Mounting The Switch On A Wall; Powering On The Switch - D-Link DGS-1008P User Manual

8-port gigabit unmanaged desktop poe switch
Hide thumbs Also See for DGS-1008P:
Table of Contents

Advertisement

surface. To attach the rubber pads, simply remove the rubber pads from the adhesive strip and stick one pad
on each corner on the bottom panel of the Switch.

Mounting the Switch on a Wall

The DGS-1008P can also be mounted to a wall for more convenient placement. Please follow the instructions
below for more information on how to mount the device to different types of walls.
Mounting the Switch on a hard surface wall (e.g. brick, cement)
1.
Drill two holes that align with the keyholes on the back of the Switch in the wall where you want to mount
the DGS-1008P and place the two included nylon screw anchors into the drilled holes.
2.
Drive the two screws included in this package into the placed nylon anchors.
3.
Hook the mounting keyholes on the back of the Switch onto the screws to secure the device to the wall.
Mounting the Switch on a soft surface wall (e.g. wood)
1.
Drive the two screws included in this package in the wooden wall where you want to mount the DGS-
1008P so that they align with the keyholes on the back of the Switch.
2.
Hook the mounting keyholes on the back of the Switch onto the screws to secure the device to the wall.

Powering on the Switch

After connecting the switch to the network using a compatible network cable such as Cat.4/5/5e, simply
connect the Switch to a power outlet to activate the device.
D-Link Switch User Manual
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents