 22 405<br />

Hippo 12740 98 130<br />

System Fielding Support 91<br />

FY08 GWOT subtotal 21741<br />

FY08 GWOT Cost Adjustment Request<br />

FSSP 120K 12000 15 800<br />

FSSP 300K 13500 15 900<br />

MA6000 Item No. 146 Page 4 <strong>of</strong> 11 Exhibit P-5<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER 131 Weapon System Cost Analysis


DISTRIBUTION SYSTEMS, PETROLEUM & WATER<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER<br />

(MA6000)<br />

MA6000<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000<br />

Forward Area Water Point Supply System 1539 28 55<br />

Hippo 15340 118 130<br />

System Fielding Support 429<br />

FY08 GWOT Cost Adjustment Subtotal 42808<br />

Total: 98605<br />

MA6000 Item No. 146 Page 5 <strong>of</strong> 11 Exhibit P-5<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER 132 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

FY08 Base Appropriation<br />

Assault Hoseline System (AHS)<br />

FY 2008<br />

Labarge Products<br />

St. Louis, MO<br />

Fuel Sys Supply Point 120K (FSSP)<br />

FY 2008<br />

Sierra <strong>Army</strong> Depot<br />

Herlong, CA<br />

Adv Aviat Forw Area Refuel Sys (AAFARS)<br />

FY 2008<br />

BAE INC.<br />

Ontario, CA<br />

Forward Area Water Point Supply System<br />

FY 2008<br />

Sierra <strong>Army</strong> Depot<br />

Herlong, CA<br />

Hippo<br />

FY 2008<br />

Mil-Mar Century, Inc.<br />

Dayton, OH<br />

Camel<br />

FY 2008<br />

Chenega Technical Products<br />

Panama City, FL<br />

Versatile Tank and Pump System (VTPU)<br />

FY 2008<br />

TBS<br />

TBS<br />

FY08 GWOT Request<br />

FSSP 120K<br />

FY 2008<br />

Sierra <strong>Army</strong> Depot<br />

Herlong, CA<br />

Hippo<br />

FY 2008<br />

Mil-Mar Century, Inc.<br />

Dayton, OH<br />

FY08 GWOT Cost Adjustment Request<br />

FSSP 120K<br />

FY 2008<br />

Sierra <strong>Army</strong> Depot<br />

Herlong, CA<br />

P-1 Line Item Nomenclature:<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER (MA6000)<br />

MA6000<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

C/FFP 8(6) TACOM Jan 08 Apr 08 10 343 Yes<br />

MIPR TACOM Jan 08 May 08 2 405 Yes<br />

C/FFP 8(7) TACOM Jan 08 Jul 08 21 262 Yes<br />

MIPR TACOM Nov 07 Mar 08 82 36 Yes<br />

SS/FP 4(2) TACOM Dec 07 Aug 08 34 130 Yes<br />

C/FFP 5(5) TACOM Jan 08 Jul 08 46 110 Yes<br />

C/FFP 4(1) TACOM Jul 08 Jan 09 21 39 No<br />

MIPR TACOM Jan 08 May 08 22 405 Yes<br />

SS/FP 4(2) TACOM Dec 07 Aug 08 98 130 Yes<br />

MIPR TACOM Jan 08 May 08 15 800 Yes<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

MA6000 Item No. 146 Page 6 <strong>of</strong> 11 Exhibit P-5a<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER 133 Budget <strong>Procurement</strong> History and Planning


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

FSSP 300K<br />

FY 2008<br />

Sierra <strong>Army</strong> Depot<br />

Herlong, CA<br />

Forward Area Water Point Supply System<br />

FY 2008<br />

Sierra <strong>Army</strong> Depot<br />

Herlong, CA<br />

Hippo<br />

FY 2008<br />

Mil-Mar Century, Inc.<br />

Dayton, OH<br />

P-1 Line Item Nomenclature:<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER (MA6000)<br />

MA6000<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

MIPR TACOM Jan 08 May 08 15 900 Yes<br />

MIPR TACOM Nov 07 Mar 08 28 55 Yes<br />

SS/FP 4(2) TACOM Dec 07 Aug 08 118 130 Yes<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

MA6000 Item No. 146 Page 7 <strong>of</strong> 11 Exhibit P-5a<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER 134 Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning


DISTRIBUTION SYSTEMS, PETROLEUM & WATER<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER (MA6000)<br />

MA6000<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

FY08 Base Appropriation<br />

Assault Hoseline System (AHS)<br />

4 FY 08 A 10 0 10 A 1 1 1 1 1 1 1 1 1 1 0<br />

Fuel Sys Supply Point 120K (FSSP)<br />

6 FY 08 A 2 0 2 A 1 1 0<br />

Adv Aviat Forw Area Refuel Sys (AAFARS)<br />

1 FY 08 A 21 0 21 A 2 2 2 2 2 2 2 2 2 1 1 1 0<br />

Forward Area Water Point Supply System<br />

3 FY 08 A 82 0 82 A 7 7 7 7 7 7 7 7 7 7 6 6 0<br />

Hippo<br />

5 FY 08 A 34 0 34 A 2 2 3 3 3 3 3 3 3 3 3 3 0<br />

Camel<br />

2 FY 08 A 46 0 46 A 4 3 3 3 33<br />

Versatile Tank and Pump System (VTPU)<br />

8 FY 08 A 21 0 21 A 1 2 2 2 2 2 2 2 2 4<br />

FY08 GWOT Request<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 BAE INC., Ontario, CA 1 7 14 6<br />

2 Chenega Technical Products, Panama City, FL 5 18 35 6<br />

3 Sierra <strong>Army</strong> Depot, Herlong, CA 2 10 50 1<br />

4 Labarge Products, St. Louis, MO 1 4 8 4<br />

5 Mil-Mar Century, Inc., Dayton, OH 2 10 21 6<br />

6 Sierra <strong>Army</strong> Depot, Herlong, CA 2 10 20 4<br />

7 Sierra <strong>Army</strong> Depot, Herlong, CA 1 2 4 3<br />

8 TBS, TBS 1 1 3 4<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 9 8 17<br />

Reorder 0 4 6 10<br />

2 Initial 15 10 6 16<br />

Reorder 0 4 6 10<br />

3 Initial 0 9 4 13<br />

Reorder 0 2 4 6<br />

4 Initial 0 10 13 23<br />

Reorder 0 4 3 7<br />

5 Initial 0 7 8 15<br />

Reorder 0 3 8 11<br />

REMARKS<br />

Production Rates are Monthly Rates.<br />

Camel: Delivery <strong>of</strong> FAT units will start 6 months<br />

after award. Delivery <strong>of</strong> LRIP units will begin<br />

180 days after First Article Test; but no later than<br />

12 months after initial contract award.<br />

The number <strong>of</strong> shifts at maximum capacity for<br />

the Assault Hoseline System=1;<br />

FSSP(contract)=2; FSSP (Depot)=2;<br />

AAFARS=2; FAWPSS=2; Hippo=1; Camel=1;<br />

VTPU=2.<br />

MA6000 Item No. 146 Page 8 <strong>of</strong> 11 Exhibit P-21<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER 135 Production Schedule


DISTRIBUTION SYSTEMS, PETROLEUM & WATER<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER (MA6000)<br />

MA6000<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

FSSP 120K<br />

6 FY 08 A 22 0 22 A 1 1 2 2 2 2 2 2 2 2 2 2 0<br />

Hippo<br />

5 FY 08 A 98 0 98 A 9 9 8 8 8 8 8 8 8 8 8 8 0<br />

FY08 GWOT Cost Adjustment Request<br />

FSSP 120K<br />

6 FY 08 A 15 0 15 A 1 1 2 2 2 1 1 1 1 1 1 1 0<br />

FSSP 300K<br />

6 FY 08 A 15 0 15 A 1 1 1 1 2 2 2 1 1 1 1 1 0<br />

Forward Area Water Point Supply System<br />

3 FY 08 A 28 0 28 A 2 2 2 2 2 2 2 2 3 3 3 3 0<br />

Hippo<br />

5 FY 08 A 118 0 118 A 9 9 10 10 10 10 10 10 10 10 10 10 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 512 512 9 10 14 14 21 37 38 38 39 38 38 38 29 28 24 24 26 5 5 37<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 BAE INC., Ontario, CA 1 7 14 6<br />

2 Chenega Technical Products, Panama City, FL 5 18 35 6<br />

3 Sierra <strong>Army</strong> Depot, Herlong, CA 2 10 50 1<br />

4 Labarge Products, St. Louis, MO 1 4 8 4<br />

5 Mil-Mar Century, Inc., Dayton, OH 2 10 21 6<br />

6 Sierra <strong>Army</strong> Depot, Herlong, CA 2 10 20 4<br />

7 Sierra <strong>Army</strong> Depot, Herlong, CA 1 2 4 3<br />

8 TBS, TBS 1 1 3 4<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 9 8 17<br />

Reorder 0 4 6 10<br />

2 Initial 15 10 6 16<br />

Reorder 0 4 6 10<br />

3 Initial 0 9 4 13<br />

Reorder 0 2 4 6<br />

4 Initial 0 10 13 23<br />

Reorder 0 4 3 7<br />

5 Initial 0 7 8 15<br />

Reorder 0 3 8 11<br />

REMARKS<br />

Production Rates are Monthly Rates.<br />

Camel: Delivery <strong>of</strong> FAT units will start 6 months<br />

after award. Delivery <strong>of</strong> LRIP units will begin<br />

180 days after First Article Test; but no later than<br />

12 months after initial contract award.<br />

The number <strong>of</strong> shifts at maximum capacity for<br />

the Assault Hoseline System=1;<br />

FSSP(contract)=2; FSSP (Depot)=2;<br />

AAFARS=2; FAWPSS=2; Hippo=1; Camel=1;<br />

VTPU=2.<br />

MA6000 Item No. 146 Page 9 <strong>of</strong> 11 Exhibit P-21<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER 136 Production Schedule


DISTRIBUTION SYSTEMS, PETROLEUM & WATER<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER (MA6000)<br />

MA6000<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

FY08 Base Appropriation<br />

Assault Hoseline System (AHS)<br />

4 FY 08 A 10 10 0<br />

Fuel Sys Supply Point 120K (FSSP)<br />

6 FY 08 A 2 2 0<br />

Adv Aviat Forw Area Refuel Sys (AAFARS)<br />

1 FY 08 A 21 21 0<br />

Forward Area Water Point Supply System<br />

3 FY 08 A 82 82 0<br />

Hippo<br />

5 FY 08 A 34 34 0<br />

Camel<br />

2 FY 08 A 46 13 33 3 3 3 4 4 4 4 4 4 0<br />

Versatile Tank and Pump System (VTPU)<br />

8 FY 08 A 21 17 4 2 2 0<br />

FY08 GWOT Request<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 BAE INC., Ontario, CA 1 7 14 6<br />

2 Chenega Technical Products, Panama City, FL 5 18 35 6<br />

3 Sierra <strong>Army</strong> Depot, Herlong, CA 2 10 50 1<br />

4 Labarge Products, St. Louis, MO 1 4 8 4<br />

5 Mil-Mar Century, Inc., Dayton, OH 2 10 21 6<br />

6 Sierra <strong>Army</strong> Depot, Herlong, CA 2 10 20 4<br />

7 Sierra <strong>Army</strong> Depot, Herlong, CA 1 2 4 3<br />

8 TBS, TBS 1 1 3 4<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 9 8 17<br />

Reorder 0 4 6 10<br />

2 Initial 15 10 6 16<br />

Reorder 0 4 6 10<br />

3 Initial 0 9 4 13<br />

Reorder 0 2 4 6<br />

4 Initial 0 10 13 23<br />

Reorder 0 4 3 7<br />

5 Initial 0 7 8 15<br />

Reorder 0 3 8 11<br />

REMARKS<br />

Production Rates are Monthly Rates.<br />

Camel: Delivery <strong>of</strong> FAT units will start 6 months<br />

after award. Delivery <strong>of</strong> LRIP units will begin<br />

180 days after First Article Test; but no later than<br />

12 months after initial contract award.<br />

MA6000 Item No. 146 Page 10 <strong>of</strong> 11 Exhibit P-21<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER 137 Production Schedule


DISTRIBUTION SYSTEMS, PETROLEUM & WATER<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER (MA6000)<br />

MA6000<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

FSSP 120K<br />

6 FY 08 A 22 22 0<br />

Hippo<br />

5 FY 08 A 98 98 0<br />

FY08 GWOT Cost Adjustment Request<br />

FSSP 120K<br />

6 FY 08 A 15 15 0<br />

FSSP 300K<br />

6 FY 08 A 15 15 0<br />

Forward Area Water Point Supply System<br />

3 FY 08 A 28 28 0<br />

Hippo<br />

5 FY 08 A 118 118 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 512 475 37 5 5 3 4 4 4 4 4 4<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 BAE INC., Ontario, CA 1 7 14 6<br />

2 Chenega Technical Products, Panama City, FL 5 18 35 6<br />

3 Sierra <strong>Army</strong> Depot, Herlong, CA 2 10 50 1<br />

4 Labarge Products, St. Louis, MO 1 4 8 4<br />

5 Mil-Mar Century, Inc., Dayton, OH 2 10 21 6<br />

6 Sierra <strong>Army</strong> Depot, Herlong, CA 2 10 20 4<br />

7 Sierra <strong>Army</strong> Depot, Herlong, CA 1 2 4 3<br />

8 TBS, TBS 1 1 3 4<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 9 8 17<br />

Reorder 0 4 6 10<br />

2 Initial 15 10 6 16<br />

Reorder 0 4 6 10<br />

3 Initial 0 9 4 13<br />

Reorder 0 2 4 6<br />

4 Initial 0 10 13 23<br />

Reorder 0 4 3 7<br />

5 Initial 0 7 8 15<br />

Reorder 0 3 8 11<br />

REMARKS<br />

Production Rates are Monthly Rates.<br />

Camel: Delivery <strong>of</strong> FAT units will start 6 months<br />

after award. Delivery <strong>of</strong> LRIP units will begin<br />

180 days after First Article Test; but no later than<br />

12 months after initial contract award.<br />

MA6000 Item No. 146 Page 11 <strong>of</strong> 11 Exhibit P-21<br />

DISTRIBUTION SYSTEMS, PETROLEUM & WATER 138 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

WATER PURIFICATION SYSTEMS<br />

Program Elements for Code B Items:<br />

Code:<br />

A<br />

P-1 Item Nomenclature<br />

WATER PURIFICATION SYSTEMS (R05600)<br />

R05600<br />

<strong>Other</strong> Related Program Elements:<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 50.1 50.1<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 50.1 50.1<br />

Initial Spares<br />

Total Proc Cost 50.1 50.1<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The FAMILY OF WATER PURIFICATION SYSTEMS consists <strong>of</strong> the 1500 Gallons Per Hour (GPH) Tactical Water Purification System (TWPS), and the Lightweight Water Purifier (LWP). The<br />

water purification rates for these two systems range from 125 GPH to 1,500 GPH. Features <strong>of</strong> each system follows:<br />

1,500 GPH TACTICAL WATER PURIFICATION SYSTEM (1500 TWPS): TWPS is a modern water purification system that replaces the aged 600 GPH Reverse Osmosis Water Purification Unit<br />

(ROWPU). The 1500 TWPS is a force multiplier--each 1500 TWPS eliminates one 600 ROWPU crew. The 1500 TWPS is mounted on an International Standards Organization (ISO) frame flat<br />

rack and transported by the Heavy Expanded Mobility Tactical Truck-Load Handling System (HEMTT-LHS) or Palletized Loading System (PLS). This modular configuration gives the 1500 TWPS<br />

the capability <strong>of</strong> rapid deployment and recovery.<br />

Lightweight Water Purification System (LWP): The LWP is a new water purification capability to the <strong>Army</strong>. It is a portable water purifier developed for use during early entry, rapid tactical<br />

movement and during independent operations such as Special Operations Forces (SOF), temporary medical facilities, emergency operations, disaster relief, and/or similar forward area operations. It<br />

is capable <strong>of</strong> purifying 75 GPH from saltwater sources and 125 GPH from freshwater sources. With Nuclear, Biological and Chemical (NBC) treatment component, it can also produce potable water<br />

from NBC contaminated water. This High Mobility Multipurpose Wheeled Vehicle (HMMWV) transportable system consists <strong>of</strong> 8 modules, a triple container (TRICON) for storage and<br />

transportation, and cold weather kit. Once employed, one soldier can maintain and operate the system. The LWP is a complementary system for Future Combat Systems (FCS).<br />

Both the 1500 TWPS and the LWP are apart <strong>of</strong> the Stryker Brigade Combat Team (SBCT).<br />

Justification:<br />

FY08 Baseline: Procures water purification systems support the <strong>Army</strong>'s mission <strong>of</strong> providing life and mission sustaining water to the front line and remote units in tactical environments. The<br />

Quartermaster water units being fielded are Water Supply Companies, Water Purification Detachments, Water Purification Teams, Tactical Water Distribution Teams, and Arid Environment Water<br />

Teams.<br />

Water remains one <strong>of</strong> the largest logistical drivers. Purifying water closer to the point <strong>of</strong> use is critical to reducing the logistics footprint and reduces the demands on transportation assistance to<br />

R05600 Item No. 147 Page 1 <strong>of</strong> 5 Exhibit P-40<br />

WATER PURIFICATION SYSTEMS 139 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Date:<br />

September 2007<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

WATER PURIFICATION SYSTEMS<br />

Program Elements for Code B Items:<br />

P-1 Item Nomenclature<br />

WATER PURIFICATION SYSTEMS (R05600)<br />

R05600<br />

<strong>Other</strong> Related Program Elements:<br />

Code:<br />

A<br />

complete long convoy runs in the Area <strong>of</strong> Responsibility (AOR).<br />

These systems sustain ground forces beyond point <strong>of</strong> initial deployment. They provide deployed ground forces with potable water for drinking, cooking, showering, and medical use. As the U.S.<br />

<strong>Army</strong> operates through smaller and more mobile units, these lighter more mobile systems will be critical enablers in meeting the sustainment needs <strong>of</strong> all Brigade Combat Teams.<br />

1,500 GPH TACTICAL WATER PURIFICATION SYSTEM (1500 TWPS):<br />

FY 2008 Baseline: $33.504 million, qty 76; GWOT: $1.600 million; qty 3; GWOT Cost Adjustment $6.535 million, qty 14; Total: $41.636 million, qty 93.<br />

FY08 Global War on Terrorism (GWOT) Request: Procures TWPS to replace two <strong>of</strong> the old 600 GPH ROWPU with one TWPS that has more capability and is easier to maintain and uses less<br />

manpower. It supports the bulk water purification requirements for Heavy Combat Teams (HBCT's) and Infantry Brigade Combat Teams/Stryker Brigade Combat Teams (IBCT's/SBCT's). This<br />

funding will have a positive impact on the National Guard (NG) units to obtain this capability. The TWPS enhances unit readiness by providing units its authorized systems and eliminates shortages<br />

in equipment required to support mission and emergency requirements. It enables brigade combat teams and support brigades to maintain the required three days <strong>of</strong> supply while remaining highly<br />

mobile. Funding includes TWPS for ARNG and <strong>Army</strong> Preposition Stocks.<br />

FY08 GWOT Cost Adjustment funds additional TWPS to enhance unit readiness by providing units their authorized systems and eliminates shortages in equipment required to support mission and<br />

emergency requirements.<br />

Lightweight Water Purification System (LWP):<br />

FY 2008 Baseline: $8.477 million, qty 50; GWOT: 0; qty 0; Total: $8.477 million, qty 50.<br />

Total Water Purification Systems Program<br />

FY08 Base Appropriation: $41.981 Million<br />

FY08 GWOT Request: $ 1.600 Million<br />

FY08 GWOT Cost Adjustment Request: $ 6.535 Million<br />

FY08 Total: $50.116 Million<br />

R05600 Item No. 147 Page 2 <strong>of</strong> 5 Exhibit P-40<br />

WATER PURIFICATION SYSTEMS 140 Budget Item Justification Sheet


WATER PURIFICATION SYSTEMS<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

WATER PURIFICATION SYSTEMS (R05600)<br />

R05600<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000<br />

Hardware<br />

1500 GPH Tactical Water Purfication Sys A 33136 76 436<br />

Lightweight Water Purifier (LWP) A 7000 50 140<br />

Documentation 16<br />

Engineering Support<br />

In-House 99<br />

Quality Assurance<br />

In-House 20<br />

Program Management Support 778<br />

System Fielding Support 932<br />

FY08 BASE APPROPIATION TOTAL 41981<br />

FY08 GWOT Request<br />

1500 GPH Tactical Water Purfication Sys A 1308 3 436<br />

Program Management Support 41<br />

System Fielding Support 251<br />

FY08 GWOT REQUEST TOTAL 1600<br />

FY08 GWOT Cost Adjustment Request<br />

1500 GPH Tactical Water Purfication Sys 6104 14 436<br />

System Fielding Support GWOT CA 431<br />

FY08 GWOT COST ADJUSTMENT<br />

TOTAL<br />

6535<br />

Total: 50116<br />

R05600 Item No. 147 Page 3 <strong>of</strong> 5 Exhibit P-5<br />

WATER PURIFICATION SYSTEMS 141 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

WATER PURIFICATION SYSTEMS<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

1500 GPH Tactical Water Purfication Sys<br />

FY 2008<br />

SFA Frederick Mfg<br />

Frederick, MD<br />

Lightweight Water Purifier (LWP)<br />

FY 2008<br />

MECO<br />

Stafford, TX<br />

FY08 GWOT Request<br />

1500 GPH Tactical Water Purfication Sys<br />

FY 2008<br />

SFA Frederick Mfg<br />

Frederick, MD<br />

FY08 GWOT Cost Adjustment Request<br />

1500 GPH Tactical Water Purfication Sys<br />

FY 2008<br />

SFA Frederick Mfg<br />

Frederick, MD<br />

P-1 Line Item Nomenclature:<br />

WATER PURIFICATION SYSTEMS (R05600)<br />

R05600<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

C/FFP5(6) TACOM Nov 07 May 08 76 436 Yes<br />

C/FFP5(5) TACOM Nov 07 Feb 08 50 140 Yes<br />

C/FFP5(6) TACOM Nov 07 May 08 3 436 Yes<br />

C/FFP5(6) TACOM Nov 07 May 08 14 436 Yes<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

R05600 Item No. 147 Page 4 <strong>of</strong> 5 Exhibit P-5a<br />

WATER PURIFICATION SYSTEMS 142 Budget <strong>Procurement</strong> History and Planning


WATER PURIFICATION SYSTEMS<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

WATER PURIFICATION SYSTEMS (R05600)<br />

R05600<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

1500 GPH Tactical Water Purfication Sys<br />

1 FY 08 A 76 0 76 A 6 6 6 6 6 6 6 6 7 7 7 7 0<br />

Lightweight Water Purifier (LWP)<br />

2 FY 08 A 50 0 50 A 4 4 4 4 5 5 4 4 4 4 4 4 0<br />

FY08 GWOT Request<br />

1500 GPH Tactical Water Purfication Sys<br />

1 FY 08 A 3 0 3 A 1 1 1 0<br />

FY08 GWOT Cost Adjustment Request<br />

1500 GPH Tactical Water Purfication Sys<br />

1 FY 08 A 14 0 14 A 1 1 1 2 2 2 2 2 1 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 143 143 4 4 4 12 13 13 12 12 12 12 12 12 7 7 7<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 SFA Frederick Mfg, Frederick, MD 1 6 14 6<br />

2 MECO, Stafford, TX 1 5 57 3<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 18 11 29<br />

Reorder 0 2 6 8<br />

2 Initial 0 19 9 28<br />

Reorder 0 2 3 5<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

The number <strong>of</strong> shifts at maximum capacity for<br />

the 15 GPH Tactical Water System=2; The<br />

Lightweight Water Purification System=3.<br />

Production Rates are monthly.<br />

R05600 Item No. 147 Page 5 <strong>of</strong> 5 Exhibit P-21<br />

WATER PURIFICATION SYSTEMS 143 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

COMBAT SUPPORT MEDICAL<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

P-1 Item Nomenclature<br />

COMBAT SUPPORT MEDICAL (MN1000)<br />

MN1000<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 533.0 93.6 626.6<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 533.0 93.6 626.6<br />

Initial Spares<br />

Total Proc Cost 533.0 93.6 626.6<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

Combat Support Medical modernizes, converts, and recapitalizes the <strong>Army</strong> Medical Department's (AMEDD's) <strong>Table</strong> <strong>of</strong> Organizational Equipment (TOE) force structure with deployable medical<br />

platforms. These combat service support systems are comprised <strong>of</strong> modular components supporting hospital and non-hospital medical force structure at all echelons <strong>of</strong> care. This program resources<br />

the acquisition <strong>of</strong> clinical equipment, associated support items <strong>of</strong> equipment (ASIOE), non-medical equipment, medical materiel sets, and medical equipment sets. The program provides treatment<br />

capability for combat related injury and disease throughout the continuum <strong>of</strong> Contingency Operations, Stability and Support Operations, Humanitarian Assistance, Homeland Defense and the Global<br />

War on Terrorism. All acquisitions for this program are either Commercial Off The Shelf (COTS) or Government Off The Shelf (GOTS) categories.<br />

Justification:<br />

FY 2008 Global War on Terrorism (GWOT) request funds additional assets to prosecute the Global War on Terrorism by resetting items, replacing battle losses, generating and protecting forces, and<br />

enhancing military capabilities. Specific quantity, cost element, and pricing data is not available at this time and will be adjusted by available FY2008 base dollars, mix <strong>of</strong> forces, and production and<br />

requirements adjustments.<br />

FY 2008 GWOT Cost Adjustment request funds HQDA approved force structure changes via new activation dates and equipment requirements. Type changes and reorganization <strong>of</strong> units in the<br />

medical force are necessary to support the demand <strong>of</strong> units in the Global War on Terrorism.<br />

FY2008 BASE APPROPRIATION: - $85.490 million<br />

FY 2008 GWOT REQUEST: - $3.617 million<br />

FY 2008 GWOT Cost Adjustment: - $4.461 million<br />

FY 2008 TOTAL: - $93.568 million<br />

MN1000 Item No. 148 Page 1 <strong>of</strong> 6 Exhibit P-40<br />

COMBAT SUPPORT MEDICAL 144 Budget Item Justification Sheet


COMBAT SUPPORT MEDICAL<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

COMBAT SUPPORT MEDICAL (MN1000)<br />

MN1000<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

DEPLOYABLE MEDICAL SYSTEMS MX0003<br />

Supp<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

1800<br />

Deployable Med Sys MX0003 Base 19420<br />

FIELD MEDICAL EQUIPMENT MB1100 Supp 3617<br />

FIELD MEDICAL EQUIPMENT MB1100 GWOT<br />

2661<br />

Cost<br />

Field Medical Equip MB1100 Base 66070<br />

Total: 93568<br />

MN1000 Item No. 148 Page 2 <strong>of</strong> 6 Exhibit P-5<br />

COMBAT SUPPORT MEDICAL 145 Weapon System Cost Analysis


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

FIELD MEDICAL EQUIPMENT - Medical ASIOE<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

Date:<br />

P-1 Item Nomenclature<br />

FIELD MEDICAL EQUIPMENT - Medical ASIOE (MB1100)<br />

MN1000 (MB1100)<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 72.3 72.3<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 72.3 72.3<br />

Initial Spares<br />

Total Proc Cost 72.3 72.3<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

Programs support the modernization, conversion and recapitalization <strong>of</strong> the medical equipment components providing the clinical, diagnostic, treatment and prevention imperatives <strong>of</strong> Force Health<br />

Protection. Requirements provide combat casualty care capabilities within the <strong>Army</strong> Medical Department (AMEDD) deployable medical platforms for both hospital and non-hospital force<br />

structures. The equipment supports the combat power <strong>of</strong> the AMEDD field unit's capabilities to support Contingency Operations, Stability and Support Operations, Humanitarian assistance,<br />

Homeland Defense, and the Global War on Terrorism.<br />

All acquisitions for this program are either Commercial Off The Shelf (COTS) or Government Off The Shelf (GOTS) categories.<br />

Justification:<br />

FY 2008 procures medical equipment supporting clinical modernization requirements for the AMEDD deployable platforms. It also supports the AMEDD investment strategy <strong>of</strong> a balanced unitbased<br />

capability for both hospital and non-hospital organizations.<br />

FY 2008 GWOT Cost Adjustment Request funds are required to support the medical equipment requirements for the HQDA approved changes to the medical force structure. These changes are<br />

necessary to support the demand for medical units needed to support the Global War on Terrorism.<br />

FY 2008 BASE APPROPRIATION: $66.070 million<br />

FY 2008 GWOT REQUEST: $3.617 million<br />

FY 2008 GWOT Cost Adjustment Request: $2.661 million<br />

FY 2008 TOTAL: $72.348 million<br />

MN1000 (MB1100) Item No. 148 Page 3 <strong>of</strong> 6 Exhibit P-40<br />

FIELD MEDICAL EQUIPMENT - Medical ASIOE 146 Budget Item Justification Sheet


FIELD MEDICAL EQUIPMENT - Medical ASIOE<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

FIELD MEDICAL EQUIPMENT - Medical ASIOE (MB1100)<br />

MN1000 (MB1100)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000<br />

Medical Equipment Groups BASE<br />

Ambulatory Care Equipment 4346 656 6.625<br />

Dental Equipment 6884 38 181.158<br />

Laboratory Science Equipment 29707 194 153.129<br />

Nursing Equipment 2080 406 5.123<br />

Opthamology/Optometry Equipment 5758 18 319.889<br />

Diagnostic Imaging Equipment 637 172 3.703<br />

Surgical Equipment 5881 780 7.540<br />

Water Distributiuon 9080 105 86.476<br />

Oxygen Generation Equipment 1697 1080 1.571<br />

FY 2008 Base Appropriation Total 66070<br />

FY 2008 GWOT Request<br />

Ambulatory Care Equipment GWOT 815 70 11.643<br />

Dental Equipment GWOT 271 13 20.846<br />

Laboratory Science Equipment GWOT 135 15 9.000<br />

Nursing Equipment GWOT 225 23 9.783<br />

Opthamology/Optometry Equipment GWOT 65 9 7.222<br />

Diagnostic Imaging Equipment GWOT 1565 29 53.966<br />

Surgical Equipment GWOT 541 52 10.404<br />

FY 2008 GWOT Request TOTAL 3617<br />

Ambulatory Care GWOT CA 570 32 17.813<br />

Dental Equip GWOT CA 1030 53 19.434<br />

Laboratory Science Equip GWOT CA 50 4 12.500<br />

Nursing Equip GWOT CA 230 12 19.167<br />

Opthalmology/Optometry GWOT CA 21 3 7.000<br />

Diagnostic Imaging Equip GWOT CA 230 6 38.333<br />

Surgical Equip GWOT CA 530 33 16.061<br />

GWOT Cost Adjustment Total 2661<br />

Total: 72348<br />

MN1000 (MB1100) Item No. 148 Page 4 <strong>of</strong> 6 Exhibit P-5<br />

FIELD MEDICAL EQUIPMENT - Medical ASIOE 147 Weapon System Cost Analysis


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

DEPLOYABLE MEDICAL SYSTEMS (DEPMEDS) - Non-medical<br />

MN1000 (MX0003)<br />

Date:<br />

September 2007<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

P-1 Item Nomenclature<br />

DEPLOYABLE MEDICAL SYSTEMS (DEPMEDS) - Non-medical (MX0003)<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 21.2 21.2<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 21.2 21.2<br />

Initial Spares<br />

Total Proc Cost 21.2 21.2<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

This program supports the modernization, conversion and recapitalization <strong>of</strong> the non-medical equipment components necessary to support Force Health Protection platforms in a functional,<br />

deployable, sustainable, and modular design. This integral non-medical functionality and infrastructure includes: waste water management systems; water distribution systems; hard and s<strong>of</strong>t shelter<br />

system, and power generation systems. The equipment supports the combat power <strong>of</strong> the AMEDD field unit's capabilities to support Contingency Operations, Stability and Sustainment Operations,<br />

Humanitarian Assistance, Homeland Defense, the Global War on Terrorism.<br />

All acquisitions for this program are either Commercial Off The Shelf (COTS) or Government Off The Shelf (GOTS) categories.<br />

Justification:<br />

FY 2008 acquisition supports the procurement <strong>of</strong> associated support equipment for medical force design readiness requirements. It also supports the AMEDD investment strategy <strong>of</strong> a balanced unit<br />

based capability for both hospital and non-hospital organizations.<br />

FY 2008 GWOT Cost Adjustment funds are required to support non medical Associated Support Items <strong>of</strong> Equipment required in HQDA approved force structure changes to the units in the medical<br />

force structure. These changes support the requirements demand <strong>of</strong> medical units needed to support the Global War on Terrorism.<br />

FY 2008 BASE APPROPRIATION: $19.420 million<br />

FY 2008 GWOT Cost Adjustment REQUEST: $1.800 million<br />

FY 2008 TOTAL: $21.220 million<br />

MN1000 (MX0003) Item No. 148 Page 5 <strong>of</strong> 6 Exhibit P-40<br />

DEPLOYABLE MEDICAL SYSTEMS (DEPMEDS) - Non-medical 148 Budget Item Justification Sheet


DEPLOYABLE MEDICAL SYSTEMS (DEPMEDS) - Non-medical<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

DEPLOYABLE MEDICAL SYSTEMS (DEPMEDS) - Nonmedical<br />

(MX0003)<br />

MN1000 (MX0003)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000<br />

HospNon-Med Materiel Readiness Base 19420<br />

HospNon-Med Materiel Readiness GWOT CA 1800<br />

Total: 21220<br />

MN1000 (MX0003) Item No. 148 Page 6 <strong>of</strong> 6 Exhibit P-5<br />

DEPLOYABLE MEDICAL SYSTEMS (DEPMEDS) - Non-medical 149 Weapon System Cost Analysis


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

MOBILE MAINTENANCE EQUIPMENT SYSTEMS<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

Date:<br />

P-1 Item Nomenclature<br />

MOBILE MAINTENANCE EQUIPMENT SYSTEMS (G05301)<br />

G05301<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 317.1 317.1<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 317.1 317.1<br />

Initial Spares<br />

Total Proc Cost 317.1 317.1<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Mobile Maintenance Equipment Systems (MMES) include the Shop Equipment contact Maintenance Truck (SECM), Standard Automotive Tool Set (SATS), and Shop Equipment Welding<br />

(SEW). These System <strong>of</strong> Systems interlock the <strong>Army</strong>'s maintenance concept. The MMES allows the maintainer to support the battlefield throughout all levels <strong>of</strong> maintenance and allows multiple<br />

maintainers to support simultaneous battlefield requirements.<br />

The SECM is a responsive, agile, mobile maintenance system that traverses the battlefield providing on-site maintenance capabilities. The SECM consists <strong>of</strong> a fabricated enclosure mounted on a<br />

separately authorized M1113/M1152 High Mobility Multi-Purpose Wheeled Vehicle (HMMWV).<br />

The SATS provides a complete base set <strong>of</strong> tools and equipment needed to perform field level maintenance <strong>of</strong> military vehicles and ground support equipment. The base tool set is augmented by<br />

modular packages to support units unique mission requirements and organizations.<br />

The SEW provides heavy-duty, on-site welding capability with increased mobility and deployability. The SEW integrates Commercial <strong>of</strong>f the Shelf (COTS) and NDI components in an enclosure<br />

mounted on an M103A3 Trailer.<br />

Justification:<br />

Shop Equipment Contact Maintenance(SECM)(M61500): FY08 Baseline funds 296 SECMs. FY 2008 Global War On Terrorism(GWOT) request funds 318 SECMs. FY2008 GWOT Cost<br />

Adjustment request funds 85 SECMs. This will provide replacement SECMs for those units who left SECMs in theater to support TPE and APS5 requirements. In addition, this will provide SECMs<br />

for completion <strong>of</strong> fielding to BCTs and EAD units. Allows maintainers to perform emergency maintenance on equipment, enabling it to reengage the fight or return to the rear area under its own<br />

power. This item not only contains tools but also a light welding capability which enhances a units emergency response capability. The SECM is a maintenance multiplier, and optimizes the<br />

logistical and support area by mobilizing mechanics and maintenance equipment. It is first responder and is capable <strong>of</strong> operations in all types <strong>of</strong> terrain, with HMMWV level <strong>of</strong> mobility.<br />

Shop Equipment, Welding Trailer(SEW)(M62700): FY08 Baseline funds 117 SEWs. FY 2008 Global War On Terrorism(GWOT) request funds 150 SEWs. FY2008 GWOT Cost Adjustment<br />

request funds 118 SEWs. This will provide replacement SEWs for those units who left SEWs in theater to support TPE and APS5 requirements. In addition, this will provide for completion <strong>of</strong><br />

G05301 Item No. 149 Page 1 <strong>of</strong> 8 Exhibit P-40<br />

MOBILE MAINTENANCE EQUIPMENT SYSTEMS 150 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

MOBILE MAINTENANCE EQUIPMENT SYSTEMS<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

Date:<br />

P-1 Item Nomenclature<br />

MOBILE MAINTENANCE EQUIPMENT SYSTEMS (G05301)<br />

G05301<br />

September 2007<br />

fielding to BCTs and EAD units. This will increase <strong>Army</strong> readiness by providing the unit with an expedient method for the cutting and welding <strong>of</strong> battle damaged weapon systems, thus reducing the<br />

time that it is exposed to hostile fire. The SEW provides a robust all-purpose welding capability that will enable repairs in all environmental conditions. The SEW is the only tactical welding shop<br />

within the <strong>Army</strong> that contains Air-Carbon Arc Cutting capabilities (ACC).<br />

Standard Automotive Tool Set (SATS)(MA9650): FY 2008 Base procures 91 SATS. FY 2008 Global War on Terrorism (GWOT) procures 495 SATS. FY 2008 GWOT Cost Adjustment procures<br />

225 SATS. The SATS are needed to implement two-level maintenance in the modular <strong>Army</strong> and maintain support to the warfighter. With SATS, Combatant commanders will perform battlefield<br />

maintenance with efficient tool sets, thus decreasing downtime and unavailability <strong>of</strong> equipment. The SATS has the potential to reduce the number <strong>of</strong> prime movers from 6 to 1 and reduce the tool<br />

load by approximately 18,000 pounds. SATS reduces the amount <strong>of</strong> time to conduct inventories from 40+ hour to less than 2 hours, resulting in more efficient mission support to the warfighter. The<br />

fielding <strong>of</strong> the SATS to Heavy and Light Brigade combat Teams (BCTs), Stryker Brigade Combat Teams (SBCTs), and Aviation/Fires/Maneuver Enhancement/Reconnaissance, Surveillance, and<br />

Target Acquisition Brigades supports the modular conversion <strong>of</strong> the <strong>Army</strong>'s Active Component and National Guard.<br />

FY 2008 Base Appropriation: $51.475 million<br />

FY 2008 GWOT Request: $190.583 million<br />

FY 2008 GWOT Cost Adjustment Request: $75.042 million<br />

FY 2008 Total: $317.100 million<br />

G05301 Item No. 149 Page 2 <strong>of</strong> 8 Exhibit P-40<br />

MOBILE MAINTENANCE EQUIPMENT SYSTEMS 151 Budget Item Justification Sheet


MOBILE MAINTENANCE EQUIPMENT SYSTEMS<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

MOBILE MAINTENANCE EQUIPMENT SYSTEMS<br />

(G05301)<br />

G05301<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY 2008 Base Appropriation<br />

Shop Equipment Contact Maintenance 21904 296 74<br />

Engineering/QA Support (In-House) 350<br />

Engineering Change Proposals (ECPs) 75<br />

Fielding 1535<br />

Program Support 543<br />

SECM FY 2008 Base SubTotal 24407<br />

Shop Equipment Welding 3510 117 30<br />

M103A3 Trailer Chassis 1170 117 10<br />

Fielding 158<br />

Program Support 230<br />

SEW FY 2008 Base SubTotal 5068<br />

Standard Automotive Tool Set 18746 91 206<br />

Systems Fielding Support 1183<br />

Documentation 30<br />

Engineering/QA Support 133<br />

Transportation 273<br />

Program Support 1635<br />

SATS FY 2008 Base SubTotal 22000<br />

FY 2008 Base Appropriation Total 51475<br />

FY 2008 GWOT Supplemental Request<br />

Shop Equipment Contact Maintenance 23532 318 74<br />

HMMWV Chassis 37206 318 117<br />

Engineering/QA Support 200<br />

Fielding 1002<br />

PIP 189<br />

Program Support 231<br />

FY 08 SECM GWOT SubTotal 62360<br />

Welding Shop, Trailer MTD 4500 150 30<br />

M103A3 Trailer Chassis 1500 150 10<br />

G05301 Item No. 149 Page 3 <strong>of</strong> 8 Exhibit P-5<br />

MOBILE MAINTENANCE EQUIPMENT SYSTEMS 152 Weapon System Cost Analysis


MOBILE MAINTENANCE EQUIPMENT SYSTEMS<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

MOBILE MAINTENANCE EQUIPMENT SYSTEMS<br />

(G05301)<br />

G05301<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

Fielding 710<br />

Transportation 521<br />

Program Support 406<br />

FY 08 SEW GWOT SubTotal 7637<br />

Standard Automotive Tool Set 105930 495 214<br />

System Fielding Support 6435<br />

Documentation 200<br />

Engineering Support 173<br />

Quality Assurance Support 132<br />

Transportation 1800<br />

Program Management 5916<br />

FY 08 SATS GWOT SubTotal 120586<br />

FY 2008 GWOT Request Total 190583<br />

FY 2008 GWOT Cost Adjustment Request<br />

Shop Equipment Contact Maintenance 6290 85 74<br />

HMMWV Chassis 9945 85 117<br />

Fielding 200<br />

Program Support 25<br />

FY 08 SECM Amended GWOT<br />

16460<br />

SubTotal<br />

Welding Shop, Trailer MTD 3540 118 30<br />

M103A3 Trailer Chassis 1180 118 10<br />

Fielding 559<br />

Transportation 409<br />

Program Support 246<br />

FY 08 SEW GWOT Cost Adjustment<br />

5934<br />

SubTotal<br />

Standard Automotive Tool Set 48150 225 214<br />

System Fielding Support 2925<br />

Documentation 91<br />

Transportation 818<br />

Program Management 664<br />

G05301 Item No. 149 Page 4 <strong>of</strong> 8 Exhibit P-5<br />

MOBILE MAINTENANCE EQUIPMENT SYSTEMS 153 Weapon System Cost Analysis


MOBILE MAINTENANCE EQUIPMENT SYSTEMS<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

MOBILE MAINTENANCE EQUIPMENT SYSTEMS<br />

(G05301)<br />

G05301<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY 08 SATS GWOT Cost Adjustment<br />

52648<br />

SubTotal<br />

FY 2008 GWOT CA Total 75042<br />

Total: 317100<br />

G05301 Item No. 149 Page 5 <strong>of</strong> 8 Exhibit P-5<br />

MOBILE MAINTENANCE EQUIPMENT SYSTEMS 154 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

MOBILE MAINTENANCE EQUIPMENT SYSTEMS<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

Shop Equipment Contact Maintenance<br />

FY 2008<br />

Rock Island Arsenal<br />

Rock Island, IL<br />

Shop Equipment Welding<br />

FY 2008<br />

Power Manufacturing Inc,<br />

Covington, TN<br />

Standard Automotive Tool Set<br />

FY 2008<br />

Kipper Tool Company<br />

Gainsville, GA<br />

FY 2008 GWOT Supplemental Request<br />

Shop Equipment Contact Maintenance<br />

FY 2008<br />

Rock Island Arsenal<br />

Rock Island, IL<br />

Welding Shop, Trailer MTD<br />

FY 2008<br />

Power Manufacturing Inc,<br />

Covington, TN<br />

Standard Automotive Tool Set<br />

FY 2008<br />

Kipper Tool Company<br />

Gainsville, GA<br />

FY 2008 GWOT Cost Adjustment Request<br />

Shop Equipment Contact Maintenance<br />

FY 2008<br />

Rock Island Arsenal<br />

Rock Island, IL<br />

Welding Shop, Trailer MTD<br />

FY 2008<br />

Power Manufacturing Inc,<br />

Covington, TN<br />

Standard Automotive Tool Set<br />

FY 2008<br />

Kipper Tool Company<br />

Gainsville, GA<br />

P-1 Line Item Nomenclature:<br />

MOBILE MAINTENANCE EQUIPMENT SYSTEMS (G05301)<br />

G05301<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

SS/FFP TACOM, Rock Island, IL Nov 07 Sep 08 296 74 Y<br />

C/FFP 5/10 TACOM, Rock Island, IL Nov 07 Jan 08 117 30 Y<br />

C/FFP 5/10 TACOM, Rock Island, Il Nov 07 Mar 08 91 206 Y<br />

SS/FFP TACOM, Rock Island, IL Nov 07 Oct 08 318 74 Y<br />

C/FFP 5/10 TACOM, Rock Island, IL Nov 07 Aug 08 150 30 Y<br />

C/FFP 5/10 TACOM, Rock Island, IL Nov 07 Apr 08 495 214 Y<br />

SS/FFP TACOM, Rock Island, IL Nov 07 Sep 08 85 74 Y<br />

C/FFP 5/10 TACOM, Rock Island, IL Nov 07 Oct 08 118 30 Y<br />

C/FFP 5/10 TACOM, Rock Island, IL Nov 07 Oct 08 225 214 Y<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

G05301 Item No. 149 Page 6 <strong>of</strong> 8 Exhibit P-5a<br />

MOBILE MAINTENANCE EQUIPMENT SYSTEMS 155 Budget <strong>Procurement</strong> History and Planning


MOBILE MAINTENANCE EQUIPMENT SYSTEMS<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

MOBILE MAINTENANCE EQUIPMENT SYSTEMS (G05301)<br />

G05301<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Each TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Shop Equipment Contact Maintenance<br />

1 FY 08 A 296 0 296 A 25 25 25 25 25 25 25 25 24 24 24 24 0<br />

B<br />

Shop Equipment Welding<br />

2 FY 08 A 117 0 117 A 10 10 10 15 15 15 15 15 12 0<br />

B<br />

Standard Automotive Tool Set<br />

3 FY 08 A 91 0 91 A 16 15 15 15 15 15 0<br />

B<br />

Shop Equipment Contact Maintenance<br />

1 FY 08 A 318 0 318 A 27 27 27 27 27 27 27 27 27 27 27 21 0<br />

GW<br />

Welding Shop, Trailer MTD<br />

2 FY 08<br />

GW<br />

A 150 0 150 A 7 10 14 14 14 13 13 13 13 13 13 13 0<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Rock Island Arsenal, Rock Island, IL 5 20 70 40<br />

2 Power Manufacturing Inc,, Covington, TN 8 24 30 20<br />

3 Kipper Tool Company, Gainsville, GA 1 20 70<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 1 1 6 7<br />

Reorder 1 1 2 3<br />

2 Initial 0 1 2 3<br />

Reorder 0 1 2 3<br />

3 Initial 6 3 6 9<br />

Reorder 1 1 7 8<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

G05301 Item No. 149 Page 7 <strong>of</strong> 8 Exhibit P-21<br />

MOBILE MAINTENANCE EQUIPMENT SYSTEMS 156 Production Schedule


MOBILE MAINTENANCE EQUIPMENT SYSTEMS<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

MOBILE MAINTENANCE EQUIPMENT SYSTEMS (G05301)<br />

G05301<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Each TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Standard Automotive Tool Set<br />

3 FY 08<br />

495 0 495 A 20 20 20 20 20 62 56 56 56 55 55 55 0<br />

GW<br />

Shop Equipment Contact Maintenance<br />

1 FY 08 A 85 0 85 A 11 11 11 11 11 10 10 10 0<br />

GWCA<br />

Welding Shop, Trailer MTD<br />

2 FY 08 A 118 0 118 A 12 12 12 12 12 12 12 12 11 11 0<br />

GWCA<br />

Standard Automotive Tool Set<br />

3 FY 08<br />

GWCA<br />

A 225 0 225 A 4 4 4 5 5 5 50 50 50 48 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 1895 1895 10 10 26 50 50 50 50 57 120 149 149 149 148 147 147 137 126 125 123 51 21<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Rock Island Arsenal, Rock Island, IL 5 20 70 40<br />

2 Power Manufacturing Inc,, Covington, TN 8 24 30 20<br />

3 Kipper Tool Company, Gainsville, GA 1 20 70<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 1 1 6 7<br />

Reorder 1 1 2 3<br />

2 Initial 0 1 2 3<br />

Reorder 0 1 2 3<br />

3 Initial 6 3 6 9<br />

Reorder 1 1 7 8<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

G05301 Item No. 149 Page 8 <strong>of</strong> 8 Exhibit P-21<br />

MOBILE MAINTENANCE EQUIPMENT SYSTEMS 157 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

GRADER, ROAD MTZD, HVY, 6X4 (CCE)<br />

Program Elements for Code B Items:<br />

654804/H01<br />

Code:<br />

B<br />

Date:<br />

P-1 Item Nomenclature<br />

GRADER, ROAD MTZD, HVY, 6X4 (CCE) (R03800)<br />

R03800<br />

<strong>Other</strong> Related Program Elements:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 12.5 12.5<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 12.5 12.5<br />

Initial Spares<br />

Total Proc Cost 12.5 12.5<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

Graders are used by Horizontal Companies, Engineer Support Companies, Asphalt Teams, and Quarry Platoons in support <strong>of</strong> modularity requirements. The heavy grader is diesel-engine driven,<br />

pneumatic tired, with articulated frame steering. It is equipped with a power shift transmission, fully enclosed cab, hydraulically operated blade and scarifier. The heavy grader may be driven from<br />

one field/work site to another and is used for grading, shaping, bank sloping, ditching, scarifying and general construction and maintenance <strong>of</strong> roads and airfields.<br />

Justification:<br />

FY2008 Global War on Terrorism (GWOT) Cost Adjustment funds procures 2 heavy graders.<br />

FY08 Base Appropriation: $11.700 million<br />

FY08 GWOT Request: $0.000 million<br />

FY08 Amended GWOT Cost Adjustment Request: $.788 million<br />

FY08 Total: $12.488 million<br />

R03800 Item No. 151 Page 1 <strong>of</strong> 6 Exhibit P-40<br />

GRADER, ROAD MTZD, HVY, 6X4 (CCE) 158 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

GRADER, MTZD, HVY<br />

Program Elements for Code B Items:<br />

0604804ADH01<br />

Code:<br />

B<br />

P-1 Item Nomenclature<br />

GRADER, MTZD, HVY (R03801)<br />

R03800 (R03801)<br />

<strong>Other</strong> Related Program Elements:<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty 40 40<br />

Gross Cost 12.5 12.5<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 12.5 12.5<br />

Initial Spares<br />

Total Proc Cost 12.5 12.5<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

Graders are used by Horizontal Companies, Engineer Support Companies, Asphalt Teams, and Quarry Platoons in support <strong>of</strong> modularity requirements. The heavy grader is diesel-engine driven,<br />

pneumatic tired, with articulated frame steering. It is equipped with a power shift transmission, fully enclosed cab, hydraulically operated blade and scarifier. The heavy grader may be driven from<br />

one field/work site to another and is used for grading, shaping, bank sloping, ditching, scarifying and general construction and maintenance <strong>of</strong> roads and airfields.<br />

Justification:<br />

FY08 Baseline: Procures 38 heavy Graders. The current graders were purchased in 1984 which means the entire fleet has exceeded its planned useful life <strong>of</strong> 15 years.<br />

FY08 Global War on Terrorism (GWOT) Cost Adjustment procures 2 heavy graders.<br />

FY08 Base Appropriation: $11.700 million<br />

FY08 GWOT Cost Adjustment Request: $.788 million<br />

FY08 Total: $12.488 million<br />

R03800 (R03801) Item No. 151 Page 2 <strong>of</strong> 6 Exhibit P-40<br />

GRADER, MTZD, HVY 159 Budget Item Justification Sheet


GRADER, MTZD, HVY<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

GRADER, MTZD, HVY (R03801)<br />

R03800 (R03801)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY2008 Base Appropriation<br />

Hardware (Base) B 9500 38 250<br />

Engineering Support 145<br />

Program Management Support 891<br />

System Fielding 228<br />

Trainig Aid 936<br />

Total Baseline 11700<br />

FY2008 GWOT Cost Adjustment Request<br />

Hardware (GWOT Cost Adjustment Request) B 500 2 250<br />

System Fielding 288<br />

Total GWOT Cost Adjustment Request 788<br />

Total: 12488<br />

R03800 (R03801) Item No. 151 Page 3 <strong>of</strong> 6 Exhibit P-5<br />

GRADER, MTZD, HVY 160 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

GRADER, MTZD, HVY<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

Hardware (Base)<br />

FY 2008<br />

TBD<br />

TBD<br />

Hardware (GWOT Cost Adjustment Request)<br />

FY 2008<br />

TBD<br />

TBD<br />

P-1 Line Item Nomenclature:<br />

GRADER, MTZD, HVY (R03801)<br />

R03800 (R03801)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

FFP5/5(2) TACOM, Warren, MI Jan 08 Aug 09 38 250 N/A N/A Dec 06<br />

FFP5/5(2) TACOM, Warren, MI Jan 08 Aug 09 2 250 N/A N/A Dec 06<br />

REMARKS:<br />

R03800 (R03801) Item No. 151 Page 4 <strong>of</strong> 6 Exhibit P-5a<br />

GRADER, MTZD, HVY 161 Budget <strong>Procurement</strong> History and Planning


GRADER, MTZD, HVY<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

GRADER, MTZD, HVY (R03801)<br />

R03800 (R03801)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Hardware (Base)<br />

1 FY 08 A 38 0 38 A 15 15 8<br />

Hardware (GWOT Cost Adjustment Request)<br />

1 FY 08 A 2 0 2 A 2 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 40 40 17 15 8<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 TBD, TBD 5 10 20 10<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 12 14 7 21<br />

Reorder 0 4 19 23<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

.<br />

R03800 (R03801) Item No. 151 Page 5 <strong>of</strong> 6 Exhibit P-21<br />

GRADER, MTZD, HVY 162 Production Schedule


GRADER, MTZD, HVY<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

GRADER, MTZD, HVY (R03801)<br />

R03800 (R03801)<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Hardware (Base)<br />

1 FY 08 A 38 30 8 8 0<br />

Hardware (GWOT Cost Adjustment Request)<br />

1 FY 08 A 2 2 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 40 32 8 8<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 TBD, TBD 5 10 20 10<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 12 14 7 21<br />

Reorder 0 4 19 23<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

R03800 (R03801) Item No. 151 Page 6 <strong>of</strong> 6 Exhibit P-21<br />

GRADER, MTZD, HVY 163 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

SCRAPERS, EARTHMOVING<br />

Program Elements for Code B Items:<br />

Code:<br />

A<br />

P-1 Item Nomenclature<br />

SCRAPERS, EARTHMOVING (RA0100)<br />

RA0100<br />

<strong>Other</strong> Related Program Elements:<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 20.9 20.9<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 20.9 20.9<br />

Initial Spares<br />

Total Proc Cost 20.9 20.9<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The 11 Cubic Yard (CY) Scraper will be used by Engineer Support Companies for earthmoving work such as construction and maintenance <strong>of</strong> roads, airfields, and facilities to support the tactical<br />

mission. The Scraper provides the Combat Engineer with essential equipment to perform their road building and site preparation mission in <strong>of</strong>fensive, defensive, and rear area combat operations.<br />

This item has a heaped capacity <strong>of</strong> 11 CY and can be transported in two sections by helicopter. The Scraper shall be capable <strong>of</strong> being loaded and rigged on an air delivery platform and air delivered<br />

by low velocity airdrop. This requirement is based on the mission to create maneuver opportunities in support <strong>of</strong> airborne and airmobile combat operations and across the full range <strong>of</strong> military<br />

operations. This equipment is critical for ensuring combat readiness and fleet mobilization.<br />

The 14-18 CY Scraper will be used by Horizontal Construction Companies. The 14-18 CY Scraper is a self-propelled, open bowl, two axle, single diesel engine driven, articulated frame steer<br />

vehicle with pneumatic tires. The loading capacity is 14 CY struck and 18 CY heaped. Normal mode <strong>of</strong> operation is to use a push tractor to maximize production. The self-propelled Scraper can<br />

work alone and self load, but at reduced production capacity. The Scraper provides a hauling and dumping capability to perform efficient earthmoving tasks in support <strong>of</strong> earthmoving projects.<br />

Justification:<br />

FY08 Global War on Terrorism (GWOT) Cost Adjustment funds 1 Heavy scraper for the Engineer Support Companies.<br />

FY08 Base Appropriation: $19.440 million<br />

FY08 GWOT Request: $0.000 million<br />

FY08 GWOT Cost Adjustment Request: $1.438 million<br />

FY08 Total: $20.878 million<br />

RA0100 Item No. 153 Page 1 <strong>of</strong> 5 Exhibit P-40<br />

SCRAPERS, EARTHMOVING 164 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

SCRAPER, EARTHMOVING, 14-18 CU YD<br />

Program Elements for Code B Items:<br />

0604804A DH01<br />

Code:<br />

B<br />

Date:<br />

P-1 Item Nomenclature<br />

SCRAPER, EARTHMOVING, 14-18 CU YD (R02800)<br />

RA0100 (R02800)<br />

<strong>Other</strong> Related Program Elements:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty 1 1<br />

Gross Cost 1.4 1.4<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 1.4 1.4<br />

Initial Spares<br />

Total Proc Cost 1.4 1.4<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

This Scraper will be used by Horizontal Construction Companies. The 14-18 Cu Yd Scraper is a self-propelled, open bowl, two axle, single diesel engine driven, articulated frame steer vehicle with<br />

pneumatic tires. The loading capacity is 14 cubic yards struck, and 18 cubic yards heaped. Normal mode <strong>of</strong> operation is to use a push tractor to maximize production. The self-propelled scraper can<br />

work alone and self load, but at reduced production capacity. The scraper provides a hauling and dumping capability to perform efficient earthmoving tasks in support <strong>of</strong> earthmoving projects.<br />

Justification:<br />

FY08 Global War on Terrorism (GWOT) Cost Adjustment procures 1 Heavy scrapers for the Engineer Support Companies. This equipment is critical for ensuring combat readiness and fleet<br />

mobilization <strong>of</strong> US Armed Forces.<br />

FY08 Base Appropriation: $0.0 million<br />

FY08 GWOT Cost Adjustment Request: $1.438 million<br />

FY08 Total - $1.438 million<br />

RA0100 (R02800) Item No. 153 Page 2 <strong>of</strong> 5 Exhibit P-40<br />

SCRAPER, EARTHMOVING, 14-18 CU YD 165 Budget Item Justification Sheet


SCRAPER, EARTHMOVING, 14-18 CU YD<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

SCRAPER, EARTHMOVING, 14-18 CU YD (R02800)<br />

RA0100 (R02800)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY2008 GWOT Cost Adjustment Request<br />

Hardware (GWOT Cost Adjustment Req) B 576 1 576<br />

Documentation<br />

Engineering In-House 145<br />

Program Management Support 300<br />

System Fielding Support 417<br />

Total GWOT Cost Adjustment Request B 1438<br />

Total: 1438<br />

RA0100 (R02800) Item No. 153 Page 3 <strong>of</strong> 5 Exhibit P-5<br />

SCRAPER, EARTHMOVING, 14-18 CU YD 166 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

SCRAPER, EARTHMOVING, 14-18 CU YD<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

Hardware (GWOT Cost Adjustment Req)<br />

P-1 Line Item Nomenclature:<br />

SCRAPER, EARTHMOVING, 14-18 CU YD (R02800)<br />

RA0100 (R02800)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

FY 2008 TBS C/FP5(1) TACOM, Warren, MI Mar 08 Aug 09 1 576 N/A N/A<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

RA0100 (R02800) Item No. 153 Page 4 <strong>of</strong> 5 Exhibit P-5a<br />

SCRAPER, EARTHMOVING, 14-18 CU YD 167 Budget <strong>Procurement</strong> History and Planning


SCRAPER, EARTHMOVING, 14-18 CU YD<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

SCRAPER, EARTHMOVING, 14-18 CU YD (R02800)<br />

RA0100 (R02800)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Hardware (GWOT Cost Adjustment Req)<br />

1 FY 08 1 0 1 A 1 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 1 1 1<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 TBS 5 20 40 10<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 12 5 6 11<br />

Reorder 0 3 6 9<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

Production rates stated are monthly vs. yearly.<br />

Admin lead time and manufacturer lead time is<br />

based on old contract data. System would not<br />

allow new contract information could not be<br />

updated.<br />

RA0100 (R02800) Item No. 153 Page 5 <strong>of</strong> 5 Exhibit P-21<br />

SCRAPER, EARTHMOVING, 14-18 CU YD 168 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

LOADERS<br />

Program Elements for Code B Items:<br />

654804/H01<br />

Code:<br />

B<br />

P-1 Item Nomenclature<br />

LOADERS (R04500)<br />

R04500<br />

<strong>Other</strong> Related Program Elements:<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 28.3 28.3<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 28.3 28.3<br />

Initial Spares<br />

Total Proc Cost 28.3 28.3<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

Loader, Scoop Type, 2.5 Cubic Yard (CY) Light Type II, is currently used by Combat Heavy Construction Battalions and Construction Support Companies in the current Force Structure TAA09.<br />

The new TAA11 calls for the loaders to be assigned to Combat Support Brigade (CSB) Engineer (EN) Companies, Concrete Teams, Training and Doctrine Command (TRADOC) and the Armored<br />

Cavalry Regiments (ACR) elements. The Light Type II general purpose scoop loader is a versatile machine which is a crucial part <strong>of</strong> the maneuver and mobility force, that supports the Brigade<br />

Combat Team (BCT) in the <strong>Army</strong>¿s Future Force. The loader is a diesel-engine driven, four-wheel-drive machine with rear axle oscillation and articulated frame steering. The hydraulicallyoperated<br />

scoop bucket is attached to the front <strong>of</strong> the loader by means <strong>of</strong> a push frame and lift arms. Loaders are usually equipped with one piece general purpose bucket or a multipurpose (hinged<br />

jaw) bucket. These vehicles will feature a quick-coupler mechanism to attach/detach the bucket, fork lift attachment, and sweepers. Crew survivability will be addressed in accordance with the<br />

<strong>Army</strong>'s Long Term Armor Strategy (LTAS).<br />

Loader, Scoop Type, 4.5 and 5.0 Cubic Yard (CY) Heavy Type I/II, is currently used by Combat Heavy Construction Battalions and Construction Support Companies in Force Structure TAA09.<br />

The new TAA11 calls for the loaders to be assigned to; Horizontal Companies, Asphalt Teams, and Quarry and Haul Platoons. The Heavy Type I and II loaders are versatile machines which are a<br />

crucial part <strong>of</strong> the Combat Support Brigade. They will provide maneuver and mobility support to the Brigade Combat Team (BCT) in the <strong>Army</strong>¿s Future Force. Two types are being procured: Type<br />

I with 4.5 cubic yard rock bucket and Type II with 5.0 cubic yard general purpose bucket. These vehicles will feature a quick-coupler mechanism to attach/detach the bucket, fork lift attachment, and<br />

sweepers. Crew survivability will be addressed in accordance with the <strong>Army</strong>'s Long Term Armor Strategy (LTAS).<br />

Justification:<br />

FY2008 Global War on Terrorism (GWOT) Cost Adjustment Request procures 35 Heavy Loaders and 2 Light Loaders.<br />

FY08 Base Appropriation: $18.842 million<br />

FY08 GWOT Request: $0.000 million<br />

FY08 GWOT Cost Adjustment Request: $9.502 million<br />

FY08 Total: $28.344 million<br />

R04500 Item No. 156 Page 1 <strong>of</strong> 9 Exhibit P-40<br />

LOADERS 169 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

LOADER, SCOOP TYPE, DD 4WHL, 2-1/2 CU YD<br />

Program Elements for Code B Items:<br />

654804/H01<br />

Code:<br />

B<br />

Date:<br />

P-1 Item Nomenclature<br />

LOADER, SCOOP TYPE, DD 4WHL, 2-1/2 CU YD (M06400)<br />

R04500 (M06400)<br />

<strong>Other</strong> Related Program Elements:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty 35 35<br />

Gross Cost 6.3 6.3<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 6.3 6.3<br />

Initial Spares<br />

Total Proc Cost 6.3 6.3<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

Loader, Scoop Type, 2.5 Cubic Yard (CY) Light Type II, is currently assigned to Combat Support Brigades (CSB) Engineer (EN) Companies, Concrete Teams, Training and Doctrine Command<br />

(TRADOC) and the Armored Cavalry Regiments (ACR) elements. The Light Type II general purpose scoop loader is a versatile machine which is a crucial part <strong>of</strong> the maneuver and mobility force<br />

that supports the Brigade Combat Team in the <strong>Army</strong>¿s Future Force. The loader is a diesel-engine driven, four-wheel-drive machine with rear axle oscillation and articulated frame steering. The<br />

hydraulically-operated scoop bucket is attached to the front <strong>of</strong> the loader by means <strong>of</strong> a push frame and lift arms. Loaders are usually equipped with one piece general purpose bucket or a<br />

multipurpose (hinged jaw) bucket. These vehicles will feature a quick-coupler mechanism to attach/detach the bucket, fork lift attachment, and sweepers. Crew survivability will be addressed in<br />

accordance with the <strong>Army</strong>'s Long Term Armor Strategy (LTAS).<br />

Justification:<br />

FY08 Baseline: Procures 33 Loader, Scoop Type, 2.5 Cubic Yard(CY) Light Type II to support requirements <strong>of</strong> the Brigade Combat Teams (BCT).<br />

FY08 Global War on Terrorism (GWOT) Cost Adjustment procures 2 Loader, Scoop Type 2.5 Cubic Yard (CY) Light Type II.<br />

FY08 Base Appropriation: $6.070 million<br />

FY08 GWOT Cost Adjustment Request: $. 252 million<br />

FY08 Total: $6.322 million<br />

R04500 (M06400) Item No. 156 Page 2 <strong>of</strong> 9 Exhibit P-40<br />

LOADER, SCOOP TYPE, DD 4WHL, 2-1/2 CU YD 170 Budget Item Justification Sheet


LOADER, SCOOP TYPE, DD 4WHL, 2-1/2 CU YD<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

LOADER, SCOOP TYPE, DD 4WHL, 2-1/2 CU YD (M06400)<br />

R04500 (M06400)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY2008 Base Appropriation<br />

Hardware B 3465 33 105<br />

Program Management Support 149<br />

Engineering<br />

System Fielding Support 148<br />

Training Aid 185<br />

Logistics Update for Armor 209<br />

A Kit Configuration Change 528<br />

C Kit Configuration Change 1386<br />

Total Baseline 6070<br />

FY2008 GWOT Cost Adjustment Request<br />

Hardware 210 2 105<br />

System Fielding 42<br />

Total GWOT Cost Adjustment 252<br />

Total: 6322<br />

R04500 (M06400) Item No. 156 Page 3 <strong>of</strong> 9 Exhibit P-5<br />

LOADER, SCOOP TYPE, DD 4WHL, 2-1/2 CU YD 171 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

LOADER, SCOOP TYPE, DD 4WHL, 2-1/2 CU YD<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

Hardware<br />

FY 2008<br />

Caterpillar Inc.<br />

Peoria, IL<br />

FY2008 GWOT Cost Adjustment Request<br />

FY 2008<br />

Caterpillar Inc.<br />

Peoria, IL<br />

P-1 Line Item Nomenclature:<br />

LOADER, SCOOP TYPE, DD 4WHL, 2-1/2 CU YD (M06400)<br />

R04500 (M06400)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

CFP5/5(4) TACOM, Warren, MI Jan 08 Jun 08 105 33 Yes Jul 05 May 05<br />

CFP/5/(4) TACOM, Warren, MI Jan 08 Jun 08 105 2 Yes Jul 05 May 05<br />

REMARKS:<br />

R04500 (M06400) Item No. 156 Page 4 <strong>of</strong> 9 Exhibit P-5a<br />

LOADER, SCOOP TYPE, DD 4WHL, 2-1/2 CU YD 172 Budget <strong>Procurement</strong> History and Planning


LOADER, SCOOP TYPE, DD 4WHL, 2-1/2 CU YD<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

LOADER, SCOOP TYPE, DD 4WHL, 2-1/2 CU YD (M06400)<br />

R04500 (M06400)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Hardware<br />

1 FY 08 A 33 0 33 A 3 3 3 3 3 3 3 3 3 3 3 0<br />

Hardware (GWOT Supplemental Amd)<br />

1 FY 08 A 2 0 2 A 2 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 35 35 5 3 3 3 3 3 3 3 3 3 3<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Caterpillar Inc., Peoria, IL 5 10 10 6<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 4 5 9<br />

Reorder 0 0 0 0<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

R04500 (M06400) Item No. 156 Page 5 <strong>of</strong> 9 Exhibit P-21<br />

LOADER, SCOOP TYPE, DD 4WHL, 2-1/2 CU YD 173 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

LOADER, SCOOP TYPE, 4-5 CU YD (CCE)<br />

Program Elements for Code B Items:<br />

654804/H01<br />

Code:<br />

B<br />

Date:<br />

P-1 Item Nomenclature<br />

LOADER, SCOOP TYPE, 4-5 CU YD (CCE) (R03900)<br />

R04500 (R03900)<br />

<strong>Other</strong> Related Program Elements:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty 81 81<br />

Gross Cost 22.0 22.0<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 22.0 22.0<br />

Initial Spares<br />

Total Proc Cost 22.0 22.0<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

Loader, Scoop Type, 4.5 and 5.0 Cubic Yard (CY) Heavy Type I/II, is currently assigned to: Horizontal Companies, Asphalt Teams and Quarry and Haul Platoons. The Heavy Type I and II loaders<br />

are versatile machines which are a crucial part <strong>of</strong> the Combat Support Brigade. They will provide maneuver and mobility support to the Brigade Combat Team (BCT) in the <strong>Army</strong>'s Future Force.<br />

Two types are being procured; Type I with 4.5 cubic yard rock bucket and Type II with 5.0 cubic yard general purpose bucket. These vehicles will feature a quick-coupler mechanism to attach/detach<br />

the bucket, fork lift attachment, and sweepers. Crew survivability will be addressed in accordance with the <strong>Army</strong>'s Long Term Armor Strategy (LTAS).<br />

Justification:<br />

FY08 Baseline: Procures 46 Heavy Loaders. The current heavy type loaders are 25 to 30 years old and have passed their useful life <strong>of</strong> 15 years.<br />

FY08 Global War on Terrorism (GWOT) Cost Adjustment procures 35 Heavy Loaders.<br />

FY08 Base Appropriation: $12.772 million<br />

FY08 GWOT Cost Adjustment Request: $9.250 million<br />

FY08 Total: $22.022 million<br />

R04500 (R03900) Item No. 156 Page 6 <strong>of</strong> 9 Exhibit P-40<br />

LOADER, SCOOP TYPE, 4-5 CU YD (CCE) 174 Budget Item Justification Sheet


LOADER, SCOOP TYPE, 4-5 CU YD (CCE)<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

LOADER, SCOOP TYPE, 4-5 CU YD (CCE) (R03900)<br />

R04500 (R03900)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY2008 Base Appropriation<br />

Hardware B 12006 46 261<br />

Program Management Support 177<br />

System Fielding Support 148<br />

Training Aid 209<br />

Logistics Update for Armor 232<br />

Total Baseline<br />

FY2008 GWOT Cost Adjustment Request<br />

Hardware 9135 35 261<br />

System Fielding 115<br />

Total Gwot Cost Adjustment<br />

Total: 22022<br />

R04500 (R03900) Item No. 156 Page 7 <strong>of</strong> 9 Exhibit P-5<br />

LOADER, SCOOP TYPE, 4-5 CU YD (CCE) 175 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

LOADER, SCOOP TYPE, 4-5 CU YD (CCE)<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

FY2008 Base Appropriation<br />

FY 2008<br />

Caterpillar Inc.<br />

Peoria, IL<br />

FY2008 GWOT Cost Adjustment Request<br />

FY 2008<br />

Caterpillar Inc.<br />

Peoria, IL<br />

P-1 Line Item Nomenclature:<br />

LOADER, SCOOP TYPE, 4-5 CU YD (CCE) (R03900)<br />

R04500 (R03900)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

CFP5/5(4) TACOM, Warren, MI Jan 08 May 08 46 261<br />

CFP5/5(4) TACOM, Warren, Mi Jan 08 May 08 35 261<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

R04500 (R03900) Item No. 156 Page 8 <strong>of</strong> 9 Exhibit P-5a<br />

LOADER, SCOOP TYPE, 4-5 CU YD (CCE) 176 Budget <strong>Procurement</strong> History and Planning


LOADER, SCOOP TYPE, 4-5 CU YD (CCE)<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

LOADER, SCOOP TYPE, 4-5 CU YD (CCE) (R03900)<br />

R04500 (R03900)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Hardware<br />

1 FY 08 A 46 0 46 A 4 4 4 4 4 4 4 4 4 4 4 2 0<br />

Hardware(GWOT Supplemental Amd)<br />

1 FY 08 A 35 0 35 A 4 4 4 4 4 4 4 4 3 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 81 81 8 8 8 8 8 8 8 8 7 4 4 2<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Caterpillar Inc., Peoria, IL 5 10 10 6<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 6 11 4 15<br />

Reorder 0 4 4 8<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

R04500 (R03900) Item No. 156 Page 9 <strong>of</strong> 9 Exhibit P-21<br />

LOADER, SCOOP TYPE, 4-5 CU YD (CCE) 177 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

HYDRAULIC EXCAVATOR<br />

Program Elements for Code B Items:<br />

Code:<br />

A<br />

P-1 Item Nomenclature<br />

HYDRAULIC EXCAVATOR (X01500)<br />

X01500<br />

<strong>Other</strong> Related Program Elements:<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 47.3 3.8 51.1<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 47.3 3.8 51.1<br />

Initial Spares<br />

Total Proc Cost 47.3 3.8 51.1<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Hydraulic Excavator (HYEX) is assigned to Combat Support Brigades (CSB), Horizontal Companies and Quarry Platoons and provides maneuver and mobility support for the Combat Support<br />

Brigade Team in the <strong>Army</strong>'s Future Force. The HYEX is a commercial item <strong>of</strong> construction equipment with minor military modifications. It is a diesel engine driven, self-propelled, track mounted,<br />

hydraulically controlled system, equipped with a hydraulic quick disconnect coupler for use with a wide variety <strong>of</strong> attachments. The HYEX is transported by highway, rail, marine, and air in C-17<br />

and C-5 aircraft. A Type I HYEX is equipped with a hydraulic impact breaker, hydraulic plate compactor, hydraulic pile driver and buckets for general excavation, digging, trenching and lifting.<br />

Type II is equipped with a rock drill and a heavy duty bucket for quarry operations. Type III is equipped with an impact breaker, rock bucket, and heavy duty bucket also for use in quarry operations.<br />

Justification:<br />

FY08 Baseline: Procures 10 HYEXs to suppport the Brigade Combat Teams (BCTs) to conduct operations that shape the battle space, set conditions for BCT operations, and provide increased<br />

operational reach throughout the theater <strong>of</strong> operations. Increased operational reaach gives U.S. Forces the ability to deploy and freely enter the theater <strong>of</strong> operations.<br />

FY08 Global War on Terrorism (GWOT) Cost Adjustment funds procure 1 additional Type I HYEX asset to prosecute the GWOT by replacing battle losses, generating and protecting forces, and<br />

enhancing military capabilities.<br />

FY08 Base Appropriation - $3.371 million<br />

FY08 GWOT Request - $0.00 million<br />

FY08 GWOT Cost Adjustment Request - $.400 million<br />

FY08 Total - $3.771 million<br />

X01500 Item No. 157 Page 1 <strong>of</strong> 4 Exhibit P-40<br />

HYDRAULIC EXCAVATOR 178 Budget Item Justification Sheet


HYDRAULIC EXCAVATOR<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

HYDRAULIC EXCAVATOR (X01500)<br />

X01500<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY2008 Base Appropriation<br />

Hardware (Base) A 2800 10 280<br />

Program Management Support 160<br />

System Fielding Support 241<br />

Engineering Change Order<br />

B-Kit Armor (Base) 170<br />

FY2008 Base Appropriation Subtotal 3371<br />

FY2008 GWOT Cost Adjustment<br />

Hardware (GWOT) A 280 1 280<br />

System Fielding 120<br />

FY2008 GWOT Cost Adjustment<br />

Subtotal<br />

400<br />

Total: 3771<br />

X01500 Item No. 157 Page 2 <strong>of</strong> 4 Exhibit P-5<br />

HYDRAULIC EXCAVATOR 179 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

HYDRAULIC EXCAVATOR<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

Hardware (Base)<br />

FY 2008<br />

TBD<br />

TBD<br />

Hardware (GWOT)<br />

FY 2008<br />

TBD<br />

TBD<br />

P-1 Line Item Nomenclature:<br />

HYDRAULIC EXCAVATOR (X01500)<br />

X01500<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

C/FP5(1) TACOM Dec 07 May 08 10 280 N<br />

C/FP5(1) TACOM Dec 07 May 08 1 280 N<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS: Unit cost includes A-Kit Armor<br />

X01500 Item No. 157 Page 3 <strong>of</strong> 4 Exhibit P-5a<br />

HYDRAULIC EXCAVATOR 180 Budget <strong>Procurement</strong> History and Planning


HYDRAULIC EXCAVATOR<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

HYDRAULIC EXCAVATOR (X01500)<br />

X01500<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Hardware (Base)<br />

1 FY 08 A 10 0 10 A 2 3 3 2 0<br />

Hardware (GWOT)<br />

1 FY 08 A 1 0 1 A 1 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 11 11 3 3 3 2<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 TBD, TBD 2 10 20<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 3 5 8<br />

Reorder 0 3 5 8<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

Production rates stated are monthly vs. yearly.<br />

X01500 Item No. 157 Page 4 <strong>of</strong> 4 Exhibit P-21<br />

HYDRAULIC EXCAVATOR 181 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

HIGH MOBILITY ENGINEER EXCAVATOR (HMEE) FOS<br />

Program Elements for Code B Items:<br />

654804/H01<br />

Code:<br />

B<br />

Date:<br />

September 2007<br />

P-1 Item Nomenclature<br />

HIGH MOBILITY ENGINEER EXCAVATOR (HMEE) FOS (R05901)<br />

R05901<br />

<strong>Other</strong> Related Program Elements:<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty 320 320<br />

Gross Cost 52.4 52.4<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 52.4 52.4<br />

Initial Spares<br />

Total Proc Cost 52.4 52.4<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The High Mobility Engineer Excavator (HMEE) is a family <strong>of</strong> vehicles consisting <strong>of</strong> the Interim HMEE (IHMEE, ended in FY04), HMEE Type I, HMEE Type II, and HMEE Type III. HMEE Type<br />

I and HMEE Type II are developmental military unique vehicles. The HMEE Type III is a commercial <strong>of</strong>f the shelf backhoe loader with minor military modifications. The family <strong>of</strong> HMEEs<br />

supports the Engineers in the following engineer forces: HMEE Type I supports the Brigade Combat Team (BCT), the HMEE Type II will support the Airborne and Air Assault forces, and the<br />

HMEE III supports the Combat Support Brigades (CSB). The family <strong>of</strong> HMEEs is lightweight, all wheel drive, diesel engine driven, high mobility vehicles with backhoe, bucket loader, and other<br />

attachments. The vehicles within the Family <strong>of</strong> HMEEs support the Air Ground Lines <strong>of</strong> Communication (A/G LOC) forces and the Rapid Tactical Earthmoving (RTE) forces, providing engineers<br />

the capability to repair and repair/improve roads, trails, bridges, and airfields, rapidly dig combat emplacements (i.e., crew served weapon positions, command posts, and individual fighting<br />

positions) for units throughout the entire theater <strong>of</strong> operations. Crew survivability will be addressed in accordance with the <strong>Army</strong>'s Long Term Armor Strategy (LTAS). The family <strong>of</strong> HMEE's<br />

supports the Future Engineer Force (FEF).<br />

Justification:<br />

FY2008 Global War on Terrorism(GWOT) Amendment procures 96 HMEE Type IIIs and 18 HMEE Type Is.<br />

FY08 Base Appropriation: $37.800 million<br />

FY08 GWOT Request: $0.000 million<br />

FY08 GWOT Cost Adjustment Request: $14.609 million<br />

FY08 Total: $52.409 million<br />

R05901 Item No. 161 Page 1 <strong>of</strong> 9 Exhibit P-40<br />

HIGH MOBILITY ENGINEER EXCAVATOR (HMEE) FOS 182 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

High Mobility Engineer Excavator (HMEE) Type I<br />

Program Elements for Code B Items:<br />

654804/H01<br />

Code:<br />

B<br />

Date:<br />

P-1 Item Nomenclature<br />

High Mobility Engineer Excavator (HMEE) Type I (R05900)<br />

R05901 (R05900)<br />

<strong>Other</strong> Related Program Elements:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty 105 105<br />

Gross Cost 28.3 28.3<br />

Less PY Adv Proc 28.3 28.3<br />

Plus CY Adv Proc<br />

Net Proc P1<br />

Initial Spares<br />

Total Proc Cost<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The High Mobility Engineer Excavator Type I (HMEE I) is a non-developmental item uniquely made for the military. HMEE Type I supports the Brigade Combat Team (BCT) within the Future<br />

Engineer Force (FEF). HMEE Type I is an all wheel drive, diesel engine driven, high mobility vehicle with backhoe, bucket loader, and other attachments, that is self-deployable (no truck/trailer<br />

combination required) and is capable <strong>of</strong> driving a minimum <strong>of</strong> 40 MPH on improved roads and 25 MPH <strong>of</strong>f-road, weight 26,000 pounds, and is air transportable via C-130 aircraft. The high mobility<br />

<strong>of</strong> the HMEE Type I provides an earthmoving machine capable <strong>of</strong> maintaining pace with the <strong>Army</strong>'s current and future combat systems and rapid movement between battle positions. The HMEE<br />

Type I is part <strong>of</strong> the Rapid Tactical Earthmoving (RTE) force and is used for clearing rubble and debris from routes and airfields; constructing UAV forward airstrips; providing survivability<br />

positions for critical assets like C2, radar and logistics (fuel and ammunition); improving ford sites; and supporting limited Combat Support (CS) and Combat Service Support (CSS) missions in<br />

forward area <strong>of</strong> the theater. Crew survivability will be addressed in accordance with the <strong>Army</strong>'s Long Term Armor Strategy (LTAS).<br />

Justification:<br />

FY08 Baseline: Procures 87 HMEEs Type I to support the Brigade Combat Teams (BCT) and will replace the Small Emplacement Excavator(SEE) procured in 1984.<br />

FY 2008 Global War on Terrorism Amendment funds 18 HMEEs Type Is.<br />

FY08 Base Appropriation: $23.760 million<br />

FY08 GWOT Cost Adjustment Request: $4.500 million<br />

FY08 Total: $28.260 million<br />

R05901 (R05900) Item No. 161 Page 2 <strong>of</strong> 9 Exhibit P-40<br />

High Mobility Engineer Excavator (HMEE) Type I 183 Budget Item Justification Sheet


High Mobility Engineer Excavator (HMEE) Type I<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

High Mobility Engineer Excavator (HMEE) Type I (R05900)<br />

R05901 (R05900)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY2008 Base Appropriation<br />

Hardware Base 20880 87 240<br />

Documentation 220<br />

Program Management Support 250<br />

System Fielding Support 350<br />

FAT Refurbishment<br />

Engineering In-House<br />

Testing<br />

Training Aid 1900<br />

Engineering Change Order 160<br />

Total Baseline 23760<br />

FY2008 GWOT Amendment Request<br />

Hardware GWOT Amd 4320 18 240<br />

System Fielding 180<br />

Total GWOT Amendment 4500<br />

Total: 28260<br />

R05901 (R05900) Item No. 161 Page 3 <strong>of</strong> 9 Exhibit P-5<br />

High Mobility Engineer Excavator (HMEE) Type I 184 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

High Mobility Engineer Excavator (HMEE) Type I<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

FY2008 Base Appropriation<br />

FY 2008<br />

JCB, Inc.<br />

Pooler, GA<br />

FY2008 GWOT Amendment Request<br />

FY 2008<br />

JCB, Inc.<br />

Pooler, GA<br />

P-1 Line Item Nomenclature:<br />

High Mobility Engineer Excavator (HMEE) Type I (R05900)<br />

R05901 (R05900)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

C/FP 5(4) TACOM, Warren, MI Jan 08 Jun 08 87 240<br />

C/FP 5(4) TACOM, Warren, MI Jan 08 Jun 08 18 240<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

R05901 (R05900) Item No. 161 Page 4 <strong>of</strong> 9 Exhibit P-5a<br />

High Mobility Engineer Excavator (HMEE) Type I 185 Budget <strong>Procurement</strong> History and Planning


High Mobility Engineer Excavator (HMEE) Type I<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

High Mobility Engineer Excavator (HMEE) Type I (R05900)<br />

R05901 (R05900)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Hardware Base<br />

1 FY 08 A 87 0 87 A 7 7 7 7 7 8 8 8 8 8 8 4 0<br />

Hardware GWOT Amd<br />

1 FY 08 A 18 0 18 A 7 7 4 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 105 105 14 14 11 7 7 8 8 8 8 8 8 4<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 JCB, Inc., Pooler, GA 2 10 20 3<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 12 12 8 20<br />

Reorder 0 4 5 9<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

Production rates stated are monthly vs. yearly.<br />

R05901 (R05900) Item No. 161 Page 5 <strong>of</strong> 9 Exhibit P-21<br />

High Mobility Engineer Excavator (HMEE) Type I 186 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

High Mobility Engineer Excavator (HMEE) Type III<br />

Program Elements for Code B Items:<br />

654804/H01<br />

Code:<br />

B<br />

Date:<br />

P-1 Item Nomenclature<br />

High Mobility Engineer Excavator (HMEE) Type III (R05910)<br />

R05901 (R05910)<br />

<strong>Other</strong> Related Program Elements:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty 215 215<br />

Gross Cost 24.1 24.1<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 24.1 24.1<br />

Initial Spares<br />

Total Proc Cost 24.1 24.1<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The HMEE Type III is a commercial <strong>of</strong>f the shelf backhoe light weight loader with minor military modifications. The HMEE Type III is capable <strong>of</strong> driving up to 25 MPH on improved roads, 7 MPH<br />

<strong>of</strong>f-road. The HMEE Type III weighs approximately 17,400 pounds and is air transportable via C-130 aircraft, highway with M916/M870 and M915/M172 truck trailer combination organic to the<br />

unit. The HMEE Type III is part <strong>of</strong> the Air Ground Lines <strong>of</strong> Communication (A/G LOC) force and is used for repair and repair/improve roads, trails, bridges, and airfields and is used in the Combat<br />

Support Brigades (CSB) which supports the Future Engineer Force (FEF). Crew survivability will be addressed in accordance with the <strong>Army</strong>'s Long Term Armor Strategy (LTAS).<br />

Justification:<br />

FY08 Baseline: Procures 119 HMEE Type IIIs to support the Combat Support Brigades and will replace the Small Emplacement Excavator(SEE) procured in 1984.<br />

FY08 Global War on Terrorism(GWOT) Cost Adjustment funds procures 96 HMEE Type IIIs.<br />

FY08 Base Appropriation: $14.040 million<br />

FY08 GWOT Request: $0.000 million<br />

FY08 GWOT Cost Adjustment Request: $10.109 million<br />

FY08 Total: $24.149 million<br />

R05901 (R05910) Item No. 161 Page 6 <strong>of</strong> 9 Exhibit P-40<br />

High Mobility Engineer Excavator (HMEE) Type III 187 Budget Item Justification Sheet


High Mobility Engineer Excavator (HMEE) Type III<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

High Mobility Engineer Excavator (HMEE) Type III (R05910)<br />

R05901 (R05910)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY2008 Base Appropriation<br />

Hardware (Base) B 11900 119 100<br />

Training Aid 1740<br />

Program Management Support 400<br />

Total Baseline 14040<br />

FY2008 GWOT Cost Adjustment<br />

Hardware (GWOT CA) 9600 96 100<br />

System Fielding (GWOT CA) 509<br />

Total FY 2008 GWOT Cost Adjustment 10109<br />

Total: 24149<br />

R05901 (R05910) Item No. 161 Page 7 <strong>of</strong> 9 Exhibit P-5<br />

High Mobility Engineer Excavator (HMEE) Type III 188 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

High Mobility Engineer Excavator (HMEE) Type III<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

Hardware (Base)<br />

FY 2008<br />

Case New Holland <strong>of</strong> America<br />

Racine, WI<br />

Hardware (GWOT CA)<br />

FY 2008<br />

Case New Holland <strong>of</strong> America<br />

Racine, WI<br />

P-1 Line Item Nomenclature:<br />

High Mobility Engineer Excavator (HMEE) Type III (R05910)<br />

R05901 (R05910)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

C/FP5(4) TACOM, Warren, MI Jan 08 Sep 08 119 100 YES N/A N/A<br />

C/FP5(4) TACOM, Warren, MI Jan 08 Sep 08 96 100 YES N/A N/A<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

R05901 (R05910) Item No. 161 Page 8 <strong>of</strong> 9 Exhibit P-5a<br />

High Mobility Engineer Excavator (HMEE) Type III 189 Budget <strong>Procurement</strong> History and Planning


High Mobility Engineer Excavator (HMEE) Type III<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

High Mobility Engineer Excavator (HMEE) Type III (R05910)<br />

R05901 (R05910)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Each TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Hardware (Base)<br />

1 FY 08 A 119 0 119 A 7 14 14 14 14 14 14 14 14 0<br />

Hardware (GWOT CA)<br />

1 FY 08 A 96 0 96 A 3 14 14 14 14 14 14 9 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 215 215 10 28 28 28 28 28 28 23 14<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Case New Holland <strong>of</strong> America, Racine, WI 5 10 30 3<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 12 9 4 13<br />

Reorder 0 4 3 7<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

Production rates stated are monthly vs. yearly.<br />

R05901 (R05910) Item No. 161 Page 9 <strong>of</strong> 9 Exhibit P-21<br />

High Mobility Engineer Excavator (HMEE) Type III 190 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

CONST EQUIP ESP<br />

Program Elements for Code B Items:<br />

Code:<br />

A<br />

P-1 Item Nomenclature<br />

CONST EQUIP ESP (M05500)<br />

M05500<br />

<strong>Other</strong> Related Program Elements:<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 52.5 52.5<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 52.5 52.5<br />

Initial Spares<br />

Total Proc Cost 52.5 52.5<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

Service Life Extension Program (SLEP) is for general Construction Equipment (CE) and Airborne/Airmobile construction equipment (includes Wheel Loaders, Scrapers, Road Graders, and<br />

Bulldozers). The SLEP program will support modularity requirements beginning in FY07. It also supports the Engineer Strategy by providing current construction capability until new procurements<br />

can be executed.<br />

The T9 Tractor (dozer) is the basic item <strong>of</strong> earthmoving equipment for heavy dozing and clearing. The tractor variations include winch, ripper or bull dozer with a medium draw bar pull. The<br />

tractors are equipped with a powershift transmission and hydraulically operated semi-U type dozer blade and a rear mounted winch or ripper. This tractor can be transported in the C-130 aircraft<br />

with the removal <strong>of</strong> some components. Due to the low ground bearing pressure <strong>of</strong> the crawler tractor, it has the capability <strong>of</strong> working in adverse underfoot conditions and is normally one <strong>of</strong> the first<br />

pieces <strong>of</strong> construction equipment on a job site. This tractor is used to perform dozing, rough grading, cutting and filling, and ripping in support <strong>of</strong> general engineer construction tasks.<br />

The Heavy Scraper, 14-18 cubic yard, is self-propelled and has an open bowl, pneumatic tires, two axles, a single diesel engine, and articulated frame steering. Its loading capacity is 14 cubic yards<br />

struck, and 18 cubic yards heaped. Normal mode <strong>of</strong> operation is to use a push tractor to maximize production. This self-propelled scraper can also work alone and self load. The scraper provides a<br />

hauling and dumping capability to perform efficient earthmoving tasks in support <strong>of</strong> earthmoving projects.<br />

The Grader is diesel-engine driven, pneumatic tired, with articulated frame steering. It is equpped with a power shift transmission, fully enclosed cab, hydraulically operated blade and scarifier. The<br />

grader is used for grading, shaping, bank sloping, ditching, scarifiying and general construction and maintenance <strong>of</strong> roads and airfields.<br />

Justification:<br />

FY 2008 Base Appropriation: $42.984 million<br />

FY 2008 Global War on Terrorism (GWOT) Request: $ 9.500 million<br />

FY 2008 GWOT Cost Adjustment: $ 0.000 million<br />

FY 2008 Total: $52.484 million<br />

M05500 Item No. 162 Page 1 <strong>of</strong> 5 Exhibit P-40<br />

CONST EQUIP ESP 191 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Date:<br />

September 2007<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

CONST EQUIP ESP<br />

P-1 Item Nomenclature<br />

CONST EQUIP ESP (M05500)<br />

M05500<br />

Program Elements for Code B Items:<br />

Code:<br />

A<br />

<strong>Other</strong> Related Program Elements:<br />

FY2008 GWOT dollars are for additional assets to prosecute the Global War on Terror providing like new vehicles to replace battle losses, generate and protect forces, and enhance military<br />

capabilities.<br />

M05500 Item No. 162 Page 2 <strong>of</strong> 5 Exhibit P-40<br />

CONST EQUIP ESP 192 Budget Item Justification Sheet


CONST EQUIP ESP<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

CONST EQUIP ESP (M05500)<br />

M05500<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY2008 Base Appropriation<br />

Hardware 41616 306 136<br />

Integrated Logisitic Support 500<br />

Engineering Support 360<br />

Program Management Support 508<br />

FY2008 Base Subtotal 42984<br />

FY2008 GWOT Request<br />

Hardware (Supplemental) A 9384 69 136<br />

Engineering Support<br />

Integrated Logistics Support<br />

Program Management Support 116<br />

FY2008 GWOT Request Subtotal 9500<br />

Total: 52484<br />

M05500 Item No. 162 Page 3 <strong>of</strong> 5 Exhibit P-5<br />

CONST EQUIP ESP 193 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

CONST EQUIP ESP<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

FY2008 Base Appropriation<br />

FY 2008<br />

Caterpillar<br />

Peoria, Il<br />

Hardware (Supplemental)<br />

FY 2008<br />

Caterpillar<br />

Peoria, Il<br />

P-1 Line Item Nomenclature:<br />

CONST EQUIP ESP (M05500)<br />

M05500<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

SS/FP(5)5 TACOM Jan 08 May 08 306 136 No N/A<br />

SS/FP 5(1) TACOM, Warren, MI Jul 08 Nov 08 69 136 No N/A<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

M05500 Item No. 162 Page 4 <strong>of</strong> 5 Exhibit P-5a<br />

CONST EQUIP ESP 194 Budget <strong>Procurement</strong> History and Planning


CONST EQUIP ESP<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

CONST EQUIP ESP (M05500)<br />

M05500<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Hardware (Base)<br />

1 FY 08 A 306 0 306 A 26 26 26 26 26 26 26 26 26 26 26 20 0<br />

Hardware (Supplemental)<br />

1 FY 08 A 69 0 69 A 14 14 14 14 13 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 375 375 26 26 26 26 26 26 40 40 40 40 39 20<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Caterpillar, Peoria, Il 10 30 40 3<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 0 0 0<br />

Reorder 0 4 4 8<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

M05500 Item No. 162 Page 5 <strong>of</strong> 5 Exhibit P-21<br />

CONST EQUIP ESP 195 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

GENERATORS AND ASSOCIATED EQUIP<br />

Program Elements for Code B Items:<br />

Code:<br />

A<br />

Date:<br />

P-1 Item Nomenclature<br />

GENERATORS AND ASSOCIATED EQUIP (MA9800)<br />

MA9800<br />

<strong>Other</strong> Related Program Elements:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 245.1 245.1<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 245.1 245.1<br />

Initial Spares<br />

Total Proc Cost 245.1 245.1<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

DOD has over 33,000 generators that do not meet user requirements and have an average age over 31 years. The Mobile Electric Power (MEP) program replaces and modernizes the DOD generator<br />

inventory to meet the <strong>Army</strong>'s requirements. The MEP program is structured around Small (2-3kW), Medium (5-60kW), Large (>100kW) stand-alone generators, multiple configurations <strong>of</strong> Power<br />

Units/Power Plants (PU/PP) and associated distribution equipment (Power Distribution Illumination System Electrical (PDISE)). These programs collectively provide a new, modern family <strong>of</strong><br />

generators and distribution systems satisfying critical user requirements and will:<br />

1. Reduce Acquisition Costs and Operating and Sustainment (O&S) costs by 15-20%.<br />

2. Reduce weight by 25% across generator population, thereby reducing the Logistics footprint and improving deployability.<br />

3. Significantly improve Reliability, Availability and Maintainability, to include Mean Time Between Failure improvements <strong>of</strong> 100-300%.<br />

4. Eliminate gasoline from the generator inventory, thus complying with DOD guidance regarding single fuel on the battlefield (diesel/JP8).<br />

5. Reduce battlefield detectability by lowering noise levels by 50-75% across generator population.<br />

6. Improve battlefield survivability critical to providing mission critical electric power to the digitized warfighting forces.<br />

Justification:<br />

FY08 Baseline: Procures small, medium and large generator sets, assembly <strong>of</strong> power units and power plants, and PDISE.<br />

FY08 Global War on Terrorism (GWOT) request: Procures medium and large generator sets, assembly <strong>of</strong> power units and power plants, and PDISE in support <strong>of</strong> ongoing GWOT operations..<br />

FY08 GWOT Cost Adjustment funds small, medium and large generator sets, assembly <strong>of</strong> power units and power plants, and PDISE in support <strong>of</strong> ongoing GWOT operations.<br />

FY08 Base Appropriation: $92.863 Million<br />

FY08 GWOT Request: $99.998 Million<br />

FY08 GWOT Cost Adjustment Request: $52.260 Million<br />

FY08 Total: $245.121 Million<br />

MA9800 Item No. 169 Page 1 <strong>of</strong> 34 Exhibit P-40<br />

GENERATORS AND ASSOCIATED EQUIP 196 Budget Item Justification Sheet


GENERATORS AND ASSOCIATED EQUIP<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

GENERATORS AND ASSOCIATED EQUIP (MA9800)<br />

MA9800<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY 2008 Base Appropriation<br />

Small Generator Sets (2kW-3kW) A 11302<br />

Medium Generator Sets (5kW-60kW) A 39799<br />

Large Generator Sets (=>100kW)) A 3640<br />

Power Unit /Power Plants A 29120<br />

PDISE A 9002<br />

Total FY 2008 Base Appropriation 92863<br />

FY 2008 GWOT Request<br />

Medium Generator Sets (5kW-60kW) 64516<br />

Large Generator Sets (=>100kW)) 5000<br />

Power Unit /Power Plants 23760<br />

PDISE 6722<br />

Total FY 2008 GWOT Request 99998<br />

FY 2008 GWOT Cost Adjustment Request<br />

Small Generator Sets (2kW-3kW) 10761<br />

Medium Generator Sets (5kW-60kW) 6790<br />

Large Generator Sets (=>100kW)) 2532<br />

Power Unit /Power Plants 27088<br />

PDISE 5089<br />

Total FY 2008 GWOT Cost Adjustmen<br />

Req<br />

52260<br />

Total: 245121<br />

MA9800 Item No. 169 Page 2 <strong>of</strong> 34 Exhibit P-5<br />

GENERATORS AND ASSOCIATED EQUIP 197 Weapon System Cost Analysis


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

MEDIUM SETS (5-60 KW)<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

P-1 Item Nomenclature<br />

MEDIUM SETS (5-60 KW) (M53500)<br />

MA9800 (M53500)<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 111.1 111.1<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 111.1 111.1<br />

Initial Spares<br />

Total Proc Cost 111.1 111.1<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Medium Generator Set program procures mid-range power sources, including the 5 kilowatt (kW), 10kW, 15kW, 30kW, and 60kW Skid Mounted, Diesel Fueled Tactical Quiet Generator<br />

(TQG) sets. These generators replace existing aged gasoline/diesel sets that are 28 years old with modernized diesel/JP8 fueled power sources that increase safety and survivability while improving<br />

reliability, reducing noise signatures, reducing weight, providing high altitude electromagnetic pulse (EMP) protection, reducing infrared signature, as well as removing gasoline from the battlefield.<br />

The TQGs provide significantly enhanced capabilities to the warfighters, as well as improved transportability, dramatically improved reliability and maintainability.<br />

Justification:<br />

FY08 Baseline: Procures 5kW, 10kW, 15kW, 30kW and 60kW TQG medium-sized sets which will replace aging sets, reduce total ownership costs, support Missile/Air Defense Systems, Tactical<br />

operations Centers, numerous communication and combat support systems (Command, Control, Communications, Computers, Intelligence, Surveillance, and Reconnaissance) (C4ISR) as well as<br />

Brigade Combat Teams (BCT).<br />

FY08 Global War on Terrorism (GWOT) Request: Procures 5kW, 10kW, 15kW, 30kW and 60kW TQG medium-sized sets.<br />

FY08 GWOT Cost Adjustment procures 5kW, 10kW, 15kW, 30kW and 60kW TQG medium-sized sets.<br />

FY08 Base Appropriation: $39.799 Million<br />

FY08 GWOT Request: $64.516 Million<br />

FY08 GWOT Cost Adjustment Request: $6.790 Million<br />

FY08 Total: $111.105 Million<br />

5kW AAO = 16,432<br />

10kW AAO = 12,965<br />

15kW AAO = 4,666<br />

30kW AAO = 3,501<br />

60kW AAO = 3,303<br />

MA9800 (M53500) Item No. 169 Page 3 <strong>of</strong> 34 Exhibit P-40<br />

MEDIUM SETS (5-60 KW) 198 Budget Item Justification Sheet


MEDIUM SETS (5-60 KW)<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

MEDIUM SETS (5-60 KW) (M53500)<br />

MA9800 (M53500)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY 2008 Base Appropriation<br />

1. Item Hardware (M53500)<br />

5kW Gen Sets<br />

5kW/60Hz A 5815 430 14<br />

10kW Gen Sets<br />

10kW/60Hz A 9977 658 15<br />

10kW/400Hz A 420 22 19<br />

15kW Gen Sets<br />

15kW/60Hz A 6714 422 16<br />

30kW Gen Sets<br />

30kW/60Hz A 4840 169 29<br />

60kW Gen Sets<br />

60kW/60Hz A 3576 109 33<br />

60kW/400Hz A 350 10 35<br />

2. Engineering Support 2548<br />

3. Engineering Change Orders 500<br />

4. Testing 250<br />

5. System Fielding Support 429<br />

6. System Assesment 324<br />

7. Logistics Support 1429<br />

8. Data 100<br />

9. PM Management Support 2527<br />

Base Appropriation Subtotal 39799<br />

FY 2008 GWOT Request<br />

5kW Gen Sets<br />

5kW/60Hz A 11170 826 14<br />

10kW Gen Sets<br />

10kW/60Hz A 19401 1279 15<br />

15kW Gen Sets<br />

15kW/60Hz A 22990 1445 16<br />

30kW Gen Sets<br />

MA9800 (M53500) Item No. 169 Page 4 <strong>of</strong> 34 Exhibit P-5<br />

MEDIUM SETS (5-60 KW) 199 Weapon System Cost Analysis


MEDIUM SETS (5-60 KW)<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

MEDIUM SETS (5-60 KW) (M53500)<br />

MA9800 (M53500)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

30kW/60Hz A 8363 292 29<br />

60kW Gen Sets<br />

60kW/60Hz A 2592 79 33<br />

GWOT Request Subtotal 64516<br />

FY 2008 GWOT Cost Adjustment Request<br />

5kW Gen Sets<br />

5kW/60Hz A 3716 274 14<br />

10kW Gen Sets<br />

10kW/60Hz A 2210 150 15<br />

10kW/400Hz A 185 10 18<br />

15kW Gen Sets<br />

15kW/60Hz A 124 8 16<br />

30kW Gen Sets<br />

30kW/60Hz A 115 4 29<br />

60kW Gen Sets<br />

60kW/60Hz A 264 8 33<br />

60kW/400Hz A 176 5 35<br />

Total FY 2008 GWOT Cost Adjustment<br />

Req<br />

6790<br />

Total: 111105<br />

MA9800 (M53500) Item No. 169 Page 5 <strong>of</strong> 34 Exhibit P-5<br />

MEDIUM SETS (5-60 KW) 200 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

MEDIUM SETS (5-60 KW)<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

5kW (Base)<br />

FY 2008<br />

DRS<br />

Bridgeport, CT<br />

10kW (Base)<br />

FY 2008<br />

DRS<br />

Bridgeport, CT<br />

15kW (Base)<br />

FY 2008<br />

DRS<br />

Bridgeport, CT<br />

30kW (Base)<br />

FY 2008 L-3<br />

Tulsa, OK<br />

60kW (Base)<br />

FY 2008 L-3<br />

Tulsa, OK<br />

5kW (GWOT)<br />

FY 2008<br />

DRS<br />

Bridgeport, CT<br />

10kW (GWOT)<br />

FY 2008<br />

DRS<br />

Bridgeport, CT<br />

15kW (GWOT)<br />

FY 2008<br />

DRS<br />

Bridgeport, CT<br />

30kW (GWOT)<br />

FY 2008 L-3<br />

Tulsa, OK<br />

60kW (GWOT)<br />

FY 2008 L-3<br />

Tulsa, OK<br />

5kW (GWOT Cost Adjustment)<br />

FY 2008<br />

DRS<br />

Bridgeport, CT<br />

10kW (GWOT Cost Adjustment)<br />

P-1 Line Item Nomenclature:<br />

MEDIUM SETS (5-60 KW) (M53500)<br />

MA9800 (M53500)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

C/FP-R10(1 CECOM Nov 07 Jul 08 430 14 YES<br />

C/FP-R10(1 CECOM Nov 07 Jul 08 680 15 YES<br />

C/FP-R10(1 CECOM Nov 07 Jul 08 422 16 YES<br />

C/FP-R7(6) CECOM Nov 07 Nov 08 169 29 YES<br />

C/FP-R7(6) CECOM Nov 07 Nov 08 119 33 YES<br />

C/FP-R10(1 CECOM Nov 07 Jul 08 826 14 YES<br />

C/FP-R10(1 CECOM Nov 07 Jul 08 1279 15 YES<br />

C/FP-R10(1 CECOM Nov 07 Jul 08 1445 16 YES<br />

C/FP-R7(6) CECOM Nov 07 Nov 08 292 29 YES<br />

C/FP-R7(6) CECOM Nov 07 Nov 08 79 33 YES<br />

C/FP-R10(1 CECOM Nov 07 Jul 08 274 14 YES<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

MA9800 (M53500) Item No. 169 Page 6 <strong>of</strong> 34 Exhibit P-5a<br />

MEDIUM SETS (5-60 KW) 201 Budget <strong>Procurement</strong> History and Planning


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

MEDIUM SETS (5-60 KW)<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

FY 2008<br />

DRS<br />

Bridgeport, CT<br />

15kW (GWOT Cost Adjustment)<br />

FY 2008<br />

DRS<br />

Bridgeport, CT<br />

30kW (GWOT Cost Adjustment)<br />

FY 2008 L-3<br />

Tulsa, OK<br />

60kW (GWOT Cost Adjustment)<br />

FY 2008 L-3<br />

Tulsa, OK<br />

P-1 Line Item Nomenclature:<br />

MEDIUM SETS (5-60 KW) (M53500)<br />

MA9800 (M53500)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

C/FP-R10(1 CECOM Nov 07 Jul 08 160 15 YES<br />

C/FP-R10(1 CECOM Nov 07 Jul 08 8 16 YES<br />

C/FP-R7(6) CECOM Nov 07 Nov 08 4 29 YES<br />

C/FP-R7(6) CECOM Nov 07 Nov 08 13 33 YES<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

MA9800 (M53500) Item No. 169 Page 7 <strong>of</strong> 34 Exhibit P-5a<br />

MEDIUM SETS (5-60 KW) 202 Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning


MEDIUM SETS (5-60 KW)<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

MEDIUM SETS (5-60 KW) (M53500)<br />

MA9800 (M53500)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

5kW (Base)<br />

1 FY 08 A 430 0 430 A 36 36 36 36 36 36 36 36 36 36 35 35 0<br />

10kW (Base)<br />

1 FY 08 A 680 0 680 A 57 57 57 57 57 57 57 57 56 56 56 56 0<br />

15kW (Base)<br />

1 FY 08 A 422 0 422 A 36 36 35 35 35 35 35 35 35 35 35 35 0<br />

30kW (Base)<br />

2 FY 08 A 169 0 169 A 15 14 14 14 14 14 14 14 14 14 14 14<br />

60kW (Base)<br />

2 FY 08 A 119 0 119 A 10 10 10 10 10 10 10 10 10 10 10 9<br />

5kW (GWOT)<br />

1 FY 08 A 826 0 826 A 68 68 69 69 69 69 69 69 69 69 69 69 0<br />

10kW (GWOT)<br />

1 FY 08 A 1279 0 1279 A 106 106 106 106 106 107 107 107 107 107 107 107 0<br />

15kW (GWOT)<br />

1 FY 08 A 1445 0 1445 A 121 121 121 121 121 120 120 120 120 120 120 120 0<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 DRS, Bridgeport, CT 1000 1400 4200<br />

2 L-3, Tulsa, OK 600 800 1900<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 6 8 8 16<br />

Reorder 6 1 8 9<br />

2 Initial 6 8 12 20<br />

Reorder 6 1 12 13<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

DRS max production rates are aggregate <strong>of</strong> 4200<br />

for the 5kW,10kW and 15kW sets.<br />

L-3 max production rates are aggregate <strong>of</strong> 1900<br />

for the 30kW and 60kW sets.<br />

All production rates shown are on an annual<br />

basis.<br />

MA9800 (M53500) Item No. 169 Page 8 <strong>of</strong> 34 Exhibit P-21<br />

MEDIUM SETS (5-60 KW) 203 Production Schedule


MEDIUM SETS (5-60 KW)<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

MEDIUM SETS (5-60 KW) (M53500)<br />

MA9800 (M53500)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

30kW (GWOT)<br />

2 FY 08 A 292 0 292 A 24 24 24 24 24 24 24 24 25 25 25 25<br />

60kW (GWOT)<br />

2 FY 08 A 79 0 79 A 6 6 6 6 6 7 7 7 7 7 7 7<br />

5kW (GWOT Cost Adjustment)<br />

1 FY 08 A 274 0 274 A 23 23 23 23 23 23 23 23 23 23 22 22 0<br />

10kW (GWOT Cost Adjustment)<br />

1 FY 08 A 160 0 160 A 14 14 14 14 13 13 13 13 13 13 13 13 0<br />

15kW (GWOT Cost Adjustment)<br />

1 FY 08 A 8 0 8 A 1 1 1 1 1 1 1 1 0<br />

30kW (GWOT Cost Adjustment)<br />

2 FY 08 A 4 0 4 A 1 1 1 1 0<br />

60kW (GWOT Cost Adjustment)<br />

2 FY 08 A 13 0 13 A 2 1 1 1 1 1 1 1 1 1 1 1<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 6200 6200 462 462 462 462 519 517 517 517 514 515 513 513 57 57 57 56<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 DRS, Bridgeport, CT 1000 1400 4200<br />

2 L-3, Tulsa, OK 600 800 1900<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 6 8 8 16<br />

Reorder 6 1 8 9<br />

2 Initial 6 8 12 20<br />

Reorder 6 1 12 13<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

DRS max production rates are aggregate <strong>of</strong> 4200<br />

for the 5kW,10kW and 15kW sets.<br />

L-3 max production rates are aggregate <strong>of</strong> 1900<br />

for the 30kW and 60kW sets.<br />

All production rates shown are on an annual<br />

basis.<br />

MA9800 (M53500) Item No. 169 Page 9 <strong>of</strong> 34 Exhibit P-21<br />

MEDIUM SETS (5-60 KW) 204 Production Schedule


MEDIUM SETS (5-60 KW)<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

MEDIUM SETS (5-60 KW) (M53500)<br />

MA9800 (M53500)<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

5kW (Base)<br />

1 FY 08 A 430 430 0<br />

10kW (Base)<br />

1 FY 08 A 680 680 0<br />

15kW (Base)<br />

1 FY 08 A 422 422 0<br />

30kW (Base)<br />

2 FY 08 A 169 155 14 14 0<br />

60kW (Base)<br />

2 FY 08 A 119 110 9 9 0<br />

5kW (GWOT)<br />

1 FY 08 A 826 826 0<br />

10kW (GWOT)<br />

1 FY 08 A 1279 1279 0<br />

15kW (GWOT)<br />

1 FY 08 A 1445 1445 0<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 DRS, Bridgeport, CT 1000 1400 4200<br />

2 L-3, Tulsa, OK 600 800 1900<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 6 8 8 16<br />

Reorder 6 1 8 9<br />

2 Initial 6 8 12 20<br />

Reorder 6 1 12 13<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

DRS max production rates are aggregate <strong>of</strong> 4200<br />

for the 5kW,10kW and 15kW sets.<br />

L-3 max production rates are aggregate <strong>of</strong> 1900<br />

for the 30kW and 60kW sets.<br />

All production rates shown are on an annual<br />

basis.<br />

MA9800 (M53500) Item No. 169 Page 10 <strong>of</strong> 34 Exhibit P-21<br />

MEDIUM SETS (5-60 KW) 205 Production Schedule


MEDIUM SETS (5-60 KW)<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

MEDIUM SETS (5-60 KW) (M53500)<br />

MA9800 (M53500)<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

30kW (GWOT)<br />

2 FY 08 A 292 267 25 25 0<br />

60kW (GWOT)<br />

2 FY 08 A 79 72 7 7 0<br />

5kW (GWOT Cost Adjustment)<br />

1 FY 08 A 274 274 0<br />

10kW (GWOT Cost Adjustment)<br />

1 FY 08 A 160 160 0<br />

15kW (GWOT Cost Adjustment)<br />

1 FY 08 A 8 8 0<br />

30kW (GWOT Cost Adjustment)<br />

2 FY 08 A 4 4 0<br />

60kW (GWOT Cost Adjustment)<br />

2 FY 08 A 13 12 1 1 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 6200 6144 56 56<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 DRS, Bridgeport, CT 1000 1400 4200<br />

2 L-3, Tulsa, OK 600 800 1900<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 6 8 8 16<br />

Reorder 6 1 8 9<br />

2 Initial 6 8 12 20<br />

Reorder 6 1 12 13<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

DRS max production rates are aggregate <strong>of</strong> 4200<br />

for the 5kW,10kW and 15kW sets.<br />

L-3 max production rates are aggregate <strong>of</strong> 1900<br />

for the 30kW and 60kW sets.<br />

All production rates shown are on an annual<br />

basis.<br />

MA9800 (M53500) Item No. 169 Page 11 <strong>of</strong> 34 Exhibit P-21<br />

MEDIUM SETS (5-60 KW) 206 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

LARGE SETS (=> 100 KW)<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

INCLUDES M56400 AND MA8800<br />

P-1 Item Nomenclature<br />

LARGE SETS (=> 100 KW) (M54400)<br />

MA9800 (M54400)<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 11.2 11.2<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 11.2 11.2<br />

Initial Spares<br />

Total Proc Cost 11.2 11.2<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Large Set Generator Program includes power sources 100 kilowatts(kW)and above, which includes the 100/200kW Tactical Quiet Generator (TQG) sets (M54400) and the 840W Power Units<br />

(M56400), which replaces the 750kW Diesel Engine (DE) with associated power distribution equipment as well as Items Less Than $5 Million (Generator Equipment)(MA8800).<br />

The 100/200kW sets are part <strong>of</strong> the Tactical Quiet Generator(TQG) program and come in two configurations, skid and trailer-mounted. This modernization and replacement effort will replace high<br />

maintenance cost military standard(MIL-STD) sets that are over 27 years old. These units are diesel/JP8 fueled and provide increased safety and survivability, improved reliability and<br />

maintainability, and decreased noise and infrared signatures, electromagnetic pulse protection as well as providing increased fuel efficiency and reduced total operating costs. First Unit Equipped<br />

(FUE) occurred in FY06.<br />

The 840kW Power Unit (with distribution equipment) is a joint <strong>Army</strong> and Air Force program that replaces the 750kW sets that contain 20-25 year old technology and associated high maintenance<br />

costs. The new 840kW units increase power density, reduce weight by 25%, reduce fuel consumption by 15%, and increase reliability and maintainability. The <strong>Army</strong>'s 840kW units are capable <strong>of</strong><br />

being towed at 55 MPH, are C-17 transportable and will be used to support 249th Engineer Battalion (Prime Power) missions, including C4ISR (Command, Control, Communications, Computers,<br />

Intelligence, Surveillance, and Reconnaissance) and humanitarian efforts.<br />

Justification:<br />

FY08 Baseline: Procures 100kW TQG sets for <strong>Army</strong> Deployable Medical Systems (DEPMEDS) and Engineer Support Groups. These modernized 100kW TQG sets will be the newest memebers <strong>of</strong><br />

the TQG family and will replace the high maintenance cost MIL-STD sets which have been in the field for over 29 years.<br />

FY08 Global War on Terrorism (GWOT) Request: Procures 100kW TQG sets.<br />

FY08 GWOT Cost Adjustment procures 100kW TQG sets.<br />

FY08 Base Appropriation: $3.640 Million<br />

FY08 GWOT Request: $5.000 Million<br />

FY08 GWOT Cost Adjustment: $2.532 Million<br />

MA9800 (M54400) Item No. 169 Page 12 <strong>of</strong> 34 Exhibit P-40<br />

LARGE SETS (=> 100 KW) 207 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

LARGE SETS (=> 100 KW)<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

INCLUDES M56400 AND MA8800<br />

FY08 Total: $11.172 Million<br />

100kW AAO = 490, 100kW Power Unit (PU) AAO = 370; 200kW AAO = 36; 840kW AAO = 42<br />

P-1 Item Nomenclature<br />

LARGE SETS (=> 100 KW) (M54400)<br />

MA9800 (M54400)<br />

Date:<br />

September 2007<br />

MA9800 (M54400) Item No. 169 Page 13 <strong>of</strong> 34 Exhibit P-40<br />

LARGE SETS (=> 100 KW) 208 Budget Item Justification Sheet


LARGE SETS (=> 100 KW)<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

LARGE SETS (=> 100 KW) (M54400)<br />

MA9800 (M54400)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY 2008 Base Appropriation<br />

1. Item Hardware<br />

100kW/60Hz A 762 11 69<br />

Assembly, Tools and Winter Kits A 114<br />

2. Engineering Support 535<br />

3. Engineering Change Orders 830<br />

4. Testing 500<br />

5. System Fielding Support 57<br />

6. System Assessment<br />

7. Logistics Support 250<br />

8. Data 200<br />

9. PM Management Support 392<br />

Base Appropriation Subtotal 3640<br />

FY 2008 GWOT Request<br />

100kW/60Hz A 5000 72 69<br />

GWOT Request Subtotal 5000<br />

FY 2008 GWOT Cost Adjustment Request<br />

100kW/60Hz A 2139 31 69<br />

Assembly, Tools and Winter Kits A 393<br />

Total FY 2008 GWOT Cost Adjustment<br />

Req<br />

2532<br />

Total: 11172<br />

MA9800 (M54400) Item No. 169 Page 14 <strong>of</strong> 34 Exhibit P-5<br />

LARGE SETS (=> 100 KW) 209 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

LARGE SETS (=> 100 KW)<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

100kW (Base)<br />

FY 2008<br />

DRS<br />

Bridgeport, CT<br />

100kW (GWOT)<br />

FY 2008<br />

DRS<br />

Bridgeport, CT<br />

100kW (GWOT Cost Adjustment)<br />

FY 2008<br />

DRS<br />

Bridgeport, CT<br />

P-1 Line Item Nomenclature:<br />

LARGE SETS (=> 100 KW) (M54400)<br />

MA9800 (M54400)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

C/FP-R13(9 CECOM Nov 07 Jul 08 11 69 YES<br />

C/FP-R13(9 CECOM Nov 07 Jul 08 72 69 YES<br />

C/FP-R13(9 CECOM Nov 07 Jul 08 31 69 YES<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

MA9800 (M54400) Item No. 169 Page 15 <strong>of</strong> 34 Exhibit P-5a<br />

LARGE SETS (=> 100 KW) 210 Budget <strong>Procurement</strong> History and Planning


LARGE SETS (=> 100 KW)<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

LARGE SETS (=> 100 KW) (M54400)<br />

MA9800 (M54400)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

100kW (Base)<br />

1 FY 08 A 11 0 11 A 1 1 1 1 1 1 1 1 1 1 1 0<br />

100kW (GWOT)<br />

1 FY 08 A 72 0 72 A 6 6 6 6 6 6 6 6 6 6 6 6 0<br />

100kW (GWOT Cost Adjustment)<br />

1 FY 08 A 31 0 31 A 3 3 3 3 3 3 3 2 2 2 2 2 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 114 114 10 10 10 10 10 10 10 9 9 9 9 8<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 DRS, Bridgeport, CT 12 55 360<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 6 6 8 14<br />

Reorder 6 1 8 9<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

Manufacturer has multiple products that<br />

contribute to the minimum production rate.<br />

Production rates shown are on an annual basis.<br />

MA9800 (M54400) Item No. 169 Page 16 <strong>of</strong> 34 Exhibit P-21<br />

LARGE SETS (=> 100 KW) 211 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

SMALL SETS (2-3 KW)<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

P-1 Item Nomenclature<br />

SMALL SETS (2-3 KW) (M59400)<br />

MA9800 (M59400)<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 22.1 22.1<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 22.1 22.1<br />

Initial Spares<br />

Total Proc Cost 22.1 22.1<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Small Generator Set program is a modernization and replacement effort that procures the 2 kilowatt (kW) Military Tactical Generator (MTG) Sets and the 3kW Tactical Quiet Generator (TQG)<br />

Sets. The 2kW MTG are manportable/skid mounted, diesel/JP8 fueled power sources that provide either alternating current (AC-60 hertz (Hz)or a direct current (DC-28Volt) power (two separate<br />

versions) configuration. The 3kW TQG is a skid mounted, diesel/JP8 fueled set in either a 60Hz configuration or a 400Hz configuration. These generators replace existing over-aged (over 35 years)<br />

gasoline/diesel sets with modernized diesel fueled assets that increase safety and survivability while improving reliability, reducing noise signatures, reducing weight, providing high altitude<br />

electromagnetic pulse protection, increasing infrared signature suppression.<br />

Justification:<br />

FY08 Baseline: Procures 3kW TQG sets. This program will replace existing old non-tactical gasoline engine sets with modern tactical assets with improved reliability, reduced weight and noise, and<br />

diesel/JP8 fueled engines. These modern sets will reduce operating and support costs. The small generator program supports Brigade Combat Teams (BCT), missile air defense systems, mobile<br />

kitchen units, other combat support systems and numerous communications systems. This program is critical to the <strong>Army</strong> having only one fuel (diesel/JP8) on the battlefield.<br />

FY08 GWOT Cost Adjustment Request procures 2kW Military Tactical Generator (MTG) sets and 3kW TQG sets.<br />

FY08 Base Appropriation: $11.302 Million<br />

FY08 GWOT Request: $0 Million<br />

FY08 GWOT Cost Adjustment Request: $10.761 Million<br />

FY08 Total: $22.063 Million<br />

2kW AAO = 10,152<br />

3kW AAO = 22,087<br />

MA9800 (M59400) Item No. 169 Page 17 <strong>of</strong> 34 Exhibit P-40<br />

SMALL SETS (2-3 KW) 212 Budget Item Justification Sheet


SMALL SETS (2-3 KW)<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

SMALL SETS (2-3 KW) (M59400)<br />

MA9800 (M59400)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000<br />

FY 2008 Base Appropriation<br />

1. Item Hardware (M59400)<br />

3kW Gen Sets<br />

3kW/60Hz A 8672 809 11<br />

2. Engineering Support 890<br />

3. Engineering Change Orders 100<br />

4. Testing 50<br />

5. System Fielding Support 150<br />

6. System Assessment 60<br />

7. Logistic Support 525<br />

8. Data 30<br />

9. PM Management Support 825<br />

Base Appropriation Subtotal 11302<br />

FY 2008 GWOT Cost Adjustment Request<br />

2kW Gen Sets<br />

2kW/60Hz A 358 71 5<br />

2kW/DC AA 379 81 5<br />

3kW Gen Sets<br />

3kW/60Hz A 10024 916 11<br />

Total FY 2008 GWOT Cost Adjustment 10761<br />

Total: 22063<br />

MA9800 (M59400) Item No. 169 Page 18 <strong>of</strong> 34 Exhibit P-5<br />

SMALL SETS (2-3 KW) 213 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

SMALL SETS (2-3 KW)<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

3kW (Base)<br />

FY 2008<br />

DRS<br />

Bridgeport, CT<br />

2kW (GWOT Cost Adjustment)<br />

FY 2008<br />

Dewey Electronics<br />

Oakland, NJ<br />

3kW (GWOT Cost Adjustment)<br />

FY 2008<br />

DRS<br />

Bridgeport, CT<br />

P-1 Line Item Nomenclature:<br />

SMALL SETS (2-3 KW) (M59400)<br />

MA9800 (M59400)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

C/FP-R10(8 CECOM Nov 07 Jul 08 809 11 YES<br />

C/FP-R10(6 CECOM Nov 07 Jul 08 152 5 YES<br />

C/FP-R10(8 CECOM Nov 07 Jul 08 916 11 YES<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

MA9800 (M59400) Item No. 169 Page 19 <strong>of</strong> 34 Exhibit P-5a<br />

SMALL SETS (2-3 KW) 214 Budget <strong>Procurement</strong> History and Planning


SMALL SETS (2-3 KW)<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

SMALL SETS (2-3 KW) (M59400)<br />

MA9800 (M59400)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

3kW (Base)<br />

1 FY 08 A 809 0 809 A 68 68 68 68 68 67 67 67 67 67 67 67 0<br />

2kW (GWOT Cost Adjustment)<br />

2 FY 08 A 152 0 152 A 13 13 13 13 13 13 13 13 12 12 12 12 0<br />

3kW (GWOT Cost Adjustment)<br />

1 FY 08 A 916 0 916 A 77 77 77 77 76 76 76 76 76 76 76 76 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 1877 1877 158 158 158 158 157 156 156 156 155 155 155 155<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 DRS, Bridgeport, CT 1200 2000 3600<br />

2 Dewey Electronics, Oakland, NJ 1200 2400 3600<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 6 5 8 13<br />

Reorder 6 1 8 9<br />

2 Initial 6 4 12 16<br />

Reorder 6 1 8 9<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

MA9800 (M59400) Item No. 169 Page 20 <strong>of</strong> 34 Exhibit P-21<br />

SMALL SETS (2-3 KW) 215 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

P-DISE 40-200 AMP<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

P-1 Item Nomenclature<br />

P-DISE 40-200 AMP (R45400)<br />

MA9800 (R45400)<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 20.8 20.8<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 20.8 20.8<br />

Initial Spares<br />

Total Proc Cost 20.8 20.8<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

Power Distribution Illumination System Electrical (PDISE) provides reliable, quick to assemble, modular designed power distribution equipment that is critical to deploying power networks. The<br />

PDISE family consists <strong>of</strong> five different end items, including two feeder systems, two power distribution systems and a utility system. PDISE is simple, reliable, and compatible with DOD generator<br />

sets from 5kW to 200kW. It is used to subdivide and distribute electricity from single power sources to multiple equipment users within shelters and various unit complexes, and thus is a critical<br />

element <strong>of</strong> the DOD power structure. PDISE is also critical to <strong>Army</strong>'s transformation by reducing the logistics footprint thru the use <strong>of</strong> centralized power configurations.<br />

Justification:<br />

FY08 Baseline: Procures PDISE to support Missile/Air Defense Systems, Tactical Operations Centers, numerous communication and combat support systems (Command, Control, Communications,<br />

Computers, Intelligence, surveillance, and Reconnaissance) (C4ISR). These items all so support the Medical Redesign Initiative (MRI), and brigade Combat Teams (BCT).<br />

FY08 Global War on Terrorism (GWOT) Request: Procures PDISE.<br />

FY08 GWOT Cost Adjustment procures PDISE.<br />

FY08 Base Appropriation: $9.002 Million<br />

FY08 GWOT Request: $6.722 Million<br />

FY08 GWOT Cost Adjustment: $5.089 Million<br />

FY08 Total: $20.813 Million<br />

MA9800 (R45400) Item No. 169 Page 21 <strong>of</strong> 34 Exhibit P-40<br />

P-DISE 40-200 AMP 216 Budget Item Justification Sheet


P-DISE 40-200 AMP<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

P-DISE 40-200 AMP (R45400)<br />

MA9800 (R45400)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000<br />

FY 2008 Base Appropriation<br />

1. Item Hardware (M53500)<br />

M200 A 247 10 25<br />

M100 A 1518 125 12<br />

M40 A 3073 241 13<br />

M46 (Utility Kit) A 2607 598 4<br />

2. Enginering Support 575<br />

3. Engineering Change Orders 100<br />

4. Testing 100<br />

5. System Fielding Support 50<br />

6. System Assessment 140<br />

7. Logistics Support 139<br />

8. Data 50<br />

9. PM Management Support 403<br />

Base Appropriation Subtotal 9002<br />

FY 2008 GWOT Request<br />

M200 A 74 3 25<br />

M100 A 802 66 12<br />

M40 A 2818 221 13<br />

M46 (Utility Kit) A 3028 695 4<br />

GWOT Request Subtotal 6722<br />

FY 2008 GWOT Cost Adjustment Request<br />

M100 A 1083 91 12<br />

M40 A 2144 168 13<br />

M46 (Utility Kit) A 1862 436 4<br />

Total FY 2008 GWOT Cost Adjustment<br />

Req<br />

5089<br />

Total: 20813<br />

MA9800 (R45400) Item No. 169 Page 22 <strong>of</strong> 34 Exhibit P-5<br />

P-DISE 40-200 AMP 217 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

P-DISE 40-200 AMP<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

M200 (Base)<br />

FY 2008<br />

Tobyhanna <strong>Army</strong> Depot<br />

Tobyhanna, PA<br />

M100 (Base)<br />

FY 2008<br />

Tobyhanna <strong>Army</strong> Depot<br />

Tobyhanna, PA<br />

M40 (Base)<br />

FY 2008<br />

Tobyhanna <strong>Army</strong> Depot<br />

Tobyhanna, PA<br />

M46 (Utility Kit) (Base)<br />

FY 2008<br />

Tobyhanna <strong>Army</strong> Depot<br />

Tobyhanna, PA<br />

M200 (GWOT)<br />

FY 2008<br />

Tobyhanna <strong>Army</strong> Depot<br />

Tobyhanna, PA<br />

M100 (GWOT)<br />

FY 2008<br />

Tobyhanna <strong>Army</strong> Depot<br />

Tobyhanna, PA<br />

M40 (GWOT)<br />

FY 2008<br />

Tobyhanna <strong>Army</strong> Depot<br />

Tobyhanna, PA<br />

M46 (Utility Kit) (GWOT)<br />

FY 2008<br />

Tobyhanna <strong>Army</strong> Depot<br />

Tobyhanna, PA<br />

M100 (GWOT Cost Adjustment)<br />

FY 2008<br />

Tobyhanna <strong>Army</strong> Depot<br />

Tobyhanna, PA<br />

M40 (GWOT Cost Adjustment)<br />

FY 2008<br />

Tobyhanna <strong>Army</strong> Depot<br />

Tobyhanna, PA<br />

M46 (Utility Kit) (GWOT Cost Adjustment)<br />

FY 2008<br />

Tobyhanna <strong>Army</strong> Depot<br />

Tobyhanna, PA<br />

P-1 Line Item Nomenclature:<br />

P-DISE 40-200 AMP (R45400)<br />

MA9800 (R45400)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Units<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

FFP CECOM Nov 07 Nov 08 10 25 YES<br />

FFP CECOM Nov 07 Nov 08 125 12 YES<br />

FFP CECOM Nov 07 Nov 08 241 13 YES<br />

FFP CECOM Nov 07 Nov 08 598 4 YES<br />

FFP CECOM Nov 07 Nov 08 3 25 YES<br />

FFP CECOM Nov 07 Nov 08 66 12 YES<br />

FFP CECOM Nov 07 Nov 08 221 13 YES<br />

FFP CECOM Nov 07 Nov 08 695 4 YES<br />

FFP CECOM Nov 07 Nov 08 91 12 YES<br />

FFP CECOM Nov 07 Nov 08 168 13 YES<br />

FFP CECOM Nov 07 Nov 08 436 4 YES<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

MA9800 (R45400) Item No. 169 Page 23 <strong>of</strong> 34 Exhibit P-5a<br />

P-DISE 40-200 AMP 218 Budget <strong>Procurement</strong> History and Planning


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

P-DISE 40-200 AMP<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Date:<br />

September 2007<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

P-1 Line Item Nomenclature:<br />

P-DISE 40-200 AMP (R45400)<br />

MA9800 (R45400)<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Units<br />

Unit Cost<br />

$000<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

MA9800 (R45400) Item No. 169 Page 24 <strong>of</strong> 34 Exhibit P-5a<br />

P-DISE 40-200 AMP 219 Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning


P-DISE 40-200 AMP<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

P-DISE 40-200 AMP (R45400)<br />

MA9800 (R45400)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

M200 (Base)<br />

1 FY 08 A 10 0 10 A 1 1 1 1 1 1 1 1 1 1 0<br />

M100 (Base)<br />

1 FY 08 A 125 0 125 A 11 11 11 11 11 10 10 10 10 10 10 10<br />

M40 (Base)<br />

1 FY 08 A 241 0 241 A 21 20 20 20 20 20 20 20 20 20 20 20<br />

M46 (Utility Kit) (Base)<br />

1 FY 08 A 598 0 598 A 49 49 50 50 50 50 50 50 50 50 50 50<br />

M200 (GWOT)<br />

1 FY 08 A 3 0 3 A 1 1 1 0<br />

M100 (GWOT)<br />

1 FY 08 A 66 0 66 A 6 6 6 6 6 6 5 5 5 5 5 5<br />

M40 (GWOT)<br />

1 FY 08 A 221 0 221 A 19 19 19 19 19 18 18 18 18 18 18 18<br />

M46 (Utility Kit) (GWOT)<br />

1 FY 08 A 695 0 695 A 58 58 58 58 58 58 58 58 58 58 58 57<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Tobyhanna <strong>Army</strong> Depot, Tobyhanna, PA 1000 2500<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 3 9 12 21<br />

Reorder 3 1 12 13<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

MA9800 (R45400) Item No. 169 Page 25 <strong>of</strong> 34 Exhibit P-21<br />

P-DISE 40-200 AMP 220 Production Schedule


P-DISE 40-200 AMP<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

P-DISE 40-200 AMP (R45400)<br />

MA9800 (R45400)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

M100 (GWOT Cost Adjustment)<br />

1 FY 08 A 91 0 91 A 8 8 8 8 8 8 8 7 7 7 7 7<br />

M40 (GWOT Cost Adjustment)<br />

1 FY 08 A 168 0 168 A 14 14 14 14 14 14 14 14 14 14 14 14<br />

M46 (Utility Kit) (GWOT Cost Adjustment)<br />

1 FY 08 A 436 0 436 A 37 37 37 37 36 36 36 36 36 36 36 36<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 2654 2654 225 224 225 224 223 221 220 219 219 219 218 217<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Tobyhanna <strong>Army</strong> Depot, Tobyhanna, PA 1000 2500<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 3 9 12 21<br />

Reorder 3 1 12 13<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

MA9800 (R45400) Item No. 169 Page 26 <strong>of</strong> 34 Exhibit P-21<br />

P-DISE 40-200 AMP 221 Production Schedule


P-DISE 40-200 AMP<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

P-DISE 40-200 AMP (R45400)<br />

MA9800 (R45400)<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

M200 (Base)<br />

1 FY 08 A 10 10 0<br />

M100 (Base)<br />

1 FY 08 A 125 115 10 10 0<br />

M40 (Base)<br />

1 FY 08 A 241 221 20 20 0<br />

M46 (Utility Kit) (Base)<br />

1 FY 08 A 598 548 50 50 0<br />

M200 (GWOT)<br />

1 FY 08 A 3 3 0<br />

M100 (GWOT)<br />

1 FY 08 A 66 61 5 5 0<br />

M40 (GWOT)<br />

1 FY 08 A 221 203 18 18 0<br />

M46 (Utility Kit) (GWOT)<br />

1 FY 08 A 695 638 57 57 0<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Tobyhanna <strong>Army</strong> Depot, Tobyhanna, PA 1000 2500<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 3 9 12 21<br />

Reorder 3 1 12 13<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

MA9800 (R45400) Item No. 169 Page 27 <strong>of</strong> 34 Exhibit P-21<br />

P-DISE 40-200 AMP 222 Production Schedule


P-DISE 40-200 AMP<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

P-DISE 40-200 AMP (R45400)<br />

MA9800 (R45400)<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

M100 (GWOT Cost Adjustment)<br />

1 FY 08 A 91 84 7 7 0<br />

M40 (GWOT Cost Adjustment)<br />

1 FY 08 A 168 154 14 14 0<br />

M46 (Utility Kit) (GWOT Cost Adjustment)<br />

1 FY 08 A 436 400 36 36 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 2654 2437 217 217<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Tobyhanna <strong>Army</strong> Depot, Tobyhanna, PA 1000 2500<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 3 9 12 21<br />

Reorder 3 1 12 13<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

MA9800 (R45400) Item No. 169 Page 28 <strong>of</strong> 34 Exhibit P-21<br />

P-DISE 40-200 AMP 223 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

POWER UNITS/POWER PLANTS<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

P-1 Item Nomenclature<br />

POWER UNITS/POWER PLANTS (R62700)<br />

MA9800 (R62700)<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 80.0 80.0<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 80.0 80.0<br />

Initial Spares<br />

Total Proc Cost 80.0 80.0<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

Depot/Field Manufacturing Program: The integration <strong>of</strong> Tactical Quiet Generators (TQGs) on trailers with the electronic components are defined as power units or power plants. Power Units (PU)<br />

consist <strong>of</strong> one TQG mounted on a trailer. Power Plants (PP) consist <strong>of</strong> two TQG's mounted on either one or two trailers (depending on size) with a switchbox installed. The trailers are procured<br />

through the Tank and Automotive Command (TACOM) and the electronic components/raw materials are procured through the depot or by other government activities and competitive contracts. Set<br />

sizes from 3 kilowatt (kW) thru 60kW are mounted in Power Unit/Power Plant (PU/PP) configurations to meet the requirements <strong>of</strong> DOD.<br />

NOTE: The FY 2008 P-5 data reflects the overall procurement <strong>of</strong> trailers, switch boxes, and the integration <strong>of</strong> the generators onto the trailers. In FY08 the cost shown on the P5 for each PU/PP<br />

includes the cost <strong>of</strong> the generator sets, assembly, trailer, and switchbox. Prior to FY08 the cost shown did not include the generator sets. In FY08, the manufacturing lead time includes the time to<br />

order and receive the generator sets, trailers and switchboxes used on the PU/PP and the assembly <strong>of</strong> the PU/PP.<br />

Justification:<br />

FY08 Baseline: Procures Power Units and Power Plants (PU/PP) in sizes 3 thru 60kW sizes. The program continues fielding for Brigade Combat Teams (BCT). Total package fielding <strong>of</strong><br />

Missile/Air Defense Systems, Communications Systems and Combat Support Systems are dependendt upon these power unit/power plant configurations.<br />

FY08 Global War on Terrorism (GWOT) request: Procures Power Units and Power Plants (PU/PP) in sizes 3 thru 60kW sizes.<br />

FY08 GWOT Cost Adjustment procures Power Units and Power Plants (PU/PP) in sizes 3 thru 60kW sizes.<br />

FY08 Base Appropriation: $29.120 Million<br />

FY08 GWOT Request: $23.760 Million<br />

FY08 GWOT Cost Adjustment:$27.088 Million<br />

FY08 Total: $79.968 Million<br />

Power Units/Power Plants AAO = 17,537<br />

MA9800 (R62700) Item No. 169 Page 29 <strong>of</strong> 34 Exhibit P-40<br />

POWER UNITS/POWER PLANTS 224 Budget Item Justification Sheet


POWER UNITS/POWER PLANTS<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

POWER UNITS/POWER PLANTS (R62700)<br />

MA9800 (R62700)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY 2008 Base Appropriation<br />

1. Power Units/Power Plants<br />

AN/MJQ37 (two 10kW/60Hz, M103,SB) A 3369 75 45<br />

AN/MJQ40 (two 30kW/60Hz, two M200, SB) A 4819 61 79<br />

AN/MJQ41 (two 60kW/60Hz, two M200, SB) A 4776 55 87<br />

AN/MJQ42 (two 3kW/60Hz, LTT, SB, racks) A 73 2 36<br />

AN/MJQ43 (two 3kW/60Hz, LTT, SB) A 73 2 36<br />

PU797 (5kW/60Hz, LTT) A 430 20 22<br />

PU798 (10kW/60Hz, LTT) A 5754 249 23<br />

PU799 (10kW/400Hz, LTT) A 297 11 27<br />

PU801 (15kW/60Hz, LTT) A 1692 70 24<br />

PU802 (15kW/60Hz, M200) A 1469 65 23<br />

PU803 (30kW/60Hz, M200) A 2103 60 35<br />

PU805 (60kW/60Hz, M200) A 1761 45 39<br />

PU806 (60kW/400Hz, M200) A 207 5 41<br />

2. Engineering Support 717<br />

3. Engineering Change Orders 6<br />

4. Testing 49<br />

5. System Fielding Support 90<br />

6. System Assessment 75<br />

7. Logistics Support 529<br />

8. Data 141<br />

9. PM Management Support 690<br />

Base Appropriation Subtotal 29120<br />

FY 2008 GWOT Request<br />

AN/MJQ37 (two 10kW/60Hz, M103,SB) A 3369 75 45<br />

AN/MJQ40 (two 30kW/60Hz, two M200, SB) A 4819 61 79<br />

AN/MJQ41 (two 60kW/60Hz, two M200, SB) A 1713 20 86<br />

AN/MJQ42 (two 3kW/60Hz, LTT, SB, racks) A 73 2 36<br />

AN/MJQ43 (two 3kW/60Hz, LTT, SB) A 73 2 36<br />

PU797 (5kW/60Hz, LTT) A 430 20 22<br />

MA9800 (R62700) Item No. 169 Page 30 <strong>of</strong> 34 Exhibit P-5<br />

POWER UNITS/POWER PLANTS 225 Weapon System Cost Analysis


POWER UNITS/POWER PLANTS<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

POWER UNITS/POWER PLANTS (R62700)<br />

MA9800 (R62700)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

PU798 (10kW/60Hz, LTT) A 5754 249 23<br />

PU799 (10kW/400Hz, LTT) A 297 11 27<br />

PU801 (15kW/60Hz, LTT) A 1692 70 24<br />

PU802 (15kW/60Hz, M200) A 1469 65 23<br />

PU803 (30kW/60Hz, M200) A 2103 60 35<br />

PU805 (60kW/60Hz, M200) A 1761 45 39<br />

PU806 (60kW/400Hz, M200) A 207 5 41<br />

GWOT Request Subtotal 23760<br />

FY 2008 GWOT Cost Adjustment Request<br />

AN/MJQ37 (two 10kW/60Hz, M103,SB) 828 18 46<br />

AN/MJQ40 (two 30kW/60Hz, two M200, SB) 3887 49 79<br />

AN/MJQ41 (two 60kW/60Hz, two M200, SB) 2354 27 87<br />

AN/MJQ48a (two 15kW/60Hz, LTT, SB) 3456 60 58<br />

PU797 (5kW/60Hz, LTT) 2134 97 22<br />

PU798 (10kW/60Hz, LTT) 5333 225 24<br />

PU799 (10kW/400Hz, LTT) 275 10 28<br />

PU801 (15kW/60Hz, LTT) 98 4 24<br />

PU802 (15kW/60Hz, M200) 4823 207 23<br />

PU803 (30kW/60Hz, M200) 2711 77 35<br />

PU805 (60kW/60Hz, M200) 982 25 39<br />

PU806 (60kW/400Hz, M200) 207 5 41<br />

Total FY 2008 GWOT Cost Adjustment<br />

Req<br />

27088<br />

Total: 79968<br />

MA9800 (R62700) Item No. 169 Page 31 <strong>of</strong> 34 Exhibit P-5<br />

POWER UNITS/POWER PLANTS 226 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

POWER UNITS/POWER PLANTS<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

Power Units/Power Plants (Base)<br />

FY 2008<br />

Tobyhanna <strong>Army</strong> Depot<br />

Tobyhanna, PA<br />

Power Units/Power Plants (GWOT)<br />

FY 2008<br />

Tobyhanna <strong>Army</strong> Depot<br />

Tobyhanna, PA<br />

Power Units/Power Plants (GWOT Cost Adj)<br />

FY 2008<br />

Tobyhanna <strong>Army</strong> Depot<br />

Tobyhanna, PA<br />

P-1 Line Item Nomenclature:<br />

POWER UNITS/POWER PLANTS (R62700)<br />

MA9800 (R62700)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

WR CECOM/TYAD Nov 07 Feb 09 720 YES<br />

WR CECOM/TYAD Nov 07 Feb 09 685 YES<br />

WR CECOM/TYAD Nov 07 Feb 09 804 YES<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS: Starting in FY08, the manufacturing lead time includes the time to order and receive the generator sets, trailers and switchboxes used on the Power Units/Power Plants (PU/PP) and the assembly <strong>of</strong> the PU/PP.<br />

MA9800 (R62700) Item No. 169 Page 32 <strong>of</strong> 34 Exhibit P-5a<br />

POWER UNITS/POWER PLANTS 227 Budget <strong>Procurement</strong> History and Planning


POWER UNITS/POWER PLANTS<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

POWER UNITS/POWER PLANTS (R62700)<br />

MA9800 (R62700)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Power Units/Power Plants (Base)<br />

1 FY 08 A 720 0 720 A 60 60 60 60 60 60 60 60 240<br />

Power Units/Power Plants (GWOT)<br />

1 FY 08 A 685 0 685 A 58 57 57 57 57 57 57 57 228<br />

Power Units/Power Plants (GWOT Cost Adj)<br />

1 FY 08 A 804 0 804 A 67 67 67 67 67 67 67 67 268<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 2209 2209 185 184 184 184 184 184 184 184 736<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Tobyhanna <strong>Army</strong> Depot, Tobyhanna, PA 500 1400 2800<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 4 5 15 20<br />

Reorder 4 1 15 16<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

This is an integration <strong>of</strong> components delivered to<br />

the depot which makes up the power units/power<br />

plants. This is one <strong>of</strong> many such efforts at the<br />

depot.<br />

In FY08 the manufacturing lead time includes the<br />

time to obtain the generator sets as well as<br />

assemble the power unit or power plant.<br />

MA9800 (R62700) Item No. 169 Page 33 <strong>of</strong> 34 Exhibit P-21<br />

POWER UNITS/POWER PLANTS 228 Production Schedule


POWER UNITS/POWER PLANTS<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

POWER UNITS/POWER PLANTS (R62700)<br />

MA9800 (R62700)<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Power Units/Power Plants (Base)<br />

1 FY 08 A 720 480 240 60 60 60 60 0<br />

Power Units/Power Plants (GWOT)<br />

1 FY 08 A 685 457 228 57 57 57 57 0<br />

Power Units/Power Plants (GWOT Cost Adj)<br />

1 FY 08 A 804 536 268 67 67 67 67 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 2209 1473 736 184 184 184 184<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Tobyhanna <strong>Army</strong> Depot, Tobyhanna, PA 500 1400 2800<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 4 5 15 20<br />

Reorder 4 1 15 16<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

This is an integration <strong>of</strong> components delivered to<br />

the depot which makes up the power units/power<br />

plants. This is one <strong>of</strong> many such efforts at the<br />

depot.<br />

In FY08 the manufacturing lead time includes the<br />

time to obtain the generator sets as well as<br />

assemble the power unit or power plant.<br />

MA9800 (R62700) Item No. 169 Page 34 <strong>of</strong> 34 Exhibit P-21<br />

POWER UNITS/POWER PLANTS 229 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Rough Terrain Container Handler (RTCH)<br />

Program Elements for Code B Items:<br />

Code:<br />

A<br />

P-1 Item Nomenclature<br />

Rough Terrain Container Handler (RTCH) (M41200)<br />

M41200<br />

<strong>Other</strong> Related Program Elements:<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty 165 165<br />

Gross Cost 130.0 130.0<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 130.0 130.0<br />

Initial Spares<br />

Total Proc Cost 130.0 130.0<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The RT-240, Rough Terrain Container Handler (RTCH) moves, lifts and stacks International Standard Organization (ISO) containers like no other piece <strong>of</strong> equipment in the world. The RT-240<br />

operates worldwide on multiple terrains, including sand, to lift and transfer ISO containers weighing up to 53,000 pounds. The RT-240 has 4-wheel drive and is capable <strong>of</strong> fording 5 feet <strong>of</strong> salt<br />

water. The RTCH is C-5 or C-17 air transportable and can be configured in minutes for loading to a drive-on/drive-<strong>of</strong>f mode. Currently, the U.S. <strong>Army</strong> has over 1 million ISO containers in Iraq,<br />

Kuwait and Afghanistan. The RTCH is the critical element in handling all <strong>of</strong> these containers. The RT-240 is equipped with an expandable 20 to 40 foot top handler capable <strong>of</strong> handling the new<br />

ISO family <strong>of</strong> 8' X 20' and 8' X 40' containers. It is capable <strong>of</strong> stacking containers three high and can reach a container in a second row. The RT-240 serves a vital need since it is necessary to stack<br />

containers in temporary storage areas, sort them by ultimate destination, and transfer the containers to appropriate modes <strong>of</strong> transport for onward movement. A single trained RTCH operator can<br />

quickly and efficiently load or unload an entire convoy in minutes instead <strong>of</strong> hours. The RT-240 will handle a large number <strong>of</strong> containers anticipated to flow through overseas ports, the theater<br />

distribution system and centers to forward support areas. The RTCH is a joint US <strong>Army</strong>, Navy and Marine Corps acquisition program. Foreign Military Sales (FMS) <strong>of</strong> the RTCH have included the<br />

United Kingdom and Australia.<br />

Justification:<br />

FY08 Baseline: Procures 34 RTCHs required to fill critical shortages within Active <strong>Army</strong> units and to papyback equipment diverted from the Reserve Component.<br />

FY08 Global War on Terrorism (GWOT) dollars procures 37 additional RTCH assets to prosecute the Global War on Terror by replacing battle losses, generating and protecting forces, and<br />

enhancing military capabilities.<br />

FY08 GWOT Cost Adjustment funds procure an additional 104 RTCH assets to prosecute the Global War on Terror by replacing battle losses, generating and protecting forces, and enhancing<br />

military capabilities.<br />

FY08 Base Appropriation: $ 20.587 million<br />

FY08 GWOT Request: $ 29.219 million<br />

FY08 GWOT Cost Adjustment Request: $ 80.195 million<br />

M41200 Item No. 170 Page 1 <strong>of</strong> 6 Exhibit P-40<br />

Rough Terrain Container Handler (RTCH) 230 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Date:<br />

September 2007<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Rough Terrain Container Handler (RTCH)<br />

P-1 Item Nomenclature<br />

Rough Terrain Container Handler (RTCH) (M41200)<br />

M41200<br />

Program Elements for Code B Items:<br />

Code:<br />

A<br />

<strong>Other</strong> Related Program Elements:<br />

FY08 Total: $ 130.001 million<br />

M41200 Item No. 170 Page 2 <strong>of</strong> 6 Exhibit P-40<br />

Rough Terrain Container Handler (RTCH) 231 Budget Item Justification Sheet


Rough Terrain Container Handler (RTCH)<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

Rough Terrain Container Handler (RTCH) (M41200)<br />

M41200<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY2008 Base Appropriation<br />

Hardware (Base) 18000 24 750<br />

Documentation 200<br />

Engineering In-House 150<br />

Program Management Support 637<br />

System Fielding Support (Base) 1600<br />

FY2008 Base Appropriation Subtotal 20587<br />

FY2008 Main Supplemental<br />

Hardware (Main Supp) A 27750 37 750<br />

System Fielding Support (Main Supp) 1469<br />

FY2008 Main Supplemental Subtotal 29219<br />

FY2008 GWOT Cost Adjustment<br />

Hardware (GWOT Cost Adjustment) 78000 104 750<br />

System Fielding Support (GWOT Cost Adju) 2195<br />

FY2008 GWOT Cost Adjustment<br />

Subtotal<br />

80195<br />

Total: 130001<br />

M41200 Item No. 170 Page 3 <strong>of</strong> 6 Exhibit P-5<br />

Rough Terrain Container Handler (RTCH) 232 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

Rough Terrain Container Handler (RTCH)<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

FY2008 Base Appropriation<br />

FY 2008<br />

Kalmar RT Center<br />

San Antonio, TX<br />

FY2008 Main Supplemental<br />

FY 2008<br />

Kalmar RT Center<br />

San Antonio, TX<br />

FY2008 GWOT Cost Adjustment<br />

FY 2008<br />

Kalmar RT Center<br />

San Antonio, TX<br />

P-1 Line Item Nomenclature:<br />

Rough Terrain Container Handler (RTCH) (M41200)<br />

M41200<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

SS/FP5(1) TACOM Apr 08 Feb 09 24 750 Y N/A N/A<br />

SS/FP5(1) TACOM Apr 08 Jul 09 37 750 Y N/A N/A<br />

SS/FP5(1) TACOM Apr 08 Feb 09 104 750 Y N/A N/A<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

M41200 Item No. 170 Page 4 <strong>of</strong> 6 Exhibit P-5a<br />

Rough Terrain Container Handler (RTCH) 233 Budget <strong>Procurement</strong> History and Planning


Rough Terrain Container Handler (RTCH)<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

Rough Terrain Container Handler (RTCH) (M41200)<br />

M41200<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

FY2008 Base Appropriation<br />

1 FY 08 A 24 0 24 A 2 2 2 2 2 2 2 2 8<br />

FY2008 Main Supplemental<br />

1 FY 08 A 37 0 37 A 6 6 5 20<br />

FY2008 Amended GWOT<br />

1 FY 08 A 104 0 104 A 10 10 10 9 9 8 8 8 32<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 165 165 12 12 12 11 11 16 16 15 60<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Kalmar RT Center, San Antonio, TX 2 10 20 6<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 0 0 0<br />

Reorder 0 7 10 17<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

Production rates stated are monthly vs. yearly.<br />

Monthly Production rates will be 20 Max.<br />

Contractor will have two shifts.<br />

M41200 Item No. 170 Page 5 <strong>of</strong> 6 Exhibit P-21<br />

Rough Terrain Container Handler (RTCH) 234 Production Schedule


Rough Terrain Container Handler (RTCH)<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

Rough Terrain Container Handler (RTCH) (M41200)<br />

M41200<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

FY2008 Base Appropriation<br />

1 FY 08 A 24 16 8 2 2 2 2 0<br />

FY2008 Main Supplemental<br />

1 FY 08 A 37 17 20 5 5 5 5 0<br />

FY2008 Amended GWOT<br />

1 FY 08 A 104 72 32 8 8 8 8 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 165 105 60 15 15 15 15<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Kalmar RT Center, San Antonio, TX 2 10 20 6<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 0 0 0<br />

Reorder 0 7 10 17<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

Production rates stated are monthly vs. yearly.<br />

Monthly Production rates will be 20 Max.<br />

Contractor will have two shifts.<br />

M41200 Item No. 170 Page 6 <strong>of</strong> 6 Exhibit P-21<br />

Rough Terrain Container Handler (RTCH) 235 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

ALL TERRAIN LIFTING ARMY SYSTEM<br />

Program Elements for Code B Items:<br />

Code:<br />

B<br />

Date:<br />

P-1 Item Nomenclature<br />

ALL TERRAIN LIFTING ARMY SYSTEM (M41800)<br />

M41800<br />

<strong>Other</strong> Related Program Elements:<br />

654804/H14<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 58.1 58.1<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 58.1 58.1<br />

Initial Spares<br />

Total Proc Cost 58.1 58.1<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The All-Terrain Lifter, <strong>Army</strong> System (ATLAS) is a C-130 transportable 10,000 LB capacity variable reach rough terrain forklift. It operates in all terrains, has cross country mobility and road speed<br />

<strong>of</strong> 23 MPH. Its primary missions include handling all classes <strong>of</strong> supply, stuffing and un-stuffing standard <strong>Army</strong> pallets in 20 foot International Standard Organization (ISO) containers, handling<br />

break-bulk cargo and loads weighing up to 10,000 LBS on Air Force 463L pallets. It is a key component <strong>of</strong> the <strong>Army</strong>'s Container Oriented Distribution System which is essential to the deployment<br />

<strong>of</strong> a CONUS based <strong>Army</strong> and sustainment <strong>of</strong> a deployed force. The ATLAS supports units from seven <strong>Army</strong> branches (Transportation, Quartermaster, Ordnance, Missile & Munitions, Engineer,<br />

Aviation and Medical). The ATLAS mobility capabilities allow it to support the Brigade Combat Teams (Unit <strong>of</strong> Action), and it is a critical asset supporting an Expeditionary <strong>Army</strong>. The ATLAS<br />

has been identified as a key component under the <strong>Army</strong>'s new modular force concept. Crew survivability will be addressed in accordance with the <strong>Army</strong>'s Long Term Armor Strategy (LTAS). The<br />

ATLAS is a military unique vehicle. Commercial forklifts cannot meet the military requirements and Key Performance Parameters identified in the Operational Requirements Document (ORD).<br />

Justification:<br />

FY08 Baseline: Procures 144 ATLAS II forklifts to upgrade the <strong>Army</strong>'s material handling fleet by replacing rought terrain forklifts that have an average age <strong>of</strong> 30+ years. The technology<br />

iimprovements <strong>of</strong> the ATLAS II system enable proven capability, supportable, reliable forklifts that can perform all <strong>of</strong> the <strong>Army</strong>'s material handling mission requirements, essential to the deployment<br />

<strong>of</strong> a CONUS based <strong>Army</strong> and to the sustainment <strong>of</strong> a deployed force.<br />

FY2008 Global War on Terrorism (GWOT) Request: Procure 136 additional assets to prosecute the Global War on Terror by replacing battle losses, generating and protecting forces, and enhancing<br />

military capabilities.<br />

FY2008 GWOT Cost Adjustment: Procure 69 additional assets to prosecute the GWOT by replacing battle losses, generating and protecting forces, and enhancing military capabilities.<br />

FY08 Base Appropriation - $24.757 million<br />

FY08 GWOT Request - $22.064 million<br />

FY08 GWOT Cost Adjustment Request - $11.317 million<br />

FY08 Total - $58.138 million<br />

M41800 Item No. 171 Page 1 <strong>of</strong> 4 Exhibit P-40<br />

ALL TERRAIN LIFTING ARMY SYSTEM 236 Budget Item Justification Sheet


ALL TERRAIN LIFTING ARMY SYSTEM<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

ALL TERRAIN LIFTING ARMY SYSTEM (M41800)<br />

M41800<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY2008 Base Appropriation<br />

Hardware(Base) 23328 144 162<br />

Engineering Change Order 400<br />

Documentation 100<br />

System Fielding Support 538<br />

Engineering In House 245<br />

Program Management 146<br />

FY2008 Base Appropriation Subtotal 24757<br />

FY2008 GWOT Request<br />

Hardware(Supplemental) 22032 136 162<br />

System Fielding Support 32<br />

FY2008 GWOT Request Subtotal 22064<br />

FY2008 GWOT Cost Adjustment<br />

Hardware (GWOT Cost Adjustment) 11178 69 162<br />

System Fielding Support (GWOT Cost Adju) 139<br />

FY2008 GWOT Cost Adjustment<br />

Subtotal<br />

11317<br />

Total: 58138<br />

M41800 Item No. 171 Page 2 <strong>of</strong> 4 Exhibit P-5<br />

ALL TERRAIN LIFTING ARMY SYSTEM 237 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

ALL TERRAIN LIFTING ARMY SYSTEM<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

Hardware(Base)<br />

FY 2008<br />

Oshkosh Trucks<br />

Oshkosh, WI<br />

Hardware(Supplemental)<br />

FY 2008<br />

Oshkosh Trucks<br />

Oshkosh, WI<br />

Hardware (GWOT Cost Adjustment)<br />

FY 2008<br />

Oshkosh Trucks<br />

Oshkosh, WI<br />

P-1 Line Item Nomenclature:<br />

ALL TERRAIN LIFTING ARMY SYSTEM (M41800)<br />

M41800<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

C/FP5(1) TACOM Jan 08 Feb 08 144 162 Y N/A Aug-05<br />

C/FP5(2) TACOM Jun 08 Jul 08 136 162 Y N/A Aug-05<br />

C/FP5(2) TACOM Jun 08 Jul 08 69 162<br />

REMARKS:<br />

M41800 Item No. 171 Page 3 <strong>of</strong> 4 Exhibit P-5a<br />

ALL TERRAIN LIFTING ARMY SYSTEM 238 Budget <strong>Procurement</strong> History and Planning


ALL TERRAIN LIFTING ARMY SYSTEM<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

ALL TERRAIN LIFTING ARMY SYSTEM (M41800)<br />

M41800<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Hardware(Base)<br />

FY 08 A 144 0 144 A 12 12 12 12 12 12 12 12 12 12 12 12 0<br />

Hardware(Supplemental)<br />

FY 08 A 136 0 136 A 2 7 7 11 11 11 11 15 15 16 16 14 0<br />

Hardware (GWOT Cost Adjustment)<br />

1 FY 08 A 69 0 69 A 1 1 1 2 2 2 3 11 11 11 11 13 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 349 349 12 12 12 12 12 15 20 20 25 25 25 26 26 26 27 27 27<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Oshkosh Trucks, Oshkosh, WI 10 30 60<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 4 1 5<br />

Reorder 0 9 1 10<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

Production rates stated are monthly vs. yearly.<br />

M41800 Item No. 171 Page 4 <strong>of</strong> 4 Exhibit P-21<br />

ALL TERRAIN LIFTING ARMY SYSTEM 239 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

TRAINING DEVICES, NONSYSTEM<br />

Program Elements for Code B Items:<br />

654715A<br />

Code:<br />

A/B<br />

P-1 Item Nomenclature<br />

TRAINING DEVICES, NONSYSTEM (NA0100)<br />

NA0100<br />

<strong>Other</strong> Related Program Elements:<br />

OMA 115013<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 202.2 202.2<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 202.2 202.2<br />

Initial Spares<br />

Total Proc Cost 202.2 202.2<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The <strong>Army</strong> continues to build on a major initiative with the Non-System Training Devices (NSTD) program to introduce realistic and effective training devices into the individual and unit training<br />

setting. These devices bring into play many aspects <strong>of</strong> the combat environment (smoke, noise, confusion, stress, etc.), which provide our soldiers with a valuable experience <strong>of</strong> battlefield conditions<br />

in a training environment. This effort includes the acquisition <strong>of</strong> training systems for maneuver situation target engagement simulators and gaming simulations. Devices and simulations are being<br />

fielded to minimize resource consumption which will affect a direct cost reduction through conservation <strong>of</strong> energy and ammunition. The reduction <strong>of</strong> available real estate (ranges and maneuver<br />

areas) for training being experienced by both active and reserve component units necessitates the increased use <strong>of</strong> devices and simulations. The devices and simulations acquired under the NSTD<br />

program are essential for the <strong>Army</strong> to increase training effectiveness and sustaining combat readiness in a constrained training environment. This budget line supports all <strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong><br />

(OPA) funding for Non-System Training Devices (NSTD). It procures a variety <strong>of</strong> NSTD items such as the Instrumentable Multiple Integrated Laser Engagement System (I-MILES), Basic<br />

Electronics Maintenance Trainer (BEMT), Call For Fire Trainer (CFFT), Battlefield Effects Simulator, Digital Range Training System (DRTS), Integrated Military Operations in Urbanized Terrain<br />

(MOUT) Training System (IMTS), Engagement Skills Trainer (EST), <strong>Army</strong> Targetry System (ATS), Targetry Modernization, Improvised Explosive Device Effects Simulator (IEDES), and Aerial<br />

Weapon Scoring System (AWSS).<br />

Justification:<br />

FY 2008 Base Appropriation - $201.843 million<br />

FY 2008 Global War on Terrorism (GWOT) Request - $.342 million<br />

FY 2008 GWOT Cost Adjustment - 0.000 million<br />

FY 2008 Total - $202.185 million<br />

FY08 NSTD baseline program ($201,843) will procure Instrumentable Multiple Integrated Laser Engagement Systems (I-MILES), Engagement Skills Trainer (EST), Call For Fire Trainer (CFFT),<br />

Laser Marksmanship Training System (LMTS), Improvised Explosive Device Effects Simulator (IEDES), Virtual Patient Simulators (VPS), Homestation Instrumentation Training System (HITS),<br />

Basic Electronics Maintenance Trainer (BEMT), BCTC Equipment, procures hardware for operation <strong>of</strong> constructive simulation systems, Intelligence Electronic Warfare Tactical Pr<strong>of</strong>iciency Trainer<br />

(IEWTPT), <strong>Army</strong> Targetry Systems (ATS), Aerial Weapon Scoring System (AWSS), Targetry Modernization, Battlefield Effects Simulator (BES), Digital Range Training System (DRTS), and<br />

Integrated Military Operations in Urbanized Terrain (MOUT) Training System (IMTS). Simulators procured under this line are either the result <strong>of</strong> a development effort or are the purchase <strong>of</strong> a non-<br />

NA0100 Item No. 173 Page 1 <strong>of</strong> 14 Exhibit P-40<br />

TRAINING DEVICES, NONSYSTEM 240 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Date:<br />

September 2007<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

TRAINING DEVICES, NONSYSTEM<br />

P-1 Item Nomenclature<br />

TRAINING DEVICES, NONSYSTEM (NA0100)<br />

NA0100<br />

Program Elements for Code B Items:<br />

654715A<br />

Code:<br />

A/B<br />

<strong>Other</strong> Related Program Elements:<br />

OMA 115013<br />

developmental item.<br />

FY08 NSTD GWOT Request ($342) will procure <strong>Army</strong> Battle Command System Servers. This equipment will be located in Iraq and Kuwait or in training locations that will support the troops<br />

preparing to enter the Theater <strong>of</strong> Operation.<br />

NA0100 Item No. 173 Page 2 <strong>of</strong> 14 Exhibit P-40<br />

TRAINING DEVICES, NONSYSTEM 241 Budget Item Justification Sheet


TRAINING DEVICES, NONSYSTEM<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

TRAINING DEVICES, NONSYSTEM (NA0100)<br />

NA0100<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000<br />

FY 2008 Base Appropriation<br />

I-MILES A 32782<br />

Engagement Skills Trainer (EST) A 21851<br />

Laser Marksmanship Training System 4514<br />

IEDES 6654<br />

HITS 6228<br />

Virtual Patient Simulator (VPS) 483<br />

Call For Fire Trainers A 4051<br />

BEMT 2257<br />

BCTC Equipment A 5628<br />

IEWTPT 875<br />

Constructive Simulation Equipment 21612<br />

<strong>Army</strong> Targetry Systems (ATS) A 20980<br />

Aerial Weapon Scoring System (AWSS) 800<br />

BES 3000<br />

DRTS A 45059<br />

IMTS A 24146<br />

Targetry Modernization 923<br />

FY 2008 Base Appropriation Total 201843<br />

FY 2008 GWOT Request<br />

ABCS Servers (Supplemental) 342<br />

FY 2008 GWOT Request Total 342<br />

Total: 202185<br />

NA0100 Item No. 173 Page 3 <strong>of</strong> 14 Exhibit P-5<br />

TRAINING DEVICES, NONSYSTEM 242 Weapon System Cost Analysis


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

NSTD MANEUVER/CLOSE COMBAT<br />

Program Elements for Code B Items:<br />

654715A<br />

Code:<br />

A/B<br />

P-1 Item Nomenclature<br />

NSTD MANEUVER/CLOSE COMBAT (NA0101)<br />

NA0100 (NA0101)<br />

<strong>Other</strong> Related Program Elements:<br />

OMA 115013<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 84.8 84.8<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 84.8 84.8<br />

Initial Spares<br />

Total Proc Cost 84.8 84.8<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

FY 2008 Base Appropriation - $84.5 million<br />

FY 2008 Main Supplemental Request - $.3 million<br />

FY 2008 Total - $84.8 million<br />

The Engagement Skills Trainer (EST) 2000 provides individual and crew weapon marksmanship at the squad level for collective training. Squad leaders are able to control and evaluate individual,<br />

team and squad performance. Included in the EST are the M16A2, M9 pistol, MK19, M249 SAW, M4 Carbine, M2 Machine Gun, M240 Machine Gun and the capabilities to include many others.<br />

EST fielding has been changed to a consistent 62 systems per year to meet <strong>Army</strong> modularity requirements.<br />

The Instrumentable Multiple Integrated Laser Engagement System (I-MILES) Program is providing key training functionality for use by the <strong>Army</strong> as a move towards modularity, current and future<br />

combat operations and for training up for deployment in the Global War on Terrorism. I-MILES provides realistic real-time casualty effects for force-on-force tactical engagement training scenarios.<br />

It enables the <strong>Army</strong> to train as a combined arms combat team. This effort replaces all direct-fire MILES devices currently fielded at the homestations and small arms MILES at the Maneuver Combat<br />

Training Centers.<br />

The Basic Electronics Maintenance Trainer (BEMT) will support basic electronics training <strong>of</strong> missile electronics repair and test, measurement, and diagnostic equipment repair. Trainers consist <strong>of</strong> a<br />

computerized instructional device with the capability for computer-based instruction and hands-on practical exercise training. It will provide highly realistic training through training scenarios, which<br />

require the students to perform basic electronics tasks.<br />

The <strong>Army</strong> requires the capability to train the vertical and horizontal integration <strong>of</strong> the <strong>Army</strong> and Joint Battle Command digital systems. The Battle Command Training Capability (BCTC) provides<br />

the capability to conduct individual and collective training throughout the active and reserve components which enables the commanders to train individual operators, leaders and battlestaffs across<br />

the full spectrum <strong>of</strong> operations, to include mission rehearsal and reach capabilities. The white boxes and Battlefield Visualization Team (BVT) equipment provides the unit the permanent capability<br />

to routinely train with their "go to war" systems, update fielding and training for both Multi Resolution Federation (MRF) and Entity Resolution Federation (ERF). This includes hardware fielding as<br />

required to support each version update fielding; Stand-up <strong>of</strong> Battle Command Training Capabilities (hardware and network installation; integration with C4ISR; and testing, initial s<strong>of</strong>tware training<br />

NA0100 (NA0101) Item No. 173 Page 4 <strong>of</strong> 14 Exhibit P-40<br />

NSTD MANEUVER/CLOSE COMBAT 243 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

NSTD MANEUVER/CLOSE COMBAT<br />

Program Elements for Code B Items:<br />

654715A<br />

P-1 Item Nomenclature<br />

NSTD MANEUVER/CLOSE COMBAT (NA0101)<br />

NA0100 (NA0101)<br />

<strong>Other</strong> Related Program Elements:<br />

OMA 115013<br />

Code:<br />

A/B<br />

for technical and support personnel); site surveys associated with stand-up <strong>of</strong> BCTCs and Program Management cost.<br />

Date:<br />

September 2007<br />

The Call For Fire Trainer (CFFT) system provides training for all related Forward Observer (FO) Military Operation Speciality (MOS) tasks at skill levels 1-4, as well as being a common skills task<br />

trainer for all soldiers. The CFFT will train from one to thirty students in both institutional and homestation training environments. CFFT will operate at the unit level to train FOs without the use <strong>of</strong><br />

live ammunition. The CFFT milestone decision was accelerated to meet GWOT training requirements.<br />

The Laser Marksmanship Training System (LMTS) is a device that simulates the live firing <strong>of</strong> the soldier's weapon without the use <strong>of</strong> live ammunition. Major components include a battery-powered<br />

laser transmitter mounted to a mandrel inserted in the rifle barrel, and a variety <strong>of</strong> laser-sensitive targets. Current LMTS fielding has been re-prioritized to support units engaged in GWOT rotations.<br />

The Improvised Explosive Device Effects Simulator (IEDES) is a Training Aids, Devices, Simulators, and Simulations (TADSS) that will assist the <strong>Army</strong> in training the joint and individual services<br />

on operational support tasks, conditions, and standards necessary to achieve DoD Improvised Explosive Device (IED) defeat objectives. The IEDES provides the tools for trainers to create simulated<br />

battle field cues and effects for a training audience. The IEDES, under current force structure, is programmed to be fielded and operated in a full spectrum <strong>of</strong> operations and conflicts.<br />

The Homestation Instrumentation Training System (HITS) provides a deployable Combat Training Center (CTC)-like instrumented capability to support platoon level training thru battalion Forceon-Force<br />

Training. HITS provides ground instrumented training by integrating with future and legacy MILES. HITS provides position location and weapons effects data for real time exercise<br />

monitoring and AAR capability, and consists <strong>of</strong> light deployable components that can be rapidly assembled/disassembled and transported to support any deployed training. HITS supports integration<br />

with virtual and constructive simulations.<br />

The Virtual Patient Simulators (VPS) are a component <strong>of</strong> the Medical Simulation Training Centers (MSTCs). These include the training devices such as bleed/breathe simulators, weighted<br />

mannequins, airway management mannequins, and IV arms. These items vary in quantity at each MSTC site, based on 91W throughput. The MSTCs provide standardized Combat Medic Advanced<br />

Skills Training (CMAST) and Combat Lifesaver (CLS) training.<br />

Justification:<br />

FY 2008 Baseline -<br />

$21,851 procures and fields 62 Engagement Skills Trainer 2000 trainers and related P3I items. Devices are needed to <strong>of</strong>fset STRAC reductions.<br />

$32,782 procures I-MILES and replaces the obsolete Basic MILES at various installations <strong>Army</strong> wide. Basic MILES was fielded in the 1970's and 1980's and is uneconomical to repair and sustain.<br />

Devices are to be fielded as either Brigade Combat Team (BCT) or battalion sets.<br />

$4,051 procures and fields 38 Call For Fire Trainers for institutional and designated units. Devices are needed to train observed fire tasks without the OPTEMPO and ammunition costs <strong>of</strong> live fire<br />

training exercises.<br />

$5,628 procures 22 Battle Site and Packet Radio Units for Battlefield Visualization under the Battle Command Training Capability (BCTC) plus upgrades to the Joint Land Component Constructive<br />

Training Capability federation to enchance digital interface with the <strong>Army</strong> Battle Command Systems (ABCS). These systems will enable routine and predeployment digital training as well as a<br />

reachback capability for deployed units. In addition, this effort establishes a battle command training capability from the operator to echelons above corps across the <strong>Army</strong>.<br />

$2,257 procures 221 Basic Electronics Maintenance Trainer (BEMT) devices for delivery to Ft. Gordon, GA and Fort Leonard Wood, MO (TRADOC).<br />

NA0100 (NA0101) Item No. 173 Page 5 <strong>of</strong> 14 Exhibit P-40<br />

NSTD MANEUVER/CLOSE COMBAT 244 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Date:<br />

September 2007<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

NSTD MANEUVER/CLOSE COMBAT<br />

Program Elements for Code B Items:<br />

654715A<br />

P-1 Item Nomenclature<br />

NSTD MANEUVER/CLOSE COMBAT (NA0101)<br />

NA0100 (NA0101)<br />

<strong>Other</strong> Related Program Elements:<br />

OMA 115013<br />

Code:<br />

A/B<br />

$6,654 procures IEDES devices for delivery to various installations <strong>Army</strong> wide. IEDES is required for counter IED training. Counter IED requirements are dynamic, and IEDES devices will use the<br />

latest technologies to replicate the most current threat, to provide soldiers the best possible training. IEDES devices are heavily used for training prior to deployment into theater.<br />

$6,228 procures Homestation Instrumentation Training System (HITS) for Fort Bliss and Fort Stewart, which provide a deployable CTC-like instrumented capability to support platoon level training<br />

thru battalion Force-on-Force Training.<br />

$4,514 procures and fields Laser Marksmanship Training Systems (LMTS) large suites for the National Guard. Additionally, procures and fields the following configurations for the <strong>Army</strong> Reserve;<br />

small unit training sets, basic rifle/pistol marksmanship sets, basic rifle/pistol marksmanship light-sets, and warrior kits. Devices are needed to train basic rifle marksmanship (BRM) without the<br />

OPTEMPO and ammunition cost <strong>of</strong> live fire training exercises.<br />

$483 procures 12 Virtual Patient Simulators (VPS) respectively including next generation, wireless, and tetherless simulators.<br />

FY 2008 Global War on Terrorism (GWOT) Request<br />

$342 procures <strong>Army</strong> Battle Command System (ABCS) servers used for ABCS system pre-deployment training in Battle Command Training Centers (BCTC). Units preparing for deployment will not<br />

be able to use BCTC ABCS systems for pre-deployment training and for their replacement personnel. ABCS 6.4 is server-based, these servers are essential to the training system. When most units<br />

conduct their final capstone mission rehearsal exercises, their operational warfighting ABCS systems are already on shipment or packed away. The BCTC <strong>of</strong>fers the only alternative to train on ABCS<br />

systems. Lack <strong>of</strong> these servers impact readiness training ans associated readiness for operations.<br />

NA0100 (NA0101) Item No. 173 Page 6 <strong>of</strong> 14 Exhibit P-40<br />

NSTD MANEUVER/CLOSE COMBAT 245 Budget Item Justification Sheet


NSTD MANEUVER/CLOSE COMBAT<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

NSTD MANEUVER/CLOSE COMBAT (NA0101)<br />

NA0100 (NA0101)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY 2008 Base Appropriation<br />

Engagement Skills Trainer (EST)<br />

A. EST (Hardware Subsystems) A 15200 62 245<br />

B. EST ECPs 4634<br />

C. EST In-House/Contractor Support 2017<br />

Laser Marksmanship Training System<br />

A. LMTS Hardware (A/AR) 4110 133 31<br />

B. LMTS In-House/Contractor Spt (A/AR) 404<br />

I-MILES<br />

MILES Vehicle Kits A 5496 229 24<br />

MILES Independent Target System (ITS) 4384 1096 4<br />

MILES In-House Government Spt 2100<br />

MILES Contractor Engineering Spt 750<br />

MILES ECPs 1433<br />

MILES Initial Spares 2300<br />

MILES Individual Weapon Systems (IWS) 12686 6343 2<br />

MILES Controller Devices 194 139 1<br />

MILES Shoulder Launched Munitions 2439 542 5<br />

MILES Tech Refresh 1000<br />

Basic Electronics Maintenance Trainer<br />

A. BEMT Inhouse /Contractor Support 240<br />

B. BEMT Devices 2006 221 9<br />

C. BEMT Spares 11<br />

Call For Fire Trainers<br />

A. CFFT (Various Configurations) A 3218 38 85<br />

B. CFFT Initial Spares 131<br />

C. CFFT In-house/Contractor Support 702<br />

HITS<br />

HITS Hardware 5478 2 2739<br />

HITS In-House /Contractor Suppor 750<br />

IEDES<br />

NA0100 (NA0101) Item No. 173 Page 7 <strong>of</strong> 14 Exhibit P-5<br />

NSTD MANEUVER/CLOSE COMBAT 246 Weapon System Cost Analysis


NSTD MANEUVER/CLOSE COMBAT<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

NSTD MANEUVER/CLOSE COMBAT (NA0101)<br />

NA0100 (NA0101)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

IEDES Devices 5965 276 22<br />

IEDES In-house /Contractor Support 689<br />

Virtual Patient Simulators (VPS)<br />

A. VPS Simulators 360 12 30<br />

B. VPS In-house Support 123<br />

Battle Command Training Capability<br />

Battlefield Visualization 5628 22 256<br />

FY 2008 Base Appropriation Total 84448<br />

FY 2008 GWOT Request<br />

ABCS Servers - GWOT Request<br />

ABCS Servers - GWOT Request 342 36 10<br />

FY 2008 GWOT Request Total<br />

Total: 84790<br />

NA0100 (NA0101) Item No. 173 Page 8 <strong>of</strong> 14 Exhibit P-5<br />

NSTD MANEUVER/CLOSE COMBAT 247 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

NSTD MANEUVER/CLOSE COMBAT<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

A. EST (Hardware Subsystems)<br />

FY 2008 CSSD (formally ECC )<br />

Option<br />

Orlando, FL<br />

A. LMTS Hardware (A/AR)<br />

FY 2008<br />

MPRI/Beamhit<br />

Option<br />

Columbia, MD<br />

MILES Vehicle Kits<br />

FY 2008<br />

TBS<br />

TBS<br />

TBS<br />

MILES Independent Target System (ITS)<br />

FY 2008<br />

Unitech<br />

Option<br />

Orlando, FL<br />

MILES Individual Weapon Systems (IWS)<br />

FY 2008<br />

Cubic Defense Systems<br />

Option<br />

San Diego, CA<br />

MILES Controller Devices<br />

FY 2008<br />

Universal Systems & Technology Option<br />

Fairfax, VA<br />

MILES Shoulder Launched Munitions<br />

FY 2008<br />

Unitech<br />

Option<br />

Orlando, FL<br />

B. BEMT Devices<br />

FY 2008<br />

TBS<br />

C/FFP<br />

TBS<br />

A. CFFT (Various Configurations)<br />

FY 2008<br />

TBS<br />

C/FFP<br />

TBS<br />

HITS Hardware<br />

FY 2008<br />

TBS<br />

FFP<br />

TBS<br />

IEDES Devices<br />

FY 2008<br />

TBS<br />

TBS<br />

TBS<br />

A. VPS Simulators<br />

P-1 Line Item Nomenclature:<br />

NSTD MANEUVER/CLOSE COMBAT (NA0101)<br />

NA0100 (NA0101)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

NAVAIR Orlando TSD,<br />

FL<br />

NAVAIR Orlando TSD,<br />

FL<br />

NAVAIR, Orlando TSD,<br />

FL<br />

NAVAIR, Orlando TSD,<br />

FL<br />

NAVAIR Orlando TSD,<br />

FL<br />

NAVAIR Orlando TSD,<br />

FL<br />

NAVAIR Orlando TSD,<br />

FL<br />

NAVAIR Orlando TSD,<br />

FL<br />

NAVAIR Orlando TSD,<br />

FL<br />

NAVAIR Orlando TSD,<br />

FL<br />

NAVAIR Orlando TSD,<br />

FL<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Dec 07 Dec 08 62 245 Yes<br />

Nov 07 Mar 08 133 31 Yes<br />

Jan 08 Jul 08 229 24 Yes<br />

Jan 08 May 08 1096 4 Yes<br />

Dec 07 Jun 08 6343 2 Yes<br />

Nov 07 Feb 08 139 1 Yes<br />

Nov 07 Feb 08 542 5 Yes<br />

Mar 08 Jun 08 221 9 Yes<br />

Nov 07 Jan 08 38 85 Yes<br />

Jan 08 Nov 09 2 2739 Yes<br />

Jan 08 Jun 08 276 22 Yes<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

NA0100 (NA0101) Item No. 173 Page 9 <strong>of</strong> 14 Exhibit P-5a<br />

NSTD MANEUVER/CLOSE COMBAT 248 Budget <strong>Procurement</strong> History and Planning


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

NSTD MANEUVER/CLOSE COMBAT<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

FY 2008<br />

TBS<br />

FFP<br />

TBS<br />

Battlefield Visualization<br />

FY 2008<br />

TBS<br />

TBS<br />

TBS<br />

ABCS Servers - GWOT Request<br />

FY 2008<br />

TBS<br />

TBS<br />

P-1 Line Item Nomenclature:<br />

NSTD MANEUVER/CLOSE COMBAT (NA0101)<br />

NA0100 (NA0101)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

NAVAIR Orlando TSD,<br />

FL<br />

NAVAIR Orlando TSD,<br />

FL<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Jan 08 Feb 08 12 30 Yes<br />

Jun 08 May 09 22 256 Yes<br />

Option Ft. Monmouth Jun 08 Aug 08 36 10 Yes<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS:<br />

NA0100 (NA0101) Item No. 173 Page 10 <strong>of</strong> 14 Exhibit P-5a<br />

NSTD MANEUVER/CLOSE COMBAT 249 Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning


NSTD MANEUVER/CLOSE COMBAT<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

NSTD MANEUVER/CLOSE COMBAT (NA0101)<br />

NA0100 (NA0101)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A. EST (Hardware Subsystems)<br />

2 FY 08 A 62 0 62 A 5 5 5 5 5 5 5 5 5 5 12<br />

A. LMTS Hardware (A/AR)<br />

7 FY 08 A 133 0 133 A 133 0<br />

MILES Vehicle Kits<br />

6 FY 08 A 229 0 229 A 30 30 30 30 30 30 30 19 0<br />

MILES Independent Target System (ITS)<br />

6 FY 08 A 1096 0 1096 A 100 100 100 100 100 100 100 100 100 100 96 0<br />

MILES Individual Weapon Systems (IWS)<br />

5 FY 08 A 6343 0 6343 A 529 529 529 529 529 529 529 529 529 529 529 524 0<br />

MILES Controller Devices<br />

1 FY 08 A 139 0 139 A 12 12 12 12 12 12 12 12 12 12 12 7 0<br />

MILES Shoulder Launched Munitions<br />

4 FY 08 A 542 0 542 A 45 45 45 45 45 45 45 45 45 45 45 47 0<br />

HITS Hardware<br />

6 FY 08 A 2 0 2 A 2 0<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Universal Systems & Technology, Fairfax, VA 50 40 800<br />

2 CSSD (formally ECC ), Orlando, FL 2 80 120<br />

3 Fidelity Technologies, Reading, PA 1 20 60<br />

4 Unitech, Orlando, FL 600 3600 5400<br />

5 Cubic Defense Systems, San Diego, CA 2400 28800 60000<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 5 5 10<br />

Reorder 0 1 4 5<br />

2 Initial 0 2 13 15<br />

Reorder 0 2 13 15<br />

3 Initial 0 1 4 5<br />

Reorder 0 8 4 12<br />

4 Initial 0 1 4 5<br />

Reorder 0 1 4 5<br />

5 Initial 0 2 9 11<br />

Reorder 0 2 7 9<br />

REMARKS<br />

It is assumed Supplemental funding can be<br />

awarded no earlier than Jun 08.<br />

NA0100 (NA0101) Item No. 173 Page 11 <strong>of</strong> 14 Exhibit P-21<br />

NSTD MANEUVER/CLOSE COMBAT 250 Production Schedule


NSTD MANEUVER/CLOSE COMBAT<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

NSTD MANEUVER/CLOSE COMBAT (NA0101)<br />

NA0100 (NA0101)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

IEDES Devices<br />

6 FY 08 A 276 0 276 A 23 23 23 23 23 23 23 23 23 23 23 23 0<br />

Battlefield Visualization<br />

6 FY 08 A 22 0 22 A 2 1 2 2 2 13<br />

ABCS Servers - GWOT Request<br />

6 FY 08 A 36 0 36 A 6 6 6 6 6 6 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 8880 8880 57 190 57 157 709 739 745 739 745 741 750 741 682 653 563 554 12 7 7 7 25<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Universal Systems & Technology, Fairfax, VA 50 40 800<br />

2 CSSD (formally ECC ), Orlando, FL 2 80 120<br />

3 Fidelity Technologies, Reading, PA 1 20 60<br />

4 Unitech, Orlando, FL 600 3600 5400<br />

5 Cubic Defense Systems, San Diego, CA 2400 28800 60000<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 5 5 10<br />

Reorder 0 1 4 5<br />

2 Initial 0 2 13 15<br />

Reorder 0 2 13 15<br />

3 Initial 0 1 4 5<br />

Reorder 0 8 4 12<br />

4 Initial 0 1 4 5<br />

Reorder 0 1 4 5<br />

5 Initial 0 2 9 11<br />

Reorder 0 2 7 9<br />

REMARKS<br />

It is assumed Supplemental funding can be<br />

awarded no earlier than Jun 08.<br />

NA0100 (NA0101) Item No. 173 Page 12 <strong>of</strong> 14 Exhibit P-21<br />

NSTD MANEUVER/CLOSE COMBAT 251 Production Schedule


NSTD MANEUVER/CLOSE COMBAT<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

NSTD MANEUVER/CLOSE COMBAT (NA0101)<br />

NA0100 (NA0101)<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A. EST (Hardware Subsystems)<br />

2 FY 08 A 62 50 12 5 7 0<br />

A. LMTS Hardware (A/AR)<br />

7 FY 08 A 133 133 0<br />

MILES Vehicle Kits<br />

6 FY 08 A 229 229 0<br />

MILES Independent Target System (ITS)<br />

6 FY 08 A 1096 1096 0<br />

MILES Individual Weapon Systems (IWS)<br />

5 FY 08 A 6343 6343 0<br />

MILES Controller Devices<br />

1 FY 08 A 139 139 0<br />

MILES Shoulder Launched Munitions<br />

4 FY 08 A 542 542 0<br />

HITS Hardware<br />

6 FY 08 A 2 2 0<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Universal Systems & Technology, Fairfax, VA 50 40 800<br />

2 CSSD (formally ECC ), Orlando, FL 2 80 120<br />

3 Fidelity Technologies, Reading, PA 1 20 60<br />

4 Unitech, Orlando, FL 600 3600 5400<br />

5 Cubic Defense Systems, San Diego, CA 2400 28800 60000<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 5 5 10<br />

Reorder 0 1 4 5<br />

2 Initial 0 2 13 15<br />

Reorder 0 2 13 15<br />

3 Initial 0 1 4 5<br />

Reorder 0 8 4 12<br />

4 Initial 0 1 4 5<br />

Reorder 0 1 4 5<br />

5 Initial 0 2 9 11<br />

Reorder 0 2 7 9<br />

REMARKS<br />

It is assumed Supplemental funding can be<br />

awarded in Jun 07.<br />

NA0100 (NA0101) Item No. 173 Page 13 <strong>of</strong> 14 Exhibit P-21<br />

NSTD MANEUVER/CLOSE COMBAT 252 Production Schedule


NSTD MANEUVER/CLOSE COMBAT<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

NSTD MANEUVER/CLOSE COMBAT (NA0101)<br />

NA0100 (NA0101)<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

IEDES Devices<br />

6 FY 08 A 276 276 0<br />

Battlefield Visualization<br />

6 FY 08 A 22 9 13 2 2 2 2 2 2 1 0<br />

ABCS Servers - GWOT Request<br />

6 FY 08 A 36 36 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 8880 8855 25 7 9 2 2 2 2 1<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Universal Systems & Technology, Fairfax, VA 50 40 800<br />

2 CSSD (formally ECC ), Orlando, FL 2 80 120<br />

3 Fidelity Technologies, Reading, PA 1 20 60<br />

4 Unitech, Orlando, FL 600 3600 5400<br />

5 Cubic Defense Systems, San Diego, CA 2400 28800 60000<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 5 5 10<br />

Reorder 0 1 4 5<br />

2 Initial 0 2 13 15<br />

Reorder 0 2 13 15<br />

3 Initial 0 1 4 5<br />

Reorder 0 8 4 12<br />

4 Initial 0 1 4 5<br />

Reorder 0 1 4 5<br />

5 Initial 0 2 9 11<br />

Reorder 0 2 7 9<br />

REMARKS<br />

It is assumed Supplemental funding can be<br />

awarded in Jun 07.<br />

NA0100 (NA0101) Item No. 173 Page 14 <strong>of</strong> 14 Exhibit P-21<br />

NSTD MANEUVER/CLOSE COMBAT 253 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Rapid Equipping Soldier Support Equipment<br />

Program Elements for Code B Items:<br />

Code:<br />

A<br />

Date:<br />

P-1 Item Nomenclature<br />

Rapid Equipping Soldier Support Equipment (M80101)<br />

M80101<br />

<strong>Other</strong> Related Program Elements:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 1210.3 1210.3<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 1210.3 1210.3<br />

Initial Spares<br />

Total Proc Cost 1210.3 1210.3<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The US <strong>Army</strong> Rapid Equipping Force (REF) was established to provide urgently needed state-<strong>of</strong>-the-art technology to soldiers in the field to meet immediate warfighter needs under operational<br />

conditions in the current theaters. The REF Forward Teams in Iraq and Afghanistan work with Combatant Commanders and the soldiers to identify warfighter needs while REF Rear formulates<br />

solutions and rapidly delivers/fields new equipment to the deployed units. REF solutions are rapid responses to evolving, adaptable and changing threats, in any operational environment. REF Rear<br />

evaluates, utilizes or adapts currently available military or civilian items (COTS/GOTS) which typically have not been type classified for <strong>Army</strong>-wide use but are available and adaptable to the current<br />

Operational Combatant Commander's needs. For the REF, necessary material solutions can only be determined as _real time_ threat modes are identified. Countermeasures to these evolving threats<br />

must be developed/purchased/modified, <strong>of</strong>ten within weeks, for the first cycle <strong>of</strong> spiral type responses.<br />

NOTE: (a) Equipment mix and configuration may change based on changes in operational environment and circumstances. (b) REF equipment and funding execution details will be provided in the<br />

Secretary <strong>of</strong> <strong>Army</strong> report to the Congressional Defense Committee in March and October <strong>of</strong> each year (per HAC Report #108-553, DoD APPNs Bill 2005, June 18, 2004, page 134.)<br />

Justification:<br />

FY08 Global War on Terrorism Amendment funds sniper defeat equipment to support the Multi National Corps _ Iraq validated Operational Needs Statement. A suite <strong>of</strong> equipment has been<br />

identified for sniper defeat purposes. The intent is to mitigate friendly sniper casualties. Sniper defeat equipment targeted to defeat attacks on both moving as well as stationary personnel. Sniper<br />

Defeat Integrated Capabilities Development Team (ICDT) working long term solution sets presently for fixed site protection. Developed counter direct fire/sniper CONOPS and techniques, tactics<br />

and procedures (TTPs) could mitigate if capability is not provided, followed by formal sniper defeat ICDT equipping actions (FY08). TRADOC directed Comprehensive Force Protection (CFPI)<br />

Fixed Site Protection involves equipping action for a counter direct fire/sniper capability. Includes the assessment, integration, testing, and deployment <strong>of</strong> potential technologies that address direct<br />

fire/sniper threats at fixed sites by April 08 as part <strong>of</strong> Sniper Defeat ICDT efforts. Funding provides ability to transition developed sniper defeat capabilities to programs <strong>of</strong> record.<br />

FY08 Base Appropriation - $48.704 million<br />

FY08 Global War on Terrorism(GWOT)Cost Request - $0 million<br />

FY08 GWOT Cost Adjustment Request - $1,161.554 million<br />

M80101 Item No. 174 Page 1 <strong>of</strong> 8 Exhibit P-40<br />

Rapid Equipping Soldier Support Equipment 254 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Date:<br />

September 2007<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Rapid Equipping Soldier Support Equipment<br />

Program Elements for Code B Items:<br />

P-1 Item Nomenclature<br />

Rapid Equipping Soldier Support Equipment (M80101)<br />

M80101<br />

<strong>Other</strong> Related Program Elements:<br />

Code:<br />

A<br />

FY08 Total - $1,210.258 million<br />

NOTE: (a) Equipment mix and configuration may change based on changes in operational environment and circumstances. (b) REF equipment and funding execution details will be provided in the<br />

Secretary <strong>of</strong> <strong>Army</strong> report to the Congressional Defense Committee in March and October <strong>of</strong> each year(per HAC Report #108-553, DoD APPNs Bill 2005, June 18, 2004, page 134.)<br />

REF RMCN categories are compatible with current guidance.<br />

M80101 Item No. 174 Page 2 <strong>of</strong> 8 Exhibit P-40<br />

Rapid Equipping Soldier Support Equipment 255 Budget Item Justification Sheet


Rapid Equipping Soldier Support Equipment<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

Rapid Equipping Soldier Support Equipment (M80101)<br />

M80101<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000<br />

Vanguard Sniper Defeat System 562320 2272 275.0<br />

Boomerang 91639 3825 15.0<br />

Ballistic Barrier A 664 205 4.0<br />

Ballistic Barrier Shield B 18000 3 6000.0<br />

Mannequins 493 685 1.0<br />

Perimeter Security Veil 37 203 0.2<br />

Stryker Topside Net 10699 4755 2.0<br />

HMMWV Turret/Gunner Net 5150 4755 1.0<br />

Security Film 487 1353 0.4<br />

Ballistic Face Shield (CPE) 72 348 0.2<br />

Gentex Maxillo Facial Shield 78 348 0.2<br />

Binoculars 774 1033 1.0<br />

Doubleshot 39206 1815 24.0<br />

Quickcam 171 10 19.0<br />

Decoy Boomerang 1836 1360 2.0<br />

Ghost 2275 361 6.0<br />

Route Reconnaisance Kit 38937 4703 9.0<br />

TRAP Outpost 36720 240 153.0<br />

Handheld Thermal Devices 6255 348 20.0<br />

Teucer 2 10 0.2<br />

M68 3x Magnifier 4 10 0.4<br />

Fast Obscurant Grenade (FOG) 9000 4500 2.0<br />

Sniper Defeat Fixed Site 385439<br />

Total: 1210258<br />

M80101 Item No. 174 Page 3 <strong>of</strong> 8 Exhibit P-5<br />

Rapid Equipping Soldier Support Equipment 256 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

Rapid Equipping Soldier Support Equipment<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

Vanguard Sniper Defeat System<br />

FY 2008<br />

Doubleshot Inc<br />

Rohnert Park, CA<br />

Boomerang<br />

FY 2008<br />

BBN<br />

Boston, MA<br />

Ballistic Barrier A<br />

FY 2008<br />

Defense Shield Inc<br />

Syracuse, NY<br />

Ballistic Barrier Shield B<br />

FY 2008<br />

Doubleshot Inc<br />

Rohnert Park, CA<br />

Mannequins<br />

FY 2008<br />

Doubleshot Inc<br />

Rohnert Park, CA<br />

Perimeter Security Veil<br />

FY 2008<br />

Creative Building Products<br />

Ft Wayne, IN<br />

Stryker Topside Net<br />

FY 2008<br />

Calco Ent and Saab-Barracuda<br />

South Pines and Fayettville NC<br />

HMMWV Turret/Gunner Net<br />

FY 2008<br />

Calco Ent and Saab-Barracuda<br />

South Pines and Fayettville NC<br />

Security Film<br />

FY 2008<br />

Cole Motor Sports<br />

Bluefield, WV<br />

Ballistic Face Shield (CPE)<br />

FY 2008<br />

Source One<br />

Wellington, FL<br />

Gentex Maxillo Facial Shield<br />

FY 2008<br />

Source One and Gentex Corp<br />

Wellington, FL<br />

Binoculars<br />

P-1 Line Item Nomenclature:<br />

Rapid Equipping Soldier Support Equipment (M80101)<br />

M80101<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

2272 275<br />

3825 15<br />

205 4<br />

3 6000<br />

685 1<br />

203 0<br />

4755 2<br />

4755 1<br />

1353 0<br />

348 0<br />

348 0<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

M80101 Item No. 174 Page 4 <strong>of</strong> 8 Exhibit P-5a<br />

Rapid Equipping Soldier Support Equipment 257 Budget <strong>Procurement</strong> History and Planning


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

Rapid Equipping Soldier Support Equipment<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

FY 2008<br />

Source One<br />

Wellington, FL<br />

Doubleshot<br />

FY 2008<br />

Doubleshot Inc<br />

Rohnert Park, CA<br />

Quickcam<br />

FY 2008<br />

Flotograph Technologies, LLC<br />

Marion IN<br />

Decoy Boomerang<br />

FY 2008<br />

BBN<br />

Boston, MA<br />

Ghost<br />

P-1 Line Item Nomenclature:<br />

Rapid Equipping Soldier Support Equipment (M80101)<br />

M80101<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

1033 1<br />

1815 24<br />

10 19<br />

1360 2<br />

FY 2008 361 6<br />

Route Reconnaisance Kit<br />

FY 2008<br />

Torry Pines Logic<br />

4703 9<br />

San Diego, CA<br />

TRAP Outpost<br />

FY 2008<br />

Doubleshot Inc<br />

240 153<br />

Rohnert Park, CA<br />

Handheld Thermal Devices<br />

FY 2008<br />

various manufacturers<br />

348 20<br />

various locations<br />

Teucer<br />

FY 2008<br />

Mistral Security, Inc<br />

10 0<br />

Bethesda, MD<br />

M68 3x Magnifier<br />

FY 2008<br />

Aimpoint Inc<br />

10 0<br />

Vienna, VA<br />

Fast Obscurant Grenade (FOG)<br />

FY 2008 PM Chem Bio 4500 2<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS: Above Cost Elements may include program costs such as Program Management, System Fielding Support, CLS, Engineering Support, Quality Assurance Support, Shipping, Documentation and Testing.<br />

M80101 Item No. 174 Page 5 <strong>of</strong> 8 Exhibit P-5a<br />

Rapid Equipping Soldier Support Equipment 258 Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning


Rapid Equipping Soldier Support Equipment<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

Rapid Equipping Soldier Support Equipment (M80101)<br />

M80101<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Each TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Vanguard Sniper Defeat System<br />

1 FY 08 A 2272 0 2272 189 189 189 190 190 190 190 189 189 189 189 189 0<br />

Boomerang<br />

1 FY 08 A 3825 0 3825 319 319 319 319 319 318 318 318 319 319 319 319 0<br />

Ballistic Barrier A<br />

1 FY 08 A 205 0 205 17 17 17 18 17 17 17 17 17 17 17 17 0<br />

Ballistic Barrier Shield B<br />

1 FY 08 A 3 0 3 1 1 1 0<br />

Mannequins<br />

1 FY 08 A 685 0 685 57 57 57 58 57 57 57 57 57 57 57 57 0<br />

Perimeter Security Veil<br />

1 FY 08 A 203 0 203 17 17 17 16 17 17 17 17 17 17 17 17 0<br />

Stryker Topside Net<br />

1 FY 08 A 4755 0 4755 396 396 396 396 397 397 397 396 396 396 396 396 0<br />

HMMWV Turret/Gunner Net<br />

1 FY 08 A 4755 -968 5723 477 477 477 477 477 476 477 477 477 477 477 477 0<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

ADMIN LEAD TIME MFR TOTAL REMARKS<br />

F Reached MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

R Name - Location MIN 1-8-5 MAX D+ 1 Initial 0 3 4 7<br />

1 Doubleshot Inc, Rohnert Park, CA 2272<br />

Reorder 0 1 2 3<br />

2 BBN, Boston, MA 3825<br />

2 Initial 0 0 0 0<br />

3 Defense Shield Inc, Syracuse, NY 205<br />

Reorder 0 0 0 0<br />

4 Letterkenny <strong>Army</strong> Depot, Chambersburg, PA 3<br />

3 Initial 0 0 0 0<br />

5 various manufacturers, various locations 685<br />

Reorder 0 0 0 0<br />

6 Creative Building Products, Ft Wayne, IN 203<br />

4 Initial 0 0 0 0<br />

7 Calco Ent and Saab-Barracuda, South Pines and<br />

4755<br />

Reorder 0 0 0 0<br />

Fayettville NC<br />

5 Initial 0 0 0 0<br />

8 Calco Ent and Saab-Barracuda, South Pines and<br />

5723<br />

Fayettville NC<br />

Reorder 0 0 0 0<br />

M80101 9 Cole Motor Sports, Bluefield, WV 1353<br />

Item No. 174 Page 6 <strong>of</strong> 8 Exhibit P-21<br />

Rapid Equipping Soldier Support Equipment 259 Production Schedule


Rapid Equipping Soldier Support Equipment<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

Rapid Equipping Soldier Support Equipment (M80101)<br />

M80101<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Each TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Security Film<br />

1 FY 08 A 1353 0 1353 113 113 112 112 112 113 113 113 113 113 113 113 0<br />

Ballistic Face Shield (CPE)<br />

1 FY 08 A 348 0 348 29 29 29 29 29 29 29 29 29 29 29 29 0<br />

Gentex Maxillo Facial Shield<br />

1 FY 08 A 348 0 348 29 29 29 29 29 29 29 29 29 29 29 29 0<br />

Binoculars<br />

1 FY 08 A 1033 0 1033 86 86 86 87 86 86 86 86 86 86 86 86 0<br />

Doubleshot<br />

1 FY 08 A 1815 0 1815 151 151 152 152 152 151 151 151 151 151 151 151 0<br />

Quickcam<br />

1 FY 08 A 10 0 10 1 1 1 1 1 1 1 1 1 1 0<br />

Decoy Boomerang<br />

1 FY 08 A 1360 0 1360 300 300 300 300 160 0<br />

Ghost<br />

1 FY 08 A 361 0 361 60 61 60 60 60 60 0<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

ADMIN LEAD TIME MFR TOTAL REMARKS<br />

F Reached MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

R Name - Location MIN 1-8-5 MAX D+ 1 Initial 0 3 4 7<br />

1 Doubleshot Inc, Rohnert Park, CA 2272<br />

Reorder 0 1 2 3<br />

2 BBN, Boston, MA 3825<br />

2 Initial 0 0 0 0<br />

3 Defense Shield Inc, Syracuse, NY 205<br />

Reorder 0 0 0 0<br />

4 Letterkenny <strong>Army</strong> Depot, Chambersburg, PA 3<br />

3 Initial 0 0 0 0<br />

5 various manufacturers, various locations 685<br />

Reorder 0 0 0 0<br />

6 Creative Building Products, Ft Wayne, IN 203<br />

4 Initial 0 0 0 0<br />

7 Calco Ent and Saab-Barracuda, South Pines and<br />

4755<br />

Reorder 0 0 0 0<br />

Fayettville NC<br />

5 Initial 0 0 0 0<br />

8 Calco Ent and Saab-Barracuda, South Pines and<br />

5723<br />

Fayettville NC<br />

Reorder 0 0 0 0<br />

M80101 9 Cole Motor Sports, Bluefield, WV 1353<br />

Item No. 174 Page 7 <strong>of</strong> 8 Exhibit P-21<br />

Rapid Equipping Soldier Support Equipment 260 Production Schedule


Rapid Equipping Soldier Support Equipment<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

Rapid Equipping Soldier Support Equipment (M80101)<br />

M80101<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Each TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Route Reconnaisance Kit<br />

1 FY 08 A 4703 0 4703 392 392 391 392 392 392 392 392 392 392 392 392 0<br />

TRAP Outpost<br />

1 FY 08 A 240 0 240 20 20 20 20 20 20 20 20 20 20 20 20 0<br />

Handheld Thermal Devices<br />

1 FY 08 A 348 0 348 100 100 100 48 0<br />

Teucer<br />

1 FY 08 A 10 0 10 10 0<br />

M68 3x Magnifier<br />

1 FY 08 A 10 0 10 10 0<br />

Fast Obscurant Grenade (FOG)<br />

22 FY 08 A 4500 0 4500 375 375 375 375 375 375 375 375 375 375 375 375 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 33142 -968 34110 3148 3129 3127 3080 2890 2728 2669 2668 2668 2668 2667 2668<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

ADMIN LEAD TIME MFR TOTAL REMARKS<br />

F Reached MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

R Name - Location MIN 1-8-5 MAX D+ 1 Initial 0 3 4 7<br />

1 Doubleshot Inc, Rohnert Park, CA 2272<br />

Reorder 0 1 2 3<br />

2 BBN, Boston, MA 3825<br />

2 Initial 0 0 0 0<br />

3 Defense Shield Inc, Syracuse, NY 205<br />

Reorder 0 0 0 0<br />

4 Letterkenny <strong>Army</strong> Depot, Chambersburg, PA 3<br />

3 Initial 0 0 0 0<br />

5 various manufacturers, various locations 685<br />

Reorder 0 0 0 0<br />

6 Creative Building Products, Ft Wayne, IN 203<br />

4 Initial 0 0 0 0<br />

7 Calco Ent and Saab-Barracuda, South Pines and<br />

4755<br />

Reorder 0 0 0 0<br />

Fayettville NC<br />

5 Initial 0 0 0 0<br />

8 Calco Ent and Saab-Barracuda, South Pines and<br />

5723<br />

Fayettville NC<br />

Reorder 0 0 0 0<br />

M80101 9 Cole Motor Sports, Bluefield, WV 1353<br />

Item No. 174 Page 8 <strong>of</strong> 8 Exhibit P-21<br />

Rapid Equipping Soldier Support Equipment 261 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

CALIBRATION SETS EQUIPMENT<br />

Program Elements for Code B Items:<br />

Code:<br />

A<br />

P-1 Item Nomenclature<br />

CALIBRATION SETS EQUIPMENT (N10000)<br />

N10000<br />

<strong>Other</strong> Related Program Elements:<br />

***$68.0 This amount is the total <strong>of</strong> BASE/GWOT/AMENDED GWOT<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 68.0 68.0<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 68.0 68.0<br />

Initial Spares<br />

Total Proc Cost 68.0 68.0<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

Calibration Sets Equipment (CALSETS) comprises calibration standards (hardware), accessories and repair equipment required to perform the <strong>Army</strong>-wide test, measurement and diagnostic<br />

equipment (TMDE) calibration and repair mission. This equipment provides for accuracy verification <strong>of</strong> TMDE by maintaining legal traceability to standards established and maintained by the US<br />

National Institute <strong>of</strong> Standards and Technology and is used by maintenance units worldwide to support the TMDE required to assure the operability, accuracy, effectiveness and safety <strong>of</strong> <strong>Army</strong><br />

weapon systems.<br />

Justification:<br />

FY2008 Baseline: Procures signal generators and radio frequency (RF) power amplifier upgrades required for calibration <strong>of</strong> avionics, communications, Identification Friend or Foe and other RFrelated<br />

equipment; leveled frequency generators and counters required for support <strong>of</strong> threat target alert, acquisition, guidance and communication systems; and precision torque cells, load cells and a<br />

scale calibrator system to enable maintenance <strong>of</strong> critical safety-<strong>of</strong>-flight systems on <strong>Army</strong> helicopters.<br />

FY2008 Global War on Terrorism (GWOT) Request: Procures additional quantities <strong>of</strong> the above items and AN/GSM-705 and AN/GSM-421 Secondary Transfer Calibration Sets (CALSET 2000),<br />

VSWR bridges, alternating current (AC) sources, gamma sources for calibration RADIAC meters, instrument controllers, electro-optics test systems and ammo gauge calibrators required to<br />

prosecute the Global War on Terror.<br />

FY2008 GWOT Cost Adjustment: Procures frequency counters, signal generators, measuring receiver workstations, voltmeters, torque calibrators, network analyzers, power meters, spectrum<br />

analyzers, RLC electronic bridges and production control units required to maintain equipment supporting weapon systems involved in ongoing GWOT operations.<br />

FY2008 Base Appropriation - $10.644 million<br />

FY2008 GWOT Request - $36.856 million<br />

FY2008 GWOT Cost Adjustment Request - $20.451 million<br />

FY 2008 Total - $67.951 million<br />

N10000 Item No. 176 Page 1 <strong>of</strong> 21 Exhibit P-40<br />

CALIBRATION SETS EQUIPMENT 262 Budget Item Justification Sheet


CALIBRATION SETS EQUIPMENT<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

CALIBRATION SETS EQUIPMENT (N10000)<br />

N10000<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY2008 BASE APPROPRIATION<br />

Signal Generator (9 KHz to 2 GHz) A 1324 71 19<br />

Wideband Power RF Amp (100KHz-2GHz) A 1822 71 26<br />

Precision Torque Cells A 333 64 5<br />

High Precision Leveled V/F Gen A 1474 44 34<br />

Wideband Power RF Amp 2 GHz-40GHz A 1194 64 19<br />

Load Cells (USP1-20B) A 384 64 6<br />

Resistance Standards (Air) A 175 35 5<br />

Calibrator Sys Precision Truck/Avn Scale A 662 35 19<br />

Anritzu 2414B Microwave Freq Counter A 724 58 12<br />

Contractual Engineering/Technical Svc 1000<br />

Government Engineering/Support 1552<br />

Subtotal 10644<br />

FY2008 GWOT REQUEST<br />

CALSET 2000 A 17415 9 1935<br />

Signal Generator (9 KHz to 2 GHz) A 1192 58 21<br />

Wideband Power RF Amp (100KHz-2GHz) A 1488 58 26<br />

Precision Torque Cells A 333 64 5<br />

Wideband Power RF Amp 2 GHz-40GHz A 243 13 19<br />

Load Cells (USP1-20B) A 816 136 6<br />

Resistance Standards (Air) A 325 65 5<br />

Calibrator Sys Precision Truck/Avn Scale A 1228 65 19<br />

VSWR Bridges A 145 86 2<br />

AC Current Source A 2130 71 30<br />

Gamma Source for Cal Radiac Meters A 682 29 24<br />

Instrument Controllers/Computers A 4629 882 5<br />

Electro Optics Test System A 4200 21 200<br />

Ammo Gauge Calibrator A 2030 199 10<br />

Subtotal 36856<br />

FY2008 GWOT Cost Adjustment<br />

Frequency Counter A 1010 100 10<br />

N10000 Item No. 176 Page 2 <strong>of</strong> 21 Exhibit P-5<br />

CALIBRATION SETS EQUIPMENT 263 Weapon System Cost Analysis


CALIBRATION SETS EQUIPMENT<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

CALIBRATION SETS EQUIPMENT (N10000)<br />

N10000<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

Low Distortion Signal Generator A 2040 200 10<br />

Measuring Receiver Workstation 50GHz A 5000 200 25<br />

RF Voltmeter A 850 100 9<br />

Torque Calibrator A 3076 100 31<br />

Network Analyzer A 2250 9 250<br />

Production Control Units A 525 150 4<br />

Type IV Power Meter A 1300 200 7<br />

Low Frequency Spectrum Analyzer A 2000 100 20<br />

RLC Electronic Bridge A 500 100 5<br />

Production Engineering 1900<br />

Subtotal 20451<br />

Total: 67951<br />

N10000 Item No. 176 Page 3 <strong>of</strong> 21 Exhibit P-5<br />

CALIBRATION SETS EQUIPMENT 264 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

CALIBRATION SETS EQUIPMENT<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

FY2008 BASE APPROPRIATION<br />

Signal Generator (9 KHz to 2 GHz)<br />

FY 2008<br />

Technical Communities, Inc<br />

San Bruno, CA<br />

Wideband Power RF Amp (100KHz-2GHz)<br />

FY 2008 TBS (1)<br />

TBD<br />

Precision Torque Cells<br />

FY 2008<br />

Sensor Data, Inc.<br />

Sterling Heights, MI<br />

High Precision Leveled V/F Gen<br />

FY 2008<br />

Fluke Corp<br />

Everett, WA<br />

Wideband Power RF Amp 2 GHz-40GHz<br />

FY 2008 TBS (2)<br />

TBD<br />

Load Cells (USP1-20B)<br />

FY 2008 TBS (3)<br />

TBD<br />

Resistance Standards (Air)<br />

FY 2008 TBS (4)<br />

TBD<br />

Calibrator Sys Precision Truck/Avn Scale<br />

FY 2008 TBS (5)<br />

TBD<br />

Anritzu 2414B Microwave Freq Counter<br />

FY 2008<br />

Technical Communities, Inc<br />

San Bruno, CA<br />

FY2008 GWOT REQUEST<br />

CALSET 2000<br />

FY 2008<br />

Dynetics<br />

Huntsville, AL<br />

Signal Generator (9 KHz to 2 GHz)<br />

P-1 Line Item Nomenclature:<br />

CALIBRATION SETS EQUIPMENT (N10000)<br />

N10000<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

SS/FP AMCOM Jan 08 Apr 08 71 19 Y FSS<br />

RFP<br />

Issue<br />

Date<br />

C/FP AMCOM Jan 08 May 08 71 26 Y Nov 07<br />

SS/FP AMCOM Jan 08 Mar 08 64 5 Y Dec 07<br />

SS/FP AMCOM Jan 08 May 08 44 34 Y FSS<br />

C/FP AMCOM Jan 08 May 08 64 19 Y Nov 07<br />

C/FP AMCOM Jan 08 May 08 64 6 Y Nov 07<br />

C/FP AMCOM Jan 08 May 08 35 5 Y Nov 07<br />

C/FP AMCOM Jan 08 Mar 08 35 19 Y Nov 07<br />

SS/FP AMCOM Jan 08 Apr 08 58 12 Y FSS<br />

SS/FP AMCOM Jun 08 May 09 9 1935 Y Apr 08<br />

N10000 Item No. 176 Page 4 <strong>of</strong> 21 Exhibit P-5a<br />

CALIBRATION SETS EQUIPMENT 265 Budget <strong>Procurement</strong> History and Planning


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

CALIBRATION SETS EQUIPMENT<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

FY 2008<br />

Technical Communities, Inc<br />

San Bruno, CA<br />

Wideband Power RF Amp (100KHz-2GHz)<br />

FY 2008 TBS (6)<br />

TBD<br />

Precision Torque Cells<br />

FY 2008<br />

Sensor Data, Inc<br />

Sterling Heights, MI<br />

Wideband Power RF Amp 2 GHz-40GHz<br />

FY 2008 TBS (7)<br />

TBD<br />

Load Cells (USP1-20B)<br />

FY 2008 TBS (8)<br />

TBD<br />

Resistance Standards (Air)<br />

FY 2008 TBS (9)<br />

TBD<br />

Calibrator Sys Precision Truck/Avn Scale<br />

FY 2008 TBS (10)<br />

TBD<br />

VSWR Bridges<br />

FY 2008 TBS (11)<br />

TBD<br />

AC Current Source<br />

FY 2008 TBS (12)<br />

TBD<br />

Gamma Source for Cal Radiac Meters<br />

FY 2008 TBS (13)<br />

TBD<br />

Instrument Controllers/Computers<br />

FY 2008 TBS (14)<br />

TBD<br />

Electro Optics Test System<br />

FY 2008 TBS (15)<br />

TBD<br />

P-1 Line Item Nomenclature:<br />

CALIBRATION SETS EQUIPMENT (N10000)<br />

N10000<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

SS/FP AMCOM Jun 08 Sep 08 58 21 Y FSS<br />

RFP<br />

Issue<br />

Date<br />

C/FP AMCOM Jun 08 Oct 08 58 26 Y Apr 08<br />

SS/FP AMCOM Jun 08 Aug 08 64 5 Y Apr 08<br />

C/FP AMCOM Jun 08 Oct 08 13 19 Y Apr 08<br />

C/FP AMCOM Jun 08 Oct 08 136 6 Y Apr 08<br />

C/FP AMCOM Jun 08 Oct 08 65 5 Y Apr 08<br />

C/FP AMCOM Jun 08 Aug 08 65 19 Y Apr 08<br />

C/FP AMCOM Jun 08 Oct 08 86 2 Y Mar 08<br />

C/FP AMCOM Jun 08 Oct 08 71 30 Y Mar 08<br />

C/FP AMCOM Jun 08 Oct 08 29 24 Y Mar 08<br />

C/FP AMCOM Jun 08 Oct 08 882 5 Y Mar 08<br />

C/FP AMCOM Jun 08 Oct 08 21 200 Y Mar 08<br />

N10000 Item No. 176 Page 5 <strong>of</strong> 21 Exhibit P-5a<br />

CALIBRATION SETS EQUIPMENT 266 Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

CALIBRATION SETS EQUIPMENT<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

Ammo Gauge Calibrator<br />

FY 2008 TBS (16)<br />

TBD<br />

FY2008 GWOT Cost Adjustment<br />

Frequency Counter<br />

FY 2008 TBS (17)<br />

TBD<br />

Low Distortion Signal Generator<br />

FY 2008 TBS (18)<br />

TBD<br />

Measuring Receiver Workstation 50GHz<br />

FY 2008 TBS (19)<br />

TBD<br />

RF Voltmeter<br />

FY 2008 TBS (20)<br />

TBD<br />

Torque Calibrator<br />

FY 2008 TBS (21)<br />

TBD<br />

Network Analyzer<br />

FY 2008 TBS (22)<br />

TBD<br />

Production Control Units<br />

FY 2008 TBS (23)<br />

TBD<br />

Type IV Power Meter<br />

FY 2008 TBS (24)<br />

TBD<br />

Low Frequency Spectrum Analyzer<br />

FY 2008 TBS (25)<br />

TBD<br />

RLC Electronic Bridge<br />

FY 2008 TBS (26)<br />

TBD<br />

P-1 Line Item Nomenclature:<br />

CALIBRATION SETS EQUIPMENT (N10000)<br />

N10000<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

C/FP AMCOM Jun 08 Oct 08 199 10 Y Mar 08<br />

C/FP AMCOM Jun 08 Oct 08 100 10 N Feb 08 Mar 08<br />

C/FP AMCOM Jun 08 Oct 08 200 10 N Feb 08 Mar 08<br />

C/FP AMCOM Jun 08 Oct 08 200 25 N Feb 08 Mar 08<br />

C/FP AMCOM Jun 08 Oct 08 100 9 N Feb 08 Mar 08<br />

C/FP AMCOM Jun 08 Oct 08 100 31 N Feb 08 Mar 08<br />

C/FP AMCOM Jun 08 Oct 08 9 250 N Feb 08 Mar 08<br />

C/FP AMCOM Jun 08 Oct 08 150 4 N Feb 08 Mar 08<br />

C/FP AMCOM Jun 08 Oct 08 200 7 N Feb 08 Mar 08<br />

C/FP AMCOM Jun 08 Oct 08 100 20 N Feb 08 Mar 08<br />

C/FP AMCOM Jun 08 Oct 08 100 5 N Feb 08 Mar 08<br />

N10000 Item No. 176 Page 6 <strong>of</strong> 21 Exhibit P-5a<br />

CALIBRATION SETS EQUIPMENT 267 Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

CALIBRATION SETS EQUIPMENT<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

P-1 Line Item Nomenclature:<br />

CALIBRATION SETS EQUIPMENT (N10000)<br />

N10000<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

Date:<br />

September 2007<br />

REMARKS: FSS in the Request for Proposal (RFP) issue date column indicates an item planned for procurement through a General Services Administration Federal Supply Schedule. The sole source acquisitions listed<br />

above are required to ensure compatibility with other equipment in the existing calibration standards sets.<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

N10000 Item No. 176 Page 7 <strong>of</strong> 21 Exhibit P-5a<br />

CALIBRATION SETS EQUIPMENT 268 Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning


CALIBRATION SETS EQUIPMENT<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

CALIBRATION SETS EQUIPMENT (N10000)<br />

N10000<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Signal Generator (9 KHz to 2 GHz)<br />

1 FY 08 A 71 0 71 A 16 16 16 16 7 0<br />

B<br />

Wideband Power RF Amp (100KHz-2GHz)<br />

2 FY 08 A 71 0 71 A 10 10 10 10 10 10 11 0<br />

B<br />

Precision Torque Cells<br />

3 FY 08 A 64 0 64 A 6 6 6 6 6 6 6 6 6 6 4 0<br />

B<br />

High Precision Leveled V/F Gen<br />

4 FY 08 A 44 0 44 A 6 6 6 6 6 6 6 2 0<br />

B<br />

Wideband Power RF Amp 2 GHz-40GHz<br />

5 FY 08<br />

B<br />

A 64 0 64 A 10 10 10 10 10 10 4 0<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Technical Communities, Inc, San Bruno, CA 71 71 71<br />

2 TBS (1), TBD 71 71 71<br />

3 Sensor Data, Inc., Sterling Heights, MI 64 64 64<br />

4 Fluke Corp, Everett, WA 44 44 44<br />

5 TBS (2), TBD 64 64 64<br />

6 TBS (3), TBD 64 64 64<br />

7 TBS (4), TBD 35 35 35<br />

8 TBS (5), TBD 35 35 35<br />

9 Technical Communities, Inc, San Bruno, CA 58 58 58<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 3 3 3 6<br />

Reorder 0 0 0 0<br />

2 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

3 Initial 6 3 2 5<br />

Reorder 0 0 0 0<br />

4 Initial 3 3 4 7<br />

Reorder 0 0 0 0<br />

5 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

REMARKS<br />

N10000 Item No. 176 Page 8 <strong>of</strong> 21 Exhibit P-21<br />

CALIBRATION SETS EQUIPMENT 269 Production Schedule


CALIBRATION SETS EQUIPMENT<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

CALIBRATION SETS EQUIPMENT (N10000)<br />

N10000<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Load Cells (USP1-20B)<br />

6 FY 08 A 64 0 64 A 10 10 10 10 10 10 4 0<br />

B<br />

Resistance Standards (Air)<br />

7 FY 08 A 35 0 35 A 10 10 10 5 0<br />

B<br />

Calibrator Sys Precision Truck/Avn Scale<br />

8 FY 08 A 35 0 35 A 10 10 10 5 0<br />

B<br />

Anritzu 2414B Microwave Freq Counter<br />

9 FY 08 A 58 0 58 A 10 10 10 10 10 8 0<br />

B<br />

CALSET 2000<br />

10 FY 08 A 9 0 9 A 2 2 2 3<br />

GW<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Technical Communities, Inc, San Bruno, CA 71 71 71<br />

2 TBS (1), TBD 71 71 71<br />

3 Sensor Data, Inc., Sterling Heights, MI 64 64 64<br />

4 Fluke Corp, Everett, WA 44 44 44<br />

5 TBS (2), TBD 64 64 64<br />

6 TBS (3), TBD 64 64 64<br />

7 TBS (4), TBD 35 35 35<br />

8 TBS (5), TBD 35 35 35<br />

9 Technical Communities, Inc, San Bruno, CA 58 58 58<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 3 3 3 6<br />

Reorder 0 0 0 0<br />

2 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

3 Initial 6 3 2 5<br />

Reorder 0 0 0 0<br />

4 Initial 3 3 4 7<br />

Reorder 0 0 0 0<br />

5 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

REMARKS<br />

N10000 Item No. 176 Page 9 <strong>of</strong> 21 Exhibit P-21<br />

CALIBRATION SETS EQUIPMENT 270 Production Schedule


CALIBRATION SETS EQUIPMENT<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

CALIBRATION SETS EQUIPMENT (N10000)<br />

N10000<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Signal Generator (9 KHz to 2 GHz)<br />

11 FY 08 A 58 0 58 A 16 16 16 10 0<br />

GW<br />

Wideband Power RF Amp (100KHz-2GHz)<br />

12 FY 08 A 58 0 58 A 10 10 10 10 10 8 0<br />

GW<br />

Precision Torque Cells<br />

13 FY 08 A 64 0 64 A 6 6 6 6 6 6 6 6 6 6 4 0<br />

GW<br />

Wideband Power RF Amp 2 GHz-40GHz<br />

14 FY 08 A 13 0 13 A 10 3 0<br />

GW<br />

Load Cells (USP1-20B)<br />

15 FY 08 A 136 0 136 A 15 15 15 15 15 15 15 15 16 0<br />

GW<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Technical Communities, Inc, San Bruno, CA 71 71 71<br />

2 TBS (1), TBD 71 71 71<br />

3 Sensor Data, Inc., Sterling Heights, MI 64 64 64<br />

4 Fluke Corp, Everett, WA 44 44 44<br />

5 TBS (2), TBD 64 64 64<br />

6 TBS (3), TBD 64 64 64<br />

7 TBS (4), TBD 35 35 35<br />

8 TBS (5), TBD 35 35 35<br />

9 Technical Communities, Inc, San Bruno, CA 58 58 58<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 3 3 3 6<br />

Reorder 0 0 0 0<br />

2 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

3 Initial 6 3 2 5<br />

Reorder 0 0 0 0<br />

4 Initial 3 3 4 7<br />

Reorder 0 0 0 0<br />

5 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

REMARKS<br />

N10000 Item No. 176 Page 10 <strong>of</strong> 21 Exhibit P-21<br />

CALIBRATION SETS EQUIPMENT 271 Production Schedule


CALIBRATION SETS EQUIPMENT<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

CALIBRATION SETS EQUIPMENT (N10000)<br />

N10000<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Resistance Standards (Air)<br />

16 FY 08 A 65 0 65 A 10 10 10 10 10 10 5 0<br />

GW<br />

Calibrator Sys Precision Truck/Avn Scale<br />

17 FY 08 A 65 0 65 A 10 10 10 10 10 10 5 0<br />

GW<br />

VSWR Bridges<br />

18 FY 08 A 86 0 86 A 10 10 10 10 10 10 10 10 6 0<br />

GW<br />

AC Current Source<br />

19 FY 08 A 71 0 71 A 10 10 10 10 10 10 10 1 0<br />

GW<br />

Gamma Source for Cal Radiac Meters<br />

20 FY 08 A 29 0 29 A 10 10 9 0<br />

GW<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Technical Communities, Inc, San Bruno, CA 71 71 71<br />

2 TBS (1), TBD 71 71 71<br />

3 Sensor Data, Inc., Sterling Heights, MI 64 64 64<br />

4 Fluke Corp, Everett, WA 44 44 44<br />

5 TBS (2), TBD 64 64 64<br />

6 TBS (3), TBD 64 64 64<br />

7 TBS (4), TBD 35 35 35<br />

8 TBS (5), TBD 35 35 35<br />

9 Technical Communities, Inc, San Bruno, CA 58 58 58<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 3 3 3 6<br />

Reorder 0 0 0 0<br />

2 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

3 Initial 6 3 2 5<br />

Reorder 0 0 0 0<br />

4 Initial 3 3 4 7<br />

Reorder 0 0 0 0<br />

5 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

REMARKS<br />

N10000 Item No. 176 Page 11 <strong>of</strong> 21 Exhibit P-21<br />

CALIBRATION SETS EQUIPMENT 272 Production Schedule


CALIBRATION SETS EQUIPMENT<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

CALIBRATION SETS EQUIPMENT (N10000)<br />

N10000<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Instrument Controllers/Computers<br />

21 FY 08 A 882 0 882 A 100 100 100 100 100 100 100 100 82 0<br />

GW<br />

Electro Optics Test System<br />

22 FY 08 A 21 0 21 A 5 5 5 5 1 0<br />

GW<br />

Ammo Gauge Calibrator<br />

23 FY 08 A 199 0 199 A 20 20 20 20 20 20 20 20 20 19 0<br />

GW<br />

Frequency Counter<br />

24 FY 08 A 100 0 100 A 20 20 20 20 20 0<br />

GWA<br />

Low Distortion Signal Generator<br />

25 FY 08 A 200 0 200 A 20 20 20 20 20 20 20 20 20 20 0<br />

GWA<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Technical Communities, Inc, San Bruno, CA 71 71 71<br />

2 TBS (1), TBD 71 71 71<br />

3 Sensor Data, Inc., Sterling Heights, MI 64 64 64<br />

4 Fluke Corp, Everett, WA 44 44 44<br />

5 TBS (2), TBD 64 64 64<br />

6 TBS (3), TBD 64 64 64<br />

7 TBS (4), TBD 35 35 35<br />

8 TBS (5), TBD 35 35 35<br />

9 Technical Communities, Inc, San Bruno, CA 58 58 58<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 3 3 3 6<br />

Reorder 0 0 0 0<br />

2 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

3 Initial 6 3 2 5<br />

Reorder 0 0 0 0<br />

4 Initial 3 3 4 7<br />

Reorder 0 0 0 0<br />

5 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

REMARKS<br />

N10000 Item No. 176 Page 12 <strong>of</strong> 21 Exhibit P-21<br />

CALIBRATION SETS EQUIPMENT 273 Production Schedule


CALIBRATION SETS EQUIPMENT<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

CALIBRATION SETS EQUIPMENT (N10000)<br />

N10000<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Measuring Receiver Workstation 50GHz<br />

26 FY 08 A 200 0 200 A 20 20 20 20 20 20 20 20 20 20 0<br />

GWA<br />

RF Voltmeter<br />

27 FY 08 A 100 0 100 A 20 20 20 20 20 0<br />

GWA<br />

Torque Calibrator<br />

28 FY 08 A 100 0 100 A 15 15 15 15 15 15 10 0<br />

GWA<br />

Network Analyzer<br />

29 FY 08 A 9 0 9 A 1 1 1 1 1 1 1 1 1 0<br />

GWA<br />

Production Control Units<br />

30 FY 08 A 150 0 150 A 50 50 50 0<br />

GWA<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Technical Communities, Inc, San Bruno, CA 71 71 71<br />

2 TBS (1), TBD 71 71 71<br />

3 Sensor Data, Inc., Sterling Heights, MI 64 64 64<br />

4 Fluke Corp, Everett, WA 44 44 44<br />

5 TBS (2), TBD 64 64 64<br />

6 TBS (3), TBD 64 64 64<br />

7 TBS (4), TBD 35 35 35<br />

8 TBS (5), TBD 35 35 35<br />

9 Technical Communities, Inc, San Bruno, CA 58 58 58<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 3 3 3 6<br />

Reorder 0 0 0 0<br />

2 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

3 Initial 6 3 2 5<br />

Reorder 0 0 0 0<br />

4 Initial 3 3 4 7<br />

Reorder 0 0 0 0<br />

5 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

REMARKS<br />

N10000 Item No. 176 Page 13 <strong>of</strong> 21 Exhibit P-21<br />

CALIBRATION SETS EQUIPMENT 274 Production Schedule


CALIBRATION SETS EQUIPMENT<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

CALIBRATION SETS EQUIPMENT (N10000)<br />

N10000<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Type IV Power Meter<br />

31 FY 08 A 200 0 200 A 25 25 25 25 25 25 25 25 0<br />

GWA<br />

Low Frequency Spectrum Analyzer<br />

32 FY 08 A 100 0 100 A 10 10 10 10 10 10 10 10 10 10 0<br />

GWA<br />

RLC Electronic Bridge<br />

33 FY 08 A 100 0 100 A 25 25 25 25 0<br />

GWA<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 3521 3521 16 42 88 83 78 80 82 480 462 429 356 318 270 252 230 179 71 2 3<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Technical Communities, Inc, San Bruno, CA 71 71 71<br />

2 TBS (1), TBD 71 71 71<br />

3 Sensor Data, Inc., Sterling Heights, MI 64 64 64<br />

4 Fluke Corp, Everett, WA 44 44 44<br />

5 TBS (2), TBD 64 64 64<br />

6 TBS (3), TBD 64 64 64<br />

7 TBS (4), TBD 35 35 35<br />

8 TBS (5), TBD 35 35 35<br />

9 Technical Communities, Inc, San Bruno, CA 58 58 58<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 3 3 3 6<br />

Reorder 0 0 0 0<br />

2 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

3 Initial 6 3 2 5<br />

Reorder 0 0 0 0<br />

4 Initial 3 3 4 7<br />

Reorder 0 0 0 0<br />

5 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

REMARKS<br />

N10000 Item No. 176 Page 14 <strong>of</strong> 21 Exhibit P-21<br />

CALIBRATION SETS EQUIPMENT 275 Production Schedule


CALIBRATION SETS EQUIPMENT<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

CALIBRATION SETS EQUIPMENT (N10000)<br />

N10000<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Signal Generator (9 KHz to 2 GHz)<br />

1 FY 08 A 71 71 0<br />

B<br />

Wideband Power RF Amp (100KHz-2GHz)<br />

2 FY 08 A 71 71 0<br />

B<br />

Precision Torque Cells<br />

3 FY 08 A 64 64 0<br />

B<br />

High Precision Leveled V/F Gen<br />

4 FY 08 A 44 44 0<br />

B<br />

Wideband Power RF Amp 2 GHz-40GHz<br />

5 FY 08<br />

B<br />

A 64 64 0<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Technical Communities, Inc, San Bruno, CA 71 71 71<br />

2 TBS (1), TBD 71 71 71<br />

3 Sensor Data, Inc., Sterling Heights, MI 64 64 64<br />

4 Fluke Corp, Everett, WA 44 44 44<br />

5 TBS (2), TBD 64 64 64<br />

6 TBS (3), TBD 64 64 64<br />

7 TBS (4), TBD 35 35 35<br />

8 TBS (5), TBD 35 35 35<br />

9 Technical Communities, Inc, San Bruno, CA 58 58 58<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 3 3 3 6<br />

Reorder 0 0 0 0<br />

2 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

3 Initial 6 3 2 5<br />

Reorder 0 0 0 0<br />

4 Initial 3 3 4 7<br />

Reorder 0 0 0 0<br />

5 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

REMARKS<br />

N10000 Item No. 176 Page 15 <strong>of</strong> 21 Exhibit P-21<br />

CALIBRATION SETS EQUIPMENT 276 Production Schedule


CALIBRATION SETS EQUIPMENT<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

CALIBRATION SETS EQUIPMENT (N10000)<br />

N10000<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Load Cells (USP1-20B)<br />

6 FY 08 A 64 64 0<br />

B<br />

Resistance Standards (Air)<br />

7 FY 08 A 35 35 0<br />

B<br />

Calibrator Sys Precision Truck/Avn Scale<br />

8 FY 08 A 35 35 0<br />

B<br />

Anritzu 2414B Microwave Freq Counter<br />

9 FY 08 A 58 58 0<br />

B<br />

CALSET 2000<br />

10 FY 08 A 9 6 3 2 1 0<br />

GW<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Technical Communities, Inc, San Bruno, CA 71 71 71<br />

2 TBS (1), TBD 71 71 71<br />

3 Sensor Data, Inc., Sterling Heights, MI 64 64 64<br />

4 Fluke Corp, Everett, WA 44 44 44<br />

5 TBS (2), TBD 64 64 64<br />

6 TBS (3), TBD 64 64 64<br />

7 TBS (4), TBD 35 35 35<br />

8 TBS (5), TBD 35 35 35<br />

9 Technical Communities, Inc, San Bruno, CA 58 58 58<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 3 3 3 6<br />

Reorder 0 0 0 0<br />

2 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

3 Initial 6 3 2 5<br />

Reorder 0 0 0 0<br />

4 Initial 3 3 4 7<br />

Reorder 0 0 0 0<br />

5 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

REMARKS<br />

N10000 Item No. 176 Page 16 <strong>of</strong> 21 Exhibit P-21<br />

CALIBRATION SETS EQUIPMENT 277 Production Schedule


CALIBRATION SETS EQUIPMENT<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

CALIBRATION SETS EQUIPMENT (N10000)<br />

N10000<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Signal Generator (9 KHz to 2 GHz)<br />

11 FY 08 A 58 58 0<br />

GW<br />

Wideband Power RF Amp (100KHz-2GHz)<br />

12 FY 08 A 58 58 0<br />

GW<br />

Precision Torque Cells<br />

13 FY 08 A 64 64 0<br />

GW<br />

Wideband Power RF Amp 2 GHz-40GHz<br />

14 FY 08 A 13 13 0<br />

GW<br />

Load Cells (USP1-20B)<br />

15 FY 08 A 136 136 0<br />

GW<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Technical Communities, Inc, San Bruno, CA 71 71 71<br />

2 TBS (1), TBD 71 71 71<br />

3 Sensor Data, Inc., Sterling Heights, MI 64 64 64<br />

4 Fluke Corp, Everett, WA 44 44 44<br />

5 TBS (2), TBD 64 64 64<br />

6 TBS (3), TBD 64 64 64<br />

7 TBS (4), TBD 35 35 35<br />

8 TBS (5), TBD 35 35 35<br />

9 Technical Communities, Inc, San Bruno, CA 58 58 58<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 3 3 3 6<br />

Reorder 0 0 0 0<br />

2 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

3 Initial 6 3 2 5<br />

Reorder 0 0 0 0<br />

4 Initial 3 3 4 7<br />

Reorder 0 0 0 0<br />

5 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

REMARKS<br />

N10000 Item No. 176 Page 17 <strong>of</strong> 21 Exhibit P-21<br />

CALIBRATION SETS EQUIPMENT 278 Production Schedule


CALIBRATION SETS EQUIPMENT<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

CALIBRATION SETS EQUIPMENT (N10000)<br />

N10000<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Resistance Standards (Air)<br />

16 FY 08 A 65 65 0<br />

GW<br />

Calibrator Sys Precision Truck/Avn Scale<br />

17 FY 08 A 65 65 0<br />

GW<br />

VSWR Bridges<br />

18 FY 08 A 86 86 0<br />

GW<br />

AC Current Source<br />

19 FY 08 A 71 71 0<br />

GW<br />

Gamma Source for Cal Radiac Meters<br />

20 FY 08 A 29 29 0<br />

GW<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Technical Communities, Inc, San Bruno, CA 71 71 71<br />

2 TBS (1), TBD 71 71 71<br />

3 Sensor Data, Inc., Sterling Heights, MI 64 64 64<br />

4 Fluke Corp, Everett, WA 44 44 44<br />

5 TBS (2), TBD 64 64 64<br />

6 TBS (3), TBD 64 64 64<br />

7 TBS (4), TBD 35 35 35<br />

8 TBS (5), TBD 35 35 35<br />

9 Technical Communities, Inc, San Bruno, CA 58 58 58<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 3 3 3 6<br />

Reorder 0 0 0 0<br />

2 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

3 Initial 6 3 2 5<br />

Reorder 0 0 0 0<br />

4 Initial 3 3 4 7<br />

Reorder 0 0 0 0<br />

5 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

REMARKS<br />

N10000 Item No. 176 Page 18 <strong>of</strong> 21 Exhibit P-21<br />

CALIBRATION SETS EQUIPMENT 279 Production Schedule


CALIBRATION SETS EQUIPMENT<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

CALIBRATION SETS EQUIPMENT (N10000)<br />

N10000<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Instrument Controllers/Computers<br />

21 FY 08 A 882 882 0<br />

GW<br />

Electro Optics Test System<br />

22 FY 08 A 21 21 0<br />

GW<br />

Ammo Gauge Calibrator<br />

23 FY 08 A 199 199 0<br />

GW<br />

Frequency Counter<br />

24 FY 08 A 100 100 0<br />

GWA<br />

Low Distortion Signal Generator<br />

25 FY 08 A 200 200 0<br />

GWA<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Technical Communities, Inc, San Bruno, CA 71 71 71<br />

2 TBS (1), TBD 71 71 71<br />

3 Sensor Data, Inc., Sterling Heights, MI 64 64 64<br />

4 Fluke Corp, Everett, WA 44 44 44<br />

5 TBS (2), TBD 64 64 64<br />

6 TBS (3), TBD 64 64 64<br />

7 TBS (4), TBD 35 35 35<br />

8 TBS (5), TBD 35 35 35<br />

9 Technical Communities, Inc, San Bruno, CA 58 58 58<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 3 3 3 6<br />

Reorder 0 0 0 0<br />

2 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

3 Initial 6 3 2 5<br />

Reorder 0 0 0 0<br />

4 Initial 3 3 4 7<br />

Reorder 0 0 0 0<br />

5 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

REMARKS<br />

N10000 Item No. 176 Page 19 <strong>of</strong> 21 Exhibit P-21<br />

CALIBRATION SETS EQUIPMENT 280 Production Schedule


CALIBRATION SETS EQUIPMENT<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

CALIBRATION SETS EQUIPMENT (N10000)<br />

N10000<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Measuring Receiver Workstation 50GHz<br />

26 FY 08 A 200 200 0<br />

GWA<br />

RF Voltmeter<br />

27 FY 08 A 100 100 0<br />

GWA<br />

Torque Calibrator<br />

28 FY 08 A 100 100 0<br />

GWA<br />

Network Analyzer<br />

29 FY 08 A 9 9 0<br />

GWA<br />

Production Control Units<br />

30 FY 08 A 150 150 0<br />

GWA<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

S<br />

E<br />

P<br />

Later<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Technical Communities, Inc, San Bruno, CA 71 71 71<br />

2 TBS (1), TBD 71 71 71<br />

3 Sensor Data, Inc., Sterling Heights, MI 64 64 64<br />

4 Fluke Corp, Everett, WA 44 44 44<br />

5 TBS (2), TBD 64 64 64<br />

6 TBS (3), TBD 64 64 64<br />

7 TBS (4), TBD 35 35 35<br />

8 TBS (5), TBD 35 35 35<br />

9 Technical Communities, Inc, San Bruno, CA 58 58 58<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 3 3 3 6<br />

Reorder 0 0 0 0<br />

2 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

3 Initial 6 3 2 5<br />

Reorder 0 0 0 0<br />

4 Initial 3 3 4 7<br />

Reorder 0 0 0 0<br />

5 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

REMARKS<br />

N10000 Item No. 176 Page 20 <strong>of</strong> 21 Exhibit P-21<br />

CALIBRATION SETS EQUIPMENT 281 Production Schedule


CALIBRATION SETS EQUIPMENT<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

CALIBRATION SETS EQUIPMENT (N10000)<br />

N10000<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Type IV Power Meter<br />

31 FY 08 A 200 200 0<br />

GWA<br />

Low Frequency Spectrum Analyzer<br />

32 FY 08 A 100 100 0<br />

GWA<br />

RLC Electronic Bridge<br />

33 FY 08 A 100 100 0<br />

GWA<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 3521 3518 3 2 1<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 Technical Communities, Inc, San Bruno, CA 71 71 71<br />

2 TBS (1), TBD 71 71 71<br />

3 Sensor Data, Inc., Sterling Heights, MI 64 64 64<br />

4 Fluke Corp, Everett, WA 44 44 44<br />

5 TBS (2), TBD 64 64 64<br />

6 TBS (3), TBD 64 64 64<br />

7 TBS (4), TBD 35 35 35<br />

8 TBS (5), TBD 35 35 35<br />

9 Technical Communities, Inc, San Bruno, CA 58 58 58<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 3 3 3 6<br />

Reorder 0 0 0 0<br />

2 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

3 Initial 6 3 2 5<br />

Reorder 0 0 0 0<br />

4 Initial 3 3 4 7<br />

Reorder 0 0 0 0<br />

5 Initial 6 3 4 7<br />

Reorder 0 0 0 0<br />

REMARKS<br />

N10000 Item No. 176 Page 21 <strong>of</strong> 21 Exhibit P-21<br />

CALIBRATION SETS EQUIPMENT 282 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

INTEGRATED FAMILY OF TEST EQUIPMENT (IFTE)<br />

Program Elements for Code B Items:<br />

Code:<br />

A<br />

Date:<br />

September 2007<br />

P-1 Item Nomenclature<br />

INTEGRATED FAMILY OF TEST EQUIPMENT (IFTE) (MB4000)<br />

MB4000<br />

<strong>Other</strong> Related Program Elements:<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 170.4 170.4<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 170.4 170.4<br />

Initial Spares<br />

Total Proc Cost 170.4 170.4<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Integrated Family <strong>of</strong> Test Equipment (IFTE) provides automatic test equipment capable <strong>of</strong> supporting multiple weapon systems. The IFTE systems provide electronic fault isolation, test, and<br />

repair capabilities at all levels <strong>of</strong> maintenance, and do it more cost effectively than system-specific testers. The IFTE family consists <strong>of</strong> the Maintenance Support Device for field-level support, the<br />

Electro-Optics Test Facility for <strong>of</strong>f-platform sustainment level electro-optical support, and the Next Generation Automatic Test System (NGATS) for consolidation <strong>of</strong> automatic test equipment<br />

requirements. The following weapon systems depend in whole or in part upon IFTE for maintenance support: Abrams, Bradley, Avenger, Kiowa Warrior, Longbow Apache, Multiple Launch<br />

Rocket System (MLRS), Paladin, Black Hawk and Chinook helicopters, Stryker Brigade Combat Team Vehicle, and the <strong>Army</strong>'s entire fleet <strong>of</strong> diesel engine-powered wheeled and tracked vehicles.<br />

Justification:<br />

FY2008 Baseline: Procures test equipment to satisfy critical test and diagnostic requirements <strong>of</strong> <strong>Army</strong> warfighting systems such as MLRS, Kiowa Warrior, Apache, Abrams, Bradley, and Stryker.<br />

This equipment plays a pivotal role in the Global War on Terrorism (GWOT) and in the <strong>Army</strong>'s overall maintenance plans. The IFTE systems are capable <strong>of</strong> supporting existing weapon systems as<br />

well as the even more electronics-intensive systems planned for future fielding. The IFTE's capability to support many different weapon systems at all levels <strong>of</strong> maintenance generates substantial<br />

long-term operations and support cost savings by eliminating the need for more costly system-specific testers, reducing the logistics footprint, improving test equipment availability and deployability,<br />

and enabling retirement <strong>of</strong> the aging and increasingly unsupportable testers currently in the field.<br />

FY2008 Global War on Terrorism (GWOT) Request: Procures test equipment to satisfy GWOT readiness requirements. This equipment will provide critical test and diagnostic support for the<br />

<strong>Army</strong>'s ground, missile and aviation fleets in units deployed or deploying in support <strong>of</strong> the GWOT.<br />

FY2008 GWOT Cost Adjustment procures additional equipment required to support ground, missile and aviation fleets involved in ongoing GWOT operations.<br />

FY2008 Base Appropriation - $36.516 million<br />

FY2008 GWOT Request - $57.111 million<br />

FY2008 GWOT Cost Adjustment Request - $76.807 million<br />

FY2008 Total - $170.434 million<br />

MB4000 Item No. 177 Page 1 <strong>of</strong> 8 Exhibit P-40<br />

INTEGRATED FAMILY OF TEST EQUIPMENT (IFTE) 283 Budget Item Justification Sheet


INTEGRATED FAMILY OF TEST EQUIPMENT (IFTE)<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

INTEGRATED FAMILY OF TEST EQUIPMENT (IFTE)<br />

(MB4000)<br />

MB4000<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY2008 BASE APPROPRIATION<br />

MAINTENANCE SUPPORT DEVICE A<br />

Hardware 29912 2426 12<br />

<strong>Other</strong> 6604<br />

TOTAL BASELINE 36516<br />

FY2008 GWOT REQUEST<br />

MAINTENANCE SUPPORT DEVICE A<br />

Hardware 33616 2680 13<br />

<strong>Other</strong><br />

ELECTRO-OPTIC EQUIPMENT A<br />

Hardware<br />

<strong>Other</strong> 23495<br />

TOTAL FY2008 GWOT Request 57111<br />

FY2008 GWOT COST ADJUSTMENT REQUEST<br />

MAINTENANCE SUPPORT DEVICE A<br />

Hardware 72430 5892 12<br />

<strong>Other</strong> 4377<br />

TOTAL GWOT Cost Adjustment 76807<br />

Total: 170434<br />

MB4000 Item No. 177 Page 2 <strong>of</strong> 8 Exhibit P-5<br />

INTEGRATED FAMILY OF TEST EQUIPMENT (IFTE) 284 Weapon System Cost Analysis


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Maintenance Support Device<br />

Program Elements for Code B Items:<br />

Code:<br />

A<br />

P-1 Item Nomenclature<br />

Maintenance Support Device (MB4002)<br />

MB4000 (MB4002)<br />

<strong>Other</strong> Related Program Elements:<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 146.9 146.9<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 146.9 146.9<br />

Initial Spares<br />

Total Proc Cost 146.9 146.9<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Maintenance Support Device (MSD) is being fielded to support the on-going Global War on Terrorism (GWOT), to support more than 40 weapon systems, Stryker Brigade Combat Teams<br />

(SBCT), and <strong>Army</strong> Transformation. It provides test and diagnostic support and maintenance automation capabilities that are critical to the readiness <strong>of</strong> <strong>Army</strong> units and their equipment. The MSD is<br />

a lightweight, ruggedized tester used at all levels <strong>of</strong> maintenance to automatically diagnose electronic and automotive subsystems <strong>of</strong> the <strong>Army</strong>'s ground, missile and aviation weapon systems. It hosts<br />

interactive electronic technical manuals (IETM) and expert diagnostic systems, conducts intrusive testing in support <strong>of</strong> <strong>Army</strong> weapon systems, and provides a means to upload/download missioncritical<br />

s<strong>of</strong>tware into weapon system on-board mission computers.<br />

Approved Acquisition Objective (AAO): 35558<br />

Justification:<br />

FY2008 Baseline: Procures 2426 MSDs to satisfy GWOT and modular force requirements. This equipment will provide critical test and diagnostic support for weapons and support systems such as<br />

the Abrams, Bradley, Apache, Kiowa Warrior, Patriot, Stryker, and the <strong>Army</strong>'s diesel engine-powered tactical vehicles. The MSD is the <strong>Army</strong>'s standard at-system tester; is an essential maintenance<br />

tool in the support plans for the <strong>Army</strong>'s ground, missile and aviation fleets; and is in widespread use in units deployed in support <strong>of</strong> Operation Iraqi Freedom (OIF) and Operation Enduring Freedom<br />

(OEF).<br />

FY2008 Global War on Terrorism (GWOT) Request: Procures an additional 2680 MSDs to satisfy GWOT readiness requirements.<br />

FY2008 GWOT Cost Adjustment funds 5892 MSDs to satisfy GWOT readiness requirements.<br />

FY2008 Base Appropriation - $36.516 million<br />

FY2008 GWOT Request - $33.616 million<br />

FY2008 GWOT Cost Adjustment Request - $76.807 million<br />

FY2008 Total - $146.939 million<br />

MB4000 (MB4002) Item No. 177 Page 3 <strong>of</strong> 8 Exhibit P-40<br />

Maintenance Support Device 285 Budget Item Justification Sheet


Maintenance Support Device<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

Maintenance Support Device (MB4002)<br />

MB4000 (MB4002)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY2008 Base Appropriation<br />

MAINTENANCE SUPPORT DEVICE A<br />

Hardware/Accessories 29912 2426 12<br />

Non-Recurring Production Engineering 2994<br />

Recurring Production Engineering 500<br />

Systems Engineering/Program Management 1640<br />

Contractual Engineering/Technical Svcs 250<br />

Technical Publications 920<br />

Fielding 300<br />

SUBTOTAL 36516<br />

FY2008 GWOT Request<br />

MAINTENANCE SUPPORT DEVICE A<br />

Hardware/Accessories 33616 2680 13<br />

SUBTOTAL 33616<br />

FY2008 GWOT Cost Adjustment Request<br />

MAINTENANCE SUPPORT DEVICE A<br />

Hardware/Accessories 72430 5892 12<br />

Recurring Production Engineering 2748<br />

Fielding 1629<br />

SUBTOTAL 76807<br />

Total: 146939<br />

MB4000 (MB4002) Item No. 177 Page 4 <strong>of</strong> 8 Exhibit P-5<br />

Maintenance Support Device 286 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

Maintenance Support Device<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

FY2008 Base Appropriation<br />

FY 2008<br />

SESI<br />

Huntsville, AL<br />

FY2008 GWOT Request<br />

FY 2008<br />

SESI<br />

Huntsville, AL<br />

FY2008 GWOT Cost Adjustment Request<br />

FY 2008<br />

SESI<br />

Huntsville, AL<br />

P-1 Line Item Nomenclature:<br />

Maintenance Support Device (MB4002)<br />

MB4000 (MB4002)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

C/FP(4/5) AMCOM Dec 07 Mar 08 2426 12 Y<br />

C/FP(4/5) AMCOM Dec 07 May 08 2680 13 Y<br />

C/FP(4/5) AMCOM Dec 07 Aug 08 5892 12 Y<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS: Unit costs vary based on the mix <strong>of</strong> basic Maintenance Support Device-Version 2 (MSD-V2) Kits and MSD-V2 Kits with Internal Combustion Engine (ICE) Adapter Kits purchased on each delivery order.<br />

MB4000 (MB4002) Item No. 177 Page 5 <strong>of</strong> 8 Exhibit P-5a<br />

Maintenance Support Device 287 Budget <strong>Procurement</strong> History and Planning


Maintenance Support Device<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

Maintenance Support Device (MB4002)<br />

MB4000 (MB4002)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

MAINTENANCE SUPPORT DEVICE<br />

1 FY 08 A 2426 0 2426 A 918 918 590 0<br />

Base<br />

1 FY 08 A 2680 0 2680 328 918 918 516 0<br />

GWOT<br />

1 FY 08<br />

GWCA<br />

A 5892 0 5892 402 918 918 918 918 918 900 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 10998 10998 918 918 918 918 918 918 918 918 918 918 918 900<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 SESI, Huntsville, AL 1800 6000 12600<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 11 1 11 12<br />

Reorder 0 2 3 5<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

MB4000 (MB4002) Item No. 177 Page 6 <strong>of</strong> 8 Exhibit P-21<br />

Maintenance Support Device 288 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

ELECTRO OPTIC EQUIPMENT<br />

Program Elements for Code B Items:<br />

Code:<br />

A<br />

P-1 Item Nomenclature<br />

ELECTRO OPTIC EQUIPMENT (MB4003)<br />

MB4000 (MB4003)<br />

<strong>Other</strong> Related Program Elements:<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 23.5 23.5<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 23.5 23.5<br />

Initial Spares<br />

Total Proc Cost 23.5 23.5<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The Integrated Family <strong>of</strong> Test Equipment (IFTE) Electro-Optics Test Facility (EOTF), also known as Base Shop Test Facility (V)5 (BSTF(V)5), satisfies test and diagnostic requirements for<br />

forward-looking infrared systems, thermal imaging devices, laser designators/range finders, television cameras and display systems, direct view optics systems, and trackers. The EOTF capitalizes<br />

on <strong>Army</strong> investments by integrating components from the IFTE BSTF (V)3 and the Navy's standard electro-optics (EO) tester within a commercial open architecture for electronics. This system<br />

supports Kiowa Warrior, Apache and the Common Remotely Operated Weapons Station (CROWS) and will replace aging EO test equipment such as the Electronic Equipment Test Facility (EETF).<br />

The EOTF is capable <strong>of</strong> supporting other <strong>Army</strong> systems in the field when it becomes cost effective or necessary to do so.<br />

Approved Acquisition Objective (AAO): 44<br />

Justification:<br />

FY2008 Global War on Terrorism (GWOT) Request: Fields EOTFs required in support <strong>of</strong> GWOT operations. As a designated DoD standard automatic test system (ATS) and as directed by the<br />

Assistant Secretary <strong>of</strong> the <strong>Army</strong> for Acquisition, Logistics and Technology (ASA/ALT), the EOTF is an essential support item for Aviation Intermediate Maintenance (AVIM) units in support <strong>of</strong><br />

Kiowa Warrior OH-58D systems. It supports the Combat Aviation Brigades and Air Cavalry Squadrons in the Force Design Update/Modular Force. The EOTF is a pacing item for the unit table <strong>of</strong><br />

organization and equipment (TOE) and is critical to mission accomplishment.<br />

FY2008 Base Appropriation: $0<br />

FY2008 GWOT Request: $23.495 million<br />

FY2008 GWOT Cost Adjustment Request - $0<br />

FY2008 Total: $23.495 million<br />

MB4000 (MB4003) Item No. 177 Page 7 <strong>of</strong> 8 Exhibit P-40<br />

ELECTRO OPTIC EQUIPMENT 289 Budget Item Justification Sheet


ELECTRO OPTIC EQUIPMENT<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

ELECTRO OPTIC EQUIPMENT (MB4003)<br />

MB4000 (MB4003)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY2008 GWOT Request<br />

ELECTRO-OPTICS TEST FACILITY A<br />

Test Program Sets/System Integration 13964<br />

Systems Engineering/Program Management 2067<br />

Contractual Engineering/Tech Svcs 1771<br />

Production Engineering 143<br />

Non-recurring Engineering 4000<br />

Initial Spares 1050<br />

Fielding 500<br />

Total: 23495<br />

MB4000 (MB4003) Item No. 177 Page 8 <strong>of</strong> 8 Exhibit P-5<br />

ELECTRO OPTIC EQUIPMENT 290 Weapon System Cost Analysis


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

TEST EQUIPMENT MODERNIZATION (TEMOD)<br />

Program Elements for Code B Items:<br />

Code:<br />

A<br />

Date:<br />

P-1 Item Nomenclature<br />

TEST EQUIPMENT MODERNIZATION (TEMOD) (N11000)<br />

N11000<br />

<strong>Other</strong> Related Program Elements:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 30.1 30.1<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 30.1 30.1<br />

Initial Spares<br />

Total Proc Cost 30.1 30.1<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The objectives <strong>of</strong> the Test Equipment Modernization (TEMOD) program are to improve the materiel readiness <strong>of</strong> <strong>Army</strong> weapon systems; minimize general-purpose test, measurement and diagnostic<br />

equipment (TMDE) proliferation and obsolescence; and reduce <strong>Army</strong> operations and support costs. These objectives are accomplished through the cost-effective acquisition <strong>of</strong> state-<strong>of</strong>-the-art test<br />

equipment that is employed for verifying accuracy, operability, and safety <strong>of</strong> <strong>Army</strong> weapon systems and for supporting weapon systems at all maintenance levels. The TEMOD program procures<br />

general-purpose TMDE that supports all <strong>Army</strong> commodities and is essential to the continued support <strong>of</strong> weapon system platforms such as the Abrams Tank, Bradley Fighting Vehicle, Apache<br />

Helicopter, Patriot, and Single-channel Ground and Airborne Radio System as well as other weapon systems scheduled for fielding to the current and future forces.<br />

Justification:<br />

FY2008 Baseline: Procures initial production quantities <strong>of</strong> the Portable Radar Test Set (PRTS) Identification Friend or Foe (IFF) Mode 5 Upgrade, the 2 GHz Signal Generator and the 26.5 GHz<br />

Signal Generator, and additional quantities <strong>of</strong> the Radio Test Set. The PRTS performs pre-flight checks <strong>of</strong> aviation and missile transponders/interrogators to alleviate potential fratricide concerns. It<br />

is required to ensure <strong>Army</strong> aircraft are in compliance with European and Federal Aviation Administration mandates. The signal generators will be used as a signal source to test receivers and<br />

transmitters <strong>of</strong> all types throughout the <strong>Army</strong> and are needed to ensure battlefield commanders can communicate in adverse conditions. The Radio Test Set will replace an obsolete radio test set<br />

(1981-1989 vintage) and will be used to test radios mounted in tactical vehicles and weapon systems platforms, many <strong>of</strong> which are deployed in support <strong>of</strong> the Global War on Terrorism. The PRTS, 2<br />

GHz Signal Generator, 26.5 GHz Signal Generator and Radio Test Set provide capabilities required for support <strong>of</strong> the <strong>Army</strong>'s current and future forces. Lack <strong>of</strong> these capabilities will impact unit<br />

readiness levels and incur unnecessary risks for <strong>Army</strong> personnel and equipment.<br />

FY2008 Global War on Terrorism (GWOT) Request: Procures additional quantities <strong>of</strong> the PRTS IFF Mode 5 Upgrade, Radio Test Set and 2 GHz Signal Generator to replace obsolete equipment in<br />

Active <strong>Army</strong> and National Guard units in support <strong>of</strong> deploying or next deploying forces.<br />

FY2008 Base Appropriation: $19.302 million<br />

FY2008 GWOT Request: $10.840 million<br />

FY2008 GWOT Cost Adjustment Request: $0<br />

FY2008 Total: $30.142 million<br />

N11000 Item No. 178 Page 1 <strong>of</strong> 5 Exhibit P-40<br />

TEST EQUIPMENT MODERNIZATION (TEMOD) 291 Budget Item Justification Sheet


TEST EQUIPMENT MODERNIZATION (TEMOD)<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

TEST EQUIPMENT MODERNIZATION (TEMOD) (N11000)<br />

N11000<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

F2008 BASE APPROPRIATION<br />

Portable Radar Test Set Upgrade A 3500 700 5<br />

Radio Test Set A 6930 630 11<br />

2 GHz Signal Generator A 1400 200 7<br />

26.5 GHz Signal Generator A 680 20 34<br />

Warranties 785<br />

System Engineering/Program Mgmt 2008<br />

Contractor Engineering/Support 283<br />

<strong>Other</strong> Government Agencies 937<br />

New Equipment Training 300<br />

Quality Assurance 100<br />

Maintenance Fixtures 200<br />

Publications 425<br />

Initial Spares 1289<br />

Fielding 465<br />

SUBTOTAL 19302<br />

FY2008 GWOT REQUEST<br />

Portable Radar Test Set Upgrade (Supp) A 1500 300 5<br />

Radio Test Set (Supp) A 4070 370 11<br />

2 GHz Signal Generator (Supp) A 4445 635 7<br />

Warranties (Supp) 652<br />

Fielding (Supp) 173<br />

SUBTOTAL 10840<br />

Total: 30142<br />

N11000 Item No. 178 Page 2 <strong>of</strong> 5 Exhibit P-5<br />

TEST EQUIPMENT MODERNIZATION (TEMOD) 292 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

TEST EQUIPMENT MODERNIZATION (TEMOD)<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

Portable Radar Test Set Upgrade<br />

FY 2008<br />

TBS-1<br />

TBD<br />

Radio Test Set<br />

FY 2008<br />

TBS-2<br />

TBD<br />

2 GHz Signal Generator<br />

FY 2008<br />

TBS-3<br />

TBD<br />

26.5 GHz Signal Generator<br />

FY 2008<br />

TBS-4<br />

TBD<br />

Portable Radar Test Set Upgrade (Supp)<br />

FY 2008<br />

TBS-1<br />

TBD<br />

Radio Test Set (Supp)<br />

FY 2008<br />

TBS-2<br />

TBD<br />

2 GHz Signal Generator (Supp)<br />

FY 2008<br />

TBS-3<br />

TBD<br />

P-1 Line Item Nomenclature:<br />

TEST EQUIPMENT MODERNIZATION (TEMOD) (N11000)<br />

N11000<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

C/FP(5) AMCOM Nov 07 May 08 700 5 Y Jun 07<br />

C/FP(2/7) AMCOM Jan 08 Oct 08 630 11 Y<br />

C/FP(1/7) AMCOM Jan 08 Mar 09 200 7 Y<br />

C/FP(7) AMCOM Mar 08 Jan 09 20 34 N Apr-07 Oct-07<br />

C/FP(5) AMCOM Nov 07 Oct 08 300 5 Y<br />

C/FP(2/7) AMCOM Jan 08 Apr 09 370 11 Y<br />

C/FP(1/7) AMCOM Jan 08 May 09 635 7 Y<br />

REMARKS:<br />

N11000 Item No. 178 Page 3 <strong>of</strong> 5 Exhibit P-5a<br />

TEST EQUIPMENT MODERNIZATION (TEMOD) 293 Budget <strong>Procurement</strong> History and Planning


TEST EQUIPMENT MODERNIZATION (TEMOD)<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

TEST EQUIPMENT MODERNIZATION (TEMOD) (N11000)<br />

N11000<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Portable Radar Test Set Upgrade<br />

1 FY 08 A 700 0 700 A 120 120 120 120 120 100 0<br />

Radio Test Set<br />

2 FY 08 A 630 0 630 A 100 100 100 100 100 100 30 0<br />

2 GHz Signal Generator<br />

3 FY 08 A 200 0 200 A 70 70 60 0<br />

26.5 GHz Signal Generator<br />

4 FY 08 A 20 0 20 A 20 0<br />

Portable Radar Test Set Upgrade (Supp)<br />

1 FY 08 A 300 0 300 A 20 100 100 80 0<br />

Radio Test Set (Supp)<br />

2 FY 08 A 370 0 370 A 70 100 100 100 0<br />

2 GHz Signal Generator (Supp)<br />

3 FY 08 A 635 0 635 A 10 70 70 70 70 345<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 2855 2855 120 120 120 120 120 220 200 200 200 100 170 170 170 170 170 70 70 345<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 TBS-1, TBD 1440 1440 1440<br />

2 TBS-2, TBD 1440 1440 1440<br />

3 TBS-3, TBD 1440 1440 1440<br />

4 TBS-4, TBD 1440 1440 1440<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 12 1 6 7<br />

Reorder 0 0 0 0<br />

2 Initial 7 8 13 21<br />

Reorder 0 3 9 12<br />

3 Initial 7 8 8 16<br />

Reorder 0 3 14 17<br />

4 Initial 5 5 10 15<br />

Reorder 0 0 0 0<br />

Initial<br />

Reorder<br />

REMARKS<br />

These items are being procured by other<br />

customers from the same production line;<br />

therefore, production breaks do not represent<br />

production breaks at the manufacturers' facilities<br />

and orders lower than the 1-8-5 production rate<br />

are economical.<br />

N11000 Item No. 178 Page 4 <strong>of</strong> 5 Exhibit P-21<br />

TEST EQUIPMENT MODERNIZATION (TEMOD) 294 Production Schedule


TEST EQUIPMENT MODERNIZATION (TEMOD)<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 10 / 11 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

TEST EQUIPMENT MODERNIZATION (TEMOD) (N11000)<br />

N11000<br />

COST ELEMENTS<br />

Fiscal Year 10 Fiscal Year 11<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 10 Calendar Year 11<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Portable Radar Test Set Upgrade<br />

1 FY 08 A 700 700 0<br />

Radio Test Set<br />

2 FY 08 A 630 630 0<br />

2 GHz Signal Generator<br />

3 FY 08 A 200 200 0<br />

26.5 GHz Signal Generator<br />

4 FY 08 A 20 20 0<br />

Portable Radar Test Set Upgrade (Supp)<br />

1 FY 08 A 300 300 0<br />

Radio Test Set (Supp)<br />

2 FY 08 A 370 370 0<br />

2 GHz Signal Generator (Supp)<br />

3 FY 08 A 635 290 345 70 70 70 70 65 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 2855 2510 345 70 70 70 70 65<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 TBS-1, TBD 1440 1440 1440<br />

2 TBS-2, TBD 1440 1440 1440<br />

3 TBS-3, TBD 1440 1440 1440<br />

4 TBS-4, TBD 1440 1440 1440<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 12 1 6 7<br />

Reorder 0 0 0 0<br />

2 Initial 7 8 13 21<br />

Reorder 0 3 9 12<br />

3 Initial 7 8 8 16<br />

Reorder 0 3 14 17<br />

4 Initial 5 5 10 15<br />

Reorder 0 0 0 0<br />

Initial<br />

Reorder<br />

REMARKS<br />

These items are being procured by other<br />

customers from the same production line;<br />

therefore, production breaks do not represent<br />

production breaks at the manufacturers' facilities<br />

and orders lower than the 1-8-5 production rate<br />

are economical.<br />

N11000 Item No. 178 Page 5 <strong>of</strong> 5 Exhibit P-21<br />

TEST EQUIPMENT MODERNIZATION (TEMOD) 295 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

PHYSICAL SECURITY SYSTEMS (OPA3)<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

Date:<br />

P-1 Item Nomenclature<br />

PHYSICAL SECURITY SYSTEMS (OPA3) (MA0780)<br />

MA0780<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 104.2 104.2<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 104.2 104.2<br />

Initial Spares<br />

Total Proc Cost 104.2 104.2<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

Physical Security Systems protect critical assets that are vulnerable to determined, skilled intruders intending to deprive the United States <strong>of</strong> resources or to disrupt the Government during peace<br />

time. Physical Security Systems include the Joint-Services Interior Intrusion Detection System (J-SIIDS), Integrated Commercial Intrusion Detection System (ICIDS), Mobile Detection Assessment<br />

Response System (MDARS), Commercial Intrusion Detection Systems (CIDS), Access Control Point Equipment Program (ACPEP), Lighting Kit, Motion Detector (LKMD), Battlefield Anti-<br />

Intrusion System (BAIS), and Automated Installation Entry (AIE). The goal is to provide security to units, installations and facilities, and to reduce the number <strong>of</strong> soldiers and security guards used<br />

for force protection missions.<br />

Justification:<br />

FY 2008 Baseline: Procures J-SIIDS; installs ICIDS at five sites; procures and fields one MDARS; supports CIDS, AIE site prepration and equipment purchase, and procures and field 268 BAIS.<br />

FY 2008 Global War on Terrorism (GWOT) Cost Adjustment procures forty-two BAIS and supports fielding and training. BAIS provides a capability to small tactical units with enhance force<br />

protection, providing early detection and warning <strong>of</strong> personnel and/or wheeled or tracked vehicles to enhance soldier survivability during defensive and ambush type operations. BAIS provides the<br />

warfighter reliable, lightweight, and rugged force protection. It provides the small units with a man-portable, easily employed, and recoverable security system.<br />

FY 2008 Base Appropriation - $103.018 million<br />

FY 2008 GWOT Request - $.035 million<br />

FY 2008 GWOT Cost Adjustment Request - $1.156 million<br />

FY 2008 Total - $104.209 million<br />

MA0780 Item No. 181 Page 1 <strong>of</strong> 7 Exhibit P-40<br />

PHYSICAL SECURITY SYSTEMS (OPA3) 296 Budget Item Justification Sheet


PHYSICAL SECURITY SYSTEMS (OPA3)<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

PHYSICAL SECURITY SYSTEMS (OPA3) (MA0780)<br />

MA0780<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

FY 2008 Base Appropriation<br />

Standardized Intrusion Detection Systems A 65729<br />

Commercial Intrusion Detection Systems A 9200<br />

<strong>Other</strong> Physical Security Measures Equip A 24089<br />

Battlefield Anti-Intrusion System AN/PRS 4000<br />

FY 2008 GWOT Request<br />

Battlefield Anti-Intrusion System AN/PRS 35<br />

FY 2008 GWOT Cost Adjustment<br />

Battlefield Anti-Intrusion System AN/PRS 1156<br />

Total: 104209<br />

MA0780 Item No. 181 Page 2 <strong>of</strong> 7 Exhibit P-5<br />

PHYSICAL SECURITY SYSTEMS (OPA3) 297 Weapon System Cost Analysis


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

<strong>Other</strong> Physical Security Measures Equip<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

P-1 Item Nomenclature<br />

<strong>Other</strong> Physical Security Measures Equip (MA0783)<br />

MA0780 (MA0783)<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 5.2 5.2<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 5.2 5.2<br />

Initial Spares<br />

Total Proc Cost 5.2 5.2<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

Programs include both access control equipment and force protection, and physical security systems. The access control systems are Access Control Point Equipment Program (ACPEP), Automated<br />

Installation entry (AIE). The tactical systems are Lighting Kit Moition Detector (LKMD), and Battlefield Anti-Intrusion System (BAIS). The ACPEP is focused on the upgrade <strong>of</strong> Access Control<br />

Points (ACP) at all <strong>Army</strong> installations to ensure compliance with the <strong>Army</strong> standard for ACP. Task consist <strong>of</strong> site surveys <strong>of</strong> CONUS and OCONUS installations and the initiation <strong>of</strong> construction<br />

projects and installation <strong>of</strong> physical security equipment (lights, barriers, Intrusion Detection Systems (IDS), Closed Circuit Television (CCTV), Ballistic Rated Guard Booths and Traffic Arms), to<br />

bring all gates into compliance with structural criteria. The AIE focuses on the design <strong>of</strong> an integrated system <strong>of</strong> systems to enhance security through the enrollment <strong>of</strong> authorized personnel and their<br />

vehicles into an automated data system to facilitate the rapid entry onto a military installation, while reducing the requirements and costs for contract security guards. LKMD is a lightweight, manportable,<br />

easily emplaced and recoverable, motion activated device. LKMD provides early warning and illumination to individuals and small units. It increases time to effectively determine<br />

appropriate tactical response. LKMD can be used as an independent/individually employed early warning device or as a part <strong>of</strong> a security concept layer. The Battlefield Anti-Intrusion System<br />

(BAIS) is a compact, modular sensor-warning system that will be used either as a tactical stand alone system or as a supplemental device for other security missions. It replaces the Platoon Early<br />

Warning System (PEWS). The system allows its user to moinitor the battlespace, while gaining and maintaining dominant situational awareness on the battlefield. It provides early warning <strong>of</strong><br />

approaching enemy forces which enhances the commander's ability to decide and react swiftly in a non-linear combat environment.<br />

Justification:<br />

FY 2008 Baseline: Procures ACPEP, AIE, LKMD, BAIS, IDS, CCTV, Ballistic Rated Guard Booths, and Traffic Arms.<br />

FY 2008 Global War On Terriorism (GWOT) Cost Adjustment Request: Procures forty-two BAIS and supports fielding and training. BAIS provides a capability to small tactical units with<br />

enhance force protection, providing early detection and warning <strong>of</strong> personnel and/or wheeled or tracked vehicles to enhance soldier survivability during defensive and ambush type operations. BAIS<br />

provides the warfighter reliable, lightweight, and rugged force protection. It provides the small units with a man-portable, easily employed, and recoverable security system.<br />

FY 2008 Base Appropriation - $4.000 million<br />

FY 2008 GWOT Request - $.035 million<br />

FY 2008 GWOT Cost Adjustment Request - $1.156 million<br />

MA0780 (MA0783) Item No. 181 Page 3 <strong>of</strong> 7 Exhibit P-40<br />

<strong>Other</strong> Physical Security Measures Equip 298 Budget Item Justification Sheet


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

<strong>Other</strong> Physical Security Measures Equip<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

P-1 Item Nomenclature<br />

<strong>Other</strong> Physical Security Measures Equip (MA0783)<br />

MA0780 (MA0783)<br />

Date:<br />

September 2007<br />

FY 2008 Total - $5.191 million<br />

MA0780 (MA0783) Item No. 181 Page 4 <strong>of</strong> 7 Exhibit P-40<br />

<strong>Other</strong> Physical Security Measures Equip 299 Budget Item Justification Sheet


<strong>Other</strong> Physical Security Measures Equip<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

<strong>Other</strong> Physical Security Measures Equip (MA0783)<br />

MA0780 (MA0783)<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000<br />

FY 2008 Base Appropriation<br />

Battlefield Anti-Intrusion System (BAIS) 3680 200 18<br />

System Engineering Technical Assistance 320<br />

FY08 GWOT Cost Adjustment<br />

BAIS GWOT Cost Adjustment 1191 42 28<br />

Total: 5191<br />

MA0780 (MA0783) Item No. 181 Page 5 <strong>of</strong> 7 Exhibit P-5<br />

<strong>Other</strong> Physical Security Measures Equip 300 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

<strong>Other</strong> Physical Security Measures Equip<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

FY 2008 Base Appropriation<br />

Battlefield Anti-Intrusion System (BAIS)<br />

FY 2008<br />

L3 Com<br />

FFP<br />

Camden, NJ<br />

BAIS GWOT Cost Adjustment<br />

FY 2008<br />

L3 Com<br />

FFP<br />

Camden, NJ<br />

P-1 Line Item Nomenclature:<br />

<strong>Other</strong> Physical Security Measures Equip (MA0783)<br />

MA0780 (MA0783)<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

CECOM-AC (Ft.<br />

Monmouth, NJ)<br />

CECOM-AC (Ft.<br />

Monmouth, NJ)<br />

QTY<br />

Units<br />

Unit Cost<br />

$000<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Apr 08 Dec 08 200 18 Yes<br />

Jun 08 Feb 09 42 28 Yes<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS: FY 2008 GWOT Cost Adjustment: Procures 42 BAIS to include fielding and training.<br />

MA0780 (MA0783) Item No. 181 Page 6 <strong>of</strong> 7 Exhibit P-5a<br />

<strong>Other</strong> Physical Security Measures Equip 301 Budget <strong>Procurement</strong> History and Planning


<strong>Other</strong> Physical Security Measures Equip<br />

Production Schedule<br />

M<br />

F<br />

R<br />

FY 08 / 09 BUDGET PRODUCTION SCHEDULE<br />

Exhibit P-21<br />

P-1 ITEM NOMENCLATURE<br />

<strong>Other</strong> Physical Security Measures Equip (MA0783)<br />

MA0780 (MA0783)<br />

COST ELEMENTS<br />

Fiscal Year 08 Fiscal Year 09<br />

S<br />

E<br />

FY R<br />

V<br />

PROC<br />

QTY<br />

ACCEP<br />

PRIOR<br />

Units TO<br />

1 OCT<br />

BAL<br />

DUE<br />

AS OF<br />

1 OCT<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

Date:<br />

September 2007<br />

Calendar Year 08 Calendar Year 09<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

Battlefield Anti-Intrusion System (BAIS)<br />

1 FY 08 A 200 0 200 A 100 100 0<br />

BAIS GWOT Cost Adjustment<br />

1 FY 08 A 42 0 42 A 42 0<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

Later<br />

Total 242 242 100 100 42<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

O<br />

C<br />

T<br />

N<br />

O<br />

V<br />

D<br />

E<br />

C<br />

J<br />

A<br />

N<br />

F<br />

E<br />

B<br />

M<br />

A<br />

R<br />

A<br />

P<br />

R<br />

M<br />

A<br />

Y<br />

J<br />

U<br />

N<br />

J<br />

U<br />

L<br />

A<br />

U<br />

G<br />

S<br />

E<br />

P<br />

M PRODUCTION RATES<br />

F Reached<br />

R Name - Location MIN 1-8-5 MAX D+<br />

1 L3 Com, Camden, NJ 100 150 200<br />

ADMIN LEAD TIME MFR TOTAL<br />

MFR Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct<br />

1 Initial 0 6 8 14<br />

Reorder 0 8 8 16<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

Initial<br />

Reorder<br />

REMARKS<br />

MA0780 (MA0783) Item No. 181 Page 7 <strong>of</strong> 7 Exhibit P-21<br />

<strong>Other</strong> Physical Security Measures Equip 302 Production Schedule


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

MODIFICATION OF IN-SVC EQUIPMENT (OPA-3)<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

Date:<br />

P-1 Item Nomenclature<br />

MODIFICATION OF IN-SVC EQUIPMENT (OPA-3) (MA4500)<br />

MA4500<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 81.2 81.2<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 81.2 81.2<br />

Initial Spares<br />

Total Proc Cost 81.2 81.2<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

This budget line funds OPA-3 modifications <strong>of</strong> in-service equipment programs. It is used to procure hardware, materials, and hardware installation cost required to complete the modification.<br />

Modifications are performed to correct safety deficiencies, increase mission capabilities, extend the useful life, improve supportability, upgrade existing technology, increase efficiency, improve<br />

readiness and to meet new legal and regulatory requirements. By modifying existing equipment, the <strong>Army</strong> maintains a ready, supportable inventory <strong>of</strong> equipment that meets current requirements and<br />

regulations at a cost considerably below that <strong>of</strong> buying new equipment.<br />

Justification:<br />

FY2008 Baseline: Procures modification to <strong>Army</strong> watercraft; continues Construction Equipment (CE) and Material Handling Equipment (MHE) technical insertion modifications; funds miillimeter<br />

wave (MMW) obscuration kits; M56 Smoke Generator systems to allow addition <strong>of</strong> armor; continue Self Contained Breathing Apparatus; modifications to the Logistics Support Vessel (LSV), and<br />

Modular Causeway System (MCS).<br />

FY08 Global War on Terrorism (GWOT) Request: Procures additional technical insertion modifications to MHE to prosecute the GWOT.<br />

FY08 GWOT Cost Adjustment procures additional modifications to the LCU 2000 and LSV to extend the service life <strong>of</strong> affected systems, gain critically required operational improvements, and<br />

maintain compliance with new federal legal mandates in the areas <strong>of</strong> safety and environmental protection.<br />

FY08 Base Appropriation - $58.223 million<br />

FY08 GWOT Request - $ 4.620 million<br />

FY08 GWOT Cost Adjustment Request - $18.387 million<br />

FY08 Total - $81.230 million<br />

MA4500 Item No. 183 Page 1 <strong>of</strong> 9 Exhibit P-40<br />

MODIFICATION OF IN-SVC EQUIPMENT (OPA-3) 303 Budget Item Justification Sheet


Exhibit P-40M<br />

Budget Item Justification Sheet<br />

Exhibit P-40M, Budget Item Justification Sheet<br />

MODIFICATION OF IN-SVC EQUIPMENT (OPA-3)<br />

MA4500<br />

Appropriation / Budget Activity / Serial No:<br />

P-1 Item Nomenclature<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment MODIFICATION OF IN-SVC EQUIPMENT (OPA-3) (MA4500)<br />

Date:<br />

September 2007<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

Description<br />

Fiscal Years<br />

OSIP No. Classification 2006 & PR FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TC Total<br />

Landing Craft Mechanized 8<br />

1 - PEO CS&CSS Equip. Upgrade 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0<br />

Landing Craft Utility<br />

3-PEO CS&CSS Equip. Upgrade 0.0 0.0 9.8 0.0 0.0 0.0 0.0 0.0 0.0 9.8<br />

Landing Craft Utility-C4I Kits<br />

PEO-CS&CSS Equipment Upgrade 0.0 0.0 13.2 0.0 0.0 0.0 0.0 0.0 0.0 13.2<br />

Uniform National Discharge Standards (UNDS)<br />

PEO CS&CSS Equip. Upgrade 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0<br />

Logistics Support Vessel<br />

5-PEO CS&CSS Equip. Upgrade 0.0 0.0 13.7 0.0 0.0 0.0 0.0 0.0 0.0 13.7<br />

M9 ACE SIP<br />

6-PEO CS&CSS Readiness 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0<br />

Petroleum/Water Systems<br />

7-PEO CS&CSS Equip Upgrade 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0<br />

Force Provider<br />

8 - PEO CS&CSS Equip. Upgrade 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0<br />

Large Tug<br />

9 - PEO CS&CSS Equip. Upgrade 0.0 0.0 10.0 0.0 0.0 0.0 0.0 0.0 0.0 10.0<br />

Millimeter Wave<br />

10- JPEOCBD Modernization 0.0 0.0 3.4 0.0 0.0 0.0 0.0 0.0 0.0 3.4<br />

Food Sanitation Center<br />

11- PEO CS&CSS Equip. Upgrade 0.0 0.0 5.2 0.0 0.0 0.0 0.0 0.0 0.0 5.2<br />

12-Head Shower<br />

12 - PEO CS&CSS Equip. Upgrade 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0<br />

Construction Equipment Tech Insertion<br />

13-PEO CS&CSS Tech Insertion 0.0 0.0 7.1 0.0 0.0 0.0 0.0 0.0 0.0 7.1<br />

Containerized Chapel<br />

14 - PEO CS&CSS Equip. Upgrade 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0<br />

MA4500 Item No. 183 Page 2 <strong>of</strong> 9 Exhibit P-40M<br />

MODIFICATION OF IN-SVC EQUIPMENT (OPA-3) 304 Budget Item Justification Sheet


Exhibit P-40M<br />

Budget Item Justification Sheet<br />

Exhibit P-40M, Budget Item Justification Sheet<br />

MODIFICATION OF IN-SVC EQUIPMENT (OPA-3)<br />

MA4500<br />

Appropriation / Budget Activity / Serial No:<br />

P-1 Item Nomenclature<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment MODIFICATION OF IN-SVC EQUIPMENT (OPA-3) (MA4500)<br />

Date:<br />

September 2007<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

Description<br />

Fiscal Years<br />

OSIP No. Classification 2006 & PR FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TC Total<br />

Modern Burner Unit (MBU)<br />

15 - PEO CS&CSS Modernization 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0<br />

MHE Technical Insertion<br />

16-PEO CS&CSS Technical Insertion 0.0 0.0 5.6 0.0 0.0 0.0 0.0 0.0 0.0 5.6<br />

Self Contained Breathing Apparatus<br />

0-00-00-0000 Equipment Upgrade 0.0 0.0 2.2 0.0 0.0 0.0 0.0 0.0 0.0 2.2<br />

Barge Derrick<br />

0-00-00-0000 New Equipment 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0<br />

Blue Force Tracking<br />

0-00-00-0000 Equipment Upgrade 0.0 0.0 10.0 0.0 0.0 0.0 0.0 0.0 0.0 10.0<br />

Small Tug<br />

0-00-00-0000 Equipment Upgrade 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0<br />

Totals 0.0 0.0 81.2 0.0 0.0 0.0 0.0 0.0 0.0 81.2<br />

MA4500 Item No. 183 Page 3 <strong>of</strong> 9 Exhibit P-40M<br />

MODIFICATION OF IN-SVC EQUIPMENT (OPA-3) 305 Exhibit P-40M, Budget Item Justification Sheet


MODIFICATION TITLE: Landing Craft Utility-C4I Kits [MOD 3] PEO-CS&CSS<br />

MODELS OF SYSTEM AFFECTED: Landing Craft Utility<br />

Exhibit P-3A<br />

Individual Modification<br />

INDIVIDUAL MODIFICATION Date: September 2007<br />

DESCRIPTION / JUSTIFICATION:<br />

This upgrade will allow these vessels to continue to meet federal maritime and safety standards and assure interoperability across the services. Equipment will upgrade<br />

communications, electronics and navigational (C4I) capability matching other services and most importantly bringing craft into compliance with updates to Maritime C4I<br />

regulations. The project applies to A2 vessels which are ocean-going vessels. The LCU is classified as an A2 vessel. The LCU fleet has been issued a Safety <strong>of</strong> Use Message<br />

(SOUM)#05-011 involving its C4I components. Two C4I kits will be installed on each LCU consisting <strong>of</strong> a Safety-Communication upgrade and an Operational-Navigational kit.<br />

Supplemental will procure SOUM C4ISR upgrades for 7 currently non-mission capable LCU 2000 Vessels and non-C4ISR modifications. These vessels support CENTCOM<br />

OP/CONPLANS and are capable <strong>of</strong> transporting 5 M1A2 Tanks or 24 twenty-foot containers up to 6500 nautical miles. Receipt <strong>of</strong> these supplemental funds will accelerate the<br />

installation <strong>of</strong> these kits in the LCU and shorten the planned completion date. These funds will also provide a modificaiton to the Logistics Support Vessel (LSV).<br />

DEVELOPMENT STATUS / MAJOR DEVELOPMENT MILESTONE(S):<br />

MILESTONES PLANNED ACCOMPLISHED<br />

1st Kit <strong>Procurement</strong> 2Q/05 4Q/05<br />

1st Kit Application 3Q/05 4Q/05<br />

MILESTONES PLANNED<br />

Kit <strong>Procurement</strong> FY05-11<br />

Kit Application FY05-11<br />

Installation Schedule<br />

Pr Yr FY 2007 FY 2008 FY 2009 FY 2010 FY 2011<br />

Totals 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

Inputs 4 7 7<br />

Outputs 3 4 7 7<br />

FY 2012 FY 2013 FY 2014 FY 2015 To Totals<br />

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Complete<br />

Inputs 18<br />

Outputs 21<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 months PRODUCTION LEADTIME: 3 months<br />

Contract Dates: FY 2008 - FY 2009 - FY 2010 -<br />

Delivery Dates: FY 2008 - FY 2009 - FY 2010 -<br />

MA4500 Item No. 183 Page 4 <strong>of</strong> 9 Exhibit P-3A<br />

MODIFICATION OF IN-SVC EQUIPMENT (OPA-3) 306 Individual Modification


MODIFICATION TITLE (cont): Landing Craft Utility-C4I Kits [MOD 3] PEO-CS&CSS<br />

FINANCIAL PLAN: ($ in Millions)<br />

RDT&E<br />

<strong>Procurement</strong><br />

Kit Quantity<br />

FY 2006<br />

Exhibit P-3A<br />

Individual Modification<br />

INDIVIDUAL MODIFICATION Date: September 2007<br />

and Prior 2007 2008 2009 2010 2011 2012 2013 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

Operational-Navigational 7 2.8 7 2.8<br />

Safety-Communication 7 1.4 7 1.4<br />

Equipment 4.9 4.9<br />

LCU Non C4I 7 2.2 7 2.2<br />

Equipment, Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

Program Support<br />

Interim Contractor Support<br />

Installation <strong>of</strong> Hardware<br />

FY 2005 & Prior Equip -- Kits<br />

FY 2006 -- Kits<br />

FY 2007 Equip -- Kits<br />

FY 2008 Equip -- Kits<br />

FY 2009 Equip -- Kits 14 1.9 14 1.9<br />

FY 2010 Equip -- Kits<br />

FY 2011 Equip -- Kits<br />

FY 2012 Equip -- Kits<br />

TC Equip- Kits<br />

Total Installment 0 0.0 0 0.0 14 1.9 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 14 1.9<br />

Total <strong>Procurement</strong> Cost 0.0 0.0 13.2 0.0 0.0 0.0 0.0 0.0 0.0 13.2<br />

MA4500 Item No. 183 Page 5 <strong>of</strong> 9 Exhibit P-3A<br />

MODIFICATION OF IN-SVC EQUIPMENT (OPA-3) 307 Individual Modification


MODIFICATION TITLE: Logistics Support Vessel [MOD 5] 5-PEO CS&CSS<br />

MODELS OF SYSTEM AFFECTED: Logistics Support Vessel (LSV)<br />

Exhibit P-3A<br />

Individual Modification<br />

INDIVIDUAL MODIFICATION Date: September 2007<br />

DESCRIPTION / JUSTIFICATION:<br />

This program <strong>of</strong> system modifications will correct safety and operational shortcommings identified by the user community and the combat developer. It will also include changes<br />

that will bring the vessels into compliance with Ozone Depleting Chemical(ODC) requirements and correct technical and operational deficiencies. Examples are: the black iron<br />

piping in the fire main and bilge/ballast systems below the water line will be replaced with copper-nickel piping. The original black piping has exceeded the design life and is<br />

degrading the fire fighting capability <strong>of</strong> the vessels and impacting the water tight integrity <strong>of</strong> the main engine room. In the latter On Condition Cyclic Maintenance (OCCM)<br />

cycles the remaining black iron piping above the water line will be replaced. Class II ODC refrigerants will be eliminated in the larger refrigerating systems-air conditioning and<br />

walk in freezers and refrigerators. Commercial availability <strong>of</strong> these refrigerants will be sharply reduced after 2010. LSV hull 06 will have the CO2 fixed fire fighting systems<br />

replaced with FM-200 systems. This will make all the vessels have the same fire fighting systems configuration. LSV 4 will have C4I equipment installed. The commercial doors<br />

in the hull exterior and interior will be replaced with Navy standard quick acting water tight doors. The work boat on the LSV will be replaced with a rescue boat and the<br />

associated hardware as well. The <strong>Army</strong> has a total <strong>of</strong> six LSV vessels in the current fleet with an additional two vessels to be added in 3rd QTR FY07. These planned kit<br />

modifications are in addition to the kits applied to these same six vessels in prior years. These modifications increase service life <strong>of</strong> the fleet, enhance capability, and meet<br />

compliance with United States Coast Guard safety and Environmental Protection Agency regulations.<br />

DEVELOPMENT STATUS / MAJOR DEVELOPMENT MILESTONE(S):<br />

MILESTONES PLANNED<br />

Kit <strong>Procurement</strong> FY99-12<br />

Kit Application FY99-12<br />

Installation Schedule<br />

Pr Yr FY 2007 FY 2008 FY 2009 FY 2010 FY 2011<br />

Totals 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

Inputs 1<br />

Outputs 1<br />

FY 2012 FY 2013 FY 2014 FY 2015 To Totals<br />

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Complete<br />

Inputs 1<br />

Outputs 1<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 6 months PRODUCTION LEADTIME: 5 months<br />

Contract Dates: FY 2008 - FY 2009 - FY 2010 - Apr 08<br />

Delivery Dates: FY 2008 - FY 2009 - FY 2010 - Sep 08<br />

MA4500 Item No. 183 Page 6 <strong>of</strong> 9 Exhibit P-3A<br />

MODIFICATION OF IN-SVC EQUIPMENT (OPA-3) 308 Individual Modification


MODIFICATION TITLE (cont): Logistics Support Vessel [MOD 5] 5-PEO CS&CSS<br />

FINANCIAL PLAN: ($ in Millions)<br />

RDT&E<br />

<strong>Procurement</strong><br />

Safety Kit<br />

C4I Kit<br />

FY 2006<br />

Exhibit P-3A<br />

Individual Modification<br />

INDIVIDUAL MODIFICATION Date: September 2007<br />

and Prior 2007 2008 2009 2010 2011 2012 2013 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

Operational/Environmental-<br />

1 13.7 1 13.7<br />

Black Pipe<br />

Operational-Dynamic<br />

Positioning<br />

Operational-Bow Visor &<br />

Ramp<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

<strong>Other</strong><br />

Program Management<br />

Installation <strong>of</strong> Hardware<br />

FY 2005 & Prior Equip -- Kits<br />

FY 2006 -- Kits<br />

FY 2007 Equip -- Kits<br />

FY2010 Equip-Kits<br />

FY2011 Equip-Kits<br />

Total Installment 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0<br />

Total <strong>Procurement</strong> Cost 0.0 0.0 13.7 0.0 0.0 0.0 0.0 0.0 0.0 13.7<br />

MA4500 Item No. 183 Page 7 <strong>of</strong> 9 Exhibit P-3A<br />

MODIFICATION OF IN-SVC EQUIPMENT (OPA-3) 309 Individual Modification


MODIFICATION TITLE: MHE Technical Insertion [MOD 16] 16-PEO CS&CSS<br />

MODELS OF SYSTEM AFFECTED: Rough Terrain Container Handler(RTCH)<br />

Exhibit P-3A<br />

Individual Modification<br />

INDIVIDUAL MODIFICATION Date: September 2007<br />

DESCRIPTION / JUSTIFICATION:<br />

This funding modifies Materiel Handling Equipment (MHE) in support <strong>of</strong> force structure changes and provides fixes to field reported problems. Requirement: Kalmar Rough<br />

Terrain Container Handler (USAAA Report A-2005-0159) - Provides new Tier III engines for the Kalmar RTCH, parts, direct labor and travel expenses.<br />

DEVELOPMENT STATUS / MAJOR DEVELOPMENT MILESTONE(S):<br />

Kit <strong>Procurement</strong>: FY08<br />

Kit Application: FY08 and out<br />

Equipment Upgrade: FY08 and out<br />

Installation Schedule<br />

Pr Yr FY 2007 FY 2008 FY 2009 FY 2010 FY 2011<br />

Totals 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

Inputs 92<br />

Outputs 21 21 21 21 8<br />

FY 2012 FY 2013 FY 2014 FY 2015 To Totals<br />

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Complete<br />

Inputs 92<br />

Outputs 92<br />

METHOD OF IMPLEMENTATION: Contractor ADMINISTRATIVE LEADTIME: 9 months PRODUCTION LEADTIME: 1 months<br />

Contract Dates: FY 2008 - FY 2009 - Jul 08 FY 2010 -<br />

Delivery Dates: FY 2008 - FY 2009 - Aug 08 FY 2010 -<br />

MA4500 Item No. 183 Page 8 <strong>of</strong> 9 Exhibit P-3A<br />

MODIFICATION OF IN-SVC EQUIPMENT (OPA-3) 310 Individual Modification


MODIFICATION TITLE (cont): MHE Technical Insertion [MOD 16] 16-PEO CS&CSS<br />

Exhibit P-3A<br />

Individual Modification<br />

INDIVIDUAL MODIFICATION Date: September 2007<br />

FINANCIAL PLAN: ($ in Millions)<br />

FY 2006<br />

and Prior 2007 2008 2009 2010 2011 2012 2013 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

<strong>Procurement</strong><br />

Kit Quantity 92 5.6 92 5.6<br />

Installation Kits<br />

Installation Kits, Nonrecurring<br />

Equipment<br />

Equipment, Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

<strong>Other</strong><br />

Interim Contractor Support<br />

Installation <strong>of</strong> Hardware<br />

FY 2005 & Prior Equip -- Kits<br />

FY 2006 -- Kits<br />

FY 2007 Equip -- Kits<br />

FY 2008 Equip -- Kits<br />

FY 2009 Equip -- Kits<br />

FY 2010 Equip -- Kits<br />

FY 2011 Equip -- Kits<br />

FY 2012 Equip -- Kits<br />

TC Equip- Kits<br />

Total Installment 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0<br />

Total <strong>Procurement</strong> Cost 0.0 0.0 5.6 0.0 0.0 0.0 0.0 0.0 0.0 5.6<br />

MA4500 Item No. 183 Page 9 <strong>of</strong> 9 Exhibit P-3A<br />

MODIFICATION OF IN-SVC EQUIPMENT (OPA-3) 311 Individual Modification


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

BUILDING, PRE-FAB, RELOCATABLE<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

Date:<br />

P-1 Item Nomenclature<br />

BUILDING, PRE-FAB, RELOCATABLE (MA9160)<br />

MA9160<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 134.5 134.5<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 134.5 134.5<br />

Initial Spares<br />

Total Proc Cost 134.5 134.5<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

Pre-Fabricated Relocatable buildings provide temporary facilities in support <strong>of</strong> initial combat training.<br />

Justification:<br />

FY 2008 Global War on Terrorism (GWOT) Cost Adjustment funds Pre-Fabricated Relocatable buildings in direct support <strong>of</strong> FY08 Training Load increases at Ft Benning, Ft Gordon, Ft Sill, Ft<br />

Leonard Wood, and Ft Knox due to the increase in <strong>Army</strong> end strength to execute the GWOT. Funds support the procurement <strong>of</strong> relocatable barracks, admin facilities, dining facilities, and classroom<br />

facilities.<br />

FY 2008 Base Appropriation: $ 0.000 million<br />

FY 2008 GWOT Request: $ 0.000 million<br />

FY GWOT Cost Adjustment: $134.469 million<br />

FY 2008 Total: $134.469 million<br />

MA9160 Item No. 185 Page 1 <strong>of</strong> 2 Exhibit P-40<br />

BUILDING, PRE-FAB, RELOCATABLE 312 Budget Item Justification Sheet


BUILDING, PRE-FAB, RELOCATABLE<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

BUILDING, PRE-FAB, RELOCATABLE (MA9160)<br />

MA9160<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000<br />

Fort Benning 9163<br />

Fort Gordon 36548<br />

Fort Knox 37371<br />

Fort Leonard Wood 44669<br />

Fort Sill 6718<br />

Total: 134469<br />

MA9160 Item No. 185 Page 2 <strong>of</strong> 2 Exhibit P-5<br />

BUILDING, PRE-FAB, RELOCATABLE 313 Weapon System Cost Analysis


Budget Item Justification Sheet<br />

Exhibit P-40, Budget Item Justification Sheet<br />

Exhibit P-40<br />

Appropriation / Budget Activity / Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

AMC CRITICAL ITEMS OP A3<br />

Program Elements for Code B Items: Code: <strong>Other</strong> Related Program Elements:<br />

P-1 Item Nomenclature<br />

AMC CRITICAL ITEMS OPA3 (G01001)<br />

G01001<br />

Date:<br />

September 2007<br />

Prior Years FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 To Complete Total Prog<br />

Proc Qty<br />

Gross Cost 138.7 138.7<br />

Less PY Adv Proc<br />

Plus CY Adv Proc<br />

Net Proc P1 138.7 138.7<br />

Initial Spares<br />

Total Proc Cost 138.7 138.7<br />

Flyaway U/C<br />

Weapon System Proc U/C<br />

Description:<br />

The <strong>Army</strong> Material Command (AMC) identified approximately 1,800 small <strong>Table</strong> <strong>of</strong> Organizational Equipment (TOE) items with identifiable line item numbers (LINs) that have valid unit<br />

requirements and support <strong>Army</strong> force generation and contingency operation requirements. The majority <strong>of</strong> the LINs are in the sustainment phase <strong>of</strong> their life cycle and are no longer being acquired<br />

by the <strong>Army</strong>. In some cases there is still a warm production base because <strong>of</strong> commercial, FMS, or other service demand. The <strong>Army</strong> prioritized these items and determined that the systems requested<br />

herein are key to supporting current operations and transformation <strong>of</strong> the <strong>Army</strong> in support <strong>of</strong> the <strong>Army</strong> Campaign Plan.<br />

Failure to fund these items will result in incomplete fills <strong>of</strong> APS sets for our HBCTs/IBCTs.<br />

Justification:<br />

FY08 Global War on Terrorism (GWOT) Cost Adjustment funds equipment for <strong>Army</strong> Pre-positioned Stock Afloat (APS-3) and <strong>Army</strong> Pre-positioned Stock Southwest Asia (APS-5) that was<br />

released to support current operations in SWA or other contingency requirements where the Department <strong>of</strong> the <strong>Army</strong> (DA) directed release <strong>of</strong> APS-3/5 equipment. <strong>Procurement</strong> action will be used<br />

as part <strong>of</strong> the <strong>Army</strong> effort to reconstitute APS-3/APS-5 Heavy Brigade Combat Team/Interim Brigade Combat Team (HBCT/IBCT) equipment for future contingency operations.<br />

FY08 Base Appropriation - $7.000 million<br />

FY08 GWOT Request - $0 million<br />

FY08 GWOT Cost Adjustment Request - $131.740 million<br />

FY08 Total - $138.740 million<br />

G01001 Item No. 187 Page 1 <strong>of</strong> 3 Exhibit P-40<br />

AMC CRITICAL ITEMS OPA3 314 Budget Item Justification Sheet


AMC CRITICAL ITEMS OP A3<br />

Exhibit P-5, Weapon OPA3 Cost Analysis<br />

Exhibit P-5<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong> / 3 / <strong>Other</strong> support equipment<br />

Weapon System Cost Analysis<br />

P-1 Line Item Nomenclature:<br />

AMC CRITICAL ITEMS OPA3 (G01001)<br />

G01001<br />

Weapon System Type:<br />

Date:<br />

September 2007<br />

OPA3<br />

ID FY 06 FY 07 FY 08 FY 09<br />

Cost Elements<br />

CD Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost Total Cost Qty Unit Cost<br />

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000<br />

Artillery Shop Set B<br />

Air Conditioner B<br />

APS 3 B 35746<br />

APS 5 B 102994<br />

Total: 138740<br />

G01001 Item No. 187 Page 2 <strong>of</strong> 3 Exhibit P-5<br />

AMC CRITICAL ITEMS OPA3 315 Weapon System Cost Analysis


Exhibit P-5a<br />

Budget <strong>Procurement</strong> History and Planning<br />

AMC CRITICAL ITEMS OP A3<br />

Exhibit P-5a, Budget <strong>Procurement</strong> History and Planning<br />

Appropriation/Budget Activity/Serial No:<br />

<strong>Other</strong> <strong>Procurement</strong>, <strong>Army</strong>/ 3/ <strong>Other</strong> support equipment<br />

Weapon System Type:<br />

WBS Cost Elements: Contractor and Location Contract<br />

Method and<br />

Type<br />

APS 3<br />

FY 2008<br />

TBS<br />

TBS<br />

APS 5<br />

FY 2008<br />

TBS<br />

TBS<br />

P-1 Line Item Nomenclature:<br />

AMC CRITICAL ITEMS OPA3 (G01001)<br />

G01001<br />

Location <strong>of</strong> PCO Award Date Date <strong>of</strong> First<br />

Delivery<br />

QTY<br />

Each<br />

Unit Cost<br />

$000<br />

TBD Various No<br />

TBD Various No<br />

Date:<br />

September 2007<br />

Specs<br />

Avail<br />

Now?<br />

Date<br />

Revsn<br />

Avail<br />

RFP<br />

Issue<br />

Date<br />

REMARKS: Items include approximately 500 small <strong>Table</strong> <strong>of</strong> Organizational Equipment (TOE) items with identifiable line item numbers (LINs) that have valid unit requirements and support <strong>Army</strong> force generation and<br />

contingency operation requirements. Items replace equipment for <strong>Army</strong> Pre-positioned Stock Afloat (APS-3) and <strong>Army</strong> Pre-positioned Stock Southwest Asia (APS-5) that was released to support current operations in SWA<br />

or other contingency requirements where the Department <strong>of</strong> the <strong>Army</strong> (DA) directed release <strong>of</strong> APS-3/5 equipment.<br />

G01001 Item No. 187 Page 3 <strong>of</strong> 3 Exhibit P-5a<br />

AMC CRITICAL ITEMS OPA3 316 Budget <strong>Procurement</strong> History and Planning